ILLINOIS POLLUTION CONTROL BOARD
September 20, 2001
DYNEGY MIDWEST GENERATION, INC.
(Wood River Power Station),
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
)
PCB 02-33
(Permit Appeal - Air)
(90-Day Extension)
ORDER OF THE BOARD (by C.A. Manning):
On September 14, 2001, the parties timely filed a joint notice to extend the 35-day period
within which Dynegy Midwest Generation Inc. (Dynegy) may petition to review the construction
permit issued by the Illinois Environmental Protection Agency (Agency).
See
415 ILCS
5/40(a)(1) (2000); 35 Ill. Adm. Code 105.206(c), 105.208(a), (c). The Agency granted Dynegy a
permit to construct an emission reduction project at its facility located at 2828 North Monroe
Street, Decatur, Macon County. The Board extends the appeal period until December 10, 2001,
as the parties request. See 415 ILCS 5/40(a)(1) (2000); 35 Ill. Adm. Code 105.208(a). If the
Agency fails to file an appeal on or before that date, the Board will dismiss this case and close
the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the above
order was adopted on September 20, 2001, by a vote of 6-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board