TITLE 35: ENVIRONMENTAL PROTECTION
    SUBTITLE C: WATER POLLUTION
    CHAPTER II: ENVIRONMENTAL PROTECTION AGENCY
    PART 370
    ILLINOIS RECOMMENDED STANDARDS FOR SEWAGE WORKS
    SUBPART A: INTRODUCTION
    Section
    370.100 Purpose
    370.110 Scope and Applicability
    370.115 Incorporations by Reference
    SUBPART B: ENGINEERING REPORTS, PLANS AND SPECIFICATIONS
    Section
    370.200 General
    370.210 Engineering Report
    370.211 Design Flows
    370.220 Detailed Engineering Plan Drawings Format
    370.230 Specifications to Accompany Detailed Engineering Plan Drawings
    370.240 Revisions to Approved Plans and Specifications
    370.250 Operation During Construction
    370.260 Engineers Seal
    SUBPART C: DESIGN OF SEWERS
    Section
    370.300 General Considerations
    370.310 Design Basis
    370.320 Details of Design and Construction
    370.330 Manholes
    370.340 Sewers in Relation to Streams
    370.350 Protection of Water Supplies
    SUBPART D: SEWAGE PUMPING STATIONS
    Section

    370.400 General
    370.410 Design
    370.420 Suction-Lift Pump Stations
    370.430 Submersible Pump Stations - Special Considerations
    370.440 Alarm Systems
    370.450 Emergency Operation
    370.460 Instructions and Equipment
    370.470 Force Mains
    SUBPART E: SEWAGE TREATMENT WORKS
    Section
    370.500 Plant Location
    370.510 Quality of Effluent
    370.520 Design
    370.530 Plant Details
    370.540 Plant Outfalls
    370.550 Essential Facilities
    370.560 Safety
    370.570 Laboratory
    SUBPART F: PRELIMINARY TREATMENT
    Section
    370.600 General Considerations
    370.610 Screening Devices
    370.620 Grit Removal Facilities
    370.630 Pre-Aeration
    SUBPART G: SETTLING
    Section
    370.700 General Considerations
    370.710 Design Considerations
    370.720 Sludge and Scum Removal
    370.730 Protection and Service Facilities
    370.740 Imhoff Tanks
    370.750 Septic Tank - Tile System
    SUBPART H: SLUDGE PROCESSING, STORAGE AND DISPOSAL
    Section
    370.800 General
    370.810 Process Selection

    370.820 Sludge Thickening
    370.830 Anaerobic Sludge Digestion
    370.840 Aerobic Sludge Digestion
    370.845 High pH Stabilization
    370.850 Sludge Pumps and Piping
    370.860 Sludge Dewatering
    370.870 Sludge Storage and Disposal
    SUBPART I: BIOLOGICAL TREATMENT
    Section
    370.900 Trickling Filters
    370.910 Rotating Biological Contactors (Repealed)
    370.915 Rotating Biological Contactors
    370.920 Activated Sludge
    370.930 Waste Stabilization Ponds and Aerated Lagoons
    370.940 Intermittent Sand Filtration for Secondary Treatment
    SUBPART J: DISINFECTION
    Section
    370.1000 General
    370.1010 Disinfection Process Selection
    370.1020 Chlorine Disinfection
    370.1021 Dechlorination
    370.1022 Ultraviolet Disinfection
    370.1030 Chlorine Gas Supply (Repealed)
    370.1040 Piping and Connections (Repealed)
    370.1050 Housing (Repealed)
    370.1060 Respiratory Protection Equipment (Repealed)
    370.1070 Application of Chlorine (Repealed)
    370.1080 Sampling and Testing
    SUBPART K: TERTIARY FILTRATION
    Section
    370.1100 Applicability
    370.1110 Type
    370.1120 High Rate Filtration
    370.1130 Low Rate Intermittent or Periodically Dosed Sand Filters
    SUBPART L: NUTRIENT REMOVAL

    Section
    370.1200 Phosphorus Removal by Chemical Treatment
    370.1210 Ammonia Control
    APPENDIX A Table No. 1 - Resident Occupancy Criteria
    APPENDIX B Table No. 2 - Commonly Used Quantities of Sewage Flows From
    Miscellaneous Type Facilities
    APPENDIX C Table No. 3 - Air Test Table for Sanitary Sewer Leakage
    Testing*
    APPENDIX D Figure No. 1 - Design of Sewers - Ratio of Peak Flow to
    Daily Average Flow
    APPENDIX E Figure No. 2 - Primary Settling
    APPENDIX F Figure No. 3 - B.O.D. Removal Single Stage Trickling Filter
    Units Including Post Settling - No Recirculation Included
    APPENDIX G Figure No. 4 - Break Tank Sketch for Potable Water Supply
    Protection
    APPENDIX H Old Section Numbers Referenced (Repealed)
    AUTHORITY: Implementing Sections 4 and 39 and authorized by Section 39 of
    the Environmental Protection Act [415 ILCS 5/4 and 39].
    SOURCE: Adopted at 4 Ill. Reg. 14, p. 224, effective March 31, 1980;
    codified at 8 Ill. Reg. 19430; recodified at 18 Ill. Reg. 6375; amended at
    21 Ill. Reg. 12444, effective August 28, 1997.
    NOTE: In this Part, superscript numbers or letters are denoted by
    parentheses; subscript are denoted by brackets.
    SUBPART A: INTRODUCTION
    <BSection 370.100 Purpose>>
    The purpose of this Part is to establish criteria for the design and
    preparation of plans and specifications for wastewater collection and
    treatment systems.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.110 Scope and Applicability>>
    a) These design criteria apply to conventional design concepts for
    wastewater collection and treatment systems. Where

    non-conventional concepts or approaches to collection and
    treatment, particularly for very small systems, are being
    considered, the Agency should be contacted for any design guidance
    that may be available.
    b) In evaluating plans and specifications for new processes, the
    Agency will consider the specific information submitted with the
    design in accordance with the provisions of Section 370.520(b) for
    situations involving new process evaluation.
    c) These criteria are intended to establish limiting values for those
    aspects of plans and specifications which the Agency evaluates and
    to promote, as far as practicable, uniformity of practice
    throughout the State. For projects with a design flow average of
    over 100 million gallons per day (mgd), the application of
    specific design parameters in these criteria should be evaluated
    on a unit-by-unit basis to insure optimum design performance and
    cost effective construction. In applying these criteria,
    consideration must be given to the characteristics (including
    current water quality) and uses of the receiving stream in order
    to insure compliance with the applicable regulations of the
    Illinois Pollution Control Board (hereinafter "IPCB"). Users
    should also be cognizant of Federal requirements.
    d) The word "shall" is used where practice is sufficiently
    standardized to warrant compliance with specific requirements, or
    where safeguarding the public health or protecting water quality
    justifies such definite action. Words such as "should",
    "recommended" or "preferred" indicate desirable procedures or
    methods with deviations subject to individual project
    consideration.
    e) Definitions of terms and their use are intended to be in
    accordance with the GLOSSARY - WATER AND WASTEWATER CONTROL
    ENGINEERING, jointly prepared by the American Public Health
    Association (APHA), American Water Works Association (AWWA),
    American Society of Civil Engineers (ASCE), and Water Environment
    Federation (WEF). The units of expression are in accordance with
    the WEF Manual of Practice Number 6, Units of Expression for
    Wastewater Treatment.
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.115 Incoporations by Reference>>
    a) The following materials are incorporated by reference:
    1) "Glossary: Water and Wastewater Control Engineering", Joint
    Editorial Board of the American Public Health Association,

    American Society of Civil Engineers, American Wasteworks
    Association, American Pollution Control Federation (1969).
    2) ASTM Standards - American Society for Testing and Materials,
    100 Bar Harbor Drive, West Conshohoken PA:
    ASTM C12-95 -- "Standard Practice for Installing Vitrified
    Clay Pipe Lines", Vol. 04.05, Chemical Resistant Materials,
    Vitrified Clay, Concrete, Fiber-Cement Products; Mortars;
    Masonry (1996).
    ASTM C969-94 -- "Standard Practice for Infiltration and
    Exfiltration Acceptance Testing of Installed Precast Concrete
    Pipe Sewer Lines", Vol. 04.05, Chemical Resistant Materials,
    Vitrified Clay, Concrete, Fiber-Cement Products; Mortars;
    Masonry (1996).
    ASTM C124 -- "Standard Test Method for Concrete Sewer
    Manholes by the Negative Pressure (Vacuum) Test", Vol. 04.05,
    Chemical Resistant Materials, Vitrified Clay, Concrete,
    Fiber-Cement Products; Mortars; Masonry (1996).
    ASTM D2321 -- "Standard Practice for Underground Installation
    of Themoplastic Pipe for Sewers and Other Gravity-Flow
    Applications", Vol. 08.04, Plastic Pipe and Building Products
    (1996).
    3) "AWWA Standard for Installation of Ductile-Iron Mains and
    their Appurtenances", ANSI/AWWA C600-93 (1994) American
    Wasteworks Association, 6666 Quincy Avenue, Denver CO 80235.
    4) "National Electrical Code Handbook", 7th ed. (1996), National
    Fire Protection Association, 1 Batterymarch Park, P.O. Box
    9101, Quincy MA 02269-9101.
    5) "Standard Specifications for Water and Sewer Main
    Construction in Illinois", 5th ed. (1996), Illinois Society
    of Professional Engineers, Illinois Municipal League, the
    Association General Contractors of Illinois, Underground
    Contractors Association.
    6) "Standard Specifications for Road and Bridge Construction"
    (1997), Illinois Department of Transportation.
    7) Manuals of Practice, Joint Task Force of the Water
    Environment Federation (WEF) (formerly Water Pollution
    Control Federation), 601 Wythe Street, Alexandria VA
    22314-1994 and the American Society of Civil Engineers
    (ASCE), 345 East 47th Street, New York NY 10017-2398:

    "Gravity Sanitary Sewer Design and Construction", WPCF Manual
    of Practice (MOP) No. FD-5 (1982).
    "Units of Expression for Wastewater Management", WEF Manual
    of Practice (MOP) No. 6 (1982).
    "Design of Municipal Wastewater Treatment Plants", vol. 1,
    WEF Manual of Practice (MOP) No. 8 (1992).
    b) The incorporations cited in this Section include no further
    editions or amendments.
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART B: ENGINEERING REPORTS, PLANS AND SPECIFICATIONS
    <BSection 370.200 General>>
    The criteria in this Subpart B are intended to be the technical basis for
    the preparation of the engineering reports and plans and specifications for
    waste collection and treatment works. For project planning requirements,
    applicable State and Federal guidance, regulations and statutes shall be
    consulted.
    a) Grant Projects
    For projects that will be funded by Stateor Federal grants,
    applicable regulations, policy and guidance documents will govern
    the non-technical requirements and shall be used in the facility
    planning process.
    b) Non Grant Projects
    For those projects which are not covered by applicable State or
    Federal project planning requirements or for those other projects
    in which there is no project planning guidance in the applicable
    State or Federal regulations or statutes, the project planning
    guidance set forth in Section 370.112 shall be utilized.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.210 Engineering Report>>
    a) General
    1) The engineering report assembles basic information; presents
    design criteria and assumptions; examines alternate projects
    including preliminary layouts and cost estimates; describes

    financing methods, user charges and operation and maintenance
    costs; reviews organizational and staffing requirements;
    offers a conclusion with a proposed project for client
    consideration; and outlines official actions and procedures
    to implement the project.
    2) The concept, factual data and controlling assumptions and
    considerations for the functional planning of sewerage
    facilities are presented for each process unit and for the
    whole system. These data form the continuing technical basis
    for the detailed design and preparation of construction plans
    and specifications.
    3) Architectural, structural, mechanical and electrical designs
    are usually excluded. Sketches may be used to aid in
    presentation of a project. Outline specifications of process
    units, special equipment, etc., may be included.
    4) Engineering reports are not required for sewer extensions or
    sewer connections, but shall be required for the following
    projects:
    A) New treatment plants.
    B) Expansion or major modification of existing plants.
    C) New collection systems.
    D) Major upgrading of existing collection systems.
    b) Content
    The engineering report shall:
    1) Prescribe design period and projected population.
    2) Describe the specific service area for immediate
    consideration and indicate possible extensions and ultimate
    use.
    3) Present data and information on anticipated quantities of
    flow and wastewater constituents. Data from comparable
    existing installations may be used to develop the design
    basis of the proposed facilities if data for the project
    under design cannot be obtained in accordance with procedures
    set forth in Subparts C, D and E of these standards.
    4) Specify the scope and nature of collection system including
    pump stations and force mains for immediate and ultimate
    service areas.
    5) Discuss various treatment alternatives with reference to
    optimum treatability and other relevant factors.
    6) Develop a detailed basis of design for the recommended
    treatment process.
    7) Indicate compliance with applicable effluent limitations and
    discuss the impact of the project on receiving waters.

    8) Indicate compliance with the requirements of the Illinois
    Groundwater Protection Act [415 ILCS 55].
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.211 Design Flows>>
    The following flows shall be identified in the basis of design for sewers,
    lift stations, sewage treatment plants, treatment units and other
    wastewater handling facilities.
    a) Design Average Flow
    The design average flow is the average of the daily volumes to be
    received for a continuous 12-month period of the design year,
    expressed as a volume per unit of time.
    b) Design Maximum Flow
    The design maximum flow is the largest volume of flow to be
    received during a continuous 24-hour period, expressed as a volume
    per unit of time.
    c) Design Peak Hourly Flow
    The design peak hourly flow is the largest volume of flow to be
    received during a one hour period, expressed as a volume per unit
    of time.
    d) Design Peak Flow
    The design peak flow is the instantaneous maximum flowrate to be
    received.
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.220 Detailed Engineering Plan Drawings Format>>
    a) General
    Detail plans shall contain as necessary, the following:
    1) Plan views.
    2) Elevations.
    3) Sections and supplementary views which, together with the
    specifications and general layouts, facilitate construction
    of the works.
    4) Dimensions and relative elevations of structures.
    5) Location and outline form of equipment.
    6) Location and sizing of piping.
    7) Water levels.
    8) Ground elevations.
    9) Location and identification of all private and public water
    supply wells (refer to Section 370.210(b)(8)), structures and

    facilities (refer to Section 370.350(b)(1)(A)).
    10) Descriptive notations as necessary for clarity.
    b) Plans of Sewers
    1) General Plan
    Except as provided in subsection (b)(1)(C) below, a
    comprehensive plan of the existing and proposed sewers shall
    be submitted for projects involving new sewer systems or
    substantial additions to existing systems. This plan shall
    show the following:
    A) Geographical Features
    i) Topography and elevations: Existing or proposed
    streets and all streams or water surfaces shall be
    clearly shown. Contour lines at suitable intervals
    should be included.
    ii) Streams: The direction of flow in all streams, and
    high and low water elevations of all water surfaces
    at sewer outlets and overflows shall be shown.
    iii) Boundaries: The boundary lines of the
    municipality and the sewer district or area to be
    sewered shall be shown.
    B) Sewers
    The plan shall show the location, size and direction of
    flow of all existing and proposed sanitary and combined
    sewers draining to the treatment works concerned.
    C) Sewer Atlas
    The comprehensive plan of the existing sewers described
    above need not be submitted in each case if the system
    owner has furnished the Agency a copy of its sewer atlas
    showing the information required by subsection (b)(1).
    The project submittal, however, must include all the
    proposed work, and must be accompanied by a location map
    showing the proposed project and the route of the outlet
    sewer to the receiving plant, where necessary.
    2) Detail Plans
    Detail plans shall be submitted. Profiles should have a
    horizontal scale of not more than 100 feet to the inch and a
    vertical scale of not more than 10 feet to the inch. Plan
    views should be drawn to a corresponding horizontal scale.
    Plans and profiles shall show:
    A) Location of streets and sewers.
    B) Line of ground surface, size, material and type of pipe,
    length between manholes, invert and surface elevation at
    each manhole, and grade of sewer between each two

    adjacent manholes. All manholes shall be numbered on
    the plan and correspondingly numbered on the profile.
    C) Except where overhead sewers are required by local
    ordinance, if there is any question of the sewer being
    sufficiently deep to serve any residence, the elevation
    and location of the basement floor shall be plotted on
    the profile of the sewer which is to serve the house in
    question. The engineer shall state that all sewers are
    sufficiently deep to serve adjacent basements except
    where otherwise noted on the plans.
    D) Locations of all special features such as inverted
    siphons, concrete encasements, elevated sewers, etc.
    E) All known existing structures both above and below
    ground which might interfere with the proposed
    construction, particularly water mains, gas mains,
    storm drains, etc.
    F) Special detail drawings, made to a scale to clearly show
    the nature of the design, shall be furnished to show the
    following particulars:
    i) All stream crossings and sewer outlets, with
    elevations of the stream bed and of normal and
    extreme high and low water levels.
    ii) Cross sections and details of all special or non
    standard joints.
    iii) Details of all sewer appurtenances such as
    manholes, lampholes, inspection chambers, inverted
    siphons, regulators, tide gates and elevated
    sewers.
    c) Plans of Sewage Pumping Stations
    1) Location Plan
    A plan shall be submitted for projects involving construction
    or revision of pumping stations. This plan shall show the
    following:
    A) The location and extent of the tributary area.
    B) Any municipal boundaries within the tributary area.
    C) The location of the pumping station and force main.
    2) Detail Plan
    Detail plans shall be submitted showing the following where
    applicable:
    A) Grading plan of the station site.
    B) Location of existing pumping station.
    C) Proposed pumping station, including provisions for
    installation of future pumps or ejectors.

    D) Elevation of high flood water at the site, and maximum
    elevation of sewage in the collection system upon
    occasion of power failure, and the pumping station
    elevations.
    E) Test borings and groundwater elevations.
    F) Force main routing and profile.
    d) Plans of Sewage Treatment Plants
    1) Location Plan
    A) A plan shall be submitted showing the sewage treatment
    plant in relation to the remainder of the system.
    B) Sufficient topographic features shall be included to
    indicate its location with relation to streams and the
    point of discharge of treated effluent.
    C) All residences within one-half mile of the site shall be
    shown.
    2) General Layout
    Layouts of the proposed sewage treatment plant shall be
    submitted, showing:
    A) Topography of the site.
    B) Size and location of plant structures.
    C) Schematic flow diagram showing the flow through various
    plant units.
    D) Piping, including any arrangements for by-passing
    individual units. Materials handled and direction of
    flow through pipes shall be shown.
    E) Test borings and expected range of ground water
    elevations.
    3) Detail Plans
    Detail plans shall show the following:
    A) Location, dimensions and elevations of all existing and
    proposed plant facilities, including flood protection
    structures where applicable.
    B) Elevations of high and low water levels of the body of
    water to which the plant effluent is to be discharged.
    C) Type, size, pertinent features, and manufacturer's rated
    capacity of all pumps, blowers, motors and other
    mechanical devices.
    D) Hydraulic profiles of the treatment plant at design peak
    flow including recirculated flows at the 25-year flood
    elevation in the receiving watercourse. To ensure their
    proper functioning, the hydraulic profile at measuring
    devices at minimum flow shall be shown.
    E) Hydraulic profiles shall be shown for supernatant liquor

    lines, recirculating flow piping and sludge transfer
    lines at the design peak flows carried by each system.
    F) Adequate description of any features not otherwise
    covered by specifications or engineer's report.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.230 Specifications to Accompany Detailed Engineering Plan
    Drawings>>
    a) Complete technical specifications for the construction of sewers,
    sewage pumping stations, sewage treatment plants, and all
    appurtenances, shall accompany the plans.
    b) The specifications accompanying construction drawings shall
    include, but not be limited to, the following:
    1) All construction information, not shown on the drawings,
    which is necessary to inform the builder in detail of the
    design requirements as to the quality of materials and
    workmanship and fabrication of the project.
    2) The type, size, strength, operating characteristics and
    rating of equipment.
    3) Allowable infiltration.
    4) The complete requirements for all mechanical and electrical
    equipment, including machinery, valves, piping and jointing
    of pipe.
    5) Electrical apparatus, wiring and meters.
    6) Laboratory fixtures and equipment.
    7) Operating tools.
    8) Construction materials.
    9) Special filter materials such as stone, sand, gravel or slag.
    10) Chemicals when used.
    11) Miscellaneous appurtenances.
    12) Instruction for testing materials and equipment as necessary.
    13) Availability of soil boring information.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.240 Revisions to Approved Plans and Specifications>>
    a) Any deviations from approved plans or specifications for
    structural configuration, appurtenances or manufactured equipment,
    affecting capacity, flow, operation of units or operational
    safety, and for substitution of the manufactured equipment

    specified and depicted in the plan documents shall be approved in
    writing by the Agency before such installation of equipment or
    construction changes are made.
    b) Plans and specifications requiring Agency approval under
    subsection (a) should be submitted well in advance of the ordering
    and delivery of equipment or any construction work which will be
    affected by such changes, to allow sufficient time for review and
    approval. Record drawings of the project as completed shall be
    submitted to the Agency.
    <BSection 370.250 Operation During Construction>>
    Specifications shall contain a time schedule describing the plant and
    collection system operational modes during construction. Where units
    essential to effluent quality are involved, temporary measures, such as wet
    hauling, sludge storage lagoons and portable pumping facilities shall be
    included in the specifications so as to ensure continuity of operation as
    required and approved by the Agency.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.260 Engineers Seal>>
    Plans and specifications, prepared by an Illinois Registered Professional
    Engineer when required by Section 14 of the Illinois Professional
    Engineering Act [225 ILCS 325/14], fully describing the design, nature,
    function and interrelationship of each individual component of the facility
    or source, shall be submitted, except that the Agency may waive this
    requirement for plans and specifications when the application is for a
    routine renewal.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART C: DESIGN OF SEWERS
    <BSection 370.300 General Considerations>>
    a) Type of Sewers
    The Agency will approve plans for new sewer systems and extensions
    only when designed as the separate sanitary type in which
    precipitation runoff and ground water from foundation drains are
    excluded. The Agency will not approve the installation of new
    combined sewers, except as provided in 35 Ill. Adm. Code 306.302.

    b) Design Period
    Sewer systems should be designed for the estimated ultimate
    tributary population, except in considering parts of the systems
    that can be readily increased in capacity. Similarly,
    consideration should be given to the maximum anticipated capacity
    of institutions, industrial parks, etc.
    c) Design Factors
    In determining the required capacities of sanitary sewers, the
    following factors should be considered:
    1) Design peak flow.
    2) Additional design peak flow from industrial plants.
    3) Ground water infiltration.
    4) Topography of area.
    5) Location of waste treatment plant.
    6) Depth of excavation.
    7) Pumping requirements.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.310 Design Basis>>
    a) Per Capita Flow
    1) New Sewers for Undeveloped Areas
    New sewer systems to serve currently undeveloped areas shall
    be designed on the basis of a design average flow of not
    less than 100 gallons per capita per day which is assumed to
    cover normal infiltration, but an additional allowance
    should be made where conditions are unfavorable.
    2) New Sewers for Existing Developed Areas
    For new sewers designed to serve existing developed areas,
    the design average flow per capita (100 gpd) shall be
    appropriately increased to allow for inflow/infiltration
    contributions from the existing buildings other than roof and
    foundation drains which shall be excluded in accordance with
    Section 370.121(a).
    b) Design Peak Flow
    1) The design peak flow for sanitary sewers shall be selected
    based on one of the following methods:
    A) The ratio of peak to average daily flow as determined
    from Appendix D, Figure No. 1.
    B) Values established from an infiltration/inflow study
    acceptable to the Agency.
    2) Use of other values for the design peak flow will be

    considered if justified on the basis of extensive
    documentation.
    3) Combined Sewer Interceptors
    Intercepting sewers, in the case of combined sewer systems,
    should fulfill the above requirements for sewers and have
    sufficient additional capacity to transport the increment of
    combined sewage required by the IPCB Regulations.
    c) Alternate Methods
    When deviations from subsections (a) and (b) are proposed, a
    description of the procedure used for sewer design shall be
    included in the submission of plan documents.
    d) Basis of Design and Calculations
    The basis of design for all sewer projects shall accompany the
    plan documents. Calculations shall be submitted to show that
    sewers will have sufficient hydraulic capacity to transport the
    design peak flows.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.320 Details of Design and Construction>>
    a) Minimum Size
    No public gravity sewer conveying raw sewage shall be less than 8
    inches in diameter.
    b) Depth
    Sewers shall be sufficiently deep to prevent freezing. Sewers
    should be sufficiently deep to serve basements except where
    overhead sewers are required by local ordinances or will be
    provided.
    1) Minimum Cover
    The minimum cover of sewers shall be no less than 3 feet
    unless special structural protection is provided.
    2) Buoyancy
    Where high ground water conditions are anticipated, buoyancy
    of sewers shall be considered and, if necessary, adequate
    provisions should be made for protection.
    c) Slope
    1) All sewers shall be designed and constructed to give mean
    velocities, when flowing full, of not less than 2.0 feet per
    second, based on Manning's formula using an "n" value of
    0.013. The following minimum slopes shall be provided;
    however, slopes greater than these are desirable:

    Minimum Slope in Feet
    Sewer Size Per 100 Feet Flow (mgd)
    8 inch 0.40 0.49
    10 inch 0.28 0.75
    12 inch 0.22 1.07
    14 inch 0.17 1.43
    15 inch 0.15 1.61
    16 inch 0.14 1.85
    18 inch 0.12 2.35
    21 inch 0.10 3.23
    24 inch 0.08 4.13
    27 inch 0.067 5.17
    30 inch 0.058 6.37
    33 inch 0.050 7.66
    36 inch 0.046 9.23
    42 inch 0.036 12.41
    2) Under special conditions, if detailed justifiable reasons are
    given, slopes slightly less than those required for the 2.0
    feet per second velocity when flowing full may be permitted.
    Such decreased slopes will only be considered where the depth
    of flow will be 0.3 of the diameter or greater for design
    average flow. Whenever such decreased slopes are selected,
    the design engineer must furnish with his report his
    computations of the depths of flow in such pipes at minimum,
    design average, and design peak rates of flow. It must be
    recognized that decreased slopes may cause additional sewer
    maintenance expense and special linings or materials should
    be considered for corrosion protection.
    3) Uniform Slope
    Sewers shall be laid with uniform slope between manholes.
    4) Steep Slope Protection
    Sewers on 20 percent slope or greater shall be anchored
    securely with concrete anchors or equal, spaced as follows:
    A) Not over 36 feet center to center on grades 20 percent
    and up to 35 percent.
    B) Not over 24 feet center to center on grades 35 percent
    and up to 50 percent.
    C) Not over 16 feet center to center on grades 50 percent
    and over.
    d) Alignments

    1) Straight Alignments
    Except as noted in subsection (d)(2), all sewers shall be
    laid with straight alignments between manholes.
    2) Curvilinear Alignments
    Curvilinear sewers are permitted in special cases provided
    the following minimum requirements are met:
    A) Curvilinear Sewers 24 Inches in Diameter and Smaller
    i) Location: Curvilinear alignments should follow the
    general alignment of streets.
    ii) Type Curve: Only simple curve design is
    acceptable.
    iii) Radius of Curvature: The minimum allowable radius
    of curvature is 300 feet.
    iv) Manholes: Manholes are required at the beginning
    and end of all curves.
    v) Joints: Compression joints are required. The ASTM
    or AWWA maximum allowable deflection of the pipe
    joints shall not be exceeded.
    vi) Velocity: In order to maintain a minimum velocity
    of 2 feet per second in curvilinear sewers,
    hydraulics of the curvilinear alignment shall be
    taken into account and the minimum slopes indicated
    in subsection (c)(1) must be increased accordingly.
    B) Curvilinear Sewers 24 Inches Through 48 Inches in
    Diameter
    Curvilinear sewers larger than 24 inches in diameter up
    to 48 inches in diameter constructed with pressure pipe
    meeting AWWA standards may be used. Other curvilinear
    sewers larger than 24 inches in diameter up to 48 inches
    in diameter shall meet the requirements of subsection
    (d)(2)(A) except that the joints must be manufactured so
    that they fit together squarely without deflection at
    the design curvature and the radius of curvature may be
    less than 300 feet.
    C) Curvilinear Sewers Larger Than 48 Inches in Diameter
    Curvilinear sewers larger than 48 inches in diameter
    shall be provided with square fitting compression joints
    and shall meet the requirements of subsection
    (d)(2)(A)(vi). The remaining design requirements under
    subsection (d)(2)(A) for these sewers will be reviewed
    by the Agency on a case by case basis.
    e) Increasing Size
    When a smaller sewer joins a larger one, the invert of the larger

    sewer should be sufficiently lower to maintain the energy
    gradient. An approximate method for securing these results is to
    place the 0.8 depth point of both sewers at the same elevation.
    f) High Velocity Protection
    Where velocities greater than 15 feet per second are attained, the
    special provisions described in subsection (c)(4) shall be made to
    protect against displacement by erosion and shock.
    g) Materials and Installation
    1) Materials
    A) Any generally accepted material for sewers will be given
    consideration, but the material selected should be
    suitable for local conditions, such as character of
    industrial wastes, possibility of septicity, soil
    characteristics, exceptionally heavy external loadings,
    abrasion, structural considerations and similar
    problems.
    B) All sewers shall be designed and installed to prevent
    damage from superimposed loads. Proper allowance for
    loads on the sewer shall be made because of the width
    and depth of trench. When the bearing strength of the
    pipe is not adequate to withstand the superimposed
    loading, other pipe material, special handling, concrete
    cradle or special construction shall be used.
    C) For new pipe materials for which ASTM standards have not
    been established (see subsection (g)(2)), the designing
    engineer shall provide complete installation
    specifications developed on the basis of criteria
    adequately documented and certified in writing by the
    pipe manufacturer to be satisfactory for the design
    conditions for the specific project. Such documentation
    and manufacturers' certification shall be submitted as a
    part of the project plan documents.
    2) Installation
    A) Standards
    i) Installation specifications shall contain
    appropriate requirements based on the criteria,
    standards and requirements established by ASTM.
    Requirements shall be set forth in the
    specifications for the pipe and methods of bedding
    and backfilling thereof so as not to damage the
    pipe or its joints, impede cleaning operations and
    future tapping, nor create excessive side fill
    pressures or ovalation of the pipe, nor seriously

    impair flow capacity.
    ii) For new pipe material, the installation
    specifications shall meet the provisions of
    subsection (g)(1).
    B) Trenching
    i) The width of the trench shall be ample to allow the
    pipe to be laid and jointed properly and to allow
    the backfill to be placed and compacted as needed.
    The trench sides shall be kept as nearly vertical
    as possible. When wider trenches are dug,
    appropriate bedding class and pipe strength shall
    be used.
    ii) Ledge rock, boulders, and large stones shall be
    removed to provide a minimum clearance of 4 inches
    below and on each side of all pipe and joints.
    C) Bedding
    i) Bedding classes A, B, or C, as described in ASTM
    Cl2-95, "Standard Practice for Installing Vitrified
    Clay Pipe Lines" (1996) or "Standard Specifications
    for Water and Sewer Main Construction in Illinois",
    5th ed. (1996) (no later additions or amendments)
    or WPCF Manual of Practice (MOP) No. FD-5 (1982)
    (no later additions or amendments) shall be used
    for all rigid pipe provided the proper strength
    pipe is used with the specified bedding to support
    the anticipated load.
    ii) Bedding class I, II, or III, as described in ASTM
    D2321-89, "Standard Practice for Underground
    Installation of Thermoplastic Pipe for Sewers and
    Other Gravity-Flow Applications" (1996) (no later
    editions or amendments) or Standard Specifications
    for Water and Sewer Main Construction in Illinois,
    5th ed. (1996) (no later additions or amendments),
    or WPCF MOP No. FD-5 (1982)(no later additions or
    amendments) shall be used for all flexible pipe
    provided the proper strength pipe is used with the
    specified bedding to support the anticipated load.
    D) Backfill
    i) Backfill shall be of a suitable material removed
    from excavation except where other material is
    specified. Debris, frozen material, large clods or
    stones, organic matter, or other unstable materials
    shall not be used for backfill within 2 feet of the

