This matter is before the Board on a petition for review filed by petitioner A.F. Moore & Associates
(AFMA) on February 16, 1996. AFMA seeks review of a final determination issued by the Illinois
Environmental Protection Agency (Agency) on January 12, 1996 which denied approval of AFMA’s September
21, 1995 Corrective Action Completion Report (CACR).
A hearing was held in this matter before the Board’s Chief Hearing Officer Michael Wallace on April
24, 1996. All witnesses were found to be credible. Petitioner submitted its post-hearing brief on May 20, 1996
(Pet. Br.), the Agency submitted its response on June 6, 1996 (Ag. Br.), and petitioner submitted its reply brief
on June 21, 1996 (Pet. Reply Br.).
BACKGROUND
AFMA is the owner of property located at 7444 West 90th Street, Bridgeview, Cook County, Illinois
(the site) (Petition for Review (Pet.) at 1.) The site is improved with a one-story industrial building, and until
July 1994, contained an 8,000 gallon underground storage tank (UST) used to store diesel fuel. (Id.) The UST
was registered with the Office of the State Fire Marshal (OSFM) on March 10, 1986.
On May 27, 1994, the OSFM granted AFMA a permit to remove the UST. In July of 1994, Midwest
Environmental, Inc. (Midwest Environmental) removed the UST in the presence of OSFM personnel. (Pet. at
2.) A release of regulated substances was detected, and, AFMA notified the Illinois Emergency Management
Agency (IEMA) of the release the following day, July 8, 1994. LUST Incident Number 941520 was assigned to
the release.
On September 8 and 9, 1994, Midwest Environmental remediated the site, excavating 525 cubic yards
of soil and removing 7,200 gallons of water from the excavation. Turnkey Environmental Consultants, Inc.
(Turnkey), provided oversight for the closure activity and performed closure sampling. (Pet. at 2.)
Turnkey submitted a combination 45-Day Report/Corrective Action Completion Report (CACR) to the
Agency on March 14, 1995. In the combined report, AFMA explained that contaminated soils were remediated
until no further signs of contamination were present, and closure sampling was performed. (Agency Record
(Ag. Rec.) at 7.) The report further states that closure sampling revealed that cleanup objectives were achieved,
with the exception of a PNA constituent in one sample. (Ag. Rec. at 8.)
2
Question 5 on the form for the 45-Day Report asks “Was any groundwater with a sheen removed from
the excavation?,” and “if YES, what was the volume, in gallons, removed from the site.” In response, AFMA
checked, “YES,” and listed the volume as 7,200 gallons. (Ag. Rec. at 4.) The combined 45-Day
Report/CACR included a Professional Engineer Certification, wherein William N. McKinnery, President of
Turnkey, certified that the site had been remediated to applicable cleanup objectives. (Ag. Rec. at 6.) It also
included manifests for disposal of a total of 7,200 gallons of non-hazardous water (Ag. Rec. at 30-32), and
photographs of the excavation. (Ag. Rec. at 34.)
On July 11, 1995 the Agency issued a letter denying AFMA’s CACR. The Agency denied the report on
the grounds that it failed to meet the applicable remediation objectives for groundwater, and failed to address the
necessary factors considered in establishing site-specific soil cleanup objectives related to the detected PNAs.
With regard to groundwater at the site, the denial letter stated:
The report fails to demonstrate that the remediation objectives set forth in 35 IAC Section 732.408 have
been met for groundwater. If the owner or operator intends to proceed in accordance with 35 IAC
Section 732.300(b), as a result of the groundwater encountered during the excavation (7200 gallons),
the Agency requires that a groundwater investigation be conducted.
(Ag. Rec. at 71.)
On September 21, 1995, Turnkey submitted, on a form provided by the Agency, a Request for Site
Specific Cleanup Objectives (Site Specific Objectives Report). (Ag. Rec. at 83-106.) In an attached cover
letter, Turnkey responded to the Agency’s July 11, 1995 denial letter. The September 21, 1995 letter stated in
part:
As indicated in the report, water removed from the excavation was strictly standing water which had
entered the excavation as rainwater runnoff (sic) from surrounding surfaced areas. No groundwater was
otherwise encountered during the excavation.
