ILLINOIS POLLUTION CONTROL BOARD
    October 18,
    1979
    MAPLE LEAF ESTATES WATER COMPANY,
    Petitioner,
    v.
    )
    PCB 79—211
    ENVIRONMENTAL PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD
    (by Mr.
    Dumelle):
    On October
    8,
    1979 Petitioner requested a variance from
    Rule 305 of Chapter
    6:
    Public Water Supplies.
    The Petition
    is deficient in several respects.
    First,
    it fails to state
    the amount of water pumped and the number and depth of wells
    in Petitioner’s water supply as required by Procedural Rule
    401(a)(3).
    Second,
    it fails to indicate why Petitioner is
    unable to comply with Rule 305 as required by Procedural Rule
    401(a)(5).
    Third,
    it fails
    to describe any compliance prog-
    ram as required by Procedural Rule 401(a)(6).
    Fourth,
    it
    fails to assess the environmental impact that the variance
    would impose on human,
    plant and animal
    life as required by
    Procedural Rule 401(a)(7).
    Fifth,
    it fails
    to state the in-
    terim measures which would be undertaken by Petitioner should
    contamination occur as
    required by Procedural Rule 401(a)(10).
    Sixth,
    it fails to specifically request or waive a hearing as
    required by Procedural Rule 401(b).
    Consequently,
    this matter is hereby dismissed.
    IT
    IS SO ORDERED.
    I,
    Christan L.
    Moffett, Clerk of the Illinois Pollution
    Contrçl Board, hereby
    ertify the above Order was adopted on
    the
    ~
    day of
    ____________,
    1979 by a vote of
    4/~
    Christan L. Moffe~t~(~lerk
    Illinois Pollution Control Board
    35—545

    Back to top