    top of the pipe.
    ii) Backfill shall be placed in such a manner as not to
    disturb the alignment of the pipe.
    iii) For flexible pipe, as a minimum, backfill material
    shall be placed and carefully compacted in
    accordance with ASTM D2321-89 (1996) to provide the
    necessary support for the pipe.
    3) Deflection Testing of Flexible Pipe.
    A) The design specifications shall provide that the first
    1200 feet of sewer and at least 10% of the remainder of
    the sewer project shall be deflection tested. The
    entire length of a sewer of less than 1200 feet shall be
    deflection tested.
    B) If the deflection test is to be run using a rigid ball
    or mandrel, it shall have a diameter equal to 95% of the
    inside or base diameter of the pipe as established in
    the ASTM standard to which the pipe is manufactured.
    The test shall be performed without mechanical pulling
    devices.
    C) The individual lines to be tested shall be tested for
    final acceptance no sooner than 30 days after they have
    been installed.
    D) Whenever possible and practical, the testing shall
    initiate at the downstream lines and proceed towards the
    upstream lines.
    E) No pipe shall exceed a deflection of 5%.
    F) In the event that the deflection exceeds the 5% limit in
    10% or more of the manhole intervals tested, the total
    sewer project shall be tested.
    h) Joints and Infiltration
    1) Joints
    The type and method of making joints and the materials used
    shall be included in the specifications and also shall be
    shown on the plans. Sewer joints shall be specified to
    minimize infiltration and to prevent the entrance of roots.
    Joint material shall conform to ASTM standards. Cement grout
    joints shall not be used for pipe to pipe joints.
    2) Leakage Testing
    Leakage tests shall be specified.
    A) Test Sections
    The design specifications shall provide that the first
    1200 feet and at least 10% of the remainder of the sewer
    project shall be tested for leakage. The entire length

    of a sewer of less than 1200 feet shall be tested for
    leakage. In the event that 10% or more of the manhole
    intervals tested do not pass the leakage test, the
    entire sewer project shall be tested.
    B) Testing Methods
    Testing methods may include appropriate water or low
    pressure air testing. The use of television cameras or
    other visual methods for inspection prior to placing the
    sewer in service and prior to acceptance is
    recommended.
    C) Water Testing
    i) The leakage outward or inward (exfiltration or
    infiltration) shall not exceed the following limits
    in gallons per inch of pipe diameter per mile per
    day for any section of the system:
    Exfiltration: 240
    Infiltration: 200
    ii) An exfiltration or infiltration test shall be
    performed with a minimum positive head of 2 feet.
    D) Air Testing
    If used, the air test shall, as a minimum, conform to
    the test procedure described in Section 31-1.11B of
    Standard Specifications for Water and Sewer Main
    Construction in Illinois, 5th ed. (1996)(no later
    additions or amendments). The specifications shall
    require that the time required for a pressure drop from
    3.5 to 2.5 PSIG not be less than the time specified in
    the Air Test Table in Appendix C. The testing methods
    selected should take into consideration the range in
    groundwater elevations projected and the situation
    during the test.
    i) Service Connections
    Sewer service connections shall meet the same criteria as public
    sanitary sewers described elsewhere in this Subpart C except as
    noted in this subsection (i). Roof and foundation drain
    connections to the sewer service connection are prohibited except
    as provided for in 35 Ill. Adm. Code 306.302. The service
    connection tap into the public sewer shall be watertight and shall
    not protrude into the public sewer. If a saddle type connection
    is used, it shall be a commercially available device designed to
    join with the types of pipe that are to be connected. All
    materials used to make service connections shall be compatible
    with one another and with the pipe materials to be joined, and

    shall be corrosion-proof.
    1) Size
    Service sewers and fittings shall be a minimum of 4 inches in
    diameter, but shall not be less than the diameter of the
    plumbing pipe from the building.
    2) Slope
    Service sewers shall have a minimum slope of 1%.
    3) Alignment
    When straight line alignment is not maintained on service
    connections, cleanouts or manholes shall be provided at
    points of changes in alignment.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.330 Manholes>>
    a) Location
    Except as noted in Section 370.123(d)(2), manholes shall be
    installed at the end of each line; at all changes in grade, size
    or alignment; at all sewer intersections; and at distances not
    greater than 400 feet for sewers 15 inches or less, and 500 feet
    for sewers 18 inches through 30 inches. Distances up to 600 feet
    may be approved in cases where adequate modern cleaning equipment
    for such spacing is provided. Greater spacing may be permitted in
    larger sewers and in those carrying a settled effluent. Lampholes
    may be used only for special conditions and shall not be
    substituted for manholes nor installed at the end of laterals
    greater than 150 feet in length.
    b) Type
    1) Drop Type
    A pipe shall be provided for a sewer entering a manhole where
    its invert elevation is more than 24 inches above the manhole
    invert. If an inside drop pipe is used, the manhole diameter
    shall be large enough to provide a minimum clearance of 48
    inches between the pipe and the opposite side of the manhole.
    Inside drip pipes shall be anchored to the manhole wall with
    corrosion-proof fasteners and bands. For sewers 36 inches in
    diameter or greater, the requirements for a drop pipe do not
    apply if the spring line of the incoming pipe is at or below
    the spring line of the main sewer. As a minimum, the
    diameter of the drop pipe shall be at least 2/3 as large as
    the diameter of the sewer tributary to the drop pipe.
    2) Non Drop Type

    Where the difference in elevation between the incoming sewer
    invert and the manhole invert is less than 24 inches, the
    manhole invert should be filleted to prevent solids
    deposition.
    c) Diameter
    1) For sewers 36 inches in diameter and smaller, the minimum
    diameter of manholes shall be 48 inches. For sewers larger
    than 36 inches in diameter, the manhole diameter at the
    invert shall be sufficiently large to accommodate the
    incoming pipes; and the riser barrel diameter shall be a
    minimum of 48 inches.
    2) A minimum access lid diameter of 24 inches shall be provided.
    d) Flow Channel
    The flow channel through manholes should be made to conform in
    shape and slope to that of the sewers. A bench shall be provided
    which should have a minimum slope of 2 inches per foot.
    e) Watertightness
    1) Construction Requirements
    Watertight manhole covers shall be used wherever the manhole
    tops may be flooded by surface runoff or high water or are
    below cover. Pickholes shall not be larger than 1 inch in
    diameter or shall be of the concealed type. Construction
    lifting holes on manhole rings shall be plugged from the
    outside and the exterior and joints of the manhole elements
    shall be waterproofed. Precast inlet and outlet connections
    fitted with "0" rings or other equally watertight connections
    shall be provided.
    2) Inspection
    The specifications shall include a requirement for inspection
    and leakage testing of all manholes for watertightness in
    accordance with ASTM C969-94--"Standard Practice for
    Infiltration and Exfiltration Acceptance Testing of Installed
    Precast Concrete Pipe Sewer Lines", Vol. 04.05, Chemical
    Resistant Materials, Vitrified Clay, Concrete, Fiber-Cement
    Products; Mortars; Masonry (1996) (no later editions or
    amendments) or ASTM C1244-93 "Standard Test Method for
    Concrete Sewer Manholes by the Negative Pressure (Vacuum)
    Test", Vol. 04.05, Chemical Resistant Materials, Vitrified
    Clay, Concrete, Fiber-Cement Products; Mortars; Masonry
    (1996) (no later editions or amendments) prior to placing
    into service.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)

    <BSection 370.340 Sewers in Relation to Streams>>
    a) Location of Sewers on Streams
    1) Cover Depth
    A) The top of all sewers entering or crossing streams shall
    be at a sufficient depth below the natural bottom of the
    stream bed to protect the sewer line. In general the
    following cover requirements must be met:
    i) One foot of cover is required where the sewer is
    located in rock.
    ii) Three feet of cover is required in other material.
    In major streams, more than three feet of cover may
    be required.
    iii) In paved stream channels, the top of the sewer
    line should be placed below the bottom of the
    channel pavement.
    B) Less cover will be approved only if the proposed sewer
    crossing will not interfere with the future improvements
    to the stream channel. Reasons for requesting less
    cover should be given in the project proposal.
    2) Horizontal Location
    Sewers located along streams shall be located outside of the
    stream bed and sufficiently removed therefrom to provide for
    future possible stream widening and to prevent pollution by
    siltation during construction.
    3) Structures
    The sewer outfalls, headwalls, manholes, gate boxes, or other
    structures shall be located so they do not interfere with the
    free discharge of flood flows of the stream.
    4) Alignment
    Sewers crossing streams should be designed to cross the
    stream as nearly perpendicular to the stream flow as possible
    and shall be designed without change in grade. Sewer
    systems shall be designed to minimize the number of stream
    crossings.
    b) Construction
    1) Materials and Backfill
    A) Sewers entering or crossing streams shall be constructed
    of cast or ductile iron pipe with mechanical joints and
    shall be capable of absorbing pipe movement and
    joint-deflection while remaining intact and watertight.
    B) The backfill used in the trench shall be coarse

    aggregate, gravel, or other materials which will not
    cause siltation, pipe damage during placement or
    chemical corrosion in place.
    2) Siltation and Erosion
    Construction methods that will minimize siltation and erosion
    shall be employed. The design engineer shall include in the
    project specifications the methods to be employed in the
    construction of sewers in or near streams to provide
    adequate control of siltation and erosion. Specifications
    shall require that cleanup, grading, seeding, and planting
    or restoration of all work areas shall begin immediately.
    Exposed areas shall not remain unprotected for more than
    seven days.
    c) Aerial Crossings
    1) Structural Support
    Support shall be provided for all joints in pipes utilized
    for aerial crossings. The supports shall be designed to
    prevent frost heave, overturning and settlement.
    2) Freeze and Expansion Protection
    Protection against freezing shall be provided. This may be
    accomplished through the use of insulation and increased
    slope. Expansion jointing shall be provided between the
    aerial and buried sections of the sewer line.
    3) Flood Clearance
    For aerial stream crossings, the impact of flood waters and
    debris shall be considered. The bottom of the pipe should be
    placed no lower than the elevation of the 50 year flood.
    d) Inverted Siphons
    Inverted siphons shall have not less than 2 barrels, with a
    minimum pipe size of 6 inches and shall be provided with necessary
    appurtenances for convenient flushing and maintenance. Long radius
    fittings should be used. The inlet and outlet structures shall
    have adequate clearances for rodding; and in general, sufficient
    head shall be provided and pipe sizes selected to secure
    velocities of at least 3.0 feet per second for design average
    flows. The inlet and outlet structures shall be designed so that
    the design average flow is diverted to 1 barrel, and so that
    either barrel may be cut out of service for cleaning.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.350 Protection of Water Supplies>>
    a) Water Supply Interconnections

    There shall be no physical connections between a public or private
    potable water supply system and a sewer, or appurtenance thereto,
    which would permit the passage of any sewage or polluted water
    into the potable supply.
    b) Location Relative to Water Works Structures
    1) Location and Soil Condition
    A) The engineering plan documents shall show the location
    of all existing water works structures (basins, wells,
    other treatment units, etc.) that are within 200 feet of
    the proposed sewer.
    B) Soil conditions in the vicinity of the water works
    structures shall be investigated and depicted on the
    plans.
    2) Minimum Distances
    The following minimum distances apply to clay and loan soils
    and, as a minimum, shall be doubled for sand. In areas
    where creviced limestone or gravel may be encountered, the
    Agency shall be contacted for a determination as to what
    minimum separation distances and special construction will be
    required.
    A) Non-watertight sewers and sewer appurtenances such as
    manholes and wetwells shall not be located closer than
    50 feet from water works structures.
    B) Sewers located closer than 50 feet to water works
    structures shall be constructed with water main quality
    pipe and joints that comply with 35 Ill. Adm. Code
    653.119. All such pipe shall be pressure tested in
    accordance with "AWWA Standard for Installation of
    Ductile-Iron Water Mains and their Appurtenances,"
    ANSI/AWWA C600-93 (1994), (no later editions or
    amendments) for a working pressure equal to or greater
    than the maximum possible surcharge head to assure
    watertightness prior to backfilling. No sewer shall be
    located closer than 10 feet from water works structures.
    c) Relation to Water Mains
    1) Horizontal and Vertical Separation
    A) Whenever possible, a sewer must be at least ten feet
    horizontally from any existing or proposed water main.
    B) Should local conditions exist which would prevent a
    lateral separation of ten feet, a sewer may be closer
    than ten feet to a water main provided that the water
    main invert is at least eighteen inches above the crown
    of the sewer, and is either in a separate trench or in

    the same trench on an undisturbed earth shelf located to
    one side of the sewer.
    C) If it is impossible to obtain proper horizontal and
    vertical separation as described above, both the water
    main and sewer must be constructed with water main
    quality pipe and joints that comply with 35 Ill. Adm.
    Code 653.119 and shall be pressure tested in accordance
    with "AWWA Standard for Installation of Ductile-Iron
    Water Mains and their Appurtenances," ANSI/AWWA C600-93
    (1994) (no later editions or amendments) for a working
    pressure equal to or greater than the maximum possible
    surcharge head to assure watertightness before
    backfilling.
    2) Water-Sewer Line Crossings
    A) Whenever possible, sewers crossing water mains shall be
    laid with the sewer below the water main with the crown
    of the sewer a minimum of 18 inches below the invert of
    the water main. The vertical separation shall be
    maintained on each side of the crossing until the
    perpendicular distance from the water main to the sewer
    is at least 10 feet. The crossing shall be arranged so
    that the sewer joints will be equidistant and as far as
    possible from the water main joints. Adequate support
    shall be provided for the water mains to prevent damage
    due to settling of the sewer trench. Refer to Appendix
    H, Drawing No. 1.
    B) Where a sewer crosses under a water main and it is not
    possible to provide an 18-inch vertical separation, the
    following special construction methods shall be
    specified (refer to Appendix H, Drawing No. 2):
    i) The sewer shall either be constructed with water
    main pipe and joints that comply with 35 Ill. Adm.
    Code 653.119 and shall be pressure tested in
    accordance with "AWWA Standard for Installation of
    Ductile-Iron Water Mains and their Appurtenances,"
    ANSI/AWWA C600-93 (1994) (no later editions or
    amendments) for a working pressure equal to or
    greater than the maximum possible surcharge head
    or shall be encased in a carrier pipe with the ends
    sealed, that, along with the joints, complies with
    35 Ill. Adm. Code 653.119.
    ii) The water main quality sewer or carrier pipe shall
    extend on each side of the crossing to a point

    where the perpendicular distance from the water
    main to the sewer is at least 10 feet.
    iii) For the required length of the water main quality
    sewer or carrier pipe, omit the select granular
    cradle and granular backfill to one foot over the
    crown of the sewer and use selected excavated
    material (Class IV) and compact to 95% of Standard
    Proctor maximum density.
    iv) Point loads between the sewer or sewer casing and
    the water main are prohibited.
    v) Adequate support shall be provided for the water
    main to prevent damage due to settling of the sewer
    trench.
    C) Where it is not possible for a proposed sewer to cross
    under an existing water main, the specifications shall
    require the construction methods set out in subsection
    (c)(2)(B) above and shall require that any select
    granular backfill above the crown of the water main be
    removed within the width of the proposed sewer trench
    and be replaced with select excavated material (Class
    IV) compacted to 95% of Standard Proctor maximum
    density. Where a proposed sewer must cross over a
    proposed water main, an 18-inch vertical separation
    shall be maintained. Refer to Appendix H, Drawing No.
    3.
    3) Sewer Manhole Separation From Water Main
    No water pipe shall pass through or come into contact with
    any part of a sewer manhole.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART D: SEWAGE PUMPING STATIONS
    <BSection 370.400 General>>
    a) Flooding
    Sewage pumping station structures and electrical and mechanical
    equipment shall be protected from physical damage by the 100 year
    flood. Sewage pumping stations should remain fully operational
    and accessible during the 25 year flood. Regulations of State
    and Federal agencies regarding flood plain obstructions shall be
    considered.

    b) Accessibility
    The pumping station shall be readily accessible by maintenance
    vehicles during all weather conditions. The facility should be
    located off the traffic way of streets and alleys.
    c) Grit
    Where it is necessary to pump sewage prior to grit removal, the
    design of the wet well and pump station piping shall receive
    special consideration to avoid operational problems from the
    accumulation of grit.
    <BSection 370.410 Design>>
    The following items should be given consideration in the design of sewage
    pumping stations:
    a) Type
    Sewage pumping stations in general use fall into three types:
    wet well/dry well, submersible, and suction lift.
    b) Structures
    1) Separation
    Dry wells, including their superstructure, shall be
    completely separated from the wet well. Common walls must be
    gastight.
    2) Pump Removal
    Provision shall be made to facilitate removing pumps and
    motors.
    3) Access
    A) Suitable and safe means of access shall be provided to
    dry wells and to wet wells. Access to wet wells
    containing either bar screens or mechanical equipment
    requiring inspection or maintenance shall conform to
    Section 370.600(a)(2)(C).
    B) For built-in-place pump stations, a stairway to the dry
    well with rest landings shall be provided at vertical
    intervals not to exceed 12 feet. For factory-built pump
    stations over 15 feet deep, a rigidly fixed landing
    shall be provided at vertical intervals not to exceed 10
    feet. Where a landing is used, a suitable and rigidly
    fixed barrier shall be provided to prevent an individual
    from falling past the intermediate landing to a lower
    level. A manlift or elevator may be used in lieu of
    landings in a factory-built station, provided emergency
    access is included in the design.
    4) Buoyancy

    Where high ground water conditions are anticipated, buoyancy
    of the sewage pumping station structures shall be considered
    and, if necessary, adequate provisions shall be made for
    protection.
    c) Pumps and Pneumatic Ejectors
    1) Multiple Units
    Multiple pumps or ejector units shall be provided. Where
    only two units are provided, they shall be of the same size.
    Units shall have capacity such that, with any unit out of
    service, the remaining units will have capacity to handle the
    design peak flows. A single pump equipped with an
    audio-visual alarm system to warn of failure may be used when
    serving only one single-family dwelling.
    2) Protection Against Clogging
    A) Pumps handling combined sewage shall be preceded by
    readily accessible bar racks to protect the pumps from
    clogging or damage. Bar racks should have clear
    openings not exceeding 1 inch. Where a bar rack is
    provided, a mechanical hoist shall also be provided.
    Where the size of the installation warrants,
    mechanically cleaned and/or duplicate bar racks shall be
    provided.
    B) Pumps handling separate sanitary sewage from 30 inch or
    larger diameter sewers shall be protected by bar racks
    meeting the above requirements. Appropriate protection
    from clogging shall also be considered for small pumping
    stations.
    3) Pump Openings
    Pumps handling raw sewage shall be capable of passing spheres
    of at least 3 inches in diameter. Pump suction and discharge
    openings shall be at least 4 inches in diameter. Grinder
    pumps that do not meet these requirements may be used solely
    for lift stations with a capacity of 70 gpm or less with the
    largest unit out of service.
    4) Priming
    The pump shall be so placed that under normal operating
    conditions it will operate under a positive suction head,
    except as specified in Section 370.133.
    5) Electrical Equipment
    Electrical systems and components (e.g., motors, lights,
    cables, conduits, switchboxes, control circuits, etc.) in raw
    sewage wet wells, or in enclosed or partially enclosed spaces
    where hazardous concentrations of flammable gases or vapors

    may be present, shall comply with the National Electrical
    Code requirements for Class 1 Group D, Division 1 locations.
    In addition, equipment located in the wet well shall be
    suitable for use under corrosive conditions. Each flexible
    cable shall be provided with water-tight seal and separate
    strain relief. A fused disconnect switch located above
    ground shall be provided for all pumping stations. When such
    equipment is exposed to weather, it shall meet the
    requirements of weatherproof equipment (National Electric
    Manufacturers Association (NEMA) 3R or 4).
    6) Intake
    Each pump shall have an individual intake. Wet well and
    intake design should be such as to avoid turbulence near the
    intake and to prevent vortex formation.
    7) Dry Well Dewatering
    Duplicate sump pumps equipped with dual check valves for each
    pump shall be provided in the dry well to remove leakage or
    drainage with discharge above the maximum high water level of
    the wet well. Water ejectors connected to a potable water
    supply will not be approved. All floor and walkway surfaces
    should have an adequate slope to a point of drainage. Pump
    seal leakage shall be piped or channeled directly to the
    sump. The sump pumps shall be sized to remove the maximum
    pump seal water discharge which would occur in the event of
    a pump seal failure.
    8) Pumping Rates
    The pumps and controls of main pumping stations, and
    especially pumping stations operated as part of treatment
    works, should be selected to operate at varying delivery
    rates. The stations shall be designed to deliver as uniform
    flow as practicable in order to minimize hydraulic surges.
    The peak design flow of the station shall be determined in
    accordance with Sections 370.300(c), 370.310(b) and
    370.520(c) and should be adequate to maintain a minimum
    velocity of 2 feet per second in the force main. Refer to
    Section 370.470(f).
    d) Controls
    Control float tubes and bubbler lines should be so located as not
    to be unduly affected by turbulent flows entering the well or by
    the turbulent suction of the pumps. Provision shall be made to
    automatically alternate the pumps in use.
    e) Valves
    Shutoff valves shall be placed on suction and discharge lines of

    each pump. A check valve shall be placed on each discharge line,
    between the shutoff valve and the pump. Check valves shall not be
    located on a vertical rise unless they are specifically designed
    for such usage.
    f) Wet Wells
    1) Divided Wells
    Where continuity of pumping station operation is critical,
    consideration should be given to dividing the wet well into
    two sections, properly interconnected, to facilitate repairs
    and cleaning.
    2) Size
    The design fill time and minimum pump cycle time shall be
    taken into account in sizing the wet well. The effective
    volume of the wet well shall be based on design average flow
    and a filling time not to exceed 30 minutes unless the
    facility is designed to provide flow equalization. The pump
    manufacturer's duty cycle recommendations shall be used in
    selecting the minimum cycle time. When the anticipated
    initial flow tributary to the pumping station is less than
    the ultimate average design flow, provisions should be made
    so that the holding time indicated is not exceeded for
    initial flows. When the wet well is designed for flow
    equalization as part of a treatment plant, provisions should
    be made to prevent septicity.
    3) Floor Slope
    The wet well floor shall have a minimum slope of 1 to 1 to
    the hopper bottom. The horizontal area of the hopper bottom
    shall be no greater than necessary for proper installation
    and function of the inlet.
    4) Air Displacement
    Covered wet walls shall provide for air displacement open to
    the atmosphere, such as by an inverted "j" tube or similar
    means.
    g) Ventilation
    1) General
    Adequate ventilation shall be provided for all pump stations.
    Where the dry well is below the ground surface, mechanical
    ventilation is required. If screens or mechanical equipment
    requiring maintenance or inspection is located in the wet
    well, permanently installed ventiliation is required. There
    shall be no interconnection between the wet well and dry well
    ventilation systems.
    2) Air Inlets and Outlets

    In dry wells over 15 feet deep, multiple inlets and outlets
    should be used. Dampers should not be used on exhaust or
    fresh air ducts and fine screens or other obstructions in air
    ducts should be avoided to prevent clogging.
    3) Electrical Controls
    Switches for operation of ventilation equipment should be
    marked and located conveniently. All intermittently operated
    ventilation equipment shall be interconnected with the
    respective pit lighting system. Consideration should be
    given also to automatic controls where intermittent operation
    is used. The manual lighting ventilation switch shall
    override the automatic controls.
    4) Fans, Heating and Dehumidification
    The fan wheel shall be fabricated from non-sparking material.
    Automatic heating and dehumidification equipment shall be
    provided in all dry wells. The electrical equipment and
    components shall meet the requirements of subsection (c)(5)
    above.
    5) Wet Wells
    Wet well ventilation may be either continuous or
    intermittent. Ventilation, if continuous, should provide at
    least 12 complete air changes per hour; if intermittent, at
    least 30 complete air changes per hour. Air shall be forced
    into the wet well by mechanical means rather than exhausted
    from the wet well. Portable ventilation equipment shall be
    provided for use at submersible pump stations and at wet
    wells with no permanently installed ventilation equipment.
    6) Dry Wells
    Dry well ventilation may be either continuous or
    intermittent. Ventilation, if continuous, should provide at
    least 6 complete air changes per hour; if intermittent, at
    least 30 complete air changes per hour. A system of
    two-speed ventilation with an initial ventilation rate of 30
    changes per hour for 10 minutes and an automatic switch-over
    to 6 changes per hour may be used to conserve heat.
    h) Flow Measurement
    Suitable devices for measuring sewage flow shall be provided at
    all pumping stations. Indicating, totalizing and recording flow
    measurement shall be provided at pumping stations with a 1200 gpm
    or greater design peak flow. Elapsed time meters used in
    conjunction with pumping rate tests may be used for pump stations
    with a design peak flow of up to 1200 gpm.
    i) Water Supply

    There shall be no physical connection between any potable water
    supply and a sewage pumping station which under any conditions
    might cause contamination of the potable water supply. If a
    potable water supply is brought to the station, it should comply
    with conditions stipulated under Section 370.146(b)(3). In-line
    backflow preventors shall not be used.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.420 Suction-Lift Pump Stations>>
    a) Pump Priming and Lift Requirements
    Suction lift pumps shall be of the self-priming or vacuum-priming
    type and shall meet the applicable requirements of Section
    370.132. Suction lift pump stations using dynamic suction lifts
    exceeding the limits outlined in the following sections may be
    approved upon submission of factory certification of pump
    performance and detail calculations indicating satisfactory
    performance under the proposed operating conditions. Such
    detailed calculations must include static suction lift as
    measured from "lead pump off" elevation to center line of pump
    suction, friction and other hydraulic losses of the suction
    piping, vapor pressure of the liquid, altitude correction,
    required net positive suction head, and a safety factor of at
    least 6 feet.
    1) Self-priming Pumps
    Self-priming pumps shall be capable of rapid priming and
    repriming at the "lead pump on" elevation. Such self-priming
    and repriming shall be accomplished automatically under
    design operating conditions. Suction piping should not
    exceed the size of the pump suction and shall not exceed 25
    feet in total length. Priming lift at the "lead pump on"
    elevation shall include a safety factor of at least 4 feet
    from the maximum allowable priming lift for the specific
    equipment at design operating conditions. The combined total
    of dynamic suction lift at the "pump off" elevation and
    required net positive suction head at design operating
    conditions shall not exceed 22 feet.
    2) Vacuum-priming Pumps.
    Vacuum-priming pump stations shall be equipped with dual
    vacuum pumps capable of automatically and completely removing
    air from the suction lift pump. The vacuum pumps shall be
    adequately protected from damage due to sewage. The combined

    total of dynamic suction lift at the "pump off" elevation and
    required net positive suction head at design operating
    conditions shall not exceed 22 feet.
    b) Equipment, Wet Well Access and Valve Location
    The pump equipment compartment shall be above grade or offset and
    shall be effectively isolated from the wet well to prevent the
    humid and corrosive sewer atmosphere from entering the equipment
    compartment. Wet well access shall not be through the equipment
    compartment. Wet well access may not be through the equipment
    compartment and shall be at least 24 inches in diameter. Gasketed
    replacements shall be provided to cover the opening to the wet
    well for pump units removed for servicing. Valves shall not be
    located in the wet well.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.430 Submersible Pump Stations - Special Considerations>>
    Submersible pump stations shall meet the applicable requirements under
    Section 370.132, except as modified in this Section.
    a) Construction
    Submersible pumps and motors shall be designed specifically for
    raw sewage use, including totally submerged operation during a
    portion of each pumping cycle, and shall meet the requirements of
    the National Electrical Code (1996). An effective method to
    detect shaft seal failure or potential seal failure shall be
    provided.
    b) Pump Removal
    Submersible pumps shall be readily removable and replaceable
    without dewatering the wet well or disconnecting any piping in the
    wet well.
    c) Electrical
    1) Power Supply and Control
    Electrical supply, control and alarm circuits shall be
    designed to provide strain relief and to allow disconnection
    from outside the wet well. Terminals and connectors shall be
    protected from corrosion by location outside the wet well or
    through use of watertight seals. If located outside,
    weatherproof equipment shall be used.
    2) Controls
    The motor control center shall be located outside the wet
    well, readily accessible, and be protected by conduit seal or
    other appropriate measures meeting the requirements of the

    National Electrical Code, to prevent the atmosphere of the
    wet well from gaining access to the control center. The
    seal shall be so located that the motor may be removed and
    electrically disconnected without disturbing the seal.
    3) Power Cord
    Pump motor power cords shall be designed for flexibility and
    serviceability under conditions of extra hard usage and shall
    meet the requirements of the National Electric Code (1996)
    for flexible cords in sewage pump stations. Ground fault
    interruption protection shall be used to de-energize the
    circuit in the event of any failure in the electrical
    integrity of the cable. Power cord terminal fittings shall
    be corrosion-resistant and constructed in a manner to prevent
    the entry of moisture into the cable, shall be provided with
    strain relief appurtenances, and shall be designed to
    facilitate field connecting.
    d) Valves
    Valves required under Section 370.132(e) shall be located in a
    separate valve pit. Provision shall be made to remove accumulated
    water from the valve pit. Accumulated water in valve pits deeper
    than 4 feet shall be pumped to the wet well or gravity drained to
    the ground surface. Valve pits 4 feet deep or less may be gravity
    drained to the wet well through a trapped and vented drain that
    meets the applicable requirements found in 77 Ill. Adm. Code 890,
    "Illinois Plumbing Code". Such pits shall have entrances that
    fully expose the pit to the atmosphere. Check valves that are
    integral to the pump need not be located in a separate valve pit
    provided that the valve can be removed from the wet well in
    accordance with subsection (b) above. Provision shall be made for
    the use of portable ventiliation equipment during periods of
    maintenance.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.440 Alarm Systems>>
    Alarm systems shall be provided for pumping stations. The alarm shall be
    activated in cases of power failure, pump failure, unauthorized entry, or
    any cause of pump station malfunction. Pumping station alarms shall be
    telemetered to a municipal facility that is manned 24 hours a day. If such
    a facility is not available and a 24-hour holding capacity is not provided,
    the alarm shall be telemetered to city offices during normal working hours
    and to the home of the person(s) in responsible charge of the lift station

    during off-duty hours. Audio-visual alarm systems with a self-contained
    power supply may be acceptable in some cases in lieu of the telemetering
    system outlined above, depending upon location, station holding capacity
    and inspection frequency.
    <BSection 370.450 Emergency Operation>>
    a) Objective
    The objective of emergency operation is to prevent the discharge
    of raw or partially treated sewage to any waters and to protect
    public health by preventing back-up of sewage and subsequent
    discharge to basements, streets, and other public and private
    property.
    b) Emergency Pumping Capability
    Provision of emergency pumping capability is mandatory and may be
    accomplished by connection of the station to at least two
    independent utility substations, or by provision of portable or
    in-place internal combustion engine equipment which will generate
    electrical or mechanical energy, or by the provision of portable
    pumping equipment. Emergency standby systems shall have
    sufficient capacity to start up and maintain the total rated
    running capacity of the station. Regardless of the type of
    emergency standby system provided, a riser from the force main
    with rapid connection capabilities and appropriate valving shall
    be provided for all lift stations to hook up portable pumps.
    c) Emergency High Level Overflows
    For use during possible periods of extensive power outages,
    mandatory power reductions, or uncontrollable emergency
    conditions, consideration should be given to providing a
    controlled, high-level wet well overflow to supplement alarm
    systems and emergency power generation in order to prevent backup
    of sewage into basements, or other discharges which may cause
    severe adverse impacts on public interests, including public
    health and property damage. Where a high level overflow is
    utilized, consideration shall also be given to the installation
    of storage/detention tanks, or basins, which shall be made to
    drain to the station wet well. Where such overflows affect
    public water supplies or waters used for culinary or food
    processing purposes, a storage detention basin, or tank, shall be
    provided having 2-hour detention capacity at the anticipated
    overflow rate.
    d) Equipment Requirements
    1) General

