ILLINOIS POLLUTION CONTROL BOARD
    January 10, 2002
     
    CITY OF CENTRALIA,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
     
     
     
     
     
    PCB 02-88
    (Variance – Public Water Supply)
    ORDER OF THE BOARD (by R.C. Flemal):
     
    On December 31, 2001, petitioner filed a petition for variance (petition). Petitioner
    requests an 18-month variance from the Interim Enhanced Surface Water Treatment Rule
    incorporated at 35 Ill. Admin. Code 611.740
    et seq.
    . Pursuant to 35 Ill. Adm. Code 104.204,
    petitioner requests a hearing. The Board accepts the matter for hearing.
     
    The Board directs that this matter proceed to hearing as expeditiously as practicable. The
    assigned hearing officer must set the matter for hearing in accordance with the requirements of
    the Environmental Protection Act (415 ILCS 5
    et seq.
    (2000)) and the Board’s procedural rules.
    It is the responsibility of the hearing officer to guide the parties toward prompt resolution of this
    matter, through whatever status calls and hearing officer orders he determines are necessary and
    appropriate. Unless otherwise ordered by the hearing officer, the Illinois Environmental
    Protection Agency recommendation must be filed with the Board within 45 days after the f
    iling
    of the petition (in this instance, February 14, 2002), or where there has been a hearing scheduled,
    at least 30 days before hearing, whichever is earlier.
    See
    35 Ill. Adm. Code 104.216(b).
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on, by a vote of 5-0.
     
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board
     
     
     
     
      
      
      
      
      
      
      
      
     