1. 28-19

ILLINOTS POLLUTION CONTROL
BOAPD
October 13,
1977
ENVIRONMENTAL
PROTECTION AGENCY,
Complainant,
v.
)
PCB 76-80
ALLAERT RENDERING,
INC.,
Respondent.
ORDER OF THE BOARD
(by Mr.
Young):
On May 19,
1976,
a Complaint was filed charging,
inter
alia,
that Respondent had constructed or modified a treatment
works without the requisite construction permits and had
operated the treatment works without an operating permit issued
by the Environmental Protection Agency.
On June 22,
1977, Complainant filed
a Motion to Allow an
Interlocutory Appeal which
the
Board granted on June
28,
1977,
together with a stay in the proceedings.
On August
4,
1977,
the Board ordered filing of the Motion on or before August 19,
1977,
and which was done on August 23,
1977;
Respondent’s response
and brief was due on or before September
2, 1977,
and was filed
on September
14, 1977.
Complainant appeals from an order of the Hearing Officer
of June
16,
1977,
to produce the Agency permit file pertaining
to a Fox Valley Grease Company,
Inc.
and ordering deposition
of Mr. William H.
Busch,
the then Manager of the Permit Section,
and Mr. Darryl
R.
Bauer, an Agency permit engineer who had reviewed
the Fox Valley permit application.
Fox Valley Grease Company,
Inc.
is
not
a
party
to
this
proceed~nq;
the
purpose
of the
deposi-
tions
wa~ to
inquire
into
Agency
criteria
and
practices
in
reviewing
permit
applications
other
than
the
applications
of
the
Respondent,
Allaert Rendering.
Respondent argues that the depositions and Fox Valley permit
file are necessary to determine the standards and guidelines
utilized by the Agency in processing other permit applications
so that Respondent can prepare a defense to
the
instant Complaint.
28-19

—2—
The issue in Counts
I,
II, and III of this Complaint is
simply whether Respondent had or had not constructed and operated
a treatment works without the reauisite permits.
Inquiry
into
Agency procedures and practices
involving Agenc~yprocessing and
decisions on permit applications of non-parties
is
not material
in
a case arising on a complaint alleging construction and opera-
tion without a permit.
The scope of discovery
is derived from
the issues raised by the pleadings and as limited by the nature
of the action.
Section 40 of the Environmental Protection Act and Rule 502
of the Board’s Procedural Rules establish the exclusive proceeding
in which an Agency denial of a permit may be ccntested.
In a
permit denial appeal the Board has consistently held
(Soil Enrich-
ment Materials Coro.
v.
EPA,
PCB
72-364,
5 PCB 715)
that the scope
of review includes only that information which the Agency had
before
it when the decision was made.
New material not before
the Agency at the time of the permit denial decision is explicitly
excluded;
the sole issue is only whether the Agency erred on the
basis of what was before it; the burden of proof is on the peti-
tioner.
It would be entirely inconsistent
to allow then,
in an
enforcement case,
the introduction of new materials
to contest
the denial of a permit which would not have been allowed
in a
permit denial hearing under Section 40 of the Act.
Therefore,
we conclude that the Order of June 18,
1977, must be reversed
as not material
in this action.
The Board will also lift the
stay on the proceedings imposed by our Order of June 28,
1977;
the matter to proceed
to hearing without further delay.
IT
IS SO ORDERED.
I, Christan
L. Moffett, Clerk of the Illinois Pollution Con—
trol Board,
here
y
certify
the
above
Order
was
adopted
on
the
/~
day
of
________________,
1977
by
a
vote
of
~p
~
Illinois Pollutio
ontrol Board
28-20

Back to top