1 BEFORE THE POLLUTION CONTROL BOARD
    OF THE STATE OF ILLINOIS
    2
    3
    4 IN THE MATTER OF: )
    )
    5 NATURAL GAS-FIRED, PEAK-LOAD ) PCB No. R01-10
    ELECTRICAL POWER GENERATING )
    6 FACILITIES (PEAKER PLANTS) )
    7
    8
    9
    10 Proceedings held on October 5, 2000, at 1:00 p.m., at
    11 the William G. Stratton Building, 401 South Spring
    12 Street, Springfield, Illinois, before Amy L. Jackson,
    13 Hearing Officer.
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23 Reported by: Karen Bristow, CSR, RPR
    CSR License No.: 084-003688
    24
    1

    KEEFE REPORTING COMPANY
    1 APPEARANCES
    2
    3 Board Members present:
    4
    5 Chairman Claire A. Manning
    Board Member Nicholas J. Melas
    6 Board Member G. Tanner Girard
    Board Member Ronald C. Flemal
    7 Board Member Marili McFawn
    Board Member Elena Z. Kezelis
    8 Board Member Samuel T. Lawton, Jr.
    9 Anand Rao, Senior Environmental Scientist
    Alisa Liu, Environmental Scientist
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24

    2
    KEEFE REPORTING COMPANY
    1 INDEX
    2
    3 WITNESS PAGE NUMBER
    4
    5 Roger Finnell 15
    6 John Smith 23
    7 Brent Gregory 29
    8 James R. Monk 36
    9 Patricio Silva 57
    10 Brian Urbaszewski 105
    11 Elliot "Bud" Nesvig 134
    12 Carol Dorge 139
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24

    3
    KEEFE REPORTING COMPANY
    1 EXHIBITS
    2
    3 NUMBER ENTERED
    4
    5 IDOT Exhibit No. 1 19
    6 Monk Exhibit No. 1 36
    7 Monk Exhibit No. 2 36
    8 Gregory Exhibit No. 1 57
    9 American Lung Association Exhibit No. 1 117
    10 Nesvig Exhibit No. 3 133
    11 Nesvig Exhibit No. 4 134
    12 Nesvig Exhibit No. 5 134
    13 Dorge Exhibit No. 1 139
    14 Dorge Exhibit No. 2 139
    15 Dorge Exhibit No. 3 139
    16 Dorge Exhibit No. 4 148
    17
    18
    19
    20
    21
    22
    23
    24

    4
    KEEFE REPORTING COMPANY
    1 PROCEEDINGS
    2 (October 5, 2000; 1:00 p.m.)
    3 HEARING OFFICER JACKSON: I want to welcome
    4 everyone to the final two days of hearing that the board
    5 has scheduled in order to examine the potential
    6 environmental impact of natural gas-fired electrical
    7 power generating facilities, commonly referred to as
    8 peaker plants. My name is Amy Jackson, and I'm the
    9 attorney assistant to Board Member Elena Kezelis, and at
    10 the request of Board Chairman Claire Manning, I'm
    11 serving as the hearing officer for these proceedings.
    12 I'll ask you all to bear with me. I'm fighting a bad
    13 cough and throat thing, so if my voice goes out at some
    14 point during the hearing, please just bear that in mind.
    15 We're very happy to have the entire board present
    16 today, and I want to take a moment to introduce all of
    17 our board members to you. Board Chairman Claire Manning
    18 is immediately behind me.
    19 CHAIRMAN MANNING: Welcome. Good afternoon,
    20 everyone.
    21 HEARING OFFICER JACKSON: To my immediate left is
    22 Board Member Elena Kezelis.
    23 BOARD MEMBER KEZELIS: Good afternoon.
    24 HEARING OFFICER JACKSON: Marili McFawn.

    5
    KEEFE REPORTING COMPANY
    1 BOARD MEMBER MCFAWN: Hello.
    2 HEARING OFFICER JACKSON: And Ronald Flemal.
    3 BOARD MEMBER FLEMAL: Hello.
    4 HEARING OFFICER JACKSON: To my right is Tanner
    5 Girard.
    6 BOARD MEMBER GIRARD: Good afternoon.
    7 HEARING OFFICER JACKSON: Nicholas Melas.
    8 BOARD MEMBER MELAS: Good afternoon.
    9 HEARING OFFICER JACKSON: And up next to Chairman
    10 Manning is Samuel Lawton, Jr.
    11 BOARD MEMBER LAWTON: Good afternoon.
    12 HEARING OFFICER JACKSON: We also have the board's
    13 technical unit present, and they are also sitting up
    14 here at the head tables. Anand Rao is up to my right.
    15 MR. RAO: Hello.
    16 HEARING OFFICER JACKSON: And Alisa Liu is to my
    17 left.
    18 MS. LIU: Hello.
    19 HEARING OFFICER JACKSON: Before I continue with
    20 some brief procedural matters, I will invite Chairman
    21 Manning to make any opening remarks that she has.
    22 Chairman Manning?
    23 CHAIRMAN MANNING: Good afternoon, everyone. Thank

    24 you, Amy. Welcome to this our last two days of
    6
    KEEFE REPORTING COMPANY
    1 scheduled hearing in the board's inquiry hearings
    2 concerning peaker plants. As most of you know-- I see a
    3 lot of familiar faces here this morning-- this
    4 afternoon; a lot of unfamiliar faces as well. Most of
    5 you know, however, that Governor Ryan has asked us to
    6 look into the potential environmental impacts of
    7 proposed peaker plants. He's done this in response to
    8 the myriad of citizens' concerns he's heard throughout
    9 his travels in the state, particularly in the northwest
    10 area of the state. We're happy to be in Springfield
    11 today too to address any concerns that we have downstate
    12 and to address all the remaining concerns during these
    13 last two days of hearing.
    14 The board is especially well-equipped to address
    15 these concerns for the Governor and for interested
    16 members of the General Assembly. That's because-- and
    17 I've explained in previous proceedings-- we're an
    18 independent body of seven technically-qualified
    19 individuals, and our general responsibilities are to
    20 promulgate the State's environmental regulations and to
    21 adjudicate any environmental matters that occur under
    22 the Environmental Protection Act.

    23 The Governor when he issued the letter to me asking
    24 us to engage in these proceedings outlined five specific
    7
    KEEFE REPORTING COMPANY
    1 issue areas, and in terms of the context of this
    2 proceeding, I would like to address those, actually read
    3 those issue areas to you for a full context of this
    4 proceeding.
    5 The first issue is whether peaker plants need to be
    6 regulated more strictly than Illinois current air
    7 quality statutes or regulations provide.
    8 The second issue is whether peaker plants pose a
    9 unique threat or a greater threat than other types of
    10 state-regulated facilities with respect to air
    11 pollution, noise pollution or groundwater or surface
    12 water pollution.
    13 The third question is whether new or expanding
    14 peaker plants should be subject to siting requirements
    15 beyond applicable zoning requirements.
    16 The fourth question is if the board determines that
    17 peaker plants should be more strictly regulated or
    18 restricted, should additional regulations or
    19 restrictions apply to currently permitted facilities or
    20 only to new facilities and expansions.
    21 And finally and lastly, the Governor's asked us to

    22 determine that-- whether-- to determine how other states
    23 regulate or restrict peaker plants.
    24 On each of these questions and in each of these
    8
    KEEFE REPORTING COMPANY
    1 issue areas, the board in the course of five days of
    2 hearing thus far, two days in Chicago and three days in
    3 the suburbs, in the collar counties, have received
    4 excellent information on each of these questions, and I
    5 can assure you that the full board has given its entire
    6 attention to all of the information we've received thus
    7 far.
    8 At the conclusion of this process and probably
    9 around the end of the year, the last board meeting in
    10 December, we're expecting to issue a written
    11 informational order. This order will analyze all of the
    12 information that's been presented in these proceedings
    13 in light of the issue areas outlined by the Governor.
    14 Importantly, the order will set forth the board's
    15 recommendations on whether further state environmental
    16 regulation or legislation is necessary to adequately
    17 protect the environment for the citizens of the state of
    18 Illinois.
    19 Now, for those of you who have been at our other
    20 proceedings, I'm sure you're familiar with the order of

    21 those proceedings. Let me say that Hearing Officer
    22 Jackson is here to ensure that the proceedings are done
    23 in an orderly fashion, giving everyone who wants to the
    24 opportunity to speak, ensuring that the court reporter
    9
    KEEFE REPORTING COMPANY
    1 gets everything recorded accurately for purposes of the
    2 board's publication of this transcript on the Web page
    3 and for our purposes when we review all of this
    4 information so that it's adequately transcribed, and
    5 finally, to give us time-- the board time to ask
    6 whatever questions we think are necessary to ensure that
    7 we have the right information.
    8 Hearing Officer Jackson thus far has done an
    9 excellent job at maintaining order and keeping these
    10 proceedings fair, and I commend her for that, and I now
    11 turn the rest of the proceedings over to her very
    12 capable and qualified hands.
    13 HEARING OFFICER JACKSON: Thank you, Chairman
    14 Manning. For those of who you have been following this
    15 process, you know that we have already held a number of
    16 hearings. Those have been held in downtown Chicago,
    17 Naperville, Joliet and Grayslake. You also know that we
    18 are maintaining much of the information we receive in
    19 this proceeding on the board's Web site. All prefiled

    20 testimony, public comments, hearing transcripts, board
    21 opinions and orders and hearing officer orders are
    22 currently maintained on the board's Web site. For those
    23 of you who do not know the address of that Web site, I
    24 will give it to you now. It is www.ipcb.state.il.us.
    10
    KEEFE REPORTING COMPANY
    1 Hard copies of any document filed with the board in
    2 this matter may also be obtained from the board's
    3 clerk's office, and the board's clerk may be reached at
    4 telephone number 312-814-3620.
    5 We have approximately ten people who have
    6 preregistered to speak today. A list of those persons
    7 is available at the table near the entrance to the
    8 room. There is also a sign-up sheet on that table for
    9 those persons who are interested in addressing the board
    10 either today or tomorrow and who have not already
    11 preregistered with me. Please be aware, however, that
    12 if you do sign up on that sign-in sheet, it may be
    13 tomorrow before we have time to call you for your
    14 comments.
    15 If you are speaking to the board today, when your
    16 name is called, I will ask that you please step
    17 forward. We have a witness table here in front. State
    18 your name clearly for the record and indicate on whose

    19 behalf you are here today to testify. You should bring
    20 with you any documents or exhibits that you would like
    21 to have entered into this matter. If you do have
    22 documents to introduce into the record, you must be
    23 prepared to leave at least one original copy with myself
    24 so the court reporter can mark it as an exhibit in this
    11
    KEEFE REPORTING COMPANY
    1 matter. Any extra copies that you have may be passed
    2 out to the board members today.
    3 Once you have made your statement, any of the board
    4 members or members of the board's technical unit may ask
    5 you questions pertaining to your statement. Please do
    6 not infer any preconceived conclusions or opinions on
    7 the part of the board by the types or number of
    8 questions they might ask. Questions are asked solely in
    9 an attempt to develop a complete and accurate record for
    10 the board to review during its deliberations in this
    11 matter. The board has made no conclusions at this time,
    12 and it will begin its deliberations only after all
    13 information is submitted and the record is closed.
    14 Because the purpose of these inquiry hearings is to
    15 provide the board with an opportunity to gather
    16 information regarding the environmental impact of peaker
    17 plants, only board members and members of the board's

    18 technical unit will be asking questions of witnesses
    19 today and tomorrow. This is an information-gathering
    20 process as opposed to a debate on the pros and cons of
    21 peaker plants. Therefore, no cross-examination or
    22 cross-questioning will be permitted.
    23 Having said that, let me assure you that the board
    24 is interested in hearing what you have to say. If any
    12
    KEEFE REPORTING COMPANY
    1 statements are made today that you feel need to be
    2 expanded upon, clarified or even questioned, we invite
    3 you to do so in one of two ways. Sign up to speak at
    4 either today or tomorrow's hearing, or two, you may
    5 submit your comments in written form to the board's
    6 clerk's office. The public comment process is a very
    7 simple one, and it is explained on the public
    8 information sheet that is at the back of the room and
    9 that has been prepared by the board's public information
    10 officer.
    11 As you can see, we do have a court reporter present
    12 today. She will be transcribing everything that is
    13 said. It is imperative that when you speak, you speak
    14 slowly and clearly so that the court reporter can take
    15 down everything you have said.
    16 We have requested an expedited transcript of this

    17 proceeding, so the transcript will be available in the
    18 board's office within three to five business days of
    19 this proceeding, and as soon as we receive it, we will
    20 ensure that it is posted to our Web site.
    21 One other thing I want to mention is that we do
    22 have a notice list for this matter. Those persons on
    23 the notice list will receive copies of all board
    24 opinions and orders as well as hearing officer orders.
    13
    KEEFE REPORTING COMPANY
    1 There is no obligation for those on the notice list to
    2 serve other persons on the notice list. If you are on
    3 the notice list and file a document with the board, you
    4 need only file the document with the clerk's office. If
    5 you are not on the notice list and would like to be
    6 added, you must contact the following person: Kim
    7 Schroeder, S-C-H-R-O-E-D-E-R. Her telephone number is
    8 area code 217-782-2633, or you can e-mail Kim at
    9 schroedk-- S-C-H-R-O-E-D-K-- @ipcb.state.il.us.
    10 If you have any questions at all that are not
    11 covered by my opening remarks, please feel free to see
    12 Connie Newman at the back of the room. As I mentioned
    13 earlier, she is our public information officer. Connie,
    14 if you want to wave? Thank you. Connie will be more
    15 than happy to try to answer any questions that you might

    16 have.
    17 I do want to mention also that we have a citizens'
    18 group that is videotaping the proceeding today. If any
    19 of the witnesses do not feel comfortable being
    20 videotaped, please let me know and we will turn the
    21 videotape off during your presentation.
    22 Those are the only opening remarks I have right
    23 now. The first witness scheduled to speak to us today
    24 is Mr. Roger Finnell with the Illinois Department of
    14
    KEEFE REPORTING COMPANY
    1 Transportation, and I'll ask you to please step forward
    2 and we will begin.
    3 MR. FINNELL: Good afternoon.
    4 HEARING OFFICER JACKSON: Good afternoon.
    5 MR. FINNELL: My name is Roger Finnell,
    6 F-I-N-N-E-L-L. I'm an engineer with the IDOT Division
    7 of Aeronautics, Bureau of Airport Engineering, and I've
    8 been asked to address the Illinois Pollution Control
    9 Board with a prepared statement, and then I'll follow up
    10 with any questions you might have on that.
    11 On behalf of the Illinois Department of
    12 Transportation, Division of Aeronautics, we thank the
    13 board for the opportunity to comment on the impacts that
    14 peaker electrical generating facilities may have upon

    15 air navigation.
    16 There are several issues associated with electrical
    17 generating facilities that have the potential for
    18 creating an aeronautical safety hazard. The main
    19 aviation concerns associated with peaker plant
    20 developments are as follows: Physical height of the
    21 structure-- including construction equipment--
    22 penetrating critical airspace; emission of visible
    23 discharge obscuring pilot and/or controller vision
    24 within the airport environment; electromagnetic
    15
    KEEFE REPORTING COMPANY
    1 interference with aeronautical, navigational and
    2 communication radio signals; and finally, the exhaust
    3 plume's vertical velocity and its effect on aircraft
    4 structural integrity and aircraft controllability.
    5 The first three issues have been addressed by the
    6 department in our Airport Hazard Zoning Rules.
    7 Presently there are 56 airports which have airport
    8 hazard zoning enacted and enforced by the department.
    9 These rules effectively limit the height of structures
    10 around individual airports as well as address smoke
    11 emissions and electromagnetic interference. They can be
    12 adopted by the department for publicly-owned airports,
    13 but only at the request of the airport sponsor.

    14 Alternatives, publicly-owned airports may adopt their
    15 own hazard zoning rules that apply to hazards partially
    16 or totally within the public owner's territorial limits.
    17 IDOT has not been granted authority under Illinois
    18 statutes to enact airport hazard zoning for
    19 privately-owned open-to-the-public facilities. The only
    20 protection these airports have from structures
    21 encroaching on their airspace is local land use control.
    22 To date, we have not had a peaker plant proposal
    23 violate any airport hazard zoning surface nor create an
    24 adverse electromagnetic or visible plume concern.
    16
    KEEFE REPORTING COMPANY
    1 However, this does not preclude conflicts with future
    2 proposals.
    3 A concern to our office is the impact the vertical
    4 velocity of the plume has on flight safety. The
    5 majority of these plants are a gas turbine-fired-- I'm
    6 sorry-- gas turbine facilities which have relatively
    7 high exhaust velocities and temperatures. While the
    8 exit velocity of the plume dissipates rapidly upon
    9 leaving the stack, the buoyancy of the plume due to its
    10 heat still causes a significant vertical velocity
    11 several hundred feet above the point of discharge.
    12 The situation where this is an aeronautical issue

    13 is if the plant is within the traffic pattern to the
    14 airport. While pattern size is dependent on the speed
    15 and number of aircraft within the traffic pattern, the
    16 lateral dimensions of the pattern are usually within a
    17 mile of the airport. If a generating facility is within
    18 this area, it can result in arriving or departing
    19 aircraft passing only a few hundred feet over the
    20 smokestack of the facility.
    21 We have entered into discussions with Federal
    22 Aviation Administration and manufacturers of general
    23 aviation aircraft to find out what the effect of flight
    24 into an exhaust plume would have on aviation. To
    17
    KEEFE REPORTING COMPANY
    1 receive certification from the FAA, an airframe must be
    2 capable of withstanding a vertical gust of 30 feet per
    3 second. However, an aircraft in a landing or takeoff
    4 configuration at typical approach and departure speeds
    5 will likely lose lift and experience a momentary stall
    6 if subjected to a vertical gust of 15 feet per second or
    7 more. This is certainly an aviation safety concern.
    8 We would like to emphasize that this concern is
    9 only for generating facilities within the immediate
    10 airport environment. Once away from the airport,
    11 aircraft are bound by FAA regulations to be at least 500

    12 feet above the highest obstacle within a horizontal
    13 distance of 2,000 feet over sparsely populated areas and
    14 1,000 feet above the highest obstacle within a
    15 horizontal distance of 2,000 feet over congested areas.
    16 Aircraft operating outside the traffic pattern are also
    17 at higher operating speeds and therefore are not as
    18 prone to stalling should they encounter larger vertical
    19 gusts of more than 15 feet per second.
    20 IDOT is currently reviewing our rules and
    21 regulations to determine if further action is necessary
    22 to prevent discharges from interfering with air
    23 navigation and compromising aviation safety. During
    24 this time, we request that the Illinois Pollution
    18
    KEEFE REPORTING COMPANY
    1 Control Board forward to IDOT any notification it
    2 receives of a generating facility being proposed within
    3 two miles of a public-use airport for further
    4 evaluation. This will afford us an opportunity to work
    5 with the proponent to mitigate any impact to aviation.
    6 It is signed by James V. Bildilli, Chief Engineer
    7 of the Bureau of Airport Engineering of IDOT. And the
    8 original to you?
    9 That being said, some of my qualifications, to give
    10 you some background with regards to questions I'll

    11 respond to, I am a registered professional engineer with
    12 the State of Illinois. I've been with the Illinois
    13 Department of Transportation, Division of Aeronautics,
    14 for nearly ten years in their planning section. In
    15 addition, I'm also a commercial pilot, licensed by the
    16 FAA in both multi-engine and instruments, and I'm also a
    17 certified flight instructor. That gives you some
    18 background for the questions you may ask.
    19 HEARING OFFICER JACKSON: Thank you. The document
    20 that you provided to the court reporter we will mark as
    21 IDOT Exhibit 1, and it will be entered into the record.
    22 Are there any questions at this time?
    23 CHAIRMAN MANNING: I just want to say thank you,
    24 Mr. Finnell, and thank you to the Department of
    19
    KEEFE REPORTING COMPANY
    1 Transportation for your participation in these
    2 proceedings. We welcome your expertise on the
    3 particular question of aviation safety.
    4 I should mention that the reason that-- for IDOT's
    5 participation is as a result of an informal request that
    6 the board has made to the Department of Transportation
    7 as a result of issues that were raised on the record by
    8 citizens in terms of aviation concerns, and so we
    9 informally requested that the Department of

    10 Transportation provide us its expertise on those
    11 questions.
    12 I have no specific questions myself, but I'd be
    13 happy to open it up to the board members who might. Ms.
    14 Kezelis.
    15 BOARD MEMBER KEZELIS: Thank you, Mr. Finnell. I
    16 do have one question. Would you for the record describe
    17 briefly an example of a sparsely populated area as
    18 opposed to a more heavily-concentrated area of
    19 population?
    20 MR. FINNELL: Certainly. The FAA's interpretation
    21 of sparsely populated basically incorporates all of the
    22 population area within Illinois. A congested area would
    23 be that of a metropolitan area, a village or town with a
    24 relatively high density of people living, places of
    20
    KEEFE REPORTING COMPANY
    1 public assembly. So certainly within metropolitan
    2 regions, that would require the 1,000 foot, as well as
    3 flying over any established town.
    4 BOARD MEMBER KEZELIS: Okay. Thank you.
    5 BOARD MEMBER FLEMAL: I believe you indicated that
    6 airports have the opportunity to request hazard zoning.
    7 There are 56 who have?
    8 MR. FINNELL: Yes.

    9 BOARD MEMBER FLEMAL: Is that correct? Are there
    10 any who have not?
    11 MR. FINNELL: Quick math, there are currently 73
    12 publicly-owned air facilities. Of those, only 56 have
    13 requested us to adopt airport hazard zoning on their
    14 behalf.
    15 BOARD MEMBER FLEMAL: Have any of those other
    16 facilities adopted hazard zoning on their own?
    17 MR. FINNELL: Yes, they have.
    18 BOARD MEMBER FLEMAL: So most-- or do all the
    19 airports have hazard zoning, either yours or theirs?
    20 MR. FINNELL: There is a requirement as a condition
    21 of accepting federal or state funding that the airport
    22 will protect their approaches. The degree to which that
    23 protection is enforced or enacted varies greatly, if
    24 that is sufficient. Some are very stringent as far as
    21
    KEEFE REPORTING COMPANY
    1 the actual airspace they protect and can be somewhat
    2 limited. Others have larger territorial limits and can
    3 afford a greater degree of protection.
    4 BOARD MEMBER FLEMAL: In your experience, are you
    5 aware of any circumstances or occurrences where vertical
    6 plumes have been a hazard to flight patterns--
    7 MR. FINNELL: We have--

    8 BOARD MEMBER FLEMAL: -- anywhere in the country?
    9 MR. FINNELL: In the country, no. In the state of
    10 Illinois, certainly no, okay? I will qualify that by
    11 saying I have not researched that fully throughout the
    12 United States. There has not been an enforcement action
    13 within the state of Illinois to my knowledge.
    14 HEARING OFFICER JACKSON: Mr. Finnell, could you
    15 please speak into the microphone?
    16 MR. FINNELL: I'm sorry.
    17 HEARING OFFICER JACKSON: They're having trouble
    18 hearing you in the back of the room. Thank you.
    19 MR. FINNELL: Would you like me to move this over,
    20 or--
    21 BOARD MEMBER FLEMAL: Does that answer that you
    22 just gave reflect all types of stacks, or are you
    23 referring specifically to peaker stacks?
    24 MR. FINNELL: We're referring to all types of
    22
    KEEFE REPORTING COMPANY
    1 discharges.
    2 BOARD MEMBER FLEMAL: Okay. Thank you.
    3 MR. FINNELL: It's not singled out to peakers, no.
    4 HEARING OFFICER JACKSON: Are there any other
    5 questions? All right. Thank you very much, Mr.
    6 Finnell. We appreciate you being here.