    The following general requirements shall apply to all
    internal combustion engines used to drive auxiliary pumps,
    service pumps through special drives, or electrical
    generating equipment:
    A) Engine Protection
    The engine must be protected from operating conditions
    that would result in damage to equipment. Unless
    continuous manual supervision is planned, protective
    equipment shall be capable of shutting down the engine
    and activating an alarm on site and as provided in
    Section 370.135. Protective equipment shall monitor for
    conditions of low oil pressure and overheating, except
    that oil pressure monitoring will not be required for
    engines with splash lubrication.
    B) Size
    The engine shall have adequate rated power to start and
    continuously operate all connected loads.
    C) Fuel Type
    Reliability and ease of starting, especially during cold
    weather conditions, should be considered in the
    selection of the type of fuel.
    D) Engine Ventilation
    The engine shall be located above grade with adequate
    ventilation of fuel vapors and exhaust gases.
    E) Routine Start-up
    All emergency equipment shall be provided with
    instructions indicating the need for regular starting
    and running of such units at full loads.
    F) Protection of Equipment
    Emergency equipment shall be protected from damage at
    the restoration of regular electrical power.
    2) Engine - Drive Pumping Equipment
    Where permanently-installed or portable engine-driven pumps
    are used, the following requirements in addition to general
    requirements shall apply:
    A) Pumping Capacity
    Engine-drive pumps shall meet the design pumping
    requirements unless storage capacity is available for
    flows in excess of pump capacity. Pumps shall be
    designed for anticipated operating conditions, including
    suction lift if applicable.
    B) Operation
    The engine and pump shall be equipped to provide

    automatic start-up and operation of pumping equipment
    unless manual start-up and operation is justified.
    Provisions shall also be made for manual start-up.
    Where manual start-up and operation is justified,
    storage capacity and alarm system must meet the
    requirements of subsection (d)(2)(C).
    C) Portable Pumping Equipment
    Where part or all of the engine-driven pumping equipment
    is portable, sufficient storage capacity shall be
    provided to allow time for detection of pump station
    failure and transportation and hookup of the portable
    equipment.
    3) Engine-Driven Generating Equipment
    Where permanently-installed or portable engine-driven
    generating equipment is used, the following requirements
    shall apply in addition to general requirements of subsection
    (d)(1):
    A) Generating Capacity
    i) Generating unit size shall be adequate to provide
    power for pump motor starting current and for
    lighting, ventilation, and other auxiliary
    equipment necessary for safety and proper operation
    of the lift station.
    ii) The operation of only one pump during periods of
    auxiliary power supply must be justified. Such
    justification may be made on the basis of the
    design peak flows relative to single-pump capacity,
    anticipated length of power outage, and storage
    capacity.
    iii) Special sequencing controls shall be provided to
    start pump motors unless the generating equipment
    has capacity to start all pumps simultaneously with
    auxiliary equipment operating.
    B) Operation
    Provisions shall be made for automatic and manual
    start-up and load transfer unless only manual start-up
    and operation is justified. The generator must be
    protected from operating conditions that would result in
    damage to equipment. Provisions should be considered to
    allow the engine to start and stabilize at operating
    speed before assuming the load. Where manual start-up
    and transfer is justified, storage capacity and alarm
    system must meet the requirements of subsection

    (d)(3)(C).
    C) Portable Generating Equipment
    Where portable generating equipment or manual transfer
    is provided, sufficient storage capacity shall be
    provided to allow time for detection of pump station
    failure and transportation and connection of generating
    equipment. The use of special electrical connections
    and double throw switches are recommended for connecting
    portable generating equipment.
    4) Independent Utility Substations
    Where independent substations are used for emergency power,
    each separate substation and its associated transmission
    lines must be capable of starting and operating the pump
    station at its rated capacity.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.460 Instructions and Equipment>>
    Sewage pumping stations and portable equipment shall be supplied with a
    complete set of operational instructions, including emergency procedures,
    maintenance schedules, tools and such spare parts as may be necessary.
    <BSection 370.470 Force Mains>>
    a) Velocity and Diameter
    At design pumping rates, a cleansing velocity of at least 2 feet
    per second should be maintained. Lower velocities may be
    permitted for very small installations. The minimum force main
    diameter for raw sewage shall be 4 inches except for grinder pump
    lift stations as allowed under Section 370.410(c)(3).
    b) Air and Vacuum Relief Valve
    An air relief valve shall be placed at high points in the force
    main to prevent air locking. Vacuum relief valves may be
    necessary to relieve negative pressure on force mains. Force main
    configuration and head conditions shall be evaluated as to the
    need for and placement of vacuum relief valves.
    c) Termination
    Force mains should enter the gravity sewer system at a point not
    more than 2 feet above the flow line of the receiving manhole.
    d) Design Pressure
    The force mains and fittings, including reaction blocking, shall
    be designed to withstand normal pressure and pressure surges

    (water hammer). The need for surge protection chambers shall be
    evaluated.
    e) Special Construction
    Force main construction near streams or water works structures and
    at water main crossings shall meet applicable provisions of
    Sections 370.125 and 370.126.
    f) Design Friction Losses
    1) Friction losses through force mains shall be based on the
    Hazen and Williams formula or other acceptable methods. When
    the Hazen and Williams formula is used, the value for "C"
    shall be 100 for unlined iron or steel pipe for design. For
    other smooth pipe materials such as polyvinyl chloride,
    polyethylene or lined ductile iron, a higher "C" value not to
    exceed 120 may be allowed for design.
    2) When initially installed, force mains will have a
    significantly higher "C" factor. The effect of the higher
    "C" factor should be considered in calculating maximum power
    requirements and duty cycle time to prevent damage to the
    motor.
    g) Identification
    Where force mains are constructed of material which might cause
    the force main to be confused with potable water mains, the force
    main shall be appropriately identified.
    h) Flexible Pipe Force Main Embedment
    Embedment bedding (haunching and initial backfill as depicted in
    ASTM D2321-89, Figure (1)) shall be in accordance with Section
    20-2.21 A and 20.2.21 B of Standard Specifications for Water and
    Sewer Main Construction in Illinois, 5th ed. (1996)(no later
    editions or amendments).
    i) Leakage Testing
    Leakage testing shall be specified, including testing methods and
    leakage limits.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART E: SEWAGE TREATMENT WORKS
    <BSection 370.500 Plant Location>>
    a) General
    The following items shall be considered when selecting a plant
    site:

    1) Proximity to residential areas.
    2) Direction of prevailing winds.
    3) Necessary routing to provide accessibility by all weather
    roads.
    4) Area available for expansion.
    5) Local zoning requirements.
    6) Local soil characteristics, geology, and topography available
    to minimize pumping.
    7) Access to receiving stream.
    8) Compatibility of treatment process with the present and
    planned future land use, including noise, potential odors,
    air quality, and anticipated sludge processing and disposal
    techniques.
    9) The requirements of the Illinois Groundwater Protection Act
    [415 ILCS 55].
    b) Critical Sites
    Where a site must be used which is critical with respect to the
    items in subsection (a), appropriate measures shall be taken to
    minimize adverse impacts.
    c) Flood Protection
    The treatment works structures, electrical and mechanical
    equipment shall be protected from physical damage by the maximum
    100 year flood. Treatment works shall remain fully operational
    during the 25 year flood. This requirement applies to new
    construction and to existing facilities undergoing major
    modification. Flood plain regulations of State and Federal
    agencies shall be considered.
    d) Plant Accessibility
    All plant facilities shall be accessible by an all weather road.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.510 Quality of Effluent>>
    The required degree of wastewater treatment shall be established by
    reference to applicable effluent and water quality standards contained in
    35 Ill. Adm. Code Subtitle C, Chapter I unless more stringent limitations
    have been established.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.520 Design>>

    a) Type of Treatment
    1) As a minimum, the following items shall be considered in the
    selection of the type of treatment:
    A) Present and future effluent requirements.
    B) Location and local topography of the plant site.
    C) The effects of industrial wastes likely to be
    encountered.
    D) Ultimate disposal of sludge.
    E) System capital costs.
    F) System operating and maintenance costs and basic energy
    requirements.
    G) Existing unit process performance and capacity.
    H) Process complexity governing operating personnel
    requirements.
    I) Environmental impact on present and future adjacent land
    use.
    2) The plant design shall provide the necessary flexibility to
    perform satisfactorily within the expected range of waste
    characteristics and volumes.
    b) Required Engineering Data for New Process Evaluation
    1) The policy of the Agency is to encourage rather than obstruct
    the development of any methods or equipment for treatment of
    wastewaters. The lack of inclusion in these standards of
    some types of wastewater treatment processes or equipment
    should not be construed as precluding their use. The Agency
    may approve other types of wastewater treatment processes and
    equipment under the condition that the operational
    reliability and effectiveness of the process or device shall
    have been demonstrated with a suitably-sized prototype unit
    operating at its design load conditions, to the extent
    required.
    2) To determine that such new processes and equipment have a
    reasonable and substantial chance of success, the Agency will
    require the following:
    A) Monitoring observations, including test results and
    engineering evaluations, demonstrating the efficiency of
    such processes.
    B) Detailed description of the test methods.
    C) Testing, including appropriately-composited samples,
    under various ranges of strength and flow rates
    (including diurnal variations) and waste temperatures
    over a sufficient length of time to demonstrate
    performance under climatic and other conditions which

    may be encountered in the area of the proposed
    installations.
    D) Other appropriate information.
    3) The Agency will require that appropriate testing be conducted
    and evaluations be made under the supervision of a competent
    process engineer other than those employed by the
    manufacturer or developer.
    c) Design Loads
    1) Hydraulic Design
    A) New Systems
    Plans for sewage treatment plants to serve new sewer
    systems for municipalities or sewer districts shall be
    based upon a design average daily flow of at least 100
    gallons per capita, to which must be added industrial
    waste volumes. The design also shall include
    appropriate allowance for flow conditions determined
    under Section 370.122.
    B) Existing Systems
    Where there is an existing sewer system, the volume and
    rates of the existing sewage flows shall be determined.
    The determination shall include both dry weather and wet
    weather flows. At least one year's flow data should be
    used to determine the design flows that are defined in
    Section 370.220.
    C) Treatment Plant Design Capacity
    The treatment plant capacity shall be rated on the
    design average flow, selected after any sewer system
    rehabilitation, plus appropriate future growth. The
    design of treatment units that are not subject to peak
    flow requirements shall be based on the design average
    flow. For plants subject to high wet weather flows or
    overflow detention pumpback flows, the design maximum
    flow that the plant is to treat on a sustained basis
    must be specified.
    2) Organic Design
    A) New Systems Minimum Design
    i) Domestic waste treatment design shall be on the
    basis of at least 0.17 pounds of biochemical oxygen
    demand (BOD5) per capita per day and 0.20 pounds of
    suspended solids per capita per day.
    ii) When garbage grinders are used in areas tributary
    to a domestic treatment plant, the design basis
    should be increased to 0.22 pounds of BOD5 and

    0.25 pounds of suspended solids per capita per
    day.
    iii) Domestic waste treatment plants that will receive
    industrial wastewater flows shall be designed to
    include these industrial waste loads.
    B) Existing Systems
    When an existing treatment works is to be upgraded or
    expanded, organic design shall be based upon the actual
    strength of the wastewater as determined from
    measurements taken in accordance with subsection
    (c)(1)(B), with an appropriate increment for growth as
    determined under the provisions of subsection (c)(2)(A).
    3) Shock Effects
    Domestic waste treatment designs shall consider and take into
    account the shock effect of high concentrations and diurnal
    peaks for short periods on the treatment process,
    particularly for small waste treatment plants serving
    institutions, restaurants, schools, etc.
    4) Design by Analogy
    Data from similar existing systems may be utilized in the
    case of new systems; however, thorough investigation and
    adequate documentation shall be made to establish the
    reliability and applicability of such data.
    d) Conduits
    1) All piping and channels shall be designed to carry the
    maximum expected flows. The incoming sewer shall be designed
    for unrestricted flow. Bottom corners of the channels must
    be filleted. Conduits shall be designed to avoid creation of
    pockets and corners where solids can accumulate.
    2) Suitable gates should be placed in channels to seal off
    unused sections which might accumulate solids. The use of
    shear gates is permitted where they can be used in place of
    gate valves or sluice gates. Non-corrodible materials shall
    be used for these control gates.
    e) Arrangement of Units
    Component parts of the plant should be arranged for greatest
    operating convenience, flexibility, economy, continuity of maximum
    effluent quality, and so as to facilitate installation of future
    units.
    f) Flow Division Control
    Flow division control facilities shall be provided as necessary to
    insure organic and hydraulic loading control to plant process
    units and shall be designed for easy operator access, change,

    observation, and maintenance. The use of head boxes equipped with
    sharp-crested weirs or similar devices are recommended. The use
    of valves for flow splitting is not acceptable. Appropriate flow
    measurement shall be incorporated in the flow division control
    design.
    g) Load Equalization and Attenuation
    1) Equalization of hydraulic and organic loads to downstream
    treatment units is recommended where the peak hourly load
    exceeds 300% of the design average load. Particular
    attention shall be given to equalization of pumped flows to
    limit hydraulic surges on downstream units.
    2) Plants proposed to receive sewage wastes from only
    institutions (motels, schools, hospitals, nursing homes,
    etc.) or industries which discharge substantially the total
    flow in 12 hours or less, shall be designed to include flow
    equalization. Where flow equalization facilities are
    provided, the design shall include adequate aeration and
    mixing equipment to prevent septicity.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.530 Plant Details>>
    a) Installation of Mechanical Equipment
    The specifications shall be so written that the installation and
    initial operation of major items of mechanical equipment will be
    inspected and approved by a representative of the manufacturer.
    b) Bypasses
    Properly located and arranged bypass structures and piping shall
    be provided so that each unit of the plant can be removed from
    service independently. The bypass design shall facilitate plant
    operation during unit maintenance and emergency repair so as to
    minimize deterioration of effluent quality and insure rapid
    process recovery upon return to normal operational mode.
    c) Unit Bypass and Wastewater Pumpage During Construction
    Final plans and specifications for upgrading or expanding existing
    treatment plants shall include construction scheduling of any unit
    bypassing, and appropriate temporary wastewater pumpage acceptable
    to the Agency to minimize temporary water quality degradation.
    Refer to Section 370.260.
    d) Drains and Buoyancy Protection
    1) Means shall be provided to dewater each unit. Pipes subject
    to clogging shall be provided with means for mechanical

    cleaning or flushing.
    2) Due consideration should be given to the possible need for
    hydrostatic pressure relief devices to prevent flotation of
    structures.
    e) Construction Materials
    Due consideration should be given to the selection of materials
    which are to be used in sewage treatment works because of the
    possible presence of hydrogen sulfide and other corrosive gases,
    greases, oils, and similar constituents frequently present in
    sewage. This is particularly important in the selection of metals
    and paints. Dissimilar metals should be avoided to minimize
    galvanic action.
    f) Painting
    The use of paints containing mercury should be avoided. In order
    to facilitate identification of piping, particularly in the large
    plants, it is suggested that the different lines be color coded.
    The following color scheme is recommended for purposes of
    standardization:
    1) Sludge line - brown
    2) Gas line - orange
    3) Potable water line - blue
    4) Non-potable water line - blue with 3 inch yellow band spaced
    30 inches apart
    5) Chlorine line - yellow
    6) Sewage line - gray
    7) Compressed air line - green
    8) Water lines for heating digesters or buildings - blue with a
    6-inch red band spaced 30 inches apart
    9) Sulfur dioxide line - yellow with red bands.
    10) The contents shall be stenciled on the piping, labeling the
    contents in a contrasting color.
    g) Operating Equipment
    A complete outfit of tools, accessories (such as portable pump and
    ventilation blowers, etc.), and spare parts necessary for the
    plant operators use shall be provided. Readily accessible storage
    space and work bench facilities shall be provided. Consideration
    shall be given to provision of a garage storage area for large
    equipment storage, maintenance, and repair.
    h) Erosion Control During Construction
    Effective site erosion control shall be provided during
    construction.
    i) Grading and Landscaping
    Upon completion of the plant, the ground should be graded and

    seeded. Concrete or gravel walkways should be provided for access
    to all units. Where possible, steep slopes should be avoided to
    prevent erosion. Surface water shall not be permitted to drain
    into any unit. Particular care shall be taken to protect
    trickling filter beds, sludge beds, and intermittent sand filters
    from storm water runoff. Landscaping shall be provided when a
    plant must be located near residential areas.
    j) Confined Spaces
    The number of confined spaces should be minimized for safety
    purposes.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.540 Plant Outfalls>>
    a) Discharge Impact Control
    The outfall sewer shall be designed to discharge to the receiving
    stream in a manner acceptable to the Agency. Consideration
    should be given in each case to the following:
    1) Preference for free fall or submerged discharge at the site
    selected.
    2) Utilization of cascade aeration of effluent discharge to
    increase dissolved oxygen.
    3) Limited or complete across-stream dispersion as needed to
    protect aquatic life movement and growth in the immediate
    reaches of the receiving stream.
    b) Design and Construction
    The outfall sewer shall be so constructed and protected against
    the effects of flood water, waves, ice, or other hazards as to
    reasonably insure its structural stability and freedom from
    stoppage. A manhole should be provided at the shore end of all
    gravity sewers extending into the receiving waters. Hazards to
    navigation shall be considered in designing outfall sewers.
    c) Sampling Provisions
    All outfalls shall be designed so that a sample of the effluent
    can be readily obtained at a point after the final treatment
    process and before discharge to or mixing with the receiving
    waters.
    <BSection 370.550 Essential Facilities>>
    a) Emergency Power or Pumping Facilities
    1) All plants shall be provided with an alternate source of

    electric power or pumping capability to allow continuity of
    operation during power failures. Methods of providing power
    or pumping capability include:
    A) The connection to at least 2 independent public utility
    sources such as substations. A power line from each
    substation into the treatment plant with capability for
    switchover to the second power source by plant operating
    personnel will be required.
    B) Portable or in place internal combustion engine
    equipment which will generate electrical or mechanical
    energy. Refer to Section 370.136(d).
    C) Portable pumping equipment when only emergency pumping
    is required. Refer to Section 370.136(d).
    2) Standby Generating Capacity Requirements
    Standby generating capacity normally is not required for
    aeration equipment used in the activated sludge process. In
    cases where a history of long term (4 hours or more) power
    outages have occurred, auxiliary power for minimum aeration
    of the activated sludge will be required.
    3) Degree of Treatment Required
    No reduction in degree of treatment due to power outages will
    be allowed when the wastewater is to be treated by
    installations using trickling filters, waste stabilization
    ponds and/or other low energy usage treatment devices.
    4) Continuity of Disinfection
    The design shall provide for continuous disinfection during
    all power outages, if required due to critical outfall
    locations and receiving waters.
    5) Continuity of Dechlorination
    For facilities using dechlorination equipment, the design
    shall provide for continuous dechlorination during all power
    outages, if required due to critical outfall locations and
    receiving waters.
    b) Water Supply
    1) General
    An adequate supply of potable water under pressure should be
    provided for use in the laboratory and general cleanliness
    around the plant. No piping or other connections shall exist
    in any part of the treatment works which, under any
    conditions, might cause the contamination of a potable water
    supply.
    2) Direct Connections
    A) Potable water from a municipal or separate supply may be

    used directly at points above grade for the following
    hot and cold supplies:
    i) Lavatory sink
    ii) Water closet
    iii) Laboratory sink (with vacuum breaker)
    iv) Shower
    v) Drinking fountain
    vi) Eye wash fountain
    vii) Safety shower
    viii) Fire protection sprinklers
    B) Hot water for any of the above units shall not be taken
    directly from a boiler used for supplying hot water to a
    sludge heat exchanger or digester heating unit.
    3) Indirect Connections
    A) Where a potable water supply is to be used for any
    purpose in a plant other than those listed in subsection
    (b)(2)(A), a break tank, pressure pump and pressure tank
    shall be provided. Water shall be discharged to the
    break tank through an air-gap at least 6 inches above
    the maximum flood line or the spill line of the tank,
    whichever is higher. A sketch of an acceptable break
    tank is contained in Appendix G, Figure No. 4. In-line
    backflow preventers are not acceptable.
    B) A sign shall be permanently posted at every hose bib,
    faucet, or sill cock located on the water system beyond
    the break tank to indicate that the water is not safe
    for drinking.
    4) Separate Potable Water Supply
    Where it is not possible to provide potable water from a
    public water supply, a separate well may be provided.
    Location and construction of the well should comply with
    requirements of the governing State and local regulations.
    Requirements governing the use of the supply are those
    contained in subsections (b)(2) and (b)(3).
    5) Separate Non-Potable Water Supply
    Where a separate non-potable water supply is to be provided,
    a break tank will not be necessary, but all sill cocks and
    hose bibs shall be posted with a permanent sign indicating
    the water is not safe for drinking.
    c) Sanitary Facilities
    Toilet, shower, and lavatory should be provided in sufficient
    numbers and at convenient locations to serve the expected plant
    personnel.

    d) Floor Slope
    Floor surfaces shall be sloped adequately to a point of drainage.
    e) Stairways
    Stairways shall be installed in lieu of ladders for access to
    those units requiring inspection and maintenance, including but
    not limited to trickling filters, digesters, aeration tanks,
    clarifiers and tertiary filters. Spiral or winding stairs are
    permitted only for secondary access where dual means of egress are
    provided. Stairways shall have slopes between 30 and 40 degrees
    from the horizontal to facilitate carrying samples, tools, etc.
    Each tread and riser shall be of uniform dimension in each flight.
    Minimum tread run shall not be less than 9 inches. The sum of the
    tread run and riser shall not be less than 17 nor more than 18
    inches. A flight of stairs shall consist of not more than a 12
    foot continuous rise without a platform.
    f) Flow Measurement
    1) Flow measurement facilities shall be provided so as to
    measure the following flows:
    A) Plant effluent flow.
    B) Plant influent flow, if significantly different from
    plant effluent flow, such as for lagoons and plants with
    excess flow storage or flow equalization.
    C) Excess flow treatment facility discharges.
    D) Other flows required to be monitored under the
    provisions of an NPDES discharge permit.
    E) Flows required for plant operational control, including
    but not limited to return activated sludge flow, waste
    activated sludge flow, recirculation flow and recycle
    flows.
    2) Indicating, totalizing and recording flow measurement devices
    shall be provided for all mechanical plants for all flows
    except those specified in subsection (f)(1)(E) above. Flow
    measurement equipment for lagoon systems shall consist of, at
    a minimum, elapsed time meters used in conjunction with
    pumping rate test or calibrated weirs. All flow measurement
    equipment must be sized to function effectively in the full
    range of flows expected and shall be protected against
    freezing.
    3) Flow measurement equipment including entrance and discharge
    conduit configuration and critical control elevations shall
    be designed to ensure that the required hydraulic conditions
    necessary for accurate measurement are provided. Conditions
    that must be avoided include turbulence, eddy currents, air

    entrainment, etc., that upset the normal hydraulic conditions
    that are necessary.
    g) Sampling Equipment
    Effluent composite sampling equipment shall be provided at all
    mechanical plants and at other facilities where necessary to meet
    discharge permit monitoring requirements.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.560 Safety>>
    a) Adequate provision shall be made to effectively protect the
    operator and visitors from hazards. The following shall be
    provided to fulfill the particular needs of each plant:
    1) Enclosure of the plant site with a fence designed to
    discourage the entrance of unauthorized persons and animals.
    2) Installation of hand rails and guards around all tanks, pits,
    stairwells, and other hazardous structures.
    3) Provision of first aid equipment at marked locations.
    4) Posting of "No Smoking" signs in hazardous areas.
    5) Protective clothing and equipment such as air packs, goggles,
    gloves, hard hats, safety harnesses and hearing protection.
    6) Provision of portable blower and sufficient hose.
    7) Portable lighting equipment that complies with the National
    Electrical Code.
    8) Appropriately placed warning signs for slippery areas,
    non-potable water fixtures, low head clearance areas, open
    service manhole, hazardous chemical storage areas, flammable
    fuel storage areas, etc.
    9) Smoke and fire detectors, fire extinguishers, and appropriate
    waste receptacles.
    10) Provisions for confined space entry in accordance with the
    requirements of the Occupational Safety and Health Act and
    any other applicable regulatory requirements.
    b) Hazardous Chemical Handling
    1) Containment Materials
    The materials utilized for storage, piping, valves, pumping,
    metering, splash guards, etc., shall be specially selected
    considering the physical and chemical characteristics of each
    hazardous or corrosive chemical.
    2) Secondary Containment and Storage
    A) Wet and Dry Chemicals
    Chemical storage areas shall be enclosed in dikes or

    curbs which will contain the stored volume until it can
    be safely transferred to alternate storage or released
    to the wastewater at controlled rates which will not
    damage facilities, inhibit the treatment processes, or
    contribute to stream pollution. Liquid polymer should
    be similarly contained to reduce areas with slippery
    floors, especially to protect travelways. Non-slip
    floor surfaces are desirable in polymer handling areas.
    B) Liquified Gas Chemicals
    Chlorine and sulfur dioxide cylinder and container
    storage shall meet the requirements of Sections 370.1020
    and 370.1040. Ammonia gas cylinder isolation shall be
    provided. Gas cylinder storage facilities shall be
    equipped with appropriate alarm system and emergency
    repair equipment and control system.
    3) Eye Wash Fountains and Safety Showers
    A) Eye wash fountains and safety showers utilizing potable
    water shall be provided in the laboratory and on each
    floor level or work location involving hazardous or
    corrosive chemical storage, mixing (or slaking),
    pumping, metering, or transportation unloading. These
    facilities are to be as close as practical to possible
    chemical exposure sites and are to be fully useful
    during all weather conditions. The eye wash fountains
    shall be supplied with water of moderate temperature
    (50
    - 90
    Fahrenheit (F)), separate from the hot water
    supply, suitable to provide 15 minutes to 30 minutes of
    continuous irrigation of the eyes.
    B) The emergency showers shall be capable of discharging 30
    to 50 gallons per minute (gpm) of water at moderate (50
    - 90
    F) temperature at pressures of 20 to 50 pounds
    per square inch (psi). The eye wash fountains and
    showers shall be no more than 25 feet from points of
    caustic exposure.
    4) Splash Guards
    All pumps or feeders for hazardous or corrosive chemicals
    shall have guards which will effectively prevent spray of
    chemicals into space occupied by personnel. The splash
    guards are in addition to guards to prevent injury from
    moving or rotating machinery parts.
    5) Piping, Labeling, Coupling Guards, Location
    A) All piping containing or transporting corrosive or
    hazardous chemicals shall be identified with labels

    every ten feet and with at least two labels in each
    room, closet, or pipe chase. Color coding may also be
    used, but is not an adequate substitute for labeling.
    B) All connections (flanged or other type), except adjacent
    to storage or feeder areas, shall have guards which will
    direct any leakage away from space occupied by
    personnel. Pipes containing hazardous or corrosive
    chemicals should not be located above shoulder level
    except where continuous drip collection trays and
    coupling guards will eliminate chemical spray or
    dripping onto personnel.
    6) Protective Clothing and Equipment
    The following items of protective clothing or equipment shall
    be available and utilized for all operations or procedures
    where their use will minimize injury hazard to personnel:
    A) Air pack breathing apparatus for protection against
    chlorine and other toxic gases.
    B) Chemical workers' goggles or other suitable goggles.
    (Safety glasses are insufficient.)
    C) Face masks or shields for use over goggles.
    D) Dust masks to protect the lungs in dry chemical areas.
    E) Rubber gloves.
    F) Rubber aprons with leg straps.
    G) Rubber boots (leather and wool clothing should be
    avoided near caustics).
    H) Safety harness and line.
    7) Warning Systems and Signs
    A) Facilities shall be provided for automatic shutdown of
    pumps and sounding of alarms when failure occurs in a
    pressurized chemical discharge line.
    B) Warning signs requiring use of goggles and dust masks
    shall be located near chemical unloading stations,
    pumps, and other points of frequent hazard.
    8) Dust Collection
    Dust collection equipment shall be provided where dry
    chemicals are stored or used to protect personnel from dusts
    injurious to the lungs or skin and to prevent polymer dust
    from settling on walkways which become slick when wet.
    9) Container Identification
    The identification and hazard warning data included on
    shipping containers, when received, shall appear on all
    containers (regardless of size or type) used to store, carry,
    or use a hazardous substance. Sewage and sludge sample

    containers should be adequately labeled. Below is a suitable
    label to identify a sewage sample as a hazardous substance:
    <PRaw Sewage>>
    Sample Point No. <P >>
    Contains Harmful Bacteria.
    May contain hazardous or
    toxic material.
    Do not drink or swallow.
    Avoid contact with openings
    or breaks in the skin.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.570 Laboratory>>
    a) All treatment works shall include a laboratory for making the
    necessary analytical determinations and operating control tests,
    except for those plants utilizing only processes not requiring
    laboratory testing for plant control and satisfactory off-site
    laboratory provisions are made to meet the permit monitoring
    requirements. For plants where a fully equipped laboratory is not
    required, the requirements for utilities and equipment such as
    fume hoods may be reduced or omitted.
    b) The laboratory shall have sufficient size, bench space, equipment
    and supplies to perform all self-monitoring analytical work
    required by discharge permits, and to perform the process control
    tests necessary for good management of each treatment process
    included in the design.
    c) The facilities and supplies necessary to perform analytical work
    to support industrial waste control programs will normally be
    included in the same laboratory. The laboratory size and
    arrangement must be sufficiently flexible and adaptable to
    accomplish these assignments. The layout should consider future
    needs for expansion in the event that more analytical work is
    needed.
    d) Location and Space
    1) The laboratory should be located on ground level, easily
    accessible to all sampling points, with environmental control

    as an important consideration. It shall be located in a
    separate room or building away from vibrating machinery or
    equipment which might have adverse effects on the performance
    of laboratory instruments or the analyst, or shall be
    designed to prevent structural transmission of machine
    vibration. The floor and wall construction shall be
    designed to keep out machine noise (blowers, pumps, etc.).
    The following minimum conditions shall be met:
    A) Blowers, pumps, etc., must be located on a separate
    floor pad.
    B) Common walls between machinery rooms must be
    double-walled with sound insulation between the walls.
    Connecting doors or windows to machinery rooms are not
    acceptable.
    C) Common attic space shall be blocked off and effective
    sound proof material provided in the ceiling.
    2) A minimum of 400 square feet of floor space should be
    allocated for the laboratory. Less space may be allowed if
    the sampling and analysis program, approved by the Agency,
    does not require a full-time laboratory chemist. If more
    than two persons normally will be working in the laboratory
    at any given time, 100 square feet of additional space should
    be provided for each additional person. Bench-top working
    surface should occupy at least 35 percent of the total floor
    space.
    3) Minimum ceiling height should be 8 feet 6 inches. If
    possible, this height should be increased to provide for the
    installation of wall-mounted water stills, distillation
    racks, and other equipment with extended height requirements.
    4) Additional floor and bench space should be provided to
    facilitate performance of analysis of industrial wastes, as
    required by the discharge permit and the utilities industrial
    waste pretreatment program. The above minimum space does not
    provide office or administration space.
    e) Materials
    1) Ceilings
    Acoustical tile should be used for ceilings except in high
    humidity areas where they should be constructed of cement
    plaster. Materials containing asbestos shall not be used.
    2) Walls
    For ease of maintenance and a pleasant working environment,
    light-colored ceramic tile should be used from floor to
    ceiling for all interior walls.

