1
    1 BEFORE THE POLLUTION CONTROL BOARD
    2
    3 IN THE MATTER OF: )
    )
    4 SITE REMEDIATION PROGRAM: ) R01-27
    AMENDMENTS TO 35 ILL. ADM. ) (Rulemaking-Land)
    5 CODE 740 )
    _______________________________)
    6 IN THE MATTER OF: )
    SITE REMEDIATION PROGRAM: ) R01-29
    7 PROPOSED 35 ILL. ADM. CODE ) (Rulemaking-Land)
    740.SUBPART H (SCHOOLS, PUBLIC )
    8 PARKS AND PLAYGROUNDS). )
    9
    10 The following is a transcript taken
    11 stenographically before TERRY A. STRONER, CSR, a
    12 notary public within and for the County of Cook and
    13 State of Illinois before HEARING OFFICER BOBB
    14 BEAUCHAMP, at Suite 2-025, 100 West Randolph Street,
    15 Chicago, Illinois, on the 4th day of April, A.D.,
    16 2001, scheduled to commence at 9:30 o'clock a.m.,
    17 commencing at 9:50 o'clock a.m.
    18
    19
    20
    21
    22
    23
    24

    L.A. REPORTING (312) 419-9292
    2
    1 A P P E A R A N C E S:
    2 ILLINOIS POLLUTION CONTROL BOARD,
    100 West Randolph Street
    3 Suite 11-500
    Chicago, Illinois 60601
    4 (312) 814-8916
    BY: MR. BOBB BEAUCHAMP, HEARING OFFICER
    5
    6
    ILLINOIS POLLUTION CONTROL BOARD MEMBERS:
    7
    Nicholas Melas, Marili McFawn, Elena Kezelis
    8 and Alisa Liu.
    9 OTHER MEMBERS OF THE PUBLIC WERE PRESENT BUT NOT
    LISTED ON THIS APPEARANCE PAGE.
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24

    L.A. REPORTING (312) 419-9292
    3
    1 HEARING OFFICER BEAUCHAMP: Good morning. My
    2 name is Bobb Beauchamp. I am the assigned hearing
    3 officer in this proceeding. Please let me welcome
    4 you to this consolidated hearing being held by the
    5 Illinois Pollution Control Board.
    6 Today's hearing does involve two dockets.
    7 The first is in the matter of site remediation
    8 program, amendments to 35 Illinois Administrative
    9 Code 740 docketed R01-27, and site remediation
    10 program, proposed 35 Illinois Administrative Code
    11 740 Subpart H, docketed R01-29.
    12 Today's hearing is the second of two
    13 hearings schedule in this matter. The first hearing
    14 was held in Springfield on February 28th, 2001.
    15 Present today on behalf of the Illinois
    16 Pollution Control Board and seated two seats to my
    17 right is Board member Marili McFawn.
    18 MS. McFAWN: Good morning.
    19 HEARING OFFICER BEAUCHAMP: She is the Board
    20 member coordinating this rulemaking. Seated to my
    21 left is Board member Elena Kezelis.
    22 MS. KEZELIS: Good morning.
    23 HEARING OFFICER BEAUCHAMP: Seated to my right
    24 is Alisa Liu, a member of the Board's technical

    L.A. REPORTING (312) 419-9292
    4
    1 staff and I see in the audience we have Joel
    2 Sternstein who is Board member Nick Melas'
    3 assistant. Member Melas will be joining us later.
    4 In the corner to my right on the table I
    5 have placed copies of -- several copies -- since we
    6 have two dockets, there are lots of piles to be had.
    7 There are copies of the service and notice list
    8 sign-up sheets for each docket. If your name is on
    9 the notice list, you will only receive copies of the
    10 Board's opinions and orders and all hearing officer
    11 orders. If your name is on the service list, not
    12 only will you receive copies of the Board's opinions
    13 and orders and all hearing officer orders, but you
    14 will also receive copies of all documents filed by
    15 all persons in this proceeding. If your name is on
    16 the service list and you file any document in either
    17 of these dockets, you must also file with or serve
    18 all of the members listed on the service list. We
    19 also have copies of each of the proposals from the
    20 proponents on the table in the corner, February 5th,
    21 2001 hearing officer order, copies of the Board
    22 except for hearing orders in the order consolidating
    23 these two dockets. We have copies of prefiled

    24 testimony both from the first hearing and I also
    L.A. REPORTING (312) 419-9292
    5
    1 believe in this hearing we have the prefiled
    2 testimony of Abigail Jarka, testimony from the
    3 Department of Navy and the General Services
    4 Administration, prefiled testimony of Harry Walton
    5 and a motion presented by Bruce Bonczyk.
    6 I'll move a little bit into how we're
    7 going to proceed today. We do have two proposals
    8 docketed in this rulemaking. The Agency filed its
    9 proposal on January 12th, 2001. Citizens for a
    10 Better Environment filed its proposal on January
    11 26th, 2001. The Agency is docketed R01-27 and
    12 Citizens for a Better Environment, which I will
    13 refer to as CBE, is docket R01-29. Since these
    14 proposals both seek to amend the site remediation
    15 program rules, the Board consolidated these
    16 proposals for purposes of hearing.
    17 Today's hearing will be governed by the
    18 Board's procedural rules for a regulatory
    19 proceeding. All information which is relevant and
    20 not repetitious or privileged will be admitted. All
    21 witnesses will be sworn and subject to cross
    22 questioning.

    23 The purpose of today's hearing is
    24 two-fold; first, to satisfy the statutory
    L.A. REPORTING (312) 419-9292
    6
    1 requirement that the Board accept evidence and
    2 comments on economic impact of any provision of the
    3 rule and shall consider -- the rules -- and shall
    4 consider the economic impact of these rules based on
    5 the record. The second purpose is to allow parties
    6 other than the proponents to present testimony on
    7 this proposal and ask additional questions of the
    8 proponent. Both the Agency and CBE will also have
    9 an opportunity to address issues held over from the
    10 first hearing and to make an additional
    11 presentation.
    12 Pursuant to Section 28.5(h) of the
    13 Environmental Protection Act, the Board shall accept
    14 evidence and comments on the economic impact of any
    15 provision of any rules proposed and shall consider
    16 the economic impact of the rules based on the
    17 record.
    18 Under Section 27(b) of the Act, the Board
    19 shall request that the Department of Commerce and
    20 Community Affairs, otherwise known as DECA, conduct
    21 an economic impact study on certain proposed rules

    22 prior to adoption of those rules. DECA may produce
    23 a study of an economic impact of the proposed rules
    24 within 34 to 45 days of the Board's request. The
    L.A. REPORTING (312) 419-9292
    7
    1 Board must make the economic impact study or DECA's
    2 explanation for not conducting the study available
    3 to the public at least 20 days before public hearing
    4 on the economic impact of the proposed rule.
    5 In keeping with Section 27(b), the Board
    6 has requested by letters dated January 30th, 2001,
    7 for R01-27 and February 2nd 2001, for R01-29 that
    8 DECA conduct an economic impact study of these
    9 rulemakings. In addition to requesting an economic
    10 impact study, the letter requested that DECA notify
    11 the Board within ten days after receipt of each
    12 request whether DECA intended to conduct the
    13 economic impact studies. The Board further noted
    14 that if it did no receive such notification, the
    15 Board would rely on a March 10th, 2000, letter from
    16 DECA as the required explanation for not conducting
    17 the economic impact study. The March 10th, 2000,
    18 DECA letter notified the Board that DECA would not
    19 be conducting economic impact studies on rules
    20 pending before the Board because DECA lacks staff

    21 and the financial resources to conduct such study.
    22 The ten days for DECA to notify the Board have
    23 expired in each docket and the Board has not
    24 received any notification from DECA that it will
    L.A. REPORTING (312) 419-9292
    8
    1 conduct an economic impact study for either of these
    2 rulemakings. Accordingly, the Board has relied on a
    3 March 10th, 2000, letter as DECA's explanation for
    4 not producing an economic impact study.
    5 Today's presentation will follow a little
    6 different schedule from the first hearing. The
    7 prefiled testimony the Board received has been
    8 focused more on the Agency's proposal and in order
    9 to accommodate everybody and be more efficient,
    10 we're going to allow Citizens for a Better
    11 Environment to make their presentation first. We
    12 have several prefiled testimonies that we'll be
    13 getting to after CBE makes their presentation.
    14 We've also had one party who did not prefile
    15 testimony and made a request to make a presentation
    16 regarding CBE's proposal after CBE makes their
    17 presentation.
    18 At the conclusion of the prefiled
    19 testimony we will allow the Agency to take the table

    20 and make any presentation that they have to present
    21 today and also answer questions and address issues
    22 that were held over from the first hearing.
    23 Does anyone have any questions about the
    24 procedure we will follow today? At this time let me
    L.A. REPORTING (312) 419-9292
    9
    1 ask Board member McFawn then if she has anything
    2 else she would like to add to my comments?
    3 MS. McFAWN: No, thank you, Bob.
    4 HEARING OFFICER BEAUCHAMP: Then before we get
    5 into CBE's proposal, let me ask if there's anyone
    6 here today who would like to present testimony,
    7 questions or comments on DECA's decision not to
    8 conduct an economic impact study for either of these
    9 rulemakings? Sir, could you please stand and
    10 identify yourself.
    11 MR. SASSILA: My name is Ala Sassila, A-l-a,
    12 S-i-s-s-i-l-a.
    13 HEARING OFFICER BEAUCHAMP: Would you please
    14 swear Mr. Sassila in? Would you please stand
    15 forward and summarize what you would like to
    16 present?
    17 MR. SASSILA: Well, I have some questions to
    18 CBE regarding their proposed amendments.

    19 HEARING OFFICER BEAUCHAMP: We're not taking
    20 questions from CBE yet. I'm sorry. We're just
    21 taking questions -- just to clarify, again, we're
    22 taking questions or comments on DECA's lack of an
    23 economic impact study not regarding CBE's proposal
    24 yet. Okay. Seeing none, then let's move on to
    L.A. REPORTING (312) 419-9292
    10
    1 CBE's proposal. Ms. Gordon, do you have an opening
    2 statement you would like to make today?
    3 MS. GORDON: Yes, I do. Good morning. My name
    4 is Holly Gordon. I am an attorney with the Chicago
    5 Legal Clinic. I am here today on behalf of Citizens
    6 for a Better Environment. With me today is -- first
    7 to my right is our expert witness, Abigail Jarka,
    8 she will testifying shortly, to her right is Keith
    9 Harley, who is also an attorney with the Chicago
    10 Legal Clinic and to his right is Stefan Noe, who is
    11 of counsel for Citizens for a Better Environment.
    12 Many of you may have been with us for the
    13 hearing in Springfield so I will just give a very
    14 brief synopsis of our petition and then I will go
    15 into answering questions that were deferred at the
    16 Springfield hearing.
    17 Our proposed rulemaking is an addition to

    18 the site remediation program proposed of much needed
    19 procedural requirements related to the cleanup of
    20 brownfield sites that will eventually be used for
    21 schools. I will now provide answers for many of the
    22 questions that we chose to defer at the Springfield
    23 hearing. I would also like to point out that many
    24 of those deferred questions are not relevant at this
    L.A. REPORTING (312) 419-9292
    11
    1 time as we have decided to amend the proposal to
    2 address just schools.
    3 We've decided to defer our proposal
    4 regarding parks and playgrounds to a later date.
    5 Although we feel that new requirements for parks
    6 and playgrounds are important, we feel that based
    7 on many of the comments at the last hearing as well
    8 the differences between schools versus parks and
    9 playgrounds that it is more appropriate to focus on
    10 schools in the current proposal. The format for
    11 the deferred question is, I will give a shortened
    12 version of the questions as well as identify who
    13 asked the question and what page it appears on in
    14 the transcript before offering a response and as
    15 well, I will turn it over to Abby Jarka to testify
    16 after these deferred questions and we'll open it up

    17 to questions to the general public at that time so
    18 if possible, if you could defer most of your
    19 questions to then even in regard to these questions
    20 that will be very helpful.
    21 The first question was asked by Mr.
    22 Rieser, it's on page 67 of the Springfield
    23 transcript: Would the public process -- the public
    24 notice be affected for a school site that had
    L.A. REPORTING (312) 419-9292
    12
    1 already been subject to a municipality's public
    2 process? And in response, without specific
    3 examples, the RAs at those sites would still have to
    4 fulfill the requirement of this proposal since the
    5 issues related to site remediation and therefore the
    6 public notice process would likely be different from
    7 those required by a municipality.
    8 Question 2 was asked by Mr. Wight and it's
    9 on page 68 of the transcript: In regard to the
    10 five-year certification for engineered barriers and
    11 institutional controls, who would be the appropriate
    12 person to perform and sign off on the certification?
    13 The requirements of the certification
    14 letter will be fairly site specific. Therefore, we
    15 feel that it would be appropriate for IEPA to

    16 indicate in the NFR letter who the appropriate
    17 person would be to sign the certification and what
    18 would be required in the certification itself. In
    19 addition, based on my conversations with Mr. Wight,
    20 we will be working with IEPA to generate more
    21 specific language in regard to the Agency's
    22 discretion in this aspect of the requirements.
    23 Question 3 was also asked by Wight and
    24 it's on page 69 of the Springfield transcript: Also
    L.A. REPORTING (312) 419-9292
    13
    1 in regard to the five-year certification
    2 requirement, should there also be a requirement that
    3 the Agency be notified of any transfers in the
    4 property so that the Agency would know where to send
    5 that notice if the certification were not received
    6 at the end of the five-year period?
    7 In response, we have added additional
    8 language under Section 740.810 requiring notice to
    9 the Agency of subsequent changes in title or use of
    10 the property.
    11 Question 4 was also asked by Mr. Wight and
    12 it is page 70 of the Springfield transcript: In the
    13 situation where a five-year certification is not
    14 received, what results from the voidance of an NFR

    15 letter?
    16 Voiding an NFR letter is currently subject
    17 to Section 740.625 of the SRP and is globally
    18 applied to the SRP, not just specific to this
    19 proposal. Therefore, we feel that this is not the
    20 proper forum to address this concern.
    21 Question 5, some of the Board members
    22 asked about the status of our communications with
    23 interested agencies, the Chicago Board of Education,
    24 the Public Building Commission and the Department of
    L.A. REPORTING (312) 419-9292
    14
    1 Environment have been added to the service list and
    2 they have received copies of the amended petition
    3 prior to today's hearing. We have been in contact
    4 with the Department of Environment and we have met
    5 with a representative of the Chicago Public Schools
    6 and I would expect that if any of these agencies
    7 have additional comments or questions, that they
    8 will be addressed today or in future comments.
    9 Question 6 was asked by Mr. Walton and it
    10 is on page 73 of the Springfield transcript.
    11 Since there appear to be requirements for
    12 school sites upon entering the SRP, what happens if
    13 a remedial applicant doesn't know what the future

    14 use of a site will be?
    15 And in response, upon enrollment into the
    16 SRP, if the RA does not know what the future use of
    17 the site will be, these requirements would not
    18 apply.
    19 And the last question was asked by Board
    20 member McFawn on pages 87 and 88 of the Springfield
    21 transcript: What is the legal authority that the
    22 Board could look to to adopt a rule that would
    23 restrict the use of land while an SRP process is
    24 ongoing?
    L.A. REPORTING (312) 419-9292
    15
    1 The Board has authority to restrict the
    2 use of a remediation site prior to the issuance of
    3 an NFR letter in several sections of the SRP.
    4 First, the general intent of the SRP is to establish
    5 a risk-based system of remediation based on
    6 protection of human health and the environment
    7 relative to present and future uses of the site. In
    8 addition, Section 58.5(b)(2) states that in the
    9 event that the concentration of a regulated
    10 substance of concern on the site exceeds a
    11 remediation objective for residential land use, the
    12 property may not be converted to residential use

    13 unless such remediation objective or an alternative
    14 risk-based remediation objective for that regulated
    15 substance of concern is first achieved. Since,
    16 residential, as defined by the SRP includes property
    17 used for education, use of the land at that site
    18 would already be prohibited under the current SRP.
    19 Finally, for school sites in the Chicago
    20 area Section 58.15(3) already prohibits such use by
    21 stating that no person shall commence construction
    22 on real property of a building intended for use as a
    23 school unless the real property is enrolled in the
    24 site remediation program and remedial action that
    L.A. REPORTING (312) 419-9292
    16
    1 the Agency approves for the intended use of the
    2 property is completed.
    3 I will now turn things over to Ms. Jarka.
    4 Ms. Jarka is a registered professional engineer with
    5 ten years of environmental engineering experience.
    6 She has a BS in civil engineering and an MBA.
    7 HEARING OFFICER BEAUCHAMP: Okay. If we could
    8 have the court reporter swear Ms. Jarka in before
    9 her testimony.
    10 (Ms. Jarka was sworn.)
    11 MS. JARKA: Good morning. My name is Abigail

    12 Jarka and I'm representing CBE to provide testimony
    13 regarding proposed requirements related to schools.
    14 The proposed rules before you today would
    15 ensure the maintenance of institutional controls and
    16 enhanced public participation at remediation sites
    17 intended for use as public schools. This proposal
    18 is intended to promote a proactive approach to
    19 remediation at school sites.
    20 The inception of this proposal is based on
    21 the site remediation that took place at two school
    22 sites, Finkl Academy and Zapata Academy located in
    23 the Little Village area of Chicago. These schools
    24 were built on property contaminated with polynuclear
    L.A. REPORTING (312) 419-9292
    17
    1 aromatic compounds and inorganics. The Finkl and
    2 Zapata sites were entered into the SRP. The
    3 schools, however, were built and opened without
    4 Agency notification and without an NFR letter.
    5 When this fact came to light in 1999,
    6 additional site investigation work was conducted.
    7 Levels of polynuclear aromatic compounds and
    8 inorganics were identified in site soils above the
    9 Tier I ingestion levels. This included soils that
    10 comprised an engineering cap put in place when the

    11 schools were originally constructed. Addition
    12 remediation was deemed necessary and an NFR letter
    13 was issued to each of these sites in 1999. Since
    14 that time, the manner in which school sites are
    15 remediated has improved thanks in part to the effort
    16 of the Chicago Public Schools and the Agency. The
    17 proposed rules, however, will provide a standard of
    18 performance for school sites in the SRP program that
    19 can be relied upon by all interested and affected
    20 persons.
    21 Public school sites should be handled
    22 differently from other sites entered into the SRP.
    23 School are typically publically funded, which in
    24 many cases eliminates the participation of
    L.A. REPORTING (312) 419-9292
    18
    1 third-party lending institutions that would
    2 typically conduct due diligence with respect to
    3 environmental issues. Similarly, there are few
    4 triggering events to highlight the importance of
    5 maintaining institutional controls. The proposal
    6 addresses this difference by requiring receipt of an
    7 NFR letter before the site could be available to
    8 general public use. The rules would require that
    9 institutional controls and engineered barriers were

    10 put in place as part of the remediation be reviewed
    11 every five years and documentation of such review be
    12 sent to the Agency. The requirement would serve to
    13 institutionalize knowledge about the requirements of
    14 the NFR letter. Additionally, because of the
    15 intense public use of school sites, enhanced public
    16 participation in the SRP process is warranted. The
    17 proposal would not add any more stringent
    18 requirements to remediating a school site, but would
    19 put in place simple cost-effective measures to
    20 provide a level of certainty to communities faced
    21 with SRP issues at school sites.
    22 CBE welcomes any questions and comments
    23 concerning our proposal. We realize that we may not
    24 be able to address all of your concerns today, but
    L.A. REPORTING (312) 419-9292
    19
    1 will endeavor to do so in our final proposal.
    2 I'd like to thank the Agency and the
    3 Chicago Public Schools for their input during
    4 development and the Board for the opportunity to
    5 present our proposal and testify at this hearing .
    6 Thank you.
    7 HEARING OFFICER BEAUCHAMP: Thank you.
    8 Ms. Gordon, at this time would you like to admit

    9 Ms. Jarka's prefiled testimony as an exhibit?
    10 MS. GORDON: Yes. Ms. Jarka, do you recognize
    11 this document?
    12 MS. JARKA: Yes, I do.
    13 MS. GORDON: Can you please tell us what it is?
    14 MS. JARKA: It is my prefiled testimony.
    15 MS. GORDON: And is it a true and accurate copy
    16 of your prefiled testimony?
    17 MS. JARKA: Yes, it is.
    18 MS. GORDON: I move that Ms. Jarka's testimony
    19 be admitted into the record as Exhibit 1.
    20 HEARING OFFICER BEAUCHAMP: Thank you. Are
    21 there any objections to admitting this testimony of
    22 Abigail Jarka? This will be Exhibit 2 in this
    23 docket number. Do you have an additional copy for
    24 the court reporter? Seeing no objections, then we
    L.A. REPORTING (312) 419-9292
    20
    1 will admit the testimony of Abigail C. Jarka as
    2 Exhibit 2 in Docket R01-29.
    3 If we could just have the record reflect
    4 that Board member Melas has joined us now.
    5 Ms. Gordon, does CBE have any other
    6 matters they wish to address today?
    7 MS. GORDON: No.

    8 HEARING OFFICER BEAUCHAMP: Okay. Then we will
    9 move into taking questions for CBE. Sir, if we
    10 could have you identify yourself again.
    11 MR. SASSILA: My name is Ala, A-l-a, Sassila,
    12 S-a-s-s-i-l-a and I have several questions regarding
    13 the proposed amendment.
    14 My first question is it appears to me that
    15 proposed amendment include additional administrative
    16 work and addition paperwork for public schools and
    17 it's not very clear to me why it would be more
    18 protected to human health and the environment.
    19 MS. JARKA: Well, I think the additional -- the
    20 proposal provides a ways for the public to
    21 participate in a meaningful way in schools that are
    22 built in their communities. I don't believe that
    23 the additional paperwork, as you call it, is a
    24 deterrent to sites entering the SRP.
    L.A. REPORTING (312) 419-9292
    21
    1 MR. SASSILA: This additional work would not
    2 really provide any additional protection to the
    3 public or the environment, is that correct?
    4 MS. JARKA: The requirements of the SRP are the
    5 same, but I believe the public participation would
    6 enhance the remediation of the site. The guidance

    7 that the Agency puts out on community relations
    8 plans acknowledges this, that participation from the
    9 public would only enhance remediation and provide
    10 additional insights into the remediation that's
    11 going to take place.
    12 MR. SASSILA: The community relations plan is
    13 normally -- is optional or voluntarily planned while
    14 under this requirement. Do you have to go through
    15 that community relation plan, is that correct?
    16 MS. JARKA: Well, it would be our hope that RA
    17 would want to do a community relations plan in this
    18 instance, but if not, the Agency would do a
    19 community relations plan with the input of the RA.
    20 MR. SASSILA: And who would be responsible for
    21 payment for the plans since it's normally -- the RA
    22 is supposed to have a contract with the Agency and
    23 pay for the expense related to the community
    24 relations, who would be responsible for it?
    L.A. REPORTING (312) 419-9292
    22
    1 MS. JARKA: Well, if the RA is going to
    2 undertake the plan, I believe they would be
    3 responsible for it.
    4 MR. SASSILA: How about if they're not?
    5 MS. JARKA: Then the Agency would undertake

    6 that responsibility, I would hope.
    7 MR. SASSILA: So the Agency would be
    8 responsible for which is -- normally the Agency --
    9 the SRP is funded by volunteer cleanup programs,
    10 which has to be reimbursed from the RA and if the RA
    11 is not accepting that then the Agency is supposed to
    12 establish funds for community relations --
    13 additional funds or new funds, is that correct?
    14 MS. JARKA: Payable -- I'm sorry.
    15 MR. SASSILA: Well, let me say it this way.
    16 If the RA is not willing to go through
    17 the community relations, I'm assuming you're
    18 expecting the Agency to establish a new fund, a new
    19 budget, for purpose of community relations?
    20 MS. JARKA: I think that will be up to Agency
    21 on how they would want to fund this.
    22 MR. SASSILA: My second question is Section
    23 740.805, which is stating that sites should not be
    24 available to the general public without first
    L.A. REPORTING (312) 419-9292
    23
    1 completing its remedial action plan and receiving
    2 NFR. That a little bit contradicts 58.15 of the
    3 Environmental Protection Act, which states upon
    4 completion of the site remediation, you can proceed

    5 with your school construction. There's
    6 contradiction -- you are overwriting or
    7 overexceeding the requirement of the Environmental
    8 Protection Act, is that correct?
    9 MS. JARKA: Well, I believe 58.15 requires also
    10 Agency approval before --
    11 MR. SASSILA: Approval and completion but does
    12 not require NFR. Here you are asking for the NFR.
    13 MS. JARKA: That's correct.
    14 MR. SASSILA: So you are overexceeding what's
    15 being written in the Illinois Environmental
    16 Protection Act.
    17 MS. JARKA: Correct.
    18 MR. SASSILA: My next question is regarding
    19 engineered barriers. You stated that the Agency
    20 should establish the qualification of the individual
    21 who had a five-year recertification based on the
    22 site condition of site specific, and my question
    23 here is does that mean we're not going to have
    24 uniform rules for all sites, we might have different
    L.A. REPORTING (312) 419-9292
    24
    1 rules for each site?
    2 MS. JARKA: No. It would be consistent for
    3 each site, but I mean the complexities of each site

    4 are different so there may be -- so then the
    5 requirement to do the five-year certification may be
    6 slightly different for sites. It just depends --
    7 based on the complexity of the site. The Agency has
    8 indicated that they're working on some language
    9 regarding that.
    10 MR. SASSILA: But there are clearly no rules
    11 under the existing SRP defining complex or simple or
    12 semi-complex? I mean, there's no such thing that
    13 exists to say we can look at this project as a
    14 complex, now this is simple, this is easier or hard,
    15 there's no such definition that exists in that
    16 regulation.
    17 MS. JARKA: No, there is not.
    18 MR. SASSILA: So how are we going to decide
    19 which site would require a PE, which site would
    20 require principal, which site would require annual?
    21 MS. JARKA: Well, again the Agency has
    22 indicated that they're working on some language
    23 regarding this, but I wouldn't foresee that you
    24 would require a PE for one site and not a PE for
    L.A. REPORTING (312) 419-9292
    25
    1 another site. I mean, something like that would
    2 be generally consistent, but maybe the level of

    3 inspection of what needs to be inspected will be
    4 different for each site because some sites are
    5 definitely more complex than other sites.
    6 MR. SASSILA: Yeah, but that for remediation
    7 might require more complex. Once the remediation is
    8 completed, all are at the same level really, there's
    9 no complex site or complex site. The issue of
    10 complex is rarely applied to remediation work not to
    11 existing site after remediation being completed.
    12 MS. JARKA: Yes. But there are different types
    13 of institutional controls and engineered barriers.
    14 Some sites may just have a fence, other sites may
    15 have a concrete cap, other sites may have three-feet
    16 of soil, they are all different so they may -- they
    17 could conceivably require maybe a different way of
    18 looking at them, a different way of inspecting them.
    19 MR. SASSILA: My question next then in your
    20 previous testimony or in the Springfield a statement
    21 was made that any person can perform that inspection
    22 or the five-year certification so for now it's not
    23 really any person other than the Agency supposed to
    24 come up with a new plan and that plan would be
    L.A. REPORTING (312) 419-9292
    26
    1 allowed for general public comments or is that

    2 something that's going to be decided by the Agency?
    3 MS. JARKA: I believe it will be decided by the
    4 Agency. I don't know of any plan that they're
    5 putting together, but in Springfield we had
    6 recommended that this could be something that could
    7 be written into an NFR letter at the time that it's
    8 issued.
    9 MR. SASSILA: Okay. My next question is
    10 Section 740.810 and part of this recertification
    11 there's a statement there which is stating that part
    12 of the recertification that damage to soil has not
    13 been disturbed and I'm wondering what that means.
    14 MS. JARKA: Our intent was that the integrity
    15 of the control or the engineered barrier is
    16 maintained. That's currently a requirement of the
    17 SRP regulation.
    18 MR. SASSILA: That's not true since you -- if
    19 you have a construction project to maintain your
    20 engineering barrier but you can contaminate soil you
    21 can remove it and dispose it at the landfill and
    22 that's acceptable, but this does not read this way.
    23 It says you cannot disturb it which means you cannot
    24 have any future construction any site once you
    L.A. REPORTING (312) 419-9292
    27

    1 completed a new construction.
    2 MS. JARKA: I understand that. I understand
    3 your point and we'll note it and consider it.
    4 MR. SASSILA: Section 740.815, the RA shall
    5 provide notice to interested persons. What is the
    6 definition of interested persons?
    7 MS. JARKA: We've -- I believe we're revising
    8 this language to -- it's called interested and
    9 affected persons to be consistent with the community
    10 relations plan. There is no list of interested
    11 persons. The community relation plan guidance
    12 starts out and gives a list of possible contacts you
    13 may want to start there, but we would think
    14 interested persons would be potential parents of
    15 school children, church groups, people located
    16 nearby.
    17 MR. SASSILA: So interested persons within the
    18 school district or in the county, in the village?
    19 MS. JARKA: It would be primarily within the
    20 community where the school is going to be built.
    21 MR. SASSILA: Would it be a one-mile radius,
    22 two miles or anymore criteria because -- Cook County
    23 is a very large county and you say interested
    24 persons so it could be three million people
    L.A. REPORTING (312) 419-9292

    28
    1 interested.
    2 MS. JARKA: Well, I think it would -- I mean,
    3 you'd have to look at each site and decide who is
    4 affected by this school being built and that would
    5 start your list of interested persons and I'm sure
    6 the Agency community relations group will also --
    7 could also have some input and give some
    8 suggestions.
    9 MR. SASSILA: I don't believe the Agency have a
    10 list of interested persons in each community, each
    11 school they can provide --
    12 MS. JARKA: No, no, I'm not saying they have a
    13 list of specific people, but they do have general
    14 guidelines and general ways to go about deciding who
    15 might be affected by this and then you can use those
    16 guidelines to expand your own list.
    17 MR. SASSILA: The same section, 740.815,
    18 regarding that public notice. There is a statement
    19 about providing the following information, one
    20 through six, which is information public records
    21 since this is what the SRP once enroll your site
    22 it's public record and anyone can obtain this
    23 information from the SRP program and freedom of
    24 information request. So what's the purpose of
    L.A. REPORTING (312) 419-9292

    29
    1 having all this mass mailing for public notice if
    2 this information is already public records and
    3 available to everyone?
    4 MS. JARKA: Well, I think it enhances public
    5 participation specifically with interested and
    6 affected people in the community. The fact that
    7 it's -- we're asking it be put into a publication of
    8 general circulation, we'll put it in front of people
    9 so that people can participate in a meaningful way
    10 in this process.
    11 MR. SASSILA: And what kind participation do
    12 you expect from general public since the Agency have
    13 the ultimate decision-making and they review all the
    14 documents and they rely on scientific fact and
    15 engineering practice to decide about NFR or closing
    16 the project, what general public involvement would
    17 decide about the remedial work?
    18 MS. JARKA: Well, the Agency's community
    19 relations plan guidance acknowledges that contacting
    20 the public is beneficial because there are
    21 additional insights that people who would live in
    22 the community may have regarding a site that the RA
    23 may not have or the Agency may not be aware of. So
    24 if they can provide additional information of that
    L.A. REPORTING (312) 419-9292

    30
    1 sort, then I think that is a benefit.
    2 MR. SASSILA: But that is optional? 58.7 of
    3 the Illinois Environmental Act, that is optional
    4 already, it's not something you have to do.
    5 MS. JARKA: I understand that.
    6 MR. SASSILA: That's all my questions.
    7 HEARING OFFICER BEAUCHAMP: Thank you,
    8 Mr. Sassila. Any other questions for CBE?
    9 MR. HARLEY: Will we be given an opportunity to
    10 ask Mr. Sassila questions?
    11 MS. McFAWN: Mr. Sassila did not testify so
    12 he's not subject to cross-examination.
    13 MR. HARLEY: I see.
    14 MS. McFAWN: Mr. Sassila, would you be open to
    15 entertaining questions from CBE? You are not
    16 required to, but --
    17 MR. SASSILA: Fine.
    18 MR. HARLEY: Simply one question, are you here
    19 on your own behalf or are you here on behalf of a
    20 firm?
    21 MR. SASSILA: No. I'm a consultant engineer on
    22 my own behalf.
    23 MR. HARLEY: And with whom do you consult
    24 regularly on issues --

    L.A. REPORTING (312) 419-9292
    31
    1 MR. SASSILA: I work with Carnow, Conibear and
    2 Associates.
    3 MR. HARLEY: I'm sorry.
    4 MR. SASSILA: I work for CCA, Carnow, Conibear
    5 and Associates, C-a-r-n-o-w, Conibear,
    6 C-o-n-i-b-e-a-r and Associates. We are consultant
    7 engineers in Chicago.
    8 MR. HARLEY: With what school districts do you
    9 regularly consult?
    10 MR. SASSILA: Well, there's -- we have
    11 different type of clients, with no school districts.
    12 We work on -- we have a wide variety of work with
    13 the city of Chicago, we work with the state, we work
    14 with the city, Agency, CPS, PBC, Department of
    15 Environment and different agencies.
    16 HEARING OFFICER BEAUCHAMP: Thank you.
    17 MR. HARLEY: Thank you.
    18 MR. NOE: Is there an opportunity for me to
    19 make some comments in addition to those made by
    20 Ms. Jarka? Would I need to be sworn in?
    21 HEARING OFFICER BEAUCHAMP: Are they formed in
    22 the form of testimony or --
    23 MR. NOE: They would be in response to some of
    24 the comments that were made.

