1 BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
    2
    3 COLOR COMMUNICATIONS, INC., )
    4 Petitioner, ) PCB No. 96-125
    5 v. ) Permit Appeal
    6 ILLINOIS ENVIRONMENTAL PROTECTION )
    7 AGENCY, )
    8 Respondent. )
    9
    10 100 West Randolph Street
    11 Suite 11-500
    12 Chicago, Illinois
    13
    14 Thursday, April 11, 1996
    15 10:00 o'clock a.m.
    16 PRESENT:
    17 MS. JUNE C. EDVENSON, Hearing Officer
    18
    19 APPEARANCES:
    20 BUTLER, RUBIN, SALTARELLI & BOYD, by
    MR. KEVIN J. O'BRIEN and
    21 MR. JAMES I. RUBIN
    On behalf of the Petitioner;
    22
    ILLINOIS ENVIRONMENTAL PROTECTION AGENCY, by
    23 MR. ROBB H. LAYMAN and
    MS. BONNIE R. SAWYER
    24 On behalf of the Respondent.
    1
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 I N D E X
    2 WITNESS DX CX RDX RCX X
    3 THOMAS M. GORMAN
    By Mr. O'Brien 16 46
    4 By Mr. Layman 36
    By Ms. Sawyer 44
    5
    GEORGE W. NICHOLAS
    6 By Mr. O'Brien 48
    By Mr. Layman 59
    7 By Ms. Sawyer 66
    8 CHRISTOPHER ROMAINE
    By Mr. Layman 70 147
    9 By Mr. O'Brien 117
    By Hearing Officer Edvenson 139
    10
    RONALD VanMERSBERGEN
    11 By Mr. Layman 149 195
    By Mr. O'Brien 180 200
    12 By Hearing Officer Edvenson 202
    13
    14 E X H I B I T S
    15 NUMBER MARKED FOR ID RECEIVED
    16 Petitioner's Exhibit
    17 No. 1 18 20
    18 No. 2 19 20
    19 No. 3 21 24
    20
    21 Respondent's Exhibit
    22 No. 1 68 69
    23 No. 2 69 70
    24 No. 3 151 151
    2
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 HEARING OFFICER EDVENSON: Good morning and
    2 welcome. This is a contested case hearing
    3 conducted by the Illinois Pollution Control Board,
    4 Case No. 96-125 entitled Color Communications,
    5 Incorporated vs. The Illinois Environmental
    6 Protection Agency. The instant proceeding is in
    7 the nature of a permit appeal.
    8 My name is June Edvenson. I am the
    9 hearing officer for this case. I will now request
    10 that counsel for the parties enter their
    11 appearances for the record.
    12 MR. O'BRIEN: For petitioner Kevin O'Brien and
    13 James Rubin.
    14 MR. LAYMAN: For respondent Robb Layman and
    15 Bonnie Sawyer.
    16 HEARING OFFICER EDVENSON: Thank you. Have
    17 counsel for the parties filed their appearances
    18 with the board in writing?
    19 MR. O'BRIEN: Yes.
    20 MS. SAWYER: Yes.
    21 MR. LAYMAN: Yes.
    22 HEARING OFFICER EDVENSON: Okay. Now I'd like
    23 to ask any other representatives of the parties or
    24 the parties that are in attendance to identify
    3
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 themselves for the record if they wish to do so.
    2 MR. GORMAN: Tom Gorman from Color
    3 Communications.
    4 MR. NICHOLAS: George Nicholas from G. Nicholas
    5 & Associates.
    6 MR. ROMAINE: Chris Romaine from the Illinois
    7 Environmental Protection Agency.
    8 MR. PATEL: Minish Patel from Illinois
    9 Environmental Protection Agency.
    10 HEARING OFFICER EDVENSON: All right. Thank
    11 you.
    12 Are there any preliminary motions or
    13 stipulations?
    14 MR. O'BRIEN: Yes. We have a joint stipulation
    15 of fact that has been agreed to by the respondent
    16 and the petitioner.
    17 There are 12 paragraphs of stipulations
    18 that have been agreed to that we will enter as
    19 joint stipulations of fact for this case.
    20 HEARING OFFICER EDVENSON: All right. And I
    21 will take a copy of that for the record. Has this
    22 been filed with the clerk of the board today, or is
    23 this being introduced --
    24 MR. O'BRIEN: No, it has not as of yet.
    4
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 HEARING OFFICER EDVENSON: All right. Were you
    2 planning on making it a filing with the board, or
    3 shall we just enter it in the record of the
    4 hearing?
    5 MR. O'BRIEN: I will just enter it in the
    6 record if that's acceptable to counsel.
    7 MR. LAYMAN: That's fine.
    8 HEARING OFFICER EDVENSON: That's fine.
    9 We will now turn to the order of the
    10 hearing. Would either party like to make an
    11 opening statement?
    12 MR. O'BRIEN: I have a brief one.
    13 HEARING OFFICER EDVENSON: Proceed.
    14 MR. O'BRIEN: Do you prefer standing up or
    15 sitting down?
    16 HEARING OFFICER EDVENSON: You can sit.
    17 MR. O'BRIEN: I'll sit.
    18 Thank you, again. I'm Kevin O'Brien. I'm
    19 one of the attorneys for the petitioner Color
    20 Communications.
    21 As we all know this is a permit appeal
    22 taken from a notice of incompleteness issued by the
    23 Illinois EPA for Color Communications' Clean Air
    24 Act Permit.
    5
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 The notice of incompleteness was issued
    2 on November 2, 1995; and the issue raised by this
    3 hearing in our mind is the agency's determination
    4 that the two Color Communications' facilities in
    5 Chicago constitute one single source for purposes
    6 of air permitting.
    7 Just to give some background which I think
    8 is important about Color Communications so you
    9 understand the context, Color Communications, or
    10 CCI as we also refer to it, is headquartered in
    11 Chicago and has two facilities here, as I
    12 mentioned. They also have facilities in Ireland,
    13 New Zealand, Mexico and New York State.
    14 Again, it's the two Chicago facilities
    15 that are at issue here; and they are located at
    16 4000 West Filmore and 4242 West Filmore.
    17 Now, today we are going to present
    18 testimony that describes how CCI operates these
    19 facilities and what goes on there; and you will
    20 hear that at the 4242 facility CCI conducts what
    21 it calls a color matching operation in which it
    22 matches, mixes and weighs various bases, lacquers,
    23 colorants, to match the specifications of their
    24 customers. They are trying to get the color
    6
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 right.
    2 Some of these colors are then put on a
    3 substrate, coated to a substrate; and the result
    4 is what we call a web or a sheet with color coated
    5 to it.
    6 These sheets are either rolled up into
    7 rolls or cut into sheets, and they are sent to a
    8 variety of places.
    9 Most of the material goes to the 4000 West
    10 Filmore facility. Some of it goes to the plants in
    11 Ireland and New Zealand.
    12 Now, at the 4000 facility a different
    13 function is performed. What the 4000 facility does
    14 is that it assembles and prints what are known as
    15 color boards; and Mr. Gorman will explain to you
    16 what a color board is, but you've probably already
    17 seen one if you've ever shopped for a new car or
    18 tried to get a paint job for your house.
    19 It's a brochure. You open it up. It will
    20 have squares or small samples of paint with
    21 different colors on it sometimes referred to as
    22 paint chips.
    23 What CCI does at the 4000 facility is that
    24 it prints those brochures, cuts and assembles the
    7
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 paint chips using the web that they produce at 4242
    2 West Filmore and then put the finished product
    3 together, they store it, they ship it out and they
    4 deliver it to their customers.
    5 So that is basically the process that
    6 happens at the two facilities in Chicago.
    7 You will also hear testimony that some of
    8 this work is also done at CCI's other facilities
    9 that I previously mentioned.
    10 So that's the background on CCI.
    11 And the issue here, as I mentioned, is
    12 whether the two Chicago facilities constitute one
    13 source for air permitting purposes.
    14 And what we are dealing with is a
    15 definition of "source," you know, found in the
    16 regulations that really has three components as we
    17 see it; and I'm just reading from Section 211.61.30
    18 of 35 Illinois Administrative Code which is "Source
    19 means any stationary source or any group of
    20 stationary sources that are located on one or more
    21 contiguous or adjacent properties and are under
    22 common control of the same person or persons under
    23 common control belonging to a single major
    24 industrial grouping."
    8
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 So from our point of view there are at
    2 least three factors that go into determining
    3 whether you have a source.
    4 One is whether they are located on one or
    5 more contiguous or adjacent properties; two is
    6 whether they are under common control of the same
    7 person; and three is whether they belong to a
    8 single major industrial grouping.
    9 Now, it's not disputed here that the two
    10 facilities are under common control of the same
    11 person. The dispute comes with regard to the two
    12 other factors.
    13 The first is the single major industrial
    14 grouping.
    15 Under the regulation it states that for
    16 the purpose of defining source a stationary source
    17 or group of stationary sources shall be considered
    18 part of a single industrial grouping if all of the
    19 pollutant emitting activity at such source or group
    20 of sources on contiguous or adjacent property
    21 belong to the same major group, i.e. all have the
    22 same two-digit code, as described in the standard
    23 industrial classification manual 1987.
    24 We've plead and we will testify today that
    9
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 the two facilities have different SIC codes which
    2 befits the different functions that they perform.
    3 The 4242 Filmore facility has a
    4 designation that is for paper coating, and the 4000
    5 facility has a designation for commercial printing.
    6 The two plants not only do different
    7 things, but they do not belong to the same major
    8 group. Their classifications do not have the same
    9 two-digit prefix.
    10 So under the regulation the two facilities
    11 don't meet the criteria that's set out in the
    12 regulation.
    13 Now, the agency has argued and I believe
    14 will argue again today that the 4242 Filmore
    15 facility constitutes a support facility; and under
    16 some proposed rules that I think of the USEPA a
    17 support facility can be considered part of the same
    18 source.
    19 Even if that's illegally binding, and that
    20 I think is a question of law, the third factor
    21 that's involved here is another area where we feel
    22 these facilities don't qualify as one source; and
    23 that's whether they are on contiguous or adjacent
    24 properties.
    10
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Mr. Gorman will explain and he will show
    2 you on this photo that these facilities are not on
    3 contiguous or adjacent properties.
    4 There is a separate company, an
    5 intervening company, that takes up the entire city
    6 block of the 4100 block of West Filmore; and you
    7 will hear that the Color Communications people have
    8 no access and don't use that facility and pretty
    9 much are like any other two buildings in the city,
    10 if you want to get from one another you got to use
    11 the city street.
    12 And we maintain that under the definition
    13 and under the way that the agency has treated this
    14 definition that these are not contiguous or
    15 adjacent properties.
    16 And, again, you will hear testimony that
    17 will describe how the functions occur on a
    18 day-to-day basis.
    19 These facilities have always been
    20 separately treated for environmental permits
    21 whether it be waste handling or air handling or air
    22 permits or what have you.
    23 By lumping them together in this way what
    24 happens is that it imposes the standards of a major
    11
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 source on both buildings.
    2 Now, you will hear testimony from Mr.
    3 Nicholas about the emissions that come from both
    4 buildings; and not only are the functions of the
    5 buildings different, but the amount of emissions
    6 are radically different.
    7 The 4242 facility, the coating facility,
    8 is a major stationary source however you slice it,
    9 whatever is added to it.
    10 That building standing alone emits enough
    11 volatile organic material that it's always going to
    12 be considered a major stationary source.
    13 The 4000 plant is a much different
    14 animal. It is a printing press and a printing and
    15 assembling facility, and it has very low emissions.
    16 It would not qualify as a major stationary source
    17 where considered separately.
    18 What it does to combine the two sources is
    19 to impose the requirements of a major stationary
    20 source on the 4000 facility as well; and Mr.
    21 Nicholas will explain how that is a real problem
    22 for operations and a real problem for management
    23 and development of the 4000 facility, and one that
    24 we think is not justified by the regulations.
    12
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Just to sum up, it's our position that the
    2 agency's position in this case indicated in its
    3 notice of incompleteness that the two facilities
    4 are actually one source is inconsistent with the
    5 state regulations and should be overturned by the
    6 PCB. Thank you.
    7 HEARING OFFICER EDVENSON: Thank you, Mr.
    8 O'Brien.
    9 Mr. Layman?
    10 MR. LAYMAN: Thank you.
    11 For the record, the Illinois Environmental
    12 Protection Agency as responded in this cause
    13 believe that the testimony mentioned today from the
    14 witnesses as well as the evidence contained in the
    15 administrative record will support the agency's
    16 notice of incompleteness of November 2, 1995.
    17 The agency's notice of incompleteness has
    18 been appealed by the petitioner Color
    19 Communications pursuant to Section 40.2 of the
    20 Environmental Protection Act. Petitioner bears the
    21 burden of proof in this matter.
    22 As will be shown from the administrative
    23 record, the agency issued a notice of
    24 incompleteness to Color Communications because of
    13
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 its failure to submit a single CAAPP permit
    2 application covering all emission units at the
    3 source.
    4 The agency believes that most of the
    5 relevant facts presented in its case, as Mr.
    6 O'Brien suggested in his opening statement, are not
    7 in dispute.
    8 Rather the issues presented to the board
    9 for consideration are predominantly legal in nature
    10 and revolve around the relevant statutory and
    11 regulatory definitions of "source."
    12 These issues to the extent that they are
    13 touched upon today in hearing will subsequently
    14 raise a legal argument or issue the first
    15 impression to the board.
    16 It occurs at a time when Illinois like
    17 many other states are just beginning to implement
    18 their own approved Title 5 permit program pursuant
    19 to the provisions of the Clean Air Act.
    20 The implication of the board's ruling
    21 will, therefore, directly affect a threshold set of
    22 criteria for CAAPP purposes.
    23 The issues addressed in this case, of
    24 course, are important to the parties to this
    14
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 proceeding; but they may also assume a larger
    2 significance for the Illinois codified program and
    3 the regulated community.
    4 The agency is confident that both the
    5 evidence and the relevant law will support its
    6 determination that the petitioner's operations at
    7 the 4242 West Filmore Street and 4000 West Filmore
    8 Street facilities today constitute a single
    9 stationary source.
    10 Petitioner's submittal of separate CAAPP
    11 permits for each of the locations should,
    12 therefore, not be deemed complete for purposes of
    13 the agency's continued CAAPP application review.
    14 The agency will present the testimony of
    15 its own technical expert for new source review and
    16 other permitting issues in Illinois for the purpose
    17 of providing some insight into the agency's basis
    18 for the notice of incompleteness.
    19 The agency will also offer supporting
    20 testimony from a national expert on air permitting
    21 programs and procedures from the United States
    22 Environmental Protection Agency of Region 5.
    23 Thank you.
    24 HEARING OFFICER EDVENSON: Thank you.
    15
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 At this point let us proceed with the
    2 petitioner's case-in-chief, and why don't you call
    3 your first witness.
    4 MR. O'BRIEN: We call Thomas Gorman.
    5 HEARING OFFICER EDVENSON: Mr. Gorman, would
    6 you please be sworn.
    7 THOMAS M. GORMAN,
    8 called as a witness herein, having been first duly
    9 sworn, was examined and testified as follows:
    10 DIRECT EXAMINATION
    11 BY MR. O'BRIEN:
    12 Q Could you state your name for the record,
    13 please?
    14 A Thomas Michael Gorman.
    15 Q Mr. Gorman, are you employed?
    16 A Yes, I am.
    17 Q And where are you employed?
    18 A At Color Communications, Incorporated.
    19 Q How long have you been employed at Color
    20 Communications, Incorporated?
    21 A Since July of 1991.
    22 Q If I refer to Color Communications,
    23 Incorporated as CCI, will you understand that's
    24 what I'm talking about?
    16
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Sure.
    2 Q What was your position at CCI when you
    3 were first hired?
    4 A I was hired as the director of loss
    5 prevention and safety.
    6 Q And what were your responsibilities in
    7 that position?
    8 A I was responsible for the corporate
    9 security for all the facilities and also the safety
    10 and OSHA compliance.
    11 Q Now, have your responsibilities at Color
    12 Communications stayed the same since you were hired
    13 in 1991?
    14 A No, they have not.
    15 Q How have they changed?
    16 A In January of 1994 I assumed the
    17 responsibility for overseeing the company's
    18 environmental affairs for permitting, waste
    19 handling, reporting, et cetera.
    20 Q Now, does that responsibility include
    21 overseeing the permit that's at issue in this case,
    22 the Clean Air Act Permit?
    23 A Yes, it does.
    24 Q Mr. Gorman, will you tell us what the
    17
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 business of CCI is?
    2 A Color Communications produces color
    3 systems, color samples, color boards and marketing
    4 color systems for paint, automotive and other
    5 industries.
    6 Q Now, you've brought some examples with you
    7 today; and I'd like to mark the first one with what
    8 the court reporter has given to me as Petitioner's
    9 No. 1.
    10 (Whereupon, Petitioner's
    11 Exhibit No. 1 was marked for
    12 identification.)
    13 BY MR. O'BRIEN:
    14 Q If you could describe for us what that is,
    15 Petitioner's No. 1?
    16 A This is an example of a color board that
    17 we produce. You see it in paint hardware stores
    18 and whatnot.
    19 We do the printing of these boards, the
    20 coating of the material and sometimes we even
    21 design the layout for the customer. Everything is
    22 coated, mounted, cut, assembled and then shipped to
    23 the customer.
    24 Q If you would like to pass that on,
    18
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 somebody may want to take a look at it.
    2 Now, you also mentioned color marketing
    3 tools or devices. Do you have an example of that
    4 with you?
    5 A We do color marketing systems for paint
    6 and automotive companies that produce, you know,
    7 colors for all the car companies, produce colors
    8 for all the paint companies and --
    9 Q Before you continue let me --
    10 A I'm sorry.
    11 Q -- mark this next as Petitioner's No. 2
    12 and ask you to describe that for the record.
    13 (Whereupon, Petitioner's
    14 Exhibit No. 2 was marked for
    15 identification.)
    16 THE WITNESS: This is more of a marketing
    17 system that was produced for a company. We will
    18 put together all the different colors that that
    19 company manufactures, either for paint or
    20 automotive customers, and market them as a total
    21 overall system; and they use this in both body
    22 shops, automotive dealers, they may use them in
    23 stores as well.
    24
    19
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 BY MR. O'BRIEN:
    2 Q Is there any name for the type of
    3 marketing tool that we've marked as Petitioner's
    4 No. 2?
    5 A This particular one is a complete system.
    6 It's called a fan deck, and you can fan it out and
    7 see all the colors at once.
    8 MR. O'BRIEN: And, again, anyone who would like
    9 to take a look at that is welcome to it.
    10 HEARING OFFICER EDVENSON: Is there any
    11 objection to the introduction of Petitioner's
    12 Exhibits 1 and 2 into evidence?
    13 MR. LAYMAN: No, there is not.
    14 HEARING OFFICER EDVENSON: All right. Thank
    15 you.
    16 (Whereupon, documents so offered
    17 were received in evidence as
    18 Petitioner's Exhibit Nos. 1 and
    19 2.)
    20 BY MR. O'BRIEN:
    21 Q Now, Mr. Gorman, you mentioned that there
    22 -- well, strike that.
    23 Where are CCI's manufacturing facilities
    24 located?
    20
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A We have two facilities in Chicago; and
    2 also a facility in Castlereagh, Ireland; a facility
    3 in Auckland, New Zealand; a facility in Mexico; and
    4 two facilities one in Buffalo, New York and another
    5 in Poughkeepsie, New York.
    6 Q Okay. First at the Chicago facilities
    7 what are the addresses of the two Chicago
    8 facilities?
    9 A We have one building at 4000 West Filmore
    10 Street and another facility at 4242 West Filmore
    11 Street.
    12 Q Where are CCI's corporate offices located?
    13 A At the 4000 West Filmore building.
    14 Q Now, how long has CCI operated these two
    15 facilities?
    16 A At 4242 West Filmore since approximately
    17 1979 and at 4000 since approximately 1990.
    18 (Whereupon, Petitioner's
    19 Exhibit No. 3 was marked for
    20 identification.)
    21 BY MR. O'BRIEN:
    22 Q Mr. Gorman, I'd like to direct your
    23 attention to this photo that we have over on the
    24 wall here which we've now marked as Petitioner's
    21
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 No. 3.
    2 MR. O'BRIEN: Can everyone see this?
    3 MR. LAYMAN: Uh-huh.
    4 BY MR. O'BRIEN:
    5 Q Let me ask you first if you recognize this
    6 photograph.
    7 A Yes, I do.
    8 Q And how do you recognize this photograph?
    9 A We received this from the City of
    10 Chicago's Department of Planning & Development.
    11 Q And what is the date of this photo?
    12 A Spring 1994.
    13 Q Was a copy of this photo attached to the
    14 permit appeal as Exhibit B?
    15 A Yes, it was.
    16 Q Now, if you would, if you could show us on
    17 Petitioner's Exhibit 3, if you would point out and
    18 describe for us the location of the two CCI Chicago
    19 facilities.
    20 A The 4000 West Filmore building is here.
    21 It occupies the city block right there, and there
    22 is a parking facility right across the street to
    23 the south.
    24 Q What are the streets that surround the
    22
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 4000 West Filmore facility?
    2 A This is Pulaski over here and Karlov over
    3 here.
    4 Q And to the south?
    5 A To the south is Filmore.
    6 Q And is the 4000 West Filmore building
    7 designated on Petitioner's 3 by a white label with
    8 the words "4000 West Filmore" written on it?
    9 A Yes, it is.
    10 Q Could you locate for us or point out to us
    11 the location of the other facility?
    12 A This is 4242 West Filmore. The building
    13 is not quite a block, and the parking area is just
    14 to the east of the building.
    15 Q Again, what streets surround the 4242
    16 building?
    17 A Kildare on the west and Keeler on the
    18 east, and Filmore on the front on the south side.
    19 Q Now, does this photo accurately reflect
    20 the location of the two CCI facilities as of spring
    21 1994 when it was taken?
    22 A Yes, it does.
    23 Q Have there been any changes in the
    24 location of CCI Chicago facilities since spring
    23
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 1994?
    2 A No.
    3 MR. O'BRIEN: I'd like to move Petitioner's
    4 Exhibit 3 into evidence.
    5 HEARING OFFICER EDVENSON: Is there any
    6 objection?
    7 MR. LAYMAN: No.
    8 HEARING OFFICER EDVENSON: Thank you.
    9 (Whereupon, document so offered
    10 was received in evidence as
    11 Petitioner's Exhibit No. 3.)
    12 BY MR. O'BRIEN:
    13 Q Now, again, referring to the photo,
    14 Mr. Gorman, what is located directly to the west of
    15 the 4000 West Filmore Street facility?
    16 A In between the two buildings is a company
    17 at 4100 West Filmore that's called the Ribbon
    18 Webbing Corporation, and their buildings occupy
    19 most of the block. They have a receiving area over
    20 here, and then their parking lot is on the south of
    21 Filmore there.
    22 Q Is the parking lot for the Ribbon Webbing
    23 Corporation fenced in?
    24 A Yes.
    24
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q Do CCI employees or representatives have
    2 any access to that parking lot?
    3 A No.
    4 Q Do CCI employees or representatives have
    5 any access to the Ribbon Webbing building?
    6 A No.
    7 Q If a CCI employee has to go from the 4000
    8 facility to the 4242 facility or vice versa, how do
    9 they get there?
    10 A We have security people that are outside
    11 at both buildings in vehicles, and what they will
    12 do is they will pick up people at each building.
    13 They will transfer them down to the other
    14 building and also take production materials,
    15 paperwork, things of that nature regarding the jobs
    16 back and forth between the buildings.
    17 Q Does CCI have any ownership interest in
    18 the Ribbon Webbing Company?
    19 A No.
    20 Q Does the company have any interest in the
    21 property where that facility sits?
    22 A No.
    23 Q Now, you've located the facilities for us
    24 on the photo. I'd like for you to describe the
    25
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 operations that are conducted at the facilities,
    2 and if you'd start with the 4242 building.