    3) Floors
    Floor surface materials shall be fire resistant and highly
    resistant to acids, alkalies, solvents, and salts.
    4) Doors
    A) Two exit doors should be located to permit a straight
    egress from the laboratory, preferably at least one to
    outside the building. Panic hardware should be used.
    They should have large glass windows for easy visibility
    of approaching or departing personnel.
    B) Automatic door closers should be installed; swinging
    doors should not be used.
    C) Flush hardware should be provided on doors if cart
    traffic is anticipated. Kick plates are also
    recommended.
    f) Cabinets and Bench Tops
    1) Cabinets
    A) Wall-hung cabinets are useful for dust-free storage of
    instruments and glassware.
    B) Units with sliding glass doors are preferable. They
    should be hung so the top shelf is easily accessible to
    the analyst. Thirty inches from the bench top is
    recommended.
    C) One or more cupboard-style base cabinets should be
    provided for storing large items; however, drawer units
    are preferred for the remaining cabinets. Drawers
    should slide out so that entire contents are easily
    visible. They should be provided with rubber bumpers
    and with stops which prevent accidental removal.
    Drawers should be supported on ball bearings or nylon
    rollers which pull easily in adjustable steel channels.
    All metal drawer fronts should be double-wall
    construction. All cabinet shelving should be acid
    resistant and adjustable from inside the cabinet.
    2) Bench Tops
    Generally, bench-top height should be 36 inches. However,
    areas to be used exclusively for sit-down type operations
    should be 30 inches high and include kneehole space.
    One-inch overhangs and drip grooves should be provided to
    keep liquid spills from running along the face of the
    cabinet. Tops should be furnished in large sections, 1 1/4
    inches thick. They should be field joined into a continuous
    surface with acid, alkali, and solvent-resistant cements
    which are at least as strong as the material of which the top

    is made.
    3) Utility Accessories
    Water, gas, air, and vacuum service fixtures; traps,
    strainers, overflows, plugs and tailpieces; and all
    electrical service fixtures shall be supplied with the
    laboratory furniture.
    g) Hoods
    Fume hoods to promote safety and canopy hoods over heat-releasing
    equipment shall be installed.
    1) Fume Hoods
    A) Location
    i) Fume hoods should be located where air disturbance
    at the face of the hood is minimal. Air
    disturbance may be created by persons walking past
    the hood; by heating, ventilating or
    air-conditioning systems; by drafts from opening or
    closing a door; etc.
    ii) Safety factors should be considered in locating a
    hood. If a hood is situated near a doorway, a
    secondary means of egress must be provided. Bench
    surfaces should be available next to the hood so
    that chemicals need not be carried long distances.
    B) Design and Materials
    i) The selection of fume hoods, their design and
    materials of construction, must be made by
    considering the variety of analytical work to be
    performed and the characteristics of the fumes,
    chemicals, gases, or vapors that will or may be
    released. Special design and construction is
    necessary if perchloric acid use is anticipated.
    Consideration should be given for providing more
    than one fume hood to minimize potential hazardous
    conditions throughout the laboratory.
    ii) Fume hoods are not appropriate for operation of
    heat-releasing equipment that does not contribute
    to hazards, unless they are provided in addition to
    those needed to perform hazardous tasks.
    C) Fixtures
    i) One cup sink should be provided inside each fume
    hood.
    ii) All switches, electrical outlets, and utility and
    baffle adjustment handles should be located outside
    the hood. Light fixtures should be

    explosion-proof.
    D) Exhaust
    Continuous duty exhaust capability should be provided.
    Exhaust fans should be explosion-proof. Exhaust
    velocities should be checked when fume hoods are
    installed.
    E) Alarms
    A buzzer for indicating exhaust fan failure and a static
    pressure gauge should be placed in the exhaust duct. A
    high temperature sensing device located inside the hood
    should be connected to the buzzer.
    2) Canopy Hoods
    Canopy hoods should be installed over the bench-top areas
    where hot plate, steam bath, or other heating equipment or
    heat-releasing instruments are used. The canopy should be
    constructed of steel, plastic, or equivalent material, and
    finished with enamel to blend with other laboratory
    furnishings.
    h) Sinks
    1) The laboratory should have a minimum of 3 sinks (not
    including cup sinks). At least 2 of them should be
    double-well with drainboards. Additional sinks should be
    provided in separate work areas as needed, and identified for
    the use intended.
    2) Waste openings should be located toward the back so that a
    standing overflow will not interfere. All water fixtures on
    which hoses may be used should be provided with reduced zone
    pressure backflow preventers to prevent contamination of
    water lines.
    3) The sinks should be constructed of material highly resistant
    to acids, alkalies, solvents, and salts, and should be
    abrasion and heat resistant, non-absorbent, light in weight
    and have all appropriate characteristics for laboratory
    applications. Traps should be made of glass, plastic, or
    lead and easily accessible for cleaning.
    i) Ventilation and Lighting
    1) Laboratories shall be separately air conditioned and
    dehumidification shall be provided where laboratory control
    tests procedures will be affected by high humidity
    conditions. Separate exhaust ventilation outlet locations
    (fume and heat hoods, room air, etc.) shall be provided
    remote from ventilation intakes.
    2) Adequate lighting, free from shadows, shall be provided to

    permit reading of laboratory instrument dials, glassware
    calibrations, etc.
    j) Gas and Vacuum
    1) Natural or bottled gas should be supplied to the laboratory.
    Digester gas should not be used.
    2) An adequately-sized line source of vacuum should be provided
    with outlets available throughout the laboratory.
    k) Balance and Table
    An analytical balance of the automatic, digital readout, single
    pan, 0.1 milligram sensitivity type shall be provided. A heavy
    special-design balance table which will minimize vibration of the
    balance shall be provided. It shall be located as far as
    practical from windows, doors, or other sources of drafts or air
    movements, so as to minimize undesirable impacts from these
    sources upon the balance.
    l) Equipment, Supplies and Reagents
    The laboratory shall be provided with all of the equipment,
    supplies, and reagents that are needed to carry out all of the
    facility's analytical testing requirements. Discharge permit,
    process control, and industrial waste monitoring requirements
    must be considered when specifying equipment needs. References
    such as Standard Methods and the USEPA Analytical Procedures
    Manual should be consulted prior to specifying equipment items.
    m) Power Supply Regulation
    1) To eliminate voltage fluctuation, electrical lines supplying
    the laboratory should be controlled with a constant voltage,
    harmonic neutralized type of transformer. This transformer
    should contain less than 3% total root mean square (rms)
    harmonic content in the output, should regulate to <P+>>1% for an
    input range of <P+>>15% of nominal voltage, with an output of 118
    volts. For higher voltage requirements, the 240-volt lines
    should be similarly regulated.
    2) Electrical devices in the laboratory not requiring a
    regulated supply (i.e., ordinary resistance heating devices)
    that are non-portable may be wired to an unregulated supply.
    n) Laboratory Grade Water Source
    A laboratory grade water source, with at least one gallon per hour
    capacity, shall be installed complete with all utility
    connections. The type of treatment used to produce laboratory
    grade water shall be based on the quality of water required for
    the tests to be performed at the plant. Laboratory water
    treatment devices shall be constructed of materials that are
    compatible with the water to be treated and produced.

    o) Laboratory Safety Equipment
    Laboratory safety equipment shall be provided in accordance with
    the requirements of Section 370.560(a)(3), (a)(9), (b)(3) and
    (b)(6).
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART F: PRELIMINARY TREATMENT
    <BSection 370.600 General Considerations>>
    a) Safety
    Safety Features Relative to Location
    1) Railings and Gratings
    A) Manually cleaned channels shall be protected by guard
    railings and deck gratings, with adequate provisions for
    removal or opening to facilitate raking.
    B) Mechanically cleaned channels shall be protected by
    guard railings and deck gratings. Consideration should
    also be given to temporary access arrangements to
    facilitate maintenance and repair.
    2) Mechanical Devices
    A) Mechanical screening equipment shall have adequate
    removable enclosures to protect personnel against
    accidental contact with moving parts and to prevent
    dripping in multi-level installations.
    B) A positive means of locking out each mechanical device
    shall be provided.
    3) Units and Equipment in Deep Pits
    Manually cleaned screens located in pits deeper than 4 feet
    shall be provided with stairway access, adequate lighting and
    ventiliation, and convenient and adequate means for removing
    screenings. Access ladders may be used instead of steps in
    pits less than 4 feet deep. Hoisting or lifting equipment
    shall be used where necessitated by the depth of the pit or
    the amount of material to be removed.
    4) In Buildings
    Units and equipment installed in buildings where other
    equipment or offices are located shall be isolated from the
    rest of the building, and shall be provided with separate
    outside entrances and separate and independent means of
    ventilation.

    5) Ventilation
    A) Adequate ventilation shall be provided for installations
    described in subsections (a)(3) and (4). Ventilation
    may either be continuous or intermittent. If
    continuous, ventilation shall provide at least 12
    complete air changes per hour; if intermittent,
    ventilation shall provide at least 30 complete air
    changes per hour.
    B) Where the pit is deeper than 4 feet mechanical
    ventilation is required, and the air shall be forced
    into the screen pit area rather than exhausted from the
    screen pit. The maximum distance from the fresh air
    discharge and the working deck floor shall be 24 inches.
    Dampers should not be used on fresh air ducts.
    Obstructions in air ducts should be avoided to prevent
    clogging. Air intake screens (bird and insect) shall be
    located so as to be easily accessible for cleaning.
    C) Switches for operation of ventilation equipment should
    be marked and located at the entrance to the screen pit
    area. All intermittently operated ventilating equipment
    shall be interconnected with the respective lighting
    system. Consideration should be given to automatic
    controls where intermittent operation is used. The
    manual lighting-ventilation switch shall override the
    automatic controls.
    D) The fan wheel shall be fabricated from non-sparking
    material. Refer to Section 370.610(a)(3)(C) for motor
    and electrical requirements.
    6) Electrical Fixtures
    Electrical fixtures and controls in enclosed places where gas
    may accumulate shall comply with Section 370.610(a)(3)(C).
    b) Communition
    Communition or other in-stream shredding of sewage solids shall be
    followed by primary settling or fine screening devices to remove
    the shredded stringy materials prior to the activated sludge
    process to minimize operational problems associated with
    reaglomeration of stringy materials.
    c) Channels
    Channels shall be equipped with the necessary gates to divert flow
    from any one unit. Provisions must also be made for dewatering
    each unit. Channels preceding and following screens shall be
    shaped and filleted as necessary to eliminate settling of solids.

    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.610 Screening Devices>>
    a) Bar Racks and Screens
    1) Where Required
    Screening of raw sewage shall be provided at all mechanical
    treatment works. For lift station applications, see Subpart
    D.
    2) Design and Installation
    A) Manually Cleaned Screens
    Clear openings for manually cleaned screens between bars
    should be from 1 to 1 3/4 inches. Design and
    installation shall be such that they can be conveniently
    cleaned. An accessible platform shall be provided on
    which the operator may rake screenings easily and
    safely. Suitable drainage facilities with return flow
    to process shall be provided for the platform.
    B) Mechanical Screens
    Clear openings for mechanically cleaned screens may be
    as small as practical to assure the proper operation and
    maintenance of treatment facilities. Mechanical screens
    shall be located so as to be protected from freezing and
    to facilitate maintenance.
    C) Velocities Through Screens
    For manually or mechanically raked bar screens the
    maximum velocities during peak flow periods should not
    exceed 2.5 feet per second. The velocity shall be
    calculated from a vertical projection of the screen
    openings on the cross-sectional area between the invert
    of the channel and the flow line. Excessive head loss
    through the screen, which may affect upstream flow
    measurement or bypassing, shall be taken into account.
    D) Invert
    The screen channel invert shall be at least 3 inches
    below the invert of the incoming sewers. To prevent
    jetting action, the length and/or construction of the
    screen channel shall be adequate to reestablish
    hydraulic flow pattern following the drop in elevation.
    E) Slope
    Manually cleaned screens should be placed on a slope of
    30 to 45 degrees with the horizontal.
    3) Control Systems

    A) Timing Devices
    All mechanical units which are operated by timing
    devices should be provided with auxiliary controls which
    will set the cleaning mechanism in operation at
    predetermined high water marks.
    B) Manual Override
    Automatic controls shall be supplemented by a manual
    override.
    C) Electrical Fixtures and Controls
    Electrical fixtures and controls in enclosed places
    where gas may accumulate shall comply with the National
    Electrical Code requirements for Class I, Group D,
    Division I locations.
    4) Disposal of Screenings
    A) Amply-sized, vector-proof facilities shall be provided
    for removal, handling and storage of screenings in a
    sanitary manner. Suitable drainage facilities shall be
    provided for the storage areas with drainage returned to
    process. The return of ground screenings to the sewage
    flow is unacceptable.
    B) Disposal shall be in accordance with 35 Ill. Adm. Code
    700 and shall be discussed in the plan documents.
    b) Auxiliary Screens
    Where mechanically operated screening is used, auxiliary manually
    cleaned screens shall be provided. Design shall include
    provisions for automatic diversion of the entire sewage flow
    through the auxiliary screens should the regular units fail.
    Refer to subsection (a)(2).
    c) Fine Screens
    Fine screens may be used in lieu of primary sedimentation
    providing that subsequent treatment units are designed on the
    basis of anticipated screen performance. Fine screens should not
    be considered equivalent to primary sedimentation. Where fine
    screens are used, additional removal of floatable oils and greases
    shall be provided if they will adversely affect the function of
    downstream treatment units.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.620 Grit Removal Facilities>>
    a) Where Required
    Grit removal facilities should be provided for all sewage

    treatment plants and are required for plants receiving sewage from
    combined sewers or from sewer systems receiving substantial
    amounts of grit. If a plant serving a separate sewer system is
    designed without grit removal facilities, the design shall include
    provision for future installation. Consideration shall be given
    to possible damaging effects on pumps, and other preceding
    equipment, and the need for additional storage capacity in
    treatment units where grit is likely to accumulate.
    b) Location
    Grit removal facilities should be located ahead of pumps. In such
    cases, coarse bar racks should be placed ahead of mechanically
    cleaned grit removal facilities. Comminution equipment, when used,
    shall be located downstream of the grit facility in order to
    reduce the operation and maintenance problems associated with
    grit.
    c) Type and number of units
    1) The selection of the type of grit removal shall be based on
    necessary flexibility of velocity control to remove the
    selected size grit particulates through the range of expected
    plant flows, the volume of grit expected, and available area
    and hydraulic gradient limits at the site. Aerated or area
    type grit removal units equipped with adequate controls for
    operational flexibility are recommended where flow rates and
    grit characteristics and volume are expected to vary widely.
    2) Plants treating wastes from combined sewers shall have at
    least one, preferably two or more, mechanically cleaned grit
    removal units, with provision for unit bypassing. A single
    manually cleaned or mechanically cleaned grit chamber with
    unit bypass is acceptable for small sewage treatment plants
    serving separate sanitary sewer systems. Minimum facilities
    for larger plants serving separate sanitary sewers shall be
    at least one mechanically cleaned unit with a unit bypass.
    d) Design Factors
    1) Channel Type Units
    A) Turbulence Control
    The equipment and inlet and outlet structures shall be
    designed to minimize turbulance throughout the channel.
    B) Velocity and Detention
    Channel-type chambers shall be designed to provide
    controlled velocities as close as possible to 1 foot per
    second. The detention period shall be based on the size
    of particle to be removed.
    2) Aerated Units

    A) Inlet
    The inlet shall be located and arranged to prevent short
    circuiting to the outlet and oriented to the unit flow
    pattern so as to provide for adequate scouring
    segregation of organic and grit materials prior to
    discharge.
    B) Detention
    A detention time of at least 3 minutes at design peak
    flow should be provided.
    C) Air Supply
    Air should be supplied at 5 cubic feet per minute (cfm)
    per foot of tank length. The rate of air supplied shall
    be widely variable so as to maximize unit process
    effectiveness.
    3) Grit Washing and Freeze Protection
    All facilities not provided with positive velocity control
    should include means for grit washing to further separate
    organic and inorganic materials. Grit elevator and washing
    facilities shall be housed to prevent freezing. Provision
    for adequate heating and ventilation shall be provided to
    prevent corrosion.
    4) Drains
    Provisions should be made for dewatering each unit.
    5) Water
    An adequate supply of water under pressure shall be provided
    for clean up.
    e) Grit Removal
    Grit removal facilities located in pits shall be provided with
    mechanical equipment for pumping or hoisting grit to ground level.
    Pits deeper than 4 feet shall be provided with stairway access. An
    approved-type elevator or manlift may be desirable in some
    locations. Adequate ventilation, as described in Section
    370.600(a)(5), and lighting shall be provided for pits that are
    deeper than 4 feet or are within an enclosed area.
    f) Grit Handling
    Impervious, non-slip, working surfaces with drains back to process
    shall be provided for grit handling areas. Safety handrails shall
    be provided around the working platform areas. If grit is to be
    transported, the conveying equipment shall be designed to avoid
    loss of material and protection from freezing. Grit disposal
    methods shall be in compliance with 35 Ill. Adm. Code 700 and
    shall be described in the plan documents.
    g) Electrical

    All electrical fixtures and controls in enclosed or below grade
    grit removal areas where hazardous gases may accumulate shall meet
    the requirements of the National Electrical Code (1996) for Class
    1, Group D, Division 1 locations.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.630 Pre-Aeration>>
    Pre-aeration of sewage to reduce septicity may be required in special
    cases.
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART G: SETTLING
    <BSection 370.700 General Considerations>>
    a) Number of Units
    Multiple units capable of independent operation are desirable and
    shall be provided in all plants where design average flows exceed
    100,000 gallons per day. Plants not having multiple units shall
    include other provisions to assure continuity of treatment.
    b) Arrangement
    Settling tanks shall be arranged in accordance with Sections
    370.520(e) and 370.710(g).
    c) Flow Distribution
    Effective flow splitting devices and control appurtenances shall
    be provided to insure proper organic and hydraulic proportion of
    flow to each unit. Refer to Section 370.520(f).
    d) Tank Configuration
    Consideration should be given to the probable flow pattern in the
    selection of tank size and shape, and inlet and outlet type and
    location.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.710 Design Considerations>>
    a) Dimensions
    The minimum length of flow from inlet to outlet should be 10 feet
    unless special provisions are made to prevent short circuiting.

    The sidewater depth for primary clarifiers shall be as shallow as
    practicable, but not less than 7 feet. Clarifiers following the
    activated sludge process shall have sidewater depths of at least
    12 feet to provide adequate separation zone between the sludge
    blanket and the overflow weirs. Clarifiers following fixed film
    reactors shall have sidewater depth of at least 7 feet.
    b) Surface Settling Rates (Overflow Rates)
    The hydraulic design of settling tanks shall be based on the
    anticipated peak hourly flow.
    1) Primary and Bypass Settling Tanks
    A) Primary Settling
    Some indication of BOD removals may be obtained by
    reference to Appendix E, Figure No. 2. The figure
    should not be used to design units which receive
    wastewaters which have BOD and total suspended solids
    concentrations which are substantially different from
    normal domestic sewage. The operating characteristics
    of such units should be established by appropriate field
    and laboratory tests. If activated sludge is wasted to
    the primary settling unit, then the design surface
    settling rate shall not exceed 1,000 gallons per day per
    square foot based on design peak hourly flow, including
    all flows to the unit. Refer to subsection (b)(3) and
    Section 370.820.
    B) Combined Sewer Overflow and Bypass Settling
    The maximum surface settling rate shall not exceed 1,800
    gallons per day per square foot based on peak hourly
    flow. Minimum liquid depth shall not be less than 10
    feet. Minimum detention shall not be less than one
    hour. The minimum length of flow from inlet baffle to
    outlet should be 10 feet, unless special provisions are
    made to prevent short-circuiting.
    2) Intermediate Settling Tanks
    Surface settling rates for intermediate settling tanks
    following series units of fixed film reactor processes should
    not exceed 1500 gallons per day per square foot based on
    design peak hourly flow. Surface settling rates for
    intermediate settling tanks following the activated sludge
    process shall not exceed 1000 gallons per day per square foot
    based on design peak hourly flow.
    3) Final Settling Tanks
    Settling tests should be conducted wherever a pilot study of
    biological treatment is warranted by unusual waste

    characteristics or treatment requirements. Testing shall be
    done where proposed loadings go beyond the limits set forth
    in subsections (b)(3)(A) and (b)(3)(B).
    A) Final Settling Tanks - Fixed Film Biological Reactors
    Surface settling rates for settling tanks following
    trickling filters or rotating biological contactors
    shall not exceed 1000 gallons per day per square foot
    based on design peak hourly flow.
    B) Final Settling Tanks - Activated Sludge
    i) Multiple units capable of independent operation
    shall be provided at all plants. To perform
    properly while producing a concentrated return
    flow, activated sludge settling tanks must be
    designed to meet thickening as well as solids
    separation requirements.
    ii) Since the rate of recirculation of return sludge is
    quite high in activated sludge processes, surface
    settling rate and weir overflow rate should be
    adjusted for the various processes to minimize the
    problems with sludge loadings, density currents,
    inlet hydraulic turbulence, and occasional poor
    sludge settleability.
    iii) The hydraulic loadings shall not exceed 1000
    gallons per day per square foot based on design
    peak hourly flow, and 800 gallons per day per
    square foot based on peak hourly flow for separate
    activated sludge nitrification stage. Refer to
    Section 370.1210(c)(4).
    iv) The solids loading shall not exceed 50 pounds
    solids per day per square foot at the design peak
    hourly rate.
    v) Flow equalization is recommended where the peak
    hourly load exceeds 300% of the design average
    load.
    C) Rectangular Units
    Rectangular final settling tanks following the activated
    sludge process frequently exhibit poor solids separation
    characteristics and should therefore be avoided. If
    land availability or other local conditions mandate the
    use of rectangular final clarifiers following the
    activated sludge process, the following design
    modifications shall be made:
    i) Within practicable limits, length shall be

    approximately equal to the width.
    ii) Excess weir length shall be provided.
    iii) Baffles shall be provided to interrupt
    longitudinal density currents.
    iv) Weir placement shall be adjustable, so as to allow
    optimization of the upflow takeoff points.
    c) Inlet Structures
    Inlets and inlet baffling should be designed to dissipate the
    inlet velocity, to distribute the flow equally both horizontally
    and vertically and to prevent short circuiting. Channels should
    be designed to maintain a velocity of at least one foot per second
    at one-half the design flow. Corner pockets and dead ends should
    be eliminated and corner fillets or channeling used where
    necessary. Provisions shall be made for prevention or removal of
    floating materials in inlet structures.
    d) Weirs
    1) General
    Overflow weirs shall be readily adjustable over the life of
    the structure to correct for differential settlement of the
    tank.
    2) Location
    Overflow weirs shall be located to optimize actual hydraulic
    detention time, and minimize short circuiting.
    3) Design Rates
    Weir loadings shall not exceed 20,000 gallons per day per
    lineal foot based on design peak hourly flows for plants
    having design average flows of 1.0 mgd or less. Overflow
    rates shall not exceed 30,000 gallons per day per lineal foot
    based on design peak hourly flow for plants having design
    average flow of greater than 1.0 mgd. Higher weir overflow
    rates may be allowed for bypass settling tanks. If pumping
    is required, weir loadings should be related to pump delivery
    rates to avoid short circuiting. Refer to Section
    370.410(c)(8).
    4) Weir Troughs
    Weir troughs shall be designed to prevent submergence at
    maximum design flow, and to maintain a velocity of at least
    one foot per second at one-half design average flow.
    e) Submerged Surfaces
    The tops of troughs, beams, and similar submerged construction
    elements shall have a minimum slope of 1.4 vertical to 1
    horizontal; the underside of such elements should have a slope of
    1 to 1 to prevent the accumulation of scum and solids.

    f) Unit Dewatering
    Unit dewatering featuring shall conform to the provisions outlined
    in Section 370.530. The bypass design should also provide for
    redistribution of the plant flow to the remaining units.
    g) Freeboard
    Walls of settling tanks shall extend at least 6 inches above the
    surrounding ground surface and shall provide not less than 12
    inches freeboard. Additional freeboard or the use of wind screens
    is recommended where larger settling tanks are subject to high
    velocity wind currents that would cause tank surface waves and
    inhibit effective scum removal.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.720 Sludge and Scum Removal>>
    a) Scum Removal
    Full surface mechanical scum collection and removal facilities,
    including baffling, shall be provided for all settling tanks,
    except for Imhoff tanks. The unusual characteristics of scum
    which may adversely affect pumping, piping, sludge handling and
    disposal, should be recognized in design. Provisions may be made
    for the discharge of scum with the sludge; however, other special
    provisions for disposal may be necessary. Refer to Section
    370.710(g).
    b) Sludge Removal
    Mechanical sludge collection and withdrawal facilities shall be
    designed to assure an effective and controlled rate of removal of
    the sludge. Suction withdrawal is encouraged.
    1) Sludge Hopper
    The minimum slope of the side walls shall be 1.7 vertical to
    1 horizontal. Hopper wall surfaces should be made smooth
    with rounded corners to aid in sludge removal. Hopper
    bottoms shall have a maximum dimension of 2 feet. Extra
    depth sludge hoppers for sludge thickening are not
    acceptable.
    2) Cross-Collectors
    Cross-collectors serving one or more settling tanks may be
    useful in place of multiple sludge hoppers.
    3) Sludge Removal Piping
    Each hopper shall have an individually valved sludge
    withdrawal line at least 6 inches in diameter. The static
    head available for withdrawal of sludge shall be 30 inches or

    greater, as necessary to maintain a 3 feet per second
    velocity in the withdrawal pipe. Clearance between the end
    of the withdrawal line and the hopper walls shall be
    sufficient to prevent "bridging" of the sludge. Adequate
    provisions shall be made for rodding or back-flushing
    individual pipe runs. Piping shall also be provided to
    return waste sludge from secondary and tertiary processes to
    primary clarifiers where they are used. Refer to Section
    370.820.
    4) Sludge Removal Control
    Sludge wells equipped with telescoping valves or swing pipes
    are recommended for primary sludge and fixed film sludges
    where periodic withdrawal is proposed. Air lift type of
    sludge removal will not be approved for removal of primary
    sludges.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.730 Protection and Service Facilities>>
    a) Operator Protection
    All settling tanks shall be equipped to enhance safety for
    operators. Such features shall appropriately include machinery
    covers, life lines, stairways, walkways, handrails and
    slip-resistant surfaces. If sidewalls are extended more than
    three feet above the liquid level or four feet above ground level,
    convenient walkways must be provided to facilitate housekeeping
    and maintenance.
    b) Mechanical Maintenance Access
    The design shall provide for convenient and safe access to routine
    maintenance items such as gear boxes, scum removal mechanisms,
    baffles, weirs, inlet stilling baffle area, and effluent channels.
    c) Electrical Fixtures and Controls
    Electrical fixtures and controls in enclosed settling basins shall
    meet the requirements of the National Electric Code for Class I,
    Group D, Division 1 locations. The fixtures and controls shall be
    located so as to provide convenient and safe access for operation
    and maintenance. Adequate area lighting shall be provided.
    <BSection 370.740 Imhoff Tanks>>
    a) General
    Imhoff tanks may be used for the sedimentation of settleable

    solids and for the unheated anaerobic digestion of these solids.
    b) Settling Compartment Design
    1) Settling Rate
    Surface settling rate shall not exceed 1000 gallons per day
    per square foot based upon design peak hourly flow.
    2) Detention Period
    A detention period of not less than 1 hour based upon design
    peak hourly flow shall be provided.
    3) Dimensions
    The minimum length of flow between inlet and outlet should be
    10 feet and at least 6 feet of settling depth should be
    provided.
    4) Freeboard
    The freeboard shall be 18 inches or more.
    5) Hopper Slope
    The bottom of the settling chamber of the conventional tank
    shall have a slope of at least 1.4 vertical to 1.0
    horizontal. The slot at the bottom of the settling chamber
    allowing solids passage shall have a minimum opening and a
    minimum overlap of 6 inches.
    6) Inlets and Outlets
    Inlet and outlet arrangements should be designed so that the
    direction of flow may be reversed to allow for a more even
    distribution of solids in the digestion compartment.
    Adequate scum baffles shall be provided at the ends of the
    flow-through chamber.
    7) Weirs
    Weir design and overflow rates shall be in accordance with
    Section 370.710(d).
    8) Walkway
    A walkway along the length of the tank shall be provided.
    c) Sludge Digestion Compartment Design
    1) Digestion Chamber Capacity
    The digestion chamber shall provide 4 cubic feet of volume
    per capita for primary treatment and should provide 6 cubic
    feet of volume per capita if secondary process sludge is also
    to be digested. The capacity shall be measured below a
    horizontal plane 18 inches below the settling chamber slot.
    2) Vent Area
    A surface area equal to 20% of the total tank surface area
    shall be provided for venting the digestion compartment.
    3) Hopper Slope
    The bottom of the digestion chamber should be a hopper type

    structure with minimum side slopes of 1.75 vertical to 1.0
    horizontal. Sludge draw-off from the digestion chamber is
    usually accomplished by utilizing the hydrostatic head with a
    minimum differential of 6 feet being required. Eight inch
    diameter sludge draw-off piping or larger shall be used.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.750 Septic Tank - Tile System>>
    a) General
    Septic tank tile systems shall be used only for domestic or
    similar organic waste, where soil conditions are suitable and
    sewers tributary to treatment works are not available.
    b) Design Standards
    Specific design information is contained in the document titled
    "Private Sewage Disposal Licensing Act & Code", which can be
    obtained from:
    State of Illinois
    Department of Public Health
    Springfield, Illinois 62706.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART H: SLUDGE PROCESSING AND DISPOSAL
    <BSection 370.800 General>>
    Facilities for processing sludge shall be provided at all mechanical sewage
    treatment plants. Handling equipment shall be capable of processing sludge
    to a form suitable for ultimate disposal.
    <BSection 370.810 Process Selection>>
    The selection of sludge handling unit processes should be based upon at
    least the following considerations:
    a) Local land use.
    b) System energy requirements.
    c) Cost effectiveness of sludge thickening and dewatering.
    d) Equipment complexity and staffing requirements.
    e) Adverse effects of heavy metals and other sludge components upon
    the unit processes.
    f) Sludge digestion or stabilization requirements.

