    This matter
    conies before the Board an a “Motion to Amend
    Petition” filed on February 23,
    1995 by Acme Steel and LTV Steel.
    Acme Steel and LTV Steel request to amend the petition to seek
    permanent relief instead of an adjusted standard for five years.
    The Board hereby grants the motion to amend the petition.
    Petitioner has also submitted reports on an instreani fish
    survey of the target area of the Calumet River and a temperature
    evaluation.
    These reports will be included in the record.
    A hearing is scheduled in this matter for April
    10,
    1995.
    The Illinois Environmental Protection Agency
    (Agency)
    filed
    its response to the petition on November 28,
    1994 along with a
    motion to file the response instanter.
    The Board grants the
    motion to file instanter and accepts the Agency’s response as
    filed.
    Pursuant to 35 Ill. Adm. Code 106.715 the Agency may
    amend its response not later than 30 days subsequent to the
    amending of the petition.
    Therefore,
    any amended response by the
    Agency should be filed with the Board on or before March 24,
    1995.
    IT IS SO ORDERED.
    I, Dorothy M.
    Gunn,
    Clerk of the Illinois Pollution Control
    Board,1 hereby certify that the above order was adopted on the
    ~?‘~--
    day
    of
    ___________________,
    1995,
    by
    a vote of
    c
    //
    ~
    ~
    ~
    Dorothy M. ~3nn, Clerk
    Illinois Pollution Control Board

    Back to top