ILLINOIS POLLUTION CONTROL BOARD
November 18,
1983
OAK GROVE MOBILE HOME
PARK,
Petitioner,
V.
)
PCB 83~21
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY, AND
VILLAGE OF MILAN,
)
Respondents.
OPINION AND ORDER
OF THE BOARD
(by J~D.
Dumelle):
This
matter comes before the
Board on
a petition for
variance filed by the Oak Grove
Mobile Home Park
(Oak Grove)
on
February
22,
1983 as amended on April
25 and
May 31,
1983,
Oak
Grove seeks variance from the effluent
and water quality limits
for BOD,
TSS,
ammonia nitrogen and fecal coliform
of
35 111.
Adm.
Code SS302.212,
304,105, 304.120
(a & c), 304,121 and 304,301 in
anticipation of connection to the
Village of Milan~ssewer system
by 1986.
Since compliance would
involve the
transportation of
Oak Grov&s effluent for treatment at a sewage treatment plant
owned and operated by the Village
of Milan
(Village),
the Village
was joined as
a respondent by Board Order of May
5,
1983,
The
Village has voiced no agreement with, or opposition to,
this
petition.
The October 25,
1983 Recommendation of the Illinois
Environmental Protection Agency
(Agency),
accompanied
by a motion
to file instanter which is hereby granted,
is that
variance be
granted subject to certain conditions.
Hearing was waived and
none has been held.
The Oak Grove Mobile Home Park
is located approximately two
miles
south of the Village of Milan in Rock Island County.
Its
55 mobile home units and two houses are served by a collection
system and sewage treatment plant which have been in operation
since the early 1950~sand were upgraded
in response
to
the Board
Order in PCB 81—148
(45 PCB 425; February
17,
1981),
The
treatment plant consists of three septic tanks
in series,
a
holding tank with two dosing siphons, and sand filters,
Effluent
is discharged into an unnamed
intermittent creek tributary first
to Mill Creek,
then
to the Rock River,
and then to the
Mississippi.
Oak Grove apparently seeks variance until
the
completion of the Village~sconstruction program (which is
estimated to
be in
1986)
to allow
it to discharge effluent
54~357

2
containing
30 mg/i of each BOD
and TSS
(the effluent standards
being 10/12),
10 mg/i ammonia nitrogen (the effluent standard
being 1,5 mg/i), and unlimited amounts of
fecal coliform
(the
effluent standard being 400/100
ml).
In February through April
of 1983
(which
is the only available discharge data since
completion of the improvements to the system
pursuant to PCB
81—148),
Daily Monitoring Reports (DMR~s)
indicated BOD loadings
ranging from 10 to 18 mg/i,
TSS from
7 to 17 and
ammonia nitrogen
from 1.0 to 3,0 mg/i.
Fecal coliform data are missing,
although
earlier data shows grab samples as high
as
5.4
million/100
ml
(September,
1982).
The Village estimates that the upgrading of
the existing
treatment plant to meet the 10/12 standard would require an
initial outlay of $16,460 with annual expenses
of $5,779,
Oak
Grove is
loathe to embark on such a project
for two reasons:
it
is not the most cost—effective alternative and
would require an
interruption in service.
The total
present work project cost is
estimated at $74,260,
A second alternative
is
to
connect
to the existing Milan
sewer.
Capital costs
for that project
are estimated at $59,650
and annual expenses are estimated at
$4,523 resulting
in
a
total
present worth project cost of $99,220,
Again, the Village
considers this alternative
as non—cost—effective and also points
out that the downstream sewer is presently subject to excess
infiltration and inflow and is currently overloaded.
It
does,
however, have the advantage of regionalized
wastewater treatment.
The
third alternative
is connection
to
a proposed
Milan
interceptor.
This would
entail capital costs of $10,220, annual
costs of $4,798 and a total present worth
cost of $64,080,
The
Village alleges that this
is the most cost—effective solution and
that it also results in regionalized wastewater
treatment.
The Agency substantially agrees with
the cost information
presented on the three compliance alternatives, hut notes that if
P37-12,
Docket D goes into effect,
the
costs of upgrading the
existing treatment plant would be $16,000 less than
that
projected
in the second amended petition.
Thus,
the upgrading of
the existing plant would become the most
cost—effective option.
According to the Agency,
the
Village
is presently
in the
Step
1 phase of the construction grants
program.
A Sewer
System
Evaluation Survey was
submitted
in March,
1983.
The
Village submitted its Facility
Plan on August
19,
1983,
The
Agency
has reviewed the
Milan SSES and Facility Plan and sent a
letter notifying
Milan
that additional documentation must be
submitted to complete the review.
54~358

