| 403.100 | Preamble |
| 403.101 | Incorporation of NPDES Water Rules |
| 403.102 | NPDES Permits Required of Certain Dischargers |
| 403.103 | Application |
| 403.104 | Construction Authorization |
| 403.APPENDIX A | |
| References to Previous Rules | |
| AUTHORITY: Authorized by Section 27 and implementing Sections 12 and 13 of the Illinois Environmental Protection Act [415 ILCS 5]. | |
| SOURCE: Adopted at 4 Ill. Reg. 34, p. 164, effective August 7, 1980; codified at 5 Ill. Reg. 34, p. 8527; effective August 10, 1981; amended in R18-24 at 43 Ill. Reg. 11591, effective September 25, 2019. | |
a) Part 403 governs mining activities and permit issuance for NPDES permit holders and persons required to obtain an NPDES permit for a facility.
b) Under 35 Ill. Adm. Code 404.102, facilities operating under an NPDES permit need not obtain a State permit so long as the Agency administers the NPDES permit program.
c) Under 35 Ill. Adm. Code 404.102, Part 404 does not apply to NPDES permit holders.
(Source: Amended at 43 Ill. Reg. 11591, effective September 25, 2019)
a) A person required to obtain an NPDES permit must file an application complying with 35 Ill. Adm. Code 405.104 on forms provided by the Agency.
b) A person who holds an NPDES permit or who submits an NPDES permit application for a facility need not apply for a State permit unless the Agency notifies that person that a State permit is required.
c) Application for a renewed or modified NPDES permit is governed by the rules on NPDES applications.
(Source: Amended at 43 Ill. Reg. 11591, effective September 25, 2019)
a) If an NPDES permit is required to prepare land for mining activities or construct a mine related facility, a person must, before preparing land or constructing a facility:
1) Hold an NPDES permit including a condition authorizing the permit holder to prepare land or construct a facility; or
2) Hold a construction permit under 35 Ill. Adm. Code 404.101 to prepare land or construct a facility.
b) A permittee must not construct a new mine related facility or modify a mining activity or mine related facility for which the permittee holds an NPDES permit unless the NPDES permit includes a condition authorizing the construction or modification. If the modification is already covered under the existing permit condition, a separate authorization from the Agency is not required.
c) Any person required to obtain a construction authorization must apply at least 180 days before the date construction or modification begins.
d) Any person seeking a construction authorization must submit an application under 35 Ill. Adm. Code 405.104. The rules governing issuance of an NPDES permit, including 35 Ill. Adm. Code 405.101 and 405.102, also apply to issuing a construction authorization.
(Source: Amended at 43 Ill. Reg. 11591, effective September 25, 2019)
| Chapter 4, Mine Related Pollution
Part III, NPDES Permits |
35 Ill. Adm. Code 403 |
| Rule 300 | Section 403.100 |
| Rule 301 | Section 403.101 |
| Rule 302 | Section 403.102 |
| Rule 303 | Section 403.103 |
| Rule 304 | Section 403.104 |