ILLINOIS POLLUTION CONTROL
BOARD
November
18,
1983
CITY OF HERRIN,
Petitioner,
v.
PCB 83—169
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent
1~
ORDER OF THE BOARD
(by J.
Theodore Meyer):
Petitioner is required to
supply
specific figures on the
cost of constructing a wastewater treatment facility for the pro-
posed housing;
to delineate the anticipated construction schedule
for the low—cost housing program;
to identify any current surcharg-
ing problems
in the vicinity of the proposed construction; to pro-
vide
a description and cost of lessening the sewer loadings
through water conservation devices
at the proposed construction
or at existing sewage hook-ups to the same sewer
line;
and to
address the impact to the existing wastewater treatment facility
if this variance petition
is
granted
as
well as that requested
in PCB 83—161 for existing housing~~
The Williamson County Housing Authority
is joined as a neces-
sary Petitioner pursuant to 35
Iii,
Adm. Code 103.141 and 103.121.
Petitioner, City of Herrin,
is ordered to serve the Williamson County
Housing Authority as a party pursuant to 35
Ill.
Adm.
Code 103.123.
Failure of Petitioner to amend the Petition by complying with
the forgoing within 45 days of the date of this Order will render
the Petition subject
to dismissal for inadequacy.
(35 Ill. Mm.
Code 104.125).
IT IS SO ORDERED~
Board Members
B.
Forcade and J~,Marlin abstained.
I, Christan
L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify that the above Order~~wasadopted on the
M~
-
day of
f~o~-o~--~
1983, by
a vote of
~
L.~
Christan L. Moffe~~J~lerk
Illinois Pollution Control Board
54~393
.