    L.A. REPORTING (312) 419-9292
    32
    1 HEARING OFFICER BEAUCHAMP: Could you identify
    2 yourself first?
    3 MR. NOE: My name is Stefan Noe, that's
    4 S-t-e-f-a-n, the last name is Noe, N-o-e. I was
    5 sort of the original drafter of these regulations
    6 so there's some things that he brought up that I
    7 thought I might be able to shed a little bit of
    8 light on.
    9 HEARING OFFICER BEAUCHAMP: Why don't we have
    10 you sworn in and also move closer to the court
    11 reporter.
    12 (Mr. Noe was sworn in.)
    13 MR. NOE: One of the comments I had was he
    14 mentioned the language of interested persons and I
    15 just wanted to note that in most all of the Agency's
    16 notification requirements under other environmental
    17 statutes and so forth that interested persons
    18 language is used and the notification provision that
    19 was drafted was really modeled after other
    20 provisions within the Illinois Environmental
    21 Protection Act. So whatever ambiguity there is in
    22 using the term interested persons that already
    23 exists in other statutes and somehow it's been able
    24 -- the Agency has been able to work around it.

    L.A. REPORTING (312) 419-9292
    33
    1 The other thing I wanted to comment on
    2 is the fact that I'm also very familiar with the
    3 Little Village situation and there was a comment
    4 about the fact that the Freedom of Information Act
    5 is available to the community if they want to find
    6 out about what's going on with a particular site
    7 and I just wanted to -- you know, I think the Little
    8 Village situation is a good example of why that
    9 doesn't work. You know, it requires first, that a
    10 span of community be familiar with the Freedom of
    11 Information Act process, that they make a request
    12 and that then they decipher what are, you know,
    13 fairly technical documents that would, you know,
    14 indicate that there is contamination and then they'd
    15 ask also -- have to know that the contaminates that
    16 were there were potentially harmful to their health
    17 and I think what we're suggesting in a situation
    18 with respect to schools where there are going to be
    19 children exposed that a much more open process is
    20 warranted. That was really all I had to say.
    21 HEARING OFFICER BEAUCHAMP: Thank you,
    22 Mr. Noe. Do we have any other questions for CBE
    23 from the members of the audience? Mr Rieser, if you

    24 could just identify yourself for the record.
    L.A. REPORTING (312) 419-9292
    34
    1 MR. RIESER: David Rieser with the law firm of
    2 Ross & Hardies. With respect to 740.820 what's the
    3 timing of the community relations plan? What point
    4 in the process does it have to be prepared and
    5 available and things of that nature?
    6 MS. JARKA: Well, I think the community
    7 relations plan, the earlier you start in the process
    8 the better. I don't think there's any specific time
    9 frame requirement, but certainly if you get the
    10 community engaged early on, I think your remediation
    11 will be more successful.
    12 MR. RIESER: Thank you.
    13 MR. WALTON: My name is Harry Walton. I'll be
    14 offering testimony and I would like to speak to --
    15 in our testimony we filed some comments in support
    16 of the proposal, but we'd like to provide some
    17 clarification on implementation and --
    18 THE REPORTER: I'm sorry. Could you speak up?
    19 There's an echo in here.
    20 HEARING OFFICER BEAUCHAMP: We need you to step
    21 up.
    22 MR. WALTON: I'll be testifying on this fact

    23 later on?
    24 HEARING OFFICER BEAUCHAMP: Would you like to
    L.A. REPORTING (312) 419-9292
    35
    1 wait until later.
    2 MR. WALTON: Yes.
    3 HEARING OFFICER BEAUCHAMP: Just to clarify
    4 that, Mr. Walton will be presenting additional
    5 testimony in support of CBEs proposal later in case
    6 we missed that.
    7 Other questions for CBE? Sir, could you
    8 identify yourself and who you represent?
    9 MR. EASTEP: I'm Larry Eastep with the
    10 Illinois EPA.
    11 In your responses to the other gentleman's
    12 questions regarding this certification I thought at
    13 one point you indicated you thought the Agency was
    14 working on some language for the certification.
    15 MS. JARKA: I believe the Agency was in contact
    16 with the Chicago Legal Clinic and they were
    17 interested in putting in some language for the
    18 quality of the certification and the Agency
    19 indicated that they would be willing to put some
    20 of that language together for that and then send it
    21 out kind of as a straw proposal for comments.

    22 MR. EASTEP: Did you intend that that would be
    23 part of the rulemaking?
    24 MS. JARKA: I don't believe we intended to
    L.A. REPORTING (312) 419-9292
    36
    1 rewrite any rules based on that, but I believe that
    2 that type of language could be made included as an
    3 appendix and certainly be included in the other
    4 letters.
    5 MR. EASTEP: Okay. But you didn't intend it to
    6 be we were proposing something --
    7 MS. GORDON: I'm sorry. She's actually
    8 speaking on a conversation that I had with Mr. Wight
    9 and my understanding was that at some point the
    10 Agency would be willing to put forth some language
    11 that the Legal Clinic and Citizens for a Better
    12 Environment could consider and would be willing to
    13 negotiate putting some language into an amended
    14 petition. I don't think it was the Agency's
    15 understanding or our understanding that it would be
    16 put forward for public comment. I think it was
    17 something they'd be willing to negotiate with the
    18 clinic.
    19 MR. EASTEP: And I guess my confusion was
    20 whether it was part of the rule and I think your

    21 saying that it is not going to be part of the rule.
    22 MS. GORDON: Right.
    23 MR. EASTEP: Under your public notice
    24 provisions 815(a), one through six, you had two
    L.A. REPORTING (312) 419-9292
    37
    1 public notice methods, one of them being in a
    2 newspaper and under item three you had indicated
    3 that the notice should include the location and site
    4 boundaries of the remediation site. What where you
    5 thinking about? What would that entail?
    6 MS. JARKA: With our conversations with the
    7 Chicago Public Schools actually a very good point
    8 was brought up concerning this list and we're
    9 considering maybe putting some minimum requirements
    10 for public notification in as -- what I mean is
    11 minimum requirements for publication in a newspaper
    12 and then having the larger amount of information put
    13 into a central depository such as a library or some
    14 business located in the community that people can
    15 easily access.
    16 MR. EASTEP: Okay. Number three, though, did
    17 you envision a map, a site drawing or a map here and
    18 would then be included in the newspapers notice?
    19 MS. JARKA: Well, like I said, we're going to

    20 work on the language from minimum requirements for a
    21 newspaper notice understanding that would be
    22 difficult to maybe publish a map in a newspaper, but
    23 if that type of information goes into a central
    24 depository, yes, a map would be more than
    L.A. REPORTING (312) 419-9292
    38
    1 appropriate.
    2 MR. EASTEP: Certainly.
    3 On -- actually, you've got three item
    4 threes here, but you said a description of the
    5 intended use, did you envision something other than
    6 a school?
    7 MS. JARKA: Well, no since these rules
    8 primarily apply to school sites, but I mean at a
    9 school site there are ballfields, playgrounds so...
    10 MR. EASTEP: So you would --
    11 MS. JARKA: I mean, I would --
    12 MR. EASTEP: You're looking for a more detailed
    13 description of how they're going to use that area of
    14 the site?
    15 MS. JARKA: Yes.
    16 HEARING OFFICER BEAUCHAMP: I'm sorry. Can you
    17 hold your question until Mr. Eastep is done? Thank
    18 you.

    19 MR. EASTEP: On number six, the statement of
    20 the nature of the NFR letter requested, what would
    21 we expect to see there? When I think of nature I
    22 think of comprehensive versus focus or something of
    23 that nature or residential versus industrial. What
    24 did you have in mind?
    L.A. REPORTING (312) 419-9292
    39
    1 MS. JARKA: Well, I think those points would be
    2 applicable, possibly if there would be institutional
    3 controls and engineered barriers anticipated for the
    4 site, that could also be included under that item.
    5 MR. EASTEP: And this would all be part of the
    6 notice that went out --
    7 MS. JARKA: Yes.
    8 MR. EASTEP: I have no further questions.
    9 HEARING OFFICER BEAUCHAMP: Mr. Sassila?
    10 MR. SASSILA: Regarding the description of the
    11 intended use of the site, it's not unusual to make
    12 changes to a site after receiving the NFR, does that
    13 mean a new notice has to go out every time you have
    14 a playground, let's say we're going to have some
    15 addition to the school and no longer a playground,
    16 does that mean you have to change this intended
    17 usage or not and a new public notice has to go out?

    18 MS. JARKA: Well, at that point the site would
    19 be outside of the SRP program. I mean, you're done
    20 with your remediation and you're enhancing the site
    21 and not --
    22 MR. SASSILA: How about if there's a change in
    23 the plan during construction, which is not unusual?
    24 MR. NOE: Actually, there is language if you
    L.A. REPORTING (312) 419-9292
    40
    1 look at 740.815(a) where it says if the site
    2 remediation action plan is amended, the Agency
    3 will determine based on the nature of the amendments
    4 whether the RA needs to provide additional notice.
    5 MR. SASSILA: Yeah. But this is for the
    6 remediation work not for the site layout.
    7 MR. NOE: In terms of --
    8 MR. SASSILA: You might have remediation work
    9 plan does not have to be by any mean related to your
    10 proposed construction site layout, I'm going to have
    11 a playground here, I'm going to have classroom here,
    12 you might change that and that's not going to be
    13 part of your remedial work then.
    14 MR. NOE: Are you saying later in time?
    15 MR. SASSILA: Yeah.
    16 MS. JARKA: Well, conceivably you could use the

    17 list of -- a mailing list of your interested parties
    18 and, you know, give them updates on the ongoing
    19 work.
    20 MR. SASSILA: Well, then my question is about
    21 the second notice, assume the remedial work plans
    22 change, you have to issue a second notice, which is
    23 not unusual when you go through the SRP to go
    24 through several changes to your final document
    L.A. REPORTING (312) 419-9292
    41
    1 before it's been final, does that means every time
    2 there are changes into the remedial work plan, a new
    3 notice has to go out?
    4 MR. NOE: What I'm saying is that the language
    5 here addresses that. It's within the Agency's
    6 discretion whether or not additional notice needs
    7 to be provided.
    8 MR. SASSILA: Would it be more fair to everyone
    9 to know the process before they start the process --
    10 MR. NOE: Well, it's going to be a case-by-case
    11 basis. If your plan -- if it's a minor change to
    12 your plan, the Agency might decide that it's not
    13 necessary for you to give additional notice, whereas
    14 if it's a significant change to your plan where, you
    15 know, a new engineered barrier might be added, it

    16 might be significant and, therefore, require
    17 additional notice to the public. It's simply -- I
    18 don't know how you would craft something that would
    19 consider every possible scenario in terms of the
    20 amendment.
    21 MR. SASSILA: Does the Agency have any plan of
    22 adopting this subject here?
    23 MR. WIGHT: No.
    24 HEARING OFFICER BEAUCHAMP: I'm sorry.
    L.A. REPORTING (312) 419-9292
    42
    1 Mr. Wight could you identify yourself for the
    2 record?
    3 MR. WIGHT: Excuse me. Mark Wight of the
    4 Illinois EPA. No, we do not. We have committed to
    5 work with the CBE on flushing out certain provisions
    6 that we may not fully understand how they're
    7 intended to work, but at this point we did not have
    8 any specific language.
    9 MR. SASSILA: Is there any plan to have another
    10 public notice and allow the general public to have
    11 comments on any proposed changes to the SRP
    12 procedure?
    13 MR. WIGHT: That would depend upon the CBE and
    14 the Pollution Control Board.

    15 MS. McFAWN: By that, Mr. Wight, you mean by
    16 what we ultimately adopt as a rule?
    17 MR. WIGHT: Exactly and whether or not you feel
    18 that additional hearings will be needed if these
    19 were submitted to you.
    20 HEARING OFFICER BEAUCHAMP: Thank you,
    21 Mr. Sassila.
    22 MR. HARLEY: If I may elaborate. For the
    23 record, Keith Harley, attorney, Chicago Legal
    24 Clinic. To elaborate on Mr. Noe's and Ms. Jarka's
    L.A. REPORTING (312) 419-9292
    43
    1 testimony on this issue --
    2 MS. McFAWN: Mr. Harley, are you going to be
    3 testifying?
    4 MR. HARLEY: No, I'm not testifying. I'm
    5 simply to clarify one issue.
    6 MS. McFAWN: Why don't we have you sworn in.
    7 (Mr. Harley was sworn.)
    8 MR. HARLEY: This issue came up during a
    9 meeting that we had yesterday with a representative
    10 of the Chicago Public Schools. There was a
    11 recognition that what can be accomplished through a
    12 newspaper notice in terms of details about any
    13 specific project is limited and that the proposal in

    14 its present form may be placing too much burden on
    15 the notice in terms of -- as being the primary
    16 mechanism to be providing information about how a
    17 site is going to go through the SRP and the
    18 representative of the Chicago Public Schools made a
    19 very good recommendation that I believe ultimately
    20 will be incorporated into this proposal and that is
    21 that the notice provide basic information, but not
    22 detail, but that it refer people who are interested
    23 for a more comprehensive description of the site and
    24 what's going on at the site to a local repository.
    L.A. REPORTING (312) 419-9292
    44
    1 This is something that Ms. Jarka alluded to in her
    2 testimony and the repository would be located in the
    3 local library or someplace where community members
    4 would be able to have ready access to that
    5 information unlike a notice which is a one time, a
    6 repository can grow and it can grow according to
    7 changes in the site, it can grow according to
    8 changes in the site layout, all of the contingencies
    9 that occur from the time an initial application is
    10 filed until there's final agreement about how a
    11 cleanup is going to be conducted and I thought that
    12 that was a very, very sensible recommendation. I

    13 believe that will find its way into our final
    14 proposal.
    15 HEARING OFFICER BEAUCHAMP: Thank you,
    16 Mr. Harley. Additional questions for CBE? Are
    17 there any questions from members of the Board, Board
    18 staff? Member Kezelis?
    19 MS. KEZELIS: Good morning. I have a general
    20 question and if you're not -- any of you for CBE
    21 comfortable with answering it, that's fine and
    22 comments would be acceptable as well.
    23 Are any of you familiar with the status
    24 or the text of Senate bill 1180 that's pending in
    L.A. REPORTING (312) 419-9292
    45
    1 the Illinois General Assembly? No?
    2 HEARING OFFICER BEAUCHAMP: Just for the
    3 record, if we could reflect that CBE indicated no to
    4 member Kezelis' question.
    5 MS. KEZELIS: What I would be interested in
    6 learning from CBE is whether that legislation would
    7 satisfy the concerns that you all have given the
    8 nature of the proposed changes you've submitted to
    9 the Board in this rulemaking. It doesn't go as far
    10 as your proposed rulemaking would, but it does
    11 address the issue of schools within Cook County in a

    12 site remediation program. Okay. I have no other
    13 questions.
    14 HEARING OFFICER BEAUCHAMP: Other questions
    15 from members of the Board or the Board staff?
    16 MS. LIU: Good morning, Ms. Jarka.
    17 MS. JARKA: Good morning.
    18 MS. LIU: Earlier today you spoke of the
    19 importance of a community relations plan in terms
    20 of allowing the public to offer information that
    21 maybe the remedial applicant or the Agency hadn't
    22 thought of and I was wondering if you could provide
    23 some examples of the types of information the public
    24 could provide that would impact the outcome of the
    L.A. REPORTING (312) 419-9292
    46
    1 remediation.
    2 MS. JARKA: Well, the first thing that comes to
    3 mind is perhaps some long-term residents may have
    4 observed former uses of the site that may not be
    5 readily available through some public records that
    6 are typically searched for Phase I activities, that
    7 could be one type of information. Other types of
    8 information could be concerns that the community
    9 might bring up regarding how the site is developed.
    10 For instance, we have a community in on the

    11 southeast side of Chicago which brought up a very
    12 valid point to a facility saying well, the trains
    13 always cross this road and sometimes they stop in
    14 the middle of the road, how does the fire department
    15 get to your plant. This was something the plant
    16 people hadn't thought about, mainly because they
    17 don't live in the community most of the time. So
    18 issues like that could be brought up in a public
    19 arena.
    20 MS. LIU: Earlier this morning Ms. Gordon was
    21 going over some questions that where deferred from
    22 the last hearing and one of them was from
    23 Mr. Walton, he had asked about at what point sites
    24 would be triggered to go into your proposal once
    L.A. REPORTING (312) 419-9292
    47
    1 they're in the SRP and you had indicated if they
    2 didn't know the future use that they wouldn't have
    3 to go to that extent. If at some later date a
    4 future use is defined to include a school, would
    5 this proposal take affect retroactively to bring
    6 them back into that requirement?
    7 MS. GORDON: I think that we would hope that it
    8 would take affect retroactively, but I think that's
    9 sort of hard to think about in the hypothetical

    10 situation because it would depend on how far along
    11 in the process they were, if they had completed the
    12 remediation and they decided to become a school, it
    13 almost becomes a moot point, but I think that that
    14 -- I mean the terms of the five-year certification,
    15 I think that would definitely come into play, just
    16 to clarify, but things like public participation and
    17 things that need to happen right away, it would
    18 really have to be discretionary based on the
    19 specific situation.
    20 MS. LIU: Is the intention of this to apply to
    21 schools just in Cook County or all across the state
    22 of Illinois?
    23 MS. JARKA: No. This would be applicable to
    24 all schools in Illinois -- or all public schools.
    L.A. REPORTING (312) 419-9292
    48
    1 MS. LIU: The proposed definition that you use
    2 in your proposal refers to the definition of school
    3 as defined by 105 Illinois Compiled Statutes,
    4 5/34.1-1. Do you happen to have that definition
    5 with you?
    6 MS. JARKAS: I do not.
    7 MS. LIU: I hope you don't mind, but I actually
    8 took the liberty of jotting it down if you don't

    9 have it.
    10 MR. NOE: The definition was -- I haven't
    11 looked at the definition, there is some -- it
    12 actually was mentioned earlier I think in Section
    13 58.15 of the Environmental Protection Act and it
    14 also refers to that definition to define schools and
    15 so we used it to be consistent, but I realize -- go
    16 ahead, you can read the definition, I don't have it
    17 right in front of me, but go ahead.
    18 MS. LIU: The definition is, quote, schools and
    19 attendant centers are used interchangeably to mean
    20 any attendant center operated pursuant to this
    21 Article 34, and under the direction of one
    22 principal. Not knowing what Article 34 was, I
    23 looked it up and Article 34 says that it applies
    24 only to cities having a population exceeding
    L.A. REPORTING (312) 419-9292
    49
    1 500,000.
    2 Since CBE's proposed definition of school
    3 would be schools operated pursuant to Article 34, my
    4 nonlawyer's read of this seems to indicate that this
    5 would limit your proposal to Cook County, city of
    6 Chicago, is that maybe how you interpret it?
    7 MR. NOE: To tell you the truth, I don't think

    8 that I noticed the fact that there was that
    9 limitation on the schools. I think in the time I
    10 was drafting it I assumed I think because the 58.15
    11 actually had language relating to Cook County and I
    12 assumed the definition was actually broader and
    13 would encompass the entire state. So I appreciate
    14 you pointing that out because I think our intention
    15 was to have the regulation applied throughout the
    16 state and not just related to Cook County.
    17 MR. HARLEY: If I may elaborate on that as
    18 well, I think that one of the things that we found
    19 in the architecture of the existing site remediation
    20 program that surprised us was that when you look at
    21 the definition of what constitutes a residential
    22 site for purposes of the site remediation program
    23 where the IEPA is already invested with authority
    24 pursuant to Board rule and where the Board has
    L.A. REPORTING (312) 419-9292
    50
    1 rulemaking authority by virtue of legislation it
    2 includes educational sites, it explicitly includes
    3 sites that are set aside for education. So we feel
    4 that this provides a legislative basis for
    5 rulemaking relating to school sites. It also gives
    6 the Board the authority to define what constitutes a

    7 residential slash education site in the state of
    8 Illinois consistent with, you know, it's existing
    9 granting of authority under the Act.
    10 MS. LIU: Could you perhaps propose a specific
    11 definition for what would constitute an educational
    12 facility?
    13 MR. HARLEY: Off the top of my --
    14 MS. LIU: Some things to think about if I was
    15 trying to imagine in my head what types of schools
    16 this would apply to. If you could address whether
    17 it would apply to colleges and universities, schools
    18 where children are in attendance for only one day a
    19 week, schools without outdoor play areas, maybe some
    20 other thoughts you might have.
    21 MS. McFAWN: Also you mentioned that you
    22 thought it was just applicable to public schools.
    23 Is that the way you want it to be, just public
    24 versus private?
    L.A. REPORTING (312) 419-9292
    51
    1 MR. NOE: Yeah. The reason for that is again
    2 the original basis for coming up with the new rules
    3 and that is that when you -- when a public entity
    4 remediates a site, there usually isn't this third
    5 party due diligence that takes place and so, you

    6 know, that was essentially the situation in Little
    7 Village where you have public funding, it's going to
    8 develop the school, therefore, you don't have a
    9 financial institution looking in to make sure that
    10 the site is completely remediated before you can
    11 start using the property. So that's why I think
    12 we're comfortable limiting it to public schools as
    13 opposed to all schools.
    14 MS. LIU: Based on what we discussed today,
    15 do you plan to submit a new proposal or a reversion
    16 of your last amendment?
    17 MS. GORDON: Yes, we will.
    18 MS. LIU: Thank you.
    19 MR. NOE: Can I just comment on that too? We
    20 were trying to work things out with the Agency so
    21 that we'd be able to address a lot of these concerns
    22 and integrate them in our amendments before this
    23 hearing. The Agency has a lot of work that they're
    24 doing on the rest of the rules and are very busy and
    L.A. REPORTING (312) 419-9292
    52
    1 it was very difficult for us to find time to
    2 coordinate all of that. So it looks as if yes,
    3 we're going to have to submit a proposal following
    4 this hearing.

    5 MS. McFAWN: It also sounds like you've learned
    6 or had some insights through your discussions with
    7 the Department of Education that help you with such
    8 revision.
    9 MR. NOE: Absolutely, that's true as well.
    10 MS. McFAWN: Usually rulemakings are like this,
    11 you go through the revisions during the course of
    12 the rulemaking, this is more the rule then the
    13 exception.
    14 HEARING OFFICER BEAUCHAMP: Do we have any
    15 other questions for CBE today? Mr. Sternstein?
    16 MR. STERSTEIN: Joel Sternstein with the
    17 Pollution Control Board. I just had one minor
    18 technical question or a couple actually. In the
    19 amended petition that you submitted to the Board for
    20 this hearing, the italicized language is the
    21 language that's been added since the proposal from
    22 the first hearing, is that true?
    23 MS. GORDON: Yes.
    24 MR. STERNSTEIN: Okay. And then the stricken
    L.A. REPORTING (312) 419-9292
    53
    1 language is language that was stricken from the
    2 proposal you submitted for the first hearing, right?
    3 MS. GORDON: Yes.

    4 MR. STERNSTEIN: Okay. I just wanted to
    5 clarify that for the record. Thank you.
    6 HEARING OFFICER BEAUCHAMP: Any other
    7 questions? Ms. Gordon, speaking of the amended
    8 petition, I don't know, did you intend to introduce
    9 that as an exhibit today or simply have it in the
    10 record as an amended petition filed?
    11 MS. GORDON: I think just filed would be fine.
    12 HEARING OFFICER BEAUCHAMP: Okay. We do have
    13 copies of that on the table in case anyone doesn't
    14 have them. I'll make a last call for questions for
    15 CBE before we let them go. All right. Seeing none,
    16 thank you. If we can go off the record for a
    17 moment.
    18 (Whereupon, a discussion
    19 was had off the record.)
    20 HEARING OFFICER BEAUCHAMP: We've had a request
    21 from Ms. Crivello, who's a representative of the
    22 Chicago Public Schools, to present a brief statement
    23 on CBE's proposal. This was not prefiled testimony.
    24 So we're going to ask if there are any objections to
    L.A. REPORTING (312) 419-9292
    54
    1 allowing her to make this statement? Seeing none,
    2 we're going to turn the floor over to Ms. Crivello.

    3 Would you please swear the witness in?
    4 (Ms. Crivello was sworn.)
    5 MS. CRIVELLO: My name is Lynn Crivello. I'm
    6 an employee of the Consoer, Townsend & Envirodyne
    7 Engineers and their joint venture, Chicago School
    8 Associates. We are contractors to the Board. My
    9 duties include environmental management of the
    10 capital improvement program for the Chicago Public
    11 Schools. I have spoken with the chief -- deputy
    12 chief operations officer at the Chicago Public
    13 School, Karen Burke, B-u-r-k-e, and she has
    14 requested that I present testimony today on behalf
    15 of the Chicago Public Schools.
    16 The Chicago Public Schools wishes to
    17 comment on the rules proposed by the Citizens for a
    18 Better Environment and designated as R01-29 by the
    19 Pollution Control Board. We would like to begin by
    20 stating categorically that the health and welfare of
    21 the children attending Chicago Public Schools is our
    22 number one priority.
    23 Since 1996 CPS has spent in excess of 100
    24 million dollars related to environmental remediation
    L.A. REPORTING (312) 419-9292
    55
    1 and maintenance of environmental health and safety

    2 in all schools. One part of this overall program is
    3 the remediation of sites designated for construction
    4 of new schools and additions.
    5 In 1999, in response to the issues raised
    6 by the finding of contaminated soil at the Finkl and
    7 Zapata schools, the Illinois State Legislature past
    8 Public Act 91-0442, entitled An Act to Amend the
    9 Environmental Protection Act by adding Section
    10 58.15. The Act states: Construction of school
    11 requirement. This section applies only to counties
    12 with populations of more than three million. In
    13 this section, school means a school as defined in
    14 Section 34-1.1 of the school code. No person shall
    15 commence construction on real property of a building
    16 intended for use as a school unless a Phase I
    17 environmental audit conducted in accordance with
    18 Section 22.2 of this Act is obtained.
    19 If the Phase I environmental audit
    20 disclosed the presence or likely presence of a
    21 release or a substantial threat of a release of a
    22 regulated substance at, on, to, or from the real
    23 property, a Phase II environmental audit conducted
    24 in accordance with Section 22.2 of this Act is
    L.A. REPORTING (312) 419-9292
    56

    1 obtained and three, if the Phase II environmental
    2 audit discloses the presence or likely presence of a
    3 release or a substantial threat of a release of a
    4 regulated substance at, on, to, or from the real
    5 property, the real property is enrolled in the site
    6 remediation program and remedial action that the
    7 Agency approves for the intended use of the property
    8 is completed.
    9 Cook County schools, including Chicago
    10 Public School, are required by this law to enter
    11 into the SRP program and to complete corrective
    12 action prior to construction of the school. This
    13 results in essentially two engineered barriers at
    14 each school, the engineered barrier approved by the
    15 Illinois Environmental Protection Agency and
    16 completed by the CPS prior to construction of the
    17 school and the school itself.
    18 Since 1999, CPS has enrolled 18 sites into
    19 the SRP program. To date, CPS has received NFR
    20 letters on nine of these 18 sites. The average time
    21 it takes CPS to complete the SRP process for a
    22 project is approximately 4.5 months, but this
    23 project can stretch to over a year depending upon
    24 the extent of contamination and the complexity of
    L.A. REPORTING (312) 419-9292

    57
    1 the site.
    2 Since the passage of Public Act 91-0442
    3 the SRP process has become a critical part of new
    4 construction project scheduling. Nearly every
    5 parcel of property designated as a school building
    6 exceeds the level of contaminates that the IEPA has
    7 set for residential cleanup objectives. In some
    8 cases, the cleanup objectives set by the IEPA are
    9 lower than the levels that occur naturally or are
    10 lower than levels found in soils across the street
    11 from the school. Therefore, nearly every CPS site
    12 must complete the SRP program before construction of
    13 the school can begin.
    14 Section 58.15 requires the completion of
    15 the SRP process prior to construction. This law
    16 robs the CPS of the option of integrating the
    17 cleanup of the site into the construction program.
    18 Typically, when contamination is found on a site, an
    19 engineered barrier is used to prevent contamination
    20 from being inhaled or ingested by children or
    21 others. The IEPA routinely approves the use of
    22 building foundations and parking lots as engineered
    23 barriers. The concrete foundations and parking lots
    24 cover the contaminated soil and prevent the
    L.A. REPORTING (312) 419-9292

    58
    1 ingestion or inhalation of the contaminants by the
    2 building occupants. Because of the way Public Act
    3 91-0442 is written, the engineered barrier must be
    4 in place before construction, including the pouring
    5 of concrete foundations, can begin. In effect, the
    6 law requires two engineered barriers on every Cook
    7 County school site.
    8 Once the corrective action completion
    9 letter is received, the Illinois Environmental
    10 Protection Agency issues an NFR letter. In this
    11 letter, it states that the engineered barrier must
    12 be maintained over the area of concern. Failure to
    13 maintain the barrier will result in the IEPA voiding
    14 the NFR letter. This is consistent with Section
    15 740.625(a) of Subtitle G, which states that any
    16 violation of institutional controls or land use
    17 restrictions will result in the NFR letter being
    18 voidable by the IEPA.
    19 With regards to public participation and
    20 notice, we would like to make you aware that CPS has
    21 an extensive program of public outreach and
    22 communication. Whenever a property is designated by
    23 CPS for a school the alderman of the ward in which
    24 the property is located is contacted by CPS and CPS

    L.A. REPORTING (312) 419-9292
    59
    1 remains in close communication with the alderman
    2 throughout the process of the SRP and the new school
    3 construction program. In addition, CPS places a
    4 sign on the designated property and identifies that
    5 site as a new school location.
    6 On a monthly basis CPS conducts public
    7 meetings throughout the city. These meeting are
    8 televised and provide an opportunity for anyone to
    9 raise any kind of issue regarding schools. Once a
    10 year the CPS conducts a series of six public
    11 meetings focusing only on the capital improvement
    12 program. During these meetings, residents of the
    13 city, parents and any other interested parties can
    14 request information on capital projects.
    15 Finally, CPS maintains a web page that
    16 identifies all capital projects. This web page is
    17 continually updated. Interested parties may review
    18 this information and contact the CPS electronically
    19 to request additional information.
    20 It should be noted that the Citizens for a
    21 Better Environment never contacted CPS nor did CBE
    22 afford CPS any opportunity to contribute or
    23 participate in the development of these amendments.
    24 We believe that if CPS had been given an opportunity

    L.A. REPORTING (312) 419-9292
    60
    1 to participate and to inform the CBE of our program,
    2 it would have afforded CPS the participation that
    3 these amendments seek to promote.
    4 CPS has gone far beyond the intent of the
    5 amendments proposed by the Citizens for a Better
    6 Environment. Also, CPS is required by law to enroll
    7 into the SRP program. These amendments are not
    8 voluntary for CPS or any other school in Cook
    9 County. Given this, CPS believes that the
    10 additional requirements proposed by Citizens for a
    11 Better Environment would be redundant and would
    12 result in additional reporting, administrative costs
    13 without adding any additional level of safety,
    14 security or public participation than what currently
    15 exists within the CPS system. Therefore, we are
    16 requesting that the amendment identified as R01-29
    17 be amended to exclude the Chicago Public Schools
    18 from the requirements of that part.
    19 HEARING OFFICER BEAUCHAMP: Thank you,
    20 Ms. Crivello. Before we move into the questions, I
    21 notice that the microphone is outside so we're going
    22 to take a short break while we set up the
    23 microphone.
    24

    L.A. REPORTING (312) 419-9292
    61
    1 (Whereupon, after a short
    2 break was had, the
    3 following proceedings
    4 were held accordingly.)
    5 HEARING OFFICER BEAUCHAMP: We will now take
    6 questions from Ms. Crivello if your presentation is
    7 finished.
    8 MS. CRIVELLO: Yes.
    9 HEARING OFFICER BEAUCHAMP: We'll open the
    10 floor to questions. Mr. Harley?
    11 MR. HARLEY: For purposes of the record, my
    12 name is Keith Harley, I'm an attorney for Citizens
    13 for a Better Environment.
    14 Also, for the purposes of full and
    15 complete disclosure, Ms. Crivello, this isn't the
    16 first time that we've ever met, is it?
    17 MS. CRIVELLO: No.
    18 MR. HARLEY: In fact, I represent you and your
    19 husband in a case involving the remediation of a
    20 site in the Pullman community, don't I?
    21 MS. CRIVELLO: My husband, myself and about 50
    22 other community residents.
    23 MR. HARLEY: Okay. And you're satisfied with

    24 that representation, yes? I'm just --
    L.A. REPORTING (312) 419-9292
    62
    1 MS. CRIVELLO: Yes. I haven't seen the invoice
    2 yet.
    3 MR. HARLEY: It's pro bono. I wanted to start
    4 off by talking about a portion of the testimony
    5 which you gave today that suggested that Citizens
    6 for a Better Environment had not been open to the
    7 recommendations or the input of the Chicago Public
    8 Schools, which was in the next to last paragraph in
    9 the written testimony and I wanted to be clear that
    10 today you are here testifying on behalf of the
    11 Chicago Public Schools, is that correct?
    12 MS. CRIVELLO: That's correct.
    13 MR. HARLEY: But before today, you did attend
    14 the public hearing in Springfield, is that right?
    15 MS. CRIVELLO: That's correct.
    16 MR. HARLEY: When you attended the public
    17 hearing in Springfield, you did not identify
    18 yourself as having a relationship to the Chicago
    19 Public Schools at that time, did you?
    20 MS. CRIVELLO: That's correct.
    21 MR. HARLEY: You did not identify that you had
    22 that relationship?