The report further reasons that additional excavation would not be prudent or cost effective, nor would
the expense of verifying a Berg designation “E” zone.
(Ag. Rec. at 79.)
In the Site Specific Objectives Report, AFMA sought to establish site-specific cleanup objectives for
two remaining soil contaminants detected in one sample from the east wall of the excavation: two-naphthalene,
and benzo (a) anthracene. AFMA also addressed the groundwater at the site in its response to several questions
on the Agency’s form, stating in relevant part:
7.
Shallow geology ascertained from the excavation revealed approximately 1.5 feet of asphalt
capping and CA-6 base, with brown silty clays turning to stiff, gray silty clays towards 12 feet.
The only waters that were removed from the excavation were waters sitting in the backfill
stone and additional precipitory waters that entered the excavation during waiting periods. See
photographs in CACR report showing dry excavation.
* * * *
14.
As previously discussed, no groundwater was encountered in the excavation. The waters that
were removed were those waters standing in the backfill area. These waters accumulated in
the backfill over time and for the two months while it was exposed and uncapped (after tank
removal) from rainwater run-off from surrounding surfaced areas. Records show significant
precipitation during the month of August. (See University of Chicago recordings in Appendix)
3
Primarily waters were removed the day prior to and on the first day of excavation September 7
and 8). (sic) Precipitation occurring on September 9 and 10 resulted in additional waters
needing to be removed. Records obtained from the University of Chicago weather station (16
miles east) show only minor precipitation on September 9, however, parties involved all recall
scattered precipitation during activities on September 8 and 9. Additional waters were
removed on September 9 prior to completion of excavation on September 12.
As the pictures in the CACR (sic), the excavation was completely dry at completion and there
were no water bearing stratas (sic) within. Copies attached. (See photos in Appendix)
(Ag. Rec. at 86-88.)
On January 12, 1996, the Agency sent AFMA a letter denying AFMA’s September 21, 1995 submittal
of its CACR. (Ag. Rec. at 146-149.) As the sole ground for denial, this letter repeated, in nearly identical
language, the denial reasons concerning groundwater previously set forth in the Agency’s July 11, 1995 denial
letter. (Ag. Rec. at 149.) It is the January 12, 1996 denial letter that forms the basis for this appeal.
At hearing, Kendra Brockamp, the Agency employee who was responsible for preparing both the July
11, 1995 denial letter and the January 12, 1996 denial letter, testified that she proposed that AFMA conduct a
groundwater investigation because of the way the company answered question C-5 of the 45-Day Report (Tr. at
10.) Ms. Brockamp further testified that the only evidence of the existence of groundwater in the excavation
was found in the answer to question C-5 of the 45-Day Report. (Tr. at 13.) Finally, Ms. Brockamp testified
that the basis for the January 12, 1996 denial letter was that AFMA failed to conduct a groundwater
investigation, as previously requested by the Agency. The dispute in this matter thus centers on whether it was
proper for the Agency to require AFMA to perform a groundwater investigation.
ARGUMENTS OF THE PARTIES
AFMA’s Arguments
AFMA asserts that the Agency was acting in an unreasonable, arbitrary and capricious manner in
insisting that a groundwater investigation is necessary at the site. (Pet. Br. at 12.) AFMA does not contest the
fact that the 45-Day Report states that groundwater with a sheen was present in the excavation. AFMA agrees
that it should have better explained its answer to question C-5 on the 45-Day Report, but believes that its
subsequent submissions adequately explained that the water was surface water runoff, not groundwater. The
subsequent submissions to the Agency included the September 21, 1995 correspondence with the Agency, and
Section C of the Site Specific Objectives Report.
