GENERAL ELECTRIC COMPANY,
)
(Mattoon Lamp Plant),
)
Petitioner,
PCB
80—24
ENVIRONMENTAL PROTECTION
AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by Dr. Satchell):
On January 28, 1980 General Electric Company
(GE)
filed a
variance petition requesting relief from manifest requirements
of Rules
301 and 302 of Chapter 9:
Special Waste Hauling Requ-
lations
Since the petition fails
to specifically request or
waive a hearing it is deficient under Procedural Rule 401(b),
Furthermore,
there is no compliance olan as required by Pro-
cedural Rule 401(a) (6),
According to the petition GE manufac-
tures lamps for photographic use at its Mattoon Lamp Plant,
Coles County.
It generates one to five loads of borosilicate
glass scraps per day which are landfilled,
It has obtained
a
special waste permit but seeks
a variance from the manifest
requirements.
The petition does not contain a detailed esti-
mate of the cost of compliance which may be necessary to sup-
port an allegation of arbitrary and unreasonable hardship.
GE
should investigate the cost of manifest
forms
with the necessary
information pre-printed and savings which may be achieved by
using a copy of the manifest for internal record keeping as was
suggested by the Board in its Opinion of March 15, 1979
(33 PCB
131, l47)~
Unless additional information
is received within forty-
five days of the date of this Order, the petition will be sub-
ject
to
dismissal.
19’
T~
~Ci
()Pfl1~P~fl
3
7—365
I
—2—
I, Christan
L. Moffett, Clerk of the Illinois Pollution
Control Board, here
the
________
day
~
above Order was adopted on
________
,
1980 by a vote of
Illinois Polluti
Board
37—366