    7 MR. FINNELL: Thank you.
    8 HEARING OFFICER JACKSON: Next on our list of
    9 speakers is Mr. John Smith with the City of Decatur. I
    10 believe you indicated that Brent Gregory is also
    11 speaking with you?
    12 MR. SMITH: Yes.
    13 HEARING OFFICER JACKSON: Would you like for him to
    14 come up at this time as well?
    15 MR. GREGORY: You can go ahead.
    16 HEARING OFFICER JACKSON: All right. And speak
    17 into the microphone, please.
    18 MR. SMITH: Sure.
    19 HEARING OFFICER JACKSON: Thank you.
    20 MR. SMITH: Good afternoon. My name is John Smith,
    21 and I represent the Illinois Section of American
    22 Waterworks Association. ISAWWA is the state section of
    23 the American Waterworks Association. Membership
    24 includes water utilities, operators and professionals
    23
    KEEFE REPORTING COMPANY
    1 throughout the state. And I appreciate the opportunity
    2 to speak before the board on the issue of peaker plants
    3 and on the use of water resources.
    4 Number one: Do peaker plants need to be regulated
    5 more strictly than Illinois' current air quality

    6 statutes and regulations provide? ISAWWA does not feel
    7 that peaker plants should be singled out and regulated
    8 more strictly than any other power plant types in
    9 Illinois with regard to air quality statutes. Adequate
    10 generation of electric power is important to the future
    11 economic growth of Illinois.
    12 Number two: Do peaker plants pose a unique threat
    13 or a greater threat than other types of state-regulated
    14 facilities with respect to air pollution, noise
    15 pollution or groundwater or surface water pollution?
    16 ISAWWA believes that peaker plants pose no greater
    17 pollution than any other type of industry and that
    18 existing regulations are adequate for protection.
    19 Number three: Should new or expanding peaker
    20 plants be subject to siting requirements beyond
    21 applicable local zoning requirements? ISAWWA believes
    22 that peaker plant siting requirements should encourage
    23 the siting of these plants near a sanitary water
    24 treatment plant, if practical, so as to utilize the
    24
    KEEFE REPORTING COMPANY
    1 discharge from the sanitary water treatment plant known
    2 as gray water or cooling water.
    3 Number four: If the board determines that peaker
    4 plants should be more strictly regulated or restricted,

    5 should additional regulations or restrictions apply to
    6 currently permitted facilities or only to new facilities
    7 and expansions? We only wish to comment on the use of
    8 water resources by these facilities. Number one, the
    9 State of Illinois must manage, protect and enhance the
    10 development of the water resources of the state as a
    11 natural and public resource. Number two, water
    12 resources have an essential and pervasive role in the
    13 social and economic well-being of the people of Illinois
    14 and is of vital importance to the general health, safety
    15 and economic welfare. Number three, water resources of
    16 the state must be used for beneficial and legitimate
    17 purposes. And number four, waste and degradation of
    18 water resources must be prevented.
    19 ISAWWA is not opposed to the use of water resources
    20 by peaker plants. We are only asking for the
    21 responsible use of water resources by these facilities
    22 and all major new water consumers. We believe the
    23 regulation or permitting of large water resource
    24 withdrawals should be the responsibility of regional
    25
    KEEFE REPORTING COMPANY
    1 agencies, such as municipalities, counties or water
    2 boards, and that a state agency should have oversight of
    3 these regional agencies.

    4 We believe that the basis for the decision on how
    5 much water can be safely used from a designated water
    6 resource be based on the existing knowledge and
    7 scientific studies of that resource, and, if knowledge
    8 of that resource is lacking, then additional research
    9 into the adequacy of this source should be done before
    10 allowing major withdrawals. The decision to allow the
    11 development of existing or new water resources must be
    12 based on sound science, not politics. We believe that
    13 funding must be adequate for the state agency to perform
    14 these studies.
    15 In conclusion, Illinois Section AWWA is not opposed
    16 to peaker facilities. We are calling for the rules and
    17 regulations of water resources be based on scientific
    18 studies of our valuable water resources and that an
    19 unbiased state agency be charged with oversight of
    20 regional water use. Adequate funding for the state
    21 agency must allow for the scientific study of our state
    22 water resources, and the State must have a plan for the
    23 efficient management of water resources. Thank you.
    24 HEARING OFFICER JACKSON: Thank you, Mr. Smith.
    26
    KEEFE REPORTING COMPANY
    1 MR. SMITH: Questions?
    2 HEARING OFFICER JACKSON: Any questions?

    3 CHAIRMAN MANNING: Thank you for being here today.
    4 I do have just one question. Are you aware of any
    5 projects right now that are ongoing between a peaker
    6 plant developer and a sanitary treatment facility in the
    7 state we could speak to?
    8 MR. SMITH: I'm not aware of any.
    9 CHAIRMAN MANNING: Thank you.
    10 HEARING OFFICER JACKSON: Anything else for Mr.
    11 Smith?
    12 BOARD MEMBER GIRARD: I have a question.
    13 HEARING OFFICER JACKSON: Okay.
    14 BOARD MEMBER GIRARD: So what you're advocating is
    15 that we have a state water resources board that
    16 allocates these large withdrawals? Is that what you're
    17 saying?
    18 MR. SMITH: What we are saying is that we believe a
    19 state agency such as the Illinois State Water Survey
    20 should have some oversight over the regional agencies
    21 that normally would have some control over water. We
    22 believe that in most cases, the regional agency has at
    23 least some knowledge of the water resource and how much
    24 of that resource can be used safely without impacting
    27
    KEEFE REPORTING COMPANY
    1 other consumers or their industries. However, if the

    2 local agency has-- unreasonably tries to restrict the
    3 use of these water resources, then a state agency could
    4 have oversight of the local agency.
    5 BOARD MEMBER GIRARD: Are you familiar with any
    6 other eastern states that might have a setup that you
    7 would consider a model for these kinds of decisions?
    8 MR. SMITH: No. I've not researched that.
    9 BOARD MEMBER GIRARD: Thank you.
    10 MR. SMITH: We would be glad to look into that.
    11 CHAIRMAN MANNING: Could you explain a little bit
    12 about your association for us?
    13 MR. SMITH: Yes. Illinois Section of American
    14 Waterworks Association represents most of the both
    15 public and private water utilities throughout the state
    16 of Illinois from the very small ones to the very large
    17 ones, and we represent the operators of these plants; we
    18 represent water resource people, such as lake managers.
    19 CHAIRMAN MANNING: Thank you. Anybody else?
    20 BOARD MEMBER MCFAWN: Is your association involved
    21 at all with any studies of water resources, be they
    22 groundwater or surface water, and their adequacy or even
    23 just their quantity?
    24 MR. SMITH: Yes, we are. Illinois Section of AWWA
    28
    KEEFE REPORTING COMPANY

    1 is involved with the Mahomet Aquifer Consortium, which
    2 has-- is trying to secure federal funding to do further
    3 studies of the Mahomet aquifer located in the central
    4 part of Illinois. This consortium and the action that
    5 we are doing to try to study this reservoir has already
    6 generated interest from other states in that they have
    7 inquired how we have put together the consortium and how
    8 we are going about to try and initiate these studies.
    9 BOARD MEMBER MCFAWN: Does that consortium cross
    10 state lines? I mean, are there participants from
    11 Indiana, for example?
    12 MR. SMITH: No, it does not cross state lines,
    13 although there are some of the water people right across
    14 the state line in Indiana that are aware of the
    15 consortium and of the study.
    16 BOARD MEMBER MCFAWN: Thank you.
    17 HEARING OFFICER JACKSON: Thank you, Mr. Smith.
    18 Brent Gregory with the Illinois-American Water Company.
    19 MR. GREGORY: Good afternoon.
    20 HEARING OFFICER JACKSON: Afternoon.
    21 MR. GREGORY: My name is Brent Gregory, and while I
    22 work for Illinois-American Water Company, I'm here today
    23 representing the National Association of Water
    24 Companies, Illinois Chapter, and I appreciate the
    29
    KEEFE REPORTING COMPANY

    1 opportunity to address the board, specifically on the
    2 issue of peaker plants and also in a more general sense,
    3 some of the related environmental and water resource
    4 issues. I do have a prepared statement.
    5 My name is Brent Gregory, and I'm here today
    6 representing the Illinois Chapter of the National
    7 Association of Water Companies, or NAWC.
    8 HEARING OFFICER JACKSON: Just slow down just a
    9 little bit for the court reporter.
    10 MR. GREGORY: Certainly.
    11 HEARING OFFICER JACKSON: Thank you.
    12 MR. GREGORY: I told myself to do that ahead of
    13 time.
    14 HEARING OFFICER JACKSON: It's hard to do when
    15 you're reading.
    16 CHAIRMAN MANNING: It's hard.
    17 MR. GREGORY: NAWC is the principal trade
    18 organization that represents the private and
    19 investor-owned water utility industry. NAWC member
    20 utilities serve over 1 million people in Illinois and 22
    21 million people nationwide. I appreciate the opportunity
    22 to address the Illinois Pollution Control Board today on
    23 the issues of peaker plants and water resource
    24 management in Illinois.

    30
    KEEFE REPORTING COMPANY
    1 The ability to provide water of sufficient quality
    2 and quantity to sustain commercial, industrial and
    3 residential growth goes hand-in-hand with the
    4 availability of electrical power. Water suppliers rely
    5 on adequate available electricity, and generating plants
    6 rely on an adequate supply of water. NAWC supports the
    7 development of new electrical generating capacity as
    8 needed for the economic advancement of Illinois.
    9 We do not believe that peaker plants pose a unique
    10 threat to the environment compared to other types of
    11 state-regulated facilities. We believe that existing
    12 environmental regulations are adequate to address air
    13 and water quality concerns from peaker plants. As much
    14 of the water used by peaker plants is discharged to the
    15 environment, it is important that current discharge
    16 regulations be consistently applied in order to protect
    17 the quality of our groundwater and surface water
    18 resources.
    19 NAWC agrees that it is in the best interests of all
    20 to have sound legislative and regulatory oversight of
    21 the state's water resources. The primary management of
    22 the water resources should be provided by an assemblage
    23 of local and regional stakeholders with the State having
    24 final oversight.

    31
    KEEFE REPORTING COMPANY
    1 We emphasize the need for water use decisions to be
    2 based on sound scientific assessment of local and
    3 regional water resources. Where existing knowledge is
    4 insufficient, the state technical agencies should
    5 provide the scientific studies needed to permit or deny
    6 water withdrawals. State funding must be adequate to
    7 support these efforts. The right of existing public
    8 water supplies to condition withdrawing at their current
    9 installed capacities should be grandfathered into any
    10 program that is developed. The State should consider
    11 competent third-party assessments presented by those
    12 seeking to utilize the water resource.
    13 We believe that permitting of new peaker plants and
    14 siting requirements should encourage conservation
    15 measures such as recycling of cooling water and use of
    16 other discharges for cooling when possible, such as
    17 those from sanitary treatment plants.
    18 In summary, NAWC believes that the ability to
    19 expand power and water resources is important to the
    20 economic growth of Illinois. Peaker plants, as all
    21 state-regulated facilities, should be subject to the
    22 consistent application of existing laws to ensure
    23 protection of our environment and natural resources.
    24 There is a need for more comprehensive oversight of

    32
    KEEFE REPORTING COMPANY
    1 Illinois' water resources. Such oversight appropriately
    2 resides with the State but must be based on sound and
    3 current science and not on politics. Thank you.
    4 HEARING OFFICER JACKSON: Thank you, Mr. Gregory.
    5 Are there any questions? Go ahead.
    6 BOARD MEMBER MELAS: Mr. Gregory, earlier in your
    7 statement you mentioned you thought that there was
    8 adequate control as far as water quality, and twice I
    9 heard the words water quality. Do you have any comments
    10 about the quantity of the-- or the adequacy of
    11 particularly groundwater supplies? Those concerns have
    12 been raised in--
    13 MR. GREGORY: Yes.
    14 BOARD MEMBER MELAS: -- previous testimony, and
    15 that's why I would like to know what your take on that
    16 is.
    17 MR. GREGORY: Well, we recognize that in certain
    18 areas of the state in particular, there may be some
    19 quantity concerns. We're traditionally known as a
    20 water-rich state, and yet due to concentrations of
    21 industry and populations and other circumstances, there
    22 are areas where, particularly in long-term outlook,
    23 water quantity is a concern. That's why we concur that
    24 there is a need for sound comprehensive management of

    33
    KEEFE REPORTING COMPANY
    1 the state's water resources with regard to quantity.
    2 BOARD MEMBER MELAS: Thank you.
    3 BOARD MEMBER MCFAWN: Wait. I have a question. I
    4 was just waiting. You mentioned you thought that the
    5 quantity-- I believe it was the assessment of it should
    6 be done by an independent third party? Could you
    7 explain that a little bit more?
    8 MR. GREGORY: Yes, I can. If there is some
    9 legislative or regulatory control set up over the use of
    10 Illinois water resources, it needs to be based on sound
    11 scientific assessment of the resource, which we believe
    12 that the State has-- is the appropriate-- has the
    13 appropriate technical resources to conduct those.
    14 However, if there would arise a dispute over the use or
    15 the application for the use of water or withdrawal of
    16 water and there is better science to be presented by a
    17 petitioner for the use of that water, that should be
    18 allowed.
    19 BOARD MEMBER MCFAWN: We are talking about just
    20 quantification, not quality?
    21 MR. GREGORY: That is really in the context of
    22 quantity.
    23 BOARD MEMBER MCFAWN: Okay.

    24 MR. GREGORY: Yes.
    34
    KEEFE REPORTING COMPANY
    1 BOARD MEMBER MCFAWN: I just want to make sure
    2 that--
    3 MR. GREGORY: If somebody wants to withdraw water
    4 from an aquifer or from a watershed and is able to hire
    5 a qualified consultant to demonstrate the reasonableness
    6 of that petition, then that should be considered.
    7 BOARD MEMBER MCFAWN: Thank you.
    8 HEARING OFFICER JACKSON: Any more questions for
    9 Mr. Gregory? No? All right. Thank you, sir.
    10 MR. GREGORY: Okay. Thank you.
    11 HEARING OFFICER JACKSON: Next we have Ashley
    12 Collins with Citizen Action Illinois. Is Ms. Collins
    13 here?
    14 MS. ZINGLE: I think she thinks she's testifying
    15 tomorrow.
    16 HEARING OFFICER JACKSON: I'm sorry?
    17 MS. ZINGLE: I think she thinks she's testifying
    18 tomorrow.
    19 HEARING OFFICER JACKSON: Okay. James Monk,
    20 Illinois Energy Association. Give me a second and I'll
    21 pass this around.
    22 MR. MONK: Sure.

    23 HEARING OFFICER JACKSON: While those are being
    24 passed out, I'll just indicate that I've been handed a
    35
    KEEFE REPORTING COMPANY
    1 document entitled "Testimony of James R. Monk," and we
    2 will mark that as Monk Exhibit 1, and also a handout
    3 entitled "System Peak-Load and Capacity," some
    4 historical data, and that will be Monk Exhibit 2. Thank
    5 you. Whenever you're ready.
    6 MR. MONK: Thank you, Hearing Officer Jackson,
    7 Chairman Manning and members of the board. My name is
    8 James R. Monk. I'm the president of the Illinois Energy
    9 Association. The Illinois Energy Association is a trade
    10 association representing investor-owned electricity and
    11 combination electricity and natural gas companies
    12 serving customers in the state of Illinois. The
    13 association was formed in 1994 and has eight member
    14 companies. Those are listed in my formal testimony, but
    15 they include what you would normally, I think, term as
    16 the incumbent electric utilities in the state of
    17 Illinois, Commonwealth Edison, Illinois Power, CILCO,
    18 CIPS, etc. The Energy Association serves as a
    19 spokesperson for the investor-owned electricity and
    20 combination natural gas and electricity industries here
    21 and as a vehicle to develop policy positions and

    22 policies on issues dealing in the public policy arena.
    23 On behalf of the association, I want to express my
    24 appreciation to the board for providing the opportunity
    36
    KEEFE REPORTING COMPANY
    1 to testify as part of this inquiry into peaker plants.
    2 Our member companies are active in both the power supply
    3 and the power transmission and distribution sectors of
    4 the industry, and we believe peaker plants play a
    5 critical role in both of those areas, and we stand ready
    6 as an industry to provide whatever information the board
    7 deems necessary to assist you in your inquiry.
    8 To that end, I'd like to respond to a request I
    9 think that was made by the board and its staff at the
    10 initial hearings in Chicago regarding current generating
    11 capacity and expected demand growth for electricity here
    12 in Illinois, and I've attached Exhibit A-- which is a
    13 document I think that's been distributed to you-- to my
    14 testimony that shows both historical and projected
    15 system peak-load capacity-- load and capacity for the
    16 Commonwealth Edison system. Hopefully this will give
    17 the board a flavor of-- for where we are as a state in
    18 both of these respects.
    19 These figures indicate a rather dramatic increase
    20 in peak-load in recent years. While peak-loads on the

    21 ComEd system have grown at 2.8 percent over the last 15
    22 years from 1984 to 1999, we note that the growth rate
    23 has nearly doubled in the last five years. From 1994
    24 through 1999, peak-loads have grown at 4.2 percent.
    37
    KEEFE REPORTING COMPANY
    1 Clearly, meeting demand was very tight in 1999, and I
    2 think most of you remember the summer of 1999.
    3 Virtually no extra reserves remained to cover
    4 contingencies at time of peak demand. New independent
    5 power capacity was critical to meeting that demand.
    6 Similarly, while this past summer was cooler than
    7 normal, it was still necessary to have new IPP capacity
    8 in order to provide adequate reserves. For your
    9 information, about 1500 megawatts of reserve capacity is
    10 needed to provide what we call reliability insurance on
    11 the ComEd system for forced plant outages and additional
    12 deratings at peak. If the summer of 2000 weather had
    13 been normal rather than cooler than normal, total
    14 capacity would not have provided targeted reliability
    15 reserves or that reliability insurance that I spoke of.
    16 The diagram also shows projected growth through the
    17 year 2003. These figures are based on average
    18 peak-making weather; not cooler than normal, not hotter
    19 than normal, but our historical average. In this

    20 respect, the existing total capacity is inadequate going
    21 forward, even with average peak-making weather. Forced
    22 outage reserves are below target beginning in 2001.
    23 Demand exceeds supply in 2002 considering higher recent
    24 demand growth rates. Even if you look at the relatively
    38
    KEEFE REPORTING COMPANY
    1 lower historical demand growth rates for the 15-year
    2 period, demand still exceeds supply in 2003. And
    3 remember, these projections are for normal summer
    4 weather. Extremely hot weather could add an additional
    5 2 to 3 thousand megawatts of demand next summer.
    6 The bottom line here is that even under the best of
    7 circumstances, additional capacity is critically
    8 necessary in order to keep the system functioning at
    9 peak times. In the short term, that additional capacity
    10 will come almost exclusively from peaker plants.
    11 I realize that the focus of the board's inquiry is
    12 on the environmental aspects of these plants, and I
    13 certainly do not wish to diminish those concerns. In
    14 fact, I'm of the opinion that the record in this inquiry
    15 shows that peaker plants are the best power supply
    16 option from an environmental standpoint as well as an
    17 economic standpoint. However, peaker plants must also
    18 be viewed in the larger context of the role they play in

    19 making sure that our state has adequate, reliable and
    20 affordable electricity throughout the year.
    21 One need only look at the situation in California
    22 to see the disastrous results of a shortsighted power
    23 supply policy. While much of the blame for highly
    24 publicized failure of the electricity market in
    39
    KEEFE REPORTING COMPANY
    1 California can be laid at the feet of those who designed
    2 the faulty marketplace mechanism, it is also undoubtedly
    3 true that lack of adequate power supply is at the heart
    4 of the problem in that state. California has allowed
    5 only limited investments in new power plants in the last
    6 20 years. Between 1996 and 1999, California added only
    7 2 percent to its generating capacity. Several state
    8 policies discouraged new construction at a time when
    9 demand continued to surge.
    10 In that same time period between 1996 and 1999,
    11 California's growing economy caused a peak demand
    12 increase of over 5500 megawatts. California's demand is
    13 expected to grow faster than new power plants can be
    14 built for the next several years, even with some recent
    15 modifications to their siting procedure which should
    16 make it easier to build power plants. Much of that
    17 demand growth in California is caused by the booming

    18 digital economy in that state that gobbles up
    19 electricity at a much higher rate than traditional
    20 industries have in the past. Obviously, here in
    21 Illinois and in the Midwest, we hope to be part of that
    22 digital economy as well, and we have to deal with the
    23 impact of that digital economy in the power supply sense
    24 as well.
    40
    KEEFE REPORTING COMPANY
    1 I'd also like to comment on the issue that I think
    2 was raised in Chicago and maybe at the suburban hearings
    3 of whether much of the electricity generated by peaker
    4 plants constructed here in Illinois will be exported to
    5 other states. I think the information that I've
    6 provided in my testimony indicates that there's a need
    7 for power here in Illinois. On top of that fact,
    8 geographic and transmission constraints in our region
    9 are such that it's very difficult to transmit large
    10 amounts of electricity on an export basis. Strangely
    11 enough, I've talked to my counterparts in both Wisconsin
    12 and Indiana, and that same export of power argument has
    13 been used in both of those states by opponents of peaker
    14 plants who say they're building power plants in
    15 Wisconsin to ship power to Illinois or they're building
    16 them in Indiana to ship power to Illinois. Just the

    17 basic facts of electricity and the physics of
    18 electricity are-- make that difficult, especially
    19 considering the transmission constraints we have in the
    20 region.
    21 The board has received testimony from many sources
    22 that are involved in the generating side of the
    23 industry, including some of my own member companies.
    24 However, there's also a distribution component, and all
    41
    KEEFE REPORTING COMPANY
    1 of my member companies are part of that side of the
    2 business, the distribution utilities. Even under our
    3 state's landmark deregulation law, distribution
    4 companies maintain a duty to provide safe, adequate,
    5 reliable and affordable electricity to our retail
    6 customers. We are also still the, quote, providers of
    7 last resort that we have always been to our native load
    8 customers. In order to fulfill those duties,
    9 distribution companies must have an adequate supply of
    10 electricity even at peak times. That is why, even for
    11 electricity distribution companies, much is at stake in
    12 the debate over construction of peaker plants here in
    13 Illinois.
    14 Thank you for the opportunity to present testimony
    15 in this proceeding. The member companies of the

    16 Illinois Energy Association are pleased to be a part of
    17 this process and stand ready to assist the board as your
    18 inquiry goes forward, and I'd be pleased to try to
    19 answer any questions that you might have, although I
    20 will tell you I'm not a technical expert. I'm a-- I'm
    21 what they call a policy guy. Thank you.
    22 HEARING OFFICER JACKSON: Thank you, Mr. Monk.
    23 BOARD MEMBER MELAS: Mr. Monk, in mentioning
    24 earlier in your statement the booming shortage, the
    42
    KEEFE REPORTING COMPANY
    1 shortfall, you said that demand will have to come from
    2 peaker plants.
    3 MR. MONK: In the short-term, I think peaker plants
    4 is where that's most exclusively going to come from.
    5 BOARD MEMBER MELAS: I've heard a lot of testimony
    6 in the last month or two. The electricity which is
    7 generated by the peaker plants is the most expensive
    8 type of electricity; is that correct?
    9 MR. MONK: I think that's a little overbroad. It
    10 depends on a lot of factors, given the market situation
    11 at the time that the peaker plants are operated or not
    12 operated. It's a little too broad, I think, to say that
    13 it's the most expensive power.
    14 BOARD MEMBER MELAS: We've heard that statement