AFMA also asserts that information which had previously been submitted to the Agency supported the
representations made in the September 21, 1995 correspondence and the Site Specific Objectives Report. The
record before the Agency included a July 7, 1994 Log of Underground Storage Tank Removal (UST Removal
Log), completed by Ronald H. Davidson, a Storage Tank Safety Specialist at the OSFM who was present at the
AFMA site during the tank removal. The UST Removal Log was submitted to the Agency July 28, 1994. In
response to the question “Groundwater Contaminated,” Mr. Davidson checked “NO.”(Ag. Adm. Rec. at 62.)
AFMA also points to the photographs which were included as an appendix to the CACR, which it claims show a
dry excavation. At hearing, AFMA introduced as exhibits photographs taken by Brian Moody, an employee of
AFMA, on July 7, 1994 at the time the tank was removed (Exhibits 1-4), and photographs of the excavation
taken by Andrew Carlson of Turnkey subsequent to completion of the tank removal (Exhibit 5).
AFMA also argues that the subsurface geology at the site supports its contention that the water was
surface runoff and not groundwater. The site specific geology was described in the Site Specific Objectives
Report as follows: “Shallow geology ascertained from the excavation revealed approximately 1.5 feet of asphalt
capping and CA-6 base, with brown silty clays turning to stiff, gray silty clays towards 12 feet.”(Ag. Rec. at
86.) The Site Specific Objectives Report based its conclusions concerning the deep hydrology at the site on the
4
Berg Circular, which designated the site as zone E, and asserts that this designation was confirmed by well logs,
which indicated clays down to 50 feet, and bedrock starting at 50 to 100 feet, with significant groundwater
aquifers in the bedrock strata. (Id.) This same information had previously been submitted to the Agency in the
tank removal narrative of the 45-Day Report. At hearing, Brian Moody of AFMA also pointed to several other
excavations he performed in the area, which he asserts did not encounter groundwater. (Tr. at 26-27.)
Agency’s Arguments
The Agency asserts that AFMA has failed to meet its burden of proving that no violation of the Act
would have occurred if the Agency had approved the CACR. The Agency asserts that the 45-Day Report
indicated that 7,200 gallons of groundwater were removed from the excavation, and that the 45-Day Report
contained no contrary information or representation. (Ag. Br. at 2, 4.) The Agency states that the only
conclusion which may be drawn from the 45-Day Report was that groundwater was removed from the
excavation. Therefore, the Agency asserts that it was justified in requiring that a groundwater investigation be
conducted.
The Agency states that it was in the Site Specific Objectives Report that AFMA first made its assertions
that the water in the excavation was rainwater runoff, not groundwater. (Ag. Br. at 7.) The Agency refers to
this as a drastic change in position, and asserts that it is not adequately supported. The Agency states that there
is a “dearth of information” to support the contention that the water in the excavation was not groundwater.
(Ag. Br. at 8.)
The Agency further attacks the adequacy of the photos of the excavation in Exhibit 5. The Agency
asserts that, while the Site Specific Objectives Report represents that the photos accurately depict that the
excavation was completely dry at completion, no testimony was elicited from Mr. Carlson about such
conditions, and that the Site Specific Objectives Report was signed by William N. McKinnery of Turnkey, not
Mr. Carlson. (Ag. Br. at 9-10.)
The Agency asserts that the information in the Site Specific Objectives Report is inherently at odds with
the information in the 45-Day Report. (Ag. Br. at 10.) The Agency states that merely offering a conclusory
statement and precipitation records does not establish that the water was not groundwater. The Agency asserts
that the 45-Day Report and the Site Specific Objectives Report are at best inconsistent, and that a groundwater
investigation was therefore warranted. The Agency concludes that the information contained in the Site Specific
Objectives Report did not adequately address the Agency’s denial and concern, and that the subsequent denial
was therefore justified. (Ag. Br. at 11.)
REGULATORY FRAMEWORK
The Board’s authority to review the Agency’s determination in UST reimbursement cases arises from
Section 57.7(c)(4)(D) and 57.8(i) of the Act. (415 ILCS 5/57.7(c)(4)(D) and 5/57.8(i).) Section 57.7(c)(4)(D)
grants individuals the right to appeal to the Board an Agency UST determination, in accordance with the
procedures established in Section 40 of the Act, which establishes the general procedures for permit appeals.