    g) Side stream or return flow treatment requirements (e.g., digester
    or sludge storage facilities supernatant, dewatering unit
    filtrate, wet oxidation return flows).
    h) Sludge storage requirements.
    i) Methods of ultimate disposal.
    j) Back-up techniques of sludge handling and disposal.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.820 Sludge Thickening>>
    a) Sludge thickeners to reduce the volume of sludge should be
    considered. The design of thickeners (gravity tank, gravity
    belt, dissolved-air flotation, centrifuge, and others) should take
    into account the type and concentration of sludge, the sludge
    stabilization processes, storage requirements, the method of
    ultimate sludge disposal, chemical needs, and the cost of
    operation. The use of gravity thickening tanks for unstabilized
    sludges is not recommended because of problems due to septicity
    unless provisions are made for adequate control of process
    operational problems as well as problems of odors at the gravity
    thickener and any following unit processes. Particular attention
    should be given to the pumping and piping of the concentrated
    sludge and possible onset of anaerobic conditions.
    b) Process selection and unit process design parameters should be
    based on prototype studies. The Agency will require such studies
    where the sizing of other plant units is dependent on performance
    of the thickeners. Refer to Section 370.520(b) for any new
    process determination.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.830 Anaerobic Sludge Digestion>>
    a) General
    1) Multiple Units
    Multiple units or alternate methods of sludge processing
    shall be provided. Facilities for sludge storage and
    supernatant separation in an additional unit may be required,
    depending on raw sludge concentration and disposal methods
    for sludge and supernatant.
    2) Depth
    If process design provides for supernatant withdrawal, the

    proportion of depth to diameter should be such as to allow
    for the formation of a reasonable depth of supernatant
    liquor. A minimum side water depth of 20 feet is
    recommended.
    3) Design Maintenance Provisions
    To facilitate emptying, cleaning, and maintenance the
    following features are desirable:
    A) Slope
    The tank bottom shall slope to drain toward the
    withdrawal pipe. For tanks equipped with a suction
    mechanism for sludge withdrawal, a bottom slope not less
    than 1 to 12 is recommended. Where the sludge is to be
    removed by gravity alone, 1 to 4 slope is recommended.
    B) Access Manholes
    At least 2 access manholes should be provided in the top
    of the tank in addition to the gas dome. There should
    be stairways to reach the access manholes. A separate
    side wall manhole shall be provided that is large enough
    to permit the use of mechanical equipment to remove grit
    and sand. The side wall access manhole should be low
    enough to facilitate heavy equipment handling and may be
    buried in the earthen bank insulation.
    C) Safety
    Non-sparking tools, rubber-soled shoes, safety harness,
    gas detectors for inflammable and toxic gases, and at
    least two self-contained breathing units shall be
    provided for emergency use.
    4) Toxic Materials
    If the anaerobic digestion process is proposed, the basis of
    design shall be supported by wastewater analyses to determine
    the presence of undesirable materials, such as high
    concentrations of sulfates and inhibitory concentrations of
    heavy metals.
    b) Sludge Inlets and Outlets, Recirculation and High Level Overflows
    1) Multiple sludge inlets and draw-offs and, where used,
    multiple recirculation suction and discharge points to
    facilitate flexible operation and effective mixing of the
    digester contents shall be provided unless adequate mixing
    facilities are provided within the digester.
    2) One inlet should discharge above the liquid level and be
    located at approximately the center of the tank to assist in
    scum breakup. The second inlet should be opposite to the
    suction line at approximately the 2/3 diameter point across

    the digester.
    3) Raw sludge inlet discharge points should be so located as to
    minimize short circuiting to the digested sludge or
    supernatant draw-offs.
    4) Sludge withdrawal to disposal should be from the bottom of
    the tank. The bottom withdrawal pipe should be
    interconnected with the necessary valving to the
    recirculation pipe, to increase versatility in mixing the
    tank contents.
    5) An unvalved vented overflow shall be provided to prevent
    damage to the digestion tank and cover in case of accidental
    overfilling. This emergency overflow shall be piped to a
    point and at a rate in the treatment process or sidestream
    treatment facilities so as to minimize the impact on process
    units.
    c) Tank Capacity
    1) Rational Design
    The total digestion tank capacity shall be determined by
    rational calculations based upon such factors as volume of
    sludge added, its percent solids, and character, the
    temperature to be maintained in the digesters, the degree or
    extent of mixing to be obtained, the degree of volatile
    solids reduction required, method of sludge disposal, and the
    size of the installation with appropriate allowances for gas,
    scum, supernatant and digested sludge storage. Secondary
    digesters of two-stage series digestion systems that are used
    for digested sludge storage and concentration shall not be
    credited in the calculations for volumes required for sludge
    digestion. Calculations should be submitted to justify the
    basis of design.
    2) Empirical Design
    When such calculations are not submitted to justify the
    design based on the above factors, the minimum combined
    digestion tank capacity outlined below will be required.
    Such requirements assume that the raw sludge is derived from
    ordinary domestic wastewater, a digestion temperature is to
    be maintained in the range of 85
    to 95
    F (29
    to 35
    C), 40
    to 50 percent volatile matter in the digested sludge, and
    that the digested sludge will be removed frequently from the
    process. (See also subsection (a)(1) above and Section
    370.860(a)(1).)
    A) Completely Mixed Systems
    For digestion systems providing for intimate and

    effective mixing of the digester contents, the system
    may be loaded up to 80 pounds of volatile solids per
    1000 cubic feet of volume per day in the active
    digestion units.
    B) Moderately Mixed Systems
    For digestion systems where mixing is accomplished only
    by circulating sludge through an external heat
    exchanger, the system may be loaded up to 40 pounds of
    volatile solids per 1000 cubic feet of volume per day in
    the active digestion units. This loading may be
    modified upward or downward depending upon the degree of
    mixing provided.
    C) Digester Mixing
    Facilities for mixing the digester contents shall be
    provided where required for proper digestion by reason
    of loading rates or other features of the system. Where
    sludge recirculation pumps are used for mixing, they
    shall be provided in accordance with the applicable
    requirements of Section 370.850(a).
    d) Gas Collection, Piping, and Appurtenances
    1) General
    All portions of the gas system including the space above the
    tank liquor, storage facilities and piping shall be so
    designed that under all normal operating conditions,
    including sludge withdrawal, the gas will be maintained under
    pressure. All enclosed areas where any gas leakage might
    occur shall be adequately ventilated.
    2) Safety Equipment
    All necessary safety facilities shall be included where gas
    is produced. Pressure and vacuum relief valves and flame
    traps together with automatic safety shut off valves shall be
    provided and protected from freezing. Water seal equipment
    shall not be installed. Safety equipment and gas compressors
    should be housed in a separate room with an exterior door.
    3) Gas Piping and Condensate
    Gas piping shall have a minimum diameter of 4 inches, except
    that a smaller diameter pipe may be used at the gas
    production meter. Gas piping shall slope to condensation
    traps at low points. The use of float-controlled condensate
    traps is not permitted. Condensation traps shall be
    protected from freezing. Tightly fitted self-closing doors
    should be provided at connecting passageways and tunnels
    which connect digestion facilities to other facilities to

    minimize the spread of gas. Piping galleries shall be
    ventilated in accordance with subsection (d)(7).
    4) Gas Utilization Equipment
    Gas burning boilers, engines, etc., shall be located in well
    ventilated rooms. Such rooms would not ordinarily be
    classified as a hazardous location if isolated from the
    digestion gallery or ventilated in accordance with subsection
    (d)(7). Gas lines to these units shall be provided with
    suitable flame traps.
    5) Electrical Fixtures
    Electrical fixtures and controls, in places enclosing
    anaerobic digestion appurtenances, where hazardous gases are
    normally contained in the tanks and piping, shall comply with
    the National Electric Code for Class 1, Group D, Division 2
    locations. Refer to subsection (d)(7).
    6) Waste Gas
    A) Waste gas burners shall be readily accessible and should
    be located at least 50 feet away from any plant
    structure if placed at ground level, or may be located
    on the roof of the control building if sufficiently
    removed from the tank. Waste gas burners shall be of
    sufficient height to prevent injury to personnel due to
    wind or downdraft conditions.
    B) All waste gas burners shall be equipped with automatic
    ignition such as a pilot light or a device using a
    photoelectric cell sensor. Consideration should be
    given to the use of natural or propane gas to insure
    reliability of the pilot.
    C) Gas piping shall be sloped at a minimum of 2 percent up
    to the waste gas burner with a condensate trap provided
    in a location not subject to freezing.
    7) Ventilation
    Any underground enclosures connecting with digestion tanks or
    containing sludge or gas piping or equipment shall be
    provided with forced ventilation in accordance with Section
    370.410(g)(1-4) and (6).
    8) Meter
    A gas meter with bypass shall be provided to meter total gas
    production for each active digestion unit. Total gas
    production for two-stage digestion systems operated in series
    may be measured by a single gas meter with proper
    interconnected gas piping. Where multiple primary digestion
    units are used with a single secondary digestion unit, a gas

    meter shall be provided for each primary digestion unit. The
    secondary digestion unit may be interconnected with the gas
    measurement unit of one of the primary units. Interconnected
    gas piping shall be properly valved with gastight gate valves
    to allow measurement of gas production from, or maintenance
    of, either digestion unit. Gas meters may be of the orifice
    plate, turbine or vortex type. Positive displacement meters
    are not recommended. The meter used must be specifically
    designed for contact with corrosive and dirty gases.
    e) Digestion Tank Heating
    1) Insulation
    Wherever possible digestion tanks should be constructed above
    ground-water level and shall be suitably insulated to
    minimize heat loss. Maximum utilization of earthen bank
    insulation should be used.
    2) Heating Facilities
    Sludge may be heated by circulating the sludge through
    external heaters or by units located inside the digestion
    tank. Refer to subsection (e)(2)(B).
    A) External Heating
    Piping shall be designed to provide for the preheating
    of feed sludge before introduction into the digesters.
    Provisions shall be made in the lay-out of the piping
    and valving to facilitate heater exchanger tube removal
    and cleaning of the lines. Heat exchanger sludge piping
    should be sized for peak heat transfer requirements.
    Heat exchangers should have a heating capacity of 130
    percent of the calculated peak heating requirement to
    account for sludge tube fouling.
    B) Other Heating Methods
    i) The use of hot water heating coils affixed to the
    walls of the digester, or other types of internal
    heating equipment that require emptying the
    digester contents for repair, are not acceptable.
    ii) Other systems and devices have been developed
    recently to provide both mixing and heating of
    anaerobic digester contents. These systems will be
    reviewed on their own merits. Operating data
    detailing their reliability, operation and
    maintenance characteristics will be required.
    3) Heating Capacity
    A) Sufficient heating capacity shall be provided to
    consistently maintain the design sludge temperature

    considering the insulation provided and ambient cold
    weather conditions. Where digestion tank gas is used
    for other purposes, an auxiliary fuel may be required.
    B) The provision of standby heating capacity or the use of
    multiple units sized to provide the heating requirements
    shall be considered unless acceptable alternative means
    of handling raw sludge are provided.
    4) Hot Water Internal Heating Controls
    A) Mixing Valves
    A suitable automatic mixing valve shall be provided to
    temper the boiler water with return water so that the
    inlet water to the removable heat jacket or coil in the
    digester can be held below a temperature at which caking
    will be accentuated. Manual control should also be
    provided by suitable bypass valves.
    B) Boiler Controls
    The boiler should be provided with suitable automatic
    controls to maintain the boiler temperature at
    approximately 180 F (82
    C) to minimize corrosion and
    to shut off the main gas supply in the event of pilot
    burner or electrical failure, low boiler water level,
    low gas pressure, excessive boiler water temperature or
    pressure.
    C) Boiler Water Pumps
    Boiler water pumps shall be sealed and sized to meet the
    operating conditions of temperature, operating head and
    flow rate. Duplicate units shall be provided.
    D) Thermometers
    Thermometers shall be provided to show inlet and outlet
    temperatures of the sludge, hot water feed, hot water
    return and boiler water.
    E) Water Supply
    The chemical quality of the water supply shall be
    suitable for use as boiler water. Refer to Section
    370.550(b) for additional water supply considerations.
    5) External Heater Operating Controls
    All controls necessary to insure effective and safe operation
    are required. Provision for duplicate units in critical
    elements should be considered.
    f) Supernatant Withdrawal
    Where supernatant separation is to be used to concentrate sludge
    in the digester units and increase digester solids retention time,
    the design shall provide for ease of operation and positive

    control of supernatant quality.
    1) Piping Size
    Supernatant piping should not be less than 6 inches in
    diameter.
    2) Withdrawal Arrangements
    A) Withdrawal Levels
    Piping should be arranged so that withdrawal can be made
    from 3 or more levels in the tank. An unvalved vented
    overflow shall be provided. The emergency overflow
    shall be piped to a point and at a rate in the treatment
    process or sidestream treatment facilities so as to
    minimize the impact on process units.
    B) Withdrawal Selection
    On fixed cover tanks the supernatant withdrawal level
    should preferably be selected by means of
    interchangeable extensions at the discharge end of the
    piping.
    C) Supernatant Selector
    A fixed screen supernatant selector or similar device
    may only be used in an unmixed secondary digestion unit.
    If such a supernatant selector is provided, provisions
    shall be made for at least one other draw-off level
    located in the supernatant zone of the tank, in addition
    to the unvalved emergency supernatant draw-off pipe.
    High pressure back-wash facilities shall be provided.
    3) Sampling
    Provision shall be made for sampling at each supernatant
    draw-off level. Sampling pipes should be at least 1 1/2
    inches in diameter and should terminate at a suitably sized
    sampling sink or basin.
    4) Supernatant Disposal
    Supernatant return and disposal facilities shall be designed
    to prevent adverse hydraulic and organic effects on plant
    operations. If nutrient removal (e.g., phosphorus, ammonia)
    must be accomplished at a plant, then a separate supernatant
    side stream treatment system should be considered.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.840 Aerobic Sludge Digestion>>
    a) General
    The aerobic sludge digestion system shall include provisions for
    digestion, supernatant separation, sludge concentration and any

    necessary sludge storage. These may be accomplished with separate
    tanks or processes or in digestion tanks.
    b) Multiple Units
    Multiple digestion units capable of independent operation are
    recommended for all plants and shall be provided in those plants
    where the design average flow exceeds 100,000 gallons per day.
    Plants without multiple units shall provide alternate sludge
    handling and disposal methods.
    c) Tank Capacity
    1) The following digestion tank capacities are based on a solids
    concentration of 2 percent with supernatant separation
    performed in a separate tank. If supernatant separation is
    performed in the digestion tank, a minimum of 25 percent
    additional volume is required. These capacities shall be
    provided unless sludge thickening facilities (refer to
    Section 370.820) are utilized to thicken the feed solids
    concentration to greater than 2 percent. If such. thickening
    is provided, the digestion volumes may be decreased
    proportionally.
    Volume (ft.(3)/Population
    <PSludge Source>> <PEquivalent (P.E.))>>
    Waste activated sludge-no
    primary settling 4.5*
    Primary plus waste activated
    sludge 4.0*
    Waste activated sludge
    exclusive of primary sludge 2.0*
    Extended aeration activated
    sludge 3.0
    Primary plus fixed film
    reactor sludges 3.0
    *These volumes apply to waste activated sludge from single stage
    nitrification facilities with less than 24 hours detention time
    based on design average flow.
    2) These volumes are based on digester temperatures of 59
    F
    (15
    C) and a solids retention time of 27 days. Aerobic

    digesters shall be covered to minimize heat loss or these
    volumes shall be increased for colder temperature
    applications. Refer to subsection (g) below for necessary
    sludge storage. Additional volume may be required if the
    land application disposal method is used in order to meet
    applicable Federal regulations.
    d) Mixing
    Aerobic digesters shall be equipped with devices which can
    maintain solids in suspension and which provide complete mixing of
    the digester contents.
    e) Air Requirements
    Sufficient air shall be provided to keep the solids in suspension
    and maintain dissolved oxygen between 1 and 2 milligrams per liter
    (mg/l). For minimum mixing and oxygen requirements, an air supply
    of 30 cfm per 1000 cubic feet of tank volume shall be provided
    with the largest blower out of service. If diffusers are used,
    the nonclog type is recommended, and they should be designed to
    permit continuity of service. If mechanical turbine aerators are
    utilized, at least two turbine aerators per tank shall be provided
    to permit continuity of service. Mechanical aerators are not
    acceptable for use in aerobic digesters due to freezing
    conditions experienced throughout Illinois.
    f) Supernatant Separation and Scum and Grease Removal
    1) Supernatant Separation
    Facilities shall be provided for effective separation or
    decanting of supernatant. Separate facilities are
    recommended; however, supernatant separation may be
    accomplished in the digestion tank if additional volume is
    provided, in accordance with subsection (c) above. The
    supernatant drawoff unit shall be designed to prevent the
    recycle of scum and grease back to plant process units.
    Provision should be made to withdraw supernatant from
    multiple levels of the supernatant withdrawl zone.
    2) Scum and Grease Removal
    Facilities shall be provided for the effective collection of
    scum and grease for final disposal and to prevent recycle
    back to plant process units and prevent long term
    accumulation and potential for discharge of scum and grease
    in the effluent.
    g) High Level Emergency Overflow
    An unvalved high level overflow and any necessary piping shall be
    provided to return digester overflow back to the head of the plant
    or to the aeration process in case of accidental overfilling. The

    design of the overflow shall take into account the length of time
    and rate at which sludge is wasted during periods when the
    treatment plant is unattended, potential effects of overflow on
    plant process units, location of the discharge from the emergency
    overflow, and the potential for discharge of suspended solids in
    the plant effluent.
    h) Digested Sludge Storage Volume
    1) Sludge storage must be provided in accordance with Section
    370.870 to accommodate daily sludge production volumes and
    as an operational buffer for unit outage and adverse weather
    conditions. Designs utilizing increased sludge age in the
    activated sludge system as a means of storage are not
    acceptable.
    2) Liquid sludge storage capacity shall be based on the
    following values unless digested sludge thickening facilities
    are utilized (refer to Section 370.173) to provide solids
    concentrations to greater than 2 percent.
    <PSludge Source>> <PVolume (ft.(3)/P.E./day)>>
    Waste activated sludge-no
    primary settling, primary
    plus waste activated sludge,
    and extended aeration
    activated sludge 0.13
    Waste activated sludge
    exclusive of primary sludge 0.06
    Primary plus fixed film
    reactor sludged 0.10
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.845 High pH Stabilization>>
    a) General
    Alkaline material may be added to liquid primary or secondary
    sludges for sludge stabilization in lieu of digestion facilities,
    to supplement existing digestion facilities, or for interim sludge
    handling. Inasmuch as the high pH stabilization process does not
    reduce organic matter but rather increases the mass of dry sludge
    solids, so that additional volumes of sludge will be generated in
    the absence of supplemental dewatering, the design shall account

    for the increased sludge quantities for storage and handling,
    transportation and disposal methods and associated costs.
    Alkaline material may be added to dewatered sludges for
    stabilization pursuant to Section 370.520(b).
    b) Operational Criteria
    Sufficient alkaline material shall be added to liquid sludge in
    order to produce a homogeneous mixture with a minimum pH of 12
    after 2 hours of vigorous mixing. Facilities for adding
    supplemental alkaline material shall be provided to maintain the
    pH of the sludge during interim sludge storage periods.
    c) Odor Control and Ventilation
    Odor control facilities shall be provided for sludge mixing and
    treated sludge storage tanks that are located within 1/2 mile of
    residential or commercial areas. Indoor sludge mixing, storage
    and processing facilities shall have ventilation that meets the
    ventilation requirements contained in Section 370.410(g)(1-4) and
    (6) and shall comply with the safety precautions contained in
    Section 370.560. Adequate facilities shall be provided to
    condition the exhaust air to meet the applicable substantive and
    permitting requirements of 35 Ill. Adm. Code Subtitle B: Air
    Pollution.
    d) Mixing Tanks and Equipment
    1) Tanks
    Mixing tanks may be designed to operate as either a batch or
    continuous flow process. A minimum of two tanks of adequate
    size to provide a minimum of 2 hours of contact time in each
    tank shall be provided. The following factors shall also be
    taken into account in determining the number and size of
    tanks:
    A) Peak sludge flow rates;
    B) Storage between batches;
    C) Dewatering or thickening performed in tanks;
    D) Repeating sludge treatment due to pH decay of stored
    sludge;
    E) Sludge thickening prior to sludge treatment;
    F) Type of mixing device used and associated maintenance
    and repair requirements.
    2) Equipment
    Mixing equipment shall be designed to provide vigorous
    agitation within the mixing tank, to maintain solids in
    suspension and to provide for a homogenous mixture of the
    sludge solids and alkaline material. Mixing may be
    accomplished by either diffused aeration or mechanical

    mixing. For diffused aeration, an air supply of 30 cfm per
    1000 cubic feet of mixing tank volume with the largest blower
    out of service shall be provided. Nonclogging diffusers
    designed to permit continuity of service should be used.
    Mechanical mixers shall be designed to assure continuity of
    service during freezing weather conditions and shall be
    equipped with impellers designed to minimize fouling from
    debris in the sludge.
    e) Chemical Feed and Storage Equipment
    1) General
    Equipment used for handling or storing alkaline shall be
    designed to provide operator protection from eye and tissue
    damage. Refer to Section 370.560 for proper safety
    precautions. Material storage, slaking and feed equipment
    shall be sealed as airtight as practicable to prevent contact
    of alkaline material with atmospheric carbon dioxide and
    water vapor and to prevent the escape of dust material. All
    equipment and associated transfer lines and piping shall be
    accessible for cleaning.
    2) Feed and Slaking Equipment
    The design of the feeding equipment shall be determined by
    the treatment plant size, type of alkaline material used,
    slaking required and operator requirements. Automated or
    batch equipment may be used. Automated feeders may be
    volumetric or gravimetric, based on accuracy, reliability and
    maintenance requirements. Manually operated batch slaking of
    quicklime (CaO) should be avoided unless protective clothing
    and equipment are provided. At small plants, for safety
    reasons the use of hydrated lime (Ca(OH)[2]) over quicklime
    is recommended. Feed and slaking equipment shall be sized to
    handle a minimum of 150% of the peak sludge flow rate,
    including sludge that may need to be retreated due to pH
    decay. Duplicate units shall be provided.
    3) Chemical Storage Facilities
    Alkaline materials may be received in either bag or bulk
    form. Materials delivered in bags must be stored indoors and
    elevated above floor level. Bags should be multi-walled and
    moisture-proof. Dry bulk storage containers must be as
    airtight as practicable and shall contain a mechanical
    agitation mechanism. Storage facilities shall be sized to
    provide a minimum 30-day supply of alkaline materials.
    Adequate provisions shall be made to meet the applicable
    substantive and permitting requirements of 35 Ill. Adm. Code

    Subtitle B: Air Pollution.
    f) Sludge Storage
    Refer to Section 370.870 for general design considerations for
    sludge storage facilities. The design shall incorporate the
    following considerations for the storage of high pH stabilized
    sludge:
    1) Liquid Sludge
    Liquid high pH stabilized sludge shall be stored in a tank or
    vessel equipped with rapid sludge withdrawl mechanisms for
    sludge disposal or retreatment and may not be stored in a
    lagoon. Provision shall be made for adding alkaline material
    in the storage tank. Mixing equipment meeting the
    requirements of subsection (d)(2) above shall be provided in
    all storage tanks.
    2) Dewatered Sludge
    On-site storage of dewatered high pH stabilized sludge shall
    be limited to 30 days. Provisions shall be made for rapid
    retreatment or disposal of dewatered sludge stored on site in
    case of sludge pH decay.
    3) Off-Site Storage
    There shall be no off-site storage of high pH stabilized
    sludge unless the Agency has issued a permit for off-site
    storage.
    g) Disposal
    Methods and options for immediate sludge disposal should be used
    in order to reduce the on-site sludge inventory and the amount of
    sludge that must be retreated to reduce odors when sludge pH decay
    occurs. Where land application is used, the sludge must be
    incorporated into the soil within 24 hours after application.
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.850 Sludge Pumps and Piping>>
    a) Sludge Pumps
    1) Capacity
    Pump capacities shall be adequate but not excessive.
    Provision for varying pump capacity is desirable. A rational
    basis of design shall be provided with the plan documents.
    2) Duplicate Units
    Duplicate units shall be provided at all installations.
    3) Type
    Plunger pumps, screw feed pumps or other types of pumps with

    demonstrated solids handling capability shall be provided for
    handling raw sludge. Where centrifugal pumps are used, a
    parallel positive displacement pump shall be provided as an
    alternate to pump heavy sludge concentrations, such as
    primary or thickened sludges, that may exceed the pumping
    head of the centrifugal pump.
    4) Minimum Head
    A minimum positive head of 24 inches shall be provided at the
    suction side of centrifugal type pumps and is desirable for
    all types of sludge pumps. Maximum suction lifts should not
    exceed 10 feet for plunger pumps.
    5) Sampling Facilities
    Unless sludge sampling facilities are otherwise provided,
    quick closing sampling valves shall be installed at the
    sludge pumps. The size of valve and piping should be at
    least 1 1/2 inches and terminate at a suitably sized sampling
    sink or floor drain.
    b) Sludge Piping
    1) Size and Head
    Digested sludge withdrawal piping should have a minimum
    diameter of 8 inches for gravity withdrawal and 6 inches for
    pump suction and discharge lines. Where withdrawal is by
    gravity, the available head on the discharge pipe should be
    at least 4 feet and preferably more. Undigested sludge
    withdrawl piping shall be sized in accordance with Section
    370.720(b)(3).
    2) Slope and Flushing Requirements
    Gravity piping should be laid on uniform grade and alignment.
    Slope on gravity discharge piping should not be less than 3
    percent for primary sludges and all sludges thickened to
    greater than 2 percent solids. The slope on gravity
    discharge piping should not be less than 2 percent for
    aerobicly digested sludge or waste activated sludge with less
    than 2 percent solids. Cleanouts shall be provided for all
    gravity sludge piping. Provisions shall be made for draining
    and flushing discharge lines. All sludge pipe shall be
    suitably located or otherwise adequately protected to prevent
    freezing.
    3) Supports
    Special consideration shall be given to the corrosion
    resistance and permanence of supporting systems for piping
    located inside the digestion tank.

    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.860 Sludge Dewatering>>
    a) General
    On-site sludge dewatering facilities shall be provided for all
    plants, although the following requirements may be reduced or
    omitted, if justified, with on-site liquid sludge storage
    facilities or approved off-site sludge disposal.
    1) Anaerobic Digestion Sludge Production
    For purposes of calculating sludge handling and disposal
    needs, sludge production values from a two-stage anaerobic
    digestion process shall be based on a maximum solids
    concentration of 5% without additional thickening. The
    solids production values, calculated on a dry weight basis,
    shall be based on the following values for the listed
    processes:
    A) Primary plus waste activated sludge--at least 0.12
    lbs/P.E./day;
    B) Primary plus fixed film reactor sludge--at least 0.09
    lbs/P.E./day.
    2) Aerobic Digestion Sludge Production
    For purposes of calculating sludge handling and disposal
    needs, sludge production values from an aerobic digester
    shall be based on a maximum solids concentration of 2%
    without additional thickening. The solids production
    values, calculated on a dry weight basis, shall be based on
    the following values for the listed processes:
    A) Primary plus waste activated sludge--at least 0.16
    lbs/P.E./day;
    B) Primary plus fixed film reactor sludge--at least 0.12
    lbs/P.E./day.
    3) Production from Other Sludge Treatment Processes
    For purposes of calculating sludge handling and disposal
    needs, sludge production values from other sludge treatment
    processes shall be determined by rational calculations in the
    basis of design. Refer to Section 370.520(b) for any new
    process determinations.
    b) Sludge Drying Beds
    1) Applicability
    Sludge drying beds may be used for dewatering well digested
    sludge from either the anaerobic or aerobic process. Due to
    the large volume of sludge produced by the aerobic digestion

    process, consideration should be given to using a combination
    of dewatering systems or other means of ultimate sludge
    disposal.
    2) Unit Sizing
    Sludge drying bed area shall be calculated on a rational
    basis with the following items taken into account:
    A) The volume of wet sludge produced by existing and
    proposed processes.
    B) Depth of wet sludge drawn to the drying beds. For
    design calculations purposes a maximum depth of 8 inches
    shall be utilized. For operational purposes, the depth
    of sludge placed on the drying bed may vary from the
    design depth based on the solids content and the type of
    digestion used.
    C) Total digester volume and other wet sludge storage
    facilities.
    D) Degree of sludge thickening provided after digestion.
    E) The maximum drawing depth of sludge which can be removed
    from the digester or other sludge storage facilities
    without causing process or structural problems.
    F) The time required on the bed to produce a removable
    cake. Adequate provision shall be made for sludge
    dewatering and/or sludge disposal facilities for those
    periods of time during which outside drying of sludge on
    beds is hindered by weather. For Illinois that season
    is considered to extend from early November through at
    least April.
    G) Capacities of auxiliary dewatering facilities.
    3) Percolation Type Bed Components
    A) Gravel
    The lower course of gravel around the underdrains should
    be properly graded and should be 12 inches in depth,
    extending at least 6 inches above the top of the
    underdrains. It is desirable to place this in 2 or more
    layers. The top layer of at least 3 inches should
    consist of gravel 1/8 inch to 1/4 inch in size.
    B) Sand
    The top course should consist of at least 6 to 9 inches
    of clean, washed, coarse sand. The effective size of
    the sand should be in the range of 0.8 to 1.5
    millimeters. The finished sand surface should be level.
    C) Underdrains
    Underdrains should be at least 4 inches in diameter laid

    with open joints. Perforated pipe may also be used.
    Underdrains should be spaced not more than 20 feet
    apart. Various pipe materials may be used, so long as
    they are sufficiently strong and are corrosion
    resistant.
    D) Additional Dewatering Provisions
    Consideration shall be given to providing a means of
    decanting the supernatant of sludge placed on the sludge
    drying beds. More effective decanting of supernatant
    may be accomplished with polymer treatment of the
    sludge.
    4) Walls
    Walls should be water-tight and extend 18 inches above and at
    least 6 inches below the surface of the bed. Outer walls
    should be curbed or extended at least 4 inches above the
    outside grade elevation to prevent soil from washing on to
    the beds.
    5) Sludge Removal
    Each bed shall be constructed so as to be readily and
    completely accessible to mechanical cleaning equipment.
    Concrete runways spaced to accommodate mechanical equipment
    shall be provided. Special attention should be given to
    assure adequate access to the areas adjacent to the
    sidewalls. Entrance ramps down to the level of the sand bed
    shall be provided. These ramps shall be high enough to
    eliminate the need for an entrance end wall for the sludge
    bed.
    c) Sludge Lagoons for Dewatering
    1) General
    Lagoons as a means of dewatering digested sludge will be
    permitted only upon proof that the character of the digested
    sludge and the design mode of operation are such that
    offensive odors will not result. Where sludge lagoons are
    permitted, adequate provisions shall be made for other sludge
    dewatering facilities or sludge disposal in the event of
    upset or failure of the sludge digestion process.
    2) Location
    Sludge lagoons shall be located as far as practicable from
    inhabited areas or areas likely to be inhabited during the
    lifetime of the structures.
    3) Seal
    Adequate provisions shall be made to seal the lagoon bottoms
    and embankments to prevent leaching into adjacent soils or

    groundwater. Refer to Section 370.930(d)(1)(A), (d)(2)(C)
    and (d)(2)(D).
    4) Access
    Provisions shall be made for sludge pumping or heavy
    equipment access for sludge removal from the lagoon.
    d) Mechanical Dewatering Facilities
    1) General
    Provision shall be made to maintain sufficient continuity of
    service so that sludge may be dewatered without accumulation
    beyond storage capacity. The number of vacuum filters,
    centrifuges, filter presses, belt filters, or other
    mechanical dewatering facilities should be sufficient to
    dewater the sludge produced with the largest unit out of
    service. Unless other standby wet sludge facilities are
    available, adequate storage facilities of at least 4 days
    production volume shall be provided. Documentation must be
    submitted justifying the basis of design of mechanical
    dewatering facilities.
    2) Water Supply Protection
    The water supply for mechanical dewatering facilities shall
    meet the requirements of Section 370.550(b).
    3) Auxiliary Facilities for Vacuum Filters
    Back-up vacuum and filtrate pumps shall be provided. It is
    permissible to have uninstalled back-up vacuum and filtrate
    pumps for every three or less vacuum filters, provided that
    the installed units can easily be removed and replaced. At
    least one filter media replacement unit shall be provided.
    4) Ventilation
    Adequate facilities shall be provided for ventilation of the
    dewatering area. The exhaust air should be properly
    conditioned to avoid odor nuisance. Ventilation shall be
    provided in accordance with Section 370.410(g)(6).
    5) Chemical Handling Enclosures
    Lime-mixing facilities should be completely enclosed to
    prevent the escape of lime dust. Chemical handling equipment
    should be automated to eliminate the manual lifting
    requirement. Refer to Section 370.560.
    e) Drainage and Filtrate Disposal
    Drainage from beds or filtrate dewatering units shall be returned
    to the sewage treatment process at appropriate points and rates.
    f) Other Dewatering Facilities
    If it is proposed to dewater sludge by other methods, a detailed
    description of the process and design data shall accompany the

    plans. Refer to Section 370.520(b) for any new process
    determinations.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.870 Sludge Storage and Disposal>>
    a) Storage
    1) General
    Sludge storage facilities shall be provided at all mechanical
    treatment plants, and may consist of any combination of
    drying beds, lagoons, separate tanks, additional volume in
    stabilization units, pad areas or other means to store either
    liquid or dried sludge. Drainage of supernatant from sludge
    storage facilities shall be returned to the sewage treatment
    process at appropriate points and rates. Refer to Section
    370.860(b) and (c) for drying bed and lagoon design criteria,
    respectively.
    2) Volume
    Rational calculations justifying the number of days of
    storage based on the total sludge handling and disposal
    system shall be submitted. Refer to Sections 370.840(g) and
    370.860(a) for anaerobicly and aerobicly digested sludge
    production values; values for other stabilization processes
    shall be justified on the basis of design. If land
    application is the only means of sludge disposal used at a
    treatment plant, a minimum of 150 days storage shall be
    provided, in order to account for inclement weather and
    cropping practices.
    b) Disposal
    1) Landfilling
    Sludge and sludge residues may be disposed of in Agency
    approved municipal solid waste landfill units under the terms
    and conditions of permits issued by the Agency's Bureau of
    Land. On-site landfilling shall be conducted in conformance
    with the design recommendations of the Bureau of Land and
    must be approved by the Agency's Bureau of Water.
    2) Land Application
    Specific design criteria for land application of sludge are
    set out in Design Criteria for Sludge Application on Land, 35
    Ill. Adm. Code 391. Additional operating criteria may be
    obtained from applicable Federal regulations. In order to
    assure compliance with the facility's effluent standards,
    alternative sludge disposal options to account for inclement

    weather and cropping practices are recommended.
    3) Sludge Lagoons
    The use of lagoons for ultimate disposal of sludge is not
    recommended because of odor potential, area and volume
    required and possible long term problems from groundwater
    contamination. If a lagoon is proposed, a hydrogeologic
    survey must be performed to demonstrate the appropriateness
    of a disposal lagoon at the particular site. A groundwater
    monitoring program must be included in any sludge lagoon
    design. Refer to Section 370.860(c) for lagoon design
    criteria.
    4) Other Disposal Methods
    A detailed description of the technique and design data shall
    accompany the plans of any proposal to dispose of sludge by
    methods other than those specified in this Section. Refer to
    Section 370.520(b) for any new process determinations.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART I: BIOLOGICAL TREATMENT
    <BSection 370.900 Trickling Filters>>
    a) General
    1) Applicability
    Trickling filters may be used for treatment of sewage
    amenable to treatment by aerobic biologic processes.
    Trickling filters shall be preceded by settling tanks
    equipped with scum and grease collecting devices, or other
    suitable pretreatment facilities.
    2) Design Basis
    Filters shall be designed so as to provide the required
    reduction in biochemical oxygen demand, ammonia nitrogen, or
    to properly condition the sewage for subsequent treatment
    processes.
    3) Multiple Units
    Multiple trickling filter units capable of independent
    operation are recommended for all plants and must be provided
    for those plants where the design average flow exceeds
    100,000 gallons per day. Plants not having multiple units
    shall include other provisions to assure continuity of
    treatment.

    b) Dosing Equipment
    1) Distribution
    A) All hydraulic factors involving proper distribution of
    sewage on the filter should be carefully calculated and
    submitted with the basis of design.
    B) The sewage may be distributed over the filter by rotary
    distributors or other suitable devices which will permit
    reasonably uniform distribution to the surface area. At
    design average flow, the deviation from calculated
    uniformly distributed volume per square foot of the
    filter surface shall not exceed plus or minus 10
    percent at any point.
    2) Dosing and Recirculation
    A) Sewage may be applied to the filters by siphons, pumps
    or by gravity discharge from preceding treatment units
    when suitable flow characteristics have been developed.
    Application of the sewage should be continuous except
    for low rate filters. A hydraulic system for
    recirculation shall be provided for new facilities and
    should be considered where existing trickling filter
    units are included in treatment plant upgrading.
    B) The piping system, including dosing equipment and
    distributor, shall be designed to provide capacity for
    the peak hourly flow rate including recirculation rates
    determined under subsection (h).
    3) Distributor Head Requirements
    For reaction type distributors, a minimum head of 24 inches
    between low water level in siphon chamber and center of arms
    is required. Similar allowances shall be made in design for
    added pumping head requirements where pumping to the reaction
    type distributor is used. The design shall include the head
    required at the center column for the full range of flows,
    taking into account all head losses from the center column
    back to the dosing facility at all water levels.
    Calculations shall be submitted to justify the basis of
    design.
    4) Clearance
    A minimum clearance of 6 inches between media and distributor
    arms shall be provided. Refer to subsection (e)(4).
    c) Media
    1) Quality
    The media may be crushed rock, slag or specially manufactured
    material. The media shall be durable, resistant to spalling

    or flaking, and be relatively insoluble in sewage. The top
    18 inches shall have a loss by the 20-cycle, sodium sulfate
    soundness test of not more than 10 percent, as prescribed by
    ASCE Manual of Engineering Practice, Number 13, the balance
    to pass a 10-cycle test using the same criteria. Slag media
    shall be free from iron. Manufactured media shall be
    resistant to ultraviolet degradation, disintegration,
    erosion, aging, all common acid and alkalies, organic
    compounds, and fungus and other biological attack. Such
    media shall be structurally capable of supporting a man's
    weight or a suitable access walkway shall be provided to
    allow for distributor maintenance.
    2) Depth
    The filter media shall have a minimum depth of 6 feet above
    the underdrains. For rock media filters (subsection
    (c)(3)(A)), only the top 7 feet of the volume of the filter
    shall be considered in BOD removal credit computations. For
    manufactured media filters see subsection (c)(3)(B).
    3) Size and Grading of Media
    A) Rock, Slag and Similar Media
    i) Rock, slag and similar media shall not contain more
    than 5 percent by weight of pieces whose longest
    dimension is 3 times the least dimension.
    ii) Media shall be free from thin elongated and flat
    pieces, dust, clay, sand, or fine material and
    shall conform to the following size and grading
    when mechanically graded over vibrating screen with
    square openings:
    Passing 4 1/2 inch screen - 100% by weight
    Retained on 3 inch screen - 95-100% by weight
    Passing 2 inch screen - 0-2% by weight
    Passing 1 inch screen - 0-1% by weight
    B) Manufactured Media
    Suitability of size, space, media configuration and
    depth will be evaluated on the basis of experience with
    installations handling similar wastes and loadings. To
    ensure sufficient void clearance, media with a specific
    surface area of no more than 30 square feet per cubic
    foot may be used for filters employed for carbonaceous
    reduction, and media with a specific surface area of no
    more than 45 square feet per cubic foot may be used for
    second stage ammonia reduction. See subsection (c)(1)
    for quality requirements.