    23 MS. CRIVELLO: I did not identify myself as a
    24 representative of the Chicago Public School system.
    L.A. REPORTING (312) 419-9292
    63
    1 MR. HARLEY: And that was at the end of
    2 February that that hearing took place?
    3 MS. CRIVELLO: That's correct.
    4 MR. HARLEY: And the first time that you
    5 contacted Citizens for a Better Environment through
    6 us as their attorneys and identified yourself as a
    7 representative of the Chicago Public Schools was
    8 last Friday, March 30th, is that correct, by phone?
    9 MS. CRIVELLO: That's correct.
    10 MR. HARLEY: And on Monday -- the following
    11 Monday we arranged for you to receive in advance by
    12 e-mail a copy of the most recent amended proposal
    13 that we had at that time, is that correct?
    14 MS. CRIVELLO: I received an e-mail Monday
    15 afternoon, that's correct.
    16 MR. HARLEY: And on Tuesday you came to our
    17 office and met with me and with the other attorney
    18 for Citizens for a Better Environment, Holly Gordon,
    19 for two hours discussing your concerns about this
    20 proposal, is that correct?
    21 MS. CRIVELLO: Yes. I believe I requested

    22 a meeting with Holly and you, we had a met yesterday
    23 morning.
    24 MR. HARLEY: Okay. And at that time you
    L.A. REPORTING (312) 419-9292
    64
    1 expressed concerns, some of which are also reflected
    2 in your testimony today about exempting Cook County
    3 from the proposal about the definition of interested
    4 person, about the nature of the community relations
    5 plan, about specific language relating to land use
    6 limitations, about public notice issues. You were
    7 given an opportunity to provide all of that input,
    8 is that correct?
    9 MS. CRIVELLO: Yesterday morning, that's
    10 correct.
    11 MR. HARLEY: Okay. And we agreed that in
    12 every -- one of these issues that we would continue
    13 to speak with one another about in anticipation of
    14 developing our final process, is that correct?
    15 MS. CRIVELLO: I believe so.
    16 MR. HARLEY: All right. Moving on, in your
    17 role as a consultant on environmental issues
    18 relating to the Chicago Public Schools, have you
    19 ever dealt with issues relating to lead containing
    20 and asbestos containing material on properties

    21 operated by the Chicago Public Schools?
    22 MS. CRIVELLO: Yes.
    23 MR. HARLEY: And are you familiar with the
    24 practice of maintaining as opposed to removing
    L.A. REPORTING (312) 419-9292
    65
    1 asbestos containing and lead containing materials
    2 under some circumstances?
    3 MS. CRIVELLO: Yes.
    4 MR. HARLEY: Is that a common practice in the
    5 Chicago Public Schools?
    6 MS. CRIVELLO: I'd have to say so, yes.
    7 MR. HARLEY: And isn't it true that as a key
    8 part of maintaining proper controls to ensure that
    9 asbestos and lead containing materials do not become
    10 bioavailable to children, the Chicago Public Schools
    11 have to maintain observation and maintenance
    12 programs?
    13 MS. CRIVELLO: We are required by law by the
    14 Illinois Department of Public Health to conduct
    15 periodic inspections of asbestos containing
    16 materials. We're required to do these inspections
    17 on a periodic basis.
    18 MR. HARLEY: And the purpose of these
    19 observations and maintenance programs is to ensure

    20 that the materials are in good condition, that they
    21 are not creating a risk of exposure of the toxins
    22 that are contained in the materials to the children
    23 who go to the Chicago Public Schools, is that
    24 correct?
    L.A. REPORTING (312) 419-9292
    66
    1 MS. CRIVELLO: That's correct.
    2 MR. HARLEY: And so it's not an unusual thing
    3 for environmental managers or an organization like
    4 the Chicago Public Schools to have to regularly
    5 inspect, observe, maintain controls that have been
    6 developed to prevent toxins from being released from
    7 otherwise sound materials?
    8 MS. CRIVELLO: The Chicago -- as I said, the
    9 Chicago Public Schools conduct periodic asbestos
    10 inspections. This costs the Chicago Public Schools
    11 approximately $2 million a year to conduct these
    12 inspections. Part of those inspections are to
    13 denote the condition of the asbestos in the
    14 locations where we observe it and to verify that
    15 it has been abated or that it is being properly
    16 controlled.
    17 MR. HARLEY: And all of this is to protect the
    18 public health and safety of the children who are

    19 attending the schools?
    20 MS. CRIVELLO: That's correct.
    21 MR. HARLEY: In your testimony, you talked
    22 about the efforts which the Chicago Public Schools
    23 take already to involve the community in the
    24 development of new school sites, is that correct?
    L.A. REPORTING (312) 419-9292
    67
    1 MS. CRIVELLO: That's correct.
    2 MR. HARLEY: And you talked about the proactive
    3 outreach efforts which you make through the local
    4 alderman's office, for example?
    5 MS. CRIVELLO: Yes.
    6 MR. HARLEY: And you also talked about hosting
    7 regular meetings where members of the public can
    8 come forward and voice their concerns?
    9 MS. CRIVELLO: That's correct.
    10 MR. HARLEY: And I think that you may have also
    11 referenced the fact that documents are available at
    12 these meetings or are provided by the Chicago Public
    13 Schools about the development of new school sites?
    14 MS. CRIVELLO: Yes.
    15 MR. HARLEY: And you talked about the fact that
    16 you post notices actually at the physical location
    17 of a new school development, is that correct?

    18 MS. CRIVELLO: That's correct.
    19 MR. HARLEY: Have you ever had an opportunity
    20 to review the community relations plan that was
    21 developed by the Illinois Environmental Protection
    22 Agency pursuant to the requirements of the site
    23 remediation program?
    24 MS. CRIVELLO: Yes.
    L.A. REPORTING (312) 419-9292
    68
    1 MR. HARLEY: Do you have an opinion as to
    2 whether or not the efforts which you are already
    3 undertaking are in the spirit of that community
    4 relations plan?
    5 MS. CRIVELLO: I would say they're probably
    6 within the spirit of that plan, although they may
    7 not conform to every aspect of the plan.
    8 MR. HARLEY: But you also are aware of the fact
    9 that the community relations plan is very flexible
    10 and doesn't mandate a rigid, one size fits all
    11 approach to community relations, but instead lays
    12 out a general approach that's designed to ensure
    13 public participation in the site remediation program
    14 consistent with the clear legislative intent?
    15 MS. CRIVELLO: I'm aware that the guidance that
    16 exists today is not a rule made by the Pollution

    17 Control Board, a law mandated by the state
    18 legislature and that this guidance could change at
    19 any moment in time and although at the present time
    20 I believe that in general we are meeting the spirit
    21 of that guidance, I can't say that in six months
    22 that this guidance would not be changed by IEPA to
    23 include requirements such as that we have a public
    24 hearing specifically for an SRP site, for instance.
    L.A. REPORTING (312) 419-9292
    69
    1 This concerns me because I think that these
    2 amendments basically require us to conform to those
    3 guidances and to those guidelines, thus in effect
    4 making them into regulations.
    5 MR. HARLEY: So you're essential concern is
    6 based on a fear that the proposal may at some time
    7 in the future engender a more restrictive approach
    8 than the one which CPS has already engaged in?
    9 MS. CRIVELLO: What I'm concerned about is that
    10 in the proposal in the community relations plan
    11 under 740.820 it states that the RA has the option
    12 of following a community relations plan according
    13 to the -- consistent with the guidance developed by
    14 the Illinois EPA and if the RA forgoes that option,
    15 then the Illinois EPA would then implement that

    16 community relations plan. This basically means that
    17 we would be required either to do it ourselves or to
    18 pay for the Agency to do it and to implement a
    19 community relations plan, which we have no idea of
    20 what the scope the Agency would enact or what the
    21 scope is in six months or a year or two years.
    22 MR. HARLEY: Okay. Thank you.
    23 In your -- to change subjects, in your
    24 role as an environmental consultant for the Chicago
    L.A. REPORTING (312) 419-9292
    70
    1 Public Schools you spoke about your involvement in a
    2 number of SRP sites?
    3 MS. CRIVELLO: That's correct.
    4 MR. HARLEY: What is your program after the no
    5 further remediation letter is received to ensure
    6 that institutional controls, engineering barriers,
    7 land use restrictions, contained in the NFR are
    8 adhered to in the future?
    9 MS. CRIVELLO: We have a program at Chicago
    10 Public Schools currently consisting of approximately
    11 20 consulting companies that are present in the
    12 school at any given time. As I stated earlier, we
    13 are required to inspect schools at least once every
    14 three years for asbestos. At that time, they would

    15 also survey the property. If they notice that
    16 there's any disturbance of the property that we
    17 didn't -- that we have no knowledge of or hadn't
    18 authorized, we would be notified of that and we also
    19 are notified by the property managers for the
    20 Chicago Public School system who are the entities
    21 to maintain the property of the school outside of
    22 environmental issues as well as within environmental
    23 issues. So we have a presence in the schools on a
    24 daily basis.
    L.A. REPORTING (312) 419-9292
    71
    1 MR. HARLEY: Why.
    2 MS. CRIVELLO: From the standpoint of
    3 maintaining the building for school occupancy we're
    4 required by several different regulatory agencies,
    5 city, state, national, federal, local, to maintain
    6 certain aspects of the buildings. We're required to
    7 inspect swimming pools. We're required to provide
    8 safe lunchrooms and cafeterias. We're -- we are
    9 continuously doing maintenance on these buildings.
    10 MR. HARLEY: Would you say that on the issue
    11 of after the NFR letter, that period after the NFR
    12 letter has been issued that the Chicago Public
    13 Schools are a model of how public schools should

    14 conduct themselves to ensure the children are safe?
    15 MS. CRIVELLO: Well, I would like to think
    16 that we run a model program.
    17 MR. HARLEY: And on the issue of a community
    18 relations plan and the kind of proactive outreach
    19 that you described in your testimony, do you believe
    20 that the Chicago Public Schools are a model of how
    21 public schools should operate?
    22 MS. CRIVELLO: I really have no expertise in
    23 public outreach and I wouldn't want to say what's a
    24 model and what's not a model. I'm an environmental
    L.A. REPORTING (312) 419-9292
    72
    1 engineer.
    2 MR. HARLEY: Okay. I have no further questions.
    3 Thank you.
    4 HEARING OFFICER BEAUCHAMP: Thank you,
    5 Mr. Harley. Are there other questions for
    6 Ms. Crivello? Questions from the Board members.
    7 MS. McFAWN: I have some questions.
    8 HEARING OFFICER BEAUCHAMP: I'm sorry. I
    9 didn't see Mr. Eastep's hand. Mr. Eastep?
    10 MR. EASTEP: Larry Eastep, Illinois EPA.
    11 In your testimony you refer to cleanup
    12 objectives as being set by the IEPA?

    13 MS. CRIVELLO: Correct.
    14 MR. EASTEP: Did you mean that the Agency
    15 actually sets the cleanup objectives for the
    16 remedial applicant or were you referring to the Part
    17 742 objective?
    18 MS. CRIVELLO: Actually, our cleanup objectives
    19 that we use I think in about every case that we've
    20 ever gone through has been the Tier I residential
    21 objectives that are in 742. So that's what I meant
    22 when I refer to it.
    23 MR. EASTEP: So you didn't mean that the Agency
    24 was involved?
    L.A. REPORTING (312) 419-9292
    73
    1 MS. CRIVELLO: No, I wouldn't mean to imply
    2 that you were involved.
    3 MR. EASTEP: If the objectives are typically
    4 residential Tier I objectives and your cleanup plan
    5 called for removing all of the contaminated soil,
    6 assuming it was contaminated soil that was involved,
    7 then there wouldn't be any need for an engineered
    8 barrier, would there?
    9 MS. CRIVELLO: That's correct.
    10 MR. EASTEP: Okay. So in your testimony in a
    11 couple cases you said that the fact that the effect

    12 of the law required engineered -- two engineered
    13 barriers, if you did a complete soil removal, there
    14 would be no need for engineered barriers at all?
    15 MS. CRIVELLO: Yeah. What I meant to I guess
    16 state was that in every case that I can think of, we
    17 have left some contamination in place and in those
    18 cases we're required to put down two engineered
    19 barriers. I believe we may have one, maybe two
    20 sites where we were able to remove all the
    21 contamination. Typically, that's not the case.
    22 MR. EASTEP: But the reason for that isn't
    23 because the law requires that, it's because of the
    24 professional judgment of a consultant using the
    L.A. REPORTING (312) 419-9292
    74
    1 rules under part 742?
    2 MS. CRIVELLO: The reason for that is if we are
    3 going to use an engineered barrier, the engineered
    4 barrier has to be in place before we start
    5 construction, if we choose to use an engineered
    6 barrier as a remedial action plan.
    7 MR. EASTEP: Okay. But you don't -- again, in
    8 those cases where they have removed all the
    9 contamination then that statement that they're
    10 required by law really doesn't apply?

    11 MS. CRIVELLO: Correct. That wouldn't apply
    12 there.
    13 MR. EASTEP: Thank you.
    14 In your testimony you provided several
    15 instances of public outreach and communication
    16 through communication with the alderman or various
    17 meetings the city has. Do you ever make any -- have
    18 any outreach or communication with the direct
    19 neighbors of the schools that are being worked on,
    20 say, people within a six-block radius or something
    21 of that nature?
    22 MS. CRIVELLO: That has occurred and that's
    23 not one of my duties so I can't say how
    24 institutionalized that is. It's my understanding
    L.A. REPORTING (312) 419-9292
    75
    1 that the Board meets with the interested parties
    2 when they are designating a site and that would be
    3 the students that would be going there, but as I
    4 said, I don't -- I am not involved in setting up
    5 the hearing process so I don't know the particulars
    6 of that.
    7 MR. EASTEP: Do you know if when they do meet
    8 when -- they're setting up a site and they meet with
    9 the neighbors, do they discuss any of the remedial

    10 activity or the fact they will be cleaning up the
    11 site?
    12 MS. CRIVELLO: I haven't personally attended
    13 one of those meetings so I can't say that. I can't
    14 answer that.
    15 MR. EASTEP: In your judgment, would that be a
    16 good opportunity to disseminate this information to
    17 the public in a meeting such as that?
    18 MS. CRIVELLO: Yes. I'm not saying that that
    19 doesn't happen. I'm just saying that I personally
    20 have not been present.
    21 MR. EASTEP: Thank you. No further questions.
    22 HEARING OFFICER BEAUCHAMP: Thank you,
    23 Mr. Eastep. Additional questions from Ms. Crivello?
    24 Board member McFawn, do you have some?
    L.A. REPORTING (312) 419-9292
    76
    1 MS. McFAWN: Yes, I do.
    2 You mentioned or you discussed at length
    3 this requirement as Mr. Eastep was referring to for
    4 the two engineered barriers and it seems to be
    5 because of the way that Section 58.15 is worded that
    6 you have to have in place either complete removal of
    7 the contamination or an engineered barrier before
    8 you would begin to construct a school?

    9 MS. CRIVELLO: That's correct.
    10 MS. McFAWN: Has there been any attempt by the
    11 Department of Education or other persons responsible
    12 for this to change that legislation?
    13 MS. CRIVELLO: I personally cannot answer that.
    14 I'm not involved in their legislative processes.
    15 MS. McFAWN: How much money do you think it
    16 costs them to do that when they are prohibited from
    17 using the actual construction of the building as an
    18 engineered barrier? Make across the board or even
    19 on a per school base, some kind of estimate.
    20 MS. CRIVELLO: It's cost had us in the vicinity
    21 of approximately $1 million to date for consulting
    22 costs. More of the concern is the limitations that
    23 it puts on us regarding our construction schedule
    24 where if we were allowed to build the school as part
    L.A. REPORTING (312) 419-9292
    77
    1 of the remediation process, we would have 16 to 18
    2 months during construction of the school from the
    3 time that we got the property until the school was
    4 completed to actually complete the SRP process and
    5 we could integrate the construction of the school
    6 with the development of the barrier. As it stands
    7 now, we generally have about six months to complete

    8 the SRP process before they actually start
    9 construction of the school and this does two things;
    10 one, it results in a lot of activity that we
    11 wouldn't have to do such as if we have to put in a
    12 three-foot barrier at a school for our engineered
    13 barrier and typically then the contractor comes in
    14 and has to dig it out and put in the foundations.
    15 So we're putting engineer fill into a hole and then
    16 we're removing engineer from the hole so we can put
    17 concrete back into the hole.
    18 Secondly, the longer it takes us to
    19 conduct the SRP program, get the completion and then
    20 start construction of the school, the longer the
    21 children have to stay in overcrowded old schools
    22 that are probably not as conducive a learning
    23 environment or as healthy learning environment as a
    24 new school would be. So we end up basically -- we
    L.A. REPORTING (312) 419-9292
    78
    1 end up with children having to attend substandard
    2 schools because we can't complete the process as
    3 quickly which is supposed to benefit children. So
    4 it's -- we don't see it as an ideal situation.
    5 MS. McFAWN: When you mentioned the $1 million
    6 in consulting fees, that is over the last two years

    7 or could you put that in context?
    8 MS. CRIVELLO: That's over the last,
    9 approximately, 18 months.
    10 MS. McFAWN: And that would be consulting fees
    11 to advise the Department of Education about how to
    12 comply with Section 58.15?
    13 MS. CRIVELLO: These consulting fees typically
    14 cover investigation, investigations of the site,
    15 investigation procedures, sampling, analysis,
    16 development of reports and in many cases because we
    17 have to do this in an expedited fashion in order to
    18 get our corrective action completed, it drives up
    19 the cost of what we would normally spend.
    20 MS. McFAWN: Okay. So those are consulting
    21 fees that you would normally even incur in large
    22 part just to comply with SRP?
    23 MS. CRIVELLO: Probably 60 percent of that is
    24 what we would normally incur. The other 40 percent
    L.A. REPORTING (312) 419-9292
    79
    1 is just an excess that we pay to expedite -- the
    2 faster turnaround we have to have for our samples so
    3 we can get our reports in. Faster results in 100
    4 percent increase in our costs for our analytical
    5 fees which if we're doing a comprehensive site

    6 investigation of a typically three-acre site that we
    7 use for a school can result in $50,000 or more.
    8 MS. McFAWN: Okay. Did the Department of
    9 Education ever estimate how much it cost to put in
    10 the engineered soil barrier of three feet and then
    11 pull it back out?
    12 MS. CRIVELLO: No.
    13 MS. McFAWN: It seems like they should.
    14 Currently, the legislation doesn't require
    15 you to get an NFR letter before you open the school,
    16 is that correct?
    17 MS. CRIVELLO: That's correct.
    18 MS. McFAWN: Under this CBE's proposal that
    19 would be required, is that an impediment?
    20 MS. CRIVELLO: No. The current law requires
    21 that we complete our corrective action before we
    22 start construction. Once we complete our corrective
    23 action, we send a letter to the state that our --
    24 corrective action completion letter and the state
    L.A. REPORTING (312) 419-9292
    80
    1 has 30 days to then issue us an NFR. We have to
    2 have the completion done before we start
    3 construction of the school and then we've got
    4 approximately 14 months before we complete the

    5 school. So we have the NFR letter far ahead of
    6 time.
    7 MS. McFAWN: Okay. You talked about your
    8 communications or CPS' communications through a
    9 series of public meetings. I was wondering, you
    10 said you publicized the information on a web site.
    11 Do you have the address for that web site?
    12 MS. CRIVELLO: I was afraid you were going to
    13 ask me that. I don't have that web site available.
    14 I can get you that web site.
    15 MS. McFAWN: Okay. Are SRP programs discussed
    16 as part of those public meetings, the six public
    17 meetings that focus on the capital improvement
    18 program?
    19 MS. CRIVELLO: The six public meetings that we
    20 have are basically an opportunity for anyone in the
    21 city of Chicago to come to the meeting and ask us --
    22 it's basically for them to ask us whatever it is
    23 they want to know about the capital program.
    24 MS. McFAWN: They would need to raise the
    L.A. REPORTING (312) 419-9292
    81
    1 issue?
    2 MS. CRIVELLO: They would basically need to
    3 raise the issue, yes.

    4 MS. McFAWN: You testified a little bit about
    5 the community relations plan and the outreach
    6 program used by the city and the two -- you seemed
    7 --or you did testify that the current process used
    8 by the city complies with the spirit of the
    9 community relations plan, is that right?
    10 MS. CRIVELLO: I believe it does.
    11 MS. McFAWN: Is that outreach program or the
    12 public meeting and the other ways, communicating
    13 with the alderman about capital improvement in these
    14 schools, is that written down anywhere?
    15 MS. CRIVELLO: I can't answer that.
    16 MS. McFAWN: Maybe you could check with the
    17 city and if so, could we see a copy of it to know
    18 what guidelines the city uses as outreach?
    19 MS. CRIVELLO: Oh, sure.
    20 MS. McFAWN: You mentioned that there would be
    21 additional reporting and administration costs if the
    22 proposal in R01-29 was adopted. Administration
    23 costs for what and how much?
    24 MS. CRIVELLO: We haven't done an economic
    L.A. REPORTING (312) 419-9292
    82
    1 analysis of what this would cost to implement.
    2 Basically, our position is is that we're already

    3 doing it so anything that we did would be an extra
    4 cost that wouldn't benefit the safety or health of
    5 the children or increase our public awareness.
    6 Probably what we're most concerned about is the
    7 nebulousness of the idea of this community relations
    8 plan in that it's not something that is delineated
    9 in the regulations and so if the Illinois EPA
    10 decided that they were not satisfied with the plan
    11 that we were following, they could institute their
    12 own plan and under 740 basically charge us as the
    13 remedial applicant the cost for that community
    14 outreach plan. We wouldn't necessarily know what
    15 that would cost us.
    16 MS. McFAWN: But you believe that you're
    17 currently doing it. So what you're doing is
    18 satisfactory?
    19 MS. CRIVELLO: We believe what we're doing is
    20 satisfactory so that any cost that we would incur
    21 to abide by any new regulations is money that comes
    22 out of school books and boiler repairs and new
    23 schools and educational enhancements and our first
    24 priority is to educate children.
    L.A. REPORTING (312) 419-9292
    83
    1 MS. McFAWN: But actually if what you're doing,

    2 if your assessment is correct, it's already
    3 providing the community relations plan and if we
    4 knew about it we might be able to --
    5 MS. CRIVELLO: Well, I don't know what a
    6 community relations plan is exactly because it
    7 doesn't say what it is in the regulations. All I
    8 have is a guidance that that guidance now becomes
    9 regulation and we don't know what that's going to
    10 be.
    11 MS. McFAWN: Okay. But let's assume that
    12 that's the guidance and then that's what constitutes
    13 a community relations plan and you still think that
    14 what the city's doing is comparable to what's called
    15 for?
    16 MS. CRIVELLO: Well, if you go through the
    17 community relations plan, it says that you have to
    18 develop separate documents, this document should be
    19 two pages long, that document should be three pages
    20 long, you should have four public hearings, you
    21 should -- there's a number of different things that
    22 they say you should do, which of course with us
    23 would become mandatory and such as an example I can,
    24 if they think we have to have four public hearings
    L.A. REPORTING (312) 419-9292
    84

    1 when maybe we only have one public hearing, who's to
    2 say that we now -- you know, we have to pay for four
    3 public hearings.
    4 MS. McFAWN: All right. So that's where the
    5 additional costs come up?
    6 MS. CRIVELLO: Correct.
    7 HEARING OFFICER BEAUCHAMP: Could we go off the
    8 record for few moments.
    9 (Whereupon, a discussion
    10 was had off the record.)
    11 MS. LIU: I have one point of curiosity.
    12 In your testimony you mentioned that since
    13 1999, Chicago Public Schools have enrolled 18
    14 different sites in the SRP. Do you know if they
    15 plan to keep up this pace of new school construction
    16 in the future?
    17 MS. CRIVELLO: My understanding is that the
    18 capital improvement program, which was started in
    19 1996, had a target of approximately 30 new schools
    20 or additions. So we have 18 that we've either
    21 constructed, that are in construction or are
    22 planned. If you go on the web site, assuming I can
    23 find the address, we published the capital
    24 improvement program for the next, I believe, it's
    L.A. REPORTING (312) 419-9292

    85
    1 five years and that indicates what schools -- new
    2 schools are planned. That is heavily contingent
    3 upon funding and if the funding goes away, the
    4 schools go away.
    5 MS. LIU: Thank you.
    6 MR. MELAS: One quick question.
    7 Towards the end of your testimony you made
    8 a suggestion that as far as this particular
    9 amendment is concerned exclude Chicago from this
    10 amendment -- exclude the Chicago Public Schools?
    11 MS. CRIVELLO: Correct.
    12 MR. MELAS: Leaving in place for the rest of
    13 the state?
    14 MS. CRIVELLO: Yes. That would be our
    15 position.
    16 HEARING OFFICER BEAUCHAMP: Any other
    17 questions?
    18 MS. McFAWN: I had one more.
    19 You talked about the schools being subject
    20 to property managers, is that correct?
    21 MS. CRIVELLO: There are property managers who
    22 are private contractors to the Board who's -- they
    23 manage properties just like U.S. Equities would
    24 manage an office building.
    L.A. REPORTING (312) 419-9292

    86
    1 MS. McFAWN: Are they the ones that supervise
    2 the inspection for asbestos and lead?
    3 MS. CRIVELLO: No. That would be done through
    4 my office.
    5 MS. McFAWN: Through your office?
    6 MS. CRIVELLO: Yes.
    7 MS. McFAWN: And then when you've done that
    8 information, do you then produce a written document
    9 for the public schools -- Chicago Public Schools
    10 verifying what you inspected and that it was done
    11 and --
    12 MS. CRIVELLO: Yes.
    13 MS. McFAWN: So they get a report on that and
    14 that's done for all the schools?
    15 MS. CRIVELLO: Yes.
    16 MS. McFAWN: So the proposal that CBE makes
    17 that such a certification be done every five years,
    18 could that be woven into that other process?
    19 MS. CRIVELLO: Well, our position is we don't
    20 need to certify every other five years because we
    21 maintain these barriers on a daily basis and we are
    22 required by the Act, the regulation, and NFR letter
    23 that says by law you must maintain these barriers.
    24 So we don't really see a need to certify that. We
    L.A. REPORTING (312) 419-9292

    87
    1 basically are compelled to follow those regulations
    2 and the requirements of our NFR letter or else we
    3 have no NFR letter. It's voidable. To certify it
    4 does not serve a purpose.
    5 MS. McFAWN: Okay. But CBE has testified as to
    6 why they believe there is a purpose on that and I'm
    7 just wondering from an administrative standpoint if
    8 that's something that could then be integrated into
    9 the current legally required asbestos maintenance
    10 program?
    11 MS. CRIVELLO: We would have a problem with
    12 that. For one thing the people that inspect
    13 asbestos, although they're educated environmental
    14 professionals, they may not be deemed appropriate
    15 personnel by the Illinois EPA who is going to
    16 determine who can certify this barrier as being
    17 qualified to do that. At this point, I don't know
    18 who's going to certify the barrier. Probably more
    19 to the heart of the matter is that I don't believe
    20 that there has ever been a documented instance where
    21 this five-year notification would have affected any
    22 operation at any school and essentially, we're
    23 requiring notification, but there hasn't been a
    24 problem identified that would require a