    3 A At 4242 West Filmore we conduct the
    4 production of the color samples basically. We mix
    5 the paint. We match the customer's colors to the
    6 customer specifications. So the color matching
    7 operation performs that.
    8 And once the colors and the bases are
    9 mixed some of that material goes to the coating
    10 department, and the coating department will then
    11 coat that paint on paper or whatever substrate it
    12 might be; and then some other material will get
    13 shipped to other facilities, the bases and colors
    14 and some webs and coated sheets as well.
    15 We also have some research and development
    16 activities going on at 4242 for new products and
    17 new things that we're working on.
    18 Q You mentioned coating. What happens to
    19 the material after the color is coated to the
    20 substrate?
    21 A The paint is placed on a roller via either
    22 hand pouring or through a series of dyes. The
    23 paint transfers from the roller onto a paper or a
    24 different type of a substrate.
    26
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 The paper goes through an oven at
    2 approximately 150 degrees where the paint dries;
    3 and then at the end of the process as it comes out
    4 the other end it's rewound into rolls, and the
    5 rolls then are either shipped to other facilities
    6 or cut into sheets.
    7 Q Now, you mentioned that some of the colors
    8 and bases are shipped to other facilities. What
    9 facilities are they shipped to?
    10 A The colors and bases we ship latex bases
    11 to New Zealand, we ship lacquer and latex bases
    12 to Buffalo, and we ship lacquer bases also to
    13 Poughkeepsie.
    14 Q You also indicated that some of the coated
    15 material was shipped. Where does that material get
    16 shipped to?
    17 A We send the Mexico plant some cut sheets
    18 or coated sheets, we send the plant in Ireland some
    19 of the actual rolls for coated webs, and we don't
    20 send any of the webs to Buffalo or to
    21 Poughkeepsie.
    22 HEARING OFFICER EDVENSON: Mr. Gorman, when you
    23 mention bases, are you speaking of liquid paint?
    24 THE WITNESS: Yes. A base is kind of a
    27
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 starting point for the color. They are generally
    2 clear or white, and then the colorants are added to
    3 the bases to actually make the color that you're
    4 looking at.
    5 HEARING OFFICER EDVENSON: Thank you.
    6 BY MR. O'BRIEN:
    7 Q Besides the Mexico plant and the Ireland
    8 plant where else do you ship the coated product to
    9 from the 4242 facility?
    10 A The major source is the 4000 West Filmore
    11 building where they do the finishing, the
    12 assembling and the production of the color systems.
    13 Q Now, again, you mention the assembly of
    14 the color systems at 4000. Are any color boards
    15 assembled at the 4242 facility?
    16 A No.
    17 Q Is there any printing done at the 4242
    18 facility?
    19 A No.
    20 Q Are there any printing presses at the 4242
    21 facility?
    22 A No.
    23 Q Mr. Gorman, are you familiar with the
    24 concept of standard industrial classification
    28
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 codes?
    2 A Yes, I am.
    3 Q And how are you familiar with that
    4 concept?
    5 A I've had to deal with those on some of the
    6 annual waste reports that we produce.
    7 Q Is there a classification that's been
    8 designated for the 4242 facility as far as standard
    9 industrial classification?
    10 A Yes.
    11 Q And what is that classification?
    12 A We classified that as paper coating not
    13 elsewhere classified, and I believe that's 26-72.
    14 Q 26-72 is the numerical code for that
    15 classification?
    16 A Correct.
    17 Q Now, you described the operations at
    18 4242. I'd like you to turn your attention to the
    19 4000 facility and describe what operations are
    20 conducted there.
    21 A At 4000 we do the printing of some of the
    22 color cards. We also do the slitting or the
    23 cutting of the rolls and sheets.
    24 We also have a mounting and a laminating
    29
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 department that actually puts the chips onto the
    2 paper, and then we have a finishing and bindery
    3 operation that cuts the paper and folds it and bags
    4 it and packages it so that it can be shipped to the
    5 customer.
    6 Our shipping and receiving department
    7 handles just that, the shipping and receiving of
    8 all the different products.
    9 And we also have a warehousing operation
    10 at 4000 that deals with customer fulfillment. We
    11 hold all of their excess inventories; and, when
    12 they request it, then we will ship it to them from
    13 that building.
    14 Q Now, outside of the color boards and
    15 display tools that you mentioned that use the
    16 material from the 4242 plant, does the 4000
    17 facility produce any other products for shipping
    18 and distribution?
    19 A Yes, we do.
    20 Q And what would those be?
    21 A They handle some jobs totally independent
    22 of 4242 West Filmore.
    23 We do some work for paper companies.
    24 Paper companies will consign us to do their color
    30
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 systems for the different types of paper and colors
    2 of paper.
    3 For those jobs we will receive the paper
    4 direct and do the cutting, the chipping, the
    5 mounting and the laminating, the bindery, all the
    6 work at 4000 West Filmore and then ship from there
    7 as well.
    8 Q Is any coating done at the 4000 West
    9 Filmore facility?
    10 A No.
    11 Q Are there any coating ovens at the 4000
    12 West Filmore facility?
    13 A No.
    14 Q Now, you previously mentioned the other
    15 manufacturing locations. What kind of
    16 manufacturing is performed at the Castlereagh,
    17 Ireland facility?
    18 A In Castlereagh, Ireland we have a color
    19 matching operation, we have a bindery and finishing
    20 operation; and they have been doing that for a
    21 little less than a year there.
    22 Q And, as I understand your testimony,
    23 Castlereagh, Ireland receives some of the coated
    24 product from the 4242 plant; is that correct?
    31
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Correct.
    2 Q What kind of manufacturing takes place at
    3 the facility in New Zealand?
    4 A Auckland, New Zealand is pretty much a
    5 self-contained color card company. They have a
    6 coating operation. They have color matching. They
    7 have bindery and finishing and mounting
    8 capabilities there.
    9 Q Does the New Zealand facility receive any
    10 materials from the 4242 West Filmore plant?
    11 A Yes. They receive some bases and
    12 colorants from us.
    13 Q So those would not be the finished coated
    14 product, but they would be the colors and liquid
    15 products we discussed earlier?
    16 A Right.
    17 Q What kind of manufacturing takes place at
    18 the Mexico facility?
    19 A Mexico has a color matching operation.
    20 They have mounting capabilities down there. They
    21 have a bindery and a finishing operation as well.
    22 Q Do they receive any materials from the
    23 4242 West Filmore plant?
    24 A They have received some coated sheets from
    32
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 us for their mounting.
    2 Q The other two facilities are in New York
    3 State, one in Buffalo. Can you explain what the
    4 manufacturing is at Buffalo?
    5 A Buffalo is strictly color matching. They
    6 will match customers' colors to their
    7 specifications.
    8 Q Does the Buffalo plant receive any
    9 materials from the 4242 West Filmore facility?
    10 A Yes. They will receive some bases and
    11 colorants from us.
    12 Q And the last one is the facility in
    13 Poughkeepsie, New York. Could you explain what
    14 manufacturing occurs there?
    15 A Poughkeepsie is designated as our color
    16 standards division; and they have a coating
    17 operation, a very small coating operation, along
    18 with color matching; and they also are starting to
    19 do some plastic sampling, matching customers'
    20 colors on plastic.
    21 Q Now, does the Poughkeepsie facility
    22 receive any materials from the 4242 West Filmore
    23 plant?
    24 A Yes. They will receive some bases and
    33
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 colorants from us as well.
    2 Q Now, back to the 4000 facility. Has a
    3 standard industrial code classification been
    4 designated for the 4000 West Filmore facility?
    5 A Yes, it has.
    6 Q And what is that classification?
    7 A It's been designated as commercial
    8 printing NEC, not elsewhere classified.
    9 Q And what's the numerical code for that?
    10 A I believe it's 27-59.
    11 Q And has that been the standard industrial
    12 classification code for the 4000 facility for as
    13 long as you have been at the company?
    14 A Yes, it has.
    15 Q I'd ask the same question, then, for the
    16 standard industrial classification code of 26-72 at
    17 the 4242 facility.
    18 Has that been the same code for that
    19 facility for as long as you have been with Color
    20 Communications?
    21 A Yes.
    22 Q Mr. Gorman, has CCI ever applied to any
    23 environmental agency for one permit to cover both
    24 the 4000 West Filmore and 4242 West Filmore
    34
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 facilities?
    2 A Not to my knowledge.
    3 Q And why not?
    4 A We've always treated the two facilities as
    5 doing entirely separate and independent functions.
    6 They do totally different jobs completely.
    7 Q Now, has any environmental agency of any
    8 kind or any department ever issued a single permit
    9 that covered both the 4000 and 4242 West Filmore
    10 facilities?
    11 A Not to my knowledge.
    12 Q Do the 4000 and 4242 facilities have
    13 separate permits for waste handling?
    14 A Yes, they do.
    15 Q And do they have separate permits for air
    16 emissions?
    17 A Yes, they have separate operating
    18 permits.
    19 MR. O'BRIEN: Bear with me for a minute.
    20 (Pause.)
    21 MR. O'BRIEN: I have no further questions at
    22 this time.
    23 HEARING OFFICER EDVENSON: All right. Then we
    24 will proceed with the cross examination of the
    35
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 witness.
    2 CROSS EXAMINATION
    3 BY MR. LAYMAN:
    4 Q Mr. Gorman, are you aware of whether or
    5 not Color Communications previously maintained a
    6 manufacturing facility at a location other than
    7 4000 or 4242 West Filmore Street?
    8 A Since I have been there those have been
    9 the two facilities that we've manufactured from;
    10 but, yes, I was told that they had other buildings
    11 in the area that they used prior to my coming
    12 there.
    13 Q Since your coming to the Color
    14 Communications facility you have not worked with
    15 or been responsible for activities at those
    16 manufacturing facilities --
    17 A No.
    18 Q -- is that correct?
    19 Are you aware of whether those
    20 manufacturing facilities for Color Communications
    21 at other than those locations for 4242 and 4000
    22 West Filmore Street are still in operation or
    23 existence?
    24 A There is no manufacturing that's going on
    36
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 at any of the other ones.
    2 Q Okay. Are you aware of the location of
    3 manufacturing facilities owned or operated by CCI
    4 prior to your coming to their company?
    5 A I knew that they had other buildings in
    6 the area that they used to work out of.
    7 Q Do you know --
    8 HEARING OFFICER EDVENSON: Gentlemen, could you
    9 both speak up a little bit more for the benefit of
    10 others in the room? Thank you.
    11 BY MR. LAYMAN:
    12 Q Are you aware of where those locations
    13 would have been?
    14 A Not exact addresses on all those
    15 locations, no.
    16 Q Were you or at any time have you been
    17 aware of a manufacturing facility previously
    18 operated by Color Communications at 917 South
    19 Kildare?
    20 A I had heard they had a building on
    21 Kildare.
    22 Q When to your knowledge did Color
    23 Communications purchase the 4000 West Filmore
    24 Street facility?
    37
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A It was either in 1990 or 1989, I believe.
    2 It was prior to my coming there.
    3 Q Do you know when manufacturing operations
    4 actually began?
    5 A I believe it was 1990.
    6 Q Are you aware of when the building at 4242
    7 West Filmore Street was purchased?
    8 A I believe they have been operating there
    9 since 1979.
    10 Q What emission units have generally been
    11 operated at the 4242 facility?
    12 A We have coating machines. We have
    13 emission units, mostly fugitive emissions from the
    14 color matching operation, and the weighing and
    15 paint manufacturing areas. But the coating
    16 machines are major sources.
    17 Q Can you tell us, Mr. Gorman, as to how
    18 Color Communications arrived at a SIC code
    19 classification for the 4242 facility?
    20 A It's coating. We could not find anything
    21 else that we saw in those codes that would classify
    22 it as anything else but not elsewhere classified.
    23 Q Do you know whether or not a SIC code for
    24 the 4242 facility has ever been assigned to you --
    38
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 to the company by a governmental agency or anyone
    2 else?
    3 A Not that I'm aware of.
    4 Q The same response, I take it, would be
    5 true for the SIC codes identified or classified for
    6 the 4000 facility as well; is that correct?
    7 A Correct.
    8 Q Is it fair to say that there is some
    9 degree of care exercised by Color Communications in
    10 insuring the efficient coating of materials at the
    11 4242 facility?
    12 A Yes.
    13 Q What kind of quality control measures are
    14 undertaken at the 4242 facility?
    15 A Quality control from what standpoint?
    16 Q Just in insuring efficient coating, good
    17 quality coating, et cetera.
    18 A Everything is tested and sampled when it
    19 first comes into the building by the research and
    20 development department -- the paints, the different
    21 material used in the bases, the papers, the
    22 plastics, the tissues.
    23 Any material that will go into the makeup
    24 of a color card or the coating material is tested
    39
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 to make sure that it falls within our parameters
    2 that are necessary to let us do our job properly.
    3 Q Is there any kinds of quality control
    4 measures undertaken with products that are coated
    5 at the 4242 facility prior to them being
    6 transferred to the 4000 facility?
    7 A The people at the rewind end of the
    8 coating machines --
    9 Q Uh-huh.
    10 A -- as they are there they see the coating
    11 as it comes out of the machine; and what they will
    12 do is they will flag or put a little marker on the
    13 roll to indicate if there is some imperfections in
    14 the roll, so that when the webs get over to 4000
    15 West Filmore those will be easily seen and cut out.
    16 Q I take it, then, from your response there
    17 will be some quality control measures that are
    18 implemented or undertaken at the 4000 facility for
    19 materials coming from the 4242 facility?
    20 A Correct.
    21 Q Are there any other quality control
    22 measures you can think of that would be implemented
    23 to screen materials coming in from 4242 to the 4000
    24 facility?
    40
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A I think the same would be true also on the
    2 coated sheets as well because we do send coated
    3 sheets over there. They will mark them or flag
    4 them if there is imperfections on them.
    5 Q Are there any particular job or coating
    6 specifications that must be considered by the
    7 company at the 4242 facility before they can be
    8 processed in any way at the 4000 facility?
    9 A I'm not sure I understand the question.
    10 Q Are there certain processes at the 4000
    11 facility either as it relates to printing or
    12 cutting of materials that have to be considered
    13 before you coat the materials at the 4242 facility?
    14 A Well, a customer will give us
    15 specifications for a job as far as the size of the
    16 chips and whatnot; and then we have to put together
    17 a job packet for that job as far as what has to be
    18 done in every department, and then those departments
    19 will follow those instructions.
    20 Q The overall purpose is to have or arrive
    21 at an overall schematic or I believe you referred
    22 to it earlier as an overall marketing scheme, in
    23 other words?
    24 A Whatever that color card or marketing
    41
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 system's got to look like, and it's important that
    2 everybody on board knows what they are supposed to
    3 do to perform the job.
    4 Q Okay.
    5 A There is one other quality control that we
    6 do in the 4242 building. That is that the people
    7 in the coating department once the paint is on the
    8 paper or the substrate, it goes through oven.
    9 After it's dried and comes out the end of
    10 the oven, we will take a sample of that coating;
    11 and we will analyze it under a computer for the
    12 right colors and tints and lights and so forth to
    13 make sure that it hasn't changed in the coating
    14 process and in the drying process.
    15 So that gives us a pretty good indication
    16 that the paint that we've got is going to stand up
    17 to the coating process and give us the right color.
    18 Q Are there any production units at the 4000
    19 facility that may be limited in their capabilities
    20 given certain types of coatings or specifications
    21 at the 4242 facility?
    22 MR. O'BRIEN: Let me object here just for the
    23 record because I'm not sure what you mean by
    24 production units. Could you maybe explain that?
    42
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 MR. LAYMAN: I can rephrase the question.
    2 HEARING OFFICER EDVENSON: Why don't we try
    3 that.
    4 BY MR. LAYMAN:
    5 Q Are there any manufacturing processes,
    6 including printing and cutting of materials at the
    7 4000 facility, that will have to be on occasion
    8 modified or will not be able to be used because of
    9 certain materials that are coated at the 4242
    10 facility?
    11 A I would have to say no. The coating can
    12 always be slit or cut out if it's not to standard.
    13 So we can -- we usually produce more coating than
    14 what we need for a job so that we always have a
    15 little overage there, and there is generally always
    16 enough of that color to make the different chips or
    17 rolls.
    18 Q It is fair so say, is it not, that you
    19 will know in advance -- Color Communications will
    20 know in advance as to how both the coatings in
    21 terms of specifications will be applied at the 4242
    22 facility as well as how they will be printed or cut
    23 or put together in brochures, the final product at
    24 the 4000 facility?
    43
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Everybody has instructions for how to do
    2 their particular aspect of the job.
    3 Q Before coatings are conducted on a
    4 particular job at the 4242 facility the company
    5 already knows what that final product is supposed
    6 to look like based on a customer request or some
    7 other reason; is that correct?
    8 A I would say in most cases that's true.
    9 There is always going to be some things that may
    10 change down the road, but generally I would say
    11 that's accurate.
    12 MR. LAYMAN: Just a moment, please.
    13 HEARING OFFICER EDVENSON: Okay.
    14 MS. SAWYER: Can I take a look at one of these
    15 exhibits here?
    16 CROSS EXAMINATION
    17 BY MS. SAWYER:
    18 Q I have Petitioner's Exhibit No. 1.
    19 MR. RUBIN: Are we doing dual questioning?
    20 MR. O'BRIEN: Is this your question now,
    21 Ms. Sawyer?
    22 MS. SAWYER: Yes.
    23 MR. O'BRIEN: Okay.
    24 BY MS. SAWYER:
    44
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q Just if you could take a look at one of
    2 the coated or the colors indicated here, one of the
    3 paint chips, sugarplum perhaps.
    4 A Okay.
    5 Q When you coat that chip at the 4242
    6 facility, is it identified with the name of the
    7 color?
    8 A What they will do -- I don't know exactly
    9 what order this was coated or how it was coated.
    10 But they will coat it on either a 40-inch web or a
    11 60-inch wide web; and they may just this color
    12 across the web, or they may have six colors across
    13 the web depending on how the job is laid out.
    14 But at the end of the -- when the roll is
    15 finished and it's wound up or the sheets are cut,
    16 they will market at the 4242 building with what
    17 colors are on there or the form that's being coated
    18 basically on that job. They are making more than
    19 one form on a job because of the different colors
    20 that are involved.
    21 Q And then at the 4000 facility the cards
    22 will be printed with the different names of the
    23 coatings?
    24 A Correct.
    45
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q And they will attach the color chips to
    2 the cards essentially?
    3 A Correct. After the material is printed,
    4 then the coating gets placed on it at that point in
    5 this particular case.
    6 MR. LAYMAN: I believe that's it.
    7 MS. SAWYER: No further questions.
    8 HEARING OFFICER EDVENSON: Okay. Is there any
    9 redirect?
    10 MR. O'BRIEN: Very brief.
    11 REDIRECT EXAMINATION
    12 BY MR. O'BRIEN:
    13 Q With regard to the questions you were
    14 asked about quality control, are materials that
    15 come into the 4000 facility other than those that
    16 originate at the 4242 facility checked for quality
    17 control?
    18 A Yes.
    19 Q And what kind of materials would those be?
    20 A Printed material. Paper stock. Glues.
    21 Q And this quality control is conducted by
    22 personnel at the 4000 facility, correct?
    23 A Correct.
    24 Q The other question Mr. Layman asked you
    46
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 about the SIC codes or the S-I-C codes, I believe
    2 your testimony was is that you have used those
    3 SIC codes on permitting and submissions to
    4 environmental agencies; is that correct?
    5 A Correct.
    6 Q Have any environmental agencies ever
    7 objected to the SIC codes that have been used for
    8 either of the 4000 or 4242 facilities?
    9 A No.
    10 MR. O'BRIEN: I have nothing further.
    11 HEARING OFFICER EDVENSON: Is there any
    12 recross?
    13 MR. LAYMAN: No.
    14 HEARING OFFICER EDVENSON: All right. Thank
    15 you, Mr. Gorman.
    16 THE WITNESS: Thank you.
    17 MR. O'BRIEN: You are excused.
    18 (Witness excused.)
    19 HEARING OFFICER EDVENSON: At this point why
    20 don't we take about a five-minute recess, and then
    21 we will come back with petitioner's next witness.
    22 MR. O'BRIEN: Thank you.
    23 (Recess taken.)
    24
    47
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 HEARING OFFICER EDVENSON: Back on the record,
    2 and we are ready for petitioner's second witness.
    3 MR. O'BRIEN: We're calling George Nicholas.
    4 HEARING OFFICER EDVENSON: Mr. Nicholas, would
    5 you please be sworn?
    6 THE WITNESS: George W. Nicholas.
    7 GEORGE W. NICHOLAS,
    8 called as a witness herein, having been first duly
    9 sworn, was examined and testified as follows:
    10 DIRECT EXAMINATION
    11 BY MR. O'BRIEN:
    12 Q Just again for the record please state
    13 your name.
    14 A George W. Nicholas.
    15 Q Mr. Nicholas, are you employed?
    16 A Yes, I am.
    17 Q And where are you employed?
    18 A My company is G. Nicholas & Associates,
    19 Incorporated.
    20 Q And how long have you been with G.
    21 Nicholas & Associates?
    22 A Since July of 1993.
    23 Q What's your position with that company?
    24 A I'm president and principal air quality
    48
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 consultant.
    2 Q What are your typical job duties as an air
    3 quality consultant for G. Nicholas & Associates?
    4 A My typical duties are to provide emission
    5 calculations, dispersion modeling, air quality
    6 permitting and the normal things that go with air
    7 quality oriented work.
    8 Q For whom do you provide these services?
    9 A I provide them to industrial clients that
    10 I have.
    11 Q Now, prior to working for G. Nicholas &
    12 Associates where did you work?
    13 A I started in air quality consulting work
    14 in February 1972 at Sargent & Lundy Engineers.
    15 Q And where was that located?
    16 A Here in Chicago down the street.
    17 Q And what was your position with Sargent &
    18 Lundy?
    19 A I was an air quality consultant.
    20 Q Did you perform at Sargent & Lundy the
    21 same function you are now performing at G. Nicholas
    22 & Associates?
    23 A Basically, yes.
    24 Q How long were you with Sargent & Lundy
    49
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Engineers?
    2 A I was there approximately three years.
    3 Q That would be until about 1975?
    4 A Yes.
    5 Q After that where did you work?
    6 A After that I worked for 15 years for Dames
    7 & Moore.
    8 Q Dames, D-a-m-e-s?
    9 A D-a-m-e-s, and Moore, M-o-o-r-e.
    10 Q And what was your position with Dames &
    11 Moore?
    12 A I was also an air quality consultant.
    13 During that period of time I also managed Dames &
    14 Moore's office here in Chicago.
    15 Q Again, was your job as an air quality
    16 consultant the same duties and functions you are
    17 now performing with G. Nicholas & Associates?
    18 A Yes, it was.
    19 Q And after working at Dames & Moore where
    20 did you work?
    21 A I worked at Roy F. Weston, Inc.
    22 Q And what was your position at Roy F.
    23 Weston, Inc.?
    24 A It was the same as the other group, air
    50
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 quality consultant services.
    2 Q Again, performing the same types of
    3 services that the other two places that you had
    4 worked previously?
    5 A Yes.
    6 Q And how long did you work for Roy F.
    7 Weston, Inc.?
    8 A Approximately three years.
    9 Q And that takes us up to G. Nicholas &
    10 Associates, correct?
    11 A Correct.
    12 Q Can you tell us your educational
    13 background after high school?
    14 A Yes. I have a bachelor's degree in
    15 mathematics and master's degree in meteorology.
    16 Q Now, are you or your firm currently
    17 engaged by Color Communications?
    18 A Yes, we are.
    19 Q In what capacity?
    20 A As an air quality consultant providing air
    21 quality permitting and other types of air quality
    22 services.
    23 Q When were you first hired by Color
    24 Communications?
    51
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A July of 1993.
    2 Q And, again, the same as with Mr. Gorman.
    3 If I use the term CCI, you will understand that to
    4 mean Color Communications? Is that acceptable?