3
The Agency further states that adverse environmental effects
on the Rock River are unlikely due to the dilution factor
(7-day,
10-year low flow of the Rock River 30 miles upstream from its
confluence with Mill Creek
is over 844 MGD),
On the other hand,
Mill Creek and the unnamed tributary into which Oak Grove
discharges both have zero 7—day,
10—year low flows,
and,
therefore,
any deoxygenating or toxic effects will be much more
noticeable.
However, during an inspection on May 16,
1983, the
Agency observed that the effluent discharge was clear with no
visual impact on the receiving stream,
The Agency concludes that some relaxation of the Board’s
regulations
would
be
both
environmentally acceptable and con-
sistent with the Clean Water
Act, but not to the levels
requested.
It believes that with the improved operation and
maintenance BOD and TSS
limitations of 20/20 could be achieved.
As Oak Grove’s ammonia nitrogen levels have not exceeded 3.0 mg/I
since the improvements to the plant were completed, the Agency
suggests an interim limit of 5,0 mg/I,
The Agency also
recommends that the fecal coliform limit be eliminated,
In
support it cites the pendency of R77-12,
Docket
D,
remarking that
Oak Grove would be exempt from the limitation if the rules are
adopted as proposed.
Finally, the Agency proposes that variance,
with conditions,
expire in six months by which time
a feasible
compliance plan could be completed.
The Board finds that denial
of variance would impose an
arbitrary or unreasonable hardship.
Oak
Grove is within the
Milan Facility Planning Area,
Given the preference,
for
environmental and other reasons,
for regional sewage treatment
over individual treatment plants,
for the Board to require
complete plant rehabilitation at this time would not be in the
best interests
of all concerned.
Variance will be granted to
include effluent limitations as recommended by the Agency, and
the fecal coliform limit will be waived entirely.
This reflects
the Board’s determination that the capital outlay required for
installation of disinfection equipment can reasonably be deferred
for the term of this variance, during which time the appeals of
the
regulatory proceeding should have
been completed.
The Board believes that the suggested six—month term for
variance is too short.
Proper evaluation of the costs and
feasibility of compliance alternatives may well be dependent upon
information generated during the course of the Village’s SSES and
facility planning and the appeals process in R77—12, Docket D.
Connection to the Milan interceptor apparently cannot be made
prior to 1986,
and, depending upon the Agency’s final action
concerning the construction grants program, may not ever be
reasonable. However, after the grant review
is completed and
R77-i2,
Docket D becomes final, Oak
Grove should he in a position
to determine how compliance will
he
attained.
54~359

4
The Board will grant variance until May 3~, 198,
thc
expiration date of Oak Grove’s current NPDES
peritit).
I~the
interceptor is constructed, compliance should h~at~-ainableby
that date.
Further, while no timetable has bc~noreser~ted, given
the nature of the modifications of the existing sewage treatment
plant which would be required to attain compliance
it
aopears
that such work
could
be
completed
by that date.
The Board
stresses that the variance granted herein
unlike the short
t rm
variance recommended by the Agency,
is intended to allow enough
time for Oak Grove to come into
compliance,
not simply to
determine how compliance will
be attained.
The compliance
alternative should be selected at the earliest reasonable date
and compliance,
thereafter,
should
be expeditious~yattained.
This Opinion constitutes the Board’s findings of fact and
conclusions
of
law in this matter,
ORDER
The Oak Grove Mobile Home Park,
is hereby g~a~ed
~‘
ara cc from
35
Ill. Adm.
Code 302.212,
304,105, 304.120
c
30
i21 and
304,212
as
they relate to the discharge of BOD
T$S
ammonia
nitrogen and fecal coliform, subject to the follo~iingconditions:
1,
Petitioner~svariance
shall expire on May
31,
1986;
2.
During the
variance period the following effluent
limitations shall
be met:
BOD/TSS—20/20 ng/l, and
ammonia nitrogen—5 mg/I
as monthly averages
3.
By October
1,
1984,
Oak Grove shall subrit a firm
compliance plan to the Agency.
If this plan is to
connect
to the
proposed
Milan interceptor
it will need
to include a commitment
from Milan that
it will be
built
by a specific date
regardless of grant funaing
status.
If
this
commitment cannot be
aade
Oak Grove
must present an alternative plan,
including a
compliance schedule;
4.
Oak Grove
shall provide the best practicable degree of
treatment at its wastewater treatment plant;
5.
Within forty—five
(45) days
of the date of this Order,
Oak Grove shall execute and send to Steven M.
Spiegel,
Attorney Advisor, Enforceme1t ?roora~~’s,Illinois
Environmental Protection Aaency
2200 Clurchill Road,
Springfield, Illinois 62706,
a Certification of
Acceptance by which it agrees to be
ound by the terms
and conditions of this variance.
The forty-five
(45)
day period shall be held in
abeyance for any period
for
which this matter
is appealed.
The form of said
certification shall be as follows:
54~360

5
CERTIFICATION
I
(We), _______________________,
having read the Order
of the Illinois Polluton Control Board
in
PCB 83—21 dated
November 18,
1983,
understand and accept
that Order and agree to
be bound by all terms and conditions thereof.
Petitioner
By:
Authorized Agent
Title
Date
IT IS SO
ORDERED.
Board Members Bill
Forcade and John Marlin abstained,
I, Christan L.
Moffett,
Clerk of the Illinois Pollution
Control
Board, hereby certify
that the above Opinion and Order
was adopted on
the ~~~day
of
______,
1983 by a vote of
~.
Christan
L. Moffett, Clew’
Illinois Polluton Contrd~1’Board