    L.A. REPORTING (312) 419-9292
    88
    1 notification.
    2 MS. McFAWN: Okay. Accepting all of that, you
    3 also mentioned that there are routine inspections in
    4 the school?
    5 MS. CRIVELLO: Correct.
    6 MS. McFAWN: For all sorts of things?
    7 MS. CRIVELLO: Correct.
    8 MS. McFAWN: And are these done by individual
    9 contractors like someone for asbestos, someone for
    10 lead, someone for public health?
    11 MS. CRIVELLO: Yes.
    12 MS. McFAWN: Okay.
    13 HEARING OFFICER BEAUCHAMP: Mr. Eastep, you
    14 have some additional questions?
    15 MR. EASTEP: Yeah. I wanted to follow-up on
    16 some of the comments of Board member McFawn's
    17 questions.
    18 Are you familiar with the publication that
    19 the Agency prepared pursuant to Section 58.7,
    20 guidance for community relations?
    21 MS. CRIVELLO: Yes?
    22 MR. EASTEP: Okay. So you've read it?
    23 MS. CRIVELLO: Yes.
    24 MR. EASTEP: In one of your responses you

    L.A. REPORTING (312) 419-9292
    89
    1 mentioned guidance requiring four public hearings or
    2 something, three public -- something like that?
    3 MS. CRIVELLO: Yeah. That was a suggestion in
    4 the guidance.
    5 MR. EASTEP: The guidance, does it require
    6 three or four public hearings?
    7 MS. CRIVELLO: The guidance doesn't require
    8 anything, but they suggest, you know, as a
    9 suggestion here's what a community relations plan
    10 would be and in that is four public hearings.
    11 MR. EASTEP: Okay.
    12 HEARING OFFICER BEAUCHAMP: On that,
    13 Ms. Crivello, do you have a copy of that guidance
    14 document with you today that you might be able to
    15 submit as an exhibit?
    16 MS. CRIVELLO: I think I do. I have one copy,
    17 yes, I can submit that.
    18 HEARING OFFICER BEAUCHAMP: Okay. If we can
    19 assist you in making copies so we can get that, let
    20 us know. Mr. Sassila has a question?
    21 MR. SASSILA: I would like to make one comment
    22 that the asbestos inspection normally performed by
    23 licensed asbestos --
    24 HEARING OFFICER BEAUCHAMP: I'm sorry. Is this

    L.A. REPORTING (312) 419-9292
    90
    1 a question or do you have some comments you'd like
    2 to present?
    3 MR. SASSILA: It's a comment to one of the
    4 issues being addressed regarding asbestos
    5 inspection -- the three-year inspection.
    6 HEARING OFFICER BEAUCHAMP: We should have you
    7 sworn in then if it's just a statement. Would you
    8 swear Mr. Sassila in?
    9 (Mr. Sassila was sworn.)
    10 MR. SASSILA: That three-year asbestos
    11 inspection normally performed by licensed asbestos
    12 inspectors and who are normally licensed by the
    13 Illinois Department of Public Health, the engineer
    14 barrier has to be certified by the professional
    15 engineer as per the existing SRP requirement, and
    16 generally there are two different requirements and
    17 qualifications and I don't believe they are --
    18 should be an asbestos inspector to be able to
    19 inspect an engineered barrier and make a decision on
    20 behalf of professional engineer. I don't know what
    21 is the Agency's position.
    22 MS. McFAWN: I don't know that the Agency has a
    23 position either. I was just prying to investigate

    24 and learn more about the current inspections
    L.A. REPORTING (312) 419-9292
    91
    1 performed at public schools. Thank you.
    2 HEARING OFFICER BEAUCHAMP: Thank you.
    3 Are there any other questions anyone may
    4 have? Mr. Eastep?
    5 MR. EASTEP: I guess I'm a little confused.
    6 Given all the other work that's done on the schools,
    7 who is currently responsible for ensuring that the
    8 engineered barriers are maintained?
    9 MS. CRIVELLO: That would be through the
    10 capital program.
    11 MR. EASTEP: I'm not sure -- who would be --
    12 MS. CRIVELLO: The capital program is the --
    13 that part of the Chicago Public School systems for
    14 which we work for the capital operations program.
    15 The operations program office at CPS is responsible
    16 for the maintenance and operation of all CPS
    17 buildings, school buildings and otherwise.
    18 MR. EASTEP: The maintenance of an engineered
    19 barrier, is that a specific item that they would
    20 look at because that's not conventional maintenance
    21 in the same sense as fixing windows and --
    22 MS. CRIVELLO: The maintenance of the

    23 engineered barrier would be in the same category
    24 as maintenance of asbestos safety, lead safety,
    L.A. REPORTING (312) 419-9292
    92
    1 integrated pest management requirements, air quality
    2 requirements. There's a whole collection of
    3 environmental issues that I work with on a daily
    4 basis and we maintain compliance with all of those,
    5 that's our mission basically is to maintain
    6 environmental compliance with all aspects of our
    7 schools.
    8 MR. EASTEP: Is there a specific section or
    9 line item in some operations manual that would
    10 require somebody to do this?
    11 MS. CRIVELLO: Yes, absolutely.
    12 MR. EASTEP: So there's something for
    13 engineered barriers?
    14 MS. CRIVELLO: It does not say engineered
    15 barriers. It says environmental compliance or
    16 environmental work.
    17 MR. EASTEP: Is there anything specific that
    18 will alert a maintenance worker to the requirements
    19 for the engineered barrier?
    20 MS. CRIVELLO: I don't believe so, not at this
    21 point.

    22 MS. McFAWN: And you do your work for what part
    23 of the city? I mean, you were saying capital
    24 development board and --
    L.A. REPORTING (312) 419-9292
    93
    1 MS. CRIVELLO: I'm sorry. In the city of
    2 Chicago, school buildings are basically built by
    3 two separate entities; one, is the Public Building
    4 Commission, the other entity is the Chicago Public
    5 Schools. They have different sources of funding so
    6 based on the funds available and negotiations and
    7 commitments and agreements between the two parties,
    8 the PBC builds, all public buildings in Chicago as
    9 well as schools and CPS also builds schools so...
    10 MS. McFAWN: And who maintains them?
    11 MS. CRIVELLO: The Chicago Public Schools is
    12 responsible for the maintenance of all buildings.
    13 MS. McFAWN: And they would --
    14 MS. CRIVELLO: All school buildings once they
    15 are built.
    16 MS. McFAWN: So Chicago Public Schools is,
    17 therefore, responsible for the maintenance and the
    18 inspections of the whole litany and possibly the
    19 engineered barriers?
    20 MS. CRIVELLO: We're responsible for all

    21 environmental compliance.
    22 MS. McFAWN: Okay. Thank you. I was getting
    23 lost in who does what at the city.
    24 HEARING OFFICER BEAUCHAMP: Are there any other
    L.A. REPORTING (312) 419-9292
    94
    1 questions for Ms. Crivello? Ms. Jarka?
    2 MS. JARKA: I have a question.
    3 You just described the Public Building
    4 Commission built some buildings, but the Chicago
    5 Public Schools maintains those buildings. Is there
    6 any mechanism in place if the Public Building
    7 Commission does remediation, receives an NFR letter
    8 that the requirements of that NFR letter are
    9 translated to the Chicago Public School system so
    10 that the people who maintain the building actually
    11 know what's in the NFR letter and know that it
    12 exists?
    13 MS. CRIVELLO: My understanding is that all the
    14 buildings plans and documents that went in -- the
    15 building plans in building and construction
    16 documents would include the SRP program, would be
    17 available to CPS, I believe copies are made for CPS.
    18 I don't have first-hand knowledge of that, but we
    19 would be made aware of any restrictions on the

    20 buildings as part of our obligation to maintain
    21 environmental compliance.
    22 MS. McFAWN: We being your consulting firm?
    23 MS. CRIVELLO: Yes.
    24 HEARING OFFICER BEAUCHAMP: Other questions for
    L.A. REPORTING (312) 419-9292
    95
    1 Ms. Crivello? Very Good. Then at this time, would
    2 you like to submit the guidance document that you
    3 were referring to as an exhibit?
    4 MS. CRIVELLO: Yes.
    5 HEARING OFFICER BEAUCHAMP: This is -- it's got
    6 Community Relations and Site Remediation Program
    7 Guidance for fulfilling 415ILCS5-58.7(h) Community
    8 Relations and Site Remediation. It is dated June
    9 1996. If there are no objections, we will admit
    10 this as Exhibit 3.
    11 MR. HARLEY: I have potentially an objection.
    12 Ms. Crivello received that document for the first
    13 time yesterday when she came to our office and we
    14 just gave her the most current version that we have.
    15 I don't know if it's the most up-to-date version
    16 that the Agency uses and so I think that as the
    17 document that we had in our files that we provided
    18 to her to review, it's the most up-to-date thing we

    19 have, but it may not be the document now effective
    20 at the Agency.
    21 HEARING OFFICER BEAUCHAMP: Thank you,
    22 Mr. Harley. Would you agree to admitting it then as
    23 the most recent version of the document that you had
    24 that you made available to Ms. Crivello and if the
    L.A. REPORTING (312) 419-9292
    96
    1 Agency has a more recent version, if they can submit
    2 that and we will admit that into the record as well?
    3 MS. McFAWN: Yeah.
    4 HEARING OFFICER BEAUCHAMP: It's dated June
    5 1996.
    6 MS. McFAWN: Why don't we just ask the
    7 Agency --
    8 MR. EASTEP: I haven't seen what they're
    9 talking about.
    10 MS. McFAWN: Could you take a look at it?
    11 MR. EASTEP: Sure.
    12 HEARING OFFICER BEAUCHAMP: We'll go off the
    13 record and we'll take a short break while the Agency
    14 reviews that.
    15 (Whereupon, after a short
    16 break was had, the
    17 following proceedings

    18 were held accordingly.)
    19 HEARING OFFICER BEAUCHAMP: We're looking at --
    20 Ms. Crivello has moved to admit a copy of the
    21 guidance which she was relying on and then referring
    22 to during her testimony and Mr. Harley raised an
    23 objection or more of a question really as to whether
    24 or not it was the most recent version. During the
    L.A. REPORTING (312) 419-9292
    97
    1 break, we discussed with the Agency and they have
    2 presented what they have stated is the most recent
    3 version of this guidance and what we've proposed to
    4 do is to admit both of these documents into the
    5 record as exhibits. The first exhibit will be the
    6 document dated June 1996, entitled Community
    7 Relations in the Site Remediation Program, Guidance
    8 for Fulfilling 415ILCS5/58.7(h) Community Relations
    9 and Site Remediation. This will be Exhibit 3 if
    10 there are no objections.
    11 MS. McFAWN: Just a point of clarification, the
    12 reason we're doing this is that that's the document
    13 that was relied upon by Ms. Crivello in her
    14 testimony.
    15 HEARING OFFICER BEAUCHAMP: And then the
    16 document with the same title, although this document

    17 has no date, this will be Exhibit 4 and this is a
    18 copy of this guidance provided by the Agency as the
    19 most recent copy of this document containing --
    20 Mr. Wight, if I'm not mischaracterizing this,
    21 nonsubstantive changes to the guidance.
    22 MR. WIGHT: Mr. Eastep, may have additional
    23 comments.
    24 MR. EASTEP: That's correct. I just want to
    L.A. REPORTING (312) 419-9292
    98
    1 point out that this is on our web site.
    2 HEARING OFFICER BEAUCHAMP: Very good. Thank
    3 you. We'd like to move forward now with the
    4 presentation from the Department of the Navy and
    5 General Services Administration. Ms. Vlahos, I'd
    6 turn the floor over to you now.
    7 MS. VLAHOS: Yes. Mr. Beauchamp, I think the
    8 General Services Administration is going to proceed
    9 first. Mr. Richard Butterworth will give his
    10 testimony.
    11 HEARING OFFICER BEAUCHAMP: Very good. Would
    12 you swear Mr. Butterworth in, please?
    13 (Mr. Butterworth was sworn.)
    14 MR. BUTTERWORTH: I will be reading from the
    15 prefiled testimony with one change to mark an error

    16 where it was printed out for submission, for some
    17 reason the first three lines of page two also appear
    18 at the bottom of page one. So I will be skipping
    19 that redundancy.
    20 Good morning, my name is Richard R.
    21 Butterworth, Jr. I am a senior assistant general
    22 counsel in the Office of General Counsel, General
    23 Services Administration, GSA. My testimony is
    24 provided on behalf of the GSA.
    L.A. REPORTING (312) 419-9292
    99
    1 I've been an employee of the GSA for 13
    2 years and have been in my current role for the past
    3 five years. In addition to other duties, I serve
    4 as chief counsel for the Office of Property Disposal
    5 within the Public Buildings Service, GSA. In that
    6 capacity, I am responsible for policy development,
    7 legislative initiatives, regulatory interpretation
    8 and adoption, overall program legal review and for
    9 individual real property disposal actions.
    10 I appreciate the opportunity to address
    11 this Board specifically on the legal limitations
    12 which exist on the ability of federal agencies to
    13 deed record land use restrictions on federal
    14 property.

    15 Why federal installations need a recording
    16 exemption.
    17 Federal installations in Illinois need the
    18 proposed recording exemption because unlike
    19 privately owned facilities, certain legal
    20 limitations exist on the ability of federal agencies
    21 to deed record land use restrictions on federal
    22 properties to be retained in federal hands.
    23 To understand the scope of federal Agency real
    24 property management authority, it must first be
    L.A. REPORTING (312) 419-9292
    100
    1 recognized that those real properties which the
    2 various federal agencies occupy or otherwise control
    3 are not, quote, unquote, owned as such by them, but
    4 rather by the United States as sovereign. This is
    5 simply because the ultimate authority to manage all
    6 federally owned land rests with Congress pursuant to
    7 the Property Clause of the U.S. Constitution,
    8 Article IV, Section 3, and Congress has not chosen
    9 to assign ownership over federal lands to any
    10 particular agency or agencies.
    11 GSA derives its authority to manage and
    12 dispose of federal lands from the Federal Property
    13 and Administrative Services Act of 1949, as amended,

    14 the same statute under which my agency was
    15 established. This is in 40 U.S.C., Section 471 et.
    16 seq and hereafter I will be referring to it as the
    17 Property Act.
    18 One of the principal purposes of the
    19 Property Act was to provide economies of scale and
    20 consolidation of resources and authorities within
    21 the Federal Government. One of those key areas of
    22 consolidation was the authority to manage and
    23 dispose of real property. Specifically, GSA was
    24 authorized to ensure the effective utilization of,
    L.A. REPORTING (312) 419-9292
    101
    1 quote, unquote, excess real property, which is
    2 property which a landholding has determined is no
    3 longer needed to accomplish its particular mission
    4 and the efficient disposal of surplus real property
    5 which is excess property for which there is no other
    6 federal needs. This authority is 40 U.S.C, Sections
    7 483 and 484. GSA is authorized to provide these
    8 functions for all federal executive agencies.
    9 Therefore, unless an agency has specific authority
    10 to dispose of real property, once a landholding
    11 agency has determined that the property is excess to
    12 its needs, it must turn the property over to GSA for

    13 disposition. The Department of Defense, DoD, is in
    14 a unique situation in the federal government in that
    15 it has a specific delegation of the same property
    16 and management functions as GSA, but only with
    17 regard to closing of realigning base properties
    18 identified under one of the various Base Closure
    19 Realignment or BRAC statutes passed by Congress in
    20 recent years. Therefore, in those limited
    21 circumstances, DoD can act as both the landholding
    22 and disposal agency - in effect, stepping into the
    23 shoes of GSA.
    24 While it is true that Congress has chosen
    L.A. REPORTING (312) 419-9292
    102
    1 on other occasions to grant certain specific
    2 property management authorities to other federal
    3 agencies, including the DoD, the scope of those
    4 authorizations has been very limited. For example,
    5 federal agencies have the general authority to grant
    6 utility easements or rights-of-way to third parties.
    7 However, the Department of Justice has previously
    8 determined that the authority Congress provided to
    9 agencies to execute these types of instruments does
    10 not extend into other broader disposal of property
    11 interests.

    12 The Property Act defines the term property
    13 to include any interest in property, 40 U.S.C,
    14 Section 472(d). Accordingly, it is GSA's position
    15 that the granting of a property right in perpetuity,
    16 such as a restriction on the future use of federal
    17 property as envisioned in the proposed SRP
    18 regulations, is an interest in property as designed
    19 by the Property Act. Thus only GSA and not the
    20 landholding agency can grant such an interest.
    21 GSA has chosen not to delegate the
    22 authority to landholding agencies to record land
    23 use restrictions that would run with the land in
    24 perpetuity for three principal reasons. First, we
    L.A. REPORTING (312) 419-9292
    103
    1 believe it would be contrary to Congressional
    2 desires as to who should hold property disposal
    3 authority. In the case of DoD, the fact that
    4 Congress has only chosen to expressly grant that
    5 agency full property disposal authority in the
    6 context of BRAC real estate action clearly indicates
    7 that it was not their intent for DoD to have those
    8 same authorities in the context of managing active
    9 base properties. Secondly, GSA believes that
    10 recorded land use restrictions should only be agreed

    11 to in the context of an actual property disposal so
    12 that such restrictions can truly reflect the risks
    13 associated with known site conditions in the context
    14 of a particular contemplated reuse of the property
    15 rather than some hypothetical use in the future. At
    16 the time of disposal, GSA or any landholding agency
    17 with disposal authority could review the
    18 institutional controls previously set in place
    19 during the landholding agency's use of the property
    20 and determine, with appropriate regulatory agency
    21 input, whether those controls should remain and
    22 become permanent use restrictions or be modified in
    23 order to be truly protective in the context of the
    24 pending reuse.
    L.A. REPORTING (312) 419-9292
    104
    1 And finally, as previously mentioned,
    2 GSA strongly believes that there are other effective
    3 means to impose use restrictions on federal property
    4 without requiring that those restrictions be
    5 recorded. For example, while federal landholding
    6 agencies may be legally precluded from recording
    7 permanent use restrictions, those agencies may enter
    8 into land use restriction agreements, which may run
    9 for the length of the agency's custody of the

    10 property. Since many agencies retain their primary
    11 facilities for many years, such agreements can
    12 implement land use controls practically and
    13 perpetuity. The LUC MOA process that was adopted in
    14 the TACO regulations and has been proposed in the
    15 LUST regulations results in exactly such an
    16 agreement. Therefore, GSA hopes that the Board will
    17 adopt the amendment proposed by the defense agencies
    18 in this proceeding, which are intended to mirror the
    19 LUC MOA process.
    20 We believe it important to also point out
    21 to this Board that in addition to those LUC MOA
    22 agreements, two federal laws, namely CERCLA and
    23 NEPA, independently impose certain preproperty
    24 disposal related notice requirements and other
    L.A. REPORTING (312) 419-9292
    105
    1 obligations on federal landholding agencies. These
    2 obligations are of a kind not similarly imposed on
    3 any private landholder. For example, CERCLA Section
    4 120(h)(3) requires federal agencies disposing of
    5 surplus properties to specifically state in the form
    6 of a deed covenant that all remedial action
    7 necessary to protect human health and the
    8 environment with regard to identified hazardous

    9 substance activity has been taken prior to
    10 conveyance. The United States also commits to
    11 return to the property to correct any other
    12 hazardous substance condition from the prior federal
    13 activity that was not previously identified.
    14 Second, federal landholding agencies must
    15 comply with the National Environmental Policy Act or
    16 NEPA in the context of making closure and excessing
    17 decisions. Under NEPA, federal agencies are
    18 required to assess potential impacts to the quality
    19 of the human environment from the proposed federal
    20 disposal action. Thus, if any institutional
    21 controls are affected by an agency's decision to
    22 close a facility or declare property excess, the
    23 landholding agency must evaluate those impacts and
    24 allow public comment on that evaluation. GSA must
    L.A. REPORTING (312) 419-9292
    106
    1 also comply with NEPA for our disposal action and if
    2 there is contamination in place on property GSA is
    3 disposing, we routinely notify the appropriate state
    4 regulatory agency to obtain their input on the need
    5 for land use restrictions on the property.
    6 In light of the foregoing, GSA urges the
    7 Board to adopt the amendment to the proposal

    8 submitted by federal agencies. GSA believes that
    9 the proposal will adequately address our concerns
    10 regarding a perfection of the NFR that would include
    11 deed recordation for ongoing federal facilities.
    12 While the deed recordation requirement has been
    13 removed, GSA believes the proposal contains adequate
    14 safeguards to ensure the viability of the
    15 institutional controls. These safeguards include
    16 identification and notice requirements, procedures
    17 to ensure ongoing updates are communicated to IEPA,
    18 measures to ensure continued compliance with the LUC
    19 MOA and advance notification to IEPA of any proposed
    20 disposal of a property regulated by an institutional
    21 control.
    22 In conclusion, we at GSA support the
    23 proposal to modify the proposed SRP rules as
    24 submitted by DoD to take into account the unique
    L.A. REPORTING (312) 419-9292
    107
    1 authorities given to and responsibilities imposed
    2 upon the federal agencies' management of federal
    3 real property.
    4 I appreciate the opportunity the federal
    5 government has had to work with the Board and IEPA
    6 to resolve this issue and I thank you for the

    7 opportunity to present this testimony to you today.
    8 HEARING OFFICER BEAUCHAMP: Thank you,
    9 Mr. Butterworth. Ms. Vlahos, would you like to take
    10 questions from Mr. Butterworth before continuing
    11 with your presentation?
    12 MS. VLAHOS: Yes, that would be good.
    13 HEARING OFFICER BEAUCHAMP: Very good. At
    14 this time then we'll open the floor to questions for
    15 Mr. Butterworth regarding his testimony. Seeing
    16 none from the audience, do the Board members or
    17 staff have any questions?
    18 MS. LIU: Good afternoon, Mr. Butterworth.
    19 MR. BUTTERWORTH: Hi.
    20 MS. LIU: Do you think that the amendments
    21 posed by the Navy are open enough to include other
    22 nonDoD federal agencies in the future who might run
    23 up against these same type of limitations?
    24 MR. BUTTERWORTH: Yes.
    L.A. REPORTING (312) 419-9292
    108
    1 MS. LIU: Thank you.
    2 HEARING OFFICER BEAUCHAMP: Are there any other
    3 questions? Ms. Vlahos, let me ask you if you would
    4 like to admit Mr. Butterworth's testimony as an
    5 exhibit while he's still here so that if he needs to

    6 leave he can do so without --
    7 MS. VLAHOS: Yes.
    8 HEARING OFFICER BEAUCHAMP: Okay.
    9 MR. BUTTERWORTH: I provided one to the court
    10 reporter, here's an additional.
    11 HEARING OFFICER BEAUCHAMP: Very good. Thank
    12 you. This is the prefiled testimony of Richard R.
    13 Butterworth, Jr. Just to clarify, the previous
    14 documents that we've admitted as exhibits today were
    15 in Docket R01-29. This exhibit will be admitted as
    16 Exhibit No. 3 in Docket R01-27 unless there are any
    17 objections. Seeing none, this will be admitted as
    18 Exhibit 3. Thank you, Mr. Butterworth.
    19 MR. BUTTERWORTH: Thank you.
    20 MS. McFAWN: Thank you for coming. We
    21 appreciate it.
    22 MR. BUTTERWORTH: Thanks.
    23 MS. McFAWN: Coming from D.C., isn't it?
    24 MR. BUTTERWORTH: Yes.
    L.A. REPORTING (312) 419-9292
    109
    1 HEARING OFFICER BEAUCHAMP: Ms. Vlahos, if
    2 you'd like to proceed. Do you have testimony you
    3 would like to present today?
    4 MS. VLAHOS: Yes. I do have prefiled testimony

    5 that I submitted. I will be reading that into the
    6 record today with only some slight modifications,
    7 some changes that happened after I filed my prefiled
    8 testimony.
    9 HEARING OFFICER BEAUCHAMP: Okay. If we could
    10 have you sworn in then.
    11 (Ms. Vlahos was sworn.)
    12 MS. VLAHOS: I guess it's still -- it's good
    13 afternoon. My name is Georgia Vlahos. I'm counsel
    14 to the commander of the Navy Training Center Great
    15 Lakes located in North Chicago, Illinois. My duties
    16 include advising the commander in the capacity as
    17 the Department of the Navy's Regional Environmental
    18 Coordinator for USEPA Region 5 an area that, of
    19 course, includes the state of Illinois. In this
    20 regard, I assist the command in coordinating
    21 environmental policy among the various Navy and
    22 other Department of Defense, DoD, components in the
    23 region concerning, among other things, those
    24 pertaining to environmental compliance,
    L.A. REPORTING (312) 419-9292
    110
    1 environmental restoration and property disposal.
    2 My testimony here today was developed in
    3 consultation with other DoD component agencies.

    4 On behalf of the Navy and the other military
    5 services, I thank you for the opportunity to be here
    6 today and provide you with our views on the
    7 revisions to the Part 740 site remediation program,
    8 SRP, regulations proposed by the Illinois
    9 Environmental Protection Agency, which I shall refer
    10 to as the Agency. I shall refer to these revisions
    11 as the Agency proposal. The Agency proposal
    12 introduces the concept of perfecting, close quote,
    13 no further remediation, NFR, letters by recording
    14 them in county land records as was addressed in
    15 testimony presented to you today by Mr. Butterworth
    16 of the General Services Administration. This
    17 recording requirement is problematic for federal
    18 landholding entities because federal entities do not
    19 generally own the federal lands on which they
    20 operate and, therefore, have no legal authority to
    21 record restrictions on the future use of that land.
    22 I appear before you to present an
    23 alternative to this recording requirement for the
    24 Navy and other federal landholding agencies in
    L.A. REPORTING (312) 419-9292
    111
    1 Illinois. Our proposal reflects our desire to apply
    2 the Land Use Control Memorandum of Agreement, LUC

    3 MOA, concept, which was recently incorporated by the
    4 Board into the TACO rules in Part 742 into the Part
    5 740 regulations for the site remediation program.
    6 At this point, I must note that, by
    7 suggesting revisions to the Agency's proposal, we in
    8 the DoD community do not mean to imply that we view
    9 every effort we undertake to address hazardous
    10 substance contamination on our facilities as subject
    11 to SRP requirements. As I'm sure this Board is
    12 aware, unlike the private sector, DoD has its own
    13 independent CERCLA lead Agency authorities which
    14 allow us to deal directly with hazardous substance
    15 releases on, or from our facilities. However, we
    16 believe there well could be times where we might
    17 want to seek an NFR letter from the Agency in
    18 connection with a site where long-term institutional
    19 controls are contemplated. Hence, we believe it
    20 appropriate to allow such sites to be encompassed
    21 under the same LUC MOA concept, which was adopted in
    22 the new TACO regulations and which we hope will soon
    23 be adopted under the LUST program rules.
    24 We concur with the General Assembly's
    L.A. REPORTING (312) 419-9292
    112
    1 statement of intent for the site remediation program

    2 set forth in Section 58 of the Illinois
    3 Environmental Protection Act that under appropriate
    4 circumstances risk-based site cleanups are desirable
    5 in Illinois. Such cleanups can be a protective,
    6 timely and cost-effective alternative to more
    7 extensive and potentially cost prohibitive remedial
    8 measures which may or may not ultimately permit
    9 unrestricted use of the affected property. We wish
    10 to secure the flexibility afforded by this approach
    11 for our sites in the state where both the Agency and
    12 we agree that use of a risk-based cleanup approach
    13 is practicable.
    14 Unfortunately, unless federal landholding
    15 agencies are provided a similar alternative to
    16 recording NFR letters as is proposed for the
    17 Illinois Department of Transportation, IDOT, in the
    18 new Section 740.621 of the Agency's proposal, our
    19 ability to utilize the SRP will be jeopardized since
    20 the existing regulations in Subpart F of
    21 Part 740 contain specific deed recordation
    22 requirements which we are legally precluded from
    23 satisfying. All that we in the federal community
    24 seek is to have the same ability that now exists
    L.A. REPORTING (312) 419-9292
    113

    1 for private industry and that is proposed by IDOT
    2 to close our sites with full Agency concurrence
    3 utilizing risk-based approaches.
    4 Because we're asking this Board to adopt
    5 our alternative to the NFR recordation requirement
    6 contained in the existing SRP regulations, we need
    7 to explain how in the absence of a publically
    8 recorded land record we will ensure the future
    9 maintenance of any land use restrictions applicable
    10 to a site. First, we would have no problem
    11 recording NFR letters for active installations,
    12 which contain notice but no land use restrictions.
    13 Under those circumstances, the letters cannot be
    14 construed as imposing restrictions on future uses
    15 of the property and, therefore, do not run afoul
    16 of the prohibition against restricting future land
    17 use. For circumstances where the NFR letters
    18 contain land use restrictions, we have proposed to
    19 the Agency and today present for your consideration
    20 the use of a tri-party LUC MOA between, I should say
    21 among, the federal landholding agency, USEPA Region
    22 5 and the Agency similar to that provided for IDOT
    23 in Section 740.621 of the Agency's proposal. The
    24 Navy has executed such LUC MOAs in other states and
    L.A. REPORTING (312) 419-9292

    114
    1 U.S. EPA regions and more important, the Board
    2 recently approved their use as a form of
    3 institutional control by federal landholding
    4 entities under the amended TACO regulations.
    5 Furthermore, this LUC MOA approach is consistent
    6 with the recently established DoD, Policy on Land
    7 Use Controls Associated with Environmental
    8 Restoration Activities, which was issued by the
    9 Deputy Under Secretary of Defense for Environmental
    10 Security on January 17th, 2001. I would be happy to
    11 provide a copy of this policy to the Board and to
    12 any other interested person.
    13 Under the form of LUC MOA we propose DoD
    14 facilities within the state would commit to, among
    15 other things, certain periodic site inspection and
    16 reporting requirements to ensure that our facility
    17 personnel adequately maintain those site
    18 remedy-based land use controls necessary for
    19 long-term protection of human health and the
    20 environment. I have provided as an exhibit to my
    21 testimony today a model LUC MOA for your
    22 consideration that has been negotiated between a DoD
    23 working group, EPA Region 5 and Agency
    24 representatives. We believe it provides a sound
    L.A. REPORTING (312) 419-9292

    115
    1 and adequately protective alternative to requiring
    2 federal entities such as ourselves to record NFRs at
    3 active, non-transferring installations and at
    4 installations that may be transferred from one
    5 federal landholding entity to another. The LUC MOA
    6 makes clear that compliance with its provision is a
    7 prerequisite for the continued validity of NFRs.
    8 I'm presenting as part of my testimony
    9 today as an exhibit a suggestive revision to the
    10 Agency's proposal to address the concerns noted in
    11 my testimony. These revisions have Agency
    12 concurrence. I need to amend, however, what was
    13 previously submitted with my testimony as prefiled
    14 because we have been in communication with the
    15 Agency since that time and have agreed to certain
    16 additional revisions and I will read those into the
    17 record at the conclusion of this testimony.
    18 In conclusion, we're proposing to the
    19 Board that the Part 740 SRP regulations be revised
    20 to exempt federal facilities from the aforementioned
    21 NFR recordation requirement subject to a given
    22 facility's execution of and subsequent compliance
    23 with a tri-party LUC MOA with the Agency and USEPA.
    24 Is it appropriate at this time for me to read the

