ILLINOIS POLLUTION CONTROL BOARD
    July
    8, 1976
    JOHNSON OIL COMPANY,
    Petitioner,
    v.
    )
    PCB 76—176
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by Mr. Young):
    On June
    17, 1976 Johnson Oil Company filed a petition for
    variance with the Board.
    The petition is inadequate
    in that
    it fails
    to comply with the requirements of our Procedural
    Rule
    401.
    It is the Order of the Board that Petitioner shall amend
    its petition within 45 days of this Order.
    Petitioner
    is
    directed to supply information, including, but not limited to
    the following data:
    the average dry weather flow of the treat-
    ment plant; the designed dry weather flow of the treatment plant;
    the maximum hydraulic capacity of the treatment plant;
    the BOD
    and suspended solids concentration of the effluent and of the
    receiving stream; and the design and construction grant status of
    Hanna City in regards
    to the treatment plant improvements.
    Failure to timely file an amended petition shall cause the
    petition to be denied without prejudice
    for inadequacy.
    The 90-
    day decision period set by Section 38 of the Environmental Pro—
    tection Act shall run from the date of the filing of the amended
    petition.
    IT IS SO ORDERED.
    I, Christan
    L. Moffett, Clerk of the Illinois Pollution Con-
    trol’
    Board, hei~ebyce tify the above Order was adopted on the
    ~
    day of
    ___________________,
    1976 by a vote of ~_p
    Illinois Pollution
    rol Board
    23
    63

    Back to top