ILLINOIS POLLUTION CONTROL BOARD
    June
    22,
    1979
    ZEIGLER COAL COMPANY,
    Petitioner,
    v.
    )
    PCB 79—123
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by
    Mr.
    Dumelle):
    On June
    15,
    1979 Petitioner requested
    a variance from
    the water quality and effluent standards for sulfate and
    total dissolved solids.
    The Petition is deficient
    in several
    respects.
    First,
    it fails to state the length of time a
    variance
    is needed as required by Procedural
    Rule 401(a).
    Second,
    it fails to relate concentrations
    of pollutants to
    flow and fails to identify the receiving waterways
    as required
    by Procedural Rule 401(a)(4).
    Third,
    it fails to adequately
    assess the environmental impact of the requested relief as
    required by Procedural Rule 401(a)(7).
    If these deficiencies
    are not corrected within 45 days of the date of this Order,
    this matter will be subject to dismissal.
    The statutory
    ninety day decision period shall
    run from the date an amended
    petition is filed.
    IT IS SO ORDERED.
    I,
    Christan L, Moffett, Clerk of the Illinois Pollution
    Control Boar1~,hereby certify t e above Order was adopted on
    the
    *_____________
    day of
    _______________,
    1979 by a vote
    of
    _____________________
    Christan L. Moffe~~IClerk
    Illinois Pollution Control Board