    L.A. REPORTING (312) 419-9292
    116
    1 additional revision into the record?
    2 HEARING OFFICER BEAUCHAMP: If you'd like to,
    3 please.
    4 MS. VLAHOS: The first revision from what was
    5 -- has been filed is in Section 740.120 which is the
    6 definition section. It's on the page marked three
    7 of what I filed and it's the definition of
    8 institutional control. That should now read
    9 institutional control means a legal mechanism for
    10 imposing a restriction on land use as described in
    11 35 Illinois Administrative Code 742, Subpart J and
    12 that's to ensure consistency with the same
    13 definition which appears in the TACO regulations.
    14 The second revision is to 740.610(a)(2),
    15 which is on page four of what I previously filed and
    16 that subsection should now read a description of the
    17 remediation site by adequate legal description or by
    18 reference to a plat showing the boundaries comma or
    19 this is the additional language, for federally owned
    20 property under Section 740.622 by other means
    21 sufficient to identify site locations with
    22 particularity.
    23 The third revision appears in
    24 740.622(a)(1)(A), which is on page five of what I

    L.A. REPORTING (312) 419-9292
    117
    1 previously submitted and that is additional language
    2 at the end, I will simply just tell you what that
    3 additional language is insert it at the end and that
    4 is acceptable to the Agency. That is all.
    5 HEARING OFFICER BEAUCHAMP: Ms. Vlahos, are
    6 there any exhibits that you'd like to submit to
    7 their entrance into the record at this time?
    8 MS. VLAHOS: Yes, I would with the revisions
    9 that I just noted, I would like to submit my
    10 prefiled testimony which attaches two documents, one
    11 is the model LUC MOA that as I said has been
    12 negotiated with federal and state EPA and then with
    13 our suggested revisions to the Agency's proposal.
    14 HEARING OFFICER BEAUCHAMP: Are you submitting
    15 this as one exhibit then -- the attached exhibit.
    16 MS. VLAHOS: Yes, I am. I'm submitting it as a
    17 single exhibit.
    18 HEARING OFFICER BEAUCHAMP: And the suggested
    19 revisions, does that include the additional language
    20 that you just read into the record?
    21 MS. VLAHOS: Yes. That's not reflected on the
    22 copy I gave you, but it is, I hope, reflected in the
    23 record.
    24 HEARING OFFICER BEAUCHAMP: It is titled

    L.A. REPORTING (312) 419-9292
    118
    1 Prefiled Testimony of Georgia Vlahos, if there are
    2 no objections and I see none, we will admit this as
    3 Exhibit 4 in Docket R01-27. Could I ask Ms. Vlahos
    4 if it might be possible in perhaps a public comment
    5 if you could submit maybe a clean version, including
    6 the language that you just read into the record?
    7 MS. VLAHOS: We will do so.
    8 HEARING OFFICER BEAUCHAMP: Okay. At this time
    9 then we'll look for any questions from the floor,
    10 the audience attending for Ms. Vlahos, any questions
    11 from the members of the Board or staff. Board
    12 member Kezelis?
    13 MS. KEZELIS: Thank you.
    14 Ms. Vlahos, would you provide to the Board
    15 a copy of the Department of Defense policy on land
    16 use controls?
    17 MS. VLAHOS: Certainly. I have a copy
    18 available.
    19 HEARING OFFICER BEAUCHAMP: Would you like to
    20 make that an exhibit as well?
    21 MS. VLAHOS: Yes, I would.
    22 HEARING OFFICER BEAUCHAMP: This is entitled
    23 Memorandum for Assistance Secretary of the Army,

    24 Installations and Environment; Assistant Secretary
    L.A. REPORTING (312) 419-9292
    119
    1 of the Navy, Installations and Environment;
    2 Assistant Secretary of the Air Force, Manpower
    3 Reserve Affairs, Installations and Environment;
    4 Director, Defense Logistics Agency and the subject
    5 is policy on land use controls associated with the
    6 environmental restoration activities. It is dated
    7 January 17th, 2001. If there are any objections,
    8 seeing none, we will admit this as Exhibit No. 5 in
    9 R01-27.
    10 MS. KEZELIS: Thank you, Ms. Vlahos.
    11 I have one other question and that is
    12 this: In addition to Illinois, how many other
    13 states have you entered into LUC MOAs.
    14 MS. VLAHOS: I am aware of Florida and it's one
    15 of the Carolinas. I believe it's North Carolina.
    16 MS. KEZELIS: Thank you.
    17 HEARING OFFICER BEAUCHAMP: Other questions?
    18 MS. LIU: Good afternoon, Ms. Vlahos.
    19 What happens in states where you don't have these
    20 LUC MOA type agreements?
    21 MS. VLAHOS: Certainly it depends on whether
    22 the state's regulations require deed recordation or

    23 not. Where it does, we're simply not able to close
    24 out our sites.
    L.A. REPORTING (312) 419-9292
    120
    1 MS. LIU: In the proposed LUC MOA that you did
    2 provide you mentioned that it applies to an
    3 installation. Could you please describe what an
    4 installation is in terms of DoD?
    5 MS. VLAHOS: Typically, it is a military base.
    6 It could also be a reserve center. It is the
    7 facility on which activities related to the
    8 Department of Defense would take place.
    9 MS. LIU: Generally speaking, how big could an
    10 installation be?
    11 MS. VLAHOS: Well, our installation at the
    12 Great Lake's is fairly vast, 1,638 acres so I
    13 suppose it is that vast. I don't know how large
    14 Scott Air Force Base is or the Rock Island Arsenal
    15 which are the other two principal military
    16 installations in Illinois.
    17 MS. LIU: Would separate MOAs be treated for
    18 separate installations?
    19 MS. VLAHOS: Correct. Separate MOAs would be
    20 created for separate installations.
    21 MS. LIU: An installation could consist of more

    22 than one remediation site?
    23 MS. VLAHOS: Yes. The LUC MOA is to apply to
    24 an installation and then the control is imposed --
    L.A. REPORTING (312) 419-9292
    121
    1 we have a term LUCIPs, in the implementation plan
    2 for various things could encompass more than one
    3 site. We view it also as a living document more
    4 sites are found in the future that require some sort
    5 of remediation is going to be modified or advised
    6 with, of course, full Agency, USEPA necessary
    7 concurrence as time goes by.
    8 MS. LIU: The LUC MOA also seems to create a
    9 lot of new work for the Navy. There seems to be
    10 30-day notification, quarterly reports, inspections
    11 annual reports that kind of thing?
    12 MS. VLAHOS: Annual certifications, correct.
    13 These are some of the -- this is the effort to do by
    14 contract, if you will, and to give notice and to
    15 give assurance to the Agency what we cannot do by
    16 recording on the land records. It's to ensure the
    17 continuation, the effective management of the
    18 controls.
    19 MS. LIU: How is the Navy preparing to budget
    20 for and provide training for those kinds of new

    21 requirements.
    22 MS. VLAHOS: This will fit very much into our
    23 environmental compliance program. At our base, for
    24 example, we have an environmental department
    L.A. REPORTING (312) 419-9292
    122
    1 comprised of over 20 people who would undertake this
    2 function. It would be part of our budgeted
    3 environmental compliance operations.
    4 MS. LIU: Thank you very much.
    5 HEARING OFFICER BEAUCHAMP: Other questions?
    6 All right. I see none. Thank you, Ms. Vlahos.
    7 Let's go off the record for a few moments.
    8 (Whereupon, a discussion
    9 was had off the record.)
    10 HEARING OFFICER BEAUCHAMP: Next we are going
    11 to have the testimony of Harry Walton. Could you
    12 please swear Mr. Walton in?
    13 (Mr. Walton was sworn in.)
    14 MR. WALTON: Good afternoon. My name is Harry
    15 Walton. Today I'll be testifying on behalf of IERG,
    16 the Environmental Regulatory Group and SRAC, the
    17 Site Remediation Advisory Committee. We'll be
    18 providing comments with regards to Illinois EPA's
    19 proposal and the Citizens for a Better Environment's

    20 proposed amendments to the SRP program.
    21 First of all, SRAC is a ten-member
    22 committee that was appointed by the Governor. This
    23 committee was formed as a part of Title XVII, the
    24 Brownfield legislation. This committee was charged
    L.A. REPORTING (312) 419-9292
    123
    1 with working with the Agency, offering our insight
    2 and to develop regulatory proposals for
    3 implementation of Brownfield.
    4 The two main regulations that were
    5 developed were the SRP program and TACO. During
    6 this process, we worked and built on the experiences
    7 of the Agency. We had a lot of experience within
    8 this committee. I have an excess of 26 years of
    9 remedial experience in regulatory programs ranging
    10 from the TACO, RCRA, CERCLA, numerous different
    11 remedial processes. The goal of SRAC and the Agency
    12 was to develop a consensus proposal in the initial
    13 rulemaking, initial SRP and TACO program and during
    14 our testimony in front of the Board I guess in 1996,
    15 '97, we supported the Agency on this consensus
    16 proposal. We had worked out many important issues
    17 and resolved many issues to have a more effective
    18 rulemaking in front of the Board. SRAC and IERG

    19 have worked with the Agency in regards to these
    20 proposed amendments. We are in support of many
    21 aspects of them. We are a bit confused on some
    22 aspects of these proposed amendments and I would
    23 like to get into those in a few moments, but another
    24 issue that's been brought and we discussed at length
    L.A. REPORTING (312) 419-9292
    124
    1 this morning was the proposed Subpart H, Community
    2 Relations proposal.
    3 During my professional career, I've worked
    4 with community relations starting in about 1986.
    5 Community relations is an effective tool to be used
    6 in the remedial process. The community relations
    7 program should be based upon the site
    8 characteristics. As it has been said prior, the
    9 community relations, one size does not fit all.
    10 Community relations should be implemented by the
    11 remedial applicant. The need for community
    12 relations should also be determined by the remedial
    13 applicant. It's been my experience that one out of
    14 100 sites requires community relations, except for
    15 one class of sites in Illinois, they are historical
    16 former gas manufacturing plants. Those plants
    17 typically require community relations because of

    18 their location and the nature of the contaminant.
    19 They stink, they smell. The old factory levels are
    20 very, very low for coal tar, but it is a program
    21 that if it's appropriate, it should be implemented.
    22 We had a lot of discussion this morning in regards
    23 to what consists of community relations. It's been
    24 our experience, again, I'm speaking primarily for
    L.A. REPORTING (312) 419-9292
    125
    1 Harry Walton here not members of IERG and SRAC, we
    2 have implemented several -- right now I'm involved
    3 in a number of sites that we're using community
    4 relations. The need for community relations -- we
    5 use a community survey, we go out four to five, six
    6 blocks from the site and see who the interested
    7 parties are. We talk to the local government. We
    8 talk to any organizations within that zone. We go
    9 to the newspapers, they have a very good idea of who
    10 are the interested parties. Based upon that, we
    11 implement a number of strategies going from what we
    12 call a living room meeting with the use of facts
    13 sheets. You always want to put something on paper
    14 that you can leave with them. It's been our
    15 experience when we're at public meetings or anything
    16 formal, the participation was not good. The people

    17 you want to hear from typically do not respond in a
    18 forum. We found that the community survey, if
    19 appropriate, the living room meetings, were the best
    20 way to solicit information and actually had
    21 one-on-one meetings with those individuals that
    22 could be effective, but again, it depends on the
    23 site issues. Location, location, location, is very
    24 critical and the contaminants of concern.
    L.A. REPORTING (312) 419-9292
    126
    1 IERG and SRAC support the concept of
    2 community relations that has been advanced by the
    3 Citizens for a Better Environment. We think there's
    4 some opportunities to work with them to give them
    5 our insight from SRAC on ways to have a program that
    6 is effective and it will really be a program that
    7 will respond to the characteristics of the site and
    8 the needs at the site. One size does not fit all.
    9 The next area I'd like to comment on, the
    10 main provisions of the amendments by the Agency to
    11 the SRP program is the concept of soil management
    12 zone and it has been our practice, IERG, SRAC and
    13 the Agency worked together, we had a number of
    14 meetings to explore this concept. IERG and SRAC
    15 are very supportive of the soil management zone.

    16 We're a bit confused on one of the conditions that
    17 were attached to the soil management zone. These
    18 conditions were attached subsequent to the
    19 interaction and the consensus agreement between --
    20 among IERG, SRAC and the Agency. One provision --
    21 the provision with regards to moving a soil
    22 management zone onto soils that are Tier I or clean.
    23 From an antidegradation sense, common sense, we
    24 don't have a lot of problems with that additional
    L.A. REPORTING (312) 419-9292
    127
    1 condition. It doesn't make sense to take dirty
    2 material and move it into a clean zone. We do have
    3 a problem with the other condition; that is, the
    4 prohibition of moving a soil management zone closer
    5 to a residential area. I've had this explained to
    6 me a number of times during our discussions and
    7 truthfully, I'm a bit confused on the need for it.
    8 First of all, there's one basic situation.
    9 When you use a soil management zone, that material
    10 is going to be characterized. That soil has to be
    11 analyzed for all the contaminants of concern under
    12 the SRP program, a comprehensive evaluation of the
    13 materials in them so you have an understanding what
    14 this material consists of.

    15 You have the TACO solution, you have to be
    16 protective according to TACO. That protection is
    17 afforded regardless of where the -- the receptor is
    18 always on the other side -- is at the compliance
    19 point. If you have a soil management zone,
    20 typically you use a barrier. On the other side of
    21 the barrier, that's the compliance point. You have
    22 to be protective at that point. An example would
    23 be, if you have a site that's in a residential area,
    24 totally surrounded by residential, it will be
    L.A. REPORTING (312) 419-9292
    128
    1 residential, you implement a TACO solution, it's
    2 protective, everybody pretty much agrees upon that,
    3 it is protective. Now, let's take another site, you
    4 have a large industrial complex, if you have
    5 residential over here, you're going to have a
    6 solution that's protective, but we have an arbitrary
    7 prohibition about moving soil closer to the
    8 residents. What is the difference in those two
    9 scenarios? They're both protective. In fact, in
    10 this location, we have residents on and adjacent to
    11 the site. The same solution is afforded in both
    12 locations. From a risk perspective under TACO, many
    13 people involved in that rule -- we always get ten

    14 minus six protection at the point of compliance and
    15 that's critical. In the Agency's statements this
    16 isn't about risk, it's about perception. As I
    17 eluded to earlier, if it's about perceptions and
    18 risks, if there are conditions at a site and the
    19 site conditions warrant a community relations
    20 evaluation of that site because of location,
    21 location, location, residents or the contaminant
    22 concerned, then it would be appropriate to address
    23 that issue head on with a community relations plan.
    24 If it's an issue, let's address the issue. Our goal
    L.A. REPORTING (312) 419-9292
    129
    1 under SRAC and IERG and I think the Agency also,
    2 when we have a TACO solution, it's protected. Why
    3 do we need additional conditions?
    4 Another issue that we'd like to offer --
    5 we offered a definition on what is soil management
    6 zone and to that what is soil. I know we wrestled
    7 this term with the Agency, the Agency wrestled with
    8 it, we wrestled with it. The term soil to us means
    9 material that is not source material. As we said
    10 previously, the good gooey stuff, it passes Subpart
    11 C, it's not hazardous, it's not corrosive, it does
    12 not exceed soil attenuation. You know, those help

    13 us define what is source material that has to be
    14 removed. Under all TACO solutions you have to
    15 remove source material or the good gooey stuff. So
    16 what we're saying is if it's not that, if it passes
    17 that test and the Agency approves it, is soil. We
    18 try to construct a definition -- we know what it
    19 isn't, we know it's not landfill material. We know
    20 it's not material that we would look at as going to
    21 a landfill, meeting those activities. It is
    22 material that is at the site based upon typically
    23 the historical activities at the site. Hundreds of
    24 years of fill, land use, casual disposal, material
    L.A. REPORTING (312) 419-9292
    130
    1 have numerous different materials in it. It is not
    2 a homogeneous, heterogenous mixture of materials.
    3 Again, we tried to construct a definition and we
    4 wrestled with it, but I think we have enough faith
    5 in the ability to characterize this material in
    6 compliance with the aspects of TACO and again, it
    7 will be an approved remedial action plan that
    8 prevents people outside the process to manage these
    9 facilities or construct these facilities.
    10 I think those are my main points. One
    11 other additional issue and this is an issue that

    12 we've discussed with the Agency subsequent to this
    13 and this is in regards to use of data from
    14 noncertified labs. We are in support of the
    15 certification of laboratories. It does give us --
    16 it is a more effective program. It does reduce
    17 costs to remedial applicants and it allows
    18 comparability of data, but there are certain
    19 situations where a company may have a contract with
    20 a response company, they will go out -- they may or
    21 may not be following the SRP certification
    22 requirements. This may or may not be a problem, we
    23 don't know. It's just an issue we like, we brought
    24 up. We have an understanding that the Agency agrees
    L.A. REPORTING (312) 419-9292
    131
    1 that this type of information could be used for site
    2 characterization and depending on the data, it
    3 probably would not be able to be used for TACO
    4 compliance sampling, but the data still has value
    5 and it should be used for some aspect of the
    6 investigation. That ends my testimony. I'd be
    7 happy to take any questions.
    8 HEARING OFFICER BEAUCHAMP: Thank you,
    9 Mr. Walton. Before we open the floor to questions,
    10 would you like to submit your prefiled testimony as

    11 an exhibit?
    12 MR. WALTON: Yes.
    13 HEARING OFFICER BEAUCHAMP: This is the
    14 prefiled testimony of Harry R. Walton. Are there
    15 any objections to admitting this as an exhibit?
    16 Seeing none, we will admit this. Mr. Walton, your
    17 testimony addresses both Dockets R01-27 and R01-29?
    18 MR. WALTON: Yes.
    19 HEARING OFFICER BEAUCHAMP: Should we admit it
    20 as an exhibit in both dockets then?
    21 MR. WALTON: Yes.
    22 HEARING OFFICER BEAUCHAMP: You wouldn't happen
    23 to have extra copies, would you?
    24 MR. WALTON: There were some over on the table.
    L.A. REPORTING (312) 419-9292
    132
    1 HEARING OFFICER BEAUCHAMP: I can run a copy of
    2 this off during our break. It will be Exhibit 6 in
    3 R01-27 and it will also be Exhibit 5 in R01-29.
    4 Are there any questions for Mr. Walton?
    5 Mr. Eastep, I think I saw your hand up?
    6 MR. EASTEP: Yes. In the first part of your
    7 testimony, Mr. Walton, you don't seem to be confused
    8 about community relations and whether or not formal
    9 public hearings are effective. It's my

    10 understanding you don't think they're very
    11 effective?
    12 MR. WALTON: It's been my personal experience
    13 they are not effective.
    14 MR. EASTEP: Are you familiar with the Agency
    15 guidance on community relations?
    16 MR. WALTON: Yes.
    17 MR. EASTEP: Is there anywhere in that guidance
    18 that explicitly or even implicitly requires public
    19 hearings?
    20 MR. WALTON: My past review and understanding
    21 of that guidance, it does not require public
    22 hearings.
    23 MR. EASTEP: It's all site specific?
    24 MR. WALTON: Site specific.
    L.A. REPORTING (312) 419-9292
    133
    1 MR. EASTEP: You also mentioned that you
    2 thought that all the MGP sites, manufactured gas
    3 plant sites, needed community relations. Is it your
    4 understanding that the sites in the program now
    5 pretty much all do have community relation plans?
    6 MR. WALTON: The sites and programs I'm
    7 familiar with would be primarily Illinois Power
    8 companies and to some extent, several other

    9 utilities. They all include community relations as
    10 a part of the remedial program.
    11 MR. EASTEP: So they're all doing that now?
    12 MR. WALTON: Yes.
    13 MR. EASTEP: Thank you. No further questions.
    14 HEARING OFFICER BEAUCHAMP: Thank you,
    15 Mr. Eastep. Additional questions for Mr. Walton?
    16 Questions from the Board members or staff?
    17 MS. McFAWN: Manufacturing gas plants also have
    18 community relations programs. Have you used formal
    19 hearings in any of those that you're familiar with?
    20 MR. WALTON: My personal experience has been
    21 with about 25 gas manufacturing plants. We did not
    22 have formal hearings. We had a number of different
    23 types of public meetings from a -- what I call a
    24 PR event to a living room meeting, but the type of
    L.A. REPORTING (312) 419-9292
    134
    1 meeting was dependant upon what activity was
    2 occurring at the site and what the site
    3 characteristics dictated we do.
    4 MS. McFAWN: You mentioned community surveys.
    5 MR. WALTON: Yes.
    6 MS. McFAWN: Did you conduct those before you
    7 began the SRP process or in the midst of it or at

    8 the conclusion?
    9 MR. WALTON: Again, I can speak to one program.
    10 The program that I was involved with, we conducted
    11 those surveys in 1986 long before the existence of
    12 the SRP program.
    13 MS. McFAWN: And those were done then prior --
    14 obviously before you started the remediation?
    15 MR. WALTON: Yes.
    16 MS. McFAWN: What did you do with the
    17 information you gained at that living room meetings
    18 or other contact with the public?
    19 MR. WALTON: Well, it depends on the site. I
    20 can give you a number of examples. One site we were
    21 in a commercial area on one site, residential on the
    22 other site. One of the critical issues is
    23 groundwater. During the living room meetings, we
    24 surveyed the areas. Our records, our review, our
    L.A. REPORTING (312) 419-9292
    135
    1 Phase I, Phase II effort did not identify any wells
    2 that were used for potable consumption. Lo and
    3 behold, community living room meetings we found a
    4 number of dug well cisterns if you would that were
    5 used -- they were 25, 30 feet deep that were using
    6 groundwater for watering gardens and incidental

    7 drinking. So they -- it was critical information to
    8 us.
    9 MS. McFAWN: If persons at those meetings
    10 objected to what you were engaged in in the program
    11 for remediation, how did that factor into your
    12 decision-making?
    13 MR. WALTON: Again, another case we had was
    14 located -- a site was located in totally a
    15 residential area. We had information that indicated
    16 that there may be materials beneath their basements.
    17 We had an idea what the aerial extent was. We
    18 raised these issues to them. They had few issues
    19 themselves and we implemented additional
    20 investigations, additional sampling. It came to
    21 pass, we actually emptied out their basements of all
    22 of their own materials so we could monitor their
    23 basements. We took that information we gathered
    24 during these living room meetings and reacted to it.
    L.A. REPORTING (312) 419-9292
    136
    1 MS. McFAWN: You stated at the outset that
    2 MPG sites all had community relation plans?
    3 MR. WALTON: The ones -- I'm aware of a certain
    4 universe that do have community relations attached
    5 to them.

    6 MS. McFAWN: Okay. What was the driving force
    7 for that again?
    8 MR. WALTON: Primarily, the location and odors.
    9 MS. McFAWN: Locations because of residents?
    10 MR. WALTON: These are historical sites. These
    11 sites started operation from 1855 as recently in
    12 Illinois as 1950s they operated. Most of them were
    13 built before and at the turn of the century. Most
    14 of these were in the downtown area located next to
    15 streams. There's been a lot of redevelopment and
    16 other uses subsequent to this activity. So there
    17 are a lot of issues that have to be addressed from
    18 community acceptance. These sites are within the
    19 community. They're visible, there's a lot of
    20 activity proximate to them, there's activities such
    21 as daycare, hospitals, numerous things, and the
    22 bottom line is they stink. They have odors and
    23 there's a perception of risk.
    24 MS. McFAWN: When you talked about the fact
    L.A. REPORTING (312) 419-9292
    137
    1 sheets, I assume you distributed those at the living
    2 room meetings and other meetings?
    3 MR. WALTON: Fact sheets were developed -- they
    4 are a relatively concise document that gave what I

    5 call a high level of information, what the issue is
    6 and why we're doing it. That fact sheet was used a
    7 lot. That fact sheet was sent out to -- say, we're
    8 going to start a site investigation. We sent the
    9 facts sheet out to the media, to the residents, to
    10 any -- we had a list of people that would be at
    11 interest at the site, we sent them copies. So
    12 everybody had an awareness of what was going on at
    13 that stage of the game and I think somebody else
    14 also stated, community relations program is a
    15 dynamic plan. It has to change based on where
    16 you're at in the process. Most of the issues may or
    17 may not develop until after you completed the
    18 investigation, you developed the remedial action
    19 plan and such as that. It is a dynamic document.
    20 It has to be periodically evaluated, but again, it's
    21 not a typical requirement. As I said earlier, less
    22 -- one in 100 sites may require it.
    23 MS. McFAWN: Those were the only questions I
    24 had on that issue. Let me make sure that -- others
    L.A. REPORTING (312) 419-9292
    138
    1 have questions on the same issues focus on that.
    2 MR. WALTON: Again, I'd like to offer -- I said
    3 earlier, SRAC and IERG like to work with the Agency

    4 and the Citizens for a Better Environment to help
    5 instruct an effective program that would work and
    6 would be based upon -- you know, would give you
    7 something that's effective. It is an effective
    8 tool, as a part, if it's required.
    9 MS. McFAWN: There was -- I do have one more
    10 question. There has been interest -- some concern
    11 about defining interested persons. Could it be
    12 defined by rule or is it better not defined?
    13 MR. WALTON: I don't know how you would define
    14 that because every site is different. The site
    15 survey, the site walk around, tells you who's
    16 interested and sometimes you may go out four, five,
    17 six blocks, you pretty much have -- and you talk to
    18 the local newspaper, the mayor, the city counsel,
    19 they know the interested groups. It's a pretty
    20 standard protocol and it really -- very soon you
    21 know who they are. There's a couple people you
    22 typically would have, the local governmental
    23 officials, the state and federal representatives.
    24 Those are our typical ones. The local newspaper and
    L.A. REPORTING (312) 419-9292
    139
    1 TV stations. Those are our typical ones. But
    2 again, it may not be of interest to them.

    3 MS. McFAWN: I'm not that familiar with the
    4 Agency's guidance document. Do they have -- maybe
    5 the Agency can respond as well -- suggestions of how
    6 you identify the interested persons as you just
    7 described? You do? Mr. Eastep is nodding yes.
    8 MR. EASTEP: Yes and I don't have the document
    9 in front of me, but there is a recommendation on how
    10 to come up with that list. It talks about some of
    11 the same -- similar things and it's -- again, that's
    12 really site specific. You figure that out kind of
    13 when you get there type of thing. That is in there.
    14 MS. McFAWN: Thank you.
    15 MS. LIU: Good afternoon, Mr. Walton. I have a
    16 question about soil management zones.
    17 MR. WALTON: Yes.
    18 MS. LIU: IERG had proposed a definition of
    19 soil that contained the term contaminated media.
    20 Could you provide a definition of contaminated
    21 media?
    22 MR. WALTON: To me, contaminated media is
    23 material fine for a site -- and again, this goes --
    24 I hate to say the word, as a common sense
    L.A. REPORTING (312) 419-9292
    140
    1 definition. We tried to construct something and we

    2 kept getting in trouble trying to construct a
    3 definition. We know what it isn't. We know it's
    4 not material that fails Subpart C. We know it's not
    5 land typical municipal waste. I can't speak for the
    6 Agency, but I think they wrestled with the issue.
    7 We had a lot of discussion on the issue ourselves.
    8 The site characteristics -- you know, again the
    9 basis for TACO, we want to have a program that
    10 reacts to the characteristics of the site. It's
    11 constructed to react on the characteristics of the
    12 site and the risk presented by that site. So, to
    13 me, in certain parts of Chicago you have a lot of
    14 fills from various materials. We had the old
    15 Chicago fire debris that's causing problems, but
    16 that's there. You've got to manage it. Again, we
    17 have tools that help us out with area backgrounds
    18 and things such as that, but there's still materials
    19 that have to be managed in the remedial process and
    20 the redevelopment of that site. So that is the end
    21 goal, the redevelopment and use of that site. The
    22 theme of this legislation was Brownfield. The basis
    23 for TACO and the SRP was Brownfield. This is being
    24 used at a lot of Brownfield sites.
    L.A. REPORTING (312) 419-9292
    141

    1 HEARING OFFICER BEAUCHAMP: Board member
    2 Kezelis?
    3 MS. KEZELIS: Mr. Walton, thank you.
    4 The benefit of your experience in site remediation
    5 is very helpful for purposes of the questions I have
    6 and specifically they are this: Do you, in your
    7 experience, in site remediation and community
    8 relations work, have you identified any problems
    9 in the community relations element of what you've
    10 done over the years that would be unique to Chicago?
    11 Does Chicago present any problems that are unique or
    12 no?
    13 MR. WALTON: As long as the process is
    14 constructed to allow for the site characteristics,
    15 it will be effective. It cannot be that
    16 prescriptive. Again, the process is -- it should be
    17 a flexible process that reacts to a site's
    18 conditions.
    19 MS. KEZELIS: Thank you.
    20 HEARING OFFICER BEAUCHAMP: Any other questions
    21 for Mr. Walton?
    22 MS. McFAWN: I had some questions about the
    23 soil management zone. In your suggestion that you
    24 be allowed to put a soil management zone nearer to a
    L.A. REPORTING (312) 419-9292

    142
    1 residential property than would now be allowed under
    2 the proposed rules and, as I read it, if that
    3 ability should be conditioned upon the preliminary
    4 mentation of the community relations plan?
    5 MR. WALTON: I think I said two things, I had
    6 an or in there. One thing is if site conditions
    7 dictate it's not an issue, it's not an issue. If
    8 you have a large industrial site and the residents
    9 is somewhat remote, again, that's objective, but
    10 again the TACO solution is protective. It's
    11 protective with that barrier is if the residence is
    12 on top of the exposure or whatever -- what I'm
    13 saying if those -- that is issue -- there is an
    14 issue in regards to adjacent residences, the
    15 remedial applicant has the opportunity to do a
    16 community relations plan to address the issue, the
    17 perceptions issues, inform them, let them know if
    18 the site conditions dictate that's an issue.
    19 MS. McFAWN: I was looking at the language you
    20 proposed at page 7 of your prepared testimony and I
    21 guess I'm missing something here, I'm not exactly
    22 sure how that is -- that concept is integrated with
    23 that language.
    24 MR. WALTON: The language is not currently in
    L.A. REPORTING (312) 419-9292

    143
    1 there. What I'm saying is delete the section that
    2 requires -- that prohibits moving closer to the
    3 residents, then the remedial applicant -- again, the
    4 remedial applicant makes this determination. If
    5 there are issues there, they'll come out in the
    6 process about adjacent residents, you would have the
    7 opportunity as we do now -- community relations is
    8 not required at gas manufacturing sites. It is not
    9 required, but based upon site conditions,
    10 contaminates of concern, it is implemented. What
    11 I'm saying is -- or if these are issues let's use
    12 community relations to address them.
    13 MS. McFAWN: Okay. What happens if the RA and
    14 the Agency disagree? The RA wants to put it closer
    15 to a residential area and the Agency says no, not
    16 because of risk, because of perception, which they
    17 have testified to, would they have the ability to
    18 compel the RA to engage in the community relations?
    19 MR. WALTON: My basic premise is if it's a
    20 protective TACO solution, it's protective. What
    21 community relations does it facilitate acceptance of
    22 that by outside parties? If it's an issue and it
    23 needs to be facilitated, community relations does
    24 it, but I don't believe -- I still -- the logic
    L.A. REPORTING (312) 419-9292