    5 A Yes, it is.
    6 Q Have you assisted CCI in preparing and
    7 submitting applications for air permits?
    8 A Yes, I have.
    9 Q What was the first air permit that you
    10 assisted CCI in preparing?
    11 A We prepared a permit application for the
    12 4000 West Filmore Street facility for the operation
    13 of their printing machines, their coaters, their
    14 laminators and other finery type equipment.
    15 Q And when was this prepared?
    16 A It was prepared in March of 1994.
    17 Q Was this permit application approved by
    18 the agency? Was a permit issued?
    19 A Yes. The permit was issued June 15, 1994.
    20 Q And this was covering emissions units at
    21 the 4000 West Filmore facility, correct?
    22 A That's correct.
    23 Q Now, prior to this permit for 4000 being
    24 issued by the agency on June 15th had Illinois EPA
    52
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 previously issued a separate operating air permit
    2 for the 4242 West Filmore facility?
    3 A Yes. I've seen copies of the permits.
    4 The initial one was issued around 1979 when they
    5 bought the 4242 Street facility. But then it was
    6 renewed in 1983, 1988, then again in 1995.
    7 Q And that permit covered emissions units at
    8 the 4242 West Filmore facility; is that correct?
    9 A That's correct.
    10 Q Now, after the permit for the 4000 West
    11 Filmore facility was issued in June of 1994, did
    12 CCI file another permit application for that 4000
    13 West Filmore facility?
    14 A Yes, we did.
    15 Q What was the nature of that permit
    16 application?
    17 A That permit application was really to
    18 construct and operate a laminating, what we call,
    19 mounting machine and to then also include some
    20 equipment that was left out of the original permit
    21 issued on June 15th.
    22 Q What kind of equipment are you referring
    23 to that had been, as you say, left out of the
    24 permit that had been issued on June 15th?
    53
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A It was some of the cutting machines,
    2 stitching machines. Mostly the machines that went
    3 into the bindery operation.
    4 Q And these are all machines that are
    5 located at the 4000 West Filmore facility?
    6 A That's correct.
    7 Q Now, this permit application, was this
    8 permit eventually issued by the Illinois EPA?
    9 A Yes, it was.
    10 Q When was that?
    11 A It was May the 3rd of 1995.
    12 Q Mr. Nicholas, have you ever assisted CCI
    13 in preparing permit applications for the 4242 West
    14 Filmore facility?
    15 A Yes, I have.
    16 Q Can you explain the circumstances behind
    17 that?
    18 A Yes. There were two permit applications
    19 submitted in September of 1994.
    20 One was for the installation and operation
    21 of an afterburner that served the control on
    22 coating lines two and three.
    23 The other application was for the
    24 operation, basically the coating lines and their
    54
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 ovens located at 4242 and operating permit.
    2 Q What was the response to those permit
    3 applications?
    4 A The afterburner permit -- well, they
    5 issued permits in three separate ones.
    6 The first one was for the afterburner, and
    7 it was issued in November of 1995. I'm sorry,
    8 November 1994.
    9 The second one was for the two boilers
    10 that exist at 4242, and it was issued in December
    11 of 1994.
    12 Now, the operation of the coating lines
    13 and their ovens was issued in May of 1995.
    14 Q Now, the three permits that you just
    15 mentioned as being issued those all were for
    16 emissions units at the 4242 West Filmore facility;
    17 is that correct?
    18 A That's correct.
    19 Q So in May 1995 I believe your testimony is
    20 that IEPA issued at least one operating permit
    21 covering the 4000 West Filmore facility and a
    22 separate operating permit covering the 4242 West
    23 Filmore facility; is that correct?
    24 A That's correct.
    55
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q Now, Mr. Nicholas, can you tell us what
    2 the annual emissions volatile organic materials are
    3 from the 4242 facility in terms of tons?
    4 A Yes. They are approximately 150 tons per
    5 year.
    6 Q And, if the 4242 facility were considered
    7 a source standing alone, would it be considered a
    8 major stationary source by under the applicable
    9 regulations?
    10 A Yes, it would.
    11 Q And why is that?
    12 A Because their emissions are greater than
    13 25 tons per year which defines a source to be major
    14 here in Chicago ozone nonattainment area.
    15 Q With regard to the 4000 West Filmore
    16 facility can you tell us in tons per year what the
    17 annual emissions of VOM are from that facility?
    18 A It's approximately 10 tons per year.
    19 Q Now, if the 4000 facility were considered
    20 an independent source standing alone, would it be
    21 considered a major stationary source under the
    22 applicable regulations?
    23 A No, it would not.
    24 Q And why is that?
    56
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Well, because their actual and volatile
    2 emissions are less than 25 tons per year to define
    3 it as a major source.
    4 Q Now, Mr. Nicholas, what are the practical
    5 ramifications for CCI of treating these two
    6 facilities as one source for air permitting
    7 purposes?
    8 A Well, the ramifications are that put
    9 together as one source both facilities would be
    10 considered as major sources and which would negate
    11 the minor source designation for the 4000 Street
    12 facility.
    13 Q What would being designated as a major
    14 source or part of a major source mean for the
    15 operations of the 4000 West Filmore facility?
    16 A Well, for the 4000 West Filmore Street
    17 facility they would be considered as a major source
    18 for any future equipment and having to deal with
    19 emissions for it; and -- well, that's basically it.
    20 Q What kind of restrictions would be placed
    21 on the 4000 facility as a result of being
    22 considered part of a major stationary source?
    23 A Well, the restrictions would be basically
    24 that for any increase in emissions they would have
    57
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 to go through the new source review regulations
    2 which are basically together one point three to one
    3 emission offsets and exercise those achievable
    4 emission rate technology.
    5 Q Now, does imposition of this major
    6 stationary source standard on the 4000 West
    7 facility offer any significant control of air
    8 emission?
    9 A No, it doesn't. It doesn't offer us any
    10 significant control.
    11 Q And why is that?
    12 A Well, basically for two reasons. One is
    13 that the equipment that would be put there define
    14 it as modification is very, very small.
    15 The permit that we got for the one
    16 mounting machine that was less than four-tenths of
    17 a ton per year in VOM emissions, and that's the
    18 order with which the emissions would be increased
    19 at that facility.
    20 Q What would happen if the company wanted to
    21 add a significant new unit that would emit a fairly
    22 high amount of volatile organic materials in terms
    23 of tons per year at the 4000 West Filmore facility?
    24 A Well, it would be restricted as a major
    58
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 stationary source if emissions would increase to
    2 25 tons per year the same as it would for 4242.
    3 Q So are you saying if the total emissions
    4 put out by the 4000 facility went over 25 tons per
    5 year it would then come under the major source
    6 restrictions?
    7 A That's correct.
    8 MR. O'BRIEN: Bear with me for a minute.
    9 (Pause.)
    10 MR. O'BRIEN: I don't have any further
    11 questions at this time.
    12 HEARING OFFICER EDVENSON: Then we will have
    13 the cross examination by respondent.
    14 CROSS EXAMINATION
    15 BY MR. LAYMAN:
    16 Q Mr. Nicholas, are you familiar with any
    17 manufacturing facilities that had previously been
    18 operated by Color Communications prior to, say,
    19 1990 or 1991?
    20 A No, I'm not familiar with any.
    21 Q You're not familiar with a previous Color
    22 Communications facility that had been operated at
    23 917 South Kildare?
    24 A No, I'm not.
    59
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q Okay. Did you take part in preparing a
    2 permitting protocol that was submitted to the
    3 agency on behalf of Color Communications through G.
    4 Nicholas & Associates on or around December 27,
    5 1993?
    6 A Yes, I was.
    7 Q Would it refresh your memory possibly to
    8 review a paragraph in that submittal detailing the
    9 existence of a previous facility at that address?
    10 A At 917?
    11 Q That's correct. Would it refresh your
    12 memory to look at this?
    13 A Yes, I think it would.
    14 Q Okay. Let me find the correct page.
    15 A Yes.
    16 Q You can, in fact, then state with some
    17 reasonable degree of certainty that there was a
    18 manufacturing facility owned by Color
    19 Communications at that address?
    20 MR. O'BRIEN: Just for as a point of
    21 clarification, are you asking for his personal
    22 knowledge or what basis are you looking for?
    23 MR. LAYMAN: Just a general recognition that,
    24 in fact, Color Communications owned or operated
    60
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 that facility sometime prior to the submittal.
    2 THE WITNESS: That was information that was
    3 given to me by Color Communications, yes.
    4 BY MR. LAYMAN:
    5 Q Okay.
    6 HEARING OFFICER EDVENSON: Perhaps the parties
    7 could agree to stipulate to that.
    8 MR. O'BRIEN: We can discuss that.
    9 MR. LAYMAN: Okay.
    10 BY MR. LAYMAN:
    11 Q You mentioned earlier that if the 4000
    12 West Filmore Street facility were to be considered
    13 a source in and of itself that it would be
    14 considered a non-major source?
    15 A That's correct.
    16 Q Can you identify the reason as to why
    17 Color Communications submitted a separate CAAPP
    18 application for the 4000 facility in light of the
    19 fact that it fell or would fall underneath that
    20 25 ton applicability threshold?
    21 A Well, we considered the two sources to be
    22 separate sources.
    23 Q That's correct. But you are aware, are
    24 you not, that a CAAPP permitting threshold, a
    61
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 threshold by which you would require a CAAPP
    2 permit, is of 25 tons; and in this case the 4000
    3 facility would be below that? Can you identify a
    4 reason as to why a CAAPP application was sought?
    5 A I think to cover the bases that, you know,
    6 there is two separate facilities.
    7 Q Are you aware of any future plans or
    8 intent on the part of Color Communications to
    9 expand its operations at the 4000 facility?
    10 A I'm not aware of any.
    11 Q You indicated that if new emissions units
    12 or production facilities were installed at the 4000
    13 facility that any significant increases in VOM
    14 might trigger new source review requirements; is
    15 that correct?
    16 A That's a possibility of that.
    17 Q You also indicated that there would be
    18 some restrictions associated with any economic
    19 development at the 4000 facility?
    20 A Yes.
    21 MR. O'BRIEN: Excuse me. I'm sorry. Economic
    22 development?
    23 MR. LAYMAN: I can rephrase that.
    24 MR. O'BRIEN: Yeah. Can you rephrase that
    62
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 question?
    2 HEARING OFFICER EDVENSON: Can you clarify your
    3 question?
    4 BY MR. LAYMAN:
    5 Q You indicated that there might be
    6 restrictions on any new production units or
    7 emission units developed or installed at the 4000
    8 facility at some point in the future.
    9 MR. O'BRIEN: Let me make one more point of
    10 clarification, if you don't mind. This is assuming
    11 that 4000 is being treated as a single source?
    12 MR. LAYMAN: That is correct.
    13 MR. O'BRIEN: Okay.
    14 MR. RUBIN: A single source with 4242?
    15 MR. LAYMAN: A single source in and of itself.
    16 MR. O'BRIEN: In and of itself.
    17 MR. LAYMAN: Hypothetically.
    18 MR. O'BRIEN: Hypothetically.
    19 THE WITNESS: Yeah. There's possibilities of,
    20 you know, putting in a new mounting machine; or
    21 there's a possibility, I suppose, in the future
    22 could install a new printing line. But each of
    23 these kinds of sources would really result in very
    24 small VOM emission increases.
    63
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 BY MR. LAYMAN:
    2 Q Isn't it true that under the new source
    3 review requirements of state and/or federal law
    4 there isn't a restriction on any increases in the
    5 Chicago metropolitan area for ozone but rather
    6 increases as they might otherwise constitute a
    7 major modification?
    8 MR. O'BRIEN: I'm going to object to the form
    9 of that question. I don't really understand what
    10 you mean by increases for ozone. Are you referring
    11 to increases of VOM?
    12 MR. LAYMAN: Yes.
    13 MR. O'BRIEN: Okay. Maybe you could rephrase
    14 it --
    15 MR. LAYMAN: I can rephrase.
    16 MR. O'BRIEN: -- so I can understand it.
    17 BY MR. LAYMAN:
    18 Q You indicated in your testimony that any
    19 increase at the 4000 facility might trigger new
    20 source review?
    21 A Correct.
    22 Q Isn't it true that that's not the case but
    23 rather that any increase in excess of 25 tons of
    24 VOM, volatile organic material emissions, would
    64
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 impose possible restrictions?
    2 A If two facilities are one source, we
    3 should understand that, you know, the
    4 contemporaneous period of adding emissions has
    5 already been used; so any increase would then fall
    6 under the new source review regulations.
    7 Q Okay. You understand that regardless of
    8 whether you treat both facilities as one source or
    9 whether you treat them as separately that new
    10 source review contemplates looking at only a net
    11 emissions increase?
    12 A That's correct.
    13 Q In doing so you would, therefore, account
    14 for any emission offsets or decreases that would
    15 have occurred within that contemporaneous five-year
    16 period?
    17 A That's correct, yes.
    18 MR. LAYMAN: If I may have just a moment to
    19 confer.
    20 (Pause.)
    21 MS. SAWYER: I've got a couple of questions.
    22
    23
    24
    65
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 CROSS EXAMINATION
    2 BY MS. SAWYER:
    3 Q You testified, I believe, that there was a
    4 netting exercise that took place at CCI's facility,
    5 is that correct, previously?
    6 A Not for any form of the submittals.
    7 Q Okay. You made some reference to a
    8 contemporaneous period already being used. What
    9 did you mean by that?
    10 A Well, if we did go through a committing
    11 exercise for new equipment, you know, for
    12 construction of the new equipment, that we would
    13 have to look at that contemporaneous period and
    14 count the net emissions.
    15 Q Okay. So your response was just a
    16 hypothetical --
    17 A Hypothetical.
    18 Q -- future sort of situation. I just
    19 wanted to clarify that.
    20 MR. LAYMAN: I believe we have no further
    21 questions.
    22 HEARING OFFICER EDVENSON: Is there any
    23 redirect?
    24 MR. O'BRIEN: No.
    66
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 HEARING OFFICER EDVENSON: Thank you very much,
    2 Mr. Nicholas.
    3 (Witness excused.)
    4 HEARING OFFICER EDVENSON: At this point why
    5 don't we take our lunch break, then we will come
    6 back with the continuation of the case.
    7 (Whereupon, a luncheon break
    8 was taken.)
    9
    10 * * * * *
    11
    12 HEARING OFFICER EDVENSON: We're back on the
    13 record. Petitioner's case-in-chief has been
    14 concluded, and do we have any additional
    15 stipulations?
    16 MR. O'BRIEN: We do. The petitioner and
    17 respondent have entered a document which we have
    18 entitled "Second Set of Joint Stipulations of
    19 Fact," which I am handing to the hearing officer.
    20 There are five additional stipulations numbered 13
    21 through 17 following the first set of one through
    22 twelve that we tendered this morning.
    23 HEARING OFFICER EDVENSON: Well, thank you very
    24 much for your prompt response to that inquiry; and
    67
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 I believe we are ready, then, for respondent's
    2 case-in-chief. Do you want to call your first
    3 witness?
    4 MR. LAYMAN: Sure. By way of a preliminary
    5 matter I'd like to note for the record that the
    6 parties are willing to stipulate to the
    7 admissability of what will be marked I think now
    8 Respondent's Exhibit 1 if that's acceptable, the
    9 administrative record.
    10 We have three volumes, so shall we mark
    11 them accordingly each?
    12 HEARING OFFICER EDVENSON: Let's create one
    13 Respondent's Exhibit 1 --
    14 MR. LAYMAN: Okay.
    15 HEARING OFFICER EDVENSON: -- that includes all
    16 three volumes; and then if you need to refer to
    17 page number you might preface that with the volume
    18 number.
    19 MR. LAYMAN: Okay.
    20 (Whereupon, Respondent's
    21 Exhibit No. 1 was marked for
    22 identification.)
    23 HEARING OFFICER EDVENSON: Then the agency
    24 record is admitted into evidence as Respondent's
    68
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Exhibit 1.
    2 MR. LAYMAN: Okay.
    3 (Whereupon, document so offered
    4 was received in evidence as
    5 Respondent's Exhibit No. 1.)
    6 MR. LAYMAN: I'd like also to move for
    7 admission of a map of the more generalized area.
    8 It's taken from the Chicago vicinity six-county
    9 street map guide published by Rand McNally.
    10 I have copies for both Mr. O'Brien and the
    11 hearing officer and then the board exhibit itself.
    12 So this would be designated as
    13 Respondent's Exhibit 2, I believe.
    14 (Whereupon, Respondent's
    15 Exhibit No. 2 was marked for
    16 identification.)
    17 HEARING OFFICER EDVENSON: All right. Is there
    18 any objection to the introduction of this map as
    19 Respondent's Exhibit 2?
    20 MR. O'BRIEN: We don't have any objection. I
    21 wonder if it might be more appropriate to admit it
    22 at the time it is discussed. I don't think we are
    23 going to have any objection to it, but for whatever
    24 that's worth.
    69
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 MR. LAYMAN: Okay.
    2 HEARING OFFICER EDVENSON: For simplicity sake
    3 let's admit it at this time as Respondent's Exhibit
    4 2, and if an objection arises you can raise it
    5 later.
    6 MR. O'BRIEN: Fine.
    7 (Whereupon, document so offered
    8 was received in evidence as
    9 Respondent's Exhibit No. 2.)
    10 MR. LAYMAN: The respondent calls Mr.
    11 Christopher Romaine.
    12 HEARING OFFICER EDVENSON: Mr. Romaine, would
    13 you please be sworn.
    14 CHRISTOPHER ROMAINE,
    15 called as a witness herein, having been first duly
    16 sworn, was examined and testified as follows:
    17 DIRECT EXAMINATION
    18 BY MR. LAYMAN:
    19 Q Mr. Romaine, would you state your name for
    20 the record again, please?
    21 A My name is Christopher Helton (phonetic)
    22 Romaine.
    23 Q Would you state your occupation?
    24 A I am an environmental engineer employed
    70
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 by the Illinois Environmental Protection Agency
    2 Division of Air Pollution Control.
    3 Q Could you describe, if you will, your
    4 educational background since high school?
    5 A I have a Bachelor of Science in
    6 engineering and a Bachelor of Arts in art from
    7 Brown University.
    8 I've completed course work toward a
    9 master's of environmental engineering at Southern
    10 Illinois University Carbondale.
    11 Q When did you start work for the Illinois
    12 Environmental Protection Agency?
    13 A In June of 1976.
    14 Q What was your role and title with the
    15 agency at that time?
    16 A I was an analyst in the Division of Air
    17 Pollution Control permit section, a junior level
    18 analyst.
    19 Q Where did you move up from there in terms
    20 of your employment with the agency?
    21 A Well, I raised in seniority as an analyst;
    22 and I'm currently manager of the new source review
    23 unit in the air permit section.
    24 Q What is your designated role as manager of
    71
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 that unit or section?
    2 A Well, the principal role of that unit is
    3 to assist in the proper implementation of various
    4 programs for new and modified sources of air
    5 pollution control.
    6 That the Federal Clean Air Act mandates
    7 and also establishes additional programs for new
    8 equipment called new source performance standards.
    9 It also has a prevention of significant
    10 deterioration program and provisions for major
    11 construction activities in nonattainment areas.
    12 My goal or role in the permit section is
    13 to evaluate changes in those programs and to make
    14 sure the permit section is properly implementing
    15 them.
    16 As part of that activity I would be
    17 involved in rule changes for the board to the
    18 extent that rule-making is necessary.
    19 I will be involved in-house training of
    20 analysts. I would also be involved in assisting
    21 analysts in the day-to-day review of specific
    22 applications.
    23 As manager of the new source review unit
    24 I've also been involved in a multitude of other
    72
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 activities.
    2 I've gotten involved in some of the
    3 regulatory activities for volatile organic material
    4 emissions.
    5 I've also assisted in development of the
    6 Clean Air Act Permit Program for the State of
    7 Illinois.
    8 Q How long have you been employed in your
    9 position as a new source review manager?
    10 A I believe 12 or 13 years.
    11 Q As part of your present work
    12 responsibilities have you become very familiar with
    13 many, if not most, of the Clean Air Act programs
    14 and requirements?
    15 A I have become very familiar with the
    16 permitting programs for stationary sources of air
    17 pollution under the Clean Air Act.
    18 I am definitely not an expert in things
    19 like vehicle inspection, maintenance and
    20 transportation control measures. My area of
    21 expertise is dealing with stationary sources.
    22 Q So you are familiar, then, with the
    23 federal prevention of significant deterioration
    24 program, as you said?
    73
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Yes, I am.
    2 Q How are you familiar or how do you work
    3 with that on a daily basis, if you will, with the
    4 federal PSD program at the agency?
    5 A The primary reference for these programs
    6 is the regulations that USEPA adopts.
    7 As part of those rule makings, we also
    8 look at proposals of rules, the preambles of
    9 adoption.
    10 We also look at guidance provided by USEPA
    11 and manuals provided by USEPA. Periodically we
    12 attend workshops or seminars handled by USEPA. We
    13 also discuss specific projects with USEPA. USEPA
    14 provides us with information on determinations they
    15 have made for other states.
    16 There is a wide variety of techniques that
    17 we use to gain information on the status of those
    18 programs and the rules themselves to a case-by-case
    19 determination.
    20 Q Are you also familiar with the Clean Air
    21 Act federal nonattainment area resource review
    22 program?
    23 A Yes, I am familiar with the Clear Air Act
    24 -- Federal Clean Air Act nonattainment area review
    74
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 program for stationary sources.
    2 That is a program which does require rule
    3 making by a state to actually adopt state rules to
    4 implement the federal program.
    5 I have been involved on behalf of the
    6 agency on various rule makings before the board
    7 adopting Illinois' new source review program.
    8 I've also been involved in discussions
    9 with USEPA concerning their approval of the program
    10 and in the actual implementation of that program as
    11 applied to new projects.
    12 Q If you don't mind going into a little
    13 further detail on that last question, how does
    14 USEPA play a role in implementing the new source
    15 review program in conjunction with the state?
    16 A Well, in terms of the nonattainment area
    17 program, even though we have state rules it is
    18 pursuant to a federal requirement under the Clean
    19 Air Act to have a new source review program.
    20 There are federal laws that also have
    21 concern, and the USEPA is concerned that there be
    22 consistency with national policy and national
    23 implementation of those programs.
    24 So after USEPA approves a state's rules,
    75
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 they are still very concerned about the day-to-day
    2 implementation of those rules.
    3 As specific projects come up where some
    4 interpretation is necessary we may, in fact,
    5 consult with USEPA for guidance.
    6 That isn't necessarily the first place
    7 we'd look. Obviously we'd look at the rules
    8 themselves, adopting material, existing guidance.
    9 But, if an issue came up where we thought
    10 it would be useful to get USEPA guidance on a
    11 point, we would certainly consult with them and get
    12 their opinion.
    13 USEPA is also involved as major and
    14 significant construction projects do undergo public
    15 notice before a permit is issued, and USEPA is part
    16 of that public notice period and has an opportunity
    17 to review our proposed action and may, in fact,
    18 have comments or suggestions as to how we should
    19 be applying the new source review program.
    20 Q Where are the state's rules for
    21 nonattainment new source review found in the
    22 board's regulations?
    23 A The state's rules for new source review
    24 are found in Part 2 of 3.
    76
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q And, again, you had indicated that you
    2 had been involved with the development or the
    3 promulgation of those rules; is that correct?
    4 A Well, I have been involved on behalf of
    5 the agency as proponents of various rule packages
    6 before the board.
    7 Q You had indicated earlier you participated
    8 and attended a number of seminars or training
    9 programs relating to new source review both PSD as
    10 well as nonattainment area.
    11 Could you give us an idea of how many you
    12 attend on an annual basis?
    13 A Well, at this stage I don't attend that
    14 many on an annual basis. It's more common than
    15 I'd be giving the training programs for in-house
    16 training.