    15 made at previous meetings.
    16 MR. MONK: Right.
    17 BOARD MEMBER MELAS: That's why I asked. Whereas
    18 the power that's generated through a so-called
    19 base-load, whether it's coal or nuclear, is much
    20 cheaper.
    21 MR. MONK: I'd say on the whole, that's probably
    22 true.
    23 BOARD MEMBER MELAS: Would not the construction of
    24 another one or two major base-load plants obviate the
    43
    KEEFE REPORTING COMPANY
    1 problem, in your opinion?
    2 MR. MONK: Well, I think if you were able to
    3 construct base-load power plants, certainly that would
    4 obviate some of the problems. The difficulty with the
    5 base-load power plant is the time frame that you're
    6 talking about in terms of the design, construction,
    7 operation, is much longer than we can afford to
    8 undertake here in Illinois.
    9 BOARD MEMBER MELAS: Are any of your members at the
    10 present time contemplating any new base-load plants that
    11 you know of?
    12 MR. MONK: Not--
    13 BOARD MEMBER MELAS: Anywhere within the state of

    14 Illinois?
    15 MR. MONK: Not that I'm aware of. There may be
    16 internal planning processes that are underway that I'm
    17 not aware of, but I'm not aware of any at the present
    18 time.
    19 BOARD MEMBER MELAS: That's all. Thank you.
    20 MR. MONK: Of course I would add that part of
    21 what's going on in the industry is a-- what we call an
    22 unbundling of the industry, and, you know, you will have
    23 distribution companies-- all of my members are
    24 distribution companies, and depending on how this all
    44
    KEEFE REPORTING COMPANY
    1 develops over the next few years, the distribution
    2 companies for the most part won't be owning generation
    3 in the first place. That will come from generation
    4 companies, some of who may be part of an overall company
    5 that the distribution company is, many of whom will not
    6 be related to a distribution company whatsoever.
    7 BOARD MEMBER MELAS: Thank you.
    8 BOARD MEMBER KEZELIS: I have one question, Mr.
    9 Monk. The chart that you've given us--
    10 MR. MONK: Yes.
    11 BOARD MEMBER KEZELIS: -- and I understand you're a
    12 policy person as opposed to perhaps a predictor or an

    13 analyzer of figures-- but the chart you've given us
    14 notes a significant drop in 1992 for peak-load demand.
    15 Was 1992 an anomaly? Was it an usually cold year, or do
    16 you know?
    17 MR. MONK: I don't know, but that would be my
    18 guess, because if you can look and compare 1999 to 2000,
    19 you see a similar drop, and I do know that those two--
    20 BOARD MEMBER KEZELIS: That was weather-related.
    21 MR. MONK: That was weather-related, and I would
    22 guess the other one was weather-related.
    23 BOARD MEMBER KEZELIS: Okay. Thank you.
    24 CHAIRMAN MANNING: I have a more general question
    45
    KEEFE REPORTING COMPANY
    1 on the graph itself, and that kind of relates to the
    2 question of the applicability of the graph. When you
    3 look at the total capacity, you've got ComEd's capacity
    4 and installed IPP capacity. What do you mean by
    5 installed IPP? Maybe I missed that in your remarks, but
    6 what are you referring to when you say-- when the graph
    7 refers to the installed IPP capacity?
    8 MR. MONK: That would be-- For the most part, that
    9 would be peaker plants that are already up and running.
    10 CHAIRMAN MANNING: Okay. So that if you look at
    11 the gray shaded area on the graph itself, that's the

    12 total capacity of energy currently being generated for
    13 what market?
    14 MR. MONK: This is for the ComEd system.
    15 CHAIRMAN MANNING: Okay.
    16 BOARD MEMBER KEZELIS: There are two shades of
    17 gray.
    18 MR. MONK: Right.
    19 BOARD MEMBER KEZELIS: They're difficult to
    20 distinguish.
    21 CHAIRMAN MANNING: Right. The shaded gray without
    22 the black line and the gray-- the shaded gray with the
    23 black line.
    24 MR. MONK: Right, and then the dotted line above
    46
    KEEFE REPORTING COMPANY
    1 that is the projection that shows that even with that,
    2 we need more power.
    3 BOARD MEMBER MCFAWN: Does the IPP stand for
    4 independent power producers?
    5 MR. MONK: Yes, it does.
    6 BOARD MEMBER MCFAWN: Thank you.
    7 BOARD MEMBER FLEMAL: The dropoff between 1997 and
    8 1998 reflects what change in the system?
    9 MR. MONK: Are you talking about the dropoff in
    10 the--

    11 BOARD MEMBER FLEMAL: The installed capacity. 1997
    12 shows the 22,000 megawatts and then '98--
    13 MR. MONK: I would-- I don't know for sure, but my
    14 guess is that would reflect-- at least in one respect,
    15 that would reflect the retirement of the Zion plant.
    16 There may be other factors, but I think that would
    17 probably be a large factor involved in that.
    18 CHAIRMAN MANNING: Mr. Monk, in our proceedings too
    19 we've heard various definitions of the word peaker plant
    20 itself. I would assume your association has a
    21 definition they would use for peaker plant. Do you want
    22 to give us what that would be?
    23 MR. MONK: My definition would be an economic
    24 definition, and that is power that is primarily for use
    47
    KEEFE REPORTING COMPANY
    1 at peak demand times, and, you know, that--
    2 CHAIRMAN MANNING: However it's generated?
    3 MR. MONK: Well, I mean, I-- yeah. I think, you
    4 know, if you're talking about a plant that is dedicated
    5 primarily to that purpose, then I would call that a
    6 peaker plant. Now, there-- you know, that may be an
    7 older plant that is only used at peak time, and there
    8 are those around, but I think, you know, in the general
    9 context of your inquiry, we're talking mostly about the

    10 new natural gas turbine-fired facilities.
    11 CHAIRMAN MANNING: Right.
    12 MR. RAO: Just as a follow-up to Chairman Manning's
    13 question, when you say, you know, a peaker plant is a
    14 plant that serves you in peak demand, can peak demand
    15 be, like, the whole summer season, like a-- you know, if
    16 there's combined-cycle plant that operates just during
    17 the summer, would that be considered a peaker plant?
    18 MR. MONK: Well, I'm treading on pretty thin ice
    19 here, but peak demand is actually a figure that's
    20 reached once per season, I guess, but what I would call
    21 the peak season would be the summer. Our systems, as
    22 are other systems around the country, the base-load
    23 demand is built to meet a regular demand, and then the
    24 peak is on top of that.
    48
    KEEFE REPORTING COMPANY
    1 Now, you might have a run of-- period of two weeks
    2 which could be considered a peak period because every
    3 day is 100 degrees and every day the same huge amount of
    4 electricity is being demanded, but at some point in
    5 time, a few days or a while later, it's going to go back
    6 to a normal demand scenario, so, I mean, that's kind of
    7 the difference. Peak is what it implies, and that is
    8 the highest point of demand for a particular day or a

    9 particular few days together. It is-- It's-- I don't
    10 know that we've ever had a peak that lasted an entire
    11 summer season or even more than a couple weeks.
    12 MR. RAO: So you say it's more based on days rather
    13 than months or weeks.
    14 MR. MONK: Yeah. Well, yes. I mean, in terms of--
    15 it depends again, as I answered the gentleman's question
    16 a moment ago, on the market conditions, but, you know,
    17 peaker plants will run for certain periods of times when
    18 it's economic to run them, and then when it's probably a
    19 nonpeak period, they won't because it's not economic to
    20 run them.
    21 MR. RAO: I had a question on the chart that you
    22 submitted, and, you know, you show growth rates for
    23 those dotted lines. The growth rate, those lines, do
    24 they represent base-load, or is it the peak-load growth
    49
    KEEFE REPORTING COMPANY
    1 rate that you're projecting?
    2 MR. MONK: That's peak, and the reason there are
    3 two there is to show you that historically we had one
    4 particular growth rate and we've accelerated that growth
    5 rate rather dramatically in the last few years.
    6 MR. RAO: Okay. And one last question I have is
    7 about the required reserves that you show in the chart.

    8 What percent of the base-load does required reserves
    9 represent; do you know?
    10 MR. MONK: I don't know in this particular figure.
    11 I think if you go back to Mr. Bulley's testimony from
    12 MAIN, their standard is 15 percent reserve.
    13 MR. RAO: That's what I just wanted to make sure,
    14 you know, that this percent is what Mr. Bulley was
    15 talking about.
    16 MR. MONK: And-- So, I mean, that's the-- I think
    17 that's-- the industry standard is the 15 percent reserve
    18 margin.
    19 MR. RAO: All right. Thank you.
    20 BOARD MEMBER MCFAWN: So when it said on your chart
    21 required reserves, is that what you mean? What do you
    22 mean by required?
    23 MR. MONK: There's some-- I would hesitate to say
    24 with 100 percent accuracy that we're talking about that
    50
    KEEFE REPORTING COMPANY
    1 15 percent margin here, because the testimony-- the
    2 figures that were supplied from Commonwealth Edison
    3 talked about the-- let's see what-- I want to get the
    4 exact phrase-- the reliability insurance, which I'd have
    5 to check to make sure that we're talking about the true
    6 15 percent system reserve as opposed to that reliability

    7 insurance reserve that they're talking about. My guess
    8 is we're talking about the 15 percent, but I can check
    9 that and be sure on it. I wouldn't want to give you an
    10 inaccurate answer.
    11 MR. RAO: If you could answer that in your
    12 comments, it would be helpful.
    13 MR. MONK: Sure. I'd be glad to.
    14 HEARING OFFICER JACKSON: Anything else?
    15 BOARD MEMBER MCFAWN: I had a question. You
    16 mentioned that it's hard to export energy from
    17 Illinois. Could you expand on that?
    18 MR. MONK: Well, for instance, the State of
    19 Wisconsin has-- is undertaking a program right now to
    20 increase its transmission capacity, because they have
    21 very serious transmission constraints caused by two main
    22 factors; geographic, the fact that this little lake kind
    23 of gets in the way of transmitting electricity around,
    24 and then they also have a shortage-- frankly, a shortage
    51
    KEEFE REPORTING COMPANY
    1 of transmission capacity, just the physical capacity to
    2 transmit. We have other constraints that are related to
    3 the-- to our geography as well as the transmission
    4 capacity.
    5 Transmission capacity, frankly, is another area

    6 that has not kept up with the growth of the market in
    7 terms of especially wholesale electricity transfers.
    8 We-- You know, it-- I think it's no secret to anybody
    9 here that it's very difficult to site and build a
    10 transmission line, and we have not been able to keep up
    11 with that demand that's taken place in the last few
    12 years, with the growth that's taken place in the last
    13 few years of the wholesale electricity market.
    14 You hear people who talk about deregulation tell
    15 you that we're starting into, at least on the wholesale
    16 basis, power transfers from one state to another, etc.
    17 We're starting into a wholesale bulk power market, but
    18 our system is really a Balkanized system that was built
    19 for the old electricity style of control area here,
    20 control area here, control area here, and that we do
    21 need to make-- one of the things that the industry is
    22 looking at and the government is looking at very
    23 seriously is how are we going to upgrade and modernize
    24 our transmission system in order to make the wholesale
    52
    KEEFE REPORTING COMPANY
    1 bulk power market work? It wasn't built for all the
    2 transfers that are taking place now between utilities in
    3 Pennsylvania and utilities in Wyoming.
    4 BOARD MEMBER MCFAWN: Do we have problems

    5 internally in Illinois?
    6 MR. MONK: No, not internally. I think our system
    7 internally is a sound system, and I'm not saying we have
    8 problems in terms of getting power when we need it.
    9 It's just that the transmission system that's there now
    10 does have constraints, and it needs to be modernized in
    11 order to be up to speed for the new industry that we're
    12 headed into, and it's very difficult to do, frankly, for
    13 some of the same reasons that building peaker plants is
    14 very difficult to do.
    15 BOARD MEMBER MCFAWN: We heard in another hearing
    16 that the transmission system up by Zion of course is
    17 underused with the closing of Zion. With that freed-up
    18 transmission line, does that make it more difficult or
    19 easier to move power around in Illinois?
    20 MR. MONK: That-- I couldn't answer that except to
    21 say that electricity unfortunately doesn't pay too much
    22 attention to the laws of man. There-- It's kind of into
    23 the laws of physics. And I don't know that simply
    24 freeing up a transmission line in and around Zion would
    53
    KEEFE REPORTING COMPANY
    1 help a situation even as close as the western suburbs.
    2 I'm not that technically expert enough to give you an
    3 answer on that.

    4 BOARD MEMBER MCFAWN: On a different topic, you
    5 talked about California.
    6 MR. MONK: Popular topic these days.
    7 BOARD MEMBER MCFAWN: It is, it is, and I would
    8 certainly like to learn more about it. You mentioned
    9 that between '96 and '99 they only added 2 percent to
    10 their capacity. I would assume their base-load capacity
    11 or just their capacity in general?
    12 MR. MONK: Their capacity in general. I don't know
    13 the breakdown. I don't think-- It would probably be a
    14 peaking type of capacity, because I don't think they've
    15 built a base-load plant there in a long, long time.
    16 BOARD MEMBER MCFAWN: Okay. And then you later
    17 mentioned that they had a demand or an increase of 5500
    18 megawatts?
    19 MR. MONK: In that same period of time.
    20 BOARD MEMBER MCFAWN: In that same period? What
    21 kind of percentage? I mean, how would I compare those
    22 two figures?
    23 MR. MONK: I have-- Let me look just a second. I
    24 believe their total system capacity is something like
    54
    KEEFE REPORTING COMPANY
    1 60,000 megawatts, so whatever 5 percent of-- whatever
    2 5,000 megawatts out of 60 would be was what it increased

    3 in that period of time.
    4 BOARD MEMBER MCFAWN: I don't know if you can help
    5 me with this or not, but we do hear a lot and-- about
    6 California and are we comparable or similar problems and
    7 that type of thing. Do you know of any resource that
    8 describes what California has suffered through most
    9 recently as far as its marketing and its capacity and
    10 all that?
    11 MR. MONK: Well, there are several trade
    12 publications and industry newsletters and things that
    13 follow that situation very closely. I have a file about
    14 that thick on it that I can give you some information.
    15 You know, I-- if you don't mind, I can give you my
    16 personal opinion.
    17 BOARD MEMBER MCFAWN: That would be great.
    18 MR. MONK: There are two problems with California
    19 that we-- number one, the first problem, we avoid it
    20 here in Illinois, and that is they designed a system
    21 that was doomed from the start, in my opinion. They
    22 didn't really deregulate their system. They just
    23 shifted regulation around. They set up a situation
    24 where their utilities could only buy power from a
    55
    KEEFE REPORTING COMPANY
    1 state-mandated, state-operated power exchange. There's

    2 no-- There really isn't an open market for power per se
    3 in the California system that was designed. It really,
    4 you know, shifted things around, but it didn't really
    5 create a competitive marketplace, and that's one of the
    6 major problems.
    7 The other major problem is what I touched on in my
    8 testimony, and that is they have-- they had before they
    9 even started their process of deregulating a tremendous
    10 supply problem. They were importing a lot of power from
    11 out of state at that point, and they haven't added any
    12 power to speak of since then. Their demands are growing
    13 exponentially, and what really happened on the power
    14 supply side this time was they couldn't get out-of-state
    15 power suppliers to sell power into California at the
    16 artificially low prices that the government was setting,
    17 so that's a big part of their supply problem. And so
    18 those two things kind of came together, and
    19 unfortunately the people in San Diego were the first
    20 ones to feel the effect of that.
    21 BOARD MEMBER MCFAWN: Thank you. That does help a
    22 lot.
    23 MR. MONK: Thank you.
    24 HEARING OFFICER JACKSON: Anything else?
    56
    KEEFE REPORTING COMPANY

    1 CHAIRMAN MANNING: Thank you.
    2 HEARING OFFICER JACKSON: Thank you very much.
    3 MR. MONK: Thank you very much.
    4 HEARING OFFICER JACKSON: At this point, before we
    5 call our next speakers forward, why don't we take a
    6 short ten-minute break, and we'll come back in ten
    7 minutes, then.
    8 (Brief recess taken.)
    9 HEARING OFFICER JACKSON: Okay. We'll go back on
    10 the record now. One point of clarification. Mr.
    11 Gregory left an exhibit with the court reporter that I
    12 was not aware of, so we've now marked that as Gregory
    13 Exhibit 1, and it has been admitted into the record in
    14 this matter. Our next speaker, I believe, Mr. Silva?
    15 MR. SILVA: Yes.
    16 HEARING OFFICER JACKSON: Okay. Whenever you're
    17 ready.
    18 MR. SILVA: Thank you. My name is Patricio Silva.
    19 I am the Midwest Activities Coordinator for the Natural
    20 Resources Defense Council. The Natural Resources
    21 Defense Council is a membership organization of 400,000
    22 members nationwide originally organized in 1970, and
    23 we've been working on clear air and clean water issues
    24 and most recently electric restructuring heavily in both
    57
    KEEFE REPORTING COMPANY

    1 California and in New York, and I'm here today in part
    2 to convey the experience of our offices in the New York
    3 and California examples to offer what lessons they may
    4 have to hold for Illinois.
    5 First, I just wanted to kind of step back and point
    6 out a couple of general trends that we've noticed of
    7 interest to us vis-a-vis what's occurring in California
    8 and in the eastern United States in terms of the siting
    9 and construction of gas turbines. Particularly,
    10 starting in New England, about four to five years ago,
    11 there was a massive influx of new capacity being
    12 proposed, approximately 25,000 megawatts. Eventually,
    13 only about 9,000 megawatts of that capacity was actually
    14 permitted and came to construction. Many of the units
    15 were-- smaller merchant developers sold them. There was
    16 regular consolidation in the IPP industry during that
    17 time, so it was actually kind of hard to keep track of.
    18 But in the end, today we have a large number of
    19 units that are all combined-cycle units. Many of them
    20 are load-following, a few are base-load units, but
    21 clearly, the overwhelming majority are not peaking
    22 single-cycle units. Part of the reason was the
    23 attraction for mainly the host communities was in having
    24 units that had a clear value, and in terms of benefits
    58

    KEEFE REPORTING COMPANY
    1 to the community and the state, there was a definite
    2 need and recognition of need for additional capacity,
    3 but also, given the status of the severe non-attainment
    4 area and serious non-attainment areas, a classification
    5 for many of the locations where these units went in,
    6 there was a strong argument, and successfully, many of
    7 them were permitted with fairly stringent air and also
    8 cooling water requirements.
    9 A number of the units rely on dry cooling with low,
    10 if any, water withdrawals. Many of them rely on
    11 closed-loop systems that have a one-time withdrawal of
    12 water, and the permit restrictions are unusually
    13 restricting in that many of them are solely natural
    14 gas-fired. They have no option of fire oil.
    15 Now, that trend is being repeated across the United
    16 States, and the Energy Information Administration now
    17 forecasts that by 2020 there will be a need for
    18 approximately 300 gigawatts, otherwise known as 300,000
    19 megawatts, of new capacity across the United States.
    20 Now, approximately 100,000 megawatts is supposed to
    21 arrive by 2010, so what we're actually seeing is a
    22 run-up to what should be a very hectic period in the--
    23 across the United States as a large number of units will
    24 be sited and permitted and built across the country to

    59
    KEEFE REPORTING COMPANY
    1 serve different reliability regions and isolated local
    2 pockets.
    3 One of the concerns that we have is that some of
    4 the locations that are being selected now early in the
    5 process may not be ideal and may actually frustrate the
    6 siting of new, more advanced units later in this
    7 construction cycle. We as an organization are in favor
    8 of replacing and backing out older fossil fuel
    9 fired-units, particularly coal-fired units, so we have
    10 fought and continued to advocate in both federal and
    11 state regulatory and in legislative forums for
    12 comprehensive legislation that would essentially call
    13 for the repowering of coal-fired units and replace them
    14 with combinations of more natural gas-fired units,
    15 greater reliance on renewable resources, and also a
    16 greater investment in energy efficiency.
    17 This actually has two different goals. One is the
    18 short-term benefit that it can actually essentially
    19 shave off enough of the demand to avoid some of the peak
    20 demand episodes that we've suffered both here in Chicago
    21 in 1999 and also across northern California this summer
    22 and in isolated pockets elsewhere across the eastern
    23 seaboard.
    24 In terms of the questions put to the Illinois

    60
    KEEFE REPORTING COMPANY
    1 Pollution Control Board by Governor Ryan, we do not feel
    2 that per se individual single-cycle units require more
    3 rigorous analysis than they currently have. Now,
    4 that's-- there are a couple of caveats I'd like to make
    5 with that statement. We believe that it was a mistake
    6 for EPA to issue the 182(f) NOx waiver for the Lake
    7 Michigan area. We think that the results of that
    8 decision have been counterproductive and will continue
    9 to be so.
    10 We're also concerned that that waiver is actually
    11 discouraging the siting of the most and cleanest
    12 categories of generation in the region in favor of less
    13 efficient units which will have a longer lease on life
    14 than they otherwise would had the full gamut of Title I
    15 requirements under the Clean Air Act been in effect in
    16 this region.
    17 In the area of-- And one of the areas that we're
    18 also concerned with is also water withdrawals for the
    19 single-cycle units. We note that there are in many
    20 parts of the state and also across the Great Lakes
    21 region units being suggested that would require
    22 significant withdrawals on limited aquifers, and that
    23 also may jeopardize the ability of future units to come
    24 in at a time when additional demand is required.

    61
    KEEFE REPORTING COMPANY
    1 So one of the things that we have sought in several
    2 states, particularly in California and New York-- and
    3 I'd like to go into the California experience in-- at
    4 some detail in a few minutes-- that a more comprehensive
    5 assessment of the actual need for the units be taken
    6 into account. Essentially, we would suggest that
    7 Illinois consider a process whereby a more comprehensive
    8 total energy strategy is developed with stakeholder
    9 input that would essentially serve as a blueprint to
    10 help guide decisions of various state agencies, whereby
    11 the communities right now, many municipalities in the
    12 state have complained, rightfully so, that they feel
    13 somewhat bereft of state assistance in assessing whether
    14 or not some of these projects are a best fit for their
    15 particular communities.
    16 And understanding that, some of these kind of
    17 centralized processes that are available in states such
    18 as California and New York allow for participation of
    19 the public and fund that participation as part of the
    20 permit applications for the plants. They essentially
    21 provide for intervenor funds based on a prorated share
    22 of the proposed generation capacity of the unit which is
    23 allocated for expert witnesses and technical assistance
    24 to the communities and the stakeholders.