    144
    1 fails me to include this prohibition about moving it
    2 closer to a residential area. I just can't
    3 understand it. People have tried to explain it to
    4 me and I do not understand the need for that
    5 prohibition.
    6 MS. McFAWN: Well, if the need, as the Agency
    7 testified, which is the perception, it is the
    8 community's perception, wouldn't a rule that
    9 obligates the RA to engage in community relations
    10 plan modified for that site, wouldn't it be well
    11 served to have such a rule rather than just a
    12 voluntary action by the RA?
    13 MR. WALTON: No. I don't see a mandatory
    14 requirement for that appropriate. Again, remember
    15 the community relations now are being implemented
    16 where appropriate, where the site issues -- my
    17 experience again, I can't speak for school
    18 districts, I have not worked on those types of
    19 sites, if it's an issue, community relations plans
    20 are being implemented. And the Agency -- you know,
    21 the SRP program there's a lot of interaction with
    22 the Agency. If the need arises, I think the Agency
    23 has -- can -- it has been my experience that they
    24 can suggest these things and the merits can be

    L.A. REPORTING (312) 419-9292
    145
    1 evaluated but the remedial applicant, he can make a
    2 needs determination. If his needs determination
    3 indicates it's an appropriate thing, he can
    4 implement it, but we don't want to loose site of the
    5 fact that TACO is protective. I have a site here in
    6 a residential area, I have the same conditions here
    7 as here. I have residents all around me and on top
    8 of me. That's not an issue. It's only here where I
    9 have a property, I'm going to move a little bit
    10 closer. If somebody -- I cannot understand the
    11 logic and the need for this.
    12 MS. McFAWN: Well, we've been talking about the
    13 need for community relations plans or the possible
    14 need for it as proposed by CBE concerning the
    15 schools and that's a perception thing because TACO
    16 is protective.
    17 MR. WALTON: Uh-huh.
    18 MS. McFAWN: And now we're talking about other
    19 sites and sites that want to use and remain -- keep
    20 contaminated material on-site and move it closer to
    21 a residential area. So again, it's perception.
    22 I mean, if I accept your concept that TACO is
    23 protective, so why would it be okay for us to adopt
    24 a rule which requires community relation plans for

    L.A. REPORTING (312) 419-9292
    146
    1 schools and not do the same for soil management
    2 zones?
    3 MR. WALTON: Okay. This is Harry Walton
    4 speaking. It's my experience one of the primary
    5 triggers for a community relations plan in what my
    6 criteria would be a school and daycare center and a
    7 hospital, those are the things that would make Harry
    8 Walton personally want to implement a community
    9 relations plan.
    10 MS. McFAWN: And that's because of perception.
    11 MR. WALTON: Yeah. But those are unique
    12 situations. We deal with residents all the time.
    13 MS. McFAWN: Let's say that you accept the
    14 argument that another trigger should be residents.
    15 It doesn't mean that there has to be a public
    16 hearing if you have a community relations plan, you
    17 just have to reach out to those people with the
    18 adjoining or nearby residences which you have
    19 testified to you did it at gas manufacturing plants.
    20 MR. WALTON: A community relations plan is
    21 an -- is not something one enters into lightly.
    22 It's a commitment and it's an effort. When I was
    23 working at Illinois Power I'd say one-third of our
    24 effort -- one-third of our effort went to community

    L.A. REPORTING (312) 419-9292
    147
    1 relations. One-third of our effort went to keeping
    2 the community informed, making sure we met with all
    3 the right people. We had the right response actions
    4 in place in case an event happened. Community
    5 relation, it's a useful tool, but it also -- it
    6 takes a lot of support to implement it correctly.
    7 It's not something I would enter into lightly.
    8 There's nothing worse than an ineffective community
    9 relations plan.
    10 MS. McFAWN: Thanks.
    11 HEARING OFFICER BEAUCHAMP: Mr. Wight, you have
    12 some questions.
    13 MR. WIGHT: I have a couple questions.
    14 Mr. Mark Wight, Illinois EPA.
    15 Mr. Walton, you suggested that and, in
    16 fact, you emphasized several times TACO is
    17 protective. Doesn't that -- isn't that based on the
    18 assumption that engineered barriers are properly
    19 maintained and that institutional controls are
    20 honored at or over a period of time?
    21 MR. WALTON: That would be the case regardless
    22 of location, yes.
    23 MR. WIGHT: Okay. Is there an issue with

    24 regard to SNZs -- within SNZs moving contamination
    L.A. REPORTING (312) 419-9292
    148
    1 closer to a residential property? Is there an issue
    2 with regard to increasing contaminant loading near a
    3 residential property and then relying on engineered
    4 barriers and institutional controls as your
    5 protective device? In other words, is it possible
    6 that when you increased contaminant loading near the
    7 residential property, that failure to maintain an
    8 engineered barrier or to abide by an institutional
    9 control would in some way possibly increase risk
    10 near that residential property?
    11 MR. WALTON: One, let's define -- if you could
    12 define loading, I could respond to it. To me,
    13 loading is a very nebulous term, has to be put in
    14 context of the pathway you're trying to address, in
    15 the context of Tier I, Tier III information. I
    16 can't really speak to loading.
    17 MR. WIGHT: Okay. And I'm not sure that I have
    18 the background to make that more clear. I guess
    19 what I mean by generally and this may help you
    20 answer the question, but just increasing the -- not
    21 necessarily increasing the concentrations, although
    22 that might be possible under an SMZ might it not

    23 where you move more contaminated material to an area
    24 that was already contaminated, but perhaps
    L.A. REPORTING (312) 419-9292
    149
    1 contaminated in lessor concentrations.
    2 MR. WALTON: I think it's basically from a TACO
    3 solution it's -- I don't want to use the word
    4 irrelevant -- but it's not a critical factor.
    5 Remember this, risk is based on where the exposure
    6 occurred. When you use soil management zone and
    7 they will have a barrier over them, the risk is
    8 measured on the other side of the barrier so,
    9 therefore, there's no change and the actual
    10 concentration as long as it does not exceed the
    11 Subpart C criteria and if appropriate Tier I or the
    12 Tier two numbers, it's protective.
    13 MR. WIGHT: Again, that assumes that the
    14 engineered barrier is maintained properly and on or
    15 over time, is that correct?
    16 MR. WALTON: Again, that basic premise is there
    17 on the side I described over here, that's barrier
    18 residential all around, it makes no difference.
    19 There's no change in risk.
    20 MR. WIGHT: We may be talking past one another,
    21 but I'll move on.

    22 I guess the other point I wanted to make
    23 contaminant loading was not just the possibility
    24 that the concentrations might increase near a
    L.A. REPORTING (312) 419-9292
    150
    1 residential property, but also simply even though
    2 concentrations might be the same or perhaps even
    3 less than just volumes of particular contaminant
    4 might also increase under soil management zone
    5 movement of the soil, does that help clarify what I
    6 meant by contaminant loading or not?
    7 MR. WALTON: No. The contaminants at the site
    8 are at the site. We're not bringing more
    9 contaminants onto the site. Basically, the relative
    10 mass of contaminants at the site are the same.
    11 MR. WIGHT: I would agree with that, but isn't
    12 location also a factor with determining pathways
    13 that need to be addressed?
    14 MR. WALTON: Yes. But if you use a soil
    15 management zone, one would have to look at the
    16 pathways from that location of the soil management
    17 zone. You would have to look at the soil
    18 groundwater issues.
    19 MR. WIGHT: Okay. I agree with that in order to
    20 meet TACO once you redistribute the contamination

    21 then is when you determine what is a proper TACO
    22 solution in that particular area?
    23 MR. WALTON: There location is an important
    24 criteria for the development of the Tier two number,
    L.A. REPORTING (312) 419-9292
    151
    1 but you're going to address that.
    2 MR. WIGHT: And then at that point you may lead
    3 to additional reliance on engineered barriers and
    4 institutional controls?
    5 MR. WALTON: For soil groundwater, no.
    6 MR. WIGHT: I have no additional questions.
    7 HEARING OFFICER BEAUCHAMP: Thank you,
    8 Mr. Sassila?
    9 MR. SASSILA: You stated that community
    10 relations plan is ineffective and you've been
    11 involved mainly on MGP sites before and then you
    12 said you think community relation plans should be
    13 implemented only for schools, hospitals and daycare
    14 centers?
    15 MR. WALTON: I think you've misstated what I
    16 said. I said that some of the important criteria
    17 for me to determine when I would implement a
    18 community relations plan would be those factors and
    19 I think community relation plans are effective.

    20 MR. SASSILA: Well, let me ask you this:
    21 Generally, what you said here, it depends on the
    22 site characteristics to decide if you need to have
    23 community relation or not, is that correct?
    24 MR. WALTON: To me, the site characteristic is
    L.A. REPORTING (312) 419-9292
    152
    1 the contaminant of the concern, the distribution of
    2 the contaminant of concern and the location of the
    3 site and the adjacent neighbors and the adjacent
    4 potential receptors.
    5 MR. SASSILA: So you look at all this criteria
    6 and then you decide if there's a need for community
    7 relations?
    8 MR. WALTON: That's what I personally would do.
    9 MR. SASSILA: But you said that you would do it
    10 for a school anyway?
    11 MR. WALTON: I said that that was one of the
    12 typical -- the site I was talking about were MGP
    13 sites, former gas manufacturing sites. They have an
    14 odor problem, odor threshold that's very critical.
    15 I would -- in that scenario, I would always have a
    16 community relations plan when those potential
    17 receptors were proximate to the site.
    18 MR. SASSILA: Well, let me ask you this

    19 question. Generally, in the Chicago area and
    20 Chicago majority of the areas and do not have any
    21 smells, any odor, any stick which you referred to
    22 then having background contaminants off-site or in
    23 the parkway of the street might be higher than what
    24 you have in your site, what would be the purpose of
    L.A. REPORTING (312) 419-9292
    153
    1 having community relations when you tell them I have
    2 some contamination here or my site is cleaner than
    3 outside the street?
    4 MR. WALTON: I didn't really understand your
    5 question.
    6 MR. SASSILA: My question is, background
    7 contaminants exist everywhere in the Chicago area
    8 and you might have a scenario which I believe the
    9 Agency's been involved in where you have the site
    10 above residential levels, however, the level of --
    11 they are required to implement corrective measures
    12 and clean it even though the background of the area
    13 is contaminated at the higher levels. So what's the
    14 purpose of having community relations addressing low
    15 residual contaminates on a given site while the
    16 surrounding areas might be a contaminated higher
    17 level?

    18 MR. WALTON: I think -- let me put what I think
    19 you're saying in context. One, I'm dealing with
    20 sites, my perspective is this is my site, this is
    21 owned by let's say me and I have adjacent properties
    22 and there may be a school here in the community
    23 relations, the conditions you're talking about this
    24 site's going to be a school, totally different
    L.A. REPORTING (312) 419-9292
    154
    1 scenario, this party is now the owner or the real
    2 applicant of the site. When we had Illinois Power
    3 sites, all Illinois Power sites where we had
    4 facilities operating, we had very, very aggressive
    5 community relations so all of the employees were
    6 aware of this because they're at the site. It's a
    7 different -- what you're presenting is a little bit
    8 different than what I was discussing. It's all in
    9 the context of what the site is. My site is, I'm
    10 the owner and I want to make sure my adjacent
    11 residents are informed of their potential receptor.
    12 Your site is there on the site and there receptor.
    13 MR. SASSILA: Let me ask you another question
    14 here. For soil management zone, when you have
    15 commercial industrial sites and you have residential
    16 adjacent to that site for the ingestions exposure

    17 you are required to have three feet of clean fill,
    18 and now the definition of clean fill for residential
    19 properties is not the same as for a residential one.
    20 In other words, you have three feet of impacted soil
    21 at industrial commercial site you might have level
    22 of contaminants higher than what would be required
    23 for the residential sites, is that correct or not?
    24 MR. WALTON: Rephrase that.
    L.A. REPORTING (312) 419-9292
    155
    1 MR. SASSILA: Let me say it a different way.
    2 The cleanup objectives for residential properties is
    3 different than residential ones?
    4 MR. WALTON: Yes.
    5 MR. SASSILA: Correct? So if I have a
    6 residential site here and the adjacent site is
    7 industrial commercial and they decided to say -- I
    8 have only a fence separating the two sites so this
    9 side of the fence is the industrial commercial
    10 property there they might have higher levels of
    11 contaminants than would be allowed on the
    12 residential site and the exposure --
    13 MR. WALTON: In context -- in context I put
    14 this, I have a barrier over that material --
    15 MR. SASSILA: No. Your barrier is three feet

    16 of fill which is for ingestion exposure routes for
    17 industrial commercial. The concentration would not
    18 be allowed on the residential property, but
    19 acceptable under industrial commercial properties?
    20 MR. WALTON: Most of my experience is we put a
    21 barrier in, we put a barrier in so that we can meet
    22 Tier I on the receptor side.
    23 MR. SASSILA: But that is not required now
    24 under the SRP program because off-site for soil is
    L.A. REPORTING (312) 419-9292
    156
    1 not an issue, is this correct?
    2 HEARING OFFICER BEAUCHAMP: Mr. Sassila, are
    3 you directing your question to --
    4 MR. SASSILA: I am directing my question to the
    5 EPA.
    6 HEARING OFFICER BEAUCHAMP: Would it be more
    7 proper to wait until they are taking the table to
    8 direct it? Could you save that question?
    9 MR. SASSILA: Sure, I can.
    10 MR. WALTON: The SRP does -- SRP is a process.
    11 The cleanup objectives are determined by TACO. TACO
    12 has a series of options to develop a solution for
    13 the site. The remedial applicant can choose to meet
    14 whatever, the Tier I at the point of exposure or

    15 residential or commercial.
    16 MR. SASSILA: On the site?
    17 MR. WALTON: On the site.
    18 MR. SASSILA: Not the adjacent site?
    19 MR. WALTON: But the point of exposure is the
    20 critical point and what I'm saying is most barriers
    21 that are put in -- you're going to put a barrier in
    22 most cases -- there's a lot of asphalt going in.
    23 MR. SASSILA: Well, you have to define barrier
    24 here. You have different barriers, you have asphalt
    L.A. REPORTING (312) 419-9292
    157
    1 is different than three feet of fill. They are not
    2 the same one.
    3 MR. WALTON: In my experience, three foot of
    4 fill changes to fill land is not effective to
    5 redevelopment of the site. It's much more cost
    6 effective to put in asphalt.
    7 MR. SASSILA: Why you want to have landscape
    8 areas? I mean, you cannot say we eliminate all
    9 landscape areas, we cannot allow to have landscape,
    10 you have to have asphalt.
    11 MR. WALTON: And again, you still have to do
    12 worker protection. Worker protection drives it even
    13 lower. Typically, at these sites we use barriers

    14 that are protective enough to allow certain
    15 activities to occur at the site which do not require
    16 these controls.
    17 MR. SASSILA: But that's not correct. Worker
    18 protection normally higher level -- the level for
    19 cleanup of workers is higher than what you have for
    20 residential, for industrial commercial, they are not
    21 the same one.
    22 MR. WALTON: That is -- but we try to hit the
    23 Tier I so we don't even --
    24 MR. SASSILA: For what --
    L.A. REPORTING (312) 419-9292
    158
    1 HEARING OFFICER BEAUCHAMP: Just a minute,
    2 Mr. Sassila, you need to let Mr. Walton finish.
    3 MR. SASSILA: I'm sorry.
    4 MR. WALTON: TACO is a series of options. You
    5 can use whatever solutions you want. People have
    6 the opportunity to develop the solution that is
    7 appropriate for their site. I cannot speak to
    8 schools. I have no familiarity with schools. I
    9 cannot speak to the process in the city of Chicago.
    10 I don't understand the process nor do I have any
    11 need to understand the process. What I'm saying
    12 is we have a TACO process, they develop a solution

    13 and the remedial applicant has that option.
    14 MR. SASSILA: Thank you.
    15 HEARING OFFICER BEAUCHAMP: Mr. Eastep?
    16 MR. EASTEP: For my clarification, in getting
    17 back to the community relations standpoint, do you
    18 think it would be important to let the neighbors to
    19 a school know that their site, in fact -- let's say
    20 an adjacent site is an industrial site with
    21 contamination, do you think it would be important or
    22 do you think that the community would like to know
    23 that the school where their children are attending
    24 is, in fact, being cleaned up to safe levels?
    L.A. REPORTING (312) 419-9292
    159
    1 MR. WALTON: One part of me says -- you know
    2 this is Harry Walton speaking, it wouldn't be a bad
    3 idea if the contaminants of concern were such that
    4 it was an issue to them. If the contaminants of
    5 certain distribution was such there was a potential
    6 to them -- there's too many variables to make a
    7 general statement. Again, it goes to the site
    8 characteristics of whether it would be important to
    9 them or not.
    10 MR. EASTEP: If the people were interested in
    11 -- let's say the local neighbors were confused and

    12 there is no communication, sometimes people tend to
    13 just dream up facts. So given that circumstance, do
    14 you think it would ever be helpful for the neighbors
    15 to know that their site isn't being left
    16 contaminated, in fact, it is being cleaned up?
    17 MR. WALTON: I'm aware of a number of
    18 situations where people fail -- they did an
    19 appropriate, they failed to provide sufficient
    20 information to people that things got out of control
    21 and the effectiveness of the remediation -- it was
    22 not an effective process in the long run, but again,
    23 the remedial applicant has the opportunity to make
    24 that determination based on-site conditions, based
    L.A. REPORTING (312) 419-9292
    160
    1 on his awareness and based upon the encouragement of
    2 Illinois EPA. Most remedial applicants have a
    3 number of meetings with the Agency. These issues
    4 can be brought forward if it's an issue. Again,
    5 based on-site characteristics. One size does not
    6 fit all.
    7 MR. EASTEP: No further questions.
    8 HEARING OFFICER BEAUCHAMP: Other questions for
    9 Mr. Walton? I see none. Thank you very much,
    10 Mr. Walton.

    11 MR. WALTON: Thank you. If we can go off the
    12 record for a moment.
    13 (Whereupon, a discussion
    14 was had off the record.)
    15 HEARING OFFICER BEAUCHAMP: We now have
    16 Mr. Bruce Bonczyk. Please swear Mr. Bonczyk in.
    17 (Mr. Bonczyk was sworn.)
    18 MR. BONCZYK: My name is Bruce Bonczyk. I'm an
    19 attorney with Bruce S. Bonczyk, Limited and I
    20 represent the Illinois Society of Professional
    21 Engineers, ISPE, and Consulting Engineers Council of
    22 Illinois, CECI. I'm also a licensed professional
    23 engineer.
    24 I'm testifying today to object to certain
    L.A. REPORTING (312) 419-9292
    161
    1 portions of proposed amendments to 35 Illinois
    2 Administrative Code 740. On behalf of ISPE and CECI
    3 I filled with the Board a motion to oppose certain
    4 proposed amendments to the Environmental Protection
    5 Agency's proposal to amend 35 Illinois
    6 Administrative Code 740 in a companion memorandum of
    7 law in support of said motion.
    8 We object to the proposed inclusion of
    9 terminology and regulations which allows for

    10 licensed professional geologists to perform certain
    11 functions assigned to licensed professional
    12 engineers in the enabling legislation for the SRP
    13 program. We object on the grounds there is no
    14 statutory authority in the enabling legislation to
    15 include licensed professional geologists in these
    16 rules. The SRP legislation only refers to licensed
    17 professional engineers. An examination of
    18 legislation provides no guidelines or standards upon
    19 which the Agency or the Board may conclude that
    20 licensed professional geologists are equally charged
    21 by the General Assembly to provide specific services
    22 subject to this rulemaking. We do ask the Agency
    23 and Board to review the motion to oppose and the
    24 memorandum of law previously filed.
    L.A. REPORTING (312) 419-9292
    162
    1 The prior testimony filed February 15th,
    2 2001, of Mr. Eastep of the Agency confirms the above
    3 objections. Mr. Eastep states the proposed rule
    4 allows licensed professional geologists to perform
    5 and to supervise only remediation site activities,
    6 but not designed or signing or review of plans and
    7 reports under the SRP program. This conflicts with
    8 the expressed provisions of Section 58.6 of the SRP

    9 legislation which make no reference to licensed
    10 professional engineer -- excuse me, geologists.
    11 Also, quoting Mr. Eastep's testimony
    12 referring to the Professional Geologist Licensing
    13 Act on page three of his prefiled testimony in
    14 quotes, it does not expressly change who is
    15 ultimately responsibility for plans and reports
    16 under the Act. As a practical matter, this probably
    17 means that licensed professional geologists could
    18 conduct site activities only as an employee or under
    19 contract to a licensed professional engineer, end
    20 quotes. This is the status as it exists today. The
    21 Professional Geologists Licensing Act allows for
    22 such geotechnical services and there is no
    23 corresponding overlap with the licensed professional
    24 engineer services as purported by the Agency. The
    L.A. REPORTING (312) 419-9292
    163
    1 geologist services are subject -- excuse me, are
    2 subset of the licensed professional engineers and
    3 the licensed professional engineers bear the
    4 ultimate responsibility of those services under
    5 this Act. We believe there is no justification for
    6 the proposed change as the existing rule allows for
    7 the current relationships between licensed

    8 professional engineers and licensed professional
    9 geologists for the site activities.
    10 Basically, we believe the Agency is
    11 attempting to address a problem that doesn't
    12 currently exist, but in doing so, it may actually
    13 be creating the potential for confusion both in a
    14 legal sense and a practical sense. Thus, we request
    15 the Board and the Agency to strike the reference to
    16 licensed professional geologists in the proposed
    17 rules. Thank you. Any questions?
    18 HEARING OFFICER BEAUCHAMP: Thank you,
    19 Mr. Bonczyk. Before we go to questions, let me ask
    20 you if you'd like to submit a written version or
    21 maybe a longer version of your testimony as an
    22 exhibit?
    23 MR. BONCZYK: I don't have any with me. I just
    24 kind of toned it today, but if you'd like us to, we
    L.A. REPORTING (312) 419-9292
    164
    1 could clean one up for you.
    2 HEARING OFFICER BEAUCHAMP: It's entirely up to
    3 you. If you'd like to submit a public later on,
    4 that's at your discretion.
    5 MR. BONCZYK: Okay.
    6 HEARING OFFICER BEAUCHAMP: And we'll open the

    7 questions for Mr. Bonczyk. Ms. Sassila.
    8 MR. SASSILA: To the best of your knowledge,
    9 is there any national standard for licensed
    10 professional geologists, nation-wide, like,
    11 standard?
    12 MR. BONCZYK: Not that I know. Standards -- I
    13 think each states vary. I do believe there's some
    14 national associations for geologists, but I'm not
    15 aware of specifically what your defining as the
    16 standard.
    17 MR. SASSILA: Well, is there a national
    18 examination board or any national examination to
    19 obtain a professional geologists license?
    20 MR. BONCZYK: I don't have the answer to that
    21 question.
    22 HEARING OFFICER BEAUCHAMP: Other questions for
    23 Mr. Bonczyk? I see none. Thank you, Mr. Bonczyk.
    24 MR. BONCZYK: Thank you.
    L.A. REPORTING (312) 419-9292
    165
    1 HEARING OFFICER BEAUCHAMP: Can we go off the
    2 record?
    3 (Whereupon, a discussion
    4 was had off the record.)
    5 HEARING OFFICER BEAUCHAMP: After taking a

    6 quick break, we've got the Agency at the witness
    7 table now. Mr. Wight, do you have any opening
    8 statements?
    9 MR. WIGHT: No opening statement today.
    10 HEARING OFFICER BEAUCHAMP: Okay. You have
    11 two people with you. Could you identify who's with
    12 you today?
    13 MR. WIGHT: Yes. With me today on my right is
    14 Larry Eastep, who is the manager of the remedial
    15 projects management section of the Bureau of Land
    16 and on my left is Greg Dunn, who is a unit manager
    17 for the site remediation program. Unfortunately,
    18 Gary King could not be with us today. Mr. King has
    19 been ill and unable to attend several Agency
    20 obligations within the last few days and today is
    21 another. So we will carry on with Mr. Eastep and
    22 Mr. Dunn. Do these witnesses need to be sworn in
    23 again?
    24 HEARING OFFICER BEAUCHAMP: I think just as a
    L.A. REPORTING (312) 419-9292
    166
    1 formality we could.
    2 MR. WIGHT: Okay. If you'd like, we'll start
    3 with that.
    4 HEARING OFFICER BEAUCHAMP: If you could swear

    5 the witnesses in.
    6 (Mr. Dunn and Mr. Eastep were sworn.)
    7 MR. WIGHT: We actually have a couple of things
    8 that we need to take care of here. We have some old
    9 business, some remnants from the first hearing where
    10 we promised to go back and brink in some additional
    11 information. We have done that. Then we have some
    12 new business which involves a rework provision of
    13 our original proposal and Mr. Dunn will be offering
    14 new testimony on that. However, I'd like to start
    15 with the brief statement regarding the Agency's
    16 intentions with regard to the CBE proposal.
    17 It was mentioned on a couple of occasions
    18 in this morning's testimony that there had been
    19 conversations with -- or between CBE and the Agency.
    20 What has happened is that CBE has approached us on
    21 at least a couple of occasions in the past asking
    22 for our comments on their proposal and also if we
    23 could agree with the contents if we would endorse
    24 their proposal or support their proposal. The
    L.A. REPORTING (312) 419-9292
    167
    1 original proposal we had some problems with. We did
    2 share some comments with them, but we did not have
    3 an opportunity to work out those issues. We had

    4 hoped then after the first hearing that we would
    5 find some time between the first and second hearing
    6 to work out those problems, we did not. CBE went
    7 ahead and made some revisions to their first
    8 proposal. They have taken care of some of the
    9 problems that were raised, but they've also raised
    10 some new issues with their second proposal, and we
    11 have some things that cause us some concern, and we
    12 have committed to work with CBE to work out
    13 something and perhaps share with them some language
    14 that we could live with along the lines of what
    15 they're suggesting. They might accept our comment,
    16 they might not. That, of course, would be up to CBE
    17 in what they would like to do. If they ultimately
    18 end up proposing something that we don't support in
    19 its entirety, then we will respond in the
    20 appropriate way at the appropriate time whether they
    21 be additional hearings or in written comments, but
    22 as of this point, we don't have an agreement on
    23 language, but we have committed to continue working
    24 with them. So that's the Agency position for now.
    L.A. REPORTING (312) 419-9292
    168
    1 MS. McFAWN: Could you tell us what some of
    2 those concerns are offhand?

    3 MR. WIGHT: Well, in a general sense I think
    4 the concerns are that there are some provisions in
    5 there that require the use or expenditure of Agency
    6 resources. We're not certain whether or not we
    7 agree with those just from the point of manpower and
    8 budgeting and some of those issues. We do have some
    9 questions about the way they have proposed their
    10 community relations plan. The alternative that the
    11 Agency would be required to do that if the RA did
    12 not care to do that, that could be a very resource
    13 intensive endeavor and also may or may not even be
    14 effective. That may be our primary concern, but
    15 also resource questions were raised by the tracking
    16 and notice provisions with regard to engineered
    17 barriers and institutional controls and then there
    18 may be some other things that we don't have
    19 conceptual concerns with, but we may have some
    20 concerns about the language and maybe the vagueness
    21 of the language and maybe we feel that some
    22 additional specificity is needed.
    23 MS. McFAWN: Thank you.
    24 MR. WIGHT: If it's okay with you, we'd like to
    L.A. REPORTING (312) 419-9292
    169
    1 go back and start with the old business first, the

    2 remnants from the first hearing and I will do a bit
    3 of a set up and when I refer to the transcript all
    4 the references to the transcript are for the
    5 proceeding that was held on February 28th, 2001, in
    6 Springfield. Once I do the set up, then either
    7 Mr. Dunn or Mr. Eastep will respond or we will have
    8 an additional exhibit to admit into the record.
    9 The first of these items at page 46 to 47
    10 of the transcript there was a suggestion from
    11 Mr. Walton to Mr. Dunn about the Agency's proposal
    12 to require that analyses of soil and groundwater
    13 sample collected on or after July 1st, 2002, be
    14 performed by accredited laboratories. Mr. Walton
    15 suggested that large interstate companies often
    16 have blanket contracts providing response teams to
    17 mitigate releases. The response teams may or may
    18 not use Illinois accredited laboratories.
    19 Mr. Walton asked Mr. Dunn if the Agency envisioned
    20 any kind of opportunity for the responsible party to
    21 make a demonstration to use that data to mitigate
    22 the release. Mr. Dunn stated that the use of the
    23 data obtained from unaccredited labs for samples
    24 collected prior to July 1, 2002, would not be an
    L.A. REPORTING (312) 419-9292
    170

    1 issue. If the data were obtained for samples
    2 collected on or after July 1, 2002, but prior to
    3 entering the SRP, there would be an opportunity to
    4 demonstrate that the data is acceptable for some
    5 use. Mr. Dunn would like to clarify and expand on
    6 that answer.
    7 MR. DUNN: Thank you, Mr. Wight. Yes, I would
    8 like to clarify the Agency's position on Mr.
    9 Walton's question from the last hearing. Under our
    10 proposal, all samples collected on or after July 1st
    11 of 2002 shall be analyzed by an Illinois accredited
    12 laboratory. For samples collected prior to July
    13 1st, 2002, and analyzed either prior to or after the
    14 July 1st, 2002, date an Illinois accredited
    15 laboratory is not required. However, if a
    16 responsible party is -- was performing mitigation of
    17 a release and did not use an Illinois accredited
    18 laboratory, then under the site remediation program
    19 the data could be evaluated for suitability in a
    20 manner similar to what is identified in 740.410(c).
    21 The consultant or remediation applicant can submit
    22 the data for consideration, but the Illinois EPA
    23 does not have to use that data. What I would like
    24 to say is that that data, however, cannot be used to
    L.A. REPORTING (312) 419-9292

    171
    1 determine compliance with remediation objectives at
    2 the site.
    3 MR. WIGHT: Would it be better to proceed
    4 through each of these before we get to questions or
    5 do you think it would be better to allow questions
    6 at the end of each response?
    7 HEARING OFFICER BEAUCHAMP: I think it would
    8 make more sense to go through your presentation in
    9 its entirety and then take questions like we've done
    10 with the other presentations.
    11 MR. WIGHT: That's fine with us.
    12 The second item at pages 51 and two of the
    13 transcript, Ms. Liu noted that change of address
    14 form has been proposed in R01-26 for the leaking
    15 underground storage tank regulations to ensure that
    16 the NFR letter is sent to the right address.
    17 Ms. Liu further noted that the LUST program would
    18 use the change use of address form to ensure that
    19 reimbursement checks from the LUST fund are sent to
    20 the correct address. She asked if the form would be
    21 useful in a site remediation program for ensuring
    22 that the NFR letter is sent to the correct address.
    23 The Agency witnesses were unfamiliar with the
    24 leaking underground storage tank provision and
    L.A. REPORTING (312) 419-9292

    172
    1 offered to check further and reply at the April 4th
    2 hearing. Mr. Eastep would like to respond.
    3 MR. EASTEP: In checking with the LUST work
    4 group, we found the primary purpose in the change of
    5 address provision is to ensure payments from the
    6 LUST fund are directed to the correct location.
    7 Over the years, the LUST program occasionally has
    8 had problems arising from oral request that payments
    9 be sent to addresses different than the address of
    10 record for the owner/operator. To avoid
    11 misunderstanding and confusion, the Agency wants to
    12 ensure that it has a written record of the
    13 owner/operator's intentions as to where the LUST
    14 payment is to be sent. This is not necessarily the
    15 same address where the NFR letter is sent. The SRP
    16 does not have the same considerations with regard to
    17 payments and has had no problems with mailing NFR
    18 letters to remediation applicants. At this time, we
    19 don't see a need for change of address provision
    20 similar to those proposed for the LUST program.
    21 MR. WIGHT: The third item at pages 55 to 57 of
    22 the transcript, Ms. Liu asked for a clarification of
    23 the labeling of the appendixes for the draft of the
    24 Illinois Department of Transportation Memorandum of

    L.A. REPORTING (312) 419-9292
    173
    1 Agreement attached to Mr. Eastep's prefiled
    2 testimony. The draft MOA references Appendixes A, B
    3 and E, but not Appendixes C and D. Also, Member
    4 McFawn when the draft attached to Mr. Eastep's
    5 testimony would become final. Mr. Eastep will
    6 respond.
    7 MR. EASTEP: In reverse order, the IDOT MOA was
    8 signed and became final September 29th, 1999. We
    9 now understand that it has been used twice for sites
    10 in the LUST program. It has not been used for sites
    11 in the SRP. We have a signed document that we will
    12 submit as an exhibit. While there are a few minor
    13 revisions, there are no significant differences
    14 between the copy submitted as a draft and the final
    15 signed version.
    16 With regard to the appendixes, the
    17 reference in paragraph seven to Appendix E is
    18 erroneous. The reference should have been to
    19 Appendix C. They are not Appendixes D or E to the
    20 IDOT MOA.
    21 MR. WIGHT: We have a copy of that document
    22 now. Mr. Eastep, would you please take a look at
    23 that? Do you recognize that document?
    24 MR. EASTEP: Yes, I do.