    17 When there are opportunities for training,
    18 USEPA has a teleconference system. We would sit in
    19 or try to get a tape and get a look at it at some
    20 point.
    21 Q So some of the training programs that you
    22 would participate or conduct in this case would be
    23 programs sponsored by other agencies or other
    24 sponsors, if you will?
    77
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Well, I do a lot of in-house training.
    2 Part of being a regulatory agency is providing
    3 guidance to the regulated public as well.
    4 A lot of our recent activity now has been
    5 outreach on the Clean Air Act Permit Program and
    6 assisting applicants in preparing applications and
    7 fulfilling their obligations under that program.
    8 Q Okay. By "in-house" who do you mean
    9 primarily?
    10 A By "in-house training" I mean primarily
    11 the permit section, but there are also people in
    12 the field operation section who do inspections who
    13 also have to be familiar with development in the
    14 new source review program and also have to be aware
    15 of the Clean Air Act Permit Program as well.
    16 Q How familiar are you with the Illinois
    17 Title 5 program as approved by USEPA?
    18 A I'm very familiar with it, I'd say. I was
    19 involved -- was part of the task force in the
    20 agency that worked on developing the agency's
    21 proposed legislation.
    22 I also worked on the task force that
    23 worked on the agency's regulations at Part 270 for
    24 the Title 5 program.
    78
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 I was also involved perhaps in a more
    2 managerial or oversight role in the form
    3 preparation.
    4 As I said, I've participated in a number
    5 of workshops and training sessions for the
    6 regulated public explaining our expectations with
    7 respect to Illinois' Title 5 permit program.
    8 Q Have you played a role in providing
    9 workshops or presentations in-house as well for the
    10 Title 5 program?
    11 A Yes, I have.
    12 Q Is it fair to say you have some
    13 familiarity with the statutory source definition
    14 for the PSD and nonattainment area new source
    15 review program?
    16 A Yes, I do have familiarity with those
    17 definitions.
    18 Q What can you generally tell us about what
    19 those definitions provide?
    20 A Well, it's always good to go back to the
    21 definitions themselves because words do change
    22 slightly from definition to definition.
    23 But in general the definitions of
    24 stationary source or the new source review program,
    79
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 prevention of significant deterioration program,
    2 established three criteria for what constitutes a
    3 single source; and a single source is the collection
    4 of pollutant activities that are located on a
    5 single piece of property or adjacent or contiguous
    6 piece of property that are under common control or
    7 under the control of persons -- under common
    8 control and finally that belong to the same
    9 industrial group.
    10 So there are three common criteria.
    11 Generally location, proximity, supervision, control
    12 and then a functional criteria.
    13 Q In applying those definitions at the state
    14 level, are there any other areas or sources that
    15 the IEPA would look to to guide its determination
    16 of what constitutes a source?
    17 A In terms of applying those definitions, we
    18 would look to whatever guidance we can obtain that
    19 is relevant to the circumstance.
    20 We'd certainly look at the material
    21 accompanying the adoption of those regulations.
    22 We'd look at guidance that has been prepared
    23 historically if we had guidance.
    24 The most authoritative compilation of
    80
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 guidance from USEPA on the new source review
    2 program is its 1990 new source review workshop
    3 manual.
    4 If an issue wasn't adequately stressed and
    5 those documents, set of circumstances, didn't quite
    6 fit, we then look at other case-by-case
    7 determinations that were made and, if necessary,
    8 consult directly with USEPA.
    9 Q How familiar are you with the stationary
    10 source definition applied or existing under the
    11 stage (phonetic) Title 5 program?
    12 A Well, I don't have as much familiarity
    13 with that definition. That is a new program just
    14 approved by USEPA in March of last year.
    15 We are coming up on our one-year
    16 anniversary. So I certainly don't have the length
    17 of familiarity with it, but insofar as I was
    18 involved in the development of that I am familiar
    19 with it.
    20 I have also tried to keep up to date with
    21 various new policy, interpreting that, lawsuits
    22 relevant to that definition.
    23 That is a slightly more complex definition
    24 because it includes both the definition of major
    81
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 source as found in new source review and prevention
    2 of significant deterioration program, and then
    3 there is a different separate definition of
    4 "source" that's being used for regulation of
    5 hazard safety (phonetic).
    6 I'm probably more familiar with the new
    7 source review PSD definition than hazard safety
    8 definition.
    9 Q As to the new source review programs both
    10 nonattainment area and PSD, how do the definitions
    11 of those generally compare with that of Title 5?
    12 A Other than the definition of "source" for
    13 hazard stafaluden (phonetic), I believe that the
    14 definition of major stationary source under the
    15 prevention of significant deterioration program and
    16 under the new source review nonattainment area
    17 program are similar to the Title 5 definition of
    18 major six (phonetic).
    19 Q Have you been involved with previous IEPA
    20 determinations of source issues for permits under
    21 both PSD and nonattainment area? I believe you've
    22 indicated you have, correct?
    23 A Yes, I have been. During the course of
    24 review of permit applications involving new source
    82
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 review or prevention of significant deterioration,
    2 we occasionally run across situations where the
    3 various entities involved in a project don't
    4 necessarily clearly meet the definition of
    5 "source."
    6 In those circumstances it's necessary to
    7 further evaluate whether the entities that are
    8 involved in the project are properly considered one
    9 source or properly considered separate sources.
    10 In some circumstances we're looking at an
    11 application where a person contends that they have
    12 two separate entities which should be separate
    13 sources.
    14 We want to make sure that they are
    15 properly kept apart, properly evaluated as other
    16 sources.
    17 In other cases people may be trying to
    18 lump two entities together and may be looking at it
    19 from the other perspective and asking whether it
    20 may be more correct to look at those as separate
    21 sources for the purposes of prevention of
    22 significant deterioration or new source review.
    23 Q When assessing the criteria relating to
    24 major industrial groupings as a source definition,
    83
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 what would or what does IEPA generally look at?
    2 A Our approach to that criteria is to try to
    3 first identify principal activity at a source, look
    4 at what is its major product, what is its major
    5 function.
    6 And once we've reached that determination
    7 of what is the primary activity then to see
    8 whether, in fact, other activities at that source
    9 are properly considered support activity so that
    10 they should really be assumed or subsumed into that
    11 principal activity or whether there are other
    12 activities at the source that, in fact, might be
    13 considered other stand alone principal activities.
    14 We have to examine it further to see
    15 whether, in fact, even though there are other
    16 principal activities they might still have the same
    17 major industrial grouping, still have to be
    18 considered together.
    19 Q If a company purports to have activities
    20 in the same two-digit SIC code or, in other words,
    21 the same major group, how will the agency apply the
    22 criteria? Do you understand the question?
    23 A Well, the relevant definition that we're
    24 working with talks about a common industrial
    84
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 grouping, a major industrial grouping, a single
    2 industrial grouping.
    3 The categorization scheme that USEPA has
    4 adopted for this purpose is the standard industrial
    5 classification code manual. They've borrowed
    6 that. That is an existing classification system
    7 that is used for other purposes.
    8 And what they have said on using that
    9 classification system is if entities have the same
    10 two-digit classification code they are considered
    11 to be along the same major industrial grouping.
    12 If we end up with entities that have the
    13 same two-digit major grouping, we'd conclude they
    14 are the same major industrial activity. We would
    15 not find any basis to distinguish them as having
    16 different industrial groupings.
    17 Q If a company purports to have activities
    18 that belong to different SIC codes, what then would
    19 the agency look at or consider?
    20 A What we would be looking at if they allege
    21 they have, in fact, two different two-digit SIC
    22 codes for the various entities, is to see whether,
    23 in fact, those activities are, in fact, related in
    24 some way where one of those entities or some of
    85
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 those entities might be considered support
    2 facilities for the other entity.
    3 So that one would be the principal
    4 activity, and the other support facilities would be
    5 as supporting facilities supporting that principal
    6 activity.
    7 That's a circumstance that occasionally
    8 arises. Most of the examples we have dealt more
    9 with the Title 5 situations than they have for
    10 new source review and prevention of significant
    11 deterioration.
    12 But we have been going through things like
    13 cement plants where a cement plant manufactures
    14 cement. They also have a quarry that may be
    15 associated with it producing raw materials.
    16 In fact, if it was a stand alone quarry,
    17 it would have a different two-digit SIC code for
    18 the cement plant. Cement plants are under mineral
    19 products SIC codes. Quarry are under, I guess,
    20 crushed rock. That's two different SIC codes.
    21 However, in a circumstance where the
    22 quarry is supplying feed material to a cement plant
    23 where the quarry is considered a support facility,
    24 we would not consider it to be a separate source.
    86
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q And in that example that would be the
    2 case even if the activities, as you indicated, had
    3 different SIC codes or purported to have different
    4 SIC codes?
    5 A That's correct. This issue of
    6 classification of an SIC code -- purported SIC
    7 codes, I'm looking at it in terms of classification
    8 for environmental purposes in terms of assigning an
    9 SIC code to implement either Title 5 or PSD or new
    10 source review. There may be, in fact, other SIC
    11 codes that have been assigned for other purposes.
    12 As I said, USEPA borrowed an existing
    13 classification code system that was already
    14 established for other purposes for defining what
    15 is a stationary source.
    16 Q Where is the support facility notion
    17 generally derived from to your knowledge?
    18 A The concept of support facility was
    19 originally identified when the USEPA revised its
    20 prevention of significant deterioration rules
    21 following the Alabama Power court decision back in
    22 1980, and it's discussed in the preamble to the
    23 final revised PSD rules at that period of time.
    24 It's also reflected in the USEPA's new source
    87
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 review workshop manual.
    2 As I said, that is a good compilation of
    3 historic interpretations and decisions that have
    4 been made. That was issued in 1990, and that
    5 reflects the preamble of the PSD rules.
    6 Q Switching gears a little bit, when
    7 assessing the criteria for the source definition
    8 for location or adjacency and contiguous, what will
    9 the IEPA generally look at under circumstances?
    10 A Well, again, we'd be looking at a
    11 circumstance where it wasn't immediately apparent
    12 whether facilities were properly being separated or
    13 properly being added together.
    14 We want to make sure that they are being
    15 handled properly in terms of being a single source
    16 or multiple source.
    17 Obviously, we think that the contiguous
    18 definition is a fairly straightforward term.
    19 Contiguous generally means touching in some
    20 manner.
    21 So we would look to see whether, in fact,
    22 there is a physical connection between the
    23 properties.
    24 The adjacent one is a little bit more
    88
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 general. But, again, we'd look at how close
    2 together are the facilities, the different
    3 entities; what is the interrelationship between
    4 the entities; do they work as a single
    5 manufacturing establishment or do they, in fact,
    6 operate independently; and then we'd also look at
    7 whether there are, in fact, other types of physical
    8 connections between the various establishments.
    9 Q So it is possible that activities could be
    10 located at a different site or parcel of property
    11 and yet still be considered the same source?
    12 MR. O'BRIEN: I'm going to have to object to
    13 the form of that question for two reasons.
    14 One, it's asking for a legal conclusion.
    15 But, secondly and more importantly, it's asking for
    16 testimony on what is really the ultimate issue in
    17 this case; and I think it's inappropriate to have
    18 testimony on that when it's really an issue of law
    19 to be decided by the board.
    20 HEARING OFFICER EDVENSON: Mr. Layman?
    21 MR. LAYMAN: I can rephrase.
    22 HEARING OFFICER EDVENSON: Objection
    23 sustained.
    24
    89
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 BY MR. LAYMAN:
    2 Q Has the agency considered in reviewing
    3 past new source review permit applications
    4 activities to be of the same source even though
    5 they may be separated by some distance?
    6 A Yes, we have. We routinely have
    7 considered establishments which have various
    8 components that are separated by roads, rail lines,
    9 other types of entities to be part of a single
    10 source for purposes of new source review. Oh,
    11 well, for purposes of PSD.
    12 There are many facilities which are
    13 separated by things like public streets and rail
    14 lines, but there are also examples where sources
    15 have different components that are separated by
    16 more substantial distances.
    17 HEARING OFFICER EDVENSON: And by PSD you mean
    18 prevention of significant deterioration?
    19 THE WITNESS: Yes, I do.
    20 HEARING OFFICER EDVENSON: Thank you.
    21 BY MR. LAYMAN:
    22 Q What purposes under the new source review
    23 programs are served by aggregating similar sources
    24 that may be closely located?
    90
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Well, the new source review programs,
    2 both the prevention of significant deterioration
    3 and the nonattainment area new source review
    4 program, are attempting to evaluate whether a
    5 proposed construction activity will have a major
    6 impact on air quality, certainly have a major
    7 change in the increase in emission.
    8 If a proposed construction project will
    9 have a major increased emission, these programs
    10 trigger additional requirements.
    11 They require trigger requirements for
    12 lowest achievement emission rate or best available
    13 control (phonetic) technology, a case-by-case
    14 determination of appropriate control levels.
    15 They will also trigger requirements to
    16 address the impact in air quality.
    17 Under prevention of significant
    18 deterioration of the trigger and analysis
    19 requirement to confirm that the proposed project
    20 would not cause or contribute to an air quality
    21 violation, and a nonattainment area would trigger
    22 a requirement for offsets to address the impact of
    23 the increased emissions.
    24 The principle that USEPA established when
    91
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 they were responding to the Alabama Power decision
    2 was that it is appropriate to use the grouping
    3 definition of "source" that fairly evaluates
    4 whether proposed construction activity will, in
    5 fact, have a major impact on air quality; and that
    6 has two concerns.
    7 First of all, it would not be appropriate
    8 to allow a company to fragment their activities
    9 in a certain area into a number of much smaller
    10 entities that individually would escape review
    11 nevertheless having in total from all those
    12 activities a significant increase in emissions
    13 and potentially a significant impact on air
    14 quality.
    15 On the other hand, if a company is making
    16 compensating changes, if they are having increases
    17 at one point and decreases at another point,
    18 likewise, it's not appropriate to trigger the
    19 points which are having significant increases in
    20 emissions as having a major impact on air quality
    21 if, in fact, there are other compensating decreases
    22 elsewhere at the source.
    23 So it gets back to the principle of how
    24 you establish an appropriate definition of "source"
    92
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 that will assure that potentially significant
    2 changes in emissions that could affect air quality
    3 will undergo appropriate scrutiny under PSD or
    4 nonattainment area review.
    5 Q Are you aware of any examples in the new
    6 source review context by the PSD or nonattainment
    7 area where the agency, the IEPA, has considered
    8 separate locations or buildings to be one source
    9 despite being separated by some distance?
    10 A Well, the example I'm most aware of that's
    11 the most significant separation in distance is
    12 permits that were issued to Acme Steel.
    13 Acme Steel operates a blast furnace and
    14 coke oven operations in the City of Chicago. Those
    15 operations are involved in making iron. That iron
    16 subsequently has to be refined and converted into
    17 steel.
    18 Acme's steel-making operations are, in
    19 fact, located in Riverdale, Illinois in a different
    20 community.
    21 The two locations, I believe, are
    22 approximately ten miles apart; however, we looked
    23 at those two entities and concluded that those two
    24 should be treated as a single source for new source
    93
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 review purposes.
    2 Under normal circumstances most plants
    3 operate as integrated steel mills where there will
    4 be both coke oven facilities, blast furnace
    5 facilities and steel-making facilities located
    6 either on a single piece of property or on
    7 properties that are in much closer proximity.
    8 In this circumstance, whatever the reason,
    9 the history of these particular companies these
    10 operations were separated a much greater distance;
    11 but we concluded that it would be appropriate,
    12 nevertheless, to consider them as a single source.
    13 Q In Acme Steel's case were those facilities
    14 operating as one or independently with each other?
    15 A In Acme Steel's case the two facilities,
    16 the two entities, certainly operated in an
    17 integrated fashion.
    18 There was, in fact, an oxygen pipeline
    19 that connected them. That's significantly minor, I
    20 believe.
    21 What's more important is that they had
    22 to transport the hot iron from the Chicago facility
    23 to the Riverdale facility for further processing.
    24 They had to make sure that they had the
    94
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 capacity to handle that hot iron in Riverdale, or
    2 they had a potential for the iron cooling and no
    3 longer being suitable for being processed.
    4 Likewise, they had to make sure there was
    5 enough hot iron coming from Chicago to make sure of
    6 utilization of the Riverdale facility.
    7 Their concerns about quality of steel,
    8 quality of metal, that would relate the two
    9 facilities also.
    10 Q The final manufacturing process in Acme
    11 Steel's case it was completed at the Riverdale
    12 facility?
    13 A That's correct. There is not much market
    14 for the intermediate product of hot iron because it
    15 would have to be further refined.
    16 Their goals, in fact, were to convert the
    17 metal to steel and then to roll that steel into
    18 product for sale.
    19 Q Are there any other examples that come to
    20 mind where in a PSD context the agency has again
    21 treated separate buildings or facilities as one
    22 despite being separated by some distance?
    23 A Another example that comes to mind that I
    24 was involved in was Lone Star Cement. Lone Star
    95
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Cement operates a quarry that is a little bit less
    2 than a mile away from the actual cement
    3 manufacturing facility.
    4 We have considered that quarry to be part
    5 of the cement manufacturing facility even though
    6 they are that distance apart.
    7 There is, in fact, a conveyor belt that
    8 transports the crushed stone from the quarry to the
    9 cement plant for further processing.
    10 Q Is the relationship between the production
    11 areas or activities at the Lone Star source similar
    12 in respect to that of Acme Steel?
    13 A They are certainly similar in as the one
    14 entity produces an intermediate product or raw
    15 material for the other.
    16 I think in the case of the steel mill
    17 there is much more concern about close coordinated
    18 management of the two facilities given the need to
    19 transport hot metal. It's a lot easier to store
    20 rock and stockpile it for whenever it is needed.
    21 Q When did you personally first become aware
    22 of Color Communications' facilities in Chicago?
    23 A The first time that I recall becoming
    24 aware of them was in January of 1994.
    96
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q And how did you become aware of them in
    2 that context?
    3 A Mr. Nicholas submitted a proposed
    4 permitting protocol to the agency to deal with
    5 permitting of the Color Communications' facilities
    6 in Chicago.
    7 That was assigned to me to look at. I
    8 reviewed it and sent comments under Mr. Sutton's
    9 signature -- that's Don Sutton, the manager of the
    10 permit section -- indicating that there were some
    11 serious concerns to be resolved about the proposed
    12 permitting strategy. As a result of that there was
    13 a subsequent meeting with Color Communications
    14 later that year.
    15 Q What can you tell us that you recall
    16 about the agency's permitting history of Color
    17 Communications at that point in time?
    18 A Well, the concern that we had at that
    19 point in time was that Color Communications had
    20 let the permit for the one facility lapse, it had
    21 expired without renewal. That was the 4242
    22 facility.
    23 And then the 4000 West Filmore Street, the
    24 much smaller facility, in fact, did not have a
    97
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 state operating permit.
    2 So we were faced with a facility that
    3 didn't have a permit under the state permit program
    4 as well as an entity or building that had let its
    5 historic permit lapse.
    6 There had also been some construction
    7 activity without getting the necessary construction
    8 permit, so we had a concern about remedying the
    9 current status of the various buildings and units
    10 under the current state permitting program which
    11 had to be resolved really before we prepared to
    12 move into the Title 5 permitting program which at
    13 that point hadn't even been approved by USEPA.
    14 Q Do you recall in the early review of the
    15 permitting protocol there being a discussion as to
    16 the existence of a third facility perhaps prior to
    17 that point in time?
    18 A I don't know if that was discussed or
    19 focused in on very heavily during the initial
    20 review of the permit applications.
    21 That point certainly became significant
    22 later on in the review of the permit applications
    23 in, I guess, the spring of 1995.
    24 As I said, we had a number of different
    98
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 permitting issues to deal with.
    2 We had a facility that was in operation,
    3 didn't have a permit; so we had to issue an
    4 operating permit for that existing facility.
    5 We also had some equipment that had been
    6 built without getting the necessary construction
    7 permit.
    8 In the absence of a construction permit
    9 that piece of equipment -- it was a new coating
    10 line -- didn't have any restrictions on the manner
    11 in which it would operate and, in fact, had in the
    12 absence of such restrictions the potential to emit
    13 more than 25 tons of volatile organic material and
    14 would be considered a major source.
    15 And then there were some minor pieces of
    16 equipment that were subsequently proposed to be
    17 added to the 4000 West Filmore Street facility.
    18 So we had to conduct an evaluation of
    19 whether, in fact, a major increase in emissions
    20 had occurred or would occur as a result of that
    21 construction activity.
    22 As part of making that determination it
    23 became important for us to evaluate what was, in
    24 fact, the source we should be dealing with; and
    99
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 initially we were concerned that it appeared that a
    2 facility had been built at 4000 West Filmore, a new
    3 facility, which even though not a major source by
    4 itself had certain emissions that contributed to
    5 the overall increases in emissions by Color
    6 Communications.
    7 At some point in time somebody who was
    8 reviewing the previous documentation became aware
    9 that that 4000 West Filmore Street facility was,
    10 in fact, the recipient of operations that had
    11 previously been conducted by Color Communications
    12 at a building on Kildare Street which was also in
    13 the same general proximity to Color
    14 Communications.
    15 At that point we concluded that it would
    16 be appropriate to not consider the West Filmore
    17 Street facility to be new construction but rather
    18 relocation of those existing operations, and we
    19 simply focused in on the new equipment being
    20 introduced into the area rather than the relocation
    21 of equipment from South Kildare to West Filmore.
    22 Q Do you recall the specific address of the
    23 South Kildare facility?
    24 A I believe that that address was recorded
    100
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 as 917 South Kildare Street.
    2 Q Could you identify on the Respondent's
    3 Exhibit No. 2 the general locality of where you may
    4 have placed or you did place that facility to be in
    5 relation to the 4242 facility?
    6 A Yes, I can. I am looking at Exhibit 2 --
    7 Respondent's Exhibit 2 and looking at Filmore
    8 Street and the 4200 block.
    9 Kildare is a north-south street that is to
    10 the west of that block, and using the street number
    11 identifications on that map the 917 South Kildare
    12 Street was within a couple of blocks of the 4242
    13 West Filmore Street location.
    14 And the South Kildare facility certainly
    15 seemed to be in the same range, if not closer, than
    16 the 4000 West Filmore Street to the 4242 West
    17 Filmore Street building.
    18 Q How would the agency have looked at or how
    19 would the agency have considered operations at the
    20 917 South Kildare facility to be in relation to the
    21 4242 facility?
    22 MR. O'BRIEN: I'm going to object to the form
    23 of that question because, frankly, I just really
    24 don't understand the relation question.
    101
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 I think the question is how did they
    2 relate from one facility to the other facility;
    3 and, you know, maybe my objection is just asking
    4 for a clarification of the question.
    5 MR. LAYMAN: The question, I think, is in the
    6 nature of how both facilities would have been
    7 treated for source determination purposes.
    8 MR. O'BRIEN: Well, then I guess maybe the
    9 other objection would be a foundation objection as
    10 to how this witness would know how that would have
    11 been treated.
    12 HEARING OFFICER EDVENSON: Is it a
    13 hypothetical?
    14 MR. LAYMAN: In this context it's a
    15 hypothetical, absolutely. It's purely a
    16 hypothetical since the agency did not have at that
    17 time an opportunity to make a determination.
    18 HEARING OFFICER EDVENSON: I'm going to sustain
    19 the objection.
    20 BY MR. LAYMAN:
    21 Q How did the agency process the permit
    22 application submitted for the first time for the
    23 newer 4000 West Filmore Street facility?
    24 A My recollection is that we issued that
    102
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 permit, we issued an operating permit for an
    2 operating facility.
    3 Q When Color Communications came in with a
    4 permit application for an operating permit for the
    5 4000 facility, how did the agency treat that
    6 submittal?
    7 A I don't recall.
    8 Q Do you recall whether or not the agency
    9 had previously permitted the operations at the 917
    10 South Kildare facility?
    11 A No, I don't. My recollection is more
    12 specific to the circumstances involving the
    13 additional construction activity at the 4000 West
    14 Kildare Street. I mean 4000 West Filmore Street.
    15 Q Okay.
    16 A That's where the issue of new source
    17 review became involved because we had a proposed
    18 construction activity.