    62
    KEEFE REPORTING COMPANY
    1 For example, under Article X of the New York Public
    2 Service Law, it's a 50-50 split on projects where
    3 projects are assessed at $1,000 per megawatt up to
    4 $300,000 maximum for a project, and that-- those funds
    5 can actually be split between the municipality involved
    6 and interested stakeholders. Any balance of funds that
    7 are not exhausted are then returned to the applicant.
    8 That would be-- That's one part. We're not saying that
    9 that's the only solution or the best solution for
    10 Illinois. That's an option that we thought it was
    11 important to mention and provide some solution and a
    12 greater sense of control.
    13 Many of us in these communities have been pointing
    14 out that there's a sense of loss of control under the
    15 local zoning decisions, and those issues are ones that
    16 we feel will only worsen in the future if they're not
    17 addressed now. Again, we're most concerned, again,
    18 looking at the future where we see a situation where
    19 we'll essentially have a Balkanized area where some
    20 communities are more willing or tolerant to accept these
    21 projects, others will fight them at any cost regardless
    22 of the actual value or how meritorious future projects
    23 may be, and we're talking both about natural gas

    24 combustion turbine units and also renewable projects,
    63
    KEEFE REPORTING COMPANY
    1 which we believe are going to have similar problems in
    2 the future as some of those projects try to move
    3 forward.
    4 One of the things that has been mentioned in prior
    5 testimony at length is the experience of California and
    6 what happened this summer, and I'd just like to go into
    7 those particular details for a few minutes. The
    8 conventional wisdom was that this summer that the entire
    9 energy system in California was essentially surging out
    10 of control, that the Internet was creating a huge demand
    11 for electricity and a booming economy was to blame. The
    12 actual reality is slightly different.
    13 The system peak grew between 1990 and 1999 by less
    14 than 2 percent per year and up to about 50,000 megawatts
    15 with 41,000 megawatts representing total demand on the
    16 three largest investor-owned systems. Total state-wide
    17 consumption of electricity increased at less than 1
    18 percent per year from 1990 to 1998. That's actually
    19 less than one-third of the rate that California
    20 experienced during the 80's.
    21 The most recent data from this summer indicates
    22 that the short-term consumption increases over the first

    23 six months of this year compared to a same period last
    24 year were not particularly unusual, even with warmer
    64
    KEEFE REPORTING COMPANY
    1 weather playing a strong role. For example, in the June
    2 2000 electricity spike, there was a 13 percent increase
    3 in consumption compared to a much cooler June of the
    4 year earlier.
    5 This was used repeatedly by-- in the media to point
    6 out that there was something clearly amiss, when in fact
    7 we're talking two slightly different situations. It was
    8 a much cooler year last year in California and also a
    9 much hotter year earlier than anyone expected this year,
    10 and there was also an unusual situation going on
    11 throughout the Pacific Northwest this summer that was
    12 not the case last year or the year before. Hydros
    13 contribution across the region was significantly
    14 curtailed. Essentially, rainfall across the Sierra
    15 Nevadas, the Cascade, was much lower and was actually
    16 near historic low, so much of that generation capacity
    17 was reduced, and in many cases there were constraints in
    18 the system that prevented exports into California.
    19 Complicating matters were that those-- that heat
    20 spike also coincided with a spike in natural gas prices,
    21 sending them above $5 per million BTU. The first three

    22 weeks of July saw more moderate weather in California,
    23 and then both electricity and peak consumption were down
    24 compared to the same period a year earlier. The average
    65
    KEEFE REPORTING COMPANY
    1 wholesale electricity price dropped about 40 percent.
    2 However, it is still quite high. It's ranging at around
    3 7 cents per kilowatt hour, and even-- we believe that
    4 that could return to be a problem in the coming weeks
    5 and months ahead.
    6 One of the things that was pointed out was that--
    7 again and again in some of the testimony was that there
    8 hasn't been new generation added to the system recently,
    9 in the last 20 years. There are two different things
    10 that work. One was the decision by California to invest
    11 heavily in energy efficiency and renewables, and in the
    12 early 1990's there was a compromise reached whereby
    13 there was going to be a great deal of additional natural
    14 gas capacity built, but due to federal intervention,
    15 none of that capacity was actually added to the system.
    16 Now, that energy efficiency actually has already
    17 done a great deal of good. Peak electricity demand has
    18 been reduced about 10,000 megawatts and total annual
    19 consumption has been reduced about 15 percent. Since
    20 1990 alone, energy efficiency investments have reduced

    21 state-wide electric bills by approximately 2.8 billion.
    22 The Rand Corporation recently pegged the per capita
    23 benefits from 20 years of energy efficiency programs in
    24 California at about $1,000 per capita with cumulative
    66
    KEEFE REPORTING COMPANY
    1 utility investment for such purposes averaging only
    2 about $125 per capita, which is a sizable return.
    3 There was also in the last week a spate of good
    4 news for the region, and California-- Governor Davis
    5 allowed several bills to be enacted which will add
    6 approximately 2500 megawatts of new renewable capacity,
    7 including geothermal, wind and some small-scale hydro to
    8 the grid over the next ten years. There's also an
    9 extension of energy efficiency building on accredits
    10 which are rated as offering 150 megawatts per year in
    11 sustained load reduction. There's also a separate R&D
    12 fund which will allow about 5 billion dollars in
    13 investment for energy efficiency, renewable energy and
    14 clean energy over the next ten years. It's a renewal of
    15 an existing fund that expired this year.
    16 The California experience to us demonstrated that
    17 there are several issues at hand. One is that that
    18 market is very much in transition. They are incomplete
    19 market mechanisms that work today that will not be fully

    20 converted for several years, and as a result, there are
    21 going to be price spikes and dislocations in the system,
    22 but we don't think that the system itself is
    23 fundamentally wrong. We think that there's significant
    24 opportunities for improvement, but we think that system
    67
    KEEFE REPORTING COMPANY
    1 will improve in weather, and it offers Illinois and
    2 other parts of the Midwest some lessons on what could be
    3 used and what might not be the most useful tools.
    4 I'd like to cut short the rest of my comments and
    5 place them in the record and use the remaining time to
    6 answer any questions that I hope you have.
    7 HEARING OFFICER JACKSON: Thank you, Mr. Silva.
    8 Any questions now?
    9 BOARD MEMBER KEZELIS: I do. Thank you, Mr. Silva,
    10 for coming here today. I do have several questions.
    11 You referred early on in your testimony to your
    12 organization's preference that states such as Illinois
    13 focus on renewable sources of energy. When you use the
    14 term renewable, for the record, could you clarify what
    15 you mean?
    16 MR. SILVA: By renewable, we would mean wind,
    17 sustainable biomass, small-scale hydro and other
    18 products that amass certification requirements through

    19 green or other third-party certification processes that
    20 have evaluated the energy source and have certified that
    21 it actually is provided in a sustainable manner and
    22 qualifies.
    23 I'd be remiss also not in mentioning of
    24 photovoltaic and solar thermal. We're particularly
    68
    KEEFE REPORTING COMPANY
    1 interested in what Spire Technology is doing in Chicago
    2 with its thin-film photovoltaics, but that is
    3 something-- all of those technologies are ones that we
    4 support. That also doesn't mean that there aren't other
    5 renewable technologies in the future that we won't turn
    6 and become advocates for, but those are the available
    7 ones that we see now that hold the most promise for
    8 making immediate contributions.
    9 BOARD MEMBER KEZELIS: For making immediate
    10 contributions.
    11 MR. SILVA: Yes.
    12 BOARD MEMBER KEZELIS: You would agree, would you
    13 not, though, that something like hydro on a larger scale
    14 is simply not practical for a state like Illinois?
    15 MR. SILVA: Gee, probably not.
    16 BOARD MEMBER KEZELIS: Okay. Thank you. You also
    17 focused a great deal of your attention today-- and for

    18 that we're very appreciative-- on your experiences and
    19 your organization's experiences in California and in New
    20 York. We've heard testimony earlier that other states
    21 which have experienced some of the controversies
    22 associated with peaker plants include Wisconsin and
    23 Indiana. Are you aware of any other states?
    24 MR. SILVA: I'm aware of a variety of unsuccessful
    69
    KEEFE REPORTING COMPANY
    1 single-cycle combustion turbine projects that failed
    2 across New England, mainly because the permitted
    3 developers failed to make the case with communities that
    4 they would be useful additions. There are some projects
    5 that were permitted also in California as single-cycle
    6 projects but they failed to acquire necessary financing
    7 and were withdrawn after obtaining the necessary
    8 permits.
    9 I'd offer we recently took a look at the available
    10 permitting databases and found that there were in the
    11 last three years 750 combustion turbines that received
    12 permits across the United States that we had quick data
    13 for. We believe that number's closer to 1,000, so--
    14 BOARD MEMBER KEZELIS: Single and combined.
    15 MR. SILVA: Single and combined, and I would say
    16 that the majority of those units was clearly

    17 combined-cycle configurations. Many of them were going
    18 in initially or were proposed as in phase one, with the
    19 second phase intended to augment them to combined-cycle
    20 operation, but very few of the units were being proposed
    21 as dedicated single-cycle units.
    22 CHAIRMAN MANNING: Those figures are nationwide?
    23 MR. SILVA: Those figures are nationwide, and I
    24 would offer the caveat that they were from EPA's
    70
    KEEFE REPORTING COMPANY
    1 permitting division, and they actually have a database
    2 that is not up to date. It's at least six months old.
    3 And we did a considerable amount of research on our own,
    4 contacting the regions individually to actually augment
    5 that database and fill in some gaps in theirs.
    6 HEARING OFFICER JACKSON: I just want to clarify
    7 too for the record you just mentioned EPA, and you did
    8 earlier regarding the NOx waiver. You're referring to
    9 USEPA as opposed to IEPA, correct?
    10 MR. SILVA: Yes. I would refer to it as EPA for
    11 the U.S. Environmental Protection Agency and IEPA for
    12 the Illinois Environmental Protection Agency.
    13 HEARING OFFICER JACKSON: Thank you.
    14 BOARD MEMBER KEZELIS: Thank you, Mr. Silva.
    15 BOARD MEMBER LAWTON: I would just want to comment

    16 that I'm so happy that the NRDC is here today and
    17 participating in our hearings, your organization. Can
    18 you hear me? Maybe it's not on.
    19 HEARING OFFICER JACKSON: That's better.
    20 BOARD MEMBER LAWTON: I'll repeat what I said, for
    21 what it's worth. I'm happy to see that the Natural
    22 Resource Defense Council is participating in our
    23 hearings. I think your organization has played an
    24 outstanding role in the last 30 years, and it's nice to
    71
    KEEFE REPORTING COMPANY
    1 see you. You had mentioned some of the-- Maybe the
    2 principal part of my question you answered part of
    3 already since I wrote the question up, but you mentioned
    4 that the interest in peaker plants was at least in part
    5 attributable to the fact that it would cause-- I'm not
    6 sure I'm using the right expression-- but you mentioned
    7 a legal backing out of coal-fired units or at least a
    8 diminution of coal-fired units?
    9 MR. SILVA: Yes.
    10 BOARD MEMBER LAWTON: I wondered whether you had
    11 given that-- your organization had given thought to some
    12 of the areas of concern that have been expressed in the
    13 various hearings we've had as to matters that might not
    14 be favorable from the use of peakers. One is the noise

    15 that's attributable to them, the nitrogen oxide that you
    16 at least commented on in part, the extraction of
    17 groundwater, which you also had mentioned, and the
    18 matter of proliferation. I just wondered whether those
    19 matters stand alone and apart from the fact that they
    20 might supplant coal-fired units that have been
    21 considered by your organization.
    22 MR. SILVA: It's something that we have definitely
    23 not come to any final agreement or decisions on. It--
    24 There are several different strategies that work. One
    72
    KEEFE REPORTING COMPANY
    1 of our-- the overriding principles in our air and energy
    2 program is that the cleanest form of energy is
    3 absolutely without question energy efficiency. If you
    4 don't have to generate the electricity in the first
    5 place, that's the greatest benefit to the environment
    6 without question.
    7 As a result, we devote a considerable amount of our
    8 resources and advocacy efforts to energy efficiency
    9 improvement measures. We currently have a bipartisan
    10 bill before congress which we are hopeful will actually
    11 offer new tax incentives for energy-efficient
    12 residential and commercial building construction. We
    13 also obtained a similar commercial building construction

    14 tax code for the State of New York and California.
    15 We've also been at work on upgrading and improving
    16 national major appliance energy efficiency standards.
    17 Getting back to the peaking units themselves, the
    18 natural gas-fired combustion turbine technology has
    19 several benefits over coal, most noticeably or both the
    20 fact that in terms of the demands on water and their
    21 resulting air emissions are a fraction of what a
    22 coal-fired unit is. However, we're currently facing
    23 somewhere between 55 and 70 proposed projects, and many
    24 of the combinations that I've seen are projects
    73
    KEEFE REPORTING COMPANY
    1 involving six to ten turbines. On a hot summer day when
    2 you have background ozone conditions already near or at
    3 the one-hour or let alone the eight-hour ozone health
    4 standards, the prolonged operation of any of those
    5 natural gas-fired units will exacerbate ozone smog
    6 pollution. You'll also have fairly modest but
    7 noticeable particulate pollution from these plants.
    8 However, in comparing them to coal, they are by far and
    9 away the preferred solution, and in our minds, the real
    10 urgency is backing out as much of that coal.
    11 Unfortunately, these units are going in on top of
    12 it. We're under no illusions that these units will be

    13 looking for the sweet spot in the market, and I would
    14 just note that the owners of the existing natural gas
    15 combustion turbine capacity, including peaking capacity,
    16 in California enjoy a bonanza that boggles the mind and
    17 has actually pushed two of the incumbent investor-owned
    18 utilities towards what they describe artfully as
    19 technical bankruptcy just from this summer generating
    20 season alone. So this-- there are no easy solutions,
    21 unfortunately, to this matter.
    22 Regarding the question of noise, I think that some
    23 of the units arguably could have better noise abatement
    24 technologies installed. In some cases it's either the
    74
    KEEFE REPORTING COMPANY
    1 structure that surrounds the unit might require
    2 additional acoustic shielding, but frankly, there may be
    3 situations where we found that there are projects in the
    4 state of New York that were entirely inappropriate for
    5 the proposed location based on aesthetic, water, noise
    6 and air pollution contribution, in part because many of
    7 those host-- potential host communities were already
    8 bearing a heavy load in terms of pollution, whether it
    9 be aesthetic, noise, air or water.
    10 BOARD MEMBER LAWTON: Thank you.
    11 CHAIRMAN MANNING: Could you follow up on the New

    12 York example? Did it-- Does New York-- the State of New
    13 York have some sort of siting requirements that were
    14 brought to bear on those issues you just talked about in
    15 terms of the New York examples?
    16 MR. SILVA: In the New York example, we actually
    17 are an intervenor in the TG&E Athens, New York, project,
    18 which is a 1,080 megawatt combined-cycle unit,
    19 state-of-the-art technology, and actually, no question
    20 that its air pollution controls are going to be among
    21 the best in the nation, but what we found was the unit's
    22 going to be on the shoreline of the Hudson River in the
    23 most scenic section of the Hudson River Valley.
    24 Aesthetically, the 150-foot tower stack leaves something
    75
    KEEFE REPORTING COMPANY
    1 of a footprint or a visual eyesore, and the water
    2 withdrawals for the unit would have been considerable.
    3 One of-- We were not satisfied with the conditions
    4 proposed entirely on the unit in the granting of its
    5 permit by the siting board. It was required to adopt
    6 dry cooling. And this is something that I think we're
    7 going to have to go through again and again on a
    8 case-by-case basis, where are those most advanced or
    9 best available control technologies, to borrow a phrase
    10 from the Clean Air Act, necessary to preserve particular

    11 qualities in the host community that merit such
    12 attention or safeguards.
    13 BOARD MEMBER MCFAWN: You mentioned the need for
    14 the siting authority.
    15 MR. SILVA: Uh-huh.
    16 BOARD MEMBER MCFAWN: Could you explain, was that a
    17 local siting authority or was it a state siting
    18 authority? And before I forget, also could I ask you to
    19 explain that-- you said that best available control
    20 technology and that type of thing and you mentioned that
    21 that particular site or unit had to agree to dry
    22 cooling, and then you mentioned the Clean Air Act, and I
    23 would have thought the water withdrawal question would
    24 be unrelated to the Clean Air Act.
    76
    KEEFE REPORTING COMPANY
    1 MR. SILVA: I'm sorry if I created any confusion
    2 regarding your last question. Yes, it's unrelated to
    3 the Clean Air Act. The water withdrawals were in part
    4 because there was some concern about adverse impact from
    5 the water withdrawals on the Hudson River for several
    6 fish species in that section of the Hudson River. I
    7 cannot remember off the top of my head if there was any
    8 impacts for nesting birds, but I don't believe so.
    9 The siting process for the State of New York is

    10 based on Article X of the New York Public Service Law.
    11 It creates a New York state board on electric generation
    12 siting and the environment. Most of the board members
    13 are appointees of the governor or are actually the heads
    14 of various state agencies or their appropriate
    15 representatives. It actually requires a multistep
    16 review process. There's a preliminary scoping statement
    17 that's first required to be submitted. The applicant
    18 then has to publicize the project and actually establish
    19 a presence in the potential host community to ensure
    20 that there's adequate opportunity for the public to gain
    21 information.
    22 I mentioned in passing that there was a requirement
    23 that when the full application is filed that a fee equal
    24 to the prorated amount of its maximum generating
    77
    KEEFE REPORTING COMPANY
    1 capacity up to $300,000 be made available to provide for
    2 expert witnesses and public assistance to the host
    3 community and any interested parties or organizations,
    4 and that it go through an open hearing process and-- but
    5 ultimately-- and we're not taking a position one way or
    6 the other-- the-- under Article X, the siting board does
    7 have the authority to supersede local municipal zoning
    8 ordinance, so that's something that I wanted to point

    9 out. We're-- Quite frankly, the law was actually
    10 amended in 1999. The Athens project is one of a handful
    11 that are currently in that process, and so we are
    12 waiting to see what actual experience tells us about in
    13 that process and whether or not it has any pitfalls.
    14 CHAIRMAN MANNING: The Athens project is the one on
    15 the Hudson River you just referred to?
    16 MR. SILVA: Yes.
    17 CHAIRMAN MANNING: I assume that that is not a
    18 natural gas-fired peak-load facility; that's something
    19 other than that. It's probably a base-load.
    20 MR. SILVA: I believe it's-- I was looking for a
    21 representative to come-- I believe it is intended to be
    22 a load-following unit that we'll be selling onto the
    23 wholesale market. I am-- I don't know off the top of my
    24 head whether or not they had a long-term contract with
    78
    KEEFE REPORTING COMPANY
    1 anyone or for any industrial uses, but I believe they're
    2 intending to go onto the wholesale market, but I would--
    3 I can actually find that out easily enough and simply
    4 insert it into my comments.
    5 CHAIRMAN MANNING: Thank you.
    6 BOARD MEMBER MCFAWN: She mentioned it-- whether--
    7 is it natural gas-fired or is it--

    8 MR. SILVA: Oh, yeah. No, it most certainly is.
    9 BOARD MEMBER MCFAWN: Thank you.
    10 BOARD MEMBER MELAS: Just a follow-up on that
    11 previous question in the New England experience. As
    12 congested an area as that is, have you heard of any
    13 instances where there have been any interference with
    14 aviation with the velocity of these fumes of-- plumes
    15 going up?
    16 MR. SILVA: As in with commercial aviation?
    17 BOARD MEMBER MELAS: Commercial or private. It's
    18 probably more likely to interfere with the smaller
    19 planes.
    20 MR. SILVA: No, I'm not aware of, and I would note
    21 that there's actually-- I grew up in Boston, and if
    22 anyone's ever flown into Boston airport, into Logan,
    23 when they're making the final approach, they have to fly
    24 over one of-- a very large coal-fired power plant in the
    79
    KEEFE REPORTING COMPANY
    1 final approach, and we've always wondered what that was
    2 doing to some of the commercial aircraft and the jet
    3 engines, but I've never heard of any aircraft actually
    4 suffering any harm from the flue gas exposure. There
    5 has--
    6 BOARD MEMBER MELAS: Of course I would imagine that

    7 the gas-fired turbine chutes, they exhaust up at a much
    8 higher velocity than the coal-fired plant would.
    9 MR. SILVA: It does, and I'd also note that one of
    10 the things is that natural gas just in the-- as a
    11 working fluid and even as an-- there's considerably less
    12 volume to deal with. I mean, the-- just the quantity of
    13 the pollutant expelled by similar-sized coal-fired power
    14 plant compared to similar-sized natural gas-fired
    15 facility, it's rather astonishing.
    16 BOARD MEMBER MELAS: Oh, no-- yeah, no question
    17 about that. I'm talking about velocity of the
    18 pollution--
    19 MR. SILVA: Yeah.
    20 BOARD MEMBER MELAS: -- flow going up, because you
    21 have a substantial amount of testimony both in
    22 Naperville and up in Grayslake about that question.
    23 MR. SILVA: It can create-- and one of the things
    24 that-- some of the dispersion models have to be quite
    80
    KEEFE REPORTING COMPANY
    1 sophisticated to account for it. There are local
    2 microclimate variations that can be created, especially
    3 if the unit is going to be located in a river valley,
    4 for instance, where there is a thermal clime that
    5 develops during winter months. So there are some areas

    6 that we're aware of where there are some issues,
    7 especially on low or high pressure days. I know there
    8 are several instances along the Ohio River Valley where
    9 some stacks are actually at more or less eye level with
    10 some communities on-- located on bluffs overlooking
    11 them, and those-- they actually do experience hitting
    12 and other downwash effects, but that's fairly unusual
    13 meteorology and not something that we've ever seen as a
    14 common or more difficult problem.
    15 BOARD MEMBER MELAS: One last item. Getting back
    16 to the renewables, you wouldn't-- would you or would you
    17 not consider a nuclear plant to be renewable?
    18 MR. SILVA: That's like my favorite trick question,
    19 and I've got an easy out, because when we're looking at
    20 any generation technology, we look at the life cycle of
    21 the technology, and one of the things that we've
    22 actually been looking at is the waste products in the
    23 construction to the decommissioning of the facilities.
    24 Nuclear has an ongoing and well-recognized waste product
    81
    KEEFE REPORTING COMPANY
    1 handling issue that I think until that particular issue
    2 is resolved, it puts the future of the industry in some
    3 question. I'd just like to note, though, that NRDC is
    4 not opposed to nuclear technology as a technology. We

    5 feel that in its current application, the risks outweigh
    6 the current benefits.
    7 BOARD MEMBER MELAS: Would that be true were you
    8 ever to achieve fusion rather than fission?
    9 MR. SILVA: Well, we could conceive some
    10 applications of nuclear technology where there are
    11 actually adequate safeguards in the handling and storage
    12 of spent fuel that would be appropriate. Fusion, we
    13 don't even-- I mean, it's too far down to--
    14 BOARD MEMBER MELAS: Pie in the sky.
    15 MR. SILVA: Pie in the sky, but a lot of this pie
    16 in the sky--
    17 BOARD MEMBER MELAS: So was the Manhattan Project.
    18 MR. SILVA: Right. But so was solar-- thin-film
    19 photovoltaics, but now we're actually manufacturing that
    20 in Chicago. So while we recognize that we don't know
    21 exactly what's going to happen, again, we go back-- we
    22 go through the whole life cycle of the product and see
    23 what it contributes and what its downsides are.
    24 BOARD MEMBER MELAS: Thank you.
    82
    KEEFE REPORTING COMPANY
    1 BOARD MEMBER FLEMAL: Did I understand correctly
    2 that the gas-fired power plants you were referring to in
    3 the northeast were largely combined-cycle?