    L.A. REPORTING (312) 419-9292
    174
    1 MR. WIGHT: Would you please tell us what the
    2 document is?
    3 MR. EASTEP: This is a signed copy of the
    4 memorandum agreement between the Agency and the
    5 Department of Transportation and it does include an
    6 Appendix B with institutional controls site listings
    7 and in Appendix C even though there are no names on
    8 it.
    9 MR. WIGHT: Thank you. At this time, I move to
    10 have this document admitted as an exhibit.
    11 HEARING OFFICER BEAUCHAMP: Thank you. Are
    12 there any objections to admitting this document into
    13 the record as an exhibit? Seeing none, we will mark
    14 this as Exhibit 7 in R01-27. Again, this is the
    15 Memorandum of Agreement between the Illinois
    16 Environmental Protection Agency and the Illinois
    17 Department of Transportation.
    18 Just for clarification, I'm reading at the
    19 top of this document that it says this agreement is
    20 entered into this 29 day of September and what year
    21 is that again?
    22 MR. EASTEP: Ninety-nine.
    23 MR. WIGHT: You will not find that year in the
    24 document itself. That was one of several oversights

    L.A. REPORTING (312) 419-9292
    175
    1 that seemed to be in the document, but that is the
    2 document that was signed without the year, only the
    3 date.
    4 HEARING OFFICER BEAUCHAMP: Thank you.
    5 MR. WIGHT: Item four, on pages 80 to 85
    6 there's a general discussion of whether the proposal
    7 by CBE in R01-29 for schools, public parks and
    8 playgrounds would effect small gardening plots on
    9 vacant lots throughout the city of Chicago.
    10 On page 83 Member McFawn asked Mr. Eastep
    11 if he was aware of any such sites coming through the
    12 SRP and to whom NFR letters would have been issued
    13 if they have come through the SRP. Mr. Eastep
    14 offered to investigate and provide any additional
    15 information at the hearing on April 4th. It's
    16 possible that this information now has become
    17 irrelevant since the CBE has withdrawn the public
    18 parks and playgrounds provision of its proposal. We
    19 do have some information if you would like to have
    20 it, but it's up to you.
    21 MS. McFAWN: I would like it. I was surprised
    22 that the garden plot would have come through the SRP
    23 program so enlighten me.

    24 MR. EASTEP: They're not exactly garden plots,
    L.A. REPORTING (312) 419-9292
    176
    1 there's -- and I think I mentioned in my previous
    2 testimony that I discussed this issue with the city
    3 of Chicago, Department of Environment. After the
    4 last hearing I spoke with David Renalds (phonetics)
    5 who's with Chicago DOE and we went through them and
    6 the ones that came to mind, there was site in the
    7 site remediation program or the SRP and that site
    8 was located at 1900 North Clark. The site is an old
    9 gas station and then it was a bus garage and that's
    10 to be developed into a community park. Now, I don't
    11 -- they're treating it down to residential levels,
    12 but I don't know if there's any indication that
    13 there's going to be a vegetable garden or anything
    14 there. I just don't know one way or the other.
    15 MS. KEZELIS: Isn't that part of Lincoln Park?
    16 MR. EASTEP: I don't know. Is 1900 North Clark
    17 --
    18 MS. McFAWN: That would be Armitage and Clark.
    19 MS. KEZELIS: Which is part of Lincoln Park.
    20 MS. McFAWN: No.
    21 MR. MELAS: That's on the south side of --
    22 MS. KEZELIS: Lincoln Park. Okay.

    23 MR. EASTEP: Well, it's in that area.
    24 I would suspect that it wouldn't be recognizable. I
    L.A. REPORTING (312) 419-9292
    177
    1 mean, it was previously a gas station and a bus
    2 garage and maybe the idea is to get it to blend it,
    3 but I thought Mr. Renalds was going to try to be
    4 here today, but apparently he couldn't make it.
    5 There have been three sites that come
    6 through the underground storage tank program. They
    7 were all former Amoco sites and the city has a
    8 program where they're taking some of these old sites
    9 or Brownfields and they're turning them in to what
    10 they call pocket parks because it's just a little
    11 pocket and actually the size of these can be quite
    12 small. The three sites he gave me were located at
    13 6963 South Stony Island Avenue, 10051 South Ewing,
    14 E-w-i-n-g, and 2501 East 83rd Street. Now, these
    15 are just going to be these little pocket parks. And
    16 the east 83rd Street site may have a -- like a
    17 flower garden, but he didn't know any intentions on
    18 using it as a vegetable garden. So I believe that's
    19 the extent of my investigation.
    20 MS. McFAWN: Thank you, Mr. Eastep.
    21 MR. WIGHT: Item five, on pages 91 and two of

    22 the transcript as part of an extended discussion of
    23 Chicago school sites and how they deal with
    24 environmental problems Ms. Jarka mentions a
    L.A. REPORTING (312) 419-9292
    178
    1 memorandum of understanding between the Illinois EPA
    2 and the Chicago Department of Environment concerning
    3 Chicago schools.
    4 On pages 93 and four of the transcript
    5 Member Kezelis asks if the Agency would submit a
    6 copy of that MOU. We do have a copy of that MOU
    7 with us today.
    8 Could you take a look at that document
    9 please? Could you tell us what that document is?
    10 MR. EASTEP: This is a memorandum of
    11 understanding between the Illinois Environmental
    12 Protection Agency and city of Chicago, Department of
    13 the Environment. It is signed by director Skinner
    14 and Commissioner Abolt for the city on October 6th,
    15 1999.
    16 MR. WIGHT: And that's a true and correct copy
    17 of the memorandum of understanding --
    18 MR. EASTEP: Yes, it is.
    19 MR. WIGHT: -- signed by the Agency? I would
    20 like to move that this be admitted as an exhibit.

    21 HEARING OFFICER BEAUCHAMP: Are there any
    22 objections to admitting this document into the
    23 record as an exhibit? Seeing none, we will mark
    24 this as Exhibit No. 8. This again is a memorandum
    L.A. REPORTING (312) 419-9292
    179
    1 of understanding, Illinois Environmental Protection
    2 Agency and the city of Chicago, Department of
    3 Environment, there's a signature and date on the
    4 back page of October 6, 1999.
    5 Let me ask the Agency, is this document
    6 more relevant towards Docket 01-27 of the proposal
    7 or towards Citizens for a Better Environment's
    8 proposal?
    9 MR. EASTEP: I'm not sure it's particularly
    10 relevant to either one directly. Indirectly it
    11 maybe gives you an indication of the relationship
    12 between the city and the state.
    13 MR. WIGHT: It came out of questions involving
    14 CBEs proposal. Ms. Jarka was testifying at the time
    15 and I think that this was a question that came out
    16 of that so perhaps it is better in the other docket.
    17 HEARING OFFICER BEAUCHAMP: Okay. Then we will
    18 renumber it. Instead of it being Exhibit No. 8 in
    19 01-27, it will be marked as Exhibit No. 6 in 01-29.

    20 MR. WIGHT: Item six, and this also probably
    21 has more to do with the CBE proposal than the
    22 Illinois EPA proposal. On page 95 of the transcript
    23 Mr. Eastep offers to submit state-wide lists of
    24 school sites that have come through the site
    L.A. REPORTING (312) 419-9292
    180
    1 remediation program. We have that list. Mr. Eastep
    2 would you please take a look at that document?
    3 MR. EASTEP: Yes.
    4 MR. WIGHT: Please tell us what the document
    5 is.
    6 MR. EASTEP: This is a computer printout.
    7 It's entitled Schools in the Site Remediation
    8 Program and we searched our database and tried to
    9 come up with either site names or site owners that
    10 had school in the name or public schools or
    11 something to that nature and I don't have my copy.
    12 I thought there were 27 here.
    13 MR. WIGHT: I haven't counted.
    14 MR. EASTEP: I'm not going to count, but
    15 there's about that many. So we think this is most
    16 of the schools that are in there, but if for
    17 whatever reason they didn't have school in the site
    18 name or site owner, it wouldn't be here. I think

    19 this is, if not exact, reasonably close.
    20 MR. WIGHT: Mr. Eastep, is this a state-wide
    21 list?
    22 MR. EASTEP: This is a state-wide list. Most
    23 of them are in Chicago, but it does have sites in
    24 Carlisle, Illinois, Clinton, Lake Forest, Ottawa and
    L.A. REPORTING (312) 419-9292
    181
    1 Rolling Meadows.
    2 MR. WIGHT: I would like to move that this
    3 document be admitted to the record for the CBE
    4 proposal.
    5 HEARING OFFICER BEAUCHAMP: Are there any
    6 objections to the admission of this document?
    7 Seeing none, we will mark this as Exhibit 8 in
    8 Docket 01-29. This is a chart and there's a date in
    9 the corner of March 22nd, 2001. The title is School
    10 in the Site Remediation Program. I correct that,
    11 it's Exhibit No. 7 in 01-29.
    12 MR. WIGHT: I believe that concludes our list
    13 of old business. We also have some new business.
    14 On page 15 of the transcript Mr. Dunn asked that the
    15 Agency be allowed to defer its testimony on
    16 amendments proposed for Section 740.415(d)(3) and
    17 related amendments to Appendix A because the Agency

    18 was reworking its language for Subsection(d)(3). On
    19 March 13th, the Agency submitted to the Board a
    20 motion to amend its proposal for Subsection(d)(3)
    21 and additional prefiled testimony by Mr. Dunn in
    22 support of the revised amendment. Mr. Dunn would
    23 like to summarize his prefiled testimony.
    24 MR. DUNN: Thank you, Mr. Wight. At the last
    L.A. REPORTING (312) 419-9292
    182
    1 hearing I did ask that my testimony on 740.415(d)(3)
    2 be deferred to today's hearing and it's kind of
    3 complicated --
    4 THE COURT REPORTER: Could you move more
    5 towards me?
    6 MR. DUNN: The testimony I submitted is kind
    7 of confusing because we actually have three
    8 different languages for 740.415(d)(3) and I'll try
    9 and go through that and try to clarify the best I
    10 can in why we're making this change.
    11 First of all, the original -- or current
    12 language 740.415(d)(3) states that the practical
    13 quantitation limit of the test method selected must
    14 be less than or equal to the PQL for the target
    15 compound list at Appendix A of this part or if the
    16 site remediation objective concentrations have been

    17 determined, the PQL must be less than or equal to
    18 the remediation objective --
    19 THE COURT REPORTER: Please slow down. I have
    20 to take it down and I have to understand what you're
    21 saying.
    22 MR. DUNN: Okay. I apologize.
    23 THE COURT REPORTER: Thank you.
    24 MR. DUNN: The PQL must be less than or equal
    L.A. REPORTING (312) 419-9292
    183
    1 to the remediation objective concentrations for the
    2 site. The reason this language is one that we're
    3 trying to rework is that if you sampled for the
    4 compounds on the target compound list in Appendix A
    5 of 740 and you met the required quantitation limits
    6 that are identified in Appendix A, it's quite
    7 possible that you would miss a number of compounds
    8 at your site. Specifically, there are 38 compounds
    9 that have remediation objectives below the required
    10 quantitation limits that are identified in Appendix
    11 A in 740. Of those 38, 28 are identified as
    12 potential carcinogens in the 742 regulations.
    13 So going through the language in this
    14 session we thought it needed reworking. So in our
    15 original submission on January 10th, 2001, we

    16 thought we had it fixed and we didn't. The one
    17 change that we had in there was that we added that
    18 the PQLs must be less than or equal to the Tier I
    19 soil remediation objectives for residential
    20 properties. This actually gave us a couple of
    21 problems. One, is that there are nine compounds
    22 that have construction work or inhalation values
    23 below the residential values. So we weren't really
    24 correcting the problem and the other problem was
    L.A. REPORTING (312) 419-9292
    184
    1 that there are 41 compounds identified -- that are
    2 not identified on the Appendix A 740 list and these
    3 are -- excuse me, 41 compounds not identified in
    4 742. So if you were analyzed with one of those
    5 compounds, you wouldn't have an RQL to compare to.
    6 One of the examples for the construction work or
    7 inhalation value and these are not compounds that
    8 are just unusual compounds, toluylene is one of
    9 them, that's a main compound especially at LUST
    10 sites, but a main compound even at SRP sites and the
    11 construction work or inhalation value is 42 for
    12 toluylene, yet the residential objective is 650.
    13 So this is the reason we went and tried to rework
    14 our language in 740.415(d)(3). And we hope that the

    15 new language that we proposed in my prefiled
    16 testimony will correct the problems that were in the
    17 original proposal in 740 and also in our subsequent
    18 January 10th, 2001, prefiled testimony of our
    19 proposed change, but hopefully, this change will
    20 take care of that problem.
    21 MR. WIGHT: Mr. Dunn, would you please take a
    22 look at this document?
    23 MR. DUNN: Yes.
    24 MR. WIGHT: Would you tell us what it is,
    L.A. REPORTING (312) 419-9292
    185
    1 please?
    2 MR. DUNN: This is my testimony concerning the
    3 revision to Section 740.415(d)(3) including
    4 attachments.
    5 MR. WIGHT: Is that a true and correct copy of
    6 the document that was prefiled with the Board.
    7 MR. DUNN: Yes, it is.
    8 MR. WIGHT: I'd like to move that this be
    9 admitted as an exhibit.
    10 HEARING OFFICER BEAUCHAMP: Thank you. Are
    11 there any objections to the admission of this
    12 document as an exhibit? Seeing none, this will be
    13 marked as Exhibit No. 8 in Docket R01-27.

    14 MR. WIGHT: I think you probably have copies of
    15 this as well as copies of the new language, which
    16 were attached to our motion to amend and there are
    17 additional copies on the table.
    18 HEARING OFFICER BEAUCHAMP: Thank you.
    19 MR. WIGHT: This concludes the formal part of
    20 our presentation today. So we're ready to accept
    21 questions at this point.
    22 HEARING OFFICER BEAUCHAMP: Thank you very
    23 much, Mr. Wight. We'll open the floor to questions
    24 for the Agency. We've lost a lot of people for the
    L.A. REPORTING (312) 419-9292
    186
    1 day, but do we you have any questions for the
    2 Agency. Mr. Sassila?
    3 MR. SASSILA: For the soil management zone, can
    4 you clarify, are you going to allow any hazardous
    5 waste being treated on-site to be buried on-site
    6 instead of being -- have to be disposed off-site?
    7 MR. EASTEP: Any hazardous waste that's on-site
    8 would have to be managed under any applicable
    9 requirements of the Resource Conservation Recovery
    10 Act, RCRA. And specifically, I'm thinking of
    11 remediation waste action plans. I'm getting the
    12 acronym mixed up, but there's a provision under RCRA

    13 to deal with remediation waste and if it -- if
    14 contaminated soil were treated and allowed to remain
    15 on-site under RCRA, then it would be also allowed
    16 on-site under the SMZ. Is that clear?
    17 MS. McFAWN: So in other words, if you can do
    18 it under RCRA, you can leave it there under SRP?
    19 MR. EASTEP: Yes. Provided it, of course,
    20 meets all the other requirements.
    21 MR. SASSILA: My second question is about the
    22 remedial action plan schedule. Can you clarify what
    23 are the changes regarding the SRP schedule or
    24 schedule of activities?
    L.A. REPORTING (312) 419-9292
    187
    1 MR. EASTEP: Let me find the session here.
    2 740.450(a) -- excuse me, 740.450 paragraph A,
    3 subparagraph three, was changed to add the language
    4 with estimated dates of completion through the
    5 recording of the no further remediation letter and
    6 the intent here is to have sites when they submit
    7 their remedial plan to give us a schedule, and some
    8 people do this already. We're asking -- formally
    9 asking this because if we do get a soil management
    10 zone, we think it's important to know how long
    11 they're going to be operating as a soil management

    12 zone and when they're going to be done. We don't
    13 want to do anything that encourages people to get
    14 in the program and to just create an illegal dump
    15 and not proceed towards getting -- fulfilling the
    16 other requirements of the soil management zone and
    17 the SRP.
    18 MR. SASSILA: Okay. And regarding soil
    19 management zone, are you going to allow any owners
    20 to import from -- if you own two facilities to
    21 transfer contaminated soil from one to another one?
    22 MR. EASTEP: No. The soil management zone is
    23 intended only for on-site contaminated soils.
    24 MR. SASSILA: So it has to -- how about if the
    L.A. REPORTING (312) 419-9292
    188
    1 site is large enough, are they allowed to remove any
    2 contaminated soil to clean area?
    3 MR. EASTEP: No. They cannot put soil on areas
    4 that are currently clean and meet all the Tier I
    5 requirements.
    6 MR. SASSILA: So just for an example, if you
    7 have a new construction project, you are excavating
    8 for a new building, you're going to need some fill
    9 where you might use some soil being generated from
    10 the site you're creating or some other activities,

    11 the owner cannot transfer their soil from area A to
    12 area B, which could be, like, 50 feet apart on the
    13 same site?
    14 MR. EASTEP: Is area B currently contaminated?
    15 MR. SASSILA: Well, area B could be
    16 contaminated. Once you finish your excavation, you
    17 might --
    18 MR. EASTEP: Well, I'm not -- if they excavate
    19 it out -- if they excavate material out, why would
    20 they bring more material in?
    21 MR. SASSILA: Well, it's very normal during
    22 construction to use different type of fill and
    23 might be not suitable for that intended construction
    24 work, but still could be other materials maybe
    L.A. REPORTING (312) 419-9292
    189
    1 suitable for the intended usage.
    2 MR. EASTEP: If the area B that you're
    3 referring to, if it was previously contaminated, I
    4 would say that it would be allowed under the SMZ.
    5 If it were uncontaminated, you would not be allowed
    6 to move soil there.
    7 MR. SASSILA: And then my last question
    8 regarding property boundary, when you have
    9 contaminated soil, which may be industrial

    10 commercial adjacent to residential properties, which
    11 standards or scenarios do you use, on-site or
    12 off-site or the most stringent one?
    13 MR. EASTEP: The way the site is characterized
    14 in terms of future use is up to the applicant.
    15 MR. SASSILA: So if I say it this way, assume I
    16 have industrial commercial site, I'm proposing an
    17 engineered barrier of three feet of fill at my fence
    18 line and then point of exposure for off-site which
    19 is only separated by fence, I would apply the
    20 industrial commercial standards, not the
    21 residential?
    22 MR. EASTEP: That's correct. I answered his
    23 question, but I might want to amplify that. There's
    24 still under the SRP and TACO even though you might
    L.A. REPORTING (312) 419-9292
    190
    1 need an industrial standards, you're still not
    2 allowed to have releases from the site that would
    3 violate any other requirements. So, for example,
    4 under groundwater, it doesn't matter whether it's
    5 industrial or residential. I mean, the numbers are
    6 the same and whatever left the site would have to
    7 meet the appropriate standard whether it's part 620
    8 or NCL or whatever it might.

    9 HEARING OFFICER BEAUCHAMP: Mr. Sassila?
    10 MR. SASSILA: But that is only for groundwater.
    11 I'm talking about soil.
    12 MR. EASTEP: Okay. Then my answer stands.
    13 HEARING OFFICER BEAUCHAMP: Thank you. Other
    14 questions for the Agency today? Members of the
    15 Board, Board staff?
    16 MS. LIU: Good afternoon. Earlier this morning
    17 an issued was raised about a conflict the CBE
    18 proposal had with Section 58.15 of the Act whereas
    19 the CBE proposal requires an NFR letter before the
    20 site could be used. 58.15 simply requires
    21 completion of the corrective action. You mentioned
    22 that sometimes there are sites that are ready for
    23 use that haven't received that letter yet. Is there
    24 another Agency document that could be used as a
    L.A. REPORTING (312) 419-9292
    191
    1 check point besides the NFR letter?
    2 MR. EASTEP: Not really because that -- the
    3 activities occur pretty quickly once the remedial
    4 action is done -- especially if they're fast
    5 tracking a project, when the remediation is done,
    6 the consultants usually try and submit the remedial
    7 action completion report pretty quickly. We then

    8 review those and once we've reviewed it and found
    9 them to be acceptable, we have 30 days after that
    10 to issue the NFR letter. So it happens fairly
    11 quickly. What we do in that 30 days is typically
    12 we'll draft up an NFR letter and send it to the
    13 remedial applicant and give them a brief period of
    14 time to look at it to make sure that they understand
    15 it and it's okay with them. So there's not much
    16 time involved.
    17 MS. LIU: Is there a great deal of time between
    18 when an NFR letter is issued and when it's actually
    19 perfected?
    20 MR. EASTEP: We -- in the site remediation
    21 program, we try and monitor -- we don't use the term
    22 perfected exactly, but filed under today's -- the
    23 way the rules are today. In the site remediation
    24 program, most of them are filed within the time
    L.A. REPORTING (312) 419-9292
    192
    1 frame. I would say well over 90 percent. We do
    2 monitor those and if we do notice one we haven't
    3 heard back from them and it should have been filed,
    4 we try and call them and usually that does the
    5 trick. So the best of my understanding is we have a
    6 pretty high compliance with that.

    7 MS. LIU: There's been so -- I'm sorry. Go
    8 ahead.
    9 HEARING OFFICER BEAUCHAMP: Mr. Sassila.
    10 MR. SASSILA: To the best of your knowledge,
    11 what is that time frame between remediation work
    12 being completed and the final NFR being issued?
    13 Do you have any idea, is it two months, three months
    14 time period?
    15 MR. EASTEP: It would probably be -- it all
    16 depends when the consultant sends in the remedial
    17 action completion report. I would say most of them
    18 occur within two months.
    19 For a point of clarification, we do have a
    20 60-day review time for any single report that comes
    21 in and actually we have another 30 after that.
    22 After we approve it, we have 30 days to issue, but I
    23 think most of those -- I haven't tracked that, but
    24 that's kind of my gut instinct is that they probably
    L.A. REPORTING (312) 419-9292
    193
    1 happen in the two month range. Some of them
    2 probably -- if people are really pressed, I know --
    3 if they're under the gun for closing or opening a
    4 school or something like that we try and help them
    5 out. So some of them will be even shorter.

    6 MS. KEZELIS: But the two-month period is from
    7 the receipt by the Agency of the documentation?
    8 MR. EASTEP: Correct.
    9 MS. KEZELIS: Reflecting completion of the
    10 work.
    11 MR. EASTEP: Right. And I might add, it
    12 depends on how -- if we've been working pretty
    13 closely on a project that's very time sensitive, I
    14 mean, we've turned them around almost in a matter of
    15 a couple of days, but if we haven't or if there's
    16 errors or problems then, of course, it could go up
    17 to three months or if they're deficient it could get
    18 sent back and actually go longer than that. I would
    19 say a good median type figure is around two months.
    20 MS. LIU: There's been a great deal of
    21 discussion today about a community relations plan
    22 and you even provided a guidance document on it. I
    23 was wondering if could you describe what a community
    24 relations plan entails in a nutshell.
    L.A. REPORTING (312) 419-9292
    194
    1 MR. EASTEP: Well, I don't know if I can do it
    2 in a nutshell, but in the interest of time I'll try
    3 and be brief.
    4 A good community relations plan involves

    5 telling your story to the people that are going to
    6 be most effected in the nearby area. Mr. Walton, I
    7 think, testified that when he was with Illinois
    8 Power their standards, so to speak, was like the
    9 local officials, the newspaper and media and that's
    10 all fine. You also -- he might only have briefly
    11 touched on is the ones that I've seen that are most
    12 successful are people out, you know, pounding the
    13 beat, they're walking the pavement, they're knocking
    14 on doors, they're, you know, finding out, you know,
    15 what the real citizen issues are with regards to
    16 some of these sites. So you have to identify what
    17 impacts you might have on the community, who might
    18 most be affected and then from there you kind of
    19 start thinking about well, how do I communicate to
    20 them and educate those people as best as possible as
    21 to what's going on. There's going to be some sites
    22 where the people are never going to like what you
    23 do. For example, there's always that chance, but if
    24 you've gone out and you've educated them and they
    L.A. REPORTING (312) 419-9292
    195
    1 understand what's going on, then you've probably
    2 been pretty successful.
    3 Overall, I would say that in good

    4 community relations, they don't cost anything and in
    5 the long run, they tend to pay for themselves.
    6 Although in terms of dollar and cents, it's much
    7 more excessive to do a good community relations plan
    8 than it is to put out a couple newspaper notices or
    9 even hold a hearing. I don't think those are
    10 particularly effective. I think what's effective is
    11 the effort and energy people put into what they do.
    12 So going back to kind of summarize, and I
    13 think the document there was written by -- that I
    14 submitted earlier was written by Greg Michaud, who's
    15 formally head of community relations with IEPA and
    16 it's fairly succinct, you go through this process of
    17 identifying kind of what the issues are, who might
    18 be affected and try and figure a way to communicate
    19 what you're going to do to those people so they have
    20 a good understanding.
    21 HEARING OFFICER BEAUCHAMP: Mr. Sassila?
    22 MR. SASSILA: From your own experience, don't
    23 you agree that that process of having a new school
    24 is different than remediating an MGP site given the
    L.A. REPORTING (312) 419-9292
    196
    1 fact most MGP sites now -- either residential,
    2 public parks or some other -- are being useful for

    3 different purposes where the entire community is not
    4 aware of the fact an MGP site used to be here, why
    5 for the school that process to have new school
    6 normally take three to four months before you build
    7 any school and you have to go through different
    8 steps before you decide the site and other factors?
    9 So they are two different really issues when it
    10 comes to school, MGP or some other site and each one
    11 should be addressed in separate ways and the most
    12 appropriate way other than one generic forum for all
    13 of them.
    14 MR. EASTEP: In general, I think that every
    15 applicant ought to evaluate their site for the
    16 potential need for community relations plan. I
    17 think Mr. Walton said 99 percent. I'm not sure
    18 that -- that figure might be low, but everybody
    19 should look to see whether they need a plan. Most
    20 sites won't need a plan. All the sites are unique.
    21 They're all individuals -- individual sites.
    22 The point that I was trying to make in
    23 some of my questions earlier is that in some cases,
    24 if the public is interested, and I've seen this many
    L.A. REPORTING (312) 419-9292
    197
    1 times, they're going to -- I don't know, sit Friday

    2 evenings when they're going out to supper and
    3 something and they'll start talking and they'll,
    4 like, assume facts not in evidence, as we say, and
    5 they will just imagine all sorts of things going on
    6 because nobody has taken the time to sit down and
    7 communicate appropriately with them.
    8 In those cases, a community relation plans
    9 can be quite simple and easy and pretty inexpensive.
    10 If you're telling people that you're cleaning up to
    11 a residential standard, trying to explain to them in
    12 layman's terms that it's safe for people not only go
    13 to school, but to live for 70 years, for example,
    14 then they won't conjure up all of these other types
    15 of thoughts and I think that type of thing pays
    16 for -- more than pays for itself down the line.
    17 So I think everybody ought to evaluate the
    18 sites and take that into consideration and community
    19 relations plans, some of them, can be one or two
    20 pages whereas as other might be -- the Superfund
    21 site, of course, might be 1,000 pages, but most of
    22 them are going to tend to be relatively brief.
    23 One situation that he didn't mention is
    24 comparing MGP sites to schools and we've had a
    L.A. REPORTING (312) 419-9292
    198

    1 couple of instances where we've had MGP sites -- or
    2 schools located on MGP sites, which, by the way,
    3 that particular site went very well and the school
    4 actually ended up with a track and a playground and
    5 it's state-of-the-art, but it went very well because
    6 they did a lot of work up front and worked with them
    7 and there was no traffic -- for example, no
    8 construction traffic during periods when kids would
    9 be coming to school or leaving school or during
    10 lunch hour. So they worked with each other pretty
    11 good.
    12 MS. LIU: Besides schools, could you provide
    13 some examples of other situations where the Agency
    14 has recommended a community relations plan?
    15 MR. EASTEP: Besides Finkl and Zapata, you
    16 mean? We've recommended -- there have been specific
    17 sites where we get calls from people wondering
    18 what's going on and why they're doing things and in
    19 those cases, we'll try and get back to the company
    20 or the applicant and let them know that there's some
    21 citizen interest and suggest that they start doing
    22 community relations. If we have real large sites
    23 like a major industry shuts done in an area and
    24 they're going to sell it and they're going to come
    L.A. REPORTING (312) 419-9292

    199
    1 through the remediation program, there's obviously a
    2 lot of public interest there, we would suggest that
    3 they get in the program. People that -- even though
    4 we advise them otherwise, they might want to involve
    5 some sorts of thermal destruction on-site.
    6 We know that citizens -- when that
    7 happens, citizens get real excited and they don't
    8 know what's going on and so we always advise those
    9 people to develop a community relations plan and
    10 actually we tell them in addition to that, in some
    11 of these, we suggest they go out and obtain
    12 qualified, professional help in that matter. They
    13 wouldn't, you know, just hire any engineer. They
    14 would hire an engineer that's experienced in
    15 remediation work and likewise, we ask them to get
    16 community relations people that are experienced in
    17 this type of -- in this line of work.
    18 MS. LIU: Would the Agency prefer keeping the
    19 requirement -- just keeping the community relations
    20 plan a voluntary kind of process rather than making
    21 it a requirement? Is there enough initiative --
    22 MR. EASTEP: I don't know if I can directly
    23 answer that because I haven't figured out a way to
    24 write what makes sense because like I said, it's
    L.A. REPORTING (312) 419-9292

