ILLINOIS POLLUTION CONTROL BOARD
April
13,
1995
AMERICAN WASTE PROCESSING,
LTD.,)
Petitioner,
PCB 91—38
v.
)
(Permit Appeal
—
RCRA)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by
E.
Dunham):
On April
11,
1995, American Waste Processing filed a status
report in response to the Board order of February
2,
1995.
Petitioner has provided the Board with an open waiver of the
decision deadline in this matter.
After the hearings in this matter were concluded,
the
parties agreed that the petitioner should file a new Part B
application.
A new Part B permit application has been filed by
petitioner and has been accepted for completeness by the Agency.
A copy of a draft permit was provided to American Waste
Processing on April
3,
1995 for comment.
The Agency intends to
issue a draft permit on May
1,
1995.
The parties request that
the Board continue to defer consideration of the record until May
15,
1995.
The Board will continue to defer review of this matter.
As
this matter was originally filed on March
1,
1991 and has been
stayed since September of 1993, the Board anticipates an
expeditious completion of negotiations
in this matter.
The Board
directs the parties to file status reports or a joint status
report on or before May 19,
1995, unless this case is otherwise
resolved or dismissed.
IT IS SO ORDERED.
I,
Dorothy M. Gunn,
Clerk of the Illinois Pollution Control
Board, hereby certify that the above order was adopted on the
/‘:~
day of
_______________,
1995, by a vote of
~
//~
)
•~K~’
~
~
Dorothy M. 4unn,
Clerk
Illinois P&llution Control Board