    4 MR. SILVA: Almost exclusively.
    5 BOARD MEMBER FLEMAL: Almost exclusively?
    6 MR. SILVA: I can probably include in my comments a
    7 list of all the units.
    8 BOARD MEMBER FLEMAL: The-- And are those
    9 dominantly peaker plants or are they base-load, cover
    10 the range?
    11 MR. SILVA: The-- There are several units that have
    12 been proposed but not yet constructed by several
    13 successors to the incumbent utility generating assets.
    14 Some developers actually came in and bought coal-fired
    15 and oil-fired units and have announced recently that
    16 they intend to repower them, and those units are
    17 intended to operate as base-load units. The great
    18 majority in my understanding-- and I don't believe the
    19 economics have changed dramatically-- is that the
    20 combined-cycle units that are operating today are
    21 load-following units.
    22 BOARD MEMBER KEZELIS: Are what?
    23 MR. SILVA: Load-following.
    24 BOARD MEMBER KEZELIS: Thank you.
    83
    KEEFE REPORTING COMPANY
    1 MR. SILVA: They are intermediate. They are
    2 dispatched-- They are not the first to dispatch, but

    3 they certainly would be operating well before any peak
    4 demand conditions.
    5 BOARD MEMBER FLEMAL: What's your understanding
    6 about the nature of the peaker plants that have been
    7 proposed in Illinois in terms of whether they're single-
    8 or combined-cycle?
    9 MR. SILVA: My understanding is that your-- the
    10 overwhelming majority of the projects are single-cycle
    11 units. I've seen some breakouts, and I've only-- I
    12 believe out of fifty or sixty, five or ten seem to
    13 suggest that they're actually intended to be base-load
    14 units. Some of them include some repowerings in
    15 Illinois.
    16 BOARD MEMBER FLEMAL: Well, is there a difference
    17 here, then? Are we talking about two different kinds of
    18 facilities, those that you're encountering in the
    19 northeast and the ones that are down to the spur of why
    20 we're here today?
    21 MR. SILVA: At first glance, yes, except that's--
    22 there was a kind of gold rush mentality four years ago
    23 in New England. It-- The perception was you had to get
    24 in quickly into the market, and quickly meant getting--
    84
    KEEFE REPORTING COMPANY
    1 bulking a jet engine on the ground, and a single-cycle

    2 was frequently the way to go. Many of those projects
    3 failed. They encountered a rather wilting opposition
    4 from the communities and in some occasions the
    5 permitting agencies that felt that this was not the
    6 appropriate technology to be using, and in some of-- in
    7 many occasions the public service commissions also had a
    8 say, and they were looking for combined-cycle because
    9 the units are often more efficient.
    10 At the time there was a limited amount of natural
    11 gas supply available in New England. I know that that's
    12 an issue that is maybe slightly resolved in that the
    13 Alliance Pipeline is starting to serve parts of northern
    14 Illinois, and there's expectation that there will be
    15 additional capacity expansions in the region. But for
    16 New England, there was also the issue of some of the
    17 units, there was also a race to get and lock in
    18 available natural gas supplies. In fact, two units to
    19 my knowledge are intending to rely exclusively on
    20 liquefied natural gas imported from Algeria.
    21 BOARD MEMBER FLEMAL: But those are facilities in
    22 New England.
    23 MR. SILVA: In New England. They are intending to
    24 ship it over by tanker from Algeria, and those units
    85
    KEEFE REPORTING COMPANY

    1 over there have figured out that's economical.
    2 BOARD MEMBER FLEMAL: Do you see anything in that
    3 experience in New England that ought to be object
    4 lessons for us here in Illinois?
    5 MR. SILVA: Well, one of them was that there was
    6 some fairly recent arguments put forward against what we
    7 thought were some fairly marginal projects. I mean,
    8 it's similar numbers. It was just a huge volume, 20,000
    9 megawatts, I think, in proposed projects at one point,
    10 and there was some-- and many of them were being sited
    11 on top of one another, and there were questions about
    12 just-- about whether it would be-- unduly tax not only
    13 the natural gas delivery system with construction of all
    14 the laterals; also the question of the host communities
    15 and the adverse impacts.
    16 There's a region in Massachusetts, Blackstone
    17 Valley, immediately north of the Rhode Island border
    18 that at one point had six or seven projects, and I think
    19 that ultimately four were built, and it was again a
    20 case-by-case assessment by a variety of siting agencies,
    21 and in many cases it uncovered that some of the
    22 developers were actually simply preparing three or four
    23 sites, and simply whichever site came through first they
    24 were permitting, so it may be a case that not all of the
    86
    KEEFE REPORTING COMPANY

    1 units we're currently facing will actually go in, but I
    2 would say that if anything that kind of came clear was
    3 that there wasn't necessarily the need to rush to a
    4 decision on every single project; that it might be a
    5 situation where, you know, the first 8 to 10 thousand
    6 megawatts might be a logical place to stop when you
    7 consider where you are and see if this is actually in
    8 the best interests.
    9 BOARD MEMBER FLEMAL: A lot of the downside that
    10 you just mentioned regarding New England's experience
    11 seems to be a downside that was borne by the investors.
    12 MR. SILVA: Uh-huh.
    13 BOARD MEMBER FLEMAL: A lot of money was obviously
    14 poured into planning some of these and for one reason or
    15 another they weren't built. Were there downsides as
    16 well to the environment in that experience?
    17 MR. SILVA: Well, in terms of-- and there were
    18 potential downsides just in the sheer volume of the
    19 number, and there's also-- I mean, much of Illinois is
    20 in attainment for most of the criteria of pollutants, so
    21 much of Massachusetts is not in attainment. For
    22 example, a big chunk of Maine is free and clear, but
    23 there are portions of it as well. Most of the states
    24 are all impacted by ozone precursor pollution, so there

    87
    KEEFE REPORTING COMPANY
    1 was also some different issues there. There were
    2 already adverse impacts. In the case of Illinois, you
    3 have somewhat of a luxury that you can avoid forcing the
    4 situation as to what's currently experienced across New
    5 England and the eastern seaboard, so in one way we would
    6 offer the object lesson that choose carefully.
    7 BOARD MEMBER FLEMAL: In a slightly different
    8 direction-- but it actually ties in a little to what you
    9 just noted-- you had stated your opinion that the
    10 presence of a NOx waiver in Illinois acted in some way
    11 to discourage what you would consider to be the optimum
    12 setup of a power generation mix. Could you walk us
    13 through some examples or an example as to how you see
    14 that nexus between NOx waiver and the ultimate mix of
    15 power generation that develops?
    16 MR. SILVA: In our eyes, the 182(f) NOx waiver has
    17 essentially extended the status quo. It's bought
    18 Illinois additional delays for several more years than
    19 it arguably would have had so that we would be farther
    20 along in actually pursuing reductions from a variety of
    21 sources, not just-- power plants I know are your primary
    22 focus in this series of hearings, but there are also
    23 other industrial boilers, which for Illinois are also a
    24 substantial inventory of NOx emissions on their own-- in

    88
    KEEFE REPORTING COMPANY
    1 their own right.
    2 There's been mention in passing about combined heat
    3 and power facilities. That's a very innovative
    4 technology where the-- in addition to generating
    5 electricity, they also create thermal heat in the form
    6 of steam that's used usually on site or at an adjacent
    7 facility for a useful process. Projects like those
    8 arguably have been in some ways frustrated, because
    9 those projects arguably would have been moving in if--
    10 because the Clean Air Act is supposed to be
    11 technology-forcing and it's supposed to be pushing
    12 existing sources to clean up. The-- Under the Title I,
    13 sources would have been facing diminishing allowances
    14 that are required to have been offsets, so there would
    15 have been an incentive to replace these same sources of
    16 pollution with cleaner sources.
    17 Instead, the 182(f) waiver simply stalled
    18 everything where it was, and now we're waiting for the
    19 NOx SIP call, hoping it will be a cure-all for all the
    20 woes, and frankly, we don't believe it will get Illinois
    21 into attainment on its own without additional
    22 reductions, so in a way, that it's actually discouraged
    23 the introduction of the most innovative,
    24 state-of-the-art facilities. And also, from the

    89
    KEEFE REPORTING COMPANY
    1 regulatory assessments that we've seen on the air
    2 permits for existing facilities, the region is not
    3 looked at elsewhere in the country as a technology
    4 leader in terms of requiring the best and
    5 state-of-the-art pollution controls, which we think it
    6 should be doing in recognition of the severity of the
    7 ozone problem. In fact, we expect it's going to worsen
    8 considerably over the next decade here without firm
    9 regulations.
    10 BOARD MEMBER FLEMAL: You don't believe that the
    11 NOx SIP call will be technology-forcing?
    12 MR. SILVA: The NOx SIP call is going to get
    13 Illinois towards attainment of the-- I mean, in our
    14 mind, the NOx SIP call is just a tool to achieve
    15 assignment of the one-hour ozone standard and hopefully
    16 eventually the eight-hour ozone standard, but it will
    17 have a technology-forcing edge to it, but arguably, the
    18 182(f) NOx waiver has-- will mute its-- the ability. I
    19 mean, we're going to see elsewhere across the upper
    20 Midwest a great deal more in the way of technology for
    21 some turnover in fleets and in sources, and we're going
    22 to see some fairly innovative strategies from some of
    23 the affected sources.
    24 We saw a whole range of tactics and behaviors in

    90
    KEEFE REPORTING COMPANY
    1 the existing ozone-- I'm sorry-- NOx trading market that
    2 serves the ozone transport region in the northeastern
    3 United States, which started in 1999 and entered its
    4 second year this year, and we've seen a lot of activity
    5 happening there, and a lot of the sources report to us
    6 and in trade publications that they're motivated in
    7 large part by the requirements of those programs. In
    8 our minds, that's kind of a lost opportunity. They're
    9 not going to recover ability because of the 182(f) NOx
    10 waiver.
    11 BOARD MEMBER FLEMAL: I guess I still don't quite
    12 understand how the presence of the caps that occur under
    13 the NOx SIP call won't effectively demand that power
    14 generators generally apply some of the cleanest possible
    15 technology simply so that they can emit under the caps.
    16 MR. SILVA: Well, in part-- and I'm kind of hedging
    17 here because I don't want to rob Brian Urbaszewski of
    18 the American Lung Association of a large part of his
    19 argument-- but one of the things that we find
    20 problematic about the way NOx allowances are being
    21 allocated under the NOx SIP call on several state
    22 rule-makings is that they're favoring the incumbent
    23 sources at the expense of future sources and that

    24 cutting-edge technology.
    91
    KEEFE REPORTING COMPANY
    1 If you're a coal-fired power plant and you're
    2 sitting on just enough allowances to squeak by, it's
    3 going to cost a-- four or five years down the road,
    4 when-- it's not that first or second year, but it's
    5 going to be the fourth or fifth year of the NOx SIP call
    6 where it's going to become increasingly difficult for
    7 new sources to get in. They're going to have to be out
    8 there looking and knocking off an incumbent source,
    9 whereas an incumbent source will have a fully amortized
    10 point source doing whatever it does, maybe manufacturing
    11 process, maybe generating electricity. They're going to
    12 have no incentive unless that new source that wants to
    13 get into the market is willing to outbid them,
    14 essentially, and we believe that in some cases,
    15 incumbent sources are simply going to hoard their
    16 allowances and they won't be willing to offer them into
    17 the marketplace. So in that sense, we believe that
    18 there's actually disincentive being created.
    19 BOARD MEMBER MCFAWN: But that's not really
    20 related, then-- wait a minute. I think-- I lost my
    21 train of thought here. But you're saying, then, that
    22 that's because of the way that the trade program and the

    23 allocation program under our SIP call is currently
    24 proposed. I thought your question went to a different
    92
    KEEFE REPORTING COMPANY
    1 topic than that, the waiver. Excuse me. It took me a
    2 moment to think back, and we've jumped from topic to
    3 topic, but I think Dr. Flemal was saying, well, how does
    4 the waiver act as a disincentive to innovative
    5 technology?
    6 MR. SILVA: The waiver essentially excuses or
    7 actually conditions NOx reductions within the affected
    8 area, which for our purposes is the Chicago
    9 non-attainment area and the rest of the Lake-- the
    10 affected Lake Michigan area under the waiver. Without
    11 that waiver, the technology-forcing requirements of
    12 Title I of the Clean Air Act would require offsets that
    13 would actually be valuable enough to existing sources
    14 that there would be an essential-- an incentive for them
    15 to turn over. And we would not see a wholesale
    16 turnover. It wouldn't be anything approaching 100
    17 percent. We're seeing behavior in similar markets.
    18 About 20 percent of resources would turn over, but that
    19 would be enough for better, cleaner technologies to get
    20 a foothold.
    21 And I'm drastically oversimplifying the-- that

    22 argument, and this is one that I've been involved with
    23 for four or five years, and we've argued at length in
    24 various regulatory forms, but I'll be happy to take
    93
    KEEFE REPORTING COMPANY
    1 another crack at it in the comments I'll actually submit
    2 to see if I can--
    3 BOARD MEMBER MCFAWN: We would appreciate that. It
    4 is a difficult topic.
    5 CHAIRMAN MANNING: Going on to a different one and
    6 maybe final one, if I might, we've-- you testified early
    7 in your comments about the growth of total electric
    8 demand in the country.
    9 MR. SILVA: Yes.
    10 CHAIRMAN MANNING: I think you said in 2020 we'd
    11 have something like another 300,000 megawatt capacity
    12 needed. Do you have any specific information regarding
    13 Illinois' place in all of that and what maybe Illinois'
    14 total electrical demand increases are going to be over
    15 the next several years?
    16 MR. SILVA: The 2020 figure is based on the--
    17 CHAIRMAN MANNING: It was 2020 instead of 2012?
    18 I'm sorry.
    19 MR. SILVA: Well, no, out to 2020. The Energy
    20 Information Administration using a forecast model, which

    21 they have adjusted and is subject to peer review
    22 analysis by some economists on a biannual basis, they
    23 tweak to recognize changes such as the restructuring in
    24 various states, changes in industry, ownership, the
    94
    KEEFE REPORTING COMPANY
    1 entrance of new market participants and changes in
    2 demand across the country to essentially forecast. The
    3 snapshot that they offer is that 300,000 megawatts of
    4 new capacity will be required by 2020 at a minimum.
    5 That model also points out that if you look to
    6 2010, there's going to be an intermediate need of at
    7 least 100,000 megawatts. Now, using that-- their model
    8 forecasts that the overwhelming majority of that new
    9 capacity will be natural gas-fired. We-- There are a
    10 variety of other industry-- or in some of the
    11 proprietary analyses that indicate that there are slight
    12 differences and different estimates. It assumes that--
    13 a fairly healthy economy with a load growth that more or
    14 less tracks future growth in gross national product.
    15 Some people actually take issue with that, noting
    16 that there's actually been a slight decoupling in the
    17 energy intensity of the U.S. economy over the last few
    18 years. We don't know if that number is accurate. It
    19 serves as a useful planning benchmark. Unfortunately,

    20 that model is very difficult to run on a regional basis,
    21 and we are aware that the reliability councils do some
    22 planning out to-- usually in ten-year increments-- a
    23 year ahead in ten-year increments for their own
    24 reliability planning purposes, but we haven't seen a
    95
    KEEFE REPORTING COMPANY
    1 fairly sophisticated model that we have access to, and
    2 being a nonprofit-- a corporation or trade association
    3 may have access to information, so that might be a
    4 question you might want to put to some of the industry
    5 participants.
    6 I did see in several instances in testimony
    7 submitted already examples for-- specifically for MAIN,
    8 but quite frankly, I spent about four days looking for
    9 similar data and could find it nowhere anywhere on the
    10 Internet without paying several thousand dollars for it.
    11 CHAIRMAN MANNING: Thank you.
    12 BOARD MEMBER KEZELIS: I have one more question.
    13 CHAIRMAN MANNING: Go ahead.
    14 BOARD MEMBER KEZELIS: As you know, California and
    15 Illinois are both in various stages of deregulation of
    16 their electric utility industries, and we've heard
    17 testimony over the last number of days about the effect
    18 of deregulation and the encouragement that it may have

    19 caused to the peaker industry here in this state. What
    20 is your opinion or your organization's opinion with
    21 respect to the flurry of activity for peaker plants in
    22 the New England states? What precipitated that?
    23 MR. SILVA: Part of it was that there was
    24 deregulation in quite a few of the states. That was the
    96
    KEEFE REPORTING COMPANY
    1 driving mechanism. You can also go back to simply FERC
    2 with their Order 888 when they opened up the wholesale
    3 market, creating conditions where you saw nationwide
    4 interest in new capacity, and it really was the driver--
    5 restructuring has been the ultimate driver behind this.
    6 Also, frankly, unabashedly, we've been trying to
    7 hitch our wagon to the train, because we see this as an
    8 opportunity to recognize and capture some of the
    9 environmental externalities associated with electric
    10 generation. We don't think that people should be
    11 polluting air and water to generate electricity in the
    12 way they're currently doing, and we're maximizing the
    13 opportunity. In some cases we've been at a state level
    14 very successful. Massachusetts, for example, we're
    15 backing out of a lot of coal-fired capacity right now
    16 and replacing it with much cleaner natural gas
    17 generation. There's a renewed emphasis on energy

    18 efficiency opportunities and such. So in a way, there
    19 are a lot of-- restructuring is the big driver, but
    20 there are also some interesting and in some cases fairly
    21 unique issues at hand. In some cases, some people
    22 simply hate incumbent utility.
    23 BOARD MEMBER MCFAWN: If you will indulge me, I
    24 have a couple of questions, one that follows up on your
    97
    KEEFE REPORTING COMPANY
    1 last comment. You mentioned just now that the northeast
    2 is moving towards more efficient energy production and
    3 also reduction in demand, and you mentioned that
    4 throughout your testimony, and can you tell me, what was
    5 the impetus in California and New York, and now you just
    6 mentioned the Northeast too, for this move toward energy
    7 efficiency and renewable resources and also shaving the
    8 need or the demand? Because other trade journals
    9 actually say that we've moved away from that.
    10 MR. SILVA: Well, I guess there are-- incumbent
    11 electric utilities-- and if you look at the-- there are
    12 various articles tracking this-- it's really quite
    13 astonishing-- have largely abandoned energy efficiency
    14 measures, mainly because they were largely mandated
    15 programs by public service commissions across the
    16 country, and as-- for various reasons, including

    17 restructuring, public service commissions withdrew those
    18 requirements, and the result was you've seen a wholesale
    19 kind of abandonment of energy efficiency.
    20 BOARD MEMBER MCFAWN: That's why they moved away
    21 from that, but why did California go-- you mentioned
    22 that California went towards it.
    23 MR. SILVA: California actually took the opposite
    24 tact. It actually goes back to a day starting in 1974,
    98
    KEEFE REPORTING COMPANY
    1 with legislation. They actually decided that one of the
    2 things that they were going to pursue was trying to
    3 diversify the energy resources. It was-- '74, obviously
    4 it was a reaction in part to the energy crisis, and they
    5 felt that they needed to kind of diversify their energy
    6 portfolio, and energy efficiency was seen as an
    7 opportunity to lower demand and kind of soften the blow
    8 in the economy.
    9 That actually-- And NRDC was very much engaged in
    10 that advocacy very early along, along with a host of
    11 other organizations. As much as we'd like to claim all
    12 the credit, there were a lot of very good people making
    13 some very good arguments, including the Union of
    14 Concerned Scientists, utility rate payers, Consumer
    15 Federation of America and others that pushed those very,

    16 very hard in states like California, which frankly had
    17 very sympathetic regulators and legislatures that wanted
    18 to see those programs succeed and created the conditions
    19 for them to succeed.
    20 BOARD MEMBER MCFAWN: And they were sustained over
    21 the last 25 years, then.
    22 MR. SILVA: Yes.
    23 BOARD MEMBER MCFAWN: Okay. On a point-- just a
    24 clarification point, you said that NRDC was concerned
    99
    KEEFE REPORTING COMPANY
    1 about water use in single-cycle units. I've always
    2 thought that the single-cycles didn't cause that concern
    3 and it was the combined-cycles.
    4 MR. SILVA: There-- A great many single-cycle
    5 combustion turbine projects that we've seen-- not just
    6 the few that we've looked at in Illinois, but in--
    7 elsewhere across the country-- rely on once-through
    8 cooling. Water is used once for evaporative cooling at
    9 the inlet duct and then essentially discarded. That,
    10 depending on the size of the unit-- and remember, the
    11 single-cycle turbines, we've seen anywhere from 80, some
    12 projects have 1,000 megawatts, so the water demand is
    13 going to be quite dramatic. Some of the combined-cycle
    14 units we've seen actually rely on dry cooling where

    15 there is essentially a process that involves a closed
    16 loop and one-time withdrawal of water.
    17 So the demands-- even though the unit-- the
    18 technology's more efficient, in some applications the
    19 combined-cycle units can be hogs as well. They can be
    20 quite water intensive. So-- But there is-- there are
    21 technology options. They also do have some drawbacks.
    22 One of the things is that they usually suffer derates,
    23 meaning losses of efficiency, up to about 5 percent when
    24 you impose thrifty or water conservation measures on
    100
    KEEFE REPORTING COMPANY
    1 those.
    2 BOARD MEMBER MCFAWN: In your-- When you say the
    3 word "unit" in that context, are you talking about
    4 single and/or combined, the derate question?
    5 MR. SILVA: The derate question would apply to both
    6 a single- or combined-cycle unit. Derate may not be the
    7 perfect term, but it would suffer a loss of efficiency
    8 of up to 5 percent. I think that is what I've seen most
    9 recently in literature.
    10 BOARD MEMBER MCFAWN: Okay. One last question.
    11 You mentioned that the NRDC has sought in California and
    12 New York more comprehensive assessment of the need for
    13 the units and the siting and all that, and then you

    14 explained to us about New York's way of siting units.
    15 Was the NRDC involved in New York adopting that
    16 approach, or how-- have you been successful in seeking
    17 this--
    18 MR. SILVA: We lobbied for portions of amendments
    19 to the Article X law. It's my understanding that
    20 several NRDC staff-- and this law-- parts of this law
    21 have been enacted ten to fifteen years-- were integral
    22 in its formulation and also in its implementation. Some
    23 of them actually left when the law was originally
    24 enacted, went over to the New York State government, and
    101
    KEEFE REPORTING COMPANY
    1 we now have to deal with them, and they don't always
    2 listen to our arguments, as the Athens project showed us
    3 that. We were pointing out that no-- this really should
    4 be somewhere else, and they were saying, no, they did
    5 everything they actually had to, and we're going to
    6 approve it.
    7 BOARD MEMBER MCFAWN: And it was approved?
    8 MR. SILVA: And it was approved.
    9 BOARD MEMBER MCFAWN: Thank you.
    10 MR. SILVA: Thank you.
    11 BOARD MEMBER GIRARD: I just have a brief question
    12 to clarify the role of that state board in New York.

    13 Does it then rule on the siting application for every
    14 new generating facility in the state, or does it only
    15 act as an appeal board if a local decision is contested
    16 by one of the parties?
    17 MR. SILVA: I'm searching for the-- What I'm
    18 searching for is there's a threshold amount generation.
    19 Eighty megawatts.
    20 BOARD MEMBER GIRARD: Okay.
    21 MR. SILVA: So any unit over 80 megawatts, it goes
    22 through the New York Siting Board, and it actually
    23 coordinates with New York Department of Environmental
    24 Conservation in the issuance of the state public water
    102
    KEEFE REPORTING COMPANY
    1 discharge permit and the Title V clean air permit for
    2 the facility, so the intention and driver behind the
    3 process is one-stop shopping, and that's when the issue
    4 of the local zoning-- well, the local zoning process
    5 happens in parallel. If it actually does come in
    6 conflict with the siting decision, there is an
    7 opportunity for judicial review, but it trumps local
    8 zoning decisions against approved projects.
    9 BOARD MEMBER GIRARD: Could you give us your
    10 opinion on whether that's a model that would be useful
    11 in Illinois?

