ILLINOIS POLLUTION CONTROL BOARD
October 22, 1981
CITY OF SPRINGFIELD,
)
Petitioner,
)
v.
PCB 81—158
ILLINOIS ENVIRONMENTAL PROTECTION
)
AGENCY,
Respondent.
ORDER OF THE BOARD
(by J
.
D.
Dumelle):
On September 18,
1981 the Illinois Environmental Protection
Agency (Agency) received a request for a provisional variance
from the City of Springfield
(City) requesting variance from
Chapter
3 standards for TDS, oil and grease, pH,
iron,
and
suspended solids.
On September 23,
1981 the Agency rejected
the petition as incomplete.
On October 19, 1981 the Agency
received further information from the City.
On the basis
of
that, on October 21,
1981 the Agency filed a recommendation
with the Board recommending that variance be denied for all
requested pollutants other than suspended solids.
Based on the Agency’s finding that compliance on a short—
term basis with the suspended solids limitation of
Rule 408 of
Chapter 3:
Water Pollution, under the circumstances set forth
in the record, would impose an arbitrary or unreasonable hardship,
and the lack of any indication of procedural irregularities
in this matter,
the Board will grant the City
a provisional
variance as recommended by the Agency.
The City is hereby granted a provisional variance from Rule
438 of Chapter
3:
Water Pollution as it relates to suspended
solids,
subject to the following conditions:
1.
The City’s provisional variance shall begin on the
date that draw down from the ash lagoon begins
and shall continue for a period of
35 days or until
repair work is completed, whichever occurs
first;
2.
The City’s discharge shall not exceed the following
limitations:
Load Limits
Concentration Limits
lbs/day
mg/l
Average
Daily Max.
Average
Daily Max.
2000
6672
30
100
43—575
—2—
3.
When discharging the City shall take 24—hour composite
samples which shall
be reported to the Agency withing
10 days after the end of the variance period;
4.
The City shall notify the Agency when draw down will
begin and when repair work is completed;
and
5.
The City shall study the possibility of relocating
the gas line to a more accessible location.
Within 15 days of the date of this Order,
the City shall
execute a Certification of acceptance and agreement to be
bound by all the terms and conditions of this provisional
variance.
The Certification shall be forwarded to the Illinois
Environmental Protection Agency,
Division of Water Pollution
Control, Variance Unit, 2200 Churchill Road, Springfield,
Illinois 62706.
This 15—day period shall be held in abeyance
for any period during which this matter is being appealed.
The
form of the Certification shall read as follows:
CERTIFICATION
I,
(We), ________________________,
having read and fully
understanding the Order in 81-158 hereby accept that Order
and agree to be bound by all of its terms and conditions.
SIGNED
____________________
TITLE
____________________
DATE
__________________
IT IS SO ORDERED.
I, Christan
L. Moffett,
Clerk of the Illinois Pollution
Control Bo~d,hereby c r ify that the above Order was a4o~pted
on
the
~.
day of
_______
,
1981 by a vote ~
~
Illinois Pollution
ntrol Board
43—576