ILLINOIS POLLUTION CONTROL BOARD
    August 1, 1996
    GRACE CONTAINER PRODUCTS,
    Petitioner,
    v.
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 97-24
    (Provisional Variance - Air)
    ORDER OF THE BOARD (by C.A. Manning):
    Pursuant to Section 35(b) of the Environmental Protection Act (Act) (415 ILCS
    5/35(b)), Grace Container Products (Grace) has requested that the Illinois Environmental
    Protection Agency (Agency) recommend that the Board grant a provisional variance to allow
    Grace to continue operating its facility while repairs are made to the catalytic oxidizer and the
    associated ventilation system which is part of its pollution control system. Such request for a
    provisional variance and the notification of recommendation was filed with the Board by the
    Agency on Tuesday, July 30, 1996. Pursuant to Section 35(b) of the Act, the Board must
    issue the variance within two (2) days of this filing.
    Specifically, the Agency recommends that we grant Grace a 45-day provisional
    variance for its Cook County facility from 35 Ill Adm. Code 218.Subpart QQ and 415 ILCS
    5/9(b) (1994) for the period commencing July 1, 1996 and continuing until the required repairs
    are completed, or after 45 days have elapsed, whichever comes first.
    The Agency’s provisional variance recommendation states that Grace operates a facility
    located at 6050 West 51st Street, Chicago, Cook County, Illinois which manufactures solvent-
    based can sealant.
    Upon receipt of the request, the Agency issued its recommendation, notifying the
    Board that due to unforeseen, temporary and uncontrollable circumstances, failure to grant the
    requested 45-day provisional variance would impose an arbitrary or unreasonable hardship on
    the petitioner.
    Provisional variances are by their very nature temporary. The responsibilities of the
    Agency and the Board in these short-term provisional variances are different from the
    responsibilities in standard variances. (See 415 ILCS 5/35(b) & 36(c).) In provisional
    variances it is the responsibility of the Agency to make the technical determinations and
    finding of arbitrary or unreasonable hardship. The Board’s responsibility is to adopt a formal

    2
    order, to assure the formal maintenance of the record, to assure the enforceability of the
    variance, and to provide notification of the action by a press release.
    Having received the Agency recommendation that a denial of the requested relief would
    impose an arbitrary or unreasonable hardship, the Board hereby grants the petitioner a
    provisional variance from 35 Ill Adm. Code 218.Subpart QQ and 415 ILCS 5/9(b) (1994) for
    the period commencing July 1, 1996 and continuing until the required repairs are completed,
    or after 45 days have elapsed, whichever comes first, subject to the following conditions:
    1.
    The term of this provisional variance shall commence on July 1,1996 and
    continue until the required repairs to the catalytic oxidizer and associated
    ventilation system are completed, or after 45 days have elapsed, whichever
    comes first; and
    2.
    Grace shall notify the Agency upon completion of the repairs to the catalytic
    oxidizer and associated ventilation system. Such notification shall be sent to:
    Mr. Dave Kolaz
    Illinois Environmental Protection Agency
    Compliance and System Management Section
    2200 Churchill Road
    Springfield, IL 62794-9276
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
    the above order was adopted on the _____ day of ___________, 1996, by a vote of
    ______________.
    ___________________________________
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    Back to top