    12 MR. SILVA: I think that for Illinois, it would be
    13 quite worthwhile to look at most of these processes that
    14 offer integrated evaluation. I don't think that it's
    15 necessarily the best approach. Another example that's
    16 immediately adjacent to you is Wisconsin, which has a
    17 long and a fairly well-- highly regarded among energy
    18 officials and energy analysts as having a very good
    19 process of evaluation.
    20 Now, that doesn't mean that the-- it's going to be
    21 a great fit for Illinois' circumstances. I think when
    22 it comes down to it, frankly, you're going to have to
    23 pick and choose among what the existing programs are
    24 defined, what works best. I'm also saying that,
    103
    KEEFE REPORTING COMPANY
    1 frankly, recognizing political realities, that a lot of
    2 the stakeholders in this process have interests that
    3 they're seeking to protect, and they will probably lobby
    4 quite forcefully to protect those interests.
    5 So I am not suggesting that a comprehensive perfect
    6 siting law is the only thing you should be looking at,
    7 but I think the whole process of looking at good siting
    8 laws that offer an inclusive process for municipalities
    9 in particular that currently are feeling like they're
    10 getting battered by the current existing process, and

    11 it's kind of football we have going on between, you
    12 know, the regulative and state agencies over whether or
    13 not they can stop this, whether or not they have the
    14 authority to make-- issue a moratorium or not.
    15 I think it would be more useful actually seeing
    16 where you can actually collaborate and add some
    17 certainty, because the other thing is that many of these
    18 projects that you're looking at are worthwhile and will
    19 add a significant reliability to the system. The
    20 question is that, you know, which ones and how do you
    21 avoid adverse public health and environmental hotbeds.
    22 BOARD MEMBER GIRARD: Thank you.
    23 MR. SILVA: Thanks.
    24 HEARING OFFICER JACKSON: Thank you very much, Mr.
    104
    KEEFE REPORTING COMPANY
    1 Silva. We know you've come quite a distance to speak
    2 today, and we really appreciate it.
    3 CHAIRMAN MANNING: Thank you.
    4 MR. SILVA: Thank you very much for the
    5 opportunity.
    6 HEARING OFFICER JACKSON: Thank you. Mr. Silva,
    7 you were going to submit public comments later on,
    8 right, as opposed to filing something?
    9 MR. SILVA: Yes.

    10 HEARING OFFICER JACKSON: Mr. Urbaszewski? Oh,
    11 hang on one second. Let's go off the record here, five
    12 minutes.
    13 (Brief recess taken.)
    14 HEARING OFFICER JACKSON: We're back on the record.
    15 MR. URBASZEWSKI: My name's Brian Urbaszewski. I'm
    16 the Director of Environmental Health Programs for the
    17 American Lung Association. I'm also a board member of
    18 the Illinois Environmental Council, and I'm offering
    19 joint comments for both organizations.
    20 As you know, the American Lung Association was
    21 founded in 19-- well, the American Lung Association of
    22 Metropolitan Chicago was founded in 1906, and it
    23 actually predates the American Lung Association national
    24 organization. We advocate for people with lung disease
    105
    KEEFE REPORTING COMPANY
    1 in Cook County. That's over 14,000 people. The
    2 Illinois Environmental Council is a state-wide group
    3 representing several dozen environmental groups and acts
    4 as an environmental education resource and a legislative
    5 aid to those various groups around the state.
    6 We are both actively involved in the policy
    7 question of how to reduce power plant emissions in the
    8 state of Illinois. We have been vocal in a current

    9 rule-making before the board that will mandate
    10 significant reductions in NOx emissions from large
    11 electrical generation units state-wide. Likewise, we
    12 believe significant pollution reductions from existing
    13 and future power generation facilities are warranted to
    14 protect the health of Illinois citizens.
    15 I'd like to again support the testimony submitted a
    16 while ago by Mr. Keith Harley before this board-- I
    17 believe that was at the Lake County hearing, but I can't
    18 be certain on that-- but stating again that the NOx
    19 waiver for the Chicago Metro area should be repealed.
    20 We believe Governor Ryan has it in his power to do
    21 this. The State of Illinois asked for the NOx waiver
    22 several years ago based on preliminary airshed modeling,
    23 and USEPA granted it. However, this occurred prior to
    24 the call for significant NOx reductions in Illinois and
    106
    KEEFE REPORTING COMPANY
    1 19 other states under the provisions of the NOx SIP call
    2 from USEPA.
    3 Due to improved regional ozone modeling and the
    4 requirements of the NOx SIP call, Illinois will now be
    5 requiring all EGU's in Illinois, regardless of
    6 geographic location in the state, to significantly
    7 reduce ozone season NOx emissions. Illinois EPA has

    8 also proposed significant NOx reductions from power
    9 plants state-wide more than a year before the SIP will
    10 be in effect, largely due to commitments needed to
    11 achieve NOx emissions to get the St. Louis Metro East
    12 area into attainment with the one-hour standard. That
    13 would occur in 2003. The NOx SIP call would occur in
    14 2004.
    15 The state is being logically inconsistent in
    16 retaining the NOx waiver. The waiver is premised on the
    17 contention that the NOx reductions in the-- that NOx
    18 reductions in the Chicago ozone non-attainment area, the
    19 six-county region, would increase ozone levels due to a
    20 NOx disbenefit. Yet in constructing the proposed
    21 Illinois NOx rule for electrical generation units, the
    22 state is requiring EGU's within the Chicago ozone
    23 non-attainment area to reduce NOx emissions as well as
    24 EGU's located outside this area. The reasoning used in
    107
    KEEFE REPORTING COMPANY
    1 granting this conditional waiver is moot if reductions
    2 within the area are being required in order to achieve
    3 regional attainment with the one-hour ozone standard.
    4 The continuing presence of this waiver is precisely
    5 why peaker simple-cycle unit power plants are counted as
    6 minor NOx sources in the Chicago ozone non-attainment

    7 area when they emit less than 250 tons of NOx per year.
    8 For the same reason, combined-cycle steam generation
    9 plants could be treated as major sources only when they
    10 emit more than 100 tons of NOx per year. There's a
    11 difference between the way federal law treats a steam
    12 unit or steam-powered unit versus a combustion turbine
    13 unit. That accounts for the difference between the two
    14 numbers.
    15 Absent the waiver, any power plant emitting more
    16 than 25 tons a year of NOx would be required to meet
    17 stricter major source standards. New major sources of
    18 NOx within the Chicago non-attainment-- ozone
    19 non-attainment area would therefore be required to meet
    20 lowest achievable emission rates, or LAER, for NOx and
    21 be required to submit offsets in a ratio of 1.3 to 1, as
    22 stated in the Clean Air Act Amendments of 1990.
    23 The proliferation of these additional NOx sources,
    24 whether classified as major or minor, will invariably
    108
    KEEFE REPORTING COMPANY
    1 erode benefits achieved through the-- an Illinois cap
    2 and trade program for NOx under the NOx rule. As these
    3 projects will require NOx credits, all these credits--
    4 all these units that are going in will require NOx
    5 credits under the trading rule, the State of Illinois

    6 could become a net importer of NOx credits in a
    7 multi-state trading arena. As such, the State would in
    8 actuality be emitting more NOx than assumed in the
    9 airshed modeling which is being used to assert that
    10 Illinois will meet the one-hour ozone standard
    11 requirements. Simply, with more NOx being emitted in
    12 the state, it is likely that ozone levels will be higher
    13 than they otherwise would be and as they are assumed in
    14 the attainment model.
    15 In addition, ozone has been shown to be dangerous
    16 even at levels below the one-hour standard, and this
    17 fact prompted the USEPA to set a tighter eight-hour
    18 ozone standard in 1997. Industry has fought this
    19 standard in litigation, but even the courts have noted
    20 that a scientific basis for establishing a tighter
    21 standard has been more than adequately proved. The main
    22 question in the case, the court case, is whether
    23 congress is allowed to give USEPA the authority to set
    24 scientific health standards and not whether a real
    109
    KEEFE REPORTING COMPANY
    1 public health need for such a standard exists. We
    2 expect the standard will be upheld when oral arguments
    3 are made before the U.S. Supreme Court next month,
    4 starting next month.

    5 The vast majority of new peaker or simple-cycle
    6 combustion turbine power plants in northeastern Illinois
    7 are being permitted for NOx emission rates in the range
    8 of 15 to 25 parts per million, although there is one
    9 project that ranges as high as 42 parts per million.
    10 There are similar simple-cycle facilities in other
    11 states that are being permitted at levels as low as 3.5
    12 parts per million. These are achievable rates and are
    13 potentially several times lower than what is being
    14 permitted in Illinois. This is the LAER, the lowest
    15 achievable emissions rate, target generators in
    16 northeastern Illinois should be meeting for simple-cycle
    17 turbines.
    18 We should not be repeating past mistakes in
    19 approving new power plants when we know with certainty
    20 that these new power plants could and should be required
    21 to meet significantly lower NOx levels than those at
    22 which they are currently being permitted. By not asking
    23 for the removal of the waiver, the Governor is ignoring
    24 this problem and activity discouraging new power plants
    110
    KEEFE REPORTING COMPANY
    1 from meeting tighter and achievable emission standards.
    2 I'd also like to talk about energy efficiency and
    3 renewable energy. Energy efficiency and renewable

    4 energy sources could provide a significant portion of
    5 electrical demand in Illinois. Encouraging the wise use
    6 of electrical power through the use of more efficient
    7 lighting, climate control and mechanical systems would
    8 negate the need for a portion of new power generation
    9 and the associated-- and remove the need or remove the
    10 presence of associated air pollution, noise and water
    11 demands due to fuel combustion at electrical
    12 generators. For unavoidable growth in electrical
    13 demand, greater use should be made of nonpolluting or
    14 less polluting renewable sources of electricity, and I
    15 would rely on the definition that Mr. Silva gave for
    16 renewable sources.
    17 The State apparently wishes to gift significant NOx
    18 allocations under the NOx SIP call, allocations worth
    19 significant dollars in the market, to the oldest and
    20 most polluting facilities in the state. Very few NOx
    21 allocations are also being set aside for cleaner,
    22 although potentially unneeded, new fossil-fueled
    23 generation facilities, largely natural gas peakers and
    24 combined-cycle plants. At this point in time, it
    111
    KEEFE REPORTING COMPANY
    1 appears the State does not support NOx allocations for
    2 energy efficiency and renewable energy products, even

    3 though such projects-- sorry-- renewable energy
    4 projects-- that's a typo-- even though such projects
    5 would actively displace NOx emissions in the state. As
    6 Mr. Silva said, energy efficiency is the best system.
    7 It means you don't have to burn fuel and create the
    8 pollution to get the electricity you need.
    9 We have actively called for a set-aside in IEPA
    10 meetings and before the board in hearings on the EGU NOx
    11 rule. We do so here again, as such a strategy could
    12 displace unneeded and polluting additional electrical
    13 generation units in the state.
    14 The board is charged with determining whether
    15 peaker power plants need to be more strictly regulated
    16 than Illinois' current air quality standards and
    17 regulations provide. Even though it can be convincingly
    18 argued that natural gas-- and has been convincingly
    19 argued that natural gas power plants are significantly
    20 cleaner and produce far fewer emissions per unit of
    21 electricity produced than existing coal plants for a
    22 number of pollutants, this should not be cause for
    23 celebration, and I include both simple-cycle and
    24 combined-cycle as being cleaner than existing coal
    112
    KEEFE REPORTING COMPANY
    1 generation. This should not be cause for celebration.

    2 Nor should this fact lead to a dismissal of the question
    3 as to whether new peaker power plants need to meet
    4 regulations far more stringent than these existing coal
    5 plants. We believe stronger standards are warranted,
    6 particularly in ozone non-attainment areas where we have
    7 an existing problem and will continue to have a problem
    8 under the eight-hour ozone standard.
    9 Peaker power plants, simply because they are being
    10 built after 1977, are already meeting more stringent air
    11 quality regulations than the coal plants. All coal
    12 plants in Illinois are already grandfathered out of ever
    13 meeting LAER or even the lesser best available control
    14 technology performance standards plants built in recent
    15 years have had to meet, and anything built since 1977
    16 that is going to be a major source would have to meet
    17 BACT and LAER.
    18 The real question the board should be examining,
    19 whether as part of the charge from the Governor or of
    20 its own initiative, is why so much deadly pollution
    21 continues to pour from the existing fleet of largely
    22 coal plants.
    23 Fine particulate matter is composed of a number of
    24 tiny particles, both solid and liquid aerosol, that have
    113
    KEEFE REPORTING COMPANY

    1 a diameter of less than two and a half microns.
    2 Inhalation of fine particles are associated with the
    3 following health impacts: Upper and lower respiratory
    4 infections, asthma attacks, development of chronic
    5 bronchitis and, most importantly, premature deaths. Due
    6 to these public health threats, USEPA established a fine
    7 particulate standard in 1997 based on the available
    8 medical evidence at that time. New studies done in
    9 subsequent years have validated the health impacts
    10 established in prior studies.
    11 Elevated levels of fine particulate matter are a
    12 problem in northeastern Illinois as well as several
    13 downstate areas. In 1999, the Illinois EPA collected
    14 accurate annual samples of ambient levels of fine
    15 particulate matter for the first time. Last year, that
    16 annual standard set by the USEPA was exceeded at twelve
    17 of thirteen monitors in the six-county Chicago region,
    18 four monitors in the Metro East region, as well as at
    19 monitors in Decatur, Springfield, Moline and Peoria.
    20 Nationally, fine particulate levels cause over 60,000
    21 premature deaths annually, including an estimated over
    22 3,000 deaths annually in Illinois.
    23 Research has shown that 30 to 48 percent of fine
    24 particulate matter in northern Illinois is composed of
    114
    KEEFE REPORTING COMPANY

    1 sulfate particles. Sulfates are the oxidized products
    2 of sulfur dioxide, a product emitted from power plants
    3 burning coal. Illinois coal-fired generation
    4 facilities, in fact, remain the single largest
    5 industrial sources of sulfur dioxide in Illinois,
    6 accounting for over 75 percent of sulfur dioxide
    7 emissions from all stationary sources.
    8 In addition, two of the most impressive national
    9 studies on particulates, the 1993 Harvard Six Cities
    10 Report and the 1995 American Cancer Society Study, have
    11 been dismissed by industry as junk science in recent
    12 years. However, this past July, the Health Effects
    13 Institute, an institution jointly funded by USEPA and
    14 industry to act as a neutral arbitrator in such
    15 disagreements, announced the results of their reanalysis
    16 of these landmark studies. The HEI found that the
    17 studies were valid and surprisingly found slightly
    18 higher associations between particulate levels and
    19 premature deaths than the original authors claimed.
    20 Although it is appropriate to mention that this PM 2.5
    21 standard is in final litigation and is now before the
    22 U.S. Supreme Court, the federal Court of Appeals for the
    23 D.C. Circuit has accepted the fact that the science
    24 behind the standards-- the standard verifies that fine
    115

    KEEFE REPORTING COMPANY
    1 particulates are both dangerous and deadly.
    2 It is clear that we have-- already have a serious
    3 air pollution problem due to the emissions from coal
    4 plants in Illinois. The State should ensure we do not
    5 create a similar problem for the future by allowing
    6 newer plants to be permitted at higher emission levels
    7 than are prudent and possible. We should hope that the
    8 State would not repeat this mistake of continuing the
    9 grandfather status of old facilities and make new gas
    10 facilities as clean as possible. Likewise, the board
    11 should begin the process of examining solutions to the
    12 problem of high PM 2.5 levels in Illinois, especially as
    13 they relate to power generation.
    14 In conclusion, we believe Governor Ryan should
    15 officially request USEPA repeal the NOx waiver; new
    16 generation facilities should meet LAER standards in the
    17 Chicago ozone non-attainment area; the State of Illinois
    18 should support energy efficiency and renewable energy by
    19 including the 10 percent energy efficiency/renewable
    20 energy set-aside in the Illinois NOx SIP call rule, as
    21 suggested by USEPA; the existing fleet-- and finally,
    22 the existing fleet of older coal-fired power plants
    23 significantly contributes to unhealthful levels of
    24 airborne fine particulate matter in the areas where the

    116
    KEEFE REPORTING COMPANY
    1 majority of Illinois citizens live.
    2 Such high air pollution levels, tied to thousands
    3 of premature deaths in Illinois every year, ought to be
    4 addressed through board-established limits on sulfur
    5 dioxide emission from electrical power generation
    6 facilities.
    7 Thank you. I'd be more than happy to answer any
    8 questions you may have.
    9 HEARING OFFICER JACKSON: Thank you, Mr.
    10 Urbaszewski. I will note for the record that you
    11 provided a copy of your comments, and we will mark those
    12 as American Lung Association Exhibit 1.
    13 MR. URBASZEWSKI: Also for the Illinois
    14 Environmental Council.
    15 HEARING OFFICER JACKSON: Right, right.
    16 MR. URBASZEWSKI: I'm afraid Mr. Silva drained all
    17 the questions out of the board.
    18 BOARD MEMBER FLEMAL: We're just warming up.
    19 CHAIRMAN MANNING: I do. I'll start. One of our
    20 speakers in Lake County called for the State to have an
    21 energy-- I think you called it energy strategy, and I
    22 assume you're-- some of your remarks are along that same
    23 vein. In terms of energy reductions and energy
    24 efficiencies that you're calling for, does either IEC or

    117
    KEEFE REPORTING COMPANY
    1 American Lung Association have any specific ideas in
    2 terms of programs or incentives that they would urge
    3 upon the State to look into?
    4 MR. URBASZEWSKI: Well, the one-- I-- as for broad
    5 strategies, I probably couldn't provide that right now.
    6 One important building block towards a comprehensive
    7 strategy and a way to encourage energy
    8 efficiency/renewable energy is to make it part and
    9 parcel of the NOx EGU rule that's before the board right
    10 now. We've advocated for this for well over a year,
    11 before the Illinois EPA proposed or gave language to the
    12 board for that rule. I've continued to advocate for
    13 that in board hearings on that rule.
    14 USEPA has put forth guidance that suggests that a
    15 set-aside be pulled out of the existing EGU budget and
    16 set aside for energy efficiency and renewable energy
    17 projects. Anything that is not used for those projects
    18 would go back to the existing EGU pool, so if it's not
    19 used, it's not permanently lost to existing polluting
    20 facilities.
    21 However, energy efficiency or renewable energy
    22 produces electricity or saves electricity and prevents
    23 pollution from going into the atmosphere and causing
    24 ozone problems downwind. Since these allegations have

    118
    KEEFE REPORTING COMPANY
    1 been essentially monetized, a credit is worth money on
    2 the open market. You can buy and sell it. If people
    3 are spending money to install an energy efficiency
    4 system, they are preventing pollution from going out of
    5 a power plant somewhere at the other end of the line.
    6 The people who are spending the money to save that
    7 electricity should get the monetized value of that
    8 credit. It shouldn't be going to a coal plant or gas
    9 plant that doesn't need that credit because it didn't
    10 emit the pollution. We believe that that system should
    11 be instituted.
    12 BOARD MEMBER MCFAWN: Is that the one that's-- Are
    13 you referring to the third item under your conclusion?
    14 MR. URBASZEWSKI: Let me see what the third item--
    15 there's so many numbers there. Yes. And I should also
    16 say that Mr. Dan Rosenblum from the Environmental Law
    17 and Policy Center is planning to submit extensive
    18 comments, written comments, in the board hearing on the
    19 EGU NOx rule on specifically this subject. I just
    20 touched upon it in my testimony for the board
    21 previously.
    22 BOARD MEMBER FLEMAL: I want to say first of all,
    23 hello, Brian. We're seeing you on a regular basis these
    24 days. For those of you who may not be aware, we are

    119
    KEEFE REPORTING COMPANY
    1 conducting, simultaneously with these hearings, hearings
    2 on a proposal that the agency has given us to implement
    3 the NOx rule, and Mr. Urbaszewski has been an active
    4 participant in that proceeding as well and has offered
    5 us some good perspective on that additional rule.
    6 Let me pose to you a scenario and just get your
    7 reaction on it. The scenario is this: That what we do
    8 with the NOx waiver or what we do with imposition of
    9 LAER or even BACT standards on power plants is largely
    10 irrelevant because with the severe cap that the NOx SIP
    11 call imposes on us, all of the objectives of LAER in
    12 fact are going to be practically met anyway. Right or
    13 wrong?
    14 MR. URBASZEWSKI: Well, as I said, there are
    15 numerous plants that are being permitted out there right
    16 now that have emission rates, and there are various
    17 peaker plant proposals out there that are being
    18 permitted at levels far higher than are achievable. If
    19 there was an understanding that the NOx SIP call was
    20 going to put a lid on this and we were going to be-- we
    21 as, you know, someone who would be building a peaker
    22 power plant would say, wow, we're going to have to meet
    23 LAER, why aren't they being permitted at those levels?

    24 I--
    120
    KEEFE REPORTING COMPANY
    1 BOARD MEMBER FLEMAL: Your concern is the fact that
    2 somebody's going to actually be emitting at the level
    3 they're permitted.
    4 MR. URBASZEWSKI: Correct. Why would they ask for
    5 that if they weren't going to use it?
    6 BOARD MEMBER FLEMAL: Well, I guess there's some
    7 possible answers to that, but if in fact-- well, if we--
    8 if in fact we can rely on the NOx SIP call putting this
    9 cap on emissions, which for large electrical generators
    10 would be something just in excess of 30,000 tons per
    11 year, way below what current emissions are, is it not
    12 possible that-- permit limits aside, that none of the
    13 emissions will occur at those levels?
    14 MR. URBASZEWSKI: Well, there is-- Okay. Let me
    15 see if I can separate out. If I take the coal plants
    16 getting an allocation and emitting their allocation as a
    17 given and shunt that off to one side, we have all the
    18 existing new facilities that have been permitted, peaker
    19 and combined-cycle, that as you know are vastly
    20 oversubscribing the new source set-aside by a factor of,
    21 I don't know, I think six or seven to one. There's six
    22 or seven times as much need as there are actual

    23 allocations that the State can give out, but those units
    24 that are going to-- are still going to operate, they're
    121
    KEEFE REPORTING COMPANY
    1 going to be forced to buy credits on the market, and if
    2 you assume that the existing coal plants are going to
    3 use their existing allocations to cover their own
    4 emissions and there's only going to be a portion of
    5 the-- the new source set-aside is only going to cover a
    6 portion of all the new units that are coming on line,
    7 we're going to have to import NOx credits into this
    8 state, which is to say we're going to exceed what our
    9 NOx budget is, but because you have a multi-state
    10 trading area, that's allowed.
    11 Now, the NOx modeling that's looking at what the
    12 ozone levels are going to be in Chicago at some point in
    13 the future are saying, we're assuming that what's going
    14 to be emitted in Illinois is only what Illinois is
    15 getting now. I believe that's not true. I believe that
    16 we're going to have significant importation of credits
    17 to cover the emissions that are coming out of these
    18 plants. Now, if you say that rather than having a
    19 peaker plant emitting at twenty-five parts per million,
    20 it's going to be required to emit at three and a half
    21 parts per million, that means the importation goes

    22 significantly down, meaning less NOx emitted actually in
    23 Illinois and less ozone in the Chicago non-attainment
    24 area. Does that answer your question?
    122
    KEEFE REPORTING COMPANY
    1 BOARD MEMBER FLEMAL: You just did.
    2 MR. URBASZEWSKI: That's what we had hoped.
    3 BOARD MEMBER FLEMAL: Good.
    4 BOARD MEMBER MCFAWN: But wouldn't you think that
    5 perhaps the power plant-- peaker power plant in your
    6 example would choose to overcontrol maybe down to 3.5
    7 parts per million so that it doesn't have to rely on
    8 finding credits to buy or paying the price for them?
    9 MR. URBASZEWSKI: We're not seeing that, though.
    10 They're being permitted at--
    11 BOARD MEMBER MCFAWN: I know they're being
    12 permitted, but won't the market force possibly change
    13 that example to where they will overcontrol voluntarily?
    14 MR. URBASZEWSKI: I think for that-- for the
    15 economic vision of that peaker plant owner, it would
    16 probably be cheaper to buy credits on the open market,
    17 and as you've said, as you've seen before the-- in the
    18 NOx hearing, that the costs of those credits are coming
    19 down as people understand how the market works and how--
    20 you know, that's the whole idea behind the market. It's

    21 going to lower the cost of compliance.
    22 My beef with that is is that I'm not buying that
    23 NOx credit, I'm not emitting it, but I'm breathing it,
    24 as are the hundreds of thousands of people with hung
    123
    KEEFE REPORTING COMPANY
    1 disease ultimately going to be breathing the ozone that
    2 NOx creates.
    3 BOARD MEMBER FLEMAL: But nonetheless, barring some
    4 significant import of allowances, we would still be
    5 capped at that 30,000 tons, whether it comes from a coal
    6 line, power line, a peaker power plant or any other.
    7 Isn't the net effect on the environment, with that one
    8 exception of whether or not we get into a significant
    9 import market, it is irrelevant as to where the-- what
    10 the source is?
    11 MR. URBASZEWSKI: I'm not too sure I follow your
    12 question.
    13 BOARD MEMBER FLEMAL: If the environmental impact
    14 is measurable by the total amount of emissions and that
    15 emissions is capped, does it not make-- or is it
    16 irrelevant where the emissions are coming from, what
    17 type of owner they're coming from, old or new,
    18 base-load, peaker, whatever?
    19 MR. URBASZEWSKI: For the purposes of ozone

    20 generation, yes. However, you have to put the caveat on
    21 it that if you have an existing coal plant and an
    22 existing natural gas-powered plant that are essentially
    23 for all other respects equal in size, etc., capacity to
    24 generate, you're going to see a significantly lower NOx
    124
    KEEFE REPORTING COMPANY
    1 rate with the natural gas plant. You're also going to
    2 see a very, very significant drop in sulfur dioxide
    3 emission levels. You're also going to see significant
    4 drops in the amount of mercury emitted from that plant.
    5 There's an interesting study where a plant in
    6 southern-- south central Illinois, the Grand Tower
    7 plant-- it's owned by Ameren-- is repowering from coal
    8 to run on natural gas, and they're actually increasing
    9 the capacity of the plant. It's going to put out more
    10 megawatts than it does or historically has. And if I
    11 remember correctly, the amount of sulfur dioxide emitted
    12 from that plant is going to go from the neighborhood of
    13 20,000 tons a year down to approximately 20, 2-0, tons
    14 per year, so in addition to the NOx and the ozone
    15 effects, there are secondary effects.
    16 BOARD MEMBER KEZELIS: The name of that facility
    17 again, please?
    18 MR. URBASZEWSKI: I think it was Grand Tower.