(415 ILCS 5/40.) Similarly, Section 57.8(i) of the Act grants parties the right to petition the Board to review the
Agency denial or partial payment of a reimbursement request in the manner provided in Section 40 of the Act.
In UST appeals, as in permit appeals, the petitioner bears the burden of proving that the application, as
submitted to the Agency, would not violate the Act or the Board’s regulations. (Graham v. Illinois
Environmental Protection Agency, PCB 95-89 (August 24, 1995) slip op. at 5,
citing
City of Herrin v. Illinois
Environmental Protection Agency (March 17, 1994), PCB 93-195;
see also
Browning Ferris Industries of
Illinois, Inc. v. Pollution Control Board, 179 Ill.App.3d 598, 534 N.E.2d 616 (Second Dist. 1989.)) The sole
question before the Board is whether the applicant proves that the application, as submitted to the Agency,
demonstrated that no violations of the Environmental Protection Act would have occurred if the requested permit
5
had been issued. (Graham at 5,
citing
John Sexton Contractors Co. v. Illinois Environmental Protection
Agency, PCB 88-139, February 23, 1989.)
ANALYSIS
In this case, the Agency denied approval of petitioner’s CACR, and the sole question before the Board
is whether the application, as submitted to the Agency, demonstrates that no violations of the Act would occur if
approval had been granted. The sole reason the Agency cited for denial was that petitioner failed to perform
groundwater sampling. The Board must therefore determine whether petitioner has shown that there were
insufficient grounds for the Agency to believe that the failure to perform groundwater monitoring could lead to a
violation of the Act. We find that AFMA has demonstrated that the Agency’s January 12, 1996 denial was
improper, since the AFMA’s application demonstrated that no violations of the Act or Board regulations would
have occurred if the Agency approved the CACR. We believe that the Agency improperly failed to take into
account the information submitted in the Site Specific Objectives Report, and that the record before the Agency
demonstrated that approval of the CACR should have been granted.
As testified to by Ms. Brockamp, the Agency’s sole ground for believing that groundwater was
encountered at the site was AFMA’s answer to question C-5 on the 45-Day Report, which indicated that 7,200
gallons of groundwater had been encountered. However, in its subsequent submissions to the Agency, AFMA
explained the basis for its answer to question C-5, making it clear that the water encountered was not
groundwater, but was in fact precipitation which collected in the excavation. This information was contained in
the Site Specific Objectives Report, which was verified by AFMA’s consulting engineer, William McKinnery.
The Site Specific Objectives Report also referenced photographs included in the CACR for the express purpose
of demonstrating that the excavation was dry at completion. (Ag. Rec. at 86-88.) Furthermore, the statements
in the Site Specific Objectives Report were consistent with other information already before the Agency,
including the OSFM’s UST Removal Log, and information regarding the subsurface geology included in the 45-
Day Report. We find that this information adequately explained the statement in the 45-day report, and
adequately demonstrated that no groundwater was encountered during the tank removal. We therefore find that
the Agency improperly failed to consider the information submitted by AFMA subsequent to the 45-Day Report,
and that the Agency improperly issued its January 12, 1996 denial letter.
ORDER
The January 12, 1996 decision of the Illinois Environmental Protection Agency (Agency), denying
approval of A.F. Moore, Inc.’s Corrective Action Completion Report (CACR) is hereby reversed. The Agency
is hereby ordered to issue its approval of the CACR.
IT IS SO ORDERED.
Section 41 of the Environmental Protection Act (415 ILCS 5/41 (1994)) provides for the appeal of final
Board orders within 35 days of the date of service of this order. The Rules of the Supreme Court of Illinois
establish filing requirements. (See also 35 Ill.Adm.Code 101.246 "Motions for Reconsideration.")
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that the above
opinion and order was adopted on the _____ day of ___________, 1996, by a vote of ______________.
___________________________________
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board