    4) Handling and Placing of Media
    A) Material delivered to the filter site shall be stored on
    wood planks or other approved clean hard surfaced areas.
    B) All material shall be rehandled at the filter site and
    no material shall be dumped directly into the filter.
    Crushed rock, slag and similar media shall be rescreened
    or forked at the filter site to remove all fines.
    C) The material shall be placed by hand to a depth of 12
    inches above the tile underdrains and all material shall
    be carefully placed so as not to damage the underdrains.
    The remainder of the material may be placed by means of
    belt conveyors or equally effective methods approved by
    the engineer.
    D) Manufactured media shall be handled and placed as
    recommended by the manufacturer and approved by the
    engineer.
    E) Trucks, tractors, or other heavy equipment shall not be
    driven over the filter during or after construction.
    d) Underdrainage System
    1) Arrangement
    Underdrains with semi-circular inverts or equivalent should
    be provided and the underdrainage system shall cover the
    entire floor of the filter. Inlet openings into the
    underdrains shall have an unsubmerged gross combined area
    equal to at least 15 percent of the surface area of the
    filter.
    2) Slope
    The underdrains shall have a minimum slope of 1 percent.
    Effluent channels shall be designed to produce a minimum
    velocity of 2 feet per second at design average flow of
    application to the filter and shall have adequate capacity
    for the peak hourly flow rate including the required
    recirculation flows.
    3) Flushing
    Provision should be made for flushing the underdrains. In
    small filters, use of a peripheral head channel with vertical
    vents is acceptable for flushing purposes. Inspection
    facilities should be provided.
    4) Ventilation Requirements for Underdrains
    The underdrainage system, effluent channels, and effluent
    pipe should be designed to permit free passage of air. The
    size of drains, channels, and pipe should be such that not
    more than 50 percent of their cross-sectional area will be

    submerged under the design hydraulic loading. Consideration
    should be given in the design of the effluent channels to the
    possibility of increased hydraulic loading.
    e) Special Features
    1) Flooding
    Provision shall be made in the design of conventional rock
    filter structures so that the media may be flooded.
    2) Maintenance
    All distribution devices, underdrains, channels and pipes
    shall be designed so that they may be properly maintained,
    flushed or drained.
    3) Flow Measurement
    Devices shall be provided to permit measurement of flow to
    the filter, and of recirculated flows.
    4) Protection From Freezing
    Trickling filters shall be covered to protect from freezing,
    and to maintain operation and treatment efficiencies. The
    filter cover shall be constructed of appropriate corrosion
    resistant materials and designed to allow operator access for
    maintenance, repair and replacement of the filter dosing
    equipment.
    5) Ventilation of Covered Filters
    Forced ventilation shall be provided for covered trickling
    filters to insure adequate oxygen for process requirements.
    Windows or simple louvered mechanisms so arranged to insure
    air distribution throughout the enclosure shall be provided.
    The ventilation facilities shall be designed to allow
    operator control of air flow in accordance with outside
    temperature. Design computations showing the adequacy of air
    flow to satisfy process oxygen requirements shall be
    submitted.
    f) Two-Stage Filters
    The foregoing standards also apply to second stage filters.
    g) Special Applications
    1) Roughing Filters
    In some instances it is desirable to partially reduce the
    organic strength of wastewaters. In such cases trickling
    filters may be used for roughing treatment. Design
    parameters and contaminant removal efficiencies will be
    approved on a case-by-case basis. Refer to subsections
    (h)(2) and (h)(3).
    2) Nitrifying Filters
    Trickling filters may, under favorable conditions, be used as

    nitrification devices. Design parameters and contaminant
    removal efficiencies will be approved on a case-by-case
    basis. Refer to Section 370.1210(d).
    h) Efficiency
    1) Single Stage, Settling Tank -- No Recirculation
    Expected reduction of BOD of settled normal domestic
    wastewater by a single stage filter, packed with crushed
    rock, slag or similar material and with subsequent settling,
    shall be determined from Appendix F, Figure No. 3. In
    developing this curve, loading due to recirculated sewage
    has not been considered.
    2) Single or Multi-Stage, Settling Tank -- Recirculation
    Expected BOD removal efficiencies may also be determined by
    theoretical and empirical formula if accompanied by detailed
    explanation, particularly for roughing filters and for
    filters with recirculation. (Refer to WEF Manual of Practice
    (MOP) No. 8, "Design of Municipal Wastewater Treatment
    Plants", vol. 1 (1992).)
    3) Single or Multi-Stage, No Settling Tank -- Recirculation
    Filters not followed by a settling tank and discharging into
    a subsequent treatment process shall not be credited with BOD
    removal efficiencies as in subsections (h)(1) and (h)(2)
    above. Expected performance in such cases, including filters
    packed with manufactured media, shall be determined from
    prototype testing and full-scale plant experience.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.910 Rotating Biological Contactors>> <B(Repealed)>>
    (Source: Repealed at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.915 Rotating Biological Contactors>>
    a) General
    Wastewater treatment facilities that propose to use rotating
    biological contactors (RBCs) shall submit to the Agency for review
    field experience and operational data that demonstrates that
    observed problems with the process have been solved at similar
    full scale installations. The Agency will review the claimed
    field experience against known field conditions and the
    operational history of observed problems at similar facilities.
    b) Mechanical Reliability and Structural Integrity

    1) The mechanical and structural reliability of the shafts and
    media subjected to cyclic stress reversals must be
    demonstrated relative to the design life of the plant and the
    known weight of the machines based on field experience.
    2) The design must show that film thickness will be effectively
    controlled throughout all parts of the media pack to prevent
    excessive film weight and water pickup weight due to plugging
    restrictions. The equipment design must include load cells
    to warn of the need for film thickness control and to
    demonstrate the effectiveness of the proposed film thickness
    control practices.
    c) Process Reliability
    1) Process reliability must be demonstrated, including proven
    operational control procedures relative to design organic
    loadings for the unit media area or volume, which
    satisfactorily insure that the applicable effluent standards
    are met. The process design shall also include proven
    operational control procedures that will prevent process
    functional deficiencies and media plugging that cause the
    weight to exceed shaft and media structural capabilities
    during the design life of the plant.
    2) The design must show that adequate void clearance (as
    distinguished from void ratio) is provided to insure that the
    biological film, including any grease and fats that may
    accumulate, will not interefere with the flow of liquid and
    air in the media pack. The Agency will compare the RBC
    designs under review to past experience with designs used for
    plastic trickling filter media to accomplish adequate void
    clearance.
    3) The design shall provide for maintaining a minimum of 2.0
    mg/l dissolved oxygen in the basin liquor. The effectiveness
    of the proposed method for maintaining adequate dissolved
    oxygen will be evaluated based on field experience at similar
    full scale installations.
    4) If pilot testing is proposed, the size of the RBC pilot plant
    unit and the scope and duration of the testing program on the
    specific waste that will be treated must be thoroughly
    documented. The proposed pilot testing program should be
    submitted to the Agency for comment prior to the initiation
    of testing. The RBC pilot units must be of prototype scale.
    Because of differential seasonal weight and plugging field
    problems, the test period must cover the four seasons, to
    allow the Agency to evaluate the proposed design against the

    experience of existing full scale plants.
    5) The process design must include provisions for meeting
    applicable effluent limits with some units out of service for
    unit repair, biofilm thickness control, out-of-balance
    correction and other operational problems. Added units for
    standby credit will be required to insure compliance with
    effluent limitations and to prevent mechanical or structural
    failures during periods of unit outage for maintenance,
    repair, or process control purposes.
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.920 Activated Sludge>>
    a) General
    1) Applicability
    A) Biodegradable Wastes
    The activated sludge process, and its various
    modifications, may be used to treat wastewater which is
    amenable to biological treatment. Approval of new
    activated sludge plants shall be limited to those plants
    where the design average flow capacity exceeds 0.25 mgd.
    B) Operation Control Requirements
    The activated sludge process requires close attention
    and competent operating supervision. Facilities and
    appurtenances for routine control and control tests
    shall be provided at all activated sludge plants.
    These requirements shall be considered when proposing
    this type of treatment.
    C) Energy Requirements
    This process requires major energy usage to meet
    aeration demands. Energy costs and potential mandatory
    emergency public power reduction events, in relation to
    critical water quality conditions, must be carefully
    evaluated. Capability of energy usage phasedown while
    still maintaining process viability, both under normal
    and emergency energy availability conditions, must be
    included in the activated sludge design.
    2) Specific Process Selection
    The activated sludge process and its several modifications
    may be employed to accomplish varied degrees of removal of
    suspended solids and reduction of 5-day BOD and nitrogenous
    oxygen demand. Choice of the process most applicable will be

    influenced by the proposed plant size, type of waste to be
    treated, treatability of waste, degree and consistency of
    treatment required and local factors. All designs shall
    provide for flexibility in operation. All plants shall be
    designed to operate in at least two modes.
    3) Winter Protection
    Units shall be protected against freezing. Maximum
    utilization of earthen bank insulation shall be considered.
    4) Process Efficiency
    The activated sludge process designed within the organic and
    hydraulic loading limits of these standards, treating normal
    domestic wastewaters unaffected by surge loadings, long term
    peak flows, or industrial wastes, may be expected to meet an
    effluent standard of 20 mg/l CBOD[5] or BOD[5] and 25 mg/l
    suspended solids when computed on a 30-day monthly average
    basis. Those installations which are anticipated to be
    subject to surge loadings, long term peak flows or
    industrial wastes shall have appropriate design
    modifications in order to assure consistent effluent
    quality.
    b) Preliminary Treatment
    Effective removal of grit, debris, excessive oil and grease and
    screening of solids shall be accomplished prior to the activated
    sludge process. Where primary settling does not precede the
    activated sludge process, screening with 1/2 inch or smaller clear
    opening is recommended in order to prevent plugging of return
    sludge piping and pumps.
    c) Primary Treatment Bypass
    When primary settling is used, provision shall also be made for
    discharging raw sewage directly to the aeration tanks following
    preliminary treatment.
    d) Process Organic Loadings
    The aeration tank capacities and permissible loadings for the
    several adaptations of the processes shown in the table shall be
    used.
    Permissible Organic Loading
    For The Activated Sludge Processes
    For Normal Domestic Sewage*
    Aeration Tank
    Organic Loading,
    Process Mode Plant Design lbs BOD[5]/day/
    Average Flow 1000 cu. ft.

    _______________________________________________________________
    Conventional, Less than 1 mgd
    Complete Mix, Contact 35
    Stabilization,**
    Step Aeration,
    Tapered Aeration
    1 mgd or greater 50
    _______________________________________________________________
    Extended Aeration 15***
    Single Stage Nitrification
    _______________________________________________________________
    * Where significant industrial wastes will be tributary to the
    process, design modification shall be made as required by
    subsection (a)(4), to assure compliance with effluent standards.
    ** Total aeration capacity includes both contact and reaeration
    capacities.
    *** Detention time at Design Average Flow for extended aeration shall
    be 24 hours. This requirement may govern tank capacity. Detention
    time for single stage activated sludge for nitrification is
    governed by Section 370.1210(c)(3)(B).
    e) Aeration Tanks
    1) Multiple Units
    Multiple tanks shall be provided. Tanks shall be designed so
    that each tank may be dewatered and operated independently.
    2) Tank Geometry
    The dimensions of each independent mixed liquor aeration tank
    or return sludge reaeration tank shall be such as to
    maintain effective mixing and utilization of air. Liquid
    depths should not be less than 10 feet. The shape of the
    tank, the location of the inlet and outlet and the
    installation of aeration equipment shall provide for
    positive control of short-circuiting through the tank.
    3) Freeboard
    All aeration tanks shall have a freeboard of not less than 18
    inches. Greater heights are desirable. Suitable water spray
    systems or other approved means of froth and foam control
    shall be provided if foaming is anticipated.
    4) Inlet and Outlet Control
    Inlets and outlets for each aeration tank unit shall be
    suitably equipped with valves, gates, stop plates, weirs, or

    other devices to permit balancing, proportioning, and
    measuring the flow to and from any unit and to maintain
    reasonably constant liquid level. The hydraulic elements of
    the system shall permit the design peak flow to be carried
    with any single aeration tank out of service.
    5) Conduits
    Channels and pipes carrying liquids with solids in suspension
    shall be designed to maintain self-cleansing velocities or
    shall be agitated to keep such solids in suspension at all
    design rates of flow. Adequate provisions should be made to
    drain segments of channels which are not being used due to
    alternate flow patterns.
    f) Aeration Equipment
    1) General
    A) Aeration requirements depend upon mixing energy, BOD
    loading, degree of treatment, oxygen uptake rate, mixed
    liquor suspended solids concentration and sludge age.
    Aeration equipment shall be capable of maintaining a
    dissolved oxygen concentration of 2.0 mg/1 in the
    aeration tanks under all design loads. Energy transfer
    shall be sufficient to maintain the mixed liquor solids
    in suspension.
    B) In the case of nitrification, the oxygen requirement for
    oxidizing ammonia must be added to the above requirement
    for carbonaceous BOD removal. The nitrogen oxygen
    demand (NOD) shall be taken as 4.6 times the diurnal
    peak ammonia (as nitrogen) content of the influent. In
    addition, the oxygen demands due to recycle flows such
    as sludge processing, return from excess flow first
    flush storage and other similar flows, must be taken
    into account due to the high concentrations of BOD and
    ammonia associated with such flows.
    C) Careful consideration should be given to maximizing
    oxygen utilization per unit power input. Unless flow
    equalization is provided, the aeration system should be
    designed to match the diurnal organic load variation
    while economizing on power input.
    2) Diffused Air Systems
    A) Except as noted in subsection (f)(2)(B) below, normal
    aeration tank air requirements shall be based upon a
    design figure of 1,500 cu. ft. of air supplied/lb. of
    BOD[5] applied to the aeration tanks. This design
    figure assumes that the equipment is capable of

    transferring 1.0 lb. of oxygen to the aeration tank
    contents/lb. of BOD[5] applied to the aeration tank. For
    the extended aeration process, air requirements shall
    be based on a design figure of 2250 cu. ft. of air
    supplied per lb. of BOD[5] applied to the aeration tanks
    to account for oxygen demand for endogenous respiration
    and ammonia (as nitrogen) for normal strength waste.
    Refer to Section 370.1210(c) for nitrification
    requirements.
    B) Air requirements may be determined based upon
    transferring 1.0 lb. oxygen/lb. of applied oxygen
    demand, as determined by subsection (f)(1) above, using
    standard equations incorporating the factors listed
    below. When using this design technique, the field
    oxygen transfer efficiency of the equipment shall be
    included in the specifications, and the detailed design
    computations shall be contained in the basis of design:
    i) Tank depth;
    ii) Alpha factor of the waste;
    iii) Beta factor of the waste;
    iv) Documented aeration device transfer efficiency;
    v) Minimum aeration tank dissolved oxygen
    concentrations;
    vi) Critical wastewater temperature;
    vii) Plant altitude.
    C) In the absence of experimentally determined alpha and
    beta factors for the design described in subsection
    (f)(2)(B) above, wastewater transfer efficiency shall be
    assumed to be no more than 50% of clean water efficiency
    for plants treating primarily (90% or greater) domestic
    sewage. Treatment plants whose waste contains higher
    percentages of industrial wastes shall use a
    correspondingly lower percentage of clean water
    efficiency and shall submit calculations to justify such
    a percentage. The design wastewater oxygen transfer
    efficiency of the equipment shall be included in the
    specifications.
    D) The specified capacity of blowers or air compressors,
    particularly centrifugal blowers, should take into
    account that the air intake temperature may reach 115
    F or higher and the pressure may be less than normal.
    The specified capacity of the motor drive should also
    take into account that the intake air may be -20
    F or

    less and may require oversizing of the motor or a means
    of reducing the rate of air delivery to prevent
    overheating or damage to the motor.
    E) The blowers shall be provided in multiple units, so
    arranged and in such capacities as to meet the maximum
    total air demand with the single largest unit out of
    service. The design shall also provide for varying the
    volume of air delivered in proportion to the load demand
    of the plant.
    F) The air diffusion piping shall be capable of delivering
    200 percent of the design air requirements. Air piping
    systems should be designed such that the friction head
    loss from the blower outlet (or silencer outlet where
    used) to the diffuser inlet does not exceed 0.5 psi at
    100 percent of design air requirements at average
    operating conditions for temperature and pressure.
    G) The spacing of diffusers should be in accordance with
    the oxygenation requirements through the length of the
    channel or tank, and should be designed to facilitate
    adjustments of their spacing without major revision to
    air header piping. Diffusers in any single assembly
    shall have substantially uniform pressure loss.
    H) Individual assembly units of diffusers shall be equipped
    with control valves, preferably with indicator markings
    for throttling and for complete shut off. The
    arrangement of diffusers shall also permit their
    removal for inspection, maintenance and replacement
    without dewatering the tank and without shutting off the
    air supply in the tank, unless the dewatered aeration
    basins are no more than 25% of the total aeration basin
    capacity. Total aeration basin capacity shall include
    the basins in both stages of a two-stage activated
    sludge process.
    I) Air filters shall be provided in numbers, arrangement,
    and capacities to furnish at all times an air supply
    sufficiently free from dust to prevent clogging of the
    diffuser system used.
    3) Mechanical Aeration Systems
    A) Oxygen requirements shall be determined in accordance
    with subsections (f)(2)(B) and (f)(2)(C) above.
    B) The mechanism and drive unit shall be designed for the
    expected conditions in the aeration tank in terms of
    the power performance. Certified testing shall verify

    mechanical aerator performance. The design field oxygen
    transfer efficiency of the equipment shall be included
    in the specifications, and the detailed design
    computations shall be contained in the basis of design.
    C) The mechanical aerators shall be provided in multiple
    units, so arranged and in such capacities as to maintain
    all biological solids in suspension, meet maximum oxygen
    demand and maintain process performance with the largest
    unit out of service. Provision shall be made for varying
    the amount of oxygen transferred in proportion to the
    load demand on the plant.
    D) Due to high heat loss, the mechanism as well as
    subsequent treatment units shall be protected from
    freezing.
    E) Motors, gear housing, bearings and grease fittings shall
    be easily accessible and protected from inundation and
    spray as necessary for proper functioning of the unit.
    g) Return Sludge Equipment
    1) Return Sludge Rate
    The rate of sludge return, expressed as a percentage of
    design average flow of sewage, shall be variable between
    limits of 15 and 100 percent.
    2) Return Sludge Pumps
    A) If motor driven return sludge pumps are used, the
    maximum return sludge capacity shall be obtained with
    the largest pump out of service. The rate of sludge
    return shall be varied by such means as variable speed
    motors or drives, multiple constant speed pumps, or
    telescoping valves. A positive head should be provided
    on pump suctions. Pumps shall be capable of passing
    spheres of at least 3 inches in diameter. Pump suction
    and discharge openings shall be at least 4 inches in
    diameter.
    B) If air lift pumps are used for returning sludge from
    each settling tank, no standby unit shall be required
    provided that the design of the air lifts is such as to
    facilitate their rapid and easy cleaning. Air lifts
    should be at least 3 inches in diameter and provided
    with adjustable air valving to permit flow control in
    accordance with subsection (g)(1) above.
    3) Return Sludge Piping
    Suction and discharge piping should be at least 4 inches in
    diameter and should be designed to maintain a velocity of not

    less than 2 feet per second when return sludge facilities
    are operating at normal return sludge rates. Suitable
    devices for observing, measuring, sampling and controlling
    return activated sludge flow from each settling tank shall
    be provided.
    4) Waste Sludge Control
    Waste sludge control facilities should have a maximum
    capacity of not less than 25 percent of the average rate of
    sewage flow and function satisfactorily at rates of 0.5
    percent of average sewage flow. Means for observing,
    measuring, sampling and controlling waste activated sludge
    flow shall be provided. Waste sludge may be discharged to
    the primary settling tank, concentrator or thickening tank,
    sludge digestion tank, vacuum filters, or any practical
    combination of these units. Refer to Sections 370.820 and
    370.710(b)(1)(A).
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.930 Waste Stabilization Ponds and Aerated Lagoons>>
    a) Supplement To Engineer's Report
    1) The engineer's report shall contain pertinent information on
    location, geology, soil conditions, area for expansion, and
    any other factors that will affect the feasibility and
    acceptability of the proposed treatment.
    2) Supplementary Field Survey Data
    The following information must be submitted in addition to
    that required in Section 370.111:
    A) The location and direction of all residences, commercial
    development, and water supplies within 1/2 mile of the
    proposed pond.
    B) Soil borings to determine surface and subsurface soil
    characteristics of the immediate area and their effect
    on the construction and operation of a pond located on
    the site.
    C) Data demonstrating anticipated percolation rates at the
    elevation of the proposed pond bottom.
    D) A description, including maps showing elevations and
    contours of the site and adjacent area suitable for
    expansion.
    E) Sulfate content of the water supply.
    F) Identification of the location, depth and discharge

    point of any field tile in the immediate area of the
    proposed site.
    b) Location
    1) Distance From Habitation
    A pond site should be as far as practicable from habitation
    or any area which may be built up within a reasonable future
    period.
    2) Prevailing Winds
    If practicable, ponds should be located so that local
    prevailing winds will be in the direction of uninhabited
    areas. Preference should be given sites which will permit an
    unobstructed wind sweep across the ponds, especially in the
    direction of the local prevailing winds.
    3) Surface Runoff
    Adequate provisions shall be made to divert storm water
    around the ponds and otherwise protect pond embankments.
    4) Ground Water Contamination
    The requirements of the Illinois Groundwater Protection Act
    [415 ILCS 55] shall be taken into account in the siting of
    ponds. Ponds should not be located proximate to water
    supplies and other facilities subject to contamination or
    located in areas of porous soils and fissured rock
    formations. If conditions dictate using such a site, then
    the potential for and the means necessary to combat
    groundwater contamination shall be critically evaluated in
    the engineer's report. In such locations, the Agency will
    require groundwater monitoring wells.
    5) Geology
    Ponds shall not be located in areas subject to sink holes and
    mine subsidence. Soil borings and tests to determine the
    characteristics of surface soil and subsoil shall be made a
    part of preliminary pond site selection surveys. Gravel and
    limestone areas should be avoided; however, where conditions
    dictate locating ponds in such areas and the minimum
    separation between the pond bottom and gravel or limestone
    will be less than 10 feet, the Agency shall be contacted
    about the necessary precautions.
    c) Basis Of Design
    1) Organic Loading
    A) Waste Stabilization Ponds
    The organic loading on each cell shall not exceed the
    loadings listed below. If more accurate design
    information for the particular type waste is not

    submitted and supported by the engineer, subsequent
    cells shall be sized for an organic loading of 25% of
    each preceding cell.
    i) North of Illinois Highway 116 (Pontiac) 22 lbs.
    BOD per acre per day.
    ii) Between Illinois Highway 116 and U.S. Highway 50,
    26 lbs. BOD per acre per day.
    iii) South of U.S. Highway 50 (Salem-Carlyle) 30 lbs.
    BOD per acre per day.
    B) Aerated Lagoons
    The organic loading for aerated lagoons shall not exceed
    0.5 lb. BOD[5] day per 1,000 cu. ft. first cell nor 0.3
    lb. BOD[5] day per 1,000 cu. ft. on any subsequent
    cells. If more accurate design information for the
    particular type waste is not submitted and supported by
    the engineer, the second and third cells shall be sized
    for an organic loading of 25% of each preceding cell.
    2) Depth
    A) Waste Stabilization Ponds
    The minimum operating liquid depth for waste
    stabilization ponds should be 2 feet. The maximum
    operating liquid depth shall be based on design storage
    requirements and shall not be less than 5 feet.
    B) Aerated Lagoons
    The design water depth for aerated lagoons should be 10
    to 15 feet. This depth limitation may be altered
    depending on the aeration equipment, waste strength,
    climatic and geological conditions.
    3) Aeration Requirements For Aerated Lagoons
    A) Aeration systems shall be designed to provide, with the
    largest unit out of service, a minimum of 1,500 cu. ft.
    of air/lb. of BOD[5] in the raw waste (1.5 lbs. of
    oxygen/lb. of BOD[5] plus oxygen required to oxidize
    the ammonia present in the raw waste). The aeration
    equipment shall be located to ensure proper mixing and
    distribution of oxygen in proportion to oxygen demand in
    multiple cells. Splash type aerators with motors above
    the water surface may not be used.
    B) Where hose type diffusers are used, the holes shall be
    of sufficient size to prevent plugging by dissolved
    solids incrustation.
    4) Multiple Cells
    A minimum of two cells to be operated in series or parallel

    should be provided for all waste stabilization ponds when
    they are utilized as a part of the primary and secondary
    treatment process. The number of cells required for aerated
    lagoons are dependent upon the degree of treatment required.
    Refer to subsection (c)(6).
    5) Pond Shape
    The shape of all primary cells should be such that there are
    no narrow or elongated portions. Round, square, or
    rectangular ponds with a length not exceeding 3 times the
    width are considered most desirable. No islands, peninsulas,
    or coves should be permitted. Dikes should be rounded at
    corners to minimize accumulations of floating materials.
    6) Solids Removal
    All lagoon systems shall include effective solids removal
    facilities. Design criteria for acceptable solids removal
    facilities are contained in Subpart K. Other solids removal
    facilities may be approved in accordance with Section
    370.520(b).
    d) Construction Details
    1) Embankments and Dikes
    A) Material
    Embankments and dikes shall be constructed of relatively
    impervious materials and compacted to at least 90%
    Standard Proctor density to form a stable structure.
    Vegetation and other unsuitable material shall be
    removed from the area upon which the embankment is to be
    placed.
    B) Top Width
    The minimum embankment top width should be 8 feet to
    permit access of maintenance vehicles. Lesser top
    widths will be considered for very small installations.
    C) Maximum Embankment Slopes
    i) Inner Slopes:
    3 horizontal to 1 vertical.
    ii) Outer Slopes:
    3 horizontal to 1 vertical.
    D) Minimum Embankment Slopes
    i) Inner Slopes:
    4 horizontal to 1 vertical. Flatter slopes are
    sometimes specified for larger installations
    because of wave action but have the disadvantage of
    added shallow areas conducive to emergent
    vegetation.

    ii) Outer Slopes:
    Outer slopes shall be sufficient to prevent surface
    runoff from entering the ponds.
    E) Freeboard
    Minimum freeboard shall be 3 feet except for very small
    installations 2 feet may be acceptable.
    F) Erosion Control Requirements
    For effective erosion control on the lagoon embankments,
    both seeding and riprap (or acceptable alternate) are
    required.
    i) Seeding
    Embankments shall be seeded from the outside toe to
    1 foot above the high water line on the dikes,
    measured on the slope. Perennial type, low
    growing, spreading grasses that withstand erosion
    and can be kept mowed are most satisfactory for
    seeding of embankments. In general, alfalfa and
    other long rooted crops should not be used in
    seeding, since the roots of this type plant are apt
    to impair the water holding efficiency of the
    dikes. The County Agricultural Extension Agent
    can usually advise as to hardy, locally suited
    permanent grasses which would be satisfactory for
    embankment seeding.
    ii) Riprap
    Riprap (or acceptable alternate) shall be placed on
    the inner slope of the embankments from 1 foot
    above the high water mark to 1 foot below the low
    water level. Riprap shall be comprised of a
    two-layer system consisting of a minimum 4-inch
    layer of coarse aggregate that meets the Illinois
    Department of Transportation (IDOT) Standard
    Specification for Road and Bridge Construction
    adopted January 1, 1997 for the gradations in the
    range of CA-6 through CA-10 and a minimum 12-inch
    layer of stone. The rock layer shall consist of
    evenly graded material with a maximum weight of 150
    pounds per piece and shall meet the IDOT gradations
    for rock of either Grade No. 3 or 4.
    2) Pond Bottom
    A) Uniformity
    Finished elevations shall not be more than 3 inches from
    the average elevation of the bottom. Shallow or

    feathering fringe areas usually result in locally
    unsatisfactory conditions.
    B) Vegetation
    The bottom shall be cleared of vegetation and debris.
    Organic material thus removed shall not be used in the
    dike core construction. However, suitable topsoil
    relatively free of debris may be used as cover material
    on the outer slopes of the embankment.
    C) Soil
    Soil used in constructing the pond bottom (not including
    the seal) shall be relatively incompressible and tight.
    Porous topsoil shall be removed. Porous areas, such as
    gravel or sandy pockets, shall be removed and replaced
    with well compacted clay. The entire bottom shall be
    compacted at or up to 4% above the optimum water content
    to at least 90% Standard Proctor density.
    D) Seal
    The pond bottom and embankments shall be sealed such
    that seepage loss through the seal is as low as
    possible. Seals consisting of soils, bentonite or
    synthetic liners may be used, provided that the
    permeability, durability and integrity of the proposed
    material is demonstrated for anticipated conditions.
    The results of a testing program that substantiates the
    adequacy of the proposed seal shall be incorporated into
    or accompany the engineering report. Standard ASTM
    procedures or similar accepted testing methods shall be
    used for all tests.
    i) A seal consisting of soil materials shall have a
    thickness of at least 24 inches and a permeability
    of less than 1x10(-7) cm per second. Provision
    shall be made in the specifications for
    demonstrating the permeability of the seal after
    completion of construction and prior to filling the
    pond.
    ii) For a seal that consists of a synthetic liner,
    seepage loss through the liner shall not exceed a
    quantity equivalent to seepage loss through a soil
    seal as described above.
    E) Prefilling
    Prefilling the pond after completion of testing is
    recommended in order to protect the seal from weed
    growth, to prevent drying and cracking and to reduce

    odor during initial operation. The pond dikes must be
    completely prepared as described in subsection
    (d)(1)(F). Synthetic liners shall be protected from
    damage during installation and filling.
    3) Influent Lines
    A) Material
    Any generally accepted material for underground sewer
    construction will be given consideration for the
    influent line to the pond. The material selected should
    be adapted to local conditions. Special consideration
    must be given to the character of the wastes,
    possibility of septicity, exceptionally heavy external
    loadings, abrasion, the necessity of reducing the number
    of joints, soft foundations, and similar problems.
    B) Manholes
    A readily accessible manhole shall be installed at the
    terminus of the trunk sewer or the force main, unless
    the force main discharges directly to the lagoon as
    described in subsection (d)(3)(H). The manhole shall be
    located as close to the dike as topography permits and
    its invert should be at least 6 inches above the maximum
    operating level of the pond to provide sufficient
    hydraulic head without surcharging the manhole.
    Surcharging of the sewer upstream from the inlet manhole
    is not permitted.
    C) Grade
    i) Influent line can be placed at zero grade and
    should be located along the bottom of the pond so
    that the top of the pipe is just below the average
    elevation of the pond bottom. The pipe shall have
    adequate seal below it.
    ii) The laying of the influent pipe on the surface of
    the pond bottom is prohibited.
    D) Point of Discharge
    Influent lines to the primary cell should terminate at
    approximately the third point farthest from the outlet
    structure. For interconnecting piping to secondary
    cells refer to subsection (d)(4)(B).
    E) Flow Distribution
    Flow distribution structures shall be designed to
    effectively split hydraulic and organic loads
    proportionally to primary cells. Refer to Section
    370.520(f).

