ILLINOIS POLLUTION CONTROL BOARD
    March
    1,
    1979
    LACLEDE STEEL COMPANY, INC.,
    )
    Petitioner,
    v,
    )
    PCB 79-39
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by Mr.
    Duinelle):
    On February 26, 1979 Petitioner requested a variance from
    Rule 203(b)
    of the Board’s Air Pollution Control Regulations.
    The Petition is insufficient
    in two respects.
    First, it does
    not specifically waive or request a hearing as required by
    Procedural Rule 401(b).
    Second,
    the Petition is signed by an
    attorney whose address
    is listed as St. Louis, Missouri.
    No
    motion for appearance by a foreign attorney was filed as required
    by Procedural Rule 106 (b), nor was the Board advised that this
    attorney is
    licensed to practice in Illinois.
    If these inadequa-
    cies are not corrected within 45 days of the date of this Order,
    this matter will be subject
    to dismissal.
    The statutory
    90 day
    decision period shall run from the date an Amended Petition
    is
    filed.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Order was adopted on
    the
    __________________
    day of
    ~
    ,
    1979 by
    a vote of
    _____________________
    Illinois Pollution
    Board