ILLINOIS POLLUTION CONTROL BOARD
    January
    6,
    1977
    FAIRFIELD LAMPLIGHT MANOR
    )
    Petitioner,
    V.
    )
    PCB 76—324
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by Mr. Dumelle):
    Petition filed December
    27,
    1976
    is inadequate
    in that the
    record of the previous variance is not stipulated into this cause.
    In addition, updated information is lacking
    as
    to whether the
    housing
    is still needed and to what extent; the full cost of the
    project;
    the type of buildings involved
    (whether pre-fabricated
    or constructed on—site);
    the nature of commitments made
    to the
    construction; the effect upon the receiving stream of this variance
    if allowed; and the exact timetable for the expansion of the
    Fairfield sewage treatment plant.
    The Petitioner
    shall amend the Petition within 45 days from
    the date of this Order to provide the information requested above.
    Failure to timely file this information shall make the Petition
    liable to dismissal for inadequacy.
    The 90-day decision period set
    by statute shall run from the date of filing the Z\mended Petition.
    IT IS SO ORDERED.
    I, Christan
    L. Moffett,
    Clerk of the Illinois Pollution Control
    Board, hereby certify the above Order was adopted on the J~day
    of January,
    1977 by a vote of __________________________
    istan L, Mof et
    ,
    erk
    Illinois Pollution C
    rol Board
    24

    Back to top