    19 At that point it was necessary to evaluate
    20 what were the contemporaneous increases and
    21 decreases that would be occurring at Color
    22 Communications.
    23 At that point in time we believe that, in
    24 fact, those two buildings should be considered part
    103
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 of a single source.
    2 We had an increase in emissions from the
    3 construction of a new line at the 4242 West Filmore
    4 Street. That line was constructed after November
    5 of '92.
    6 But at that point Color Communications
    7 had, in fact, installed an afterburner on that line
    8 and had accepted limitations restricting its
    9 emissions to something on the order of 24 tons
    10 per year.
    11 Color Communications was requesting a
    12 permit to add an additional laminating machine or
    13 mounting machine at the 4000 West Kildare Street
    14 location. That had emissions about four-tenths of
    15 a ton.
    16 We looked at the combination of 24 tons
    17 and four-tenths of a ton; came up with a
    18 contemporaneous increase of 24.4 tons which was
    19 less than 25 tons, not a major modification.
    20 So we issued a construction permit -- a
    21 joint construction operating permit, I believe --
    22 to allow them to go ahead and install and operate
    23 the proposed new machine at 4000 West Kildare
    24 Street.
    104
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 In conjunction with that activity we also
    2 sent a letter to Color Communications notifying
    3 them that we had looked at various information they
    4 provided in their permit application considering
    5 whether the two buildings should be considered
    6 separate sources or not.
    7 And then after a detailed review we were
    8 not convinced, that we believed it was appropriate
    9 to consider the two buildings as a single source
    10 for purposes of new source review and to alert
    11 them that under the Title 5 context we would be
    12 expecting those two buildings to be considered
    13 and treated as a single source.
    14 Q I will show you now from Respondent's
    15 Exhibit 1 Pages 9A and 9B, a letter dated May 9,
    16 1995, from the agency to Mr. Steve Winter. Is that
    17 the letter you were referring to in your last
    18 answer?
    19 A Yes, it is. This is the letter that we
    20 sent out about the same time that we issued the
    21 construction permit for the new machine at 4000
    22 West Filmore.
    23 HEARING OFFICER EDVENSON: What page of the
    24 record are we on, Mr. Layman?
    105
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 MR. LAYMAN: 9A and 9B.
    2 HEARING OFFICER EDVENSON: Okay. Thank you.
    3 BY MR. LAYMAN:
    4 Q Mr. Romaine, in receiving a permit
    5 application submittal from Color Communications
    6 for operations at its 4000 West Filmore Street
    7 facility, did the agency consolidate all of the
    8 operations activity at that source into the permit
    9 for the 4242 facility?
    10 A Are you referring back to the activity in
    11 the spring of 1995 --
    12 Q Yes, I am.
    13 A -- that we discussed?
    14 No, we did not. We were still operating
    15 under the state permit program, and we allowed the
    16 permit to continue as a permit on its own under a
    17 separate ID number distinct from the ID number for
    18 the 4242 West Filmore Street building.
    19 Q What is the agency's purpose in assigning
    20 permit ID numbers?
    21 A Permit ID numbers were created for the
    22 initial operation of the permit program when it
    23 was established in 1973.
    24 Under the state permitting program,
    106
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 which applies to both new equipment and existing
    2 equipment, a person can apply for a permit for
    3 individual pieces of equipment or individual
    4 emission units if they so desire.
    5 There are companies that the state program
    6 had many permits at a single location. The record
    7 that we always talk about is A. East Dally
    8 (phonetic) in Decatur; that, in fact, their
    9 manufacturing establishments had over 250
    10 individual permits.
    11 We used identification numbers as a means
    12 to identify a single location for a number of
    13 different permits.
    14 At that point in time it was useful for
    15 the purposes of just alerting our field staff that,
    16 in fact, when they visited that particular site
    17 they should be aware of all these different permits
    18 and grouping all those permits together in our
    19 filing system.
    20 Since that time ID numbers have taken on
    21 additional roles. They are used for the fee
    22 program at this point in time.
    23 Under the fee program for air pollution
    24 sources and sources required to pay a fee per site,
    107
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 we have allowed the identification number to stand
    2 as the distinct identifier for payment of fee so
    3 that we expect each entity with a distinct ID
    4 number to be paying its own separate permit fee.
    5 We have carried the ID number concept
    6 on Title 5 in terms of identifying particular
    7 sources.
    8 That could be important in terms of
    9 distinguishing Title 5 permits from construction
    10 permits that might apply to that same location.
    11 However, the assignment of identification
    12 number does not indicate a determination under
    13 Title 5 or, in fact, under new source review or PSD
    14 whether those separate entities would be considered
    15 one source for those purposes or not. There are
    16 other purposes for which the identification number
    17 system was established.
    18 Q During the initial review of the permit
    19 applications as they came in in 1994 for Color
    20 Communications, what became known to the agency
    21 about the nature of the relationship between the
    22 existing Color Communications' facilities at the
    23 4242 West Filmore Street facility and the 4000 West
    24 Filmore Street facility?
    108
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A The information in the application that
    2 we saw it suggested that there was a definite
    3 relationship between those two facilities.
    4 It suggested to us that there was, in
    5 fact, a support facility relationship; that the
    6 4242 facility produced an intermediate product that
    7 was subsequently finished in the 4000 West Filmore
    8 Street building.
    9 Because of that apparent relationship
    10 we requested further information from Color
    11 Communications explaining how those two facilities
    12 related.
    13 We asked questions about how much material
    14 was transferred from one building to the other
    15 building, how much material came in from outside.
    16 As a result of those inquiries we were
    17 not able to come up with any information that
    18 demonstrated to us that there was not, in fact, a
    19 support facility relationship between those two
    20 structures.
    21 We concluded after that detailed review
    22 and formally communicated to Color Communications
    23 in May of 1995 we found that they were, in fact,
    24 appropriately considered one source based on a
    109
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 single industrial grouping.
    2 Q Was the nature of the business
    3 relationship at Color Communications, then, similar
    4 to the manufacturing operations at other facilities
    5 where the agency has treated such facilities as one
    6 source, Acme Steel being one example?
    7 MR. RUBIN: May I have the question read back,
    8 please?
    9 MR. LAYMAN: I beg your pardon?
    10 MR. RUBIN: May I have the question read back?
    11 HEARING OFFICER EDVENSON: Can we have the
    12 question read back, please?
    13 (Whereupon, the record was read
    14 by the reporter as requested.)
    15 THE WITNESS: In terms of a functional
    16 relationship it is certainly similar in general
    17 terms to Acme Steel and other facilities where
    18 there are a series of steps involved from taking
    19 the initial raw materials to making a final product
    20 for sale.
    21 It is not as straightforward, I would say,
    22 as Acme Steel because there are other materials
    23 that are being introduced at the 4000 West Filmore
    24 Street in terms of bringing in paper that these
    110
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 color chips are assembled on top of; but it still
    2 does represent an integrated manufacturing
    3 process.
    4 BY MR. LAYMAN:
    5 Q Would the same be true in comparison with
    6 the other example you referenced in your testimony,
    7 that of Lone Star?
    8 A Yes, it would. It would probably be more
    9 similar to Lone Star. In the manufacture of cement
    10 there are some other additives that are introduced
    11 into cement that are not present in the stone
    12 brought over from the quarry.
    13 Q Are you aware of any other color-board
    14 manufacturers in the State of Illinois?
    15 A No, I am not.
    16 Q Are you familiar with other business
    17 operations in Illinois that perform both coating
    18 and printing functions?
    19 A Yes, I am. There are a number of
    20 packaging companies in Illinois which involve both
    21 coating and printing operations, and sometimes they
    22 coat to produce the packaging material and then
    23 subsequently print on top of that packaging
    24 material.
    111
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 So they are starting from rolls of foil
    2 or plastic and are then shipping out rolls of
    3 packaging material for snack products like a Frito
    4 Lay bag for potato chips.
    5 They may also slightly reverse the order
    6 where they do their printing first and then put a
    7 protective coating on top of the packaging to
    8 protect the printing from deterioration or
    9 abrasion.
    10 Q In your experience are you aware of
    11 whether these facilities commonly conduct their
    12 operations at the same place of business?
    13 A The examples that I'm aware of operate
    14 under a single premises, yes.
    15 Q During the review, again, of the various
    16 permit applications in 1994 of Color
    17 Communications' facilities, what did the agency
    18 learn about the location of Color Communications'
    19 facilities?
    20 A Well, in terms of the location we learned
    21 that the locations of the two buildings were very
    22 close together.
    23 They were not contiguous of a common
    24 definition; but they were certainly in the general
    112
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 vicinity, only a block apart, meaning a common
    2 sense definition of adjacent.
    3 Q Do you believe the agency's approach in
    4 that context to be consistent with other cases
    5 involving facilities that acted in the same type
    6 of relationship?
    7 A We have not made that many determinations.
    8 As I said, the Title 5 program is a new program.
    9 I'd say that to the extent those issues have come
    10 up in new source review and PSD it's consistent.
    11 A common sense approach says that looking
    12 at facilities within a couple of blocks certainly
    13 meets the concept of being in close proximity to
    14 each other particularly if there is a functional
    15 interrelationship between those entities.
    16 Q In assessing the issue of source
    17 determination did the agency in Color
    18 Communications' case seek guidance from USEPA?
    19 A Yes, we did seek guidance from USEPA.
    20 The issue of adjacency is not directly
    21 addressed by USEPA's new source review workshop
    22 manual.
    23 We knew that there were potential
    24 enforcement issues out there, so we also did
    113
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 consult with USEPA to get their opinion on whether
    2 these facilities should be considered as qualifying
    3 as adjacent or, in fact, whether USEPA in some
    4 previous circumstance had found similar buildings
    5 to actually constitute separate sources.
    6 USEPA did not identify circumstances where
    7 buildings this close together had ever been
    8 considered separate sources.
    9 Q What kind of guidance did the agency
    10 receive in response from USEPA?
    11 A We received written guidance from USEPA.
    12 Q And what was the general gist of that
    13 written guidance?
    14 A The written guidance addressed the
    15 relevant criteria of the source definition and
    16 indicated it did not appear that common control
    17 or ownership was under question.
    18 So it addressed the idea of or the
    19 criterion of common industrial grouping indicating
    20 it was believed the two facilities would qualify as
    21 a single activity and it's a support facility
    22 versus primary activity; and it also indicated that
    23 in terms of the issue of proximity and location
    24 USEPA believed that those facilities should be
    114
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 considered to be adjacent facilities, that the two
    2 buildings should be considered to be adjacent
    3 buildings.
    4 Q In subsequently issuing state permits to
    5 Color Communications how did the agency then treat
    6 Color Communications' facilities for purposes of
    7 the new source review?
    8 A As I said before, when looking at the
    9 construction activity at 4000 West Filmore Street
    10 facility, we looked at that construction activity
    11 in conjunction with contemporaneous construction
    12 activity at the 4242 West Filmore and looked at
    13 those two buildings as a single source.
    14 Q When Color Communications submitted its
    15 CAAPP applications most recently, what did the
    16 agency learn of how Color Communications wanted
    17 to treat its facilities in terms of source?
    18 A Color Communications submitted two
    19 separate CAAPP applications, submitted one for the
    20 4000 West Filmore Street facility and another CAAPP
    21 application for the 4242 West Filmore Street
    22 facility. That was identified as part of the
    23 agency's completeness review of those
    24 applications.
    115
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Given our historical review of those, the
    2 source issue for those facilities within the last
    3 year and a half, within the last year we were aware
    4 that was inconsistent with our determination, and
    5 we communicated that inconsistency to Color
    6 Communications.
    7 Q I will show you Respondent's Exhibit 1
    8 identified by Bates No. 286 in the record as well
    9 as Page 287. It's a letter dated November 2, 1995,
    10 again to the attention of Mr. Steve Winter. Is
    11 that the letter that you were referring to in your
    12 last answer?
    13 A Yes, it is.
    14 Q Would you say in summing things up that
    15 the source determination made for purposes of the
    16 CAAPP program was consistent with the agency's
    17 earlier permitting decisions for new source review?
    18 A Yes, it certainly was. Our determination
    19 for the CAAPP program, in fact, reflected the
    20 determination previously made for permitting Color
    21 Communications under the new source review
    22 program.
    23 MR. LAYMAN: We have nothing further at this
    24 point.
    116
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 HEARING OFFICER EDVENSON: All right. I think
    2 for the benefit of the witness we will take a
    3 five-minute recess before cross examination.
    4 (Recess taken.)
    5 HEARING OFFICER EDVENSON: Let's proceed then
    6 with the cross examination of Mr. Romaine.
    7 CROSS EXAMINATION
    8 BY MR. O'BRIEN:
    9 Q Mr. Romaine, I'd like to ask you some
    10 questions first about some of the other facilities
    11 you discussed with Mr. Layman in your direct
    12 examination this afternoon, and the first one would
    13 be the Acme Steel plant. You are familiar with
    14 that plant, you testified?
    15 A Yes, I did.
    16 Q I believe you testified that there is a
    17 rail line running between the Chicago and Riverdale
    18 plants of the Acme Steel Company; is that correct?
    19 A There are rail lines running between two
    20 facilities, that is correct. I'm not sure if there
    21 is one rail line or a number of different rail
    22 connections between the two plants.
    23 Q And it's also, I think, my understanding
    24 that some of the material from the Chicago plant is
    117
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 transported via rail line to the Riverdale facility;
    2 is that correct?
    3 A That is correct.
    4 Q Do you know who owns the rail line or rail
    5 lines that connect the Chicago and Riverdale
    6 facilities for Acme Steel?
    7 A No, I do not.
    8 Q Do you know who operates those rail lines?
    9 A No, I do not.
    10 Q Do you know if Acme Steel itself owns any
    11 part of those rail lines?
    12 A No, I do not.
    13 Q Now, you also testified, I believe, that
    14 the material going from the Chicago plant to the
    15 Riverdale plant in Acme's case was hot iron. Is
    16 that a fair description of it?
    17 A Yes, it is.
    18 Q Does all the hot iron that is produced
    19 at the Acme Steel plant in Chicago then get
    20 transferred to the Riverdale plant for additional
    21 processing?
    22 A That is my understanding except for any
    23 small amount of scrap metal that gets reprocessed
    24 at the Chicago facility.
    118
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q Except for scrap metal that gets
    2 reprocessed at Chicago?
    3 A That's correct.
    4 Q What would the circumstances of that be,
    5 do you know?
    6 A What I was thinking about is just residual
    7 amounts of metal left in the tapping troths or
    8 removed from a slagging operation that has cooled,
    9 solidified but then gets reintroduced or discharged
    10 to the process.
    11 Q So this would be material that was for
    12 some reason taken out of the process at Chicago and
    13 either thrown away or reintroduced to the process?
    14 A That's my understanding.
    15 Q Now, I believe you also mentioned an
    16 oxygen pipe connected to the Chicago and Riverdale
    17 facilities of Acme Steel. Do I have that right?
    18 A Yes, you do.
    19 Q What's the purpose of that oxygen pipe, if
    20 you know?
    21 A The purpose of that oxygen pipe is to
    22 transfer oxygen from one of the sites where the
    23 oxygen is separated from the air at least to
    24 transfer some of that oxygen to the other facility
    119
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 where there is a need for oxygen.
    2 Q Do you know who owns the oxygen pipe that
    3 connects those two facilities?
    4 A I believe it is owned by Acme.
    5 Q Now, you testified that the agency made a
    6 determination that the Riverdale and Chicago plants
    7 of Acme Steel were treated as one source; is that
    8 correct?
    9 A Yes.
    10 Q Did Acme Steel request that those two
    11 plants be treated as one source?
    12 A Yes, they did.
    13 Q I'd like to ask you a couple questions now
    14 about the Lone Star facility that you identified in
    15 discussions with Mr. Layman. You're familiar with
    16 that facility, I take it?
    17 A Yes, I am.
    18 Q Now, as I understand that facility, there
    19 is a quarry and materials from the quarry are
    20 transferred to a cement plant. Do I have that
    21 right?
    22 A Yes.
    23 Q Do any materials from the quarry get
    24 transferred to designations other than to Lone Star
    120
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Cement plant?
    2 A I'm not aware that they are.
    3 Q Now, I believe you testified with regard
    4 to Lone Star that there is a conveyor belt that
    5 connects the quarry to the cement plant. Do I have
    6 that right?
    7 A Yes.
    8 Q And I also think I understand that the
    9 conveyor belt is used to transfer materials, rocks
    10 and such, out of the quarry to the cement plant; is
    11 that correct?
    12 A That's correct.
    13 Q Do you know who owns the conveyor belt
    14 that connects the quarry to the cement plant?
    15 A I believe that would be owned by Lone Star
    16 Cement.
    17 Q Do you know if Lone Star has an easement
    18 or some rights over the property on which the
    19 conveyor belt runs between the two facilities?
    20 A I don't know that for a fact, but I would
    21 assume that to be the case.
    22 Q The property or the interval over which
    23 this conveyor belt runs do you know if this
    24 property is developed, if it has other buildings
    121
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 or activities on it?
    2 A I don't recall.
    3 Q Now, in Lone Star's case, again, you
    4 indicated that the agency has determined that the
    5 cement plant and the quarry are treated as a single
    6 source, correct?
    7 A Yes.
    8 Q Did Lone Star request that its quarry and
    9 cement plant be treated as a single source?
    10 A I don't recall.
    11 Q Do you recall if Lone Star objected to the
    12 agency's determination that the quarry and the
    13 cement plant would be treated as a single source?
    14 A I don't recall that either.
    15 Q Going back to Acme for a minute, do you
    16 know whether the Chicago plant and the Riverdale
    17 plant would both qualify independently as major
    18 stationary sources under the applicable
    19 regulations?
    20 A Yes, they would.
    21 Q Now, I'd like to ask you a couple
    22 questions about the idea of support facility which
    23 I believe you testified to with Mr. Layman. Do you
    24 have my frame of reference there?
    122
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Yes.
    2 Q You said and I believe in your testimony
    3 that the concept of a support facility as you're
    4 aware of it was derived from a preamble to some
    5 regulations and from the 1990 NSR workshop manual.
    6 Was that your testimony?
    7 A Yes, it is.
    8 Q Are you aware of any other sources for the
    9 concept of support facility?
    10 A I think the concept of support facility
    11 has been also touched on in various case-by-case
    12 determinations.
    13 It came up in a facility operated by --
    14 two entities operated by General Motors in Lansing,
    15 Michigan. It came up in, I believe, a power plant
    16 in Wisconsin. There are a number of specific
    17 instances where that topic has been discussed.
    18 Q Is the concept of support facility
    19 included in the Illinois EPA -- I should not say
    20 Illinois EPA.
    21 Is the concept of support facility
    22 included in the Illinois regulations Title 35?
    23 MR. LAYMAN: Objection. I guess I'm not quite
    24 sure whether what's being asked is a question of
    123
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 law or exactly what.
    2 MR. O'BRIEN: Maybe I can rephrase it.
    3 MR. LAYMAN: Okay.
    4 BY MR. O'BRIEN:
    5 Q Do the Illinois regulations at Title 35
    6 contain as regulations the reference to the support
    7 facility that you described this afternoon in your
    8 direct testimony?
    9 A I don't believe that the term "support
    10 facility" is specifically used; however, as those
    11 regulations were intended to carry out the federal
    12 programs, I would contend that they build on
    13 federal guidance in which the term "support
    14 facility" is used to carry out that particular
    15 criterion in the definition of "source."
    16 Q So, in other words, that you believe that
    17 federal guidance drives the interpretation that the
    18 agency makes of Illinois regulations?
    19 MR. LAYMAN: Objection. Calls for a legal
    20 conclusion.
    21 MR. O'BRIEN: Well, I think it's as the agency
    22 is applying it.
    23 MR. LAYMAN: The question asked is whether the
    24 federal law drives a state agency. I think that's
    124
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 a question of law.
    2 HEARING OFFICER EDVENSON: The question was
    3 whether federal guidance drives the state
    4 interpretation of state regulations, I believe.
    5 MR. O'BRIEN: I think that's what I'm trying to
    6 ask.
    7 HEARING OFFICER EDVENSON: Mr. Romaine has been
    8 testifying as to the basis for decisions that he
    9 has made in permit decisions, and so I am going to
    10 overrule the objection and request that Mr. Romaine
    11 answer to the best of his ability.
    12 THE WITNESS: I'm not sure what you mean by the
    13 term "drive."
    14 HEARING OFFICER EDVENSON: Would you want to
    15 rephrase the question, Counsel?
    16 MR. O'BRIEN: I'll try.
    17 BY MR. O'BRIEN:
    18 Q Does the federal guidance that you
    19 referred to influence or help the agency make
    20 determinations of how to interpret its own air
    21 regulations?
    22 A Yes, it does.
    23 Q Do you know if the concept of support
    24 facility that we've discussed is contained in any
    125
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 of the federal regulations that have been adopted
    2 under Part 70?
    3 MS. SAWYER: Objection. I think that calls for
    4 a legal conclusion also if you're asking him if the
    5 concept is reflected in the regulations.
    6 MR. O'BRIEN: Maybe I can ask it this way and
    7 fix the objection.
    8 BY MR. O'BRIEN:
    9 Q Do you know if the definition of support
    10 facility that you've been discussing this afternoon
    11 is included in the federal regulations that have
    12 been adopted under Part 70?
    13 A The Federal Part 70 regulations which I
    14 would base the Title 5 on do not include the
    15 definition of support facility.
    16 Q Now, I'd like to pose a hypothetical
    17 question. It has to do with this concept of
    18 support facility.
    19 In the hypothetical question you'd have
    20 two manufacturing buildings A and B. They are
    21 under common ownership and control, and the output
    22 of Building A 100 percent of that output is
    23 transferred to Building B for additional processing
    24 or manufacturing.
    126
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 In that instance if Building A and
    2 Building B were 50 miles apart, would the agency
    3 consider those two facilities as one source under
    4 the regulations?
    5 A With that hypothetical example I don't
    6 believe that the agency would consider those two
    7 facilities to be a single source given the extent
    8 of geographic separation between the two entities.
    9 Q How about if you change it to 25 miles
    10 apart?
    11 A I think I would stick with the same
    12 answer. One of the things that crops up in the
    13 back of my mind is one of the examples in the
    14 USEPA's preamble, the PSD regulations and the
    15 terminology that talks about an example that was
    16 posed to comments asking a question about a mine
    17 and a power plant that were separated by 20 miles
    18 and connected by a rail line.
    19 So I have a line of demarcation that would
    20 suggest that entities that are separated by more
    21 than 20 miles that is such a distance that they
    22 would be considered separate sources.
    23 Q That brings up another question. Let's
    24 say you had that situation you just referred to
    127
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 where those facilities were 20 miles apart; and,
    2 again, let's assume they are support facilities,
    3 as I've indicated. 100 percent of the -- in my
    4 hypothetical 100 percent of the output of one goes
    5 to the other for more processing.
    6 And what if they were 20 miles apart, but
    7 there wasn't a rail line connecting them. There
    8 wasn't any connection via conveyor belt or a rail
    9 line or any other kind of connection.
    10 In that instance what kind of
    11 determination would the agency make?
    12 A I think still going back to that
    13 particular guidance USEPA has given us one
    14 benchmark that says if things are separated by 20
    15 miles they would not consider them to be in close
    16 proximity, one would consider those entities to be
    17 separate sources.
    18 Q So, in other words, 20 miles would be --
    19 in the way you're interpreting the agency or the
    20 USEPA's example, 20 miles apart facilities could be
    21 considered adjacent; is that correct?
    22 A No. I'm saying exactly the opposite.
    23 That USEPA has given us one piece of guidance in
    24 the preamble that indicates that entities 20 miles
    128
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 apart would not be considered part of a single
    2 source; and so that I believe the agency in this
    3 type of hypothetical example would turn to that
    4 particular guidance and conclude that entities that
    5 are 20 miles apart would be considered separate
    6 sources.
