ILLINOIS POLLUTION CONTROL BOARD
June
22,
1979
ZEIGLER COAL COMPANY,
Petitioner,
v.
)
PCB 79—123
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by
Mr.
Dumelle):
On June
15,
1979 Petitioner requested
a variance from
the water quality and effluent standards for sulfate and
total dissolved solids.
The Petition is deficient
in several
respects.
First,
it fails to state the length of time a
variance
is needed as required by Procedural
Rule 401(a).
Second,
it fails to relate concentrations
of pollutants to
flow and fails to identify the receiving waterways
as required
by Procedural Rule 401(a)(4).
Third,
it fails to adequately
assess the environmental impact of the requested relief as
required by Procedural Rule 401(a)(7).
If these deficiencies
are not corrected within 45 days of the date of this Order,
this matter will be subject to dismissal.
The statutory
ninety day decision period shall
run from the date an amended
petition is filed.
IT IS SO ORDERED.
I,
Christan L, Moffett, Clerk of the Illinois Pollution
Control Boar1~,hereby certify t e above Order was adopted on
the
*_____________
day of
_______________,
1979 by a vote
of
_____________________
Christan L. Moffe~~IClerk
Illinois Pollution Control Board
34—97