    19 BOARD MEMBER KEZELIS: Brand Tower.
    20 MR. URBASZEWSKI: Grand.
    21 BOARD MEMBER KEZELIS: Grand. For the court
    22 reporter. Thank you.
    23 BOARD MEMBER MELAS: Brian, getting off the topic a
    24 little bit, I appreciate very much those points of your
    125
    KEEFE REPORTING COMPANY
    1 conclusion. I'd like to see, do you have any comments
    2 or any thoughts on the specific charges that the
    3 Governor gave us in setting up these hearings, that we
    4 meet stronger site requirements for peaker plants, etc.,
    5 all those points that were laid out by Claire at the
    6 beginning of the-- do you think you could comment on any
    7 of those?
    8 MR. URBASZEWSKI: Well, from my perspective, what I
    9 know most about is the air pollution health effects.
    10 BOARD MEMBER MELAS: Right.
    11 MR. URBASZEWSKI: I mean, that's what I tailored my
    12 comments to. And I guess the one point that I would say
    13 is that, yes, we should have tighter standards for newer
    14 power plants, and it largely revolves around the
    15 continuing existence of that NOx waiver, which in
    16 reality shouldn't be there. The State in getting the
    17 waiver said we don't need to have NOx reductions within

    18 the Chicago ozone non-attainment area, because if you
    19 reduce NOx in that six-county area, you actually make
    20 ozone go up.
    21 Well, now, under the NOx SIP call rule, we're
    22 seeing reductions being required from power plants
    23 state-wide, everywhere, whether you're in the ozone
    24 non-attainment area or not in the ozone non-attainment
    126
    KEEFE REPORTING COMPANY
    1 area. Why would the State be doing that for attainment
    2 reasons if it wasn't reducing ozone, if it wasn't
    3 necessary for attainment of the ozone standard?
    4 Likewise, why would USEPA be requiring the State to do
    5 that if it wasn't needed for attainment of the ozone
    6 standard? So to us, it just doesn't make sense that
    7 that continues to exist out there, and it's just sort of
    8 going on inertia, but we believe that's one thing the
    9 Governor can push along and potentially solve part of
    10 the problem of bringing a lot of new capacity into the
    11 region by requiring the capacity that is added to the
    12 region meet much tighter standards.
    13 BOARD MEMBER MELAS: Okay.
    14 BOARD MEMBER GIRARD: I have a question, Brian.
    15 Thank you. My question is about your second conclusion,
    16 which deals with new generation facilities meeting LAER

    17 standards in the Chicago ozone non-attainment area. We
    18 have two non-attainment areas in the state. The Metro
    19 East area is the other one. Did-- Are you not making
    20 the same conclusion for the Metro East because it's a
    21 different level of non-attainment?
    22 MR. URBASZEWSKI: I don't have to. The NOx waiver
    23 does not affect Metro East St. Louis non-attainment
    24 area, and so facilities built in the Metro East area are
    127
    KEEFE REPORTING COMPANY
    1 already required to meet LAER, and I believe there's at
    2 least one combined-cycle facility that is proposed for
    3 that region. There may be more. They are going to be
    4 required to meet LAER standards.
    5 BOARD MEMBER GIRARD: Thank you.
    6 BOARD MEMBER MCFAWN: I had a question about-- it's
    7 a factual question.
    8 MR. URBASZEWSKI: Sure.
    9 BOARD MEMBER MCFAWN: You mentioned that there are
    10 3,000 premature deaths annually in Illinois because of
    11 pollutants other than NOx, but is that--
    12 MR. URBASZEWSKI: Fine particulates.
    13 BOARD MEMBER MCFAWN: Exactly. And I was
    14 wondering, is that number taken from your American
    15 Cancer Society study?

    16 MR. URBASZEWSKI: It's originally derived from a
    17 study done by NRDC several years ago. It has been
    18 discounted. I believe the original number was a range
    19 of 3500 to 5,000 deaths state-wide. It was an
    20 estimate. And because of some overestimations on their
    21 part, we discounted it to say more than 3,000. The
    22 corresponding number to the Chicago area is about 2,000
    23 out of that 3,000.
    24 BOARD MEMBER MCFAWN: If we wanted to review that
    128
    KEEFE REPORTING COMPANY
    1 article, could we?
    2 MR. URBASZEWSKI: Sure. It's actually a report.
    3 BOARD MEMBER MCFAWN: A report?
    4 MR. URBASZEWSKI: It's a very thick report,
    5 actually. I can get the title for it. I'd also like to
    6 point out that this is based on a number that said
    7 60,000 deaths. There's a professor at Harvard School of
    8 Public Health who has said that it's potentially as high
    9 as 70,000 premature deaths, so I just wanted to let you
    10 know that I've discounted this to a very conservative
    11 estimate.
    12 BOARD MEMBER MCFAWN: For us to be able to cite to
    13 that number, it would be very helpful for us to review
    14 this--

    15 MR. URBASZEWSKI: I can find that.
    16 BOARD MEMBER MCFAWN: Thank you. The report, and
    17 if it was you that-- the Chicago chapter that discounted
    18 it or if it was discounted by another report.
    19 MR. URBASZEWSKI: I can find that information for
    20 you.
    21 BOARD MEMBER MCFAWN: Thanks. I had-- Just walk me
    22 through this a little bit. If in fact the waivers was
    23 repealed, where we voluntarily ask for it to be
    24 withdrawn, then the requirement for LAER would come into
    129
    KEEFE REPORTING COMPANY
    1 being for major sources, now defined at 25 tons per
    2 year.
    3 MR. URBASZEWSKI: Correct.
    4 BOARD MEMBER MCFAWN: And then you also mentioned
    5 the offsets in a ratio of 1.3 to 1. Is that a critical
    6 element in the scheme to the American Lung Society?
    7 MR. URBASZEWSKI: Yes, and it's operated somewhat
    8 separately from the NOx SIP call trading scheme. It
    9 preexists that. This was written in the later half of
    10 1990. The general idea behind the offsets is that if
    11 you're going to build a new major facility in a
    12 non-attainment area, you have to draw the permission to
    13 emit NOx in that area at 1.3 times what you would be

    14 actually emitting, so the idea is there's a net drawdown
    15 of the total NOx being emitted in that non-attainment
    16 area.
    17 BOARD MEMBER MCFAWN: Okay. I thank you for that
    18 explanation, and I somewhat understand the offset
    19 requirement, but what I wondered is how important is
    20 that element to the American Lung Society? Because
    21 we've been talking about LAER and BACT, and other states
    22 have adopted BACT even when they're not required to, and
    23 the same could be done with LAER possibly, so I wonder
    24 if you could just address this.
    130
    KEEFE REPORTING COMPANY
    1 MR. URBASZEWSKI: We believe it's very important.
    2 It's something that's written into the Clean Air Act.
    3 It should be being done right now, but because of this
    4 inertia of the NOx waiver-- which is actually only
    5 granted as a temporary fix before the final NOx SIP call
    6 was announced. It doesn't only affect peaker plants.
    7 It affects any large major source of NOx, large
    8 industrial facility or, you know, anything else that
    9 would be emitting a large amount of NOx, so it's not
    10 exclusively linked to this. We believe all major
    11 sources should be meeting these standards. And again,
    12 the same goes for LAER. Any large facility that's

    13 coming in emitting NOx, peaker or some other type of
    14 industrial facility, should also be required to meet
    15 those standards.
    16 BOARD MEMBER MCFAWN: Can I ask a real fundamental
    17 question that I probably should know the answer to?
    18 MR. URBASZEWSKI: I hope I do.
    19 BOARD MEMBER MCFAWN: The waiver, does it have to
    20 do with SO2 emissions?
    21 MR. URBASZEWSKI: No, no. It's only exclusively
    22 connected to NOx.
    23 BOARD MEMBER MCFAWN: That's what I thought. Okay.
    24 MR. URBASZEWSKI: And it's related to the ozone
    131
    KEEFE REPORTING COMPANY
    1 problem.
    2 BOARD MEMBER MCFAWN: And the definition of major
    3 source, then, is the 25 tons for SO2?
    4 MR. URBASZEWSKI: For NOx.
    5 BOARD MEMBER MCFAWN: For NOx. And a major source
    6 of SO2 in the non-attainment area is defined at what
    7 level?
    8 MR. URBASZEWSKI: I'm not too sure.
    9 UNIDENTIFIED AUDIENCE MEMBER: There's no
    10 non-attainment areas.
    11 MR. URBASZEWSKI: We're not-- We aren't--

    12 UNIDENTIFIED AUDIENCE MEMBER: There are no
    13 non-attainment areas.
    14 BOARD MEMBER MCFAWN: Oh, that's correct. Thanks.
    15 MR. URBASZEWSKI: Particulate matter is a secondary
    16 pollutant, like ozone, and it's derived from SO2.
    17 BOARD MEMBER MCFAWN: Sorry. Thank you for that.
    18 MR. URBASZEWSKI: Even though SO2 itself is a
    19 criteria for--
    20 BOARD MEMBER MCFAWN: I lost sight of the SO2
    21 attainment. Forgive me.
    22 MR. URBASZEWSKI: You're very welcome.
    23 BOARD MEMBER MCFAWN: Thank you.
    24 CHAIRMAN MANNING: For purposes of the record, the
    132
    KEEFE REPORTING COMPANY
    1 IEPA indicated that they had indicated before to us that
    2 we're in attainment for SO2.
    3 BOARD MEMBER MCFAWN: Lost sight of it.
    4 HEARING OFFICER JACKSON: Thank you, Mr.
    5 Urbaszewski.
    6 MR. URBASZEWSKI: Thank you for giving me the
    7 opportunity to speak to you.
    8 CHAIRMAN MANNING: Thank you.
    9 HEARING OFFICER JACKSON: We're going to skip
    10 around a bit on our list. The two next listed

    11 participants, Susan Zingle and Carol Dorge, will be
    12 available tomorrow morning, so we're going to hold off
    13 on calling them forward at this time and proceed with
    14 Mr. Bud Nesvig. Before you begin, I do want to note for
    15 the record you've handed me three documents, and I think
    16 we've already had one exhibit entered on your behalf.
    17 Let me double-check. Two, actually. So what we will
    18 do, the first document you've handed me I guess is-- are
    19 your comments for today?
    20 MR. NESVIG: That's right.
    21 HEARING OFFICER JACKSON: The comments will be
    22 marked as Nesvig Exhibit 3. Second document appears to
    23 be a hard copy of a Powerpoint presentation. It looks
    24 to be entitled "Elwood Energy II and Elwood Energy III,"
    133
    KEEFE REPORTING COMPANY
    1 and we will mark that as Nesvig Exhibit 4. And then
    2 finally, a one-page document. At the heading at the top
    3 of the document it reads, "Figure 1, U.S. Electricity
    4 Imports and Exports 1995-1999," and that would be Nesvig
    5 Exhibit 5, and I-- you can go ahead and begin your
    6 comments, and I'll pass these documents out to the
    7 board.
    8 MR. NESVIG: Thank you.
    9 HEARING OFFICER JACKSON: Thank you.

    10 MR. NESVIG: Thank you for listening. I come from
    11 a little different interest than polluting as such, but
    12 first, my name is Nesvig-- that's N-E-S-V as in Victor,
    13 I-G as in George. My first name is Elliot,
    14 E-L-L-I-O-T. I am a licensed professional electrical
    15 engineer, retired. My main reason for being here is to
    16 emphasize the fact that I did get the opportunity to go
    17 through the Elwood site, which all of you had that
    18 opportunity.
    19 In going backward as reminders, ComEd sold their
    20 coal-fueled electric generating plants; approximately 55
    21 percent of the normal needs, about 13,000 megawatts of
    22 capacity. The coal plants are still operating and
    23 polluting.
    24 ComEd has a four-year declining usage contract with
    134
    KEEFE REPORTING COMPANY
    1 Mission Energy, which is owned by Southern California
    2 Edison, to purchase the output of the coal plants. So
    3 ComEd must add at least 3,000 megawatts of sustainable
    4 capacity per year during these four years. Plus, they
    5 need a source of summertime periodic capacity of about
    6 5,000 megawatts per year, depending on how hot it is in
    7 the summertime.
    8 I attended the IEPA permit meeting for Elwood II

    9 and III. Prior to the meeting, I was allowed to tour
    10 the Elwood Energy I site, as did this board on September
    11 14, 2000. I was impressed. The four operational
    12 gas-fired peaker turbine generators are the larger
    13 peaker units that I have ever seen. Each of the four
    14 can produce 150/172 megawatts of electricity. The
    15 higher amount of 172 is reached when the outside
    16 temperature is at or below 60 degrees Fahrenheit or
    17 water spray is used to cool the incoming air. The
    18 output of the generator is connected to a high-voltage
    19 transformer and then to a 345,000-volt ComEd
    20 transmission line. This is a major effort.
    21 These four units can produce 600/688 megawatts,
    22 which is more than half the output of a nuclear power
    23 generator. This is not what we formerly called a peaker
    24 generator. This is all new General Electric equipment
    135
    KEEFE REPORTING COMPANY
    1 packaged into impressive units. Probably General
    2 Electric because they are in the finance and credit
    3 business came up with the 75 to 100 million dollars
    4 needed to fund the equipment and installation. Also,
    5 which has been passed out in the data on Elwood I and
    6 proposed Elwood II and III, which was presented that
    7 evening.

    8 During the tour, I was startled to find the Elwood
    9 control center manned by four individuals, and this was
    10 late September. Were they waiting for requests for
    11 power? I understood that these peaker plants would only
    12 be used in the summer on 90 degree plus days.
    13 At the IEPA meeting, there were approximately
    14 fifteen people, three from IEPA, about ten or eleven
    15 representing the owner, and myself. It was suggested
    16 that as I had no financial or employment interest in
    17 Elwood Energy or the Illinois government, I helped to
    18 legitimize the small permit hearing. It lasted about 30
    19 minutes total.
    20 The IEPA permit hearing was to finalize the issues
    21 of Elwood II and III construction permits. They would
    22 add five more single-cycle gas turbine generators, 750
    23 to 860 megawatts in addition to the 600/688 already
    24 operational. The total at this site would then be 1350
    136
    KEEFE REPORTING COMPANY
    1 up to 1548 megawatts, and 1548 megawatts would be 50
    2 percent more than a ComEd nuclear unit. This is a lot
    3 of stuff. But on top of that, as I'm sure you know,
    4 there has been permitted for that site but not built is
    5 twenty-- no, is ten 250-megawatt units, so if they
    6 decide to construct them, there will be 2500 more

    7 megawatts of electrical power available from that single
    8 site. As I said earlier, that's a lot of stuff. With
    9 more than 19 sites to fill with peaker units, why are
    10 you doing this?
    11 Other questions: What happened to the idea of
    12 seeking alternatives before polluting? Two alternative
    13 electric power sources are Mexico and Canada. Both have
    14 fuel and already sell power into the United States.
    15 Attached is the 1999 import/exports with Mexico and
    16 Canada.
    17 Have you determined that the ComEd transmission
    18 system is accepting electric power from all present and
    19 future peaker plants, accepting electric power from
    20 Mission-- formerly ComEd-- coal plants which may be
    21 selling all or part of their output out of state,
    22 polluting Illinois and benefiting other states, and
    23 allowing Unicom or ComEd to continue to sell-- to send
    24 electric power by contract to other users, such as
    137
    KEEFE REPORTING COMPANY
    1 utilities in state and out of state? They are in the
    2 wholesale business. Why can't we be told what Unicom
    3 and ComEd and our political leaders have planned for us
    4 in the way of electric power? Thank you.
    5 HEARING OFFICER JACKSON: Thank you, Mr. Nesvig.

    6 Are there any questions? Thank you very much.
    7 MR. NESVIG: Thank you.
    8 HEARING OFFICER JACKSON: We appreciate your
    9 interest in this proceeding.
    10 MR. NESVIG: Thanks.
    11 HEARING OFFICER JACKSON: Sure. Let's go off the
    12 record for one brief second.
    13 (Brief recess taken.)
    14 HEARING OFFICER JACKSON: Okay. Back on the
    15 record. We will go ahead and take testimony from Carol
    16 Dorge at this point on behalf of Lake County
    17 Conservation Alliance. At this point it looks like Ms.
    18 Dorge will be our last presenter this afternoon, and
    19 then tomorrow we will start with Ashley Collins, Susan
    20 Zingle, and then conclude with the Illinois
    21 Environmental Protection Agency. They'll have a panel
    22 of speakers here tomorrow.
    23 Okay. Before we start, let me just identify these
    24 documents that you've given me. First of all, we have
    138
    KEEFE REPORTING COMPANY
    1 your comments, correct?
    2 MS. DORGE: Correct.
    3 HEARING OFFICER JACKSON: Okay.
    4 MS. DORGE: You have-- The first group of documents

    5 includes my comments from September 7.
    6 HEARING OFFICER JACKSON: Correct. I was just
    7 checking to see if we had any other exhibits from you in
    8 this proceeding yet, and I don't think we do, so we will
    9 mark the first set, being your comments, Dorge--
    10 D-O-R-G-E-- Exhibit 1. Dorge Exhibit 2 will be the
    11 handout entitled "Peaker Natural Gas-Fired Turbines
    12 Permits Issued." Dorge Exhibit 3 will be the handout
    13 entitled "Peaker Natural Gas-Fired Turbines Permits
    14 Issued -- PSD." Whenever you're ready.
    15 MS. DORGE: Thank you. My name is Carol Dorge, and
    16 I'm an attorney representing the Lake County
    17 Conservation Alliance. I presented an initial set of
    18 comments--
    19 BOARD MEMBER MELAS: Slow down.
    20 MS. DORGE: -- on September 7.
    21 HEARING OFFICER JACKSON: Thank you.
    22 MS. DORGE: As I struggled with the additional
    23 thoughts I had on the subject of peaker plants and the
    24 question of the many tools and programs we think we have
    139
    KEEFE REPORTING COMPANY
    1 to address environmental concerns, at least in your
    2 area, I kept coming back to the thought of these tools
    3 are not working. They cannot be working if 30 years

    4 after the Clean Air Act was adopted, it will still be
    5 non-attainment for ozone. They're not working if IEPA
    6 is supposed to be issuing permits within 180 days of
    7 receiving a complete application and routinely asks for
    8 more time.
    9 This begs the question of when an application is
    10 complete, and we will have more on that subject later.
    11 They are not working if they allow sources with truly
    12 major impacts to be permitted as minor sources. These
    13 merchant power plants all look major and should be
    14 treated as major, and I will have more on that later.
    15 The sources can theoretically be permitted to emit
    16 NOx at levels of about 75 parts per million under a
    17 20-year-old new source performance standard when they
    18 can easily achieve 15 parts per million or less with
    19 widely utilized technology.
    20 The tools are not working if they allow the
    21 permitting of these sources without reliable
    22 manufacturers' data on emissions of conventional
    23 pollutants and toxins during routine operations and
    24 start-up. They are not working if 40 some permit
    140
    KEEFE REPORTING COMPANY
    1 applicants can threaten a large increase in emissions of
    2 NOx and other pollutants in Illinois without securing

    3 offsets and their combined impact is not addressed.
    4 They are not adequate if they allow major sources
    5 to be permitted without utilizing state-of-the-art
    6 catalytic technology, which we argue is truly LAER.
    7 They are not adequate if they allow the kind of
    8 variation and quality of information that we have seen
    9 in the applications that we have reviewed. They're not
    10 adequate if citizens are denied a meaningful opportunity
    11 to comment in the permitting process, and that includes
    12 providing access to manufacturers' performance data and
    13 the calculations that these permits are being based on
    14 and to a timely appeal of granting of a permit. They
    15 are not adequate if we do not really know who is going
    16 to own and operate a facility and who will assure that
    17 it's properly decommissioned.
    18 The costs to IEPA and the public in terms of
    19 dollars and time suggest that there must be a better
    20 way. You could even argue that the public anxiety
    21 caused by these proceedings has its own human health
    22 implications.
    23 We believe a number of things are required in the
    24 context of air permitting, and I would like to refer you
    141
    KEEFE REPORTING COMPANY
    1 to my comments of September 7, which is in the packet

    2 marked Exhibit 1. On pages 3 and 4 we list items of
    3 information we had asked that the manufacturers be
    4 subpoenaed to provide this information. It is not being
    5 supplied in the permit applications, and we feel that
    6 it's critical information and that permit decisions
    7 should not be made without this very critical
    8 information, particularly data on emissions of toxins
    9 and emissions during start-up.
    10 We are also asking for a better definition of what
    11 constitutes a complete application. We've identified
    12 this information which we believe should-- is
    13 necessarily part of a complete application. At this
    14 point I would like to demonstrate the need for this
    15 information by walking you through some application
    16 materials.
    17 HEARING OFFICER JACKSON: Slow down just a little
    18 bit, please.
    19 MS. DORGE: As many of you know, I have been
    20 practicing law in the environmental area for about 20
    21 years. I also have a master's in environmental
    22 engineering and worked as an engineer in the Air
    23 Enforcement Branch of the EPA. I represented the LCCA
    24 in two Zion peaker plant proceedings, Carlton and Zion
    142
    KEEFE REPORTING COMPANY

