ILLINOIS
 POLLUTION CONTROL
 BOARD
September 13,
 1982
CITY OF
 SPRINGFIELD,
 )
Petitioner,
PCB
 82-413
ILLINOIS
 ENVIRONNENTAL~PROTECTION AGENCY,
 Respondent
 )
ORDER OF
 THE BOARD
 (by
 I.
 Goodman):
On August 31,
 1982 the City of Springfield
 (City)
 filed for
a provisional variance,
 and
 on September
 15,
 1982 the Illinois
Environmental Protection
 Aaency
 ~tAgency)
 filed
 its Recommendation.
The Agency recommends that variance
 be
 granted from the suspended
solids limitation of
 Section
 304,124 for
 a period of five days,
the time necessary
 to construct a
 bypass.
 Over the past two
years when cleaning its
 surge lagoon,
 the City has diverted flows
from a
 grit
 settling
 basin
 directly
 to Lake Springfield.
 It now
proposes
 to
 construct
 a
 bypass
 around
 the
 grit
 tank
 and
 surge
lagoon,
 to
 avoid
 future
 direct
 discharges.
 The
 Agency
 has
concluded
 that
 enviror~rnenta.
 harm during
 the
 construction
 period
to Lake
 Springfield will be minimai~and that the
 lake~spublic
water supply is not adversely affected.
 Furthermore, the Agency
has concluded
 that. denial would
 impose an arbitrary or unreasonable
hardship
 to
 the
 City.
Although
 the
 Board notes that the circumstances involved in
constructing
 the bypass are
 riot
 an
 emergency or unexpected nature,
it will
 grant
 this
 provis:Lonai
 variance
 pursuant to Section 35(b)
of
 the
 Environmental
 Protection
 Act.
ORDER
The
 City
 of Springfield
 is
 granted
 a
 provisional
 variance
from
 the
 suspended
 solids
 limitation
 contained
 in
 35
 Illinois
Administrative Act
 304.124,
 for a period of five days during the
construction
 of its bypass,
 subject to the following conditions:
1,
 The City shall
 notify
 the Illinois Environmental
Protection
 Agency
 two
 days
 prior
 to
 diverting
 flows
 to
 Lake
Springfield,
 and notify the
 Agency when the diversion has
ceased,
48-193
2
2.
 The
 period
 of variance is to commence on the date
the City begins to divert its flows to Lake Springfield.
3.
 The City’s discharge shall not exceed the total
suspended solids concentration of 225.0 mg/i during the
period of the variance.
4.
 The City shall sample and analyze the diverted
flow for the parameters as required
 in the NPDES permit and
report the results to the Agency within fourteen days after
the expiration of the variance.
5.
 The City shall make reasonable efforts to reduce
wastewater flows during the period of this variance.
6.
 Within
 ten
 days of the date of this Order,
Petitioner shall execute and forward to the Environmental
Protection Agency,
 2200 Churchill Road, Springfield, Illinois
 62706, a Certificate of Acceptance and Agreement to be bound
to all terms and conditions of this variance.
 The form of
the certificate shall be as follows:
CERTIFICATE
I,
 (We), ________________________________,
 having read
the Order of the Illinois Pollution Control Board in PCB 82—113,
dated _________________________________, understand and accept the
said Order, realizing that such acceptance renders all terms and
conditions thereto binding and enforceable.
Petitioner
By:
 Authorized Agent
Title
Date
IT IS SO ORDERED.
Board
 Chairman
 Dumelle and Board Member Joan Anderson concurred.
I,
 Christan
 L. Moffett, Clerk of the Illinois Pollution
Control Board, hereby certify that the above Order was ado~ted
on the
 /
 ~‘~‘
 day of
_________________,
 1982 by a vote of
 ~
Christan L. Moffé~OClerk
Illinois Pollution Control Board
48-194