ILLINOIS POLLUTION CONTROL BOARD
August 24,
1995
CITY OF GREENFIELD,
)
Petitioner,
v.
)
PCB 96-44
)
(Provisional Variance—Water)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by C.
A. Manning):
Pursuant to Section 35(b)
of the Environmental Protection
Act
(Act)
(415 ILCS 5/35(b)), the City of Greenfield has
requested that the Illinois Environmental Protection Agency
(Agency)
recoimnend that the Board grant a provisional variance to
allow the City of Greenfield to continue operating during a
period of repairs to its wastewater treatment facility.
Such
request for a provisional variance and the Notification of
Recommendation were filed with the Board by the Agency on
Wednesday, August 23,
1995.
Pursuant to Section 35(b)
of the
Act, the Board must issue the variance within two
(2) days of
this filing.
Pursuant to Section 35(b)
of the Environmental Protection
Act
(Act)
(415 ILCS 5/35(b)), the Agency, by and through its
Director, Nary A. Gade,
seeks a provisional variance for the City
of Greenfield in order to allow it to continue operating during a
period of repairs to cell #1 of its wastewater treatment facility
lagoon.
Specifically, the Agency recommends that we grant the City
of Greenfield a (forty-five)
45 day provisional variance for its
facility located in Greene County,
from the requirements
pertaining to carbonaceous biochemical oxygen demand
(CBOD5)
and
total suspended solids
(TSS)
as set forth in 35 Iii. Adm. Code
304.120(a)
and 304.141(a),
for the period beginning when the City
of Greenfield begins partial dewatering of cell #1 and continue
for a period not longer than forty-five
(45)-days.
The Agency recommends that the Board grant the requested
provisional variance with specified conditions.
The Agency
agrees that the repairs are necessary.
The Agency anticipates
that the requested provisional variance would have minimal
environmental impact on the receiving stream.
The Agency is
unaware of any public water supplies that the requested
provisional variance would adversely impact.
The Agency
maintains that a grant of a provisional variance would violate no
federal laws.
The Agency finds that a denial of the requested
provisional variance would create an arbitrary or unreasonable
2
hardship on the petitioner.
Provisional variances are by their very nature temporary.
The responsibilities of the Agency and the Board in these short-
term provisional variances are different from the
responsibilities in standard variances.
~
415 ILCS 5/35
(b)
&
36(c)).
In provisional variances it is the responsibility of the
Agency to make the technical determinations and finding of
arbitrary or unreasonable hardship.
The Board’s responsibility
is to adopt a formal order,
to assure the formal maintenance of
the record, to assure the enforceability of the variance, and to
provide notification of the action by a press release.
Having received the Agency recommendation finding that a
denial of the requested relief would impose an arbitrary or
unreasonable hardship, the Board hereby grants the City of
Greenfield a provisional variance from 35 Ill.
Adin.
Code
304.120(a)
and 304.141(a), on the following conditions:
1.
The variance shall commence on the date when the City
of Greenfield begins partial dewatering of cell #1 and
continue for a period not longer than forty-five (45)-days
or until cell #1 of their lagoon
is returned to service,
which ever occurs first;
2.
The petitioner shall notify John Wells of the Agency’s
Springfield Regional office by telephone, at 217/786-6892,
when it begins partial dewatering of cell #1 and when it
returns the cell to service,
and the petitioner shall
confirm this notice in writing within five
(5)
days,
addressed as follows:
Illinois Environmental Protection Agency
Bureau of Water
Wastewater Compliance Assurance Section
2200 Churchill Road
P.O. Box 19276
Springfield, Illinois
62794—9276
Attention:
Mark T. Books
3.
During this provisional variance, the City of
Greenfield shall meet monthly concentration average effluent
limits of 55 milligrams per liter for both CBOD5 and TSS.
Monitoring for those parameters shall be conducted twice per
week;
4.
During this provisional variance, the City of
Greenfield shall operate its wastewater treatment facility
so as to produce the best effluent practicable.
Additionally,
the City of Greenfield shall perform the
necessary repairs as expeditiously as possible so as to
3
minimize the period of time that cell #1 of the lagoon is
out of service.
The City of Greenfield shall execute a copy of a Certificate
of Acceptance of this provisional variance and forward that copy
to the Agency addressed as is the written notice required in the
above condition; the petitioner shall forward that copy within
ten
(10) days of the date of this order of the Board, and the
Certificate of Acceptance shall take the following form:
CERTIFICATION
I
(We),
hereby accept and agree to be bound by all terms
and conditions of the order of the Pollution
Control Board in PCB 96—44, August 24,
1995.
Petitioner
Authorized Agent
Title
Date
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board,
do hereby ce~ifythat the above order was adopted on the
~
day of
~4-~
(~57
,
1995,
by a vote of
~
Dorothy N~3unn, Clerk
Illinois P~bllutionControl Board