    F) Submerged Inlets
    Submerged inlet lines shall discharge horizontally into
    a shallow, saucer-shaped depression which should extend
    below the pond bottom not more than the diameter of the
    influent pipe plus 1 foot.
    G) Discharge Apron
    The end of the discharge line should rest on a suitable
    concrete apron with a minimum size of 2 feet square.
    H) Force Mains
    Force mains discharging directly to lagoons are
    permitted if the force main has a freefall discharge
    into the lagoon and is not turned upward at the point of
    discharge. The point of discharge shall be at
    approximately the third point farthest from the outlet
    structure and the pipe shall be sloped for drainage into
    the lagoon to avoid freezing.
    I) Anti-Seep Collars
    Anti-seep collars shall be used on all piping passing
    through or under the lagoon embankments.
    4) Outlet Structures and Interconnecting Piping
    A) Outlet Structure
    i) Outlet structures shall be designed to allow the
    operating level of the pond to be adjusted to
    permit operation at depths of 2 feet to the maximum
    depth. The design shall also allow effluent to be
    drawn from various depths below all operating
    levels. All structures and devices such as weirs,
    gates and valves shall be watertight and capable of
    being easily adjusted by the operator without the
    need of additional mechanical equipment. Wooden
    stop-planks are not acceptable for level control.
    ii) Drawoff lines should not be located any lower than
    12 inches off the bottom to control eroding
    velocities and avoid pickup of bottom deposits.
    iii) A locking device should be provided to prevent
    unauthorized access to the level control
    facilities.
    iv) When possible, the outlet structure should be
    located on the windward side to prevent short
    circuiting. The outlet structure shall be properly
    baffled to prevent the discharge of floating
    material.
    v) Consideration must be given in the design of all

    structures to protect against freezing or ice
    damage under winter conditions.
    B) Interconnecting Piping and Unit Bypass
    i) Interconnecting piping and overflows should be
    constructed of materials that will withstand damage
    during construction and operation, giving special
    consideration to damage that may occur during
    compaction of embankments and damage to shallow
    piping. Piping shall be sized to allow transfer of
    maximum flows without raising the lagoon water
    level by more than 6 inches in the upstream cell.
    In no case shall interconnecting pipe be less than
    8 inches in diameter. Interconnecting piping
    between cells should be valved or provided with
    other arrangements to regulate flow between
    structures and permit flexible depth control.
    ii) The interconnecting pipe to the secondary cell
    should discharge horizontally near the lagoon
    bottom to minimize need for erosion control
    measures and should be located as near the dividing
    dike as construction permits.
    iii) Piping and valves shall be provided so that each
    cell can be operated independently of any other
    cell. Provision shall be made for independent cell
    dewatering.
    C) Anti-Seep Collars
    Anti-seep collars shall be used on all interconnecting
    and outlet piping passing through or under the lagoon
    embankments.
    5) Miscellaneous
    A) Fencing
    The pond area shall be enclosed with a suitable fence to
    preclude livestock and discourage trespassing. A
    vehicle access gate of sufficient width to accommodate
    mowing equipment shall be provided. All access gates
    shall be provided with locks.
    B) Warning Signs
    Appropriate signs should be provided along the fence
    around the pond to designate the nature of the facility
    and advise against trespassing.
    C) Flow Measurement, Sampling and Level Gauge
    Provisions for flow measurement and sampling shall be
    provided on the inlet and outlet. Pond level gauges

    shall be provided. The NPDES permit monitoring
    requirements for the facility shall be taken into
    account. Elapsed time meters on pumps or calibrated
    weirs may be used as flow measurement devices for
    lagoons.
    D) Sludge Removal
    When an existing lagoon is to be upgraded, the project
    design shall provide for removal of any sludge
    accumulation in the existing lagoon. The sludge removed
    shall be disposed of in accordance with IPCB
    regulations.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.940 Intermittent Sand Filtration for Secondary Treatment>>
    a) Applicability
    Use of the intermittent sand filter for secondary treatment is
    generally limited to weak to normal strength wastewaters which are
    amenable to biological treatment. Cold weather operational
    problems may preclude the use of this process unless the influent
    temperature to the filter is adequate to allow efficient filter
    operation necessary to meet the applicable effluent standards.
    b) Pretreatment Requirements
    Wastewaters applied to intermittent sand filters must be
    substantially free of grit, debris, oil and grease, floating and
    suspended materials, and components which inhibit biological
    processes and cause rapid clogging of the filter. Special
    consideration shall be given to the design of preceding treatment
    units, including dosing facilities, to limit heat loss during
    winter operation.
    c) Multiple Units
    Intermittent sand filters shall be provided in multiple units,
    designed for independent operation and maintenance.
    d) Location
    Intermittent sand filters treating septic tank or primary effluent
    should be restricted to relatively isolated locations or otherwise
    modified in order to minimize odor nuisances.
    e) Recirculation
    Recirculation of filter effluent may be practiced in order to
    attenuate and equalize organic and hydraulic loads to the filter,
    and improve unit process efficiency, control odors, and improve
    day-to-day reliability.

    1) Rate
    A recirculation rate of up to 300% of the settled sewage load
    to the filter may be provided.
    2) Variability
    The capability of varying the recirculation rate allows
    greater process control and optimization of process
    efficiency. This feature shall be included where
    recirculation is provided.
    f) Dosing
    1) Dosing Volumes
    The dosing facilities shall be designed for a capacity of
    2,500 gallons per 1,000 sq. ft. of filter bed to be dosed at
    any given time.
    2) Dosing Rates for Siphons or Pumps
    Siphons (at minimum head) or pumps shall have a discharge
    capacity at least 100% in excess of the maximum rate of
    inflow to the dosing tank, including recirculation, and at
    average head, at least 90 gallons per minute per 1,000 square
    feet.
    3) Discharge Line Capacity
    The discharge lines to the beds shall have sufficient
    capacity to permit the full rated discharge of the siphons or
    pumps.
    g) Construction Details
    1) Earth Base
    The earth base of the filters shall be sloped to the
    underdrains.
    2) Underdrains
    The sand filter shall be provided with open-joint or
    perforated pipe underdrains. They should be sloped to the
    outlet and spaced not to exceed 10 foot centers. Vertical
    riser vents shall be provided at both ends of each underdrain
    pipe and shall be located as not to be overtopped at maximum
    dosing depth.
    3) Media
    A) Gravel Base
    Clean graded gravel, preferably placed in at least three
    layers, should be placed around the underdrains and to a
    depth of at least 6 inches over the top of the
    underdrains. Crushed stone may not be used in lieu of
    gravel. Suggested gradings for the three layers are:
    1 1/2" to 3/4", 3/4" to 1/4", 1/4" to 1/8".
    B) Sand

    At least 24 inches of clean washed sand shall be
    provided. Sand shall be durable and relatively
    insoluble in sewage. Clay content shall be less than 1%
    by weight. The effective size shall be 0.3 to 1.0
    millimeter (mm). The uniformity coefficient shall not
    be greater than 3.5.
    4) Splash Slabs
    Splash slabs shall be provided at each point of discharge to
    the filter. A means of dissipating the energy of the
    discharge velocity shall be provided around the periphery of
    the splash slab.
    5) Curbs
    Provision shall be made to prevent soil and surface runoff
    from entering the filter area. Curbs should be high enough
    to hold the maximum dose and provide adequate freeboard.
    6) Distribution System
    A) Arrangement
    Provision shall be made for even distribution of the
    flow on the filter surface. If troughs or piping are
    used, they shall be so located that the maximum lateral
    travel of the flow on the media surface is not more than
    20 feet.
    B) Drains
    Troughs, discharge piping or other distribution
    equipment shall be sloped to drain to prevent freezing.
    h) Loading Rates
    The loading rates shall be based on the raw sewage flow and
    organic strength. The following loading rates shall not be
    exceeded:
    Raw Waste Strength Dose Rate
    (BOD[5] mg/l) (gals./ft.(2)/day)
    _______________ __________________
    100 to 200 3
    200 to 300 2
    above 300 1
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART J: DISINFECTION

    <BSection 370.1000 General>>
    Where needed to meet applicable standards, disinfection of the effluent
    shall be provided. The design shall provide for meeting both the bacterial
    standards and any disinfectant residual limits applicable to the effluent.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1010 Disinfection Process Selection>>
    a) The disinfection process should be selected after due
    consideration of waste characteristics, type of treatment
    processes provided prior to disinfection, waste flow rates, waste
    pH, disinfectant demand rates, current technology application,
    cost of equipment, chemical availability, power costs and
    maintenance requirements. Areawide public safety shall be
    considered where large liquid chlorine or sulfur dioxide
    containers are to be handled.
    b) Chlorine may be used in the form of liquid chlorine or calcium or
    sodium hypochlorite. Dechlorination will be required where
    necessary to meet applicable chlorine residual effluent
    limitations.
    c) An ultra-violet radiation system may be used as an alternative
    disinfection process.
    d) Other alternative means of disinfection will be evaluated
    according to the provisions of Section 370.520(b).
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1020 Chlorine Disinfection>>
    a) Type of Feed Equipment
    The types of chlorine feed equipment include:
    1) Vacuum solution feed by gas;
    2) Direct gas feed;
    3) Hypochlorite solution positive displacement pump feed;
    4) Hypochlorite tablet feed.
    b) Selection of Feed Equipment
    The selection of the type of chlorine feed equipment shall take
    into account operator safety and overall public safety relative to
    the proximity of the sewage treatment plant to populated areas and
    to the security of the gas cylinder or container storage.

    c) Output Capacity of Gas Chlorine Cylinders
    <PDelivery Rates (lbs of chlorine/day)>>
    Ambient 100 pound 150 pound 1 Ton
    Temp.
    F Cylinder Cylinder Container
    40 6 9 100
    50 14 21 240
    60 23.7 35.5 385
    70 32 47.5 536
    80 41.2 62 700
    Some types of vacuum chlorinators can deliver chlorine at rates
    greater than those listed above under the same conditions. When
    designs include rates in excess of those indicated above,
    manufacturer's specifications and test results shall be provided.
    d) Standby Equipment and Spare Parts
    Standby equipment of sufficient capacity should be available to
    replace the largest unit during shutdowns. Spare parts shall be
    available for all chlorinators to replace parts which are subject
    to wear and breakage.
    e) Potable Water Supply Protection
    An ample supply of water shall be available for operating the
    chlorinator. Where a booster pump is required, duplicate
    equipment should be provided and, when necessary, also standby
    power (refer to Section 370.550(a)(4)). Protection of a potable
    water supply shall conform to the requirements of Section
    370.550(b)(3). In-line backflow preventers are not acceptable.
    f) Chlorine Gas Supply
    1) Cylinders
    The use of 1-ton containers should be considered where the
    average daily chlorine gas consumption is over 150 pounds.
    All upright chlorine cylinders shall be strapped securely to
    prevent tipping.
    2) Tank Cars
    A) At large installations the use of tank cars, generally
    accompanied by evaporators, may be considered. Areawide
    public safety shall be evaluated as a part of the
    considerations. Provision shall be made for a chlorine
    supply during tank car switching.
    B) The tank car being used for the chlorine supply shall be
    located on a dead end, level track that is a dedicated

    siding. The tank car shall be protected from accidental
    bumping by other railway cars by a locked de-rail
    device, a closed lock switch, or both. The area shall
    be clearly posted "DANGER-CHLORINE." The tank car shall
    be secured by adequate fencing with locked gates for
    personnel and rail access.
    C) The tank car site shall be provided with an operating
    platform at the unloading point that allows for easy
    access to the protective housing on the tank car for
    flexible feed line connection and valve operation. Area
    lighting adequate for night time operation and
    maintenance shall be provided.
    3) Scales
    A) Scales shall be provided for weighing cylinders and
    containers at all plants using chlorine gas.
    B) At large plants, indicating and recording scales are
    recommended. At a minimum, a platform scale shall be
    provided. Scales shall be made of corrosion-resistant
    material. Scales should be recessed unless hoisting
    equipment is provided or the scales are low enough to
    allow the cylinders to be rolled onto them.
    4) Evaporators
    Where manifolding of several cylinders or containers will be
    required to evaporate sufficient chlorine, consideration
    should be given to liquid drawoff and installation of an
    evaporator.
    5) Leak Detection and Controls
    A bottle of ammonium hydroxide solution should be available
    for detecting chlorine leaks. Consideration should also be
    given to the provision of caustic soda solution reaction
    tanks for absorbing the contents of leaking 1-ton containers
    where such containers are in use. Also, when cylinders,
    containers or tank cars are used, a leak repair kit approved
    by the Chlorine Institute shall be provided. At
    installations using over 150 pounds of chlorine gas per day
    consideration should be given to the installation of
    automatic gas detection and related alarm equipment.
    g) Piping and Connections
    1) Piping systems should be as simple as possible, and shall be
    specially selected and manufactured to be suitable for
    chlorine service, with a minimum number of joints. Piping
    should be well supported and protected against temperature
    extremes.

    2) The chlorine system piping shall be color coded and labeled
    to distinguish it from sulfur dioxide and other plant piping.
    Where sulfur dioxide is used, the piping and fittings for
    chlorine and sulfur dioxide systems shall be designed so that
    interconnection between the two systems cannot occur.
    h) Housing
    1) Container and Equipment Location
    Containers and feed equipment should be located indoors, in a
    suitable fire-resistant building. Gas cylinders should be
    protected from direct sunlight if not located indoors.
    A) Separation
    If gas chlorination equipment and chlorine cylinders or
    containers are to be housed in a building used for other
    purposes, the chlorine cylinders or containers and
    equipment shall be located in an isolated room. This
    room shall not contain any sulfonation equipment, sulfur
    dioxide cylinders or other equipment unrelated to
    chlorination. Common walls to other areas of the
    building shall be gastight. Doors to this room shall
    open only to the outside of the building and shall be
    equipped with panic hardware. Rooms shall be at ground
    level and shall permit easy access to all equipment.
    Storage areas should be separated from the feed area.
    B) Inspection Window
    A clear gastight window shall be installed in the
    chlorinator room to permit the units to be viewed and
    gauges to be read without entering the room.
    C) Heat
    Chlorinator housing facilities shall be provided with a
    means of heating so that a temperature of at least 60
    F
    can be maintained. Where chlorine gas is to be
    withdrawn from cylinders or containers, the cylinders or
    containers shall be maintained at essentially room
    temperature. The room shall be protected from excessive
    heat. If liquid chlorine is to be withdrawn from the
    cylinders or containers to an evaporator unit, the feed
    cylinders or containers may be located in an unheated
    area.
    3) Ventilation For Gas Chlorination Systems
    A) Forced, mechanical ventilation shall be installed which
    will provide 1 complete air change per minute. The
    entrance to the air exhaust duct from the room shall be
    within 12 inches of the floor and the point of discharge

    shall be so located as not to contaminate the air in the
    immediate vicinity of the entrance door to the
    chlorinator room or ventilation inlet or window or
    entrance door to any buildings or inhabited areas.
    Where the public may be subjected to extensive exposure
    to chlorine in case of chlorine leaks, scrubbers may be
    required on the ventilation discharge.
    B) The chlorination room air inlets shall be so located as
    to provide cross ventilation with air and at such
    temperature that will not adversely affect the
    chlorination equipment. The vent hose from the
    chlorinator shall discharge to the outside atmosphere
    above grade.
    4) Electrical Controls
    The controls for the fans and lights shall be provided at
    those locations where it is necessary to enter the
    chlorination room and shall automatically operate when the
    door is opened and continue to operate when the operator
    enters the room and the door is closed. Provision shall be
    made for manual operation of controls from the outside of the
    room without opening the door.
    5) Outdoor Cabinet Housing
    Outdoor shallow cabinet-type units, with wide opening doors,
    that are shallow enough not to need or require operator
    entry, may be used to house the containers and feed
    equipment. Use of such cabinets shall be limited to small
    plants that provide seasonal disinfection or use less than 10
    pounds of chlorine per day. Only two chlorine gas cylinders
    of 150 pounds or less on line may be housed in the cabinets.
    The following items shall be provided for in the design:
    A) The cabinet structure shall be located on and securely
    anchored to a concrete slab sized to allow for safe
    transport and handling of the cylinders. The structure
    and slab shall be capable of withstanding expected wind
    loadings on the cabinet. The design of the cabinet
    support slab shall take into account the effects of
    frost and settling due to soil stability. Flexible
    piping connections should be considered for lines
    connected to the cabinet.
    B) The cabinet shall be protected from direct sunlight to
    prevent overheating of the chlorine cylinders.
    C) The cabinet doors shall extend the full width of the
    long side of the cabinet structure so that the full

    interior of the cabinet is exposed with the door open.
    Provision shall be made to secure the open doors while
    the operator is changing cylinders and maintaining the
    feed equipment.
    D) The cabinet depth shall not exceed 24 inches. The feed
    equipment shall be positioned to allow easy access for
    maintenance and to allow observation of the gauges and
    meters.
    E) Provision shall be made for chains, wall mounted
    fastener hooks or similar means for anchoring the
    chlorine cylinders to prevent tipping.
    F) The cabinet structure shall be corrosion resistant to
    chlorine gas.
    G) Where electrical power is available, the cabinet should
    be placed in a well-lighted area.
    i) Respiratory Protection Equipment
    Respiratory protection equipment meeting the requirements of the
    National Institute for Occupational Safety and Health (NIOSH)
    shall be available at all installations where chlorine gas is
    handled and shall be stored in a convenient location outside of
    any room where chlorine is used or stored. The respiratory
    protection units shall use compressed air, have at least a
    30-minute capacity, and be compatible with or exactly the same as
    NIOSH-approved units used by the local fire department.
    Instructions for using, testing, and replacing mask parts shall be
    posted. At large installations, consideration should be given to
    providing acid suits and fire suits.
    j) Application of Chlorine
    1) Contact Period
    After thorough mixing, a minimum contact period of 15 minutes
    at design peak hourly flow or maximum rate of pumpage shall
    be provided.
    2) Chlorinator Dosing Rate Capacity
    Chlorinators shall be designed to have a capacity adequate to
    produce an effluent that will meet the applicable bacterial
    limits. Where necessary to meet the operating ranges,
    multiple units shall be provided for adequate peak capacity
    and for a sufficiently low feed rate on turn down to allow
    proper chlorine residual. The chlorination system shall be
    designed on a rational basis and calculations justifying the
    equipment sizing and number of units shall be submitted for
    the whole operating range of flow rates, including the
    minimum turn down capacity for the type of control to be

    used. System design considerations shall include the
    controlling sewage flow meter (sensitivity and location),
    telemetering equipment and chlorinator controls. For treated
    normal domestic sewage the following dosing capacity, based
    on design average flow, is suggested (see Section
    370.520(c)(1)):
    <PType of Treatment>> <PDosage (mg/l)>>
    Primary Settled Sewage 20
    Lagoon Effluent (unfiltered) 20
    Trickling Filter Plant Effluent 10
    Lagoon Effluent (filtered) 10
    Activated Sludge Plant Effluent 6
    Activated Sludge Plants with
    Chemical Addition 4
    Filtered Effluent Following
    Mechanical Biological Treatment 4
    k) Contact Tank
    1) Mechanical means of sludge removal is recommended and should
    be provided unless multiple chlorine tanks are provided.
    Portable deck-level vacuum cleaning equipment may be used for
    small treatment plants. Provisions for draining contact
    tanks not equipped with mechanical sludge removal equipment
    shall be provided, with the drain flow returned to process
    for treatment.
    2) Exception to the requirement of duplicate contact tanks may
    be granted if the contact tank follows a sand filter or if
    the main treatment works is a waste stabilization pond, with
    provisions for storing the sewage flow for several days while
    the contact tank is being cleaned.
    3) Adequate mixing during the chlorine contact period shall be
    insured by the installation of adequate baffling, air or
    other mixing equipment. Facilities for the retention and
    removal of floating scum shall be provided.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1021 Dechlorination>>
    a) General
    Dechlorination of sewage plant effluents may be required to reduce

    toxicity due to chlorine residuals.
    b) Feed Equipment
    1) Type
    The common types of dechlorination feed equipment using
    sulfur compounds include:
    A) Vacuum solution feed of sulfur dioxide gas.
    B) Positive displacement pump feed or aqueous solutions of
    sulfite or bisulfite products.
    2) Selection of Feed Equipment
    The selection of the type of feed equipment using sulfur
    compounds shall include consideration of operator safety and
    overall public safety relative to the proximity of the sewage
    treatment plant to populated areas and the security of the
    gas cylinder storage. The selection and design of sulfur
    dioxide feeding equipment shall take into account the fact
    that the gas reliquifies very easily.
    c) Output Capacity of Sulfur Dioxide Cylinders
    The number of feed cylinders or containers necessary to meet the
    design delivery rates shall be based on the physical,
    thermodynamic and chemical properties for sulfur dioxide. Refer
    to the Compressed Gas Association publication CGA G-3-1988 "Sulfur
    Dioxide" or other standard reference sources for information on
    sulfur dioxide properties.
    d) Standby Equipment and Spare Parts
    Standby equipment should be available of sufficient capacity to
    replace the largest unit during shutdown. Spare parts to replace
    parts that are subject to wear and breakage shall be available for
    all sulfonators.
    e) Potable Water Supply
    An ample supply of water shall be available for operating the
    sulfonator. Where a booster pump is required duplicate equipment
    should be provided and, when necessary, standby power. (Refer to
    Section 370.550(a)(4).) Protection of the potable water supply
    shall conform to the requirements of Section 370.550(b)(6).
    In-line back flow preventers may not be used.
    f) Sulfur Dioxide Gas Supply
    1) Cylinders
    The use of 1-ton containers should be considered where the
    average daily sulfur dioxide consumption is over 150 pounds.
    All upright sulfur dioxide cylinders shall be strapped
    securely to prevent tipping.
    2) Tank Cars
    A) The use of tank cars, generally accompanied by

    evaporators, may be considered for large installations.
    Areawide public safety shall be evaluated as part of the
    considerations. Continuity of sulfur dioxide supply
    shall be maintained during tank car switching.
    B) The tank car being used for the sulfur dioxide supply
    shall be located on a dead end, level track that is a
    dedicated siding. The tank car shall be protected from
    accidental bumping by other railway cars by a locked
    de-rail device, a closed lock switch, or both. The area
    shall be clearly posted "DANGER-SULFUR DIOXIDE." The
    tank car shall be secured by adequate fencing with
    locked gates for personnel and rail access.
    C) The tank car site shall be provided with an operating
    platform at the unloading point that allows for easy
    access to the protective housing on the tank car for
    flexible feed line connection and valve operation. Area
    lighting adequate for night time operation and
    maintenance shall be provided.
    3) Scales
    A) Scales shall be provided for weighing cylinders or
    containers at all plants using sulfur dioxide gas.
    B) At large plants indicating and recording scales are
    recommended. At a minimum, a platform scale shall be
    provided. Scales shall be made of corrosion resistant
    material. Scales should be recessed unless hoisting
    equipment is provided or the scales are low enough to
    allow the cylinders to be rolled onto them.
    4) Evaporator
    Where the manifolding of several cylinders or containers will
    be required to evaporate sufficient sulfur dioxide,
    consideration should be given to liquid drawoff and
    installation of an evaporator. A liquid nitrogen gas padding
    system to enhance the liquid sulfur dioxide delivery rate
    should be considered.
    5) Leak Detection and Controls
    Sulfur dioxide leak detection equipment shall be provided
    which has a sensitivity level equal to that of ambient air
    pollution monitoring equipment. Where cylinders, one-ton
    containers and tank cars are used, a leak repair kit that is
    compatible for use with sulfur dioxide gas shall be provided.
    Leak repair kits used for chlorine gas (Section
    370.1020(f)(5)) equipped with gasket materials suitable for
    service with sulfur dioxide may be used. (See paragraphs

    10.4 and 13.2 of "Sulfur Dioxide," Compressed Gas
    Association, Inc., Publication CGA G-3-1988 for a discussion
    of suitable materials.) Refer to Section 370.560.
    g) Piping and Connections
    1) Piping systems should be as simple as possible, with a
    minimum number of joints, and shall be suitable for sulfur
    dioxide service. Piping should be well supported and
    protected against temperature extremes.
    2) The piping for the sulfur dioxide system shall be color-coded
    and labeled to distinguish it from chlorine piping, and the
    system shall be designed so that interconnections with
    chlorine piping cannot occur.
    h) Housing
    1) Container and Equipment Location
    Containers and feed equipment should be located inside a fire
    resistant building. Gas cylinders and containers should be
    protected from direct sunlight.
    A) Isolation
    If gas sulfonation equipment and sulfur dioxide
    cylinders will be located in a building also used for
    other purposes, the sulfur dioxide equipment and
    containers shall be located in an isolated room that
    shall not contain any chlorination equipment, chlorine
    containers or any other equipment unrelated to
    sulfonation. Common walls to other areas of the
    building shall be gastight. Doors to the room shall
    open only to the outside and shall be equipped with
    panic hardware. Rooms shall be at ground level and
    shall allow easy access to all equipment. Storage areas
    should be separated from feed areas; sulfur dioxide and
    chlorine cylinders shall be stored in separate areas.
    B) Inspection Window
    A clear gastight window shall be installed in the
    sulfonate room to permits the units to be viewed and
    gauges to be read without entering the room.
    2) Heat
    Sulfonator housing facilities shall be provided with a means
    of heating so that cylinder temperatures can be maintained in
    the range of 90 to 100
    F when sulfur dioxide is to be
    withdrawn from the cylinder. The sulfonator room shall be
    protected from excessive heat.
    3) Ventilation for Sulfur Dioxide Systems
    A) Forced, mechanical ventilation that will provide one

    complete air change per minute shall be installed in the
    sulfonator room. The entrance to the exhaust duct from
    the room shall be within 12 inches from the floor and
    the point of discharge shall be located so as not to
    contaminate the air in the immediate vicinity of the
    door to the sulfonator room or ventilation inlet to any
    buildings or inhabited areas.
    B) The air inlets to the sulfator room shall be located so
    as to provide cross ventilation with air and at
    temperatures that will not adversely affect the
    sulfonation equipment. The vent hose from the
    sulfonator shall discharge to the outside atmosphere
    above grade.
    4) Electrical Controls
    Controls for fans and lights shall be located at the
    entrances to the sulfonation room and shall automatically
    operate when the door is opened and continue in operation
    when the operator enters the room and the door is closed.
    Provision shall be made for operation of the fans and lights
    from the outside without opening the door.
    i) Respiratory Protection Equipment
    Respiratory protection equipment meeting the requirements of NIOSH
    shall be available at all installations where sulfur dioxide gas
    is handled and shall be stored in a convenient location outside of
    any room where sulfur dioxide is used or stored. The units shall
    use compressed air, shall have at least a 30-minute capacity and
    shall be the same as or compatible with NIOSH-approved units used
    by the local fire department. Instructions for using, testing and
    replacing mask parts shall be posted. At large installations,
    providing acid suits and fire suits should be considered.
    j) Application of Sulfonation Chemicals
    1) Contact Period and Reaeration
    A minimum contact period of 30 seconds, including mixing
    time, at design peak hourly flow or maximum pumpage rate
    shall be provided. Mechanical mixers are required unless the
    mixing facility will provide the necessary hydraulic
    turbulence to assure thorough mixing. A means of reaeration
    shall be provided to insure maintenance of the required
    dissolved oxygen concentration in the effluent and the
    receiving stream after sulfonation. When choosing a
    reaeration method the fact that excess sulfur dioxide, formed
    when the dechlorinating chemicals are dissolved in water, may
    be expected to consume 1 mg of dissolved oxygen for every 4

    mg of sulfur dioxide should be taken into account.
    2) Sulfonation Dosing Rate Capacity
    A) Capacity
    Sulfonators shall be designed to have a capacity
    adequate to produce an effluent that meets the
    applicable chlorine residual effluent limits. Where
    necessary to meet the operating ranges, multiple units
    shall be provided for adequate peak capacity and to
    provide a sufficiently low feed rate on turn down to
    avoid depletion of the dissolved oxygen concentrations
    in the receiving waters. The sulfonator system shall be
    designed on a rational basis and calculations justifying
    the equipment sizing and number of units shall be
    submitted for the entire operating range, including the
    minimum turn down capability for the type of control to
    be used. System considerations shall include the
    sensitivity and location of the controlling sewage flow
    meter, the telemetering equipment and sulfonator
    controls.
    B) Dosing Rates
    The design dosage rate of the sulfonation equipment
    shall be based on the particular dechlorinating chemical
    used and the applicable residual chlorine limits. The
    following theoretical amounts of the commonly used
    dechlorinating chemicals may be used for initial
    approximations to size feed equipment.
    Theoretical mg/l
    required to neutralize
    1 mg/l Cl[2]
    Sulfur dioxide (gas) 0.90
    Sodium meta bisulfite
    (solution) 1.34
    Sodium bisulfite
    (solution) 1.46
    The design shall take into account the fact that under
    good mixing conditions approximately 10% more
    dechlorinating chemical than theoretical value is
    required for satisfactory results.
    C) Liquid Solution Tanks
    Mixing and dilution tanks for dechlorinating feed

    solutions shall be provided as necessary to mix dry
    compounds and to dilute liquid compounds to provide for
    proper dosage. Solution tanks should be covered to
    minimize evaporation. The mixing and dilution tanks
    should be sized to provide sufficient feed solution for
    several days of operation. The tanks shall be made of
    materials that will withstand the corrosive nature of
    the solutions. Refer to Section 370.560.
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1022 Ultraviolet Disinfection>>
    Because operating data and experience with this process is not well
    established, expected performance of the ultraviolet disinfection units
    shall be based upon either experience at similar full scale installations
    or thoroughly documented prototype testing with the particular wastewater.
    Use of this process should be limited to high quality effluent having at
    least 65% ultraviolet radiation transmittance at 254 nanometers wave length
    and BOD and suspended solids concentrations no greater than 30 mg/l at any
    time. Projects will be evaluated by the Agency on the basis of the factors
    set out in Section 370.530(b).
    (Source: Added at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1030 Chlorine Gas Supply (Repealed)>>
    (Source: Repealed at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1040 Piping and Connections (Repealed)>>
    (Source: Repealed at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1050 Housing (Repealed)>>
    (Source: Repealed at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1060 Respiratory Protection Equipment (Repealed)>>
    (Source: Repealed at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1070 Application of Chlorine (Repealed)>>