    7 Q I misunderstood that. I thought you said
    8 that those were considered one source, and I
    9 apologize. So I misunderstood you.
    10 So just to make sure I have the record
    11 clear, the USEPA's guidance suggests that
    12 facilities located 20 miles apart and connected by
    13 a rail line indicates that those facilities should
    14 be treated as separate sources; is that correct?
    15 A That was a hypothetical that was posed to
    16 USEPA, and my recollection is that they said those
    17 should be separate.
    18 Q Can you tell us as you sit here in using
    19 and going back to my hypothetical of two buildings
    20 under common control, one providing all its
    21 materials to the other for additional production,
    22 at what point do they become close enough to be
    23 considered a single source? Is there a line of
    24 demarcation?
    129
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 MR. LAYMAN: Objection. Calls for speculation,
    2 and we will increasingly get into an area of
    3 speculation as we try to narrow the mile marker
    4 down from 20 miles to in this case and relevant
    5 only to this case less than a mile.
    6 MR. O'BRIEN: Well, I think it's relevant how
    7 we've heard testimony from Mr. Romaine as to how
    8 the regulations are applied by the agency; and I
    9 think it's fair to inquire as to what the
    10 application would be of a situation that is
    11 somewhat different than the one that is presented
    12 here.
    13 MR. LAYMAN: Well, if anything, Mr. Romaine's
    14 testimony would illustrate that these determinations
    15 are made on a case-by-case basis and involve any
    16 number of different factors.
    17 MR. O'BRIEN: I understand that that's probably
    18 -- that may be what Mr. Romaine's testimony would
    19 be; but, if that is the case, let's let him testify
    20 to it.
    21 If he says there is no line of
    22 demarcation, he can say that. If he knows where
    23 there is one, he can say that.
    24 We just would like to have something for
    130
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 the record to indicate what the agency's position
    2 is on this issue.
    3 HEARING OFFICER EDVENSON: I'm going to sustain
    4 the objection with respect to this particular
    5 question; however, I am interested in exploring
    6 with the witness further the basis for decisions on
    7 this issue. I think the question was a little too
    8 far from the facts in our present situation.
    9 BY MR. O'BRIEN:
    10 Q With that in mind, let me ask a somewhat
    11 different hypothetical.
    12 Let's assume we had a situation where,
    13 again, we had two facilities A and B; and, again,
    14 they are owned by the same company so they are
    15 under common control.
    16 And in this instance they are sitting on
    17 properties that are contiguous to each other. They
    18 share a common boundary. So they are right next
    19 door.
    20 In this hypothetical there is absolutely
    21 no support relationship; that is, none of the
    22 products or production from Facility A go to
    23 Facility B or vice versa; and in this instance
    24 these two facilities have a different SIC code.
    131
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Would the agency consider these two
    2 facilities to constitute one source or separate
    3 sources?
    4 A Given the hypothetical circumstances that
    5 were presented, we would consider those to be
    6 separate sources for PSD and new source review
    7 purposes and for the Title 5 definition of
    8 "source." Based on those definitions they would
    9 fail on having a common major industrial grouping.
    10 Q So it would be your belief that in that
    11 instance those facilities because they did not
    12 support each other would not share a common major
    13 industrial grouping; is that correct?
    14 A No.
    15 Q Okay. What is the basis for your
    16 conclusion that in that instance those two
    17 facilities would not share a major industrial
    18 grouping?
    19 A That was the hypothetical circumstance you
    20 gave to me.
    21 Q That's correct. What is -- I've asked
    22 that badly. Let me go back.
    23 If two facilities have no support
    24 relationship to each other, is the analysis of
    132
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 whether they are a single major industrial grouping
    2 determined solely by virtue of their standard
    3 industrial classifications?
    4 A For this hypothetical example --
    5 Q Sure.
    6 A -- where criteria of common ownership is
    7 satisfied and criteria for common proximity is
    8 satisfied?
    9 Q (Mr. O'Brien nodded head up and down.)
    10 A I believe that would be the case. I'm
    11 trying to think of an example where I've run across
    12 it as you've described it.
    13 The example that I go back to that type of
    14 situation is Dow Chemical. Dow in Joliet they own
    15 a very large piece of property.
    16 On that piece of property they have a
    17 chemical production facility in one area, another
    18 corner they have a terminal that is involved in
    19 distribution of materials, and finally they have a
    20 plastic product production facility.
    21 There is not -- between those plants they
    22 operate essentially independently without
    23 relationship; and as to new source review and PSD
    24 we would, in fact, consider those to be separate
    133
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 sources.
    2 Q So in the instance of Dow Chemical -- I
    3 want to make sure I have the facts straight on that
    4 -- are those three facilities you mentioned a
    5 chemical production facility, a plastic production
    6 facility and a terminal, are they located on
    7 contiguous or adjacent properties?
    8 A Yes, they are.
    9 Q And because there is no support
    10 relationship among those three the agency treats
    11 those as separate sources; is that correct?
    12 A We would treat them as separate sources
    13 for PSD and new source review purposes as related
    14 to Title 5.
    15 I qualify it because under the hazardous
    16 air pollutant criteria definition of "source" it
    17 would still be a single source.
    18 Q And why would that be under the hazardous
    19 air pollutant criteria?
    20 A There is a different definition for
    21 stationary source under hazardous air pollutant
    22 which does not include common industrial activity.
    23 That particular criteria was dropped out.
    24 For that purpose under Title 5 there are
    134
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 only two criteria, common ownership of control and
    2 general proximity.
    3 Q Thanks. That clears it up.
    4 We talked a little bit about how the
    5 agency interprets adjacent -- or maybe the way to
    6 ask it is this.
    7 How far apart must two facilities be to be
    8 no longer adjacent as the agency interprets that
    9 term?
    10 MR. LAYMAN: Objection on the same ground that
    11 we had previously objected for the reason that it
    12 comes down again to a question of how far is far
    13 enough and how close is close enough. It
    14 inherently calls for speculation.
    15 MR. O'BRIEN: It calls for -- in this case
    16 what I'm asking for is it calls for the way the
    17 agency is applying the regulations that are imposed
    18 upon the manufacturer and community, and the idea
    19 is to see how the agency exercises its discretion
    20 or its interpretation of these regulations.
    21 And I just wanted -- I think we discussed
    22 earlier when we had an objection the idea of how
    23 the agency treats other facilities.
    24 The purpose of this question is to find
    135
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 out how the agency treats facilities that are
    2 separated by distances that are different than the
    3 one we have in the instant case.
    4 MR. LAYMAN: Is this a hypothetical; or is it,
    5 in fact, designed to get at cases where the agency
    6 has treated facilities to be adjacent under or
    7 within this distance or --
    8 MR. O'BRIEN: Mr. Rubin whispered in my ear,
    9 but he's right. We're asking if the agency has a
    10 policy as to how far apart two facilities must be
    11 to be considered no longer adjacent.
    12 MS. SAWYER: I think he's already answered
    13 that.
    14 HEARING OFFICER EDVENSON: I am going to
    15 sustain the objection based on the way the question
    16 was originally phrased.
    17 I think, though, that, Counsel, could you
    18 explore your interest in the definition used by the
    19 agency for the word "adjacent" by rephrasing your
    20 questions in this area? The question was too
    21 broad.
    22 MR. O'BRIEN: I'll try it this way.
    23
    24
    136
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 BY MR. O'BRIEN:
    2 Q Can you tell us how the agency analyzes
    3 the question of whether facilities are considered
    4 adjacent?
    5 A If that is the relevant criteria for
    6 investigation, it would be looked at on a
    7 case-by-case basis looking at the two entities,
    8 how far apart they are, what the relationship is
    9 between the two entities in terms of their
    10 function, how they relate together, how other
    11 similar businesses conduct their operation, what
    12 are the nature of the physical connections that
    13 exist between the facilities, what are the nature
    14 of the nonphysical connections of the facilities.
    15 We'd be open to any -- beyond those if
    16 there are other factors that somebody identified,
    17 it would be a case-by-case basis.
    18 Q So is it fair to say that factors other
    19 than distance go into the agency's determination
    20 of whether two facilities are adjacent?
    21 A Yes. Clearly we've indicated that the
    22 nature of any physical connection between the
    23 two facilities is considered, the nature of the
    24 obstacles perhaps and then the functional
    137
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 relationship between the two entities.
    2 Q In other words, would the fact that the
    3 two facilities had what may be construed as a
    4 support facility relationship play a role in
    5 determining whether facilities are considered
    6 adjacent?
    7 A It could, yes.
    8 MR. O'BRIEN: If I could take just a minute.
    9 (Pause.)
    10 MR. O'BRIEN: Just a couple more.
    11 BY MR. O'BRIEN:
    12 Q Does the agency have any written document
    13 that defines how close facilities have to be to be
    14 considered adjacent that's available for guidance?
    15 A We have no prepared document of that
    16 type. Any guidance we have would be on a
    17 case-by-case basis to an individual source for a
    18 particular circumstance.
    19 Q So in each instance where this issue
    20 arises it's going to be up to the discretion of
    21 the agency whether the facilities are considered
    22 adjacent or not?
    23 A I would not use the term "discretion."
    24 It's part of the decision that has to be made for
    138
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 permitting in that we have to use the authority
    2 granted to us by the act to decide, in fact,
    3 whether they have complied with the particular
    4 regulations.
    5 Q But there is no distance benchmark in
    6 terms of number of feet or miles that is applied to
    7 the analysis of that question; is that correct?
    8 A We have not established such a benchmark
    9 at this point beyond the 20 miles that I can point
    10 to in the USEPA's preamble.
    11 MR. O'BRIEN: That's all I have. Thanks.
    12 HEARING OFFICER EDVENSON: I have a couple
    13 questions myself that came to my mind during
    14 Mr. Romaine's testimony that I thought I might ask
    15 for the board, and should I do that now?
    16 MR. LAYMAN: I don't care as long as I have an
    17 opportunity to redirect.
    18 HEARING OFFICER EDVENSON: Okay.
    19 EXAMINATION
    20 BY HEARING OFFICER EDVENSON:
    21 Q Some of these might be somewhat
    22 repetitive; but they do go to the foundation, I
    23 think, on the basis for the decision that you are
    24 talking about making in these kinds of situations.
    139
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 When you stated that when you're looking
    2 at the definition of "source" you are looking at
    3 location, proximity, supervision and control
    4 besides what you call functional criteria, I was
    5 curious about your use of the word "proximity." Is
    6 the word "proximity" in the rules and regulations
    7 somewhere?
    8 A No, it is not.
    9 Q Okay.
    10 A The term "proximity" is used in USEPA's
    11 preamble, but that's the term I was using as an
    12 umbrella term for the terms "contiguous" and
    13 "adjacent."
    14 Q Okay. You made reference to definitions
    15 of the word "source" that are effective in
    16 different programs; and I am unfamiliar with the
    17 names of the different programs that would have
    18 different definitions of source and what definition
    19 would be applicable to this specific permit, and it
    20 may be simply because I have not gone into depth in
    21 the record.
    22 But could you identify the permit type
    23 that's the program definition of "source" that
    24 applies in this case?
    140
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A In this case we made a completeness
    2 determination under the CAAPP program, Illinois'
    3 Clean Air Act Permit Program.
    4 The definition that we specifically point
    5 to for that program would be the definition of
    6 "stationary source" under Section 39.5 of the
    7 act.
    8 Q Okay, thanks. So, when you were referring
    9 to the type of review you would do in classifying a
    10 facility in terms of the definition of "source" and
    11 you referred to a permit for a new source, is that
    12 the type of permit review that you were doing in
    13 this case?
    14 A That was the type of permit review we
    15 were doing back in April and May of '95 for Color
    16 Communications.
    17 So it was not the basis for the
    18 determination in November of '95 on the Clean Air
    19 Act Permit Programs, but it was the basis of a
    20 prior determination that we believed should also
    21 be reflected in the Clean Air Act Permit Program
    22 permit application.
    23 Q You made reference to, I believe, a case
    24 decision entitled Alabama Power?
    141
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A That's correct.
    2 Q Was that case the same type of permit
    3 application and subject to the same laws as the
    4 petitioner's operations are in the current permit
    5 appeal, do you know?
    6 A No, it was not. The Alabama Power case
    7 was an appeal of USEPA's rule making on the
    8 prevention of significant deterioration rules and
    9 their nonattainment area rules. So it was an
    10 appeal of a rule making. It was not an appeal of
    11 actions pursuant to a rule.
    12 Q And, when you referred to Acme Steel
    13 permits that identify it as a single source, do you
    14 happen to know if any of those permits that were
    15 referenced are currently of concern in open cases
    16 before the Pollution Control Board or do you just
    17 happen to know?
    18 A I don't believe so. I'm not aware that
    19 they are.
    20 Q And then the same for Lone Star. Do you
    21 happen to know if the Lone Star permits are the
    22 subject of any current open case?
    23 A I don't believe they are.
    24 Q Now, you made general references to
    142
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 guidance with respect to the meaning of the word
    2 "adjacent" and the way in which you use it in
    3 decisions.
    4 However, are there any written guidelines
    5 that are currently in the agency record that we
    6 have here and/or are there other identified written
    7 documents that include any statements related to
    8 the definition of "adjacent" by USEPA or IEPA that
    9 would be of assistance to the board?
    10 A It certainly would be appropriate if the
    11 board wanted to look at the new source review
    12 workshop manual as the most definitive companion
    13 of USEPA interpretations and guidance with respect
    14 to new source review.
    15 There may be some other determinations
    16 that are relevant. Perhaps Mr. VanMersbergen can
    17 discuss them later when he's on direct.
    18 Q You use the word "contiguous" to describe
    19 facilities that are not contiguous in the general
    20 understanding of the word as being not next to one
    21 another physically.
    22 But, when I look at the section definition
    23 on "source" at 211.6130, the word "contiguous" is
    24 used only with respect to clarifying industrial
    143
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 groupings and how they would be coded.
    2 So is the word "contiguous" a word that
    3 you also are using, then, to modify the word
    4 "adjacent"?
    5 A I'm not sure what you are referring to.
    6 I was not using the word "contiguous" to modify the
    7 word "adjacent."
    8 I was using the word as found in the
    9 rules to my recollection in terms of the proximity
    10 criteria for defining "source."
    11 The definitions do not use the word
    12 "proximity." They use the term "contiguous" or
    13 "adjacent."
    14 Q And, when you referred to USEPA guidance
    15 that you use in making these decisions, is that
    16 document would that be in the form of rules and
    17 regulations; or is your reference solely to the new
    18 source review guidelines that you mentioned; or is
    19 there some other material that you could help us or
    20 that you have knowledge of that you could refer for
    21 the board?
    22 MR. LAYMAN: If I may ask for a clarification.
    23 I think there were two types of guidance that were
    24 discussed in Mr. Romaine's testimony. One guidance
    144
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 document from USEPA, and then two specific guidance
    2 or recommendations via letters and correspondence
    3 from USEPA. You're referring to guidance
    4 documents?
    5 HEARING OFFICER EDVENSON: Well, the word he
    6 used, I believe, was "guidance."
    7 BY HEARING OFFICER EDVENSON:
    8 Q And so I'm wondering if those are in the
    9 form of documents of general applicability; or, if
    10 they are in the form of documents on specific
    11 cases, then I'm just wondering if you could give
    12 us some detail on that; or, if there are some
    13 guidelines of general applicability, you could
    14 let us know if you know of them.
    15 A The USEPA's preamble certainly discusses
    16 the issue of proximity, so that's a preamble to
    17 their adoption of PSD and new source review rules
    18 back in 1980. That's a published document.
    19 The next document I'd refer the board to
    20 is the new source review workshop manual. That is
    21 also a document that has been published by USEPA
    22 and widely disseminated by them as a standard
    23 reference tool, I think, for permittees,
    24 consultants and permitting authorities.
    145
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Then the other documents would be, I'd
    2 say, precedent type documents referring to specific
    3 cases.
    4 I'm not sure which documents of those are
    5 in the record as compared to the interrogatory
    6 response.
    7 There may be additional documents that we
    8 have only provided to Color Communications as part
    9 of the interrogatories that we might be able to
    10 provide to the board.
    11 MR. LAYMAN: As far as the record is concerned,
    12 there's the two letters of correspondence from
    13 USEPA and attached to one of those letters was the
    14 General Motors determination that had previously
    15 been made by USEPA. That's all that's contained
    16 in the administrative record at this point.
    17 HEARING OFFICER EDVENSON: Okay. Could we
    18 identify the page numbers for the record now or
    19 later?
    20 MR. LAYMAN: Sure. Page 2 is a letter dated
    21 February 2, 1995. Pages 2 and 3 are that letter,
    22 I should say.
    23 Page 4 is the attached determination. In
    24 fact, Pages 4 through 4A, Page 5 and 5A are the
    146
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 determination letters attached to USEPA's letter
    2 to the agency.
    3 Those determination letters both address
    4 the issue of General Motors and its Lansing,
    5 Michigan facilities. The other USEPA
    6 correspondence dated March 24, 1995, is found
    7 at Bates No 7.
    8 HEARING OFFICER EDVENSON: Okay, thank you.
    9 MR. LAYMAN: Redirect?
    10 HEARING OFFICER EDVENSON: (Hearing Officer
    11 Edvenson nodded head up and down.)
    12 MR. LAYMAN: Real briefly.
    13 REDIRECT EXAMINATION
    14 BY MR. LAYMAN:
    15 Q Is it fair to say that one major factor
    16 considered by the agency in determining that Color
    17 Communications' facilities were adjacent or
    18 contiguous in this case was, in fact, the close
    19 location of the two facilities at the 4000 and
    20 4242 West Filmore?
    21 A Yes, it was. They were located just a
    22 block apart. A block apart is not very far in an
    23 urban area.
    24 Q Is it also fair to say that the
    147
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 interdependency of the facilities, the way in which
    2 they acted as one or encountered with each other,
    3 was also important in this context?
    4 A Yes, it was.
    5 MR. LAYMAN: That's all I have.
    6 HEARING OFFICER EDVENSON: Is there any
    7 recross?
    8 MR. O'BRIEN: (Mr. O'Brien shook head back and
    9 forth.)
    10 HEARING OFFICER EDVENSON: All right. Thank
    11 you very much, Mr. Romaine.
    12 THE WITNESS: No problem.
    13 (Witness excused.)
    14 MR. LAYMAN: The agency will call its next
    15 witness Mr. Ronald VanMersbergen.
    16 MR. O'BRIEN: Can we go off the record for a
    17 minute in terms of scheduling?
    18 MR. LAYMAN: Yes.
    19 HEARING OFFICER EDVENSON: Off the record.
    20 (Whereupon, discussion was had
    21 off the record.)
    22
    23 * * * * *
    24
    148
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 RONALD VanMERSBERGEN,
    2 called as a witness herein, having been first duly
    3 sworn, was examined and testified as follows:
    4 DIRECT EXAMINATION
    5 BY MR. LAYMAN:
    6 Q Would you please restate your name for the
    7 record?
    8 A My name is Ronald VanMersbergen.
    9 Q And what is your occupation,
    10 Mr. VanMersbergen?
    11 A I'm an engineer with the U.S.
    12 Environmental Protection Agency.
    13 Q Could you give us a general idea as to
    14 your education after high school?
    15 A I graduated from University of Michigan
    16 with a bachelor's degree in civil engineering. I
    17 continued at the same university with a master's
    18 degree in sanitary engineering.
    19 I worked for EPA or for a predecessor of
    20 EPA for a couple of years. I went to Penn State
    21 University to get a degree in air pollution control
    22 administration.
    23 I've taken a number of courses with EPA in
    24 my earlier career related to air pollution control
    149
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 and management.
    2 Q When did you become employed by the United
    3 States Environmental Protection Agency?
    4 A I had been working for either EPA or its
    5 predecessor since 1963 after graduation with a
    6 master's degree and continued with the agency until
    7 about 1972.
    8 Took a year and a half off to work with
    9 private industry developing air pollution control
    10 equipment and doing some consulting.
    11 Then in 1974 or early '74 rejoined EPA,
    12 at that time it was EPA; and I've worked with the
    13 agency since that time either in permitting or
    14 either in soot development for a couple of years.
    15 And then in 1976 -- approximately 1976
    16 focused in on new source review permitting and
    17 have been involved in some aspect of permitting
    18 continually since that time.
    19 Q What current position do you hold for
    20 USEPA?
    21 A I'm currently recognized as a national
    22 expert in air permitting.
    23 Q What kind of responsibilities are entailed
    24 with that position?
    150
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A I'm expected to assist the agency in
    2 making national policy, assist the agency in
    3 developing regulations, reviewing regulations
    4 relating to permitting.
    5 I expect to speak on behalf of the agency
    6 in areas; receiving questions from industry
    7 consultants, universities, law firms, other federal
    8 agencies, with respect to air permitting.
    9 MR. LAYMAN: Before we go any further and
    10 before I forget I would at this point ask that
    11 Mr. VanMersbergen's resume be marked and, in fact,
    12 accepted into evidence.
    13 BY MR. LAYMAN:
    14 Q This is, in fact, a copy of your resume?
    15 A That's correct.
    16 MR. LAYMAN: That will be marked, again, I'm
    17 sorry, as Respondent's Exhibit 3, I believe.
    18 HEARING OFFICER EDVENSON: Yes, Respondent's
    19 Exhibit 3. Is there any objection to the
    20 introduction of this?
    21 MR. O'BRIEN: No.
    22 HEARING OFFICER EDVENSON: All right.
    23 (Whereupon, document so offered
    24 was marked and received in
    151
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 evidence as Respondent's Exhibit
    2 No. 3.)
    3 BY MR. LAYMAN:
    4 Q Going back to your official title and
    5 responsibility for USEPA, national expert in
    6 permitting matters implies more than just an
    7 expert for Region 5; is that correct?
    8 A That's correct. When EPA has to or feels
    9 obligated to make policy decisions or change
    10 directions, I'm involved in some of those types
    11 of activities.
    12 For example, I have been a member of the
    13 air pollution control -- or, excuse me, air
    14 pollution advisory subcommittee on reevaluating the
    15 construction permit regulations; participated in
    16 that.
    17 I'm currently involved in what is called
    18 the CSI, common sense initiative program, which the
    19 current admission wishes to work with industry.
    20 I'm involved in the automotive sector in that
    21 aspect.
    22 I get involved in other task force dealing
    23 with developing guidance. For example, I
    24 participated in a task force that developed the new
    152
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 source review workshop manual that was referred to
    2 earlier.
    3 Those types of things.
    4 Q How many other national experts are there
    5 employed by USEPA for air permit matters besides
    6 yourself?
    7 A There is one expert in North Carolina that
    8 works directly in our headquarters office, and
    9 there is a person in one other region that has a
    10 very similar responsibility at the same grade level
    11 that his title is just slightly different. There
    12 would be three of us.
    13 Q As part of your work responsibilities in
    14 that position have you become familiar with many of
    15 the Clean Air Act programs and requirements?
    16 A That's correct, I have, although I do not
    17 claim a great deal of familiarity and expertise
    18 with respect to the automotive program.
    19 Q Are you familiar, then, with the federal
    20 new source review requirements for PSD?
    21 A That's correct, I am.
    22 Q How are you familiar? In other words, how
    23 do you work with that in your current position?
    24 A I have assisted in the very early years
    153
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 reviewing the initial PSD regulations that are the
    2 basis for the current program. That would be the
    3 August 1980 regulations. Assisted in development
    4 of those regulations.
    5 Participated and then delegating that
    6 program to various state agencies.
    7 Assisting states in developing their own
    8 regulations if they so choose to in reviewing those
    9 regulations for approval or disapproval.
    10 What I do is participate in training
    11 programs -- national training programs that may be
    12 sponsored by various organizations explaining these
    13 regulations. I may have some part in that or
    14 develop training schools for these programs.
    15 More towards the mundane I do paperwork or
    16 I train people in our own office. I have reviewed
    17 permits that may come into our office for
    18 oversight.
