ILLINOIS POLLUTION CONTROL BOARD
October 17, 1996
ILLINOIS POWER COMPANY, an Illinois
Corporation (Unit 1 - Baldwin Power Station),
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
)
PCB 97-35
(Permit Appeal - Air)
ILLINOIS POWER COMPANY, an Illinois
Corporation (Unit 2 - Baldwin Power Station),
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
)
PCB 97-36
(Permit Appeal - Air)
ORDER OF THE BOARD (by J. Yi):
On August 19, 1996 the Illinois Power Company (IPC) filed two separate permit
appeals and a motion to consolidate those appeals. Both permit appeals concern IPC’s
“Request to Revise Air Permit” submitted to the Illinois Environmental Protection Agency
(Agency) on June 24, 1996 and are brought pursuant to Section 40 of the Environmental
Protection Act (Act). (415 ILCS 5/40.) On September 5, 1996 the Board consolidated these
matters.
On September 20, 1996 the Agency filed a motion to waive requirements, motion to
file instanter the Agency’s record and the record. The Agency requests waiver from the
requirements set forth in 35 Ill. Adm. Code 103.123(b) and 105.102(a)(4) and (6) which
require ten copies and original of the record be filed with the Clerk. The Agency requests that
they be allowed to file the original and three copies due to the length of the records. The
Agency’s motions are granted.
IT IS SO ORDERED.
Board Member K. Hennessey abstained.
2
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
the above order was adopted on the _____ day of ___________, 1996, by a vote of
______________.
___________________________________
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board