    (Source: Repealed at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1080 Sampling and Testing>>
    a) Facilities shall be included for collecting samples, as monitoring
    requirements warrant, of the disinfected effluent.
    b) Where chlorine disinfection is used, equipment shall be provided
    for measuring chlorine residual using accepted test procedures.
    c) Where required by the Agency, equipment shall also be provided for
    measuring fecal coliform using accepted test procedures.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART K: TERTIARY FILTRATION
    <BSection 370.1100 Applicability>>
    Various types of tertiary filters may be used to polish effluents of
    secondary treatment plants.
    <BSection 370.1110 Type>>
    a) Granular media filtration is considered to include the following
    type units:
    1) High rate single, dual and multi-media of either the pressure
    or gravity type with facilities for backwashing.
    2) Low rate sand filters dosed intermittently or periodically.
    b) Low rate filtration is generally limited in use to small
    installations.
    c) For miscellaneous considerations, refer to Section 370.203(j).
    <BSection 370.1120 High Rate Filtration>>
    a) Design Considerations
    Care should be given in the selection of pumping equipment ahead
    of filter units to minimize shearing of flow particles.
    Consideration should be given in the plant design to providing
    flow-equalization facilities to moderate filter influent quality
    and quantity.
    b) Pretreatment
    A positive method shall be provided to control the suspended
    solids loading to the filters. Equipment for the feeding of

    chemical coagulant aids prior to secondary settling shall be
    provided unless other equally effective means of suspended solids
    control are used.
    c) Multiple Units
    Multiple units shall be provided. At least three units should be
    provided. Units shall be capable of independent operation and
    maintenance.
    d) Filtration Rates
    The peak hourly flow rate applied to the filter shall not exceed 5
    gpm/sq. ft. of filter area, computed with one unit out of service.
    1) Rate Controls
    Controls shall be provided which allow adjustment and control
    of the rate of flow to each filter unit.
    2) Flow Measurement
    The flow to each filter shall be monitored by indicating
    equipment.
    e) Accessibility and Maintenance
    Each filter unit shall be designed and installed so that there is
    ready and convenient access to all components and the media
    surface for inspection and maintenance without taking other units
    out of service.
    f) Housing
    Housing of filter units shall be provided. The housing shall be
    constructed of suitable corrosion-resistant materials. All
    controls shall be enclosed, and the structure housing the filter,
    controls and equipment shall be provided with heating and
    ventilation adequate to minimize problems with excess humidity.
    g) Construction Details
    1) Underdrains
    The underdrain system shall be designed for uniform
    distribution of flow of backwash water (and air, if
    provided) without danger of clogging from solids in the
    backwash water. A positive means of pressure relief shall
    be provided for the underdrain system to prevent structural
    damage by excessive backwash pressures. The selection of the
    underdrain system shall be based on demonstrated satisfactory
    field experience under similar conditions.
    2) Media
    The selection of proper media sizes and types depends upon
    the filtration rate selected, the type of treatment provided
    the influent to the filter, filter configuration, and
    effluent quality objectives. In dual or multi-media filters,
    media size and type selection must consider compatibility

    among media. Media shall be selected and provided to meet
    specific conditions and treatment requirements relative to
    the project under consideration. The selection and sizing of
    the media shall be based on demonstrated satisfactory field
    experience under similar conditions. All media shall have a
    uniformity coefficient of 1.7 or less. The uniformity
    coefficient, effective size, depth and type of media shall be
    set forth in the specification.
    3) Appurtenances
    The design of the filter appurtenances shall be based on
    demonstrated satisfactory field experience under similar
    conditions. The filters shall be equipped with the
    following:
    A) Wash water troughs.
    B) Surface wash, air scouring equipment or mechanical
    agitation designed to adequately remove entrapped solids
    from the media.
    C) Equipment for measuring filter head loss.
    D) Filter influent and effluent sampling points.
    Also refer to subsections (h)(2), (h)(4) and (i) below.
    h) Backwash
    1) Rate and Duration
    The backwash rate shall be adequate to fluidize and expand
    each media layer a minimum of 20 percent based on the media
    selected. Minimum and maximum backwash rates shall be based
    on demonstrated satisfactory field experience under similar
    conditions. The design shall provide for a minimum backwash
    period of 10 minutes. Excessive backwash rates may cause
    washout of the filter media.
    2) Control and Flow Measurement
    A positive means of shutting off flow to a filter shall be
    provided. Controls shall be provided which permit adjustment
    of both the backwash rate and the backwash period. Flow
    measurement of the backwash flow rate shall be provided. A
    staff gauge or wall mounted scale to allow use of the rise
    rate for flow measurement may be used.
    3) Clearwell
    A clearwell or other plant tankage isolated from unfiltered
    flows shall be provided as a source of backwash water.
    Filtered plant effluent shall be used as backwash water.
    The volume of storage provided shall be sufficient to allow
    sequential backwashing of at least 2 filter units at the
    design backwash rate.

    4) Chlorination of Filter Backwash
    Provision shall be made for periodic chlorination of filter
    backwash water (or filter influent) to control slime growths.
    The flows from the cleaning of the filters shall be returned
    to the head of the plant. Refer to subsection (h)(6)(A)
    below.
    5) Backwash Pumps
    Where used, backwash pumps shall be provided in multiple
    units, designed for independent operation and maintenance.
    Pumps shall be sized in accordance with subsection (h)(1)
    above to provide the required backwash rate with one unit out
    of service and should be of equal size. The total dynamic
    head of the pump shall be limited to that needed for the
    application so that undue stress of the underdrain system
    will not occur. Refer to subsection (g)(1) above.
    6) Mudwell
    A mudwell or other plant tankage shall be provided to hold
    backwash water from the filters. The volume provided shall
    be sufficient to hold the water generated by the backwashing
    of two filter units including the water in and above the
    filter media prior to filtration. Refer to subsection (h)(1)
    above. Filter backwash shall be returned to process or
    otherwise treated to insure compliance with applicable
    standards.
    A) Return Rate
    The rate of return of filter backwash to the treatment
    units shall not exceed 15 percent of the design average
    flow to the treatment units. Refer to subsection (j)(1)
    below and Section 370.520(g).
    B) Mudwell Return Pumps
    Backwash return pumps, where used, shall be provided in
    multiple units designed for independent operation and
    maintenance. The units shall be sized to provide the
    required pumping rate with the largest unit out of
    service. Refer to subsection (h)(6)(A) above.
    i) Control Panel
    Automatic controls shall be provided, with a manual override on
    the control panel for operating equipment, including each
    individual valve essential to the filter operation.
    j) Miscellaneous Considerations
    1) Return Backwash Loadings
    The return of backwash water and solids will result in
    increases in the hydraulic and suspended solids loads to the

    preceding treatment units. Design of these units shall take
    into account the increased loads.
    2) Oil and Grease
    Filters at treatment plants treating wastewaters containing
    above normal concentrations of greases or similar materials
    should be of the gravity type. Facilities should be
    considered for the periodic addition of chemicals to remove
    greases in such cases.
    3) Proprietary Equipment
    Proprietary equipment not conforming to the requirements of
    this section will be evaluated on a case-by-case basis in
    accordance with Section 370.520(b).
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.1130 Low Rate Intermittent or Periodically Dosed Sand Filters>>
    a) Applicability
    1) Intermittent sand filters may be used to polish secondary
    effluents. The process removes residual suspended solids and
    soluble biochemical oxygen demand and converts ammonia to
    nitrate. (See Section 370.1210(b).)
    2) Cold weather operational problems may preclude the use of
    this process unless the influent temperature to the filter is
    adequate to allow efficient filter operation necessary to
    meet the applicable effluent standards.
    3) Because of manual labor necessary to clean, maintain and
    replace sand on the filters, the application is usually
    limited to small waste treatment plants.
    b) Design Criteria
    The criteria of Section 370.940(b), (c), and (f)(3), are generally
    applicable to intermittent sand filters used as tertiary
    filtration units.
    1) Dosing Volumes
    The dosing facilities shall be sized to provide for a 12-hour
    dosing cycle for each bed.
    2) Siphon or Pump Capacity
    Siphons (at minimum head) or pumps shall have a discharge
    capacity at least 100 percent in excess of the maximum rate
    of inflow to the dosing tank, including recirculation, and at
    average head, at least 90 gallons per minute per 1,000 square
    feet being dosed.
    3) Recirculation

    Provision for recirculation of filter effluent may be
    included to improve process flexibility.
    A) Rate
    A recirculation rate of up to 100% of design average
    flow to the filter may be provided.
    B) Variability
    Capability for varying the recirculation rate shall be
    provided.
    4) Loading Rates
    The hydraulic load of secondary wastewater applied to
    supplemental intermittent sand filters shall not exceed 15
    gallons per day (gpd)/sq. ft. More conservative application
    rates should be provided for low quality filter influents.
    Refer to subsection (d)(3) below.
    c) Construction Details
    The criteria of Section 370.940(g) are generally applicable to
    tertiary intermittent sand filters. Also, refer to subsection
    (d).
    d) Special Design Considerations in Lagoon Systems
    1) General
    Low rate sand filter systems that are intermittently or
    periodically dosed may be used to reduce suspended solids
    from multicell aerated or nonaerated sewage lagoon treatment
    plants.
    2) Cold Weather Design
    Lagoons which have sand filters shall be designed to provide
    storage of flows received during cold weather when the filter
    is expected to be inoperable.
    3) Hydraulic Loading
    A) The filter area design considerations must include the
    following:
    i) The total annual flow volume to be treated (Section
    370.520(c)(1)) including wet weather flows if the
    lagoons are to be used for wet weather storage.
    ii) The effective net days annually for filter
    operation excluding cold weather shut-down and
    filter maintenance time.
    iii) Lagoon effluent quality.
    iv) Extent and reliability of flow data from the sewer
    system.
    B) Where sewer system conditions are not favorable or
    industrial waste loadings are expected to increase algae
    blooms, the loading rate should be limited to 10

    gal./ft.(2)/day.
    4) Dosing Considerations
    A) Methods of Operation
    The design should include allowance for periodic dosing
    of varied volumes onto the filter while the filter
    discharge is shut off, then to be followed by a
    filtration period to completely empty the filter at a
    controlled rate.
    B) Depth
    The filter shall be designed for flexibility of dosing
    depth from 6 inches to 2 feet.
    C) Valving, Piping, Flow Measurement
    i) The filter shall be provided with valving to allow
    shutting off and controlling rate of flow both onto
    and from the filter. A flow measurement weir or
    flume shall be provided both on the inlet and
    outlet of the filter for operator control of the
    dosing and filtration rates under the falling head
    conditions.
    ii) The outlet valving, piping and flow measurement
    shall be designed to allow complete drainage of the
    filter underdrains at the end of the filter cycle
    to insure aerobic conditions in the filter during
    the rest period.
    D) Dosing Inlet Structures
    The dosing inlet structures shall be designed to
    dissipate inlet velocity and prevent sand scouring
    during the dosing period at the high dose rates. The
    inlet structures should be arranged to not interfere
    with maintenance of the sand surface.
    5) Filter Containment Structure
    The filter containment may be of vertical concrete walls on
    three sides (refer to subsection (d)(6) below) or sloped
    earthen berms with impervious lining, constructed to insure
    that no ground surface runoff or silts get onto the sand
    surface. A freeboard of 1 foot above the maximum design
    dosing depth should be provided.
    6) Access Ramps
    The filter should be designed with a ramp on one end sloped
    and surfaced for access to the edge of the bed by wheeled
    vehicle to facilitate removing and replacement of sand. For
    larger filters, concrete tracks at the level of the sand
    surface may be desirable to reduce distance sand must be

    handled.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    SUBPART L: NUTRIENT REMOVAL
    <BSection 370.1200 Phosphorus Removal by Chemical Treatment>>
    a) General
    1) Method
    Addition of lime or the salts of aluminum or iron may be used
    for the chemical removal of soluble phosphorus. The
    phosphorus reacts with the calcium, aluminum or iron ions to
    form insoluble compounds. These insoluble compounds may be
    flocculated with or without the addition of a coagulant aid
    such as a polyelectrolyte to facilitate separation by
    sedimentation.
    2) Design Basis
    A) Preliminary Testing
    Laboratory, pilot or full-scale trial of various
    chemical feed systems and treatment processes are
    recommended to determine the achievable performance
    level, cost-effective design criteria, and ranges of
    required chemical dosages.
    B) System Flexibility
    Systems shall be designed with sufficient flexibility to
    allow for several operational adjustments in chemical
    feed location, chemical feed rates, and for feeding
    alternate chemical compounds.
    b) Process Requirements
    1) Dosage
    The required chemical dosage shall include the amount needed
    to react with the phosphorus in the wastewater, the amount
    required to drive the chemical reaction to the desired state
    of completion, and the amount required due to inefficiencies
    in mixing or dispersion. Excessive chemical dosage should be
    avoided.
    2) Chemical Selection
    A) The choice of lime or the salts of aluminum or iron
    should be based on the wastewater characteristics and
    the economics of the total system.
    B) When lime is used it may be necessary to neutralize the

    high pH prior to subsequent treatment in secondary
    biological systems or prior to discharge in those flow
    schemes where lime treatment is the final step in the
    treatment process.
    3) Chemical Feed Points
    Selection of chemical feed points shall include consideration
    of the chemicals used in the process, necessary reaction
    times between chemical and polyelectrolyte additions, and the
    wastewater treatment processes and components utilized.
    Considerable flexibility in feed location should be provided,
    and multiple feed points are recommended.
    4) Flash Mixing
    Each chemical must be mixed rapidly and uniformly with the
    flow stream. Where separate mixing basins are provided, they
    should be equipped with mechanical mixing devices. The
    detention period should be at least 30 seconds.
    5) Flocculation
    The particle size of the precipitate formed by chemical
    treatment may be very small. Consideration should be given
    in the process design to the addition of synthetic
    polyelectrolytes to aid settling. The flocculation equipment
    should be adjustable in order to obtain optimum floc growth,
    control deposition of solids, and prevent floc destruction.
    6) Liquid - Solids Separation
    A) The velocity through pipes or conduits from flocculation
    basins to settling basins should not exceed 1,5 feet per
    second in order to minimize floc destruction. Entrance
    works to settling basins should also be designed to
    minimize floc shear.
    B) Settling basin design shall be accordance with criteria
    outlined in Subpart G. For design of the sludge
    handling system, special consideration should be given
    to the type and volume of sludge generated in the
    phosphorus removal process.
    7) Filtration
    Effluent filtration shall be considered where effluent
    phosphorus concentrations of less than 1 mg/1 must be
    achieved.
    c) Feed Systems
    1) Location
    A) All liquid chemical mixing and feed installations should
    be installed on corrosion-resistant pedestals and
    elevated above the highest liquid level anticipated

    during emergency conditions. Refer to Section
    370.147(b)(2)(A).
    B) Lime feed equipment should be located so as to minimize
    the length of slurry conduits. All slurry conduits
    shall be accessible for cleaning.
    2) Liquid Chemical Feed Pumps
    A) Liquid chemical feed pumps should be of the positive
    displacement type with variable feed rate. Pumps shall
    be selected to feed the full range of chemical
    quantities required for the phosphorus mass loading
    conditions anticipated with the largest unit out of
    service.
    B) Screens and valves shall be provided on the chemical
    feed pump suction lines.
    C) An air break or anti-siphon device shall be provided
    where the chemical solution stream discharges to the
    transport water stream to prevent an induction effect
    resulting in overfeed.
    D) Consideration shall be given to providing pacing
    equipment to optimize chemical feed rates.
    3) Dry Chemical Feed System
    A) Each dry chemical feeder shall be equipped with a
    dissolver which is capable of providing a minimum
    5-minute retention at the maximum feed rate.
    B) Polyelectrolyte feed installations should be equipped
    with two solution vessels and transfer piping for
    solution make-up and daily operation.
    C) Make-up tanks shall be provided with an eductor funnel
    or other appropriate arrangement for wetting the polymer
    during the preparation of the stock feed solution.
    Adequate mixing should be provided by a large-diameter
    low-speed mixer.
    d) Storage Facilities
    1) Size
    Storage facilities shall be sufficient to insure that an
    adequate supply of the chemical is available at all times.
    Exact size required will depend on size of shipment, length
    of delivery time, and process requirements. Storage for a
    minimum of a 10-day supply should be provided.
    2) Location
    A) The liquid chemical storage tanks and tank fill
    connections shall be located within a containment
    structure having a capacity exceeding the total volume

    of all storage vessels. Valves on discharge lines shall
    be located adjacent to the storage tank and within the
    containment structure.
    B) Auxiliary facilities, including pumps and controls,
    within the containment area shall be located above the
    highest anticipated liquid level. Containment areas
    shall be sloped to a sump area and shall not contain
    floor drains.
    C) Bag storage should be located near the solution make-up
    point to avoid unnecessary transportation and
    housekeeping problems.
    3) Accessories
    A) Platforms, stairways, and railings should be provided as
    necessary to afford convenient and safe access to all
    filling connections, storage tank entries, and measuring
    devices.
    B) Storage tanks shall have reasonable access provided to
    facilitate cleaning.
    e) Other Requirements
    1) Materials All chemical feed equipment and storage facilities
    shall be constructed of materials resistant to chemical
    attack by all chemicals normally used for phosphorus
    treatment.
    2) Temperature, Humidity and Dust Control
    Precautions shall be taken to prevent chemical storage tanks
    and feed lines from reaching temperatures likely to result in
    freezing or chemical crystallization at the concentrations
    employed. Enclosure heating or insulation may be required.
    Consideration must be given to temperature, humidity and dust
    control in all chemical feed room areas.
    3) Cleaning
    Consideration shall be given to the accessibility of piping.
    Piping should be installed with plugged wyes, tees or crosses
    at changes in direction to facilitate cleaning.
    4) Drains and Drawoff
    Above-bottom drawoff from chemical storage or feed tanks
    shall be provided to avoid withdrawal of settled solids into
    the feed system. A bottom drain shall also be installed for
    periodic removal of accumulated settled solids.
    f) Hazardous Chemical Handling
    The requirements of Section 370.147(b), Hazardous Chemical
    Handling, shall be met.
    g) Sludge Handling

    1) General
    Consideration shall be given to the type and additional
    capacity of the sludge handling facilities needed when
    chemicals are added.
    2) Dewatering
    Design of dewatering systems should be based, where possible,
    on an analysis of the characteristics of the sludge to be
    handled. Consideration should be given to the ease of
    operation, effect of recycle streams generated, production
    rate, moisture content, dewaterability, final disposal, and
    operating cost.
    <BSection 370.1210 Ammonia Control>>
    a) General
    Ammonia control can be accomplished by physical, chemical,
    biological and ion-exchange techniques. These criteria contain
    design standards for a limited number of biological types and
    configurations of ammonia control systems. Other types and
    configuration of systems will be evaluated in accordance with
    Section 370.520(b).
    1) Process Selection
    A) Biological systems, normally used to accomplish
    secondary levels of treatment, may be adapted to
    function as nitrification systems. In applications of
    the fixed growth processes staged biological treatment
    is normally provided. The single stage activated sludge
    process has been found to be reliable for nitrification
    and is more commonly used than the two-stage activated
    sludge process.
    B) Because operating data and experience for the fixed
    growth processes for nitrification are not well
    established, expected performance in all cases shall be
    based upon experience at similar full scale
    installations or thoroughly documented prototype testing
    with the particular wastewater. The design shall
    provide the necessary flexibility to perform
    satisfactorily within the range of expected waste
    characteristics and temperatures.
    2) Alkalinity and pH Control
    Biological utilization of ammonia to produce nitrates is
    consumptive of available alkalinity in the ratio of 7.14
    pounds alkalinity (as CaCO[3]) per pound of ammonia nitrogen

    (as N) oxidized. The determination of the need for added
    alkalinity must be calculated and included in the basis of
    design to be submitted with the plan documents for Agency
    approval. The following factors shall be taken into account
    in determining the amount of alkalinity to be added:
    A) The available alkalinity in the raw wastewater and any
    sidestreams;
    B) The total ammonia load (including sidestreams such as
    flows from digesters and sludge handling facilities)
    imposed on the process;
    C) The alkalinity needed to maintain pH levels in the range
    of 7.2 to 8.4.
    3) Load Equalization
    Load equalization shall be considered to limit peak loadings
    of ammonia from plant sidestreams or slug sources on the
    sewer system. For the fixed growth biological nitrification
    processes, the ammonia loading peaks shall be limited to 150%
    of the design average ammonia loading value.
    b) Intermittent Sand Filters
    Intermittent sand filters, used in conjunction with various
    primary and secondary treatment systems, may be considered for use
    as a biological process to convert ammonia to nitrate.
    1) Construction Details
    The construction details are generally as described in
    Section 370.940(g).
    2) Loading Criteria
    A) Following Primary Treatment
    The design loading criteria following primary treatment
    is described in Section 370.940(e), (f) and (h) except
    that reduced organic loadings should be considered to
    insure meeting effluent ammonia limitations.
    B) Following Secondary Treatment
    The design loading criteria following secondary
    treatment is described in Section 370.1130(b)(4) and
    (d)(3).
    c) Suspended Growth Systems
    1) Applicability
    Suspended growth nitrifying systems may be designed as a
    single stage process with combined carboneous BOD removal and
    nitrogenous oxygen demand reductions or as the second stage
    of a two-stage process following a first stage activated
    sludge process or other types of biological treatment such as
    trickling filters.

    2) Design Requirements
    A) Aeration and Mixing
    For nitrification, the oxygen requirement for oxidizing
    ammonia must be added to the requirement for
    carbonaceous BOD removal. The nitrogen oxygen demand
    shall be taken as 4.6 times the peak hourly ammonia (as
    N) content of the influent. In addition, the oxygen
    demands due to sidestream flows (digestion and sludge
    handling facilities and the like) must be considered due
    to the high concentrations of BOD and ammonia associated
    with such flows. Sufficient aeration and mixing
    capability shall be provided to maintain a sludge age of
    up to 20 days and a dissolved oxygen concentration in
    the aeration tank of at least 2 mg/l.
    B) Power
    Careful consideration should be given to maximizing
    oxygen utilization per unit of power input. Unless flow
    equalization is provided, the aeration system should be
    designed to match the peak hourly load variation while
    economizing on power input.
    C) Temperature
    Careful consideration shall be given in the design and
    selection of aeration and mixing equipment to minimize
    heat losses and to maintain sewage temperatures of at
    least 50
    F in cold weather.
    D) Chemical Feed
    Where the ratio of ammonia to available alkalinity in
    the wastewater requires its use, chemical feed equipment
    shall be provided to maintain adequate alkalinity and a
    pH level between 7.2 and 8.4.
    3) Single Stage Activated Sludge
    In addition to the requirements of Section 370.920, the
    following criteria shall govern the design:
    A) Organic Loading Organic loading shall not exceed 15
    lbs/day of BOD[5] per 1,000 cu.ft. of available tank
    volume.
    B) Detention Time
    The hydraulic detention time shall be a minimum of 8
    hours based on the plant design average flow as
    determined by Section 370.520(c).
    4) Activated Sludge Nitrifying Stage Following Secondary
    Treatment
    The following subsections set out criteria in addition to the

    requirements of Section 370.920 for the activated sludge
    nitrifying stage following a first stage activated sludge or
    fixed growth process used for carbonaceous BOD removal.
    A) Organic Loading
    BOD[5] concentration shall be limited to 20-50 mg/1.
    B) Detention Time
    The hydraulic detention time shall be a minimum of 6
    hours based on the plant design average flow as
    determined by Section 370.520(c).
    C) Special Design Requirement
    The following requirements in addition to subsection
    (c)(3) above, shall be provided:
    i) Bypass around the first stage process to allow
    discharge of raw or primary settled sewage to the
    second stage aeration tank as needed as a carbon
    source for control of the nitrification process.
    ii) Careful consideration shall be given in the design
    and selection of covers and ventilation or aeration
    and mixing equipment to minimize heat losses in the
    first stage process and maintain sewage
    temperatures of at least 50
    F in cold weather.
    d) Fixed Growth Systems
    1) Applicability
    Nitrifying fixed growth systems may be used following
    activated sludge and fixed growth systems used for
    carbonaceous BOD removal.
    2) Design Requirements
    A) Peak Loadings
    In addition to the requirements of Section 370.900, the
    design of fixed growth systems shall take into account
    the peak hourly ammonia content of the influent. The
    design shall provide for ammonia load equalization in
    accordance with subsection (a)(3) above.
    B) Temperature
    Adequate cover or housing of the nitrification units
    shall be provided and preceding systems shall be
    designed or upgraded to minimize heat losses to maintain
    sewage temperatures of at least 50 F in cold weather.
    C) Ventilation for Process Air Requirements
    Adequate ventilation shall be provided to satisfy the
    oxygen demand of the process. Refer to Section
    370.900(e)(5).
    D) Chemical Feed

    Chemical feed equipment shall be provided to maintain
    adequate alkalinity concentrations and a pH level
    between 7.2 and 8.4 where the ratio of ammonia to
    available alkalinity in the wastewater requires its use.
    E) Post-Process Settling
    Settling tanks following nitrifying fixed growth systems
    shall be provided and designed in accordance with
    Subpart G. A single unit will be allowed if the
    applicable BOD and suspended solids effluent limitations
    can be met and other serious operational problems will
    not occur when the clarifier is temporarily out of
    service.
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.APPENDIX A Table No. 1 - Resident Occupancy Criteria>>
    <PResidence Type>> <PNumber of Persons>>
    Efficiency or Studio Apartment 1
    1 Bedroom Apartment 1.5
    2 Bedroom Apartment 3
    3 Bedroom Apartment 3
    Single Family Dwelling 3.5
    Mobile Home 2.25
    <BSection 370.APPENDIX B Table No. 2 - Commonly Used Quantities of Sewage
    Flows From Miscellaneous Type Facilities>>
    Gallons Per Person
    Per Day
    (Unless otherwise
    <PType of Establishment>> <P noted) >>
    Airports (per passenger) 5
    Bathhouses and swimming pools 10
    Camps:
    Campground with central comfort stations 35
    With flush toilets, no showers 25
    Construction camps (semi-permanent) 50
    Day camps (no meals served) 15
    Resort camps (night and day) with
    limited plumbing 50

    Luxury camps 100
    Cottages and small dwellings with
    seasonal occupancy 75
    Country clubs (per resident member) 100
    Country clubs (per non-resident member
    present) 25
    Dwellings:
    Boarding houses 50
    (additional for non-resident boarders) 10
    Rooming houses 40
    Factories (gallons per person, per shift,
    exclusive of industrial wastes) 35
    Hospitals (per bed space) 250
    Hotels with laundry (2 persons
    per room) per room 150
    Institutions other than hospitals including
    Nursing Homes (per bed space) 125
    Laundries-self service (gallons per wash) 30
    Motels (per bed space) with laundry 50
    Picnic parks (toilet wastes only per
    park user) 5
    Picnic parks with bathouses, showers and
    flush toilets (per park user) 10
    Restaurants (toilet and kitchen wastes
    per patron) 10
    Restaurants (kitchen wastes per meal served) 3
    Restaurants (additional for bars and cocktail
    lounges) 2
    Schools:
    Boarding 100
    Day, without gyms, cafeterias or showers 15
    Day, with gyms, cafeterias and showers 25
    Day, with cafeterias, but without gyms
    or showers 20
    Service stations (per vehicle served) 5
    Swimming pools and bathouses 10
    Theaters:
    Movie (per auditorium seat) 5
    Drive-in (per car space) 10
    Travel trailer parks without individual
    water and sewer hook-ups (per space) 50
    Travel trailer parks with individual
    water and sewer hook-ups (per space) 100

    Workers:
    Offices, schools and business
    establishments (per shift) 15
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.APPENDIX C Table No. 3 - Air Test Table for Sanitary Sewer
    Leakage Testing*>>
    SPECIFICATION TIME (MIN:SEC) REQUIRED FOR PRESSURE DROP
    FROM 3 1/2 TO 2 1/2 PSIG WHEN TESTING ONE PIPE DIAMETER ONLY
    Length of
    Sewer Pipe PIPE DIAMETER, INCHES
    <PIn Feet>> <P4>> <P6>> <P8>> <P10>> <P12>> <P15>> <P18>>
    <P21>> <P24>>
    25 0:04 0:10 0:28 0:28 0:40 1:02 1:29 2:01 2:38
    50 0:09 0:20 0:35 0:55 1:19 2:04 2:58 4:03 5:17
    75 0:13 0:30 0:53 1:23 1:59 3:06 4:27 6:04 7:55
    100 0:18 0:40 1:10 1:50 2:38 4:08 5:56 8:05 10:34
    125 0:22 0:50 1:28 2:18 3:18 5:09 7:26 9:55 11:20
    150 0:26 0:59 1:46 2:45 3:58 6:11 8:30
    175 0:31 1:09 2:03 3:13 4:37 7:05
    200 0:35 1:19 2:21 3:40 5:17 12:06
    225 0:40 1:29 2:38 4:08 5:40 10:25 13:36
    250 0:44 1:39 2:56 4:35 8:31 11:35 15:07
    275 0:48 1:49 3:14 4:43 9:21 12:44 16:38
    300 0:53 1:59 3:31 10:12 13:53 18:09
    350 1:02 2:19 3:47 8:16 11:54 16:12 21:10
    400 1:10 2:38 6:03 9:27 13:36 18:31 24:12
    450 1:19 2:50 6:48 10:38 15:19 20:50 27:13
    500 1:28 5:14 7:34 11:49 17:01 23:09 30:14
    *From Standard Specifications for Water and Sewer Main Construction in
    Illinois, Fourth Edition, May, 1986. (Copies may be obtained from Illinois
    Society of Professional Engineers, Springfield, Illinois 62704.)
    (Source: Amended at 21 Ill. Reg. 12444, effective August 28, 1997)
    <BSection 370.APPENDIX D Figure No. 1 - Design of Sewers - Ratio of Peak
    Flow to Daily Average Flow>>

    <BSection 370.APPENDIX E Figure No. 2 - Primary Settling>>
    <BSection 370.APPENDIX F Figure No. 3 - B.O.D. Removal Single Stage
    Trickling Filter Units Including Post Settling - No Recirculation Included>>
    <BSection 370.APPENDIX G Figure No. 4 - Break Tank Sketch for Potable Water
    Supply Protection>>
    <BSection 370.APPENDIX H Old Section Numbers Referenced (Repealed)>>
    (Source: Repealed at 21 Ill. Reg. 12444, effective August 28, 1997)

    Back to top