    19 I have some period of time assisted or
    20 reviewed or audited, I would say, state permitting
    21 programs to see whether they had procedures that
    22 would result in implementing permit decisions that
    23 would be consistent with the national policy.
    24 Q When you say you've participated in
    154
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 seminars, I take it you mean both attended as well
    2 as conduct; is that correct?
    3 A Well, primarily conducting the seminars.
    4 Q You did do that?
    5 A We've conducted seminars in each one of
    6 the Region 5 states. Then there would be seminars
    7 -- two seminars that were put on by the National
    8 Air Pollution Control -- well, the National Air &
    9 Waste Management Association sponsored seminars.
    10 Participated in instruction at those seminars.
    11 Q Are you also familiar with the Clean Air
    12 Act federal nonattainment area new source review
    13 program?
    14 A That's correct, I am.
    15 Q How are you familiar with that?
    16 A That program and the PSD program have many
    17 similarities in Region 5 where we are expecting
    18 states to develop regulations to meet the Clean
    19 Air Act requirements and assist in reviewing or
    20 participate in overseeing the review of the
    21 development of these regulations, and then the
    22 final approval or disapproval of these regulations
    23 at the state program.
    24 And, then again, in the oversight of
    155
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 permits that may emanate from these programs most
    2 states have arrangements with us where we receive
    3 copies of major source permits prior to or during
    4 the public comment period.
    5 We look at these permits such that we
    6 can be assured that decisions are consistent with
    7 national policy.
    8 This is something that EPA wants to do
    9 is try to make sure that these regulations are
    10 interpreted at a consistent manner across the
    11 nation so that there is no competitive advantage
    12 of one over another because of inconsistent
    13 interpretations, so part of my responsibility is
    14 to look at permits to look for this.
    15 Q Have you, in fact, been involved with this
    16 type of oversight for the Illinois new source
    17 review nonattainment area program?
    18 A That's correct, I have.
    19 Q Have you also been involved with that type
    20 of oversight for the federally delegated PSD
    21 program to Illinois?
    22 A That's correct.
    23 Q And why is it that that role or what
    24 purposes, I should say, does that role serve, do
    156
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 you believe, in that new source review context?
    2 A It serves two purposes. One purpose is to
    3 make sure that the state is familiar with what the
    4 federal regulations are, and in some cases we can
    5 even assist the state in managing a state program
    6 by knowing what goes on in other -- what is
    7 happening in other states.
    8 The other purpose is to assure that the
    9 federal regulations are consistently applied in
    10 this country.
    11 Q Are you familiar in light of your present
    12 responsibilities with the Clean Air Act federal
    13 permitting program under Title 5?
    14 A That's correct.
    15 Q Are you also familiar with USEPA's Part 70
    16 federal rules?
    17 A That's correct.
    18 Q Have you had a role or assistance, if you
    19 will, in developing those regulations?
    20 A Early in 1990 when the Clean Air Act was
    21 passed I spent a ten-week period in North Carolina
    22 working with the group that was developing these
    23 regulations, participated in the initial
    24 structuring of these regs during that particular
    157
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 time. That was a full-time activity for that
    2 ten-week period.
    3 Since that time I have participated in
    4 reviewing proposed amendments to those regulations
    5 and assisting in interpretations of policy and
    6 trying to guide the national policy in implementing
    7 this Part 70 regs.
    8 Q Are you familiar with the Illinois Title 5
    9 program as it has been approved by USEPA?
    10 A To a degree I'm familiar with it. One of
    11 our other individuals reviewed it underneath my
    12 oversight. I did not read the full rule myself.
    13 Just parts here and there where there were
    14 questions as to whether or not it was consistent
    15 with the federal regs.
    16 Q Have you assisted Illinois as well as
    17 other states in addressing relevant or recent CAAPP
    18 permitting issues since its enactment?
    19 A When questions come up with respect to the
    20 CAAPP program that the state feels that they would
    21 like to have a federal input, I participate in
    22 that.
    23 And the reason for that is that the state
    24 CAAPP program is intended to meet the federal Clean
    158
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Air Act requirements and inasmuch as a regulation
    2 cannot cover every aspect of managing the program,
    3 then we provide an interpretation to rules because
    4 we are trying to make sure that what Congress has
    5 intended, passing that message from what Congress
    6 has intended and the courts interpret down to the
    7 state as the state tries to implement the intent of
    8 Congress. That is our concern, and that's why we
    9 look at these permits and answer policy questions.
    10 Q Given your experience and, in fact, from
    11 some of your testimony you are, then, familiar with
    12 stationary source definitions for both the PSD and
    13 the nonattainment area NSR, new source review
    14 program?
    15 A That's correct.
    16 Q What do the definitions generally provide?
    17 A The definition of "major source" for
    18 nonattainment PSD came from the Clean Air Act and
    19 have had major impact upon that definition as a
    20 result of the Alabama Power case which was referred
    21 to earlier in the testimony.
    22 In the Alabama Power case the court
    23 instructed EPA to write regs or give a more precise
    24 definition of what a source is between the criteria
    159
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 of common sense industrial grouping and as one
    2 criteria.
    3 Another would be the assurance that the
    4 purpose of PSD would be met; and then, thirdly, to
    5 make sure that as we group activities for a major
    6 source that we didn't aggregate something in too
    7 broad a sense.
    8 So with that instruction of Congress we
    9 developed for a regulation promulgated August 7,
    10 1980, defining major source or its sister
    11 definition of a building structure and facility.
    12 In that definition we tried to implement
    13 what Congress has intended by common sense
    14 industrial grouping by setting up criteria -- broad
    15 criteria in terms of how we define a source that
    16 had to be for a common sense industrial grouping.
    17 We were trying to look at SIC code and
    18 its support facilities as defined in our regs
    19 common control and adjacent, contiguous piece of
    20 property.
    21 So that's how that definition occurred,
    22 and that's the definition with respect to PSD and
    23 nonattainment. As we pointed out earlier, Title 5
    24 is just a bit broader.
    160
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q Now, you are familiar with Title 5
    2 definition of "source" as well?
    3 A That's correct.
    4 Q Are there any significant differences
    5 between source definition from one program to the
    6 other?
    7 A In the Title 5 program the Congress
    8 directly defines "source" without using the SIC
    9 code as distinguishing features for toxic materials
    10 resulting in situations where you could have
    11 different types of activity that one wouldn't
    12 consider the same SIC code, but the toxic materials
    13 from both those activities would be grouped
    14 together to determine whether or not a major source
    15 met the emission threshold level. That's the
    16 primary difference.
    17 Q Okay. In the context of how these
    18 issues arise to your attention, how are source
    19 determinations generally made by USEPA?
    20 A When we make these determinations, we,
    21 first of all, go to the regulation to determine
    22 what the regulation may obviously say; and, if
    23 it's not clear in the situation, then we depend
    24 upon previous policy determinations that have
    161
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 been made.
    2 These policy determinations are brought
    3 together in a three-volume manual that EPA has that
    4 is publicly available.
    5 These determinations are
    6 in forms of letters most frequently or possibly
    7 memos. Those policy determinations most of them
    8 are on an electronic bulletin board that EPA has.
    9 And then in the third area we have a
    10 manual that we have brought together summarizing
    11 these determinations called the new source review
    12 workshop manual.
    13 Now, in making a determination, we will
    14 see whether or not -- see what has been done with
    15 previous determinations, okay? It's tried to keep
    16 within those guidelines.
    17 If we have situations that arise that are
    18 outside that determination, then what we would do
    19 is bring the problem to our -- our general counsel
    20 in Washington would be a participant, our office
    21 enforcement a participant and then the program
    22 people three headquarters groups then as well as
    23 regional people bringing in the regional experts
    24 on these questions and try to determine what a
    162
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 national policy should be.
    2 Q Regarding the criteria of a source
    3 definition for major industrial groupings, what
    4 does USEPA first generally look at in applying that
    5 definition to a particular set of facts?
    6 A We take a look at the -- well, first of
    7 all, we look at three major criteria.
    8 The common control of which ownership is
    9 the biggest factor, but there can be contractual
    10 arrangements that provide control.
    11 We look at the activity that's occurring
    12 at the source; and, if it comes within -- the
    13 activities they fall within the first two-digit
    14 SIC code, we generally will let that sit at that
    15 level.
    16 If there are activities that expand beyond
    17 the SIC code, we will look to see whether or not
    18 these activities are support activities.
    19 Support activity, then, would be an
    20 activity that is an activity engaged in or one of
    21 the functions that occur at a source such that we
    22 generally generate a principal product.
    23 That could be a couple of different SIC
    24 codes that make contribution; but, if we end up
    163
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 making a principal product, we look at those
    2 activities and make that principal product.
    3 We try to group these activities to see
    4 whether or not we have a -- in terms of common
    5 sense definition whether or not they occur in an
    6 adjacent or contiguous area.
    7 The Clean Air Act refers to a contiguous
    8 area in some places. It's a little -- I admit it's
    9 a little confusing in some aspects.
    10 But we'll take a look at adjacent and
    11 contiguous locations; and, if the activities occur
    12 in the proximity neighborhood, then we will say
    13 this is the same source, and we will make those
    14 determinations based upon earlier determinations
    15 such that we have a consistency.
    16 There is some federal guidance as referred
    17 to earlier. If something is 20 miles apart, we
    18 would say that is too far. We have made
    19 determinations at lesser distances that we feel
    20 fairly comfortable with.
    21 Q Can you describe for us an example
    22 illustrating perhaps what a support facility is?
    23 HEARING OFFICER EDVENSON: Could you speak up
    24 a little more --
    164
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 MR. LAYMAN: I'm sorry.
    2 HEARING OFFICER EDVENSON: -- for the benefit of
    3 others in attendance?
    4 MR. LAYMAN: Yes.
    5 HEARING OFFICER EDVENSON: Thank you, both of
    6 you.
    7 THE WITNESS: A support facility would either
    8 generate a subproduct or provide some kind of
    9 service that is necessary in manufacturing or
    10 assembling or producing a final principal product.
    11 For example, a support facility might be
    12 a power plant which has a completely different SIC
    13 code, a completely different set of functions, than
    14 a chemical plant; but the power plant obviously is
    15 supporting the chemical plant to make a principal
    16 product. That would be a support facility.
    17 So we take a look at what the principal
    18 product is, is there a relationship, a functional
    19 tie, between the emitting activity that we're
    20 concerned about and the principal product to get
    21 a common sense definition of the pollutant emitting
    22 activities.
    23
    24
    165
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 BY MR. LAYMAN:
    2 Q Is there any commonly applied threshold
    3 for determining whether one facility is a support
    4 facility for another?
    5 A Yes. Let's say the power plant as an
    6 example. If there were a power plant at an
    7 industrial site and it gave one-third of its
    8 energy to three different plants evenly, we'd say
    9 that's not a support facility.
    10 But, if it had at least 50 percent of its
    11 energy production donated to one activity, then
    12 we'd say this is a support facility. So 50 percent
    13 would be the cutoff that federal guidance would
    14 use.
    15 Q And is this rule as it relates to support
    16 facilities something that's commonly applied by
    17 USEPA?
    18 A This is in our federal guidance preamble
    19 that preceded the August 7, 1980, regulations for
    20 PSD and for nonattainment; and so it's applied, and
    21 we have been applying it for the last 15 or 16
    22 years.
    23 Q I take it it's not uncommon then --
    24 A No, it's not uncommon at all.
    166
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q -- to be presented?
    2 A As a matter of fact, I don't think we've
    3 had any determinations recently on this issue
    4 because it's fairly well accepted as a support
    5 facility.
    6 Q As to the source definition criteria for
    7 location that of adjacency and contiguous, what
    8 will USEPA generally look at in any given case?
    9 A You have to recognize that the basis for
    10 why we come to these three regulatory criteria,
    11 that is a common ownership adjacency as well as the
    12 activity that's engaged in, we're trying to group
    13 sources together or Congress intended us to group
    14 sources together; and the original basis for this
    15 or one of the dominating basis for this is try to
    16 relate this to air quality impact and activities
    17 that could be brought together that may have a
    18 similar impact in some area was important to us.
    19 So much of this came out of the air when
    20 we were pressing on a particular matter and sulfur
    21 dioxide. That gave us some clues as to where we
    22 were headed.
    23 So the adjacency issue, then, may have
    24 some impact there at least in our traditional
    167
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 manner of looking at sources, and in an effort to
    2 keep consistent we've carried that forward.
    3 As we look at these three type of
    4 criteria, we are still trying to make a common
    5 source or common sense grouping of emission
    6 activities. Common sense grouping. That's the
    7 guides the court gave us.
    8 And so we recognize that there are
    9 case-by-case determinations, and not every -- a
    10 case-by-case determination goes beyond just
    11 distances.
    12 It's not very difficult for us to get
    13 a ruler out and measure distances. We don't have
    14 to need case-by-case determinations.
    15 We bring in some other factors we believe
    16 are appropriate, and that is some of the functional
    17 relationships at an activity to help us make a
    18 determination.
    19 We've made some determinations, and with
    20 that in mind we take a look at the other activities
    21 -- the functional relationship, I should say, of
    22 the activities occurring at the facilities in
    23 question.
    24 Q It is possible, I take it from the way you
    168
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 answered the last question, that activities can be
    2 located at a different site or --
    3 A Excuse me?
    4 Q It is possible that activities can be
    5 located separately or separated by distance and yet
    6 still treated as one source?
    7 A I'm presuming you say is it possible that
    8 activities may be on properties that don't have
    9 touching boundaries?
    10 Q Correct.
    11 A That is very frequently the case. That's
    12 a very common situation.
    13 Quite frequently we will have separate
    14 pieces of property that are separated by public
    15 right-of-ways, possibly by a private railroad. So
    16 that's private property that would separate pieces
    17 of property.
    18 There may be other geographic features
    19 like rivers or streams that might separate two
    20 pieces of property.
    21 But as long as these activities are
    22 grouped functionally and are reasonably close, then
    23 we call that a source -- single source.
    24 Q Those factors that you have just described
    169
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 are those fairly common or characteristic of a
    2 long-line operation?
    3 A Oh, yes. That's correct. That's correct.
    4 Q Are you aware of any cases involving
    5 either PSD or nonattainment area new source review
    6 where USEPA has considered separate buildings or
    7 facilities to be one source even though they were
    8 separated by some distance?
    9 A Yes, I am.
    10 Q Can you give us one such example?
    11 A One such example, okay, fine.
    12 General Motors in Lansing, Michigan is a
    13 situation where there are two activities dealing
    14 with the generation of a -- I believe it's an
    15 Oldsmobile where painting activities occur at two
    16 different locations separated by a distance of
    17 close to three-quarters of a mile.
    18 And we've indicated that that is a single
    19 source because of the long line; that is, a
    20 continuation of making a subproduct into a final
    21 product. That's the furthest distance that I have
    22 been personally involved in.
    23 And then there are numerous other
    24 distances that are shorter than that along the
    170
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 categories that I earlier described across the
    2 river and things like this.
    3 MR. O'BRIEN: Could I ask the answer be read
    4 back?
    5 THE WITNESS: Sure.
    6 (Whereupon, the record was read
    7 by the reporter as requested.)
    8 BY MR. LAYMAN:
    9 Q In the General Motors' case do you recall
    10 how at the time the determination was made
    11 materials and products were being conveyed between
    12 facilities?
    13 A The body of the car without the doors or
    14 trunk and hood, I believe, the bodies of the car
    15 were painted at one location, put on a truck and
    16 trucked to the other location where they were
    17 assembled and made into Oldsmobiles.
    18 There may have been other -- well, there
    19 was, I think, another connection between those two
    20 properties with respect to a railroad; but the
    21 railroad was not a functioning activity in terms
    22 of transporting at this particular time.
    23 Q Okay. How did you first become involved
    24 in the source issue relating to Color
    171
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Communications?
    2 A I'm a team leader at our office. We have
    3 eight or ten people dealing with permitting. We
    4 meet each week and discuss current problems, new
    5 policies and so on.
    6 At one of these meetings one of the
    7 engineers that is assigned to Illinois brought this
    8 issue up and described it, and it was an ideal
    9 teaching situation to bring out a common point.
    10 So that's my first exposure to it.
    11 Q And what was your understanding at that
    12 time about the nature of the relationship between
    13 the facilities at Color Communications?
    14 A Okay. What was revealed to me at that
    15 time was that a map was drawn on a board showing
    16 two locations about a block apart, that a certain
    17 printing or coating operation occurred at one
    18 source, and then that product was transported to
    19 another location where it was generated into a
    20 final product. At that particular point in time
    21 that's all I knew about this situation.
    22 Q Was there any aspect of that relationship
    23 at Color Communications that was similar to the
    24 interpenancy (phonetic) at the General Motors'
    172
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 facility or as found to be existing in that General
    2 Motors' case?
    3 MR. O'BRIEN: If you will, let me object to the
    4 form of that question especially related to the --
    5 did you mean any interdependency or independency?
    6 MR. LAYMAN: I'm sorry.
    7 MR. O'BRIEN: I really didn't follow that.
    8 Maybe you could rephrase it.
    9 MR. LAYMAN: Allow me to rephrase the question,
    10 if I may.
    11 HEARING OFFICER EDVENSON: Okay.
    12 BY MR. LAYMAN:
    13 Q Was there any aspect of Color
    14 Communications' business relationship that was
    15 similar to the General Motors' case in that General
    16 Motors' facilities were operating as one or
    17 interdependently?
    18 MR. O'BRIEN: I think I also have to object to
    19 that question to the extent it's very leading in
    20 that it assumes that the GM facilities were acting
    21 as one, so that's an objection to form.
    22 HEARING OFFICER EDVENSON: Objection
    23 sustained.
    24
    173
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 NY MR. LAYMAN:
    2 Q Were there any common characteristics as
    3 to the type of business relationship between Color
    4 Communications and that that was found to exist in
    5 General Motors' case?
    6 A Yes. There were similar relationships.
    7 THE WITNESS: Let me ask this. Can I pause
    8 here and ask a question of you?
    9 HEARING OFFICER EDVENSON: (Hearing Officer
    10 Edvenson nodded head up and down.)
    11 THE WITNESS: Okay. There are some things that
    12 I learned today that I may not have known back
    13 then.
    14 Can they come into my testimony, or do I
    15 have to answer the question with respect just to
    16 what I knew at the time?
    17 MR. LAYMAN: I would ask that the witness be
    18 instructed to answer the question on the table, and
    19 we can proceed from there and to --
    20 HEARING OFFICER EDVENSON: I understood the
    21 context of the question to be what he knew at a
    22 certain time when he was looking at information --
    23 MR. LAYMAN: That's correct.
    24 HEARING OFFICER EDVENSON: -- that had a
    174
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 factual scenario similar to the Color
    2 Communications' scenario.
    3 So I would have to ask that you answer
    4 this question with respect to what you were looking
    5 at when you were looking at this factual scenario
    6 in the past.
    7 THE WITNESS: Okay. When this problem was
    8 first brought to us, the problem was first brought
    9 to us and then I participated in providing guidance
    10 and development of a new letter for Mr. Rothblast's
    11 signature.
    12 The things that impacted me at that point
    13 were the fact that in the General Motors' case
    14 there was a management of the product development
    15 at one site that dictated how the final -- that was
    16 coordinated with the development of the final
    17 product.
    18 That is, the subproduct was developed in
    19 such a manner that it fit into development of the
    20 final product. That was important for us in
    21 General Motors.
    22 As the facts were presented to me then
    23 with respect to the time frame we're talking
    24 about, I was impacted by the fact that there was
    175
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 a subproduct that was being developed that had
    2 to have further actions upon it to make a final
    3 product.
    4 So that seemed to be the same thing as
    5 what was happening in General Motors with respect
    6 to the relationship of the two activities at the
    7 two sites.
    8 Q Okay. With respect to the relationship at
    9 the Color Communications' facilities are there any
    10 new facts that you have become aware of since that
    11 time that further support a determination that was
    12 made by USEPA previously?
    13 A Yes, there are. I have come to understand
    14 that at General Motors the quality of product that
    15 was generated at one site was very crucial in terms
    16 of the quality of the final product at General
    17 Motors.
    18 Basically the color of the paint on the
    19 hood they felt that the customer wanted the color
    20 of the paint on the hood to match the color of the
    21 paint on the top of the car.
    22 I understand that the management of
    23 quality in this particular case before us at the
    24 initial activity is important for the final quality
    176
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 of the product, okay?
    2 So I saw an interdependency in that aspect
    3 of the source, okay? I'm relating these two
    4 activities.
    5 Q Were you aware that IEPA subsequently
    6 issued operating permits to Color Communications
    7 after the time in which you provided or Region 5
    8 USEPA provided guidance to the agency on the source
    9 determination?
    10 A Could you define operating permit for me?
    11 I know of two types of operating permits in
    12 Illinois. One is what we call CAAPP. The other is
    13 underneath their older operating permit program.
    14 HEARING OFFICER EDVENSON: Can you clarify your
    15 reference, Mr. Layman?
    16 MR. LAYMAN: Yeah.
    17 BY MR. LAYMAN:
    18 Q In this case it's the older state version
    19 permits that were pending at that time in 1994.
    20 Were you aware that they were --
    21 A Come to think of it, I'm not aware of
    22 either.
    23 Q Were you made aware after the guidance
    24 was provided to IEPA that IEPA went on to find the
    177
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 facilities to constitute one source as opposed to
    2 two?
    3 A Yes.
    4 Q And have you since become aware that Color
    5 Communications submitted separate CAAPP permit
    6 applications for each of its facilities there?
    7 A That's correct. I'm aware of that.
    8 Q And you are also aware that IEPA
    9 subsequently issued a notice of incompleteness to
    10 Color Communications for that same reason?
    11 A That's correct.
    12 Q Does USEPA believe that IEPA's source
    13 determination for purpose of CAAPP was consistent
    14 with the earlier determination made respecting new
    15 source review?
    16 A That's correct. We would consider this a
    17 correct determination. We feel that the new source
    18 review policies, though established for new source
    19 review, was in the mind of Congress when they
    20 formed Title 5 regulations or Title 5 legislation.
    21 We picked that up directly. I am aware of
    22 that because I worked on the earlier regulation
    23 development.
    24 It was a determination to pick up new
    178
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 source review, try to keep -- pick up the new
    2 source review policy determinations and regulations
    3 and try to keep our regs simple.
    4 So based on that I am of the opinion that
    5 the IEPA's determination that this is one source is
    6 consistent with what Congress intended for Title 5.
    7 Q Now, does this promote any goals in terms
    8 of uniformity for federal program requirements in
    9 your view?
    10 A As I indicated earlier, one of the primary
    11 functions -- one of the functions that I have as a
    12 federal employee with oversight is to assure that
    13 we have common implementing of the Clean Air Act,
    14 and that was the reason why EPA sent this letter to
    15 the State of Illinois is to make sure that we were
    16 implementing the Clean Air Act in this particular
    17 case consistent with how we were implementing the
    18 Clean Air Act nationally.
    19 MR. LAYMAN: I believe that's all we have for
    20 now.
    21 HEARING OFFICER EDVENSON: Why don't we take a
    22 five-minute recess.
    23 MR. LAYMAN: Okay.
    24 (Recess taken.)
    179
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 HEARING OFFICER EDVENSON: Then we will proceed
    2 with the cross-examination of Respondent's second
    3 witness.
    4 MR. O'BRIEN: Thank you.
    5 CROSS EXAMINATION
    6 BY MR. O'BRIEN:
    7 Q Mr. VanMersbergen, I just have a
    8 clarification question about your resume which I
    9 believe was marked as Respondent's 3.
    10 MR. O'BRIEN: Is that correct?
    11 MR. LAYMAN: (Mr. Layman nodded head up and
    12 down.)
    13 BY MR. O'BRIEN:
    14 Q Under the title 1976 to 1994 designation
    15 regional new source review expert, is that a title
    16 that was given to you by the USEPA?
    17 A Yes, that's correct. It's in my -- it's
    18 in a position description for a position that I
    19 applied to, so it's a title.