    1 Energy, which by the way are across the street from each
    2 other, and also worked closely with Scott Evans of Clean
    3 Air Engineering, who provided technical assistance in
    4 those proceedings and who's been involved in the
    5 permitting of many of these facilities on behalf of the
    6 applicants.
    7 I'm going to discuss portions of the Carlton
    8 application, which was presented as a synthetic minor.
    9 We also have many concerns involving Zion Energy, and
    10 I'll touch on those. Zion Energy is a much larger
    11 facility being permitted as a major source. I've also
    12 prepared a copy of the application, one copy for the
    13 record, which includes the original application to
    14 permit three simple-cycle GE turbines dated December
    15 1999, a supplemental application for an alternative
    16 configuration with six simple-cycle GE turbines dated
    17 March 2000, and the applicant's calculation of emissions
    18 during start-up and emissions of toxins which was
    19 presented for the first time at the public hearing on
    20 August 14. IEPA also requested modeling, which has not
    21 been included but which was submitted May 25, 2000. The
    22 emission calculations were based on internal Mostardi
    23 Platt data that was claimed to be proprietary and was
    24 not substantiated anywhere on the record.
    143
    KEEFE REPORTING COMPANY

    1 The second document in the packet I've handed you
    2 includes some of my notes on what we felt was missing
    3 from the application. I'm going to go through some of
    4 the things that we felt were essential and that were
    5 missing. First--
    6 HEARING OFFICER JACKSON: And this is in Exhibit
    7 1?
    8 MS. DORGE: This is Exhibit 1 titled "Notes
    9 10-4-00." The owner/operator of this facility is
    10 identified as Carlton, Inc. Carlton, Inc., is a
    11 home-based business located at John Notch's home in
    12 Wilmette, and I checked the phone book yesterday and
    13 confirmed that the residential address and phone number
    14 were the same. John, who by the way is a very nice guy,
    15 may not even be easy to reach at home because he
    16 probably is spending most of his time on his boat in
    17 Waukegan Harbor. He is a very pleasant fellow, but
    18 that's who was filing the operation-- filing to own and
    19 operate this facility.
    20 The address was not included. There was a general
    21 address on Ninth Street, so the address was not included
    22 in the application. Form APC-203, which is for start-up
    23 emissions, was not completed.
    24 You've seen the kind of general schematics that are

    144
    KEEFE REPORTING COMPANY
    1 being included in these applications to show how the
    2 unit operates. We have questions about a number of
    3 things, but one question we ask is how-- who's going to
    4 turn it on, who's going to run it. We've heard that GE
    5 runs some of these things from a central computer. We
    6 don't even know who's turning the facility on and who's
    7 going to make sure it only goes on once a day and some
    8 of the other things that are required.
    9 I could go through all of these. They did not
    10 complete hours of operation. Their-- They purported to
    11 limit their emissions by limiting the amount of fuel
    12 that they would burn. They had conflicting stack
    13 heights. There was no toxins information in the permit
    14 application itself submitted at the hearing, and one
    15 figure was off, I believe. One figure for gas usage was
    16 off by several orders of magnitude. That was never
    17 corrected. The second set of comments applied to the
    18 supplemental permit application and are similar.
    19 Now I would like to turn your attention to the next
    20 group of documents, which are three pages of performance
    21 data for the two-turbine configurations, and I would
    22 like to review just a few of the items on the list.
    23 Excuse me. I coded the columns to allow me to direct
    24 you to some of the items of greatest interest, at which

    145
    KEEFE REPORTING COMPANY
    1 time I will refer you to it. Very difficult to read.
    2 This is somewhat typical performance data. This is
    3 really the only meaningful information that's contained
    4 in the permit applications.
    5 It's my understanding that these sheets are
    6 typically provided by GE sales department and that some
    7 numbers are added, particularly the temperatures, and
    8 the first line you will see-- this is so hard to read--
    9 line A, a little bit off, but that would be ambient
    10 temperature. Line H is percent of total operation at a
    11 particular temperature.
    12 What you find as you study these sheets is that
    13 pollutants such as NOx and CO go off-- they increase in
    14 terms of pounds per hour at lower temperatures. They're
    15 also higher when line C is on, the evaporative cooler.
    16 This sheet reflects operation at 95 degrees. Look at--
    17 let's see-- H2 and H4. That's 25 percent of the time
    18 with the evaporative cooler on and 10 percent of the
    19 time with it off, so that gives you 35 percent of your
    20 time at 95 degrees. Shouldn't be computed that way.
    21 They should have assumed some sort of middle temperature
    22 range.
    23 As you go across to 11-H, I, J, you see they're
    24 proposing to emit 219 pounds of NOx in this case and 243

    146
    KEEFE REPORTING COMPANY
    1 tons of CO. On the next sheet, or two sheets further
    2 on, they're the same sorts of issues, but in their case
    3 they're at 247.7 for NOx and 228.6 for CO. This
    4 information stated does not include emissions during
    5 start-up. The source is clearly major. We obviously
    6 made those arguments in the permitting proceeding.
    7 We stated at the proceeding that we were concerned
    8 that the agency's resources were stretched, that we
    9 couldn't possibly see how they could be handling the
    10 volume of applications that they're getting. What we--
    11 The point we're trying to make here is that it's very
    12 important that if the agency's resources are stretched
    13 that citizens have input in these proceedings and that
    14 there be an early appeal of these decisions so that we
    15 don't make the mistake of building these facilities if
    16 they aren't going to be able to operate as minor
    17 sources.
    18 HEARING OFFICER JACKSON: Let me just clarify real
    19 quick for the record. The pages you were referring to,
    20 the charts that were kind of difficult to read, were the
    21 last--
    22 MS. DORGE: Three or four pages.
    23 HEARING OFFICER JACKSON: -- last three pages of
    24 what we've marked as Dorge Exhibit 1.

    147
    KEEFE REPORTING COMPANY
    1 MS. DORGE: Correct.
    2 HEARING OFFICER JACKSON: Thank you.
    3 CHAIRMAN MANNING: And what permit application is
    4 this?
    5 MS. DORGE: This is Carlton, Inc., being permitted
    6 as a synthetic minor.
    7 BOARD MEMBER MCFAWN: As a synthetic?
    8 MS. DORGE: Yes, synthetic minor.
    9 BOARD MEMBER KEZELIS: It's also called North Shore
    10 Power Project.
    11 MS. DORGE: Correct. Carlton is the operator. I'm
    12 going to hand the court reporter this packet, which has
    13 our written comments in the Carlton proceeding, our
    14 written comments in the Skygen proceeding, the Carlton
    15 application minus the modeling, and it also includes
    16 Skygen's calculation of air toxins, which I'll talk
    17 about a little later too.
    18 HEARING OFFICER JACKSON: We'll mark that packet,
    19 then, as Dorge Exhibit 4.
    20 MS. DORGE: I noted that the data we reviewed did
    21 not represent emissions during start-up. Our
    22 consultant, Scott Evans, had access to information from
    23 GE, which some of the applicants said they did not have,

    24 that they were not able to get information from GE, but
    148
    KEEFE REPORTING COMPANY
    1 our consultant had access to some information and did
    2 his own calculations.
    3 Assuming one start-up per day, which is what the
    4 permit allowed, emissions were as much as 30 percent
    5 higher than reported on an annualized basis, and what
    6 we're hearing is that-- this is coming from GE-- that it
    7 could be as much as ten times higher for, say, a period
    8 of twenty minutes, so we think we're being fairly
    9 conservative in our calculations, but if you're
    10 operating for five hours a day or even ten hours a day,
    11 they become very significant at that level, and that
    12 affects your-- it affects your CO primarily, your NOx to
    13 a lesser extent, but would also affect the volatiles
    14 such as your toxins, which is-- in this case,
    15 formaldehyde is the primary one of concern. And Scott
    16 Evans' calculations are included in Exhibit 4.
    17 Now I'd like to refer you to Exhibit 2. This is a
    18 summary that Susan Zingle prepared of peaker draft
    19 permits. These are the synthetic minors, and if you run
    20 down the center of the page, the NOx column, you see how
    21 close so many of them are to their major source
    22 threshold. The same is true for CO. You can also see--

    23 We believe that if start-up emissions were included,
    24 most of these sources would be major and that they are
    149
    KEEFE REPORTING COMPANY
    1 not being properly accounted for.
    2 There are also problems with the sources that are
    3 being permitted as major sources. Turning to Exhibit 3,
    4 these are your PSD sources, your major sources. And we
    5 can just look at-- eyeball this, but you can see they're
    6 being permitted at levels-- NOx levels as high as 25
    7 parts per million but in many cases 9 to 15 parts per
    8 million without catalytic controls, where a number of
    9 them have demonstrated a clear ability to achieve the
    10 lower levels, which are under 5, in this case reporting
    11 4.5 parts per million with catalytic controls.
    12 We also question why things are so different. I'm
    13 looking at Enron, for example, which I understand has GE
    14 turbines. This is a 664-megawatt facility with 432 tons
    15 of NOx, where Skygen, our 900-megawatt facility, has 716
    16 tons, which doesn't-- you would think Skygen should be
    17 able to achieve emission levels that Enron can achieve.
    18 They may not be because they have diesel. They're
    19 permitted to use diesel for up to 500 hours per
    20 turbine. We don't understand how that could possibly be
    21 BACT for these turbines.

    22 And just this questioning, why do these numbers
    23 seem so odd? Again, Enron is at 714 for CO. Skygen is
    24 at 258 for CO. How could they be so different when
    150
    KEEFE REPORTING COMPANY
    1 they're using very similar technology?
    2 So the question is, why are we permitting these
    3 sources this way? Why are they not being required to
    4 account for start-up in their modeling? I didn't
    5 mention that, modeling. Of course modeling did not
    6 include emissions for start-up because they weren't
    7 calculated until the last minute. Why aren't we getting
    8 the data we need to calculate emissions and guaranteed
    9 performance according to manufacturers' specifications
    10 for the manufacturers? This information is essential.
    11 The agency seems to feel compelled to act on these
    12 applications because of the 180-day clock. There's so
    13 much depending on when an application is deemed
    14 complete. I think we need regulations to make clear
    15 what is required, perhaps a history of acting on working
    16 with the applicants and being very flexible, but with
    17 that 180-day clock in the statute, I think it's
    18 necessary at this point to make it more clear that
    19 certain things are absolutely required in the case of
    20 these peakers.

    21 Just a couple comments responding to some of the
    22 other questions that were raised earlier. We're
    23 obviously concerned about the fact that Illinois seems
    24 to be permitting even the major sources at levels that
    151
    KEEFE REPORTING COMPANY
    1 are higher than other states, and we think that all of
    2 these merchant power plants-- we can exclude some of the
    3 very small ones-- seem to be utility boilers, but
    4 they're just so close to the line that they should
    5 absolutely be treated as major and be subject to BACT.
    6 We're concerned that with the SIP call, are-- these
    7 peakers here in Illinois will just purchase their EGU's
    8 from out of state, and perhaps there's some East Coast
    9 states that are so much more advanced that we won't see
    10 any impact on our air quality. You know, I decided to
    11 focus on air again because I think that the problems are
    12 just so blatant. Of course we continue to be concerned
    13 about noise and the other issues that have been
    14 identified.
    15 I also want to mention that next week I'm attending
    16 an ABA meeting in Pennsylvania, and peaker plants and
    17 NOx are on our agenda. I'm going to try to learn as
    18 much as I can about what other states are doing, and
    19 we'll still get back to you in writing with the

    20 information that we've collected. Thank you.
    21 HEARING OFFICER JACKSON: Thank you very much.
    22 MS. DORGE: Can I answer any questions?
    23 BOARD MEMBER KEZELIS: Ms. Dorge, how many
    24 megawatts is the Carlton facility, if you can tell me?
    152
    KEEFE REPORTING COMPANY
    1 MS. DORGE: Uh-huh.
    2 BOARD MEMBER KEZELIS: The North Shore Power
    3 Project.
    4 MS. DORGE: They're two-turbine configurations.
    5 Let's see.
    6 BOARD MEMBER KEZELIS: Let me short-circuit. Your
    7 Exhibit 2 suggests several figures and I'm not sure how
    8 to read that best, and I don't know whether questions
    9 should be directed to you with respect to that Exhibit 2
    10 or to Ms. Zingle, because you indicated she prepared
    11 this document.
    12 MS. DORGE: No, I can get that for you and give it
    13 to you I think tomorrow. I don't recall. There are
    14 two-- There were two determined configurations, and it's
    15 different for the two.
    16 BOARD MEMBER KEZELIS: And should I direct my
    17 questions on Dorge Exhibit 2 to you or to Ms. Zingle?
    18 MS. DORGE: I can probably answer more of the

    19 technical questions.
    20 BOARD MEMBER KEZELIS: Then would you bear with me
    21 for a moment? Take Reliant-Aurora, that line on Exhibit
    22 2, and just so I understand how to read this and so the
    23 court reporter can take this down for the record, could
    24 we go through very quickly those columns and then what's
    153
    KEEFE REPORTING COMPANY
    1 indicated there so we know how to read them? For
    2 example, name, Reliant-Aurora, that's pretty
    3 straightforward. Date, I assume, is the date the permit
    4 was issued by IEPA?
    5 MS. DORGE: I believe it's the date of the
    6 application. Can Susan come up? I think I can answer
    7 most of your questions.
    8 BOARD MEMBER KEZELIS: There's a lot of material,
    9 but I'd rather we know what it means.
    10 HEARING OFFICER JACKSON: Ms. Zingle, I would just
    11 ask that you identify yourself for the record.
    12 MS. ZINGLE: My name is Susan Zingle with the Lake
    13 County Conservation Alliance.
    14 HEARING OFFICER JACKSON: Thank you.
    15 MS. ZINGLE: The date is the date the application--
    16 the date on the application when it was sent to the
    17 IEPA.

    18 HEARING OFFICER JACKSON: And you need to speak
    19 into the microphone too.
    20 BOARD MEMBER KEZELIS: And not the date the permit
    21 might have been issued, right?
    22 MS. ZINGLE: Correct. It's when the clock--
    23 BOARD MEMBER KEZELIS: And continue--
    24 MS. ZINGLE: When the clock started ticking.
    154
    KEEFE REPORTING COMPANY
    1 BOARD MEMBER KEZELIS: Thank you. Continue to the
    2 next column, please.
    3 MS. ZINGLE: That's the number of turbines.
    4 BOARD MEMBER KEZELIS: Okay. We're still-- We're
    5 talking about Reliant-Aurora, okay? Continue on,
    6 please.
    7 MS. ZINGLE: Megawatts is the total number of
    8 megawatts from those ten turbines.
    9 BOARD MEMBER KEZELIS: Thank you.
    10 MS. ZINGLE: The next column, the limit method,
    11 some of the permits are limited by the amount of natural
    12 gas that is burned. Others are limited by the number of
    13 hours. A few of them in the application I couldn't find
    14 that data, so I left it blank.
    15 BOARD MEMBER KEZELIS: And SCF means?
    16 MS. ZINGLE: Standard cubic feet.

    17 BOARD MEMBER KEZELIS: Thank you. Continue on.
    18 MS. ZINGLE: NOx tons, that is the total number of
    19 tons of NOx that would be emitted by that plant.
    20 BOARD MEMBER KEZELIS: Okay.
    21 MS. ZINGLE: NOx parts per million--
    22 BOARD MEMBER KEZELIS: Oh, that's per year, tons
    23 per year?
    24 MS. ZINGLE: Per operating period. So if it's for
    155
    KEEFE REPORTING COMPANY
    1 2300 hours, for that amount of gas that's burned, that's
    2 how much NOx will come out.
    3 BOARD MEMBER KEZELIS: Thank you.
    4 MS. ZINGLE: NOx parts per million is
    5 self-explanatory. I couldn't necessarily find it in the
    6 applications.
    7 BOARD MEMBER KEZELIS: Okay.
    8 MS. ZINGLE: Tons of carbon monoxide, tons of
    9 VOC's, tons of PM 10, tons of sulfur dioxide, and then a
    10 note on the NOx control method the plant is using, if I
    11 could find it.
    12 BOARD MEMBER KEZELIS: And for the record, DLN and
    13 WI refer to?
    14 MS. ZINGLE: DLN is dry low NOx; WI is water
    15 injection.

    16 BOARD MEMBER KEZELIS: Thank you. Thanks.
    17 MS. ZINGLE: Thank you.
    18 CHAIRMAN MANNING: Can we go back to that limit
    19 method? I don't-- I still don't know what 9878mmScf
    20 means.
    21 MS. ZINGLE: That means that they'll allow the
    22 plant to burn 9800 million cubic-- standard cubic feet
    23 of natural gas.
    24 MS. DORGE: The example was Carlton. Rather than
    156
    KEEFE REPORTING COMPANY
    1 set a limited number of their operating hours, set the
    2 limit based upon the gas usage, although they do
    3 estimate their operating hours, and that is in last
    4 three pages of this exhibit, 8700 for six turbines,
    5 six-turbine configuration, and a total of 5400 hours for
    6 the three-turbine configuration.
    7 HEARING OFFICER JACKSON: And again, you're looking
    8 at Exhibit 1, Dorge Exhibit 1.
    9 MS. DORGE: Exhibit 1, yes.
    10 MS. ZINGLE: For the record, I should say I would
    11 like to thank Marilyn Clardy and Betty Asher for their
    12 help that went into getting this information together.
    13 They really did a lot of work.
    14 BOARD MEMBER MCFAWN: Can I just verify, these

    15 permits have been issued, then?
    16 MS. ZINGLE: Draft permit.
    17 CHAIRMAN MANNING: A draft permit-- If it's a draft
    18 permit, it's not been issued. I mean, I don't
    19 understand whether the draft permit been issued. The
    20 permit's issued, I would assume it's a legally-- a legal
    21 document, a draft permit.
    22 MS. DORGE: These are draft permits.
    23 MS. ZINGLE: The most recent ones are drafts. The
    24 older ones are in fact final permits.
    157
    KEEFE REPORTING COMPANY
    1 BOARD MEMBER MCFAWN: Now, the missing information,
    2 is that because it was missing from the application?
    3 MS. ZINGLE: Or I just couldn't find it.
    4 BOARD MEMBER MCFAWN: Even in the draft permit?
    5 MS. ZINGLE: It may very well exist. It may be
    6 more my skill.
    7 MS. DORGE: Just to clarify the record, the agency
    8 did make some assumptions as to emissions during
    9 start-up, but they were never-- they were not supported
    10 by any inquiry or manufacturers' information.
    11 BOARD MEMBER MCFAWN: Were there assumptions
    12 factored into the numbers here?
    13 MS. DORGE: They were factored into the draft

    14 permit.
    15 MS. ZINGLE: Sometimes.
    16 MS. DORGE: Sometimes.
    17 MS. ZINGLE: We went-- On Coastal, if you look
    18 about two-thirds of the way down the page, Verena and I
    19 attended the public hearing for the Coastal plant in Big
    20 Rock, and it was of particular interest because you can
    21 see it says-- I need a little-- 249.3 tons, which is the
    22 closest I'd ever seen to the 250, so-- I had not read
    23 the application, so my first question in public comment
    24 was did that include start-up, and Mr. Romaine's answer
    158
    KEEFE REPORTING COMPANY
    1 was no, so obviously immediately it's over the 250 tons
    2 and it's going to be a major source. That air hearing
    3 was August 3, and that final permit has not yet been
    4 issued, so I don't know what changes they would make to
    5 it.
    6 CHAIRMAN MANNING: Could we maybe go to a facility
    7 we're little bit familiar with at least? And that's in
    8 your-- in the PSD, the ones that are PSD, the Elwood
    9 facilities particularly. You have two listed, Peoples,
    10 dash, Elwood and Elwood, and one of them you have as
    11 having fourteen turbines, I assume, when you say number
    12 fourteen, and then the other one numbered two. The

    13 facility-- The Peoples energy facility, Peoples-- old
    14 Peoples gas facility that we visited at Elwood had four
    15 turbines. Which of these would be that facility?
    16 MS. ZINGLE: From this, I can't tell you. I have
    17 the permits and the applications both at home. I could
    18 go back and find it. I can't tell you here today.
    19 CHAIRMAN MANNING: Okay.
    20 BOARD MEMBER KEZELIS: Back to Dorge 2 for a
    21 moment. If you read the line that starts with Rolls
    22 Royce, under NOx parts per million, there appears to be
    23 the beginning of the word "yes." What is that a
    24 reference to?
    159
    KEEFE REPORTING COMPANY
    1 MS. ZINGLE: I-- That was an editorial comment.
    2 BOARD MEMBER KEZELIS: Okay.
    3 BOARD MEMBER MCFAWN: You have Reliant listed twice
    4 in the middle of Dorge Exhibit 2.
    5 MS. ZINGLE: Reliant is building three plants. I
    6 don't know why I didn't put the cities next to the first
    7 two, and then the one in Aurora. It's three separate
    8 permits, three separate facilities.
    9 BOARD MEMBER KEZELIS: Do you know which is which
    10 city?
    11 MS. ZINGLE: I'm sorry. I don't.

    12 BOARD MEMBER KEZELIS: Okay.
    13 CHAIRMAN MANNING: The Indeck on the list, is that
    14 the Indeck that's been referred to in Libertyville
    15 several times in the proceeding?
    16 MS. ZINGLE: I believe so, because the date is
    17 February of this year.
    18 CHAIRMAN MANNING: Thank you.
    19 MS. ZINGLE: Thank you.
    20 HEARING OFFICER JACKSON: Anything else for Ms.
    21 Dorge or Ms. Zingle? And I do note that Ms. Zingle will
    22 be speaking to us again tomorrow morning.
    23 BOARD MEMBER MCFAWN: Wait. One quick question.
    24 The-- Ms. Dorge, I'm hurrying, so maybe the answer is--
    160
    KEEFE REPORTING COMPANY
    1 maybe you've given us the answer. Forgive me if I
    2 missed it. What is the status of the Carlton permit
    3 application?
    4 MS. DORGE: Public hearings were held on both
    5 August the 13th for Skygen and 14th for Carlton, and we
    6 understand that they're proposing to-- planning to issue
    7 the permit at the end of November.
    8 MS. ZINGLE: October.
    9 MS. DORGE: October. Excuse me. The end of
    10 October.

    11 BOARD MEMBER MCFAWN: Thank you.
    12 HEARING OFFICER JACKSON: Thank you very much.
    13 CHAIRMAN MANNING: Thank you.
    14 HEARING OFFICER JACKSON: As I said earlier, that's
    15 going to do it for our presentations today. We will
    16 reconvene tomorrow morning in this same room at 10 a.m.,
    17 and we have Susan Zingle, Ashley Collins and the IEPA on
    18 the agenda. I do want to reiterate that anyone who has
    19 made a presentation either today or any of the other
    20 hearings can obviously supplement their oral
    21 presentations with written public comments, and the
    22 written public comments will be accepted by the board
    23 until November 6.
    24 That's all I have, so at this point we will go off
    161
    KEEFE REPORTING COMPANY
    1 the record and see you tomorrow morning at 10. Thank
    2 you very much.
    3 (Whereupon the proceedings were
    4 adjourned until October 6, 2000, at
    5 10:00 a.m.)
    6
    7
    8
    9

    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    162
    KEEFE REPORTING COMPANY
    1 STATE OF ILLINOIS )
    ) SS
    2 COUNTY OF ST. CLAIR)
    3
    4
    5 I, KAREN BRISTOW, a Notary Public and
    6 Certified Shorthand Reporter in and for the County of
    7 St. Clair, State of Illinois, DO HEREBY CERTIFY that I
    8 was present at the William G. Stratton Building, 401

    9 South Spring Street, Springfield, Illinois, on October
    10 5, 2000, and did record the aforesaid proceedings; that
    11 same was taken down in shorthand by me and afterwards
    12 transcribed upon the typewriter, and that the above and
    13 foregoing is a true and correct transcript of said
    14 proceedings.
    15 IN WITNESS WHEREOF I have hereunto set
    16 my hand and affixed my Notarial Seal this 9th day of
    17 October, 2000.
    18
    19
    20 __________________________
    21 Notary Public--CSR
    22 #084-003688
    23
    24
    163