    200
    1 only a small percentage that really needs them and
    2 when that need them, they should really have them.
    3 So it would be -- it would be foolish to
    4 ask people in sites where there's really no interest
    5 and lot of times you can tell by just talking to
    6 some of the neighbors or some of the employees, you
    7 know, at a site that there's no interest. It would
    8 be foolish to require them to do much more than just
    9 find that out. So I don't know if the Agency has a
    10 position as they sit here. I'm pretty sure we
    11 don't.
    12 MS. LIU: Skipping around a bit, under the
    13 discussion of soil management zone, IERG had
    14 proposed the definition of soil. How does the
    15 Agency feel about that proposed definition?
    16 MR. EASTEP: I don't think that their
    17 definition does anything to improve our ability
    18 to communicate between one another what soil is.
    19 MR. WIGHT: There was also some discussion of
    20 that in the transcript at the last hearing. I think
    21 this issue came up a little bit so you might like to
    22 review that. I think Mr. King had some remarks in
    23 there about that as well -- about the difficulties
    24 of coming up with a definition that would work and
    L.A. REPORTING (312) 419-9292

    201
    1 some of the considerations involved such as whether
    2 or not the TACO models would work on the material
    3 and that had been an issue discussed during the
    4 TACO hearings some years ago and the consensus at
    5 that time was that it should not be defined because
    6 of the difficulties of it, but you might want to
    7 review that part of the transcript. I can't tell
    8 you exactly where that was. I'm sure if Mr. King
    9 were here today, that would be area where he might
    10 have some comments too, but unfortunately he's not
    11 so -- but you may want to review those.
    12 MR. EASTEP: It was during my testimony.
    13 MS. LIU: Okay. Thank you.
    14 MS. McFAWN: Mr. King could, of course,
    15 supplement that testimony in public comment on this
    16 proposed definition?
    17 MR. WIGHT: And we probably will do that in
    18 direct response to the proposal by Mr. Walton.
    19 MS. McFAWN: Thank you.
    20 MR. EASTEP: But in discussions, I don't
    21 believe Mr. King's opinion has changed.
    22 MS. LIU: IERG had also proposed removing the
    23 prohibition against moving an SMZ closer to a
    24 residential property, but instead rather applying a

    L.A. REPORTING (312) 419-9292
    202
    1 TACO risk-based approach. How does the Agency feel
    2 about that?
    3 MR. EASTEP: I think going back to
    4 Mr. Wight's comments. I think this issue was
    5 discussed during the last hearing and I believe I
    6 was asked that question in a couple different ways
    7 and I think I responded.
    8 MS. McFAWN: I think Mr. Walton also included
    9 in his prefiled testimony your responses and is it
    10 correct as he summarized it that it is a perception
    11 as opposed to a risk issue?
    12 MR. EASTEP: I don't recall that we exactly
    13 said that, although we might. I don't recall that.
    14 I recall the gist of my response being that we did
    15 not do -- when we developed that particular section
    16 of the rule, we did not do any risk analysis. We
    17 did not evaluate how a risk was impacted as part of
    18 putting that in.
    19 MS. McFAWN: All right. I see the distinction.
    20 I had come away from that hearing likewise thinking
    21 this is a public perception problem and if it's
    22 that, then the suggestion that a community relations
    23 plan be used to diffuse that perception, is that a
    24 good remedy or a usable remedy to the perhaps

    L.A. REPORTING (312) 419-9292
    203
    1 misperception or accurate perception by the public?
    2 MR. EASTEP: I suppose the Agency may have
    3 comments later on that particular aspect. I don't
    4 know that we could -- I mean, that might be -- if
    5 you accept the fact that perception is the problem,
    6 then that might be one way to address it, but that
    7 in and of itself would still be fraught with
    8 implementation issues.
    9 For example, if you were to craft
    10 something that said well, you had to have a
    11 community relation plan, then you'd have to make it
    12 acceptable to the Agency and then if they went out
    13 and did their community relations and the people
    14 were opposed to it, would that mean that they
    15 couldn't do it?
    16 Would it mean all the people had to be for
    17 it or could one person be against it and stop it or
    18 would it take all the people? And so you would
    19 still have some of those sorts of issues to work
    20 your way through.
    21 MS. McFAWN: You know, I can see that as an
    22 argument, but there are other scenarios where TACO
    23 has removed the risk and we don't mandate a
    24 community relations plan, but if a community

    L.A. REPORTING (312) 419-9292
    204
    1 relations plan is used, it diffuses the
    2 misunderstanding hopefully and reaches a consensus
    3 maybe, but it's not obligated to reach a consensus
    4 for you to get an NFR letter?
    5 MR. EASTEP: That's correct. Yes, ma'am.
    6 MS. McFAWN: Okay. I'm glad we agree and I'm
    7 just thinking in this scenario if the risk has been
    8 removed by TACO, then why would you prohibit someone
    9 from putting a site management zone in a place that
    10 isn't of any greater risk to the public if -- and to
    11 make sure that this is more acceptable to the
    12 affected public that maybe perhaps require -- and
    13 Mr. Walton doesn't even oppose that we require it,
    14 but what if you were to require community relations
    15 plan which generally should -- I don't know about
    16 the question should it be acceptable to the Agency
    17 or what, but wouldn't that be a very logical way of
    18 diffusing the misunderstanding?
    19 MR. EASTEP: I think certainly community
    20 relations are usually logical ways of dealing with
    21 misunderstandings. On the other hand, they don't --
    22 as I mentioned, if you do good, everybody will
    23 communicate, educate people, but they may not like

    24 it in the end. Even though you -- people just don't
    L.A. REPORTING (312) 419-9292
    205
    1 like stuff. Well, if you're tying this particular
    2 aspect of the program directly to community
    3 relations, then the next logical question after that
    4 is if they have it, does it have to be acceptable to
    5 100 percent of the people that are affected,
    6 whatever that might be?
    7 MS. McFAWN: But isn't that same question posed
    8 by CBEs proposal then?
    9 MR. EASTEP: Well, now that you mention it.
    10 MS. McFAWN: They're not mandating community
    11 relations programs, but...
    12 MR. EASTEP: Their approach is a little bit
    13 different, I think. They're just having -- they're
    14 building a school and creating a community
    15 relation -- or some sort of community relation as
    16 part of the remediation for that school site. Under
    17 that circumstance, the school is going to be built
    18 regardless. They have to clean it up to meet
    19 residential standards regardless. So that's a
    20 little -- I think that is a little bit different
    21 situation.
    22 MS. McFAWN: Just because of the difference

    23 between a soil management zone possibly going in at
    24 an industrial site versus one that's cleaned up to
    L.A. REPORTING (312) 419-9292
    206
    1 residential because the school could have a soil
    2 management zone, couldn't it?
    3 MR. EASTEP: Well, I think the way we've
    4 written it, it probably could.
    5 MS. McFAWN: So the distinction there is the
    6 level of cleanup that's going to be required at a
    7 school site versus using an SMZ at an industrial
    8 site?
    9 MR. EASTEP: Say that again.
    10 MS. McFAWN: So you're telling me that the
    11 distinction is that at the school site, they will
    12 clean the site up to residential which is about as
    13 clean as clean can get?
    14 MR. EASTEP: Absolutely.
    15 MS. McFAWN: Versus being at an industrial site
    16 with an SMZ not being the most clean that be
    17 achieved under TACO?
    18 MR. EASTEP: Well, it would still have to be
    19 clean to the industrial standard.
    20 MS. McFAWN: Which means it can't migrate
    21 off-site?

    22 MR. EASTEP: Absolutely. Absolutely.
    23 But here you're creating a situation with the SMZ
    24 that you're not mandated to create. There's no
    L.A. REPORTING (312) 419-9292
    207
    1 mandate in any of the statutes or the rest of the
    2 regulations that require you to create an SMZ or
    3 what otherwise might be construed as an onsite
    4 disposal activity closer to somebody's house.
    5 There's no requirement that you do that.
    6 On the other hand, with the school, there
    7 is a requirement that if the site is contaminated,
    8 that you have to get in the SRP and you have to
    9 clean it up before you commence construction of the
    10 school. That's all part of the statute and that's
    11 how we're operating now. So I think that's kind of
    12 a distinction under the scenario that you just
    13 brought up.
    14 MS. McFAWN: So on either site, you could not
    15 put the SMZ in an uncontaminated area?
    16 MR. EASTEP: That's correct.
    17 MS. McFAWN: And on the industrial site, you
    18 could put the SMZ in a contaminated area and you
    19 could do the same at the school site so that way
    20 they're equal?

    21 MR. EASTEP: That's correct.
    22 HEARING OFFICER BEAUCHAMP: Mr. Walton, you had
    23 something to ask?
    24 MR. WALTON: Mr. Eastep, I have a question.
    L.A. REPORTING (312) 419-9292
    208
    1 Again, I'm a little confused. I have a site --
    2 industrial commercial site. I'm going to clean it
    3 up to residential through the use of barriers. Can
    4 I move it closer to the property boundaries? I'm
    5 going to achieve Tier I ROs with the use of
    6 barriers, et cetera, et cetera, this land use is
    7 going to be residential, can I --
    8 MR. EASTEP: Are you moving it to previously
    9 uncontaminated?
    10 MR. WALTON: It will be above Tier I.
    11 MR. EASTEP: What is the adjacent contiguous
    12 property?
    13 MR. WALTON: It will be residential.
    14 MR. EASTEP: The adjacent property is
    15 residential. Then you could not move it closer the
    16 way the proposal is written.
    17 MR. WALTON: That logic fails me.
    18 MR. EASTEP: Well, it shouldn't because the way
    19 it is now, regardless of what your current land use

    20 is, the way the rule is drafted, you can't move a
    21 soil management zone closer to a contiguous
    22 residential property. So you still probably have
    23 your same objection to that part of the rule.
    24 MR. WALTON: Yeah.
    L.A. REPORTING (312) 419-9292
    209
    1 MR. EASTEP: So how your end use ends up
    2 doesn't matter. It's the impact you're having on
    3 the nearest resident -- or the contiguous resident.
    4 MR. WALTON: I'd like to follow-up. You said
    5 the impact I'm having to the adjacent areas, that
    6 connotes risk. My TACO solution says there is no
    7 risk.
    8 MR. EASTEP: I didn't mean to use impact in
    9 the sense of risk, only in the sense of evaluating
    10 its compliance with the proposed regulation.
    11 MS. KEZELIS: And what's the rationale for
    12 that?
    13 MR. EASTEP: The rationale is very difficult to
    14 put your finger on. It's the same as it was before.
    15 I mean, the site -- we made it clear for the SMZ
    16 that it had to meet all the requirements of TACO
    17 when you were done. It had to be safe. The
    18 restriction we put -- and that doesn't differentiate

    19 between industrial commercial or residential or some
    20 other use if you had one for that matter.
    21 What it did was it didn't allow you to
    22 move something closer to contiguous residential
    23 property. So that gets back to the other -- his
    24 inability to understand our confusion for him on why
    L.A. REPORTING (312) 419-9292
    210
    1 we did that to begin with which he's asserting is a
    2 perception issue. So that issue still remains.
    3 HEARING OFFICER BEAUCHAMP: Mr. Sassila?
    4 MR. SASSILA: Can you explain what -- that
    5 rationale here if you have contaminated soil being
    6 removed to a clean area and then you have engineered
    7 barriers so you're understaffed with your
    8 compliance? You have pavement or concrete. So
    9 there's no exposure. So what the rationale is
    10 though you cannot place it at this location even
    11 though you are in compliance with TACO? It's not
    12 clear to me why not.
    13 MR. EASTEP: We're just trying to protect clean
    14 areas from degradation. It's like -- the concept is
    15 antidegradation. If you've got an area that's
    16 clean, we leave it clean.
    17 MR. SASSILA: But the source is no longer

    18 there. Really, it's not going to change anything,
    19 that's the fact. Now, we are in agreement the
    20 source is gone. Having contaminated soil at point A
    21 or B is not going to change or denigrate the site.
    22 The reality is not going to change anything of the
    23 site conditions. You have your engineered barrier.
    24 It does make sense to say no, you cannot because
    L.A. REPORTING (312) 419-9292
    211
    1 there, it doesn't make sense to say no, you cannot.
    2 MR. EASTEP: I think my answer was that it was
    3 protecting areas from degradation.
    4 MS. McFAWN: So in other words, TACO is just
    5 meant to clean up?
    6 MR. EASTEP: Yes.
    7 MS. McFAWN: Not to denigrate areas?
    8 MR. EASTEP: Yes. Well put. Thank you.
    9 MS. LIU: Does the TACO solution mean no risk?
    10 MR. EASTEP: The TACO solution means no
    11 unacceptable risk.
    12 MS. LIU: Thank you.
    13 MR. EASTEP: I'd like to clarify that. It also
    14 means management of residual risk.
    15 MS. LIU: Could an SMZ be established in place
    16 where no soils are actually moved?

    17 MR. EASTEP: I don't know if that would really
    18 be an SMZ. That's what people do today. If they
    19 operate in an area where it's all -- where it's
    20 contaminated. I mean, that's where the issue came
    21 up was people wanted to start moving stuff around.
    22 It stays exactly where it is or it wouldn't be
    23 called an SMZ.
    24 MR. WIGHT: May I make a comment here?
    L.A. REPORTING (312) 419-9292
    212
    1 This is just for a point of clarification
    2 and this may just people's shorthand way of
    3 discussing this, but several times, it's been
    4 mentioned about moving the SMZ around. The issue is
    5 really moving soil around within an SMZ.
    6 An SMZ may be established anywhere on the
    7 remediation site, but I believe the way the proposal
    8 is drafted and the reason for this because you may
    9 have different concentrations of contamination at
    10 various places within your defined SMZ, but the
    11 issue is where you move the contaminated soil not
    12 where the SMZ is established. So I don't know if
    13 that helps clarify anything or not, but it seems
    14 like sometimes that's important to keep in mind.
    15 It's not so much where you can establish the SMZ,

    16 but what you can do within the SMZ once you've
    17 established it.
    18 HEARING OFFICER BEAUCHAMP: We'll need you to
    19 identify yourself for the record.
    20 MS. HIRNER: My name is Deirdre Hirner,
    21 D-e-i-r-d-r-e, H-i-r-n-e-r, and I'm with the
    22 Illinois Environmental Regulatory Group and my
    23 question -- here is what I have a difficulty
    24 understanding. Again, knowing that I'm a technical
    L.A. REPORTING (312) 419-9292
    213
    1 person, but say I have large industrial site and I
    2 have a soil management zone and I have different
    3 levels of contamination within this site and at the
    4 south end of the site is a residential area, at the
    5 north end of the site, it's just open space. If the
    6 soil has a heavier concentration of contamination on
    7 the side that's toward the residential site and I'm
    8 going to make a zone with some of the less
    9 contaminated soil, but I can't do that because I'm
    10 going to be moving that closer to a residential
    11 site. What's the sense in that? What's the sense
    12 in the prohibition? You know, people are talking
    13 about different concentrations or different levels
    14 of contamination or, you know, you said a minute

    15 ago, it's about concentration of the contamination
    16 on the site. You know, if it's towards the
    17 residential area and you want to move the media
    18 there with what -- I don't understand and let's say
    19 it's a huge industrial site.
    20 MR. EASTEP: Well, part of the issue could be
    21 that let's say you decide you're going to move very
    22 large volumes of contaminated soil to the
    23 residential area and let's say you want to, in
    24 effect, allow this isn't certainly our intention or
    L.A. REPORTING (312) 419-9292
    214
    1 desire here to create things that start looking like
    2 landfills, but what if you create a pile that's 50
    3 or 60 feet high of contaminated material? Even
    4 though it meets TACO, even though there's no
    5 unacceptable risk, all of the sudden now you've got
    6 something that looks like a landfill, smells like a
    7 landfill and absent the SMZ provision, would be a
    8 landfill.
    9 Of course, we know how the public reacts.
    10 I think if a person built a site today in accordance
    11 with solid waste rules, they can build a perfectly
    12 safe landfill, but you're not going to get very many
    13 people to agree to allowing you to put that landfill

    14 next to their house no matter how safe you tell them
    15 it's going to be. So in effect, you could be doing
    16 some of that under the SMZ and I think if you want
    17 to call that public perception, that would be public
    18 perception, I guess.
    19 So what you're doing there is that's part
    20 of the logic, too, that you're creating something
    21 that's right next to somebody's house or some
    22 residences and that's kind of what a lot of Silver
    23 Shovel is about because a lot of those sites were
    24 next to people's homes.
    L.A. REPORTING (312) 419-9292
    215
    1 MS. HIRNER: Just a little more questioning
    2 maybe kind of as a follow-up, if that's okay. When
    3 we look at being no closer to the residential area
    4 and again, I'm going to look at in the context of
    5 large industrial site where is it -- is it -- if I
    6 am located in the middle of the state of Illinois, I
    7 mean just to make it easy, and the residential area
    8 is 25 miles away from it, but it's a residential
    9 area, does this mean that I can't move it closer
    10 to --
    11 MR. EASTEP: No. It would be contiguous
    12 residential.

    13 HEARING OFFICER BEAUCHAMP: Mr. Sassila?
    14 MR. SASSILA: I'm a little bit confused.
    15 You keep referencing to landfill and you said you
    16 cannot accept any waste or any soil from off-site.
    17 We all know in a landfill, you are allowed to import
    18 waste and while it's being generated on-site means
    19 management site, it cannot be even close to
    20 definition of landfill. So how are you drawing this
    21 conclusion of land fill?
    22 MR. EASTEP: Regardless of where the waste is
    23 generated, it could still be a landfill and I think
    24 the Agency would treat on-site disposal areas as
    L.A. REPORTING (312) 419-9292
    216
    1 being subject to the design and operation
    2 requirements for landfills. There's a permit
    3 exemption, but nonetheless, they'd -- if somebody
    4 were to -- some industry were to build an on-site
    5 RCRA landfill, they'd have to get a RCRA permit.
    6 MS. McFAWN: Even a solid --
    7 MR. EASTEP: Even a solid -- if they were to
    8 build --
    9 MS. McFAWN: Oh, they don't need the permit,
    10 you're right.
    11 MR. EASTEP: Right. I shouldn't have used

    12 RCRA. They would need to conform with Parts 811
    13 through 815.
    14 HEARING OFFICER BEAUCHAMP: Mr. Walton?
    15 MR. WALTON: Does this prohibition about moving
    16 a soil management zone closer to a property boundary
    17 with contiguous residential property prevent the
    18 construction of a 50-, 60-foot landfills? There's
    19 nothing in the -- my understanding is there's
    20 nothing within the proposal soil management zone
    21 regulation other than a little common sense that
    22 would prevent the construction of this 50-foot
    23 monster.
    24 MR. EASTEP: That's correct.
    L.A. REPORTING (312) 419-9292
    217
    1 MS. McFAWN: So do you think there should be?
    2 MR. EASTEP: Right now, I don't know. I'm kind
    3 of up in the air the more this issue comes up. Most
    4 of the sites that I've had experience with -- Greg
    5 can jump in -- I haven't seen circumstances where
    6 that would -- where the sites in the SRP -- I've
    7 seen sites outside the SRP that might have been
    8 under enforcement where they might be wanting to do
    9 that, but that's a little bit of a different
    10 situation. Sites in the SRP, that type of thing.

    11 I don't know if I've seen too many of those. They
    12 just lend themselves to that, but could there be one
    13 in the future. Well, I never say never.
    14 If I had some sort of limitation, I don't
    15 know, first of all, what the -- if you had a
    16 limitation on, say, height or above grade, I don't
    17 know what that would be first of all and secondly, I
    18 don't know how I would justify it, but in some case
    19 some years down the road, if we had a case where
    20 that came up, I'd think, boy, I wish we had
    21 something, but I don't know what it is now.
    22 MR. WIGHT: Mr. Eastep -- just as a point of
    23 clarification, when you said sites in the SRP don't
    24 typically lend themselves to that, do you mean
    L.A. REPORTING (312) 419-9292
    218
    1 because that type of structure doesn't usually
    2 facilitate redevelopment? Is that what you meant by
    3 that?
    4 MR. EASTEP: Exactly, that's exactly correct.
    5 Most of the sites that are in the SRP are being
    6 developed for one purpose or another and that
    7 usually -- usually, you want to level -- they want
    8 to be leveled off, frankly. So thank you.
    9 MR. DUNN: Typically, we see cotton fill in the

    10 site remediation program where they'll take a little
    11 soil from here and put it over here. When they're
    12 doing digging for foundations, that's typically what
    13 we see happening.
    14 MS. LIU: To follow up on a question that
    15 Ms. Hirner asked, if you have an enormous site that
    16 just happens to be contiguous with a residential
    17 property and your remediation activities are on the
    18 far side, wouldn't the size of the site have some
    19 bearing on whether or not it could be moved slightly
    20 closer to that residential area?
    21 MR. EASTEP: Not the way the rule is currently
    22 written.
    23 MR. WIGHT: I think also Mr. King had some
    24 comments on that at the first hearing as well too.
    L.A. REPORTING (312) 419-9292
    219
    1 So again, I can't give you a citation, but you may
    2 want to review the first transcript from Mr. King's
    3 comment on that.
    4 MS. LIU: If you don't mind, could I turn your
    5 attention to the MOA with IDOT. It was submitted as
    6 Exhibit 7. There's a definition in Section two of
    7 institutional controls and it states, quote,
    8 nonengineered mechanisms for ensuring compliance

    9 with necessary land use limitations, end quote.
    10 MR. EASTEP: Yes.
    11 MS. LIU: Does this MOA exclude engineered
    12 mechanisms as land use controls?
    13 MR. EASTEP: It's not meant to exclude
    14 engineered mechanisms.
    15 MS. LIU: Skipping around again, Mr. Dunn had
    16 testified today about the revision under Section
    17 740.415(d)(3). There are two very similar terms
    18 that are used in this part, required quantitation
    19 limit and practical quantitation limit. Could you
    20 differentiate between those for me, please?
    21 MR. DUNN: The reason those were in there is
    22 and I was not privy to the original site remediation
    23 program regulations when they were -- when we were
    24 first working on them back in '95, '96, but
    L.A. REPORTING (312) 419-9292
    220
    1 apparently there were terms mixed and matched in
    2 there. Practical quantitation limit was actually --
    3 I believe there is a definition in the regulation
    4 for that. The required quantitation limit was only
    5 mentioned in the Appendix and from my understanding
    6 is they are similar.
    7 They are -- if you talk to a chemist,

    8 they're not used interchangeably, but we have here
    9 in the regulations and so that's why when you go
    10 through my testimony I talk about PQL and RQL and it
    11 depends on whether I refer back to the original
    12 language or I refer to the Appendix A. That's the
    13 reason there is some confusion. I hoped I answered
    14 your question.
    15 MS. LIU: You did. Thank you.
    16 When the RQLs were removed from Appendix
    17 A, I was wondering whether or not the practical
    18 quantitation limits or the method detection limits
    19 were listed anywhere else in Title 35.
    20 MR. DUNN: I do not think so. I believe the
    21 only kind of detection limits that are identified
    22 are the acceptable detection limits in 742 for a
    23 number of compound where the remediation objectives
    24 for a compound may be so low that you can't get that
    L.A. REPORTING (312) 419-9292
    221
    1 low with any kind of instrument or any kind of
    2 method that you use. So they use an acceptable
    3 detection limit. There are no other places I
    4 believe that identify those. They are sort of
    5 identified in our incorporations by reference when
    6 you identify SW846. They are identified in SW846.

    7 MS. LIU: In part of the revision, you propose
    8 using a figure of ten times the method detection
    9 limit in determining a practical quantitation limit
    10 for contaminants that weren't specifically included
    11 in Part 742. I was wondering if you could explain
    12 the rationale behind the number ten times?
    13 MR. DUNN: Unfortunately, I can't take credit
    14 for that. I took that right out SW846, method 8260
    15 for volatiles, and that was the closest thing I had
    16 come to where -- when they did not have a detection
    17 limit. They used that language there and that's the
    18 closest thing I could come up with.
    19 MS. LIU: Thank you very much.
    20 HEARING OFFICER BEAUCHAMP: Are there any other
    21 questions for the Agency today?
    22 MS. McFAWN: I have a couple on the lab
    23 certification issue. As I understood Mr. Walton's
    24 testimony, he wanted the ability to use uncertified
    L.A. REPORTING (312) 419-9292
    222
    1 laboratory results before -- collected before he
    2 enters the SRP program. Is that your understanding
    3 of what he was asking for?
    4 MR. EASTEP: That's right.
    5 MR. DUNN: His was having to do with -- I

    6 understand -- spills and mitigation of releases.
    7 Under the first hearing, my understanding was more
    8 for emergency response actions and I think his
    9 testimony today, and unfortunately I may be speaking
    10 for him, but I think he did agree that they would
    11 not be used for compliance with remediation
    12 objectives at the site, but that that data did have
    13 some validity, that it did have some merit to look
    14 at.
    15 MS. McFAWN: Okay. And the Agency agrees with
    16 that -- the use of it in the -- for mitigation
    17 purposes, emergency or nonemergency or just in the
    18 emergency situation?
    19 MR. DUNN: Typically, we see more of it in the
    20 non -- excuse me -- the emergency situations. I
    21 think what we're trying to not get into is somebody
    22 doing a lot of work out of a site and then coming
    23 into the site remediation program and all the work
    24 that they have completed has been at a nonaccredited
    L.A. REPORTING (312) 419-9292
    223
    1 laboratory and the purpose of putting this in is
    2 that all sites that come into the program use an
    3 accredited laboratory whether that be before they
    4 actually come into the program because we actually

    5 see a lot of sites that actually do a lot of work
    6 before they actually get into the program. We would
    7 like to see those sites also use an accredited lab
    8 so we now the data that we are seeing is of good
    9 quality.
    10 MR. EASTEP: I'd like to expand on that a
    11 little bit. I was surprised when we were preparing
    12 for this at the number of laboratories that we found
    13 that have already become certified and maybe -- I
    14 think -- has Mr. Walton left? We could talk to him
    15 see and because a lot of these large companies, you
    16 know, they're not using small out of the way labs,
    17 they're using typically larger, well staffed, well
    18 equipped laboratories and I wouldn't be surprised if
    19 some of the laboratories that are working for the
    20 large companies doing emergency responses are -- if
    21 they're not certified already, that they will soon
    22 become certified. So that's kind of a marketing
    23 ploy for a lot of the labs we've seen anyway.
    24 They're selling that certification to get business.
    L.A. REPORTING (312) 419-9292
    224
    1 MS. McFAWN: All right. I guess where I'm
    2 not -- maybe I just haven't processed this enough
    3 yet, but are you in agreement with Mr. Walton's

    4 testimony today? I mean, he actually -- as I
    5 understand it -- would like the ability to use data
    6 from laboratories that aren't certified and is the
    7 Agency willing to consider that and issue a decision
    8 on that?
    9 MR. EASTEP: No. I thought that we said only
    10 in the context of its suitability, not for
    11 compliance purposes. There's another provision that
    12 allows the use of older data, if you will, where
    13 the LPE is looking at previous work and they
    14 evaluate that previous work on its own merits and
    15 the suitability of that as it relates to the current
    16 situation and I would think we would have to do that
    17 with that type of laboratory data, too, and so to
    18 that extent, it might be quite valuable, but it
    19 would certainly not be suitable for compliance
    20 purposes.
    21 MS. McFAWN: So it would just be for the old
    22 data, not the new data collected before the cutoff
    23 date? Is that what you mean by old data?
    24 MR. EASTEP: No. I was referring back to that
    L.A. REPORTING (312) 419-9292
    225
    1 420 or something --
    2 MR. DUNN: 410(c).

    3 MR. EASTEP: That allows an LPE to refer back
    4 to work done by a prior PE or information submitted
    5 and so he doesn't have to certify that that's 100
    6 percent accurate because the current PE hasn't done
    7 it, but he can look at that and say well,
    8 regardless, I've looked at it and I've evaluated it
    9 and it's suitable for a certain purpose in my
    10 current application. And so that's not good for
    11 compliance purposes, if you will, but it's probably
    12 pretty good information to have and pretty useful
    13 and pretty valuable in terms of conducting his
    14 current remediation.
    15 MS. McFAWN: By compliance purposes, do you
    16 mean a final sign-off that the site has reached its
    17 objectives?
    18 MR. EASTEP: That as well -- as far as the
    19 investigation because they might be trying to
    20 determine the extent of investigation and if he's
    21 using a noncertified lab and he doesn't have the
    22 same detection limits, he might not be describing
    23 the extent of contamination and the work they're
    24 doing might be perfectly suitable for emergency
    L.A. REPORTING (312) 419-9292
    226
    1 response work, but it might not be suitable for

    2 determining whether or not they're meeting the TACO
    3 rules, plus that some of the emergency response data
    4 might be three or four years old and it might
    5 have -- what looked suitable then, I mean, if they
    6 didn't get the all the source material, it might
    7 have traveled some distance and your whole scenario
    8 is different. So that's what I mean by the
    9 suitability of it.
    10 MS. McFAWN: Thank you.
    11 HEARING OFFICER BEAUCHAMP: I will ask if there
    12 are any more questions for the Agency today? Seeing
    13 none, Mr. Wight let me ask if you have anything
    14 further the Agency wishes to present today?
    15 MR. WIGHT: Nothing further today.
    16 HEARING OFFICER BEAUCHAMP: Thank you very
    17 much. Before we wrap up, let me ask -- I know that
    18 our members of the public has dwindled as the
    19 afternoon has gone, but is there anyone here who
    20 wants to present testimony before we wrap things up?
    21 Seeing none, we will move into our conclusion then.
    22 The transcript from today's hearing should
    23 be available in ten business days. The Board will
    24 post the transcript from this hearing on its web
    L.A. REPORTING (312) 419-9292
    227

    1 site. The web site address is www.ipcb.state.il.us.
    2 You can obtain hard copies of the transcript by
    3 contacting either the court reporter or the Board,
    4 although the Board does charge 75 cents per page.
    5 The court reporter will inform you of the fee for
    6 providing a hard copy of the transcript.
    7 The Board will accept public comments on
    8 these proposals until May 3rd, 2001. In the event
    9 the Board receives the transcript after April 18th,
    10 the Board will accept public comments up to 14 days
    11 after receipt of the transcript.
    12 There will be an additional public comment
    13 period after the Board adopts these rules either
    14 jointly or separately for first notice.
    15 Today's hearing concludes the hearings
    16 scheduled by the Board in these matters. Any party
    17 may request an additional hearing pursuant to
    18 Section 102.412(b) of the Board's procedural rules.
    19 The party making the request must demonstrate that
    20 failing to hold an additional hearing would result
    21 in material prejudice to that party.
    22 I want to thank everyone for their
    23 patience and endurance this afternoon unless. Are
    24 there any other matters to be addressed at this
    L.A. REPORTING (312) 419-9292

    228
    1 time? Seeing none then, this matter is hereby
    2 adjourned. Thank you for your attendance and
    3 participation in this hearing.
    4 (Whereupon, the hearing was concluded.)
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING (312) 419-9292

    229
    1 STATE OF ILLINOIS )
    2 ) SS.
    3 COUNTY OF C O O K )
    4
    5
    6 I, TERRY A. STRONER, CSR, do
    7 hereby state that I am a court reporter doing
    8 business in the City of Chicago, County of Cook, and
    9 State of Illinois; that I reported by means of
    10 machine shorthand the proceedings held in the
    11 foregoing cause, and that the foregoing is a true
    12 and correct transcript of my shorthand notes so
    13 taken as aforesaid.
    14
    15
    16 _____________________
    17 Terry A. Stroner, CSR
    18 Notary Public, Cook County, Illinois
    19
    20 SUBSCRIBED AND SWORN TO
    before me this ___ day
    21 of ________, A.D., 2001.
    22
    _________________________
    23 Notary Public
    24

    L.A. REPORTING (312) 419-9292

    Back to top