ILLINOIS POLLUTION CONTROL BOARD
    May
    6
    ,
    1976
    VILLAGE OF SENECA,
    V.
    Petitioner,
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by Mr. Young):
    )
    )
    )
    )
    )
    )
    )
    PCB 76—118
    On April
    27,
    1976 Petitioner filed a petition for variance
    with the Board.
    The petition is inadequate
    in that it fails
    to comply with the requirements of our Procedural Rule 401.
    It
    is the Order of the Board that Petitioner shall amend
    its petition within 45 days of this Order.
    Petitioner is directed
    to supply information, including, but not limited to the following
    data:
    the average dry weather flow of the treatment plant,
    the
    designed dry weather flow of the treatment plant, the maximum
    hydraulic capacity of the treatment plant,
    the BOD and Suspended
    Solids concentration of the effluent and of the receiving stream.
    Failure to timely file an amended petition shall cause the
    petition to be denied without prejudice for inadequacy.
    The
    90-
    day decision period set by Section 38 of the Environmental Pro-
    tection Act shall run from the date of the filing of the amended
    petition.
    IT IS SO ORDERED.
    I, Christan L.
    Moffett, Clerk of the Illinois Pollution
    Control Board,
    hereby certify the above Order was adopted on
    the
    _______
    day of
    _____________________,
    1976 by a vote
    Illinois Pollution C
    ol Board
    21
    —391

    Back to top