ILLINOIS POLLUTION CONTROL BOARD
August 7,
1975
ROCKWELL INTERNATIONAL,
Petitioner,
v.
)
PCB
75—306
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
INTERIM ORDER OF THE BOARD
(by Mr.
Goodman):
This matter comes before the Pollution Control Board
(Board)
upon Rockwell International’s petition for variance from Rules
203(b)
and 205(f)
of the Air Pollution Control Regulations.
The petition
is inadequate
in that
it fails
to
include
information pertaining to the criteria required by Train
V.
NRDC,
Inc.,
43 USLW 4467
(Supreme Court No.
73-1742,
April 16,
1975)
.
Petitioner must show:
1)
Whether the
ambient air quality of the area affected by the variance
meets the national ambient air quality standards;
2)
If the
ambient air quality does not meet those standards, whether
the granting of the variance would contribute
to the area’s
failure to meet said standards; and
3)
If the ambient air
quality does meet said standards, whether the variance would
cause the ambient air quality to fail
to meet said standards.
It
is the Order of the Board that Petitioner shall
amend its petition within 45 days of this Order to provide
the above described information.
Failure to timel~~’file the
amended petition shall cause the petition to be dismissed
for inadequacy without prejudice.
The 90—day decision
period set by Statute shall run from the date of filing the
amended petition.
IT
IS SO ORDERED.
I,
Christan
L.
Moffett,
Clerk of the Illinois Pollution
Control Board, hereby certify the above Order was adopted on
the~”
dayof
,l975byavoteof
~O
~
lerk
Illinois Pollutio
~9htro1
Board
18— 337