    20 Q What is your position that you held from
    21 1976 to 1994 if other than the description of
    22 regional new source review expert? Was there a
    23 separate position title, in other words, is what
    24 I'm driving at.
    180
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Oh, I'm not sure what you're driving at;
    2 but I could possibly answer your question, okay?
    3 Underneath the civil service system
    4 individuals are classified in terms of their
    5 disciplines or their potentiality, and one could
    6 be called an environmental specialist; and the
    7 agency did that so that they could identify people
    8 that may have -- well, so I was classified as an
    9 environmental specialist, okay, at that point in
    10 time to come into the agency for as a position.
    11 Q That does answer my question.
    12 Did that position designation of
    13 environmental specialist change in 1995 when your
    14 resume indicates that your description changed to
    15 "national air permitting expert"?
    16 A That's correct. A new job description
    17 had to be prepared. It had to be completed --
    18 competed for because it was a different GS level.
    19 And so there was a new job description,
    20 and that job description has the title the national
    21 air permitting expert.
    22 Q Now, you described what your position
    23 entails and how it relates to the state programs
    24 that are going on.
    181
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Is part of your job interpreting
    2 individual state regulations as they apply to air
    3 pollution?
    4 A I do not interpret state regulations.
    5 I determine -- I make interpretations of state
    6 activities as to whether or not they are meeting
    7 the federal requirement for which the state
    8 regulation was intended to prove to me.
    9 HEARING OFFICER EDVENSON: Mr. VanMersbergen?
    10 THE WITNESS: Yes, ma'am?
    11 HEARING OFFICER EDVENSON: Perhaps if you move
    12 your seat back further then the court reporter will
    13 be able to hear your answers better.
    14 BY MR. O'BRIEN:
    15 Q Would it be fair to say, then, that one
    16 of the things that you're looking for in terms of
    17 looking at state applications or state activities
    18 is consistency with the federal regulations and
    19 consistency with the federal air pollution program?
    20 A There are two things that we may comment
    21 on. That is one of the things that we would be
    22 looking for.
    23 Q What is the other thing you might comment
    24 on?
    182
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A The other thing we may comment on is we
    2 feel that the state would be our partners in air
    3 pollution, so we would be willing to comment on
    4 things that we felt would improve program
    5 operation, okay?
    6 If I didn't think I would hurt Chris
    7 Romaine's feelings, I would suggest, Chris, this
    8 may be another way to look at this.
    9 Q In your testimony I think you referred
    10 to the case where the instance of the 20-mile
    11 separation between facilities as being one where
    12 the USEPA determined that those facilities would
    13 not constitute separate sources. Are you familiar
    14 with that instance?
    15 A You said would not constitute separate --
    16 Q I have that backwards. Let me ask that
    17 again.
    18 You referred to in your testimony the
    19 instance that Mr. Romaine had also referred to a
    20 situation where facilities separated by 20 miles
    21 would constitute separate sources under the USEPA's
    22 interpretation. Do you recall that?
    23 A That's correct. I recall that I referred
    24 to that.
    183
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 Q Now, you also said that there are some
    2 closer distances which we are comfortable with.
    3 Can you tell me what you meant or explain to me
    4 what you meant by that testimony?
    5 A Certainly, I can. For example, the
    6 General Motors' plant that was nearly a mile,
    7 okay?
    8 And so, when somebody would bring up an
    9 occasion that would be less than a mile, we would
    10 say, look, we made a determination for a mile with
    11 General Motors and we feel that you ought to be
    12 doing the same thing.
    13 And we wouldn't feel necessary to go on
    14 in and take a look at a lot of other details in
    15 this particular situation. So some of the other --
    16 okay.
    17 Q Are you familiar with any cases or
    18 instances or decisions that have had to have been
    19 made where the distance between the facility was
    20 between 20 miles on the long end and the mile or
    21 three-quarters of a mile that you were presented
    22 with at General Motors?
    23 A I heard Mr. Romaine offer testimony of two
    24 sources, Acme Steel and -- at two different
    184
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 locations of ten miles, okay? I am aware of that.
    2 Q Are there any other ones that you have
    3 been asked to or the USEPA has been asked to either
    4 advise or rule on that presented that situation
    5 where the facilities were separated by between 20
    6 miles on the high end and three-quarters to one
    7 mile on the low end?
    8 A Let me qualify your question to your
    9 advantage here.
    10 Absent other factors we are now dealing
    11 with a situation on an air force base where the
    12 property is completely owned by EPA or completely
    13 owned by the federal government, one ownership.
    14 And on some of these air force bases
    15 we have activities that are separated by great
    16 distances, and we are wondering whether or not or
    17 how these should be grouped. So I'm aware of the
    18 agency looking at that activity, okay?
    19 Q So those determinations haven't been made
    20 yet, correct?
    21 A They haven't -- there is no public
    22 statement with respect to those determinations.
    23 Q I'd like to ask you a couple questions
    24 about the General Motors' instance that you talked
    185
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 about.
    2 I believe you testified that those
    3 facilities were -- let's see if we can get it
    4 right.
    5 Are they three-quarters of a mile apart
    6 or a mile apart? Do you remember exactly how far
    7 apart they are?
    8 A I believe the letter suggests -- the
    9 policy letter says 4500 feet, okay, recognizing
    10 that 4500 feet is a rounding of something.
    11 Q Now, were you involved in the decision
    12 making back in I believe it was 1981 when this
    13 issue was presented to the USEPA?
    14 A Yes. Excuse me. What date did you say it
    15 was presented?
    16 Q I have 1981.
    17 A Okay, fine.
    18 Q So you were at that time, I suppose,
    19 familiar with the facts of the case as they had
    20 been presented to you by General Motors, correct?
    21 A That's correct.
    22 Q You stated that the reason for considering
    23 these two facilities as a single source is because
    24 of the long-line production in which the production
    186
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 at the facility was continued from one plant to
    2 another. Is that a fair summary of your testimony?
    3 A That's what I said. That's correct.
    4 Q And I believe you also testified that
    5 there was a rail line that existed between the two
    6 facilities; is that correct?
    7 A That's correct.
    8 Q Now, was it your testimony that the
    9 railroad wasn't functioning at the time that this
    10 determination was made?
    11 A No. That was not the intent. The intent
    12 of what I was trying to say is that General Motors
    13 was not using the rail activities to transport
    14 partially complete vehicles from one area -- excuse
    15 me, from one location to another.
    16 Though that may have been a possibility
    17 on General Motors' part, they were not doing that.
    18 They were transporting by road.
    19 Q Were those GM plants both receiving raw
    20 materials via the rail spur that was connecting the
    21 two facilities?
    22 A I'm not aware of that happening.
    23 Q Let me show you what has been marked as
    24 Respondent's Exhibit 1, and we're looking at Volume
    187
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 1 of the record in the case. I will show it to
    2 you. This is Page 4.
    3 Let me ask you first if you are familiar
    4 with this memorandum dated June 8, 1981.
    5 A Well, I'm generally familiar with it. I
    6 might not have every detail down pat.
    7 Q Let me just turn the page for you; and
    8 the last line says, "Please contact Ronald J.
    9 VanMersbergen for further information." That
    10 refers to you, correct?
    11 A That's me.
    12 Q I don't suppose there are too many other
    13 VanMersbergens.
    14 A Not Ronald Js.
    15 Q Okay. Let me direct your attention to the
    16 last full paragraph on Page 4 of the record, and
    17 the last sentence in that last paragraph starting
    18 with "With the distance" and ask you to look at
    19 that.
    20 A Okay.
    21 Q Okay? And you've read that sentence which
    22 reads, "With the distance between the two plants
    23 less than one mile and the plants being connected
    24 by a railroad used only for GM, we believe that the
    188
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 plants meet the requirement of being adjacent and,
    2 therefore, can be considered one source." That's
    3 what you just read, correct?
    4 A That's correct.
    5 Q So is it fair to say that at least in
    6 this memo one of the factors that was considered
    7 in determining that the two GM plants can be
    8 considered one source was the fact that there was
    9 a railroad connection between the two plants that
    10 would be used only for GM?
    11 A You added "used only for GM," and that's
    12 not what I understood this to be.
    13 Q Well, let's take a look again at the
    14 sentence. That's probably unfair of me.
    15 A Okay. All right, fine.
    16 Q So, again, just for the record --
    17 A Okay. It --
    18 Q Yeah. Let me put it again so we get it
    19 right.
    20 Is it fair to say that one of the factors
    21 that went into the agency's determination that the
    22 plants could be considered one source was that the
    23 plants were connected by a railroad to be used only
    24 for GM?
    189
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A That's correct.
    2 Q In the case of the GM plants were both
    3 plants classified under the same SIC code?
    4 A Yes, they were.
    5 Q I'd like to ask you a couple questions
    6 about the concept of support facility, and you
    7 mentioned that one of the places that support
    8 facility is discussed is in the new source review
    9 workshop document which I believe was published
    10 in 1990 by the agency; is that correct?
    11 A Yes. It's referred to in that document,
    12 certainly.
    13 Q And, when you're describing support
    14 facility, you testified that your understanding of
    15 it or the common understanding of it was that if 50
    16 percent or more of a facility's output is sent to
    17 another facility for further processing that those
    18 two facilities -- the first facility would be
    19 considered a support facility to the other. Is
    20 that an accurate statement?
    21 A That's correct.
    22 Q Does that 50 percent cutoff, if you will,
    23 appear anywhere in the USEPA's Part 70 regulations?
    24 A Not in terms of print. Concept is there,
    190
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 of course.
    2 Q And what's the source of the concept in
    3 the regulation?
    4 A The development of the Part 70 regulations
    5 uses the term "source," and that term "source" is
    6 taken from Congress' placing it within the Clean
    7 Air Act which Congress had understood what EPA was
    8 meaning when -- Congress understood what major
    9 source meant when EPA defined or when EPA uses
    10 "source."
    11 And then the Clean Air Act definition of
    12 "source" specifically refers to the source as
    13 defined in 302 of the Clean Air Act, and EPA has
    14 published a policy in its preamble all that
    15 material that helps define a source.
    16 So that definition of "source," then,
    17 the definition along with its meaning and
    18 interpretation is carried on over into Part 70
    19 in that manner.
    20 Q You mentioned the Clean Air Act statute
    21 itself in Part 302. Does the 50 percent cutoff
    22 definition for a support facility appear in Part
    23 302 in the Clean Air Act?
    24 A No, it doesn't. And it wouldn't
    191
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 ordinarily because the 50 percent comes from the
    2 support --
    3 Q Well, but it was a yes or no question.
    4 A Sorry.
    5 MR. O'BRIEN: Bear with me for a minute.
    6 BY MR. O'BRIEN:
    7 Q I believe you also testified that when you
    8 were looking at the question of whether facilities
    9 were adjacent that distance was not the only factor
    10 in making that determination. Is that a fair
    11 summary of your testimony?
    12 A Could you state that again?
    13 MR. O'BRIEN: Why don't you read the question
    14 back, and I may be able to state it better. I
    15 really can't remember at this point.
    16 (Whereupon, the record was read
    17 by the reporter as requested.)
    18 THE WITNESS: I think a more accurate summary
    19 would be that in determining whether we have a
    20 major source -- we can talk about what I said.
    21 HEARING OFFICER EDVENSON: Mr. VanMersbergen,
    22 again, you just answer to the best of your
    23 ability.
    24 THE WITNESS: Yeah. That's close to what I
    192
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 said.
    2 BY MR. O'BRIEN:
    3 Q What other factors does the agency use
    4 in making the determination as to whether two
    5 facilities are adjacent?
    6 A Okay. When we make determinations, we
    7 are trying to determine whether or not pollution
    8 emitting activities are a source.
    9 The regs point us -- the regs use three
    10 criteria that we use, and we do not try to separate
    11 -- we do not like to use the regulations to
    12 separate those three criteria when the intent is
    13 to try to define "common industrial grouping."
    14 So there may be activity, there may be
    15 relationships, that are happening at the source
    16 that in one case you may have two activities
    17 separate exactly by -- you may have two separate
    18 activities that are five miles apart -- excuse me.
    19 You may have two sources with activities
    20 that are five miles apart, one source. One would
    21 say these are to be included together because of
    22 some of the other activities that occur, some of
    23 the interdependent relationships.
    24 The others that are only five miles --
    193
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 that are five miles apart may not have the inter-
    2 dependent activities, okay? So we look at other
    3 activities.
    4 So we use these three guidelines to try
    5 to get at the main idea that the court was telling
    6 us to do, and that is to get a common sense
    7 definition of "source."
    8 Q So, as I understand it, the three criteria
    9 or certainly at least two criteria of same major
    10 industrial grouping and contiguous and adjacent are
    11 interrelated, they are not considered separately in
    12 making what you call a common sense determination;
    13 is that correct?
    14 A Sometimes there can be some overlap in
    15 those considerations.
    16 Q And I think you testified that the
    17 difference in two situations of facilities that
    18 were in both instances separated by five miles
    19 might be the nature of the relationship between
    20 those two facilities --
    21 A That is correct.
    22 Q -- for making the determination as to
    23 whether they are treated as separate sources,
    24 correct?
    194
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 A Whether they are treated as common sense
    2 industrial groupings. Okay, fine.
    3 Q And, therefore, separate sources, correct?
    4 A Or the same source, right.
    5 Q That's right.
    6 MR. O'BRIEN: That's all the questions I have.
    7 Thanks.
    8 HEARING OFFICER EDVENSON: Do you have
    9 redirect?
    10 MR. LAYMAN: Okay. Just a few questions, and
    11 then I would like to confer with my co-counsel.
    12 HEARING OFFICER EDVENSON: And if you will
    13 speak up for the benefit of the persons in the back
    14 of the room.
    15 MR. LAYMAN: Okay.
    16 REDIRECT EXAMINATION
    17 BY MR. LAYMAN:
    18 Q Does the fact that USEPA considered the
    19 proposed rail line in the General Motors' case of
    20 1981 mean that USEPA's determination would have
    21 been something different had the proposed rail line
    22 not been proposed?
    23 A No.
    24 Q Isn't it likely, therefore, that USEPA
    195
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 would have found the facilities at GM to be a
    2 long-line operation even with trucking being the
    3 only mode of transport or conveyance between the
    4 facilities?
    5 MR. O'BRIEN: I have to object to the form of
    6 that question as leading and also asking for
    7 speculation.
    8 MR. LAYMAN: We're on redirect, and it's no
    9 more speculative than half the questions that have
    10 been posed today.
    11 HEARING OFFICER EDVENSON: Could you rephrase
    12 your question so that it's no longer a
    13 hypothetical?
    14 MR. LAYMAN: Yes, I can.
    15 BY MR. LAYMAN:
    16 Q How would you have characterized the
    17 General Motors' case in terms of it fulfilling or
    18 constituting a long-line operation had the facts
    19 been only that trucking was the mode of transport?
    20 MR. O'BRIEN: It's still a hypothetical
    21 question, but --
    22 MR. LAYMAN: Yes. Did you bar me from asking
    23 it in hypothetical terms?
    24 HEARING OFFICER EDVENSON: Yes. I asked you
    196
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 that you not ask it as a hypothetical.
    2 MR. LAYMAN: Okay. Allow me to rephrase one
    3 more time.
    4 HEARING OFFICER EDVENSON: Please.
    5 BY MR. LAYMAN:
    6 Q Is it fair to say that in the General
    7 Motors' case the fact that trucking was a
    8 significant mode of transport at that time made
    9 that a significant factor in the determination
    10 that was made?
    11 A Trucking was -- a significant factor is
    12 that the product was brought from one activity and
    13 completed in another activity.
    14 HEARING OFFICER EDVENSON: Was trucking
    15 involved, Mr. VanMersbergen?
    16 THE WITNESS: Trucking was involved in that
    17 particular activity, okay?
    18 HEARING OFFICER EDVENSON: Thank you.
    19 THE WITNESS: The rail line was an alternate
    20 that could have been used if trucking was not,
    21 but trucking was the activity that brought the
    22 subproduct to the area where it was completed.
    23 BY MR. LAYMAN:
    24 Q So the fact that you made reference --
    197
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 USEPA made reference to the railroad spur was that
    2 an additional factor that was made note of by USEPA
    3 in its determination at that time?
    4 A That's correct. Because there were other
    5 determinations where a property -- a real estate
    6 determination had been made via a rail line or a
    7 pipeline connection, and we felt that if we put in
    8 the rail connections we wouldn't be challenged as
    9 much. So it was a factor related back to some
    10 other earlier determinations.
    11 Q Does the fact that a long-line operation
    12 may not have a railroad, a rail line or some
    13 pipeline facility connecting them does that always,
    14 if ever, rule out the possibility that they will be
    15 considered adjacent or contiguous?
    16 A Could you restate that question to me?
    17 Q Sure. Does the fact that a long-line
    18 operation doesn't have a railroad or a pipeline
    19 connecting the two does that fact alone rule out
    20 the possibility that they won't be deemed adjacent
    21 or contiguous?
    22 A No, it does not. It just does not.
    23 Q Is it possible, then, in your view that
    24 a long-line operation may not be characterized so
    198
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 much as addressing a point of common nexus as much
    2 as it does maybe the nature of the relationship of
    3 the business or the facility?
    4 MR. O'BRIEN: Let me object. Are you asking
    5 for his opinion on what he means to define a
    6 long-line operation?
    7 MR. LAYMAN: Generally.
    8 MR. O'BRIEN: Okay. With that understanding I
    9 will withdraw my objection.
    10 THE WITNESS: A long-line operation where the
    11 product is generated at one area and in some means
    12 transported to another area is the key to our
    13 making a determination. Sometimes it's helpful to
    14 support determinations by putting in other factors.
    15 BY MR. LAYMAN:
    16 Q By "putting in" you mean addressing other
    17 factors?
    18 A Addressing other factors like pieces of
    19 property that are touching.
    20 Q Okay.
    21 MR. LAYMAN: If I may confer just one moment
    22 with counsel.
    23 (Pause.)
    24 MR. LAYMAN: I don't believe we have any
    199
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 further questions.
    2 HEARING OFFICER EDVENSON: Okay.
    3 MR. O'BRIEN: Can I ask one recross question?
    4 I promise that will be it.
    5 HEARING OFFICER EDVENSON: That's fine.
    6 Please.
    7 MR. O'BRIEN: For everyone's benefit.
    8 RECROSS EXAMINATION
    9 BY MR. O'BRIEN:
    10 Q Mr. VanMersbergen, in response to a
    11 question Mr. Layman just asked you in his redirect
    12 with regard to the issue of the rail link at the GM
    13 facility, I think your testimony was that in that
    14 instance a property or real estate determination
    15 had been made. Do I have your testimony clear on
    16 that point?
    17 A I don't know whether you have it clear on
    18 that point. I made a reference to a real estate
    19 connection.
    20 Q Maybe you could explain for me just so I
    21 understand it what the reference was made to the
    22 real estate connection.
    23 Was that referring to the GM case, or
    24 was that referring to determinations that the
    200
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 agency makes generally?
    2 A We referenced the rail connection in
    3 this particular situation to support our
    4 determinations.
    5 There were several other factors that
    6 didn't even go into this letter that were involved
    7 in making this determination; and we put into this
    8 letter the fact that they were connected by a rail
    9 to ward off any other challenges because the
    10 factors that went into this determination dealt
    11 with the administration within General Motors of
    12 how they managed the quality of a subproduct, that
    13 is the paints that go in there, how they managed
    14 the production at both plants to meet a final
    15 outcome. Those were the factors that we
    16 considered; and we says, okay, fine, this acts as
    17 one plant.
    18 Q In that response listen to another
    19 question. Did General Motors request that these
    20 two facilities be treated as one source back in
    21 1981?
    22 A I cannot -- it may have been the state
    23 that made this request. I'm not totally clear on
    24 this. I know the state of Michigan --
    201
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 HEARING OFFICER EDVENSON: Made what request?
    2 THE WITNESS: Made the request for the
    3 determination -- the request for us to make the
    4 determination -- I'm a little hazy on that. I have
    5 to be reminded of the situation.
    6 I know that at that particular -- the
    7 reason I say I think it's the state is because at
    8 that particular time we were trying to get the
    9 states to relate to EPA so I wouldn't have to
    10 relate to every industry on making a
    11 determination. So it may have come from the
    12 state.
    13 BY MR. O'BRIEN:
    14 Q Do you remember or do you have any
    15 knowledge as to whether General Motors objected
    16 to the determination that had been made by the
    17 USEPA?
    18 A No. General Motors lived with that
    19 determination.
    20 MR. O'BRIEN: That's all the questions I have.
    21 EXAMINATION
    22 BY HEARING OFFICER EDVENSON:
    23 Q Sir, I was just wondering if you could
    24 speak to the real estate determination reference
    202
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 that you made.
    2 A Yes.
    3 Q Why did you make that reference?
    4 A We had made a -- okay, real estate.
    5 People will accept without challenge if there are
    6 two pieces of property that are touching each
    7 other, okay? Touching each other, okay?
    8 And in this particular case somebody was
    9 suggesting that -- well, here's a railroad that is
    10 touching both pieces of property; and we said,
    11 well, okay.
    12 But General Motors is the only one using
    13 that railroad, so it's just functioning for General
    14 Motors; and we said, well, okay, that can be --
    15 Q So it was with respect to the rail line
    16 reference?
    17 A With respect to the rail line.
    18 Q Okay.
    19 A The arguments we were trying -- some
    20 arguments were raised to say these are -- there is
    21 no question about the adjacency or contiguousy on
    22 this, okay, because there is a rail line, okay?
    23 Well, okay, that's a rail line; but it's
    24 owned by somebody else, and so it's not much of an
    203
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 argument.
    2 Well, it's only used by General Motors.
    3 Well, okay, then the objection isn't quite
    4 so severe if it's only used by General Motors.
    5 It was an issue at that time, and we
    6 addressed it.
    7 HEARING OFFICER EDVENSON: Okay, thank you.
    8 All right. I believe that that concludes the
    9 respondent's case-in-chief.
    10 MR. LAYMAN: Yes, it does.
    11 HEARING OFFICER EDVENSON: Okay. And we did
    12 discuss on one of our breaks an agreeable briefing
    13 schedule, and I understand that the parties will
    14 forgo closing arguments at hearing and would like
    15 to brief the case.
    16 MR. O'BRIEN: That's correct.
    17 MR. LAYMAN: That's correct.
    18 HEARING OFFICER EDVENSON: All right. The
    19 agreed briefing schedule is as follows.
    20 We will expect to receive the transcript
    21 in the office of the board by April 23rd.
    22 The petitioner's brief will be due on
    23 May 8th.
    24 The respondent's brief will be due on
    204
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 May 15 with a request that a copy be provided to
    2 petitioner on May 15th, and the petitioner's reply
    3 brief will be due on May 20th.
    4 The board's last decision date is June
    5 20th as the deadline for decision is, I believe,
    6 June 27th or 28th.
    7 For the record, I have identified no
    8 issues of witness credibility in this case; and
    9 this concludes our hearing for today in the case
    10 of Color Communications vs. IEPA, Case No. 96-125.
    11 Thank you for your attendance and
    12 cooperation in our process.
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    205
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    1 STATE OF ILLINOIS )
    2 ) SS:
    3 COUNTY OF COOK )
    4
    5 KATHRYN L. PATTON, being first duly sworn,
    6 on oath says that she is a court reporter doing
    7 business in the City of Chicago; and that she
    8 reported in shorthand the proceedings of said
    9 hearing, and that the foregoing is a true and
    10 correct transcript of her shorthand notes so taken
    11 as aforesaid, and contains the proceedings given at
    12 said hearing.
    13
    14 ______________________________
    15 Certified Shorthand Reporter
    16
    17 SUBSCRIBED AND SWORN TO
    18 before me this______day
    19 of________________1996.
    20
    21
    22 _______________________
    23 Notary Public
    24
    206
    McCORKLE COURT REPORTING, INC.
    CHICAGO, ILLINOIS - (312) 263-0052

    Back to top