ILLINOIS POLLUTION CONTROL BOARD
March 2,
1995
IN THE
MATTER
OF:
)
)
PETITION OF ACME STEEL COMPANY
)
AS 94-8
AND LTV STEEL COMPANY FROM
)
(Adjusted Standard-Water/NPDES)
35
ILL.
ADM. CODE 302.211
)
ORDER OF THE BOARD
(by E. Dunham):
This matter
conies before the Board an a “Motion to Amend
Petition” filed on February 23,
1995 by Acme Steel and LTV Steel.
Acme Steel and LTV Steel request to amend the petition to seek
permanent relief instead of an adjusted standard for five years.
The Board hereby grants the motion to amend the petition.
Petitioner has also submitted reports on an instreani fish
survey of the target area of the Calumet River and a temperature
evaluation.
These reports will be included in the record.
A hearing is scheduled in this matter for April
10,
1995.
The Illinois Environmental Protection Agency
(Agency)
filed
its response to the petition on November 28,
1994 along with a
motion to file the response instanter.
The Board grants the
motion to file instanter and accepts the Agency’s response as
filed.
Pursuant to 35 Ill. Adm. Code 106.715 the Agency may
amend its response not later than 30 days subsequent to the
amending of the petition.
Therefore,
any amended response by the
Agency should be filed with the Board on or before March 24,
1995.
IT IS SO ORDERED.
I, Dorothy M.
Gunn,
Clerk of the Illinois Pollution Control
Board,1 hereby certify that the above order was adopted on the
~?‘~--
day
of
___________________,
1995,
by
a vote of
c
//
~
~
~
Dorothy M. ~3nn, Clerk
Illinois Pollution Control Board