ILLINOIS POLLUTION CONTROL BOARD
January
 6,
 1977
CENTRAL
 ILLINOIS PUBLIC SERVICE CO.
(Coffeen Power Station),
 )
Petitioner,
V.
 )
 PCB 77-2
ENVIRONMENTAL PROTECTION AGENCY,
 )
Respondent.
INTERIM ORDER OF THE BOARD
 (by Mr.
 Zeitlin):
The Petition for Variance
 in this matter was filed on January
3,
 1977,
 with
 a minor Amendment thereto subsequently filed on January
6,
 1977.
 The Petition, as amended,
 is deficient
 in the following re-
spects:
1)
 The Petition fails to indicate those specific Regulations
from which Variance
 is sought;
2)
 The precise or approximated amounts by which discharge
limitations will be exceeded
 is not shown,
 (one day’s historical
data
 —
 in Exhibit
 I
 —
 being insufficient);
3)
 The period for which Variance is sought, with regard to
both Regulations affected by a proposed set of interim control
measures and those covered by Petitioner’s
 “Phase
 I”
 final com-
pliance sLudy,
 is
 not shown;
4)
 The expected results of Petitioner’s proposed interim
measures are not shown.
5)
 The Petition fails
 to detail the effects
 (if any)
 on the
environment of continued operations under the Variance.
For guidance,
 Petitioner
 is referred to Rule 401 of the
Board’s Procedural Rules.
24
—
577
It
 is the Order of the Board that Petitioner shall amend
 its
Petition within
 45 days of this Order to provide the above information
and achieve compliance with Procedural Rule
 401.
 Failure to timely file
the Amended Petition shall cause the Petition
 to be dismissed without
prejudice for inadequacy.
 The 90-day period for decision set by
Statute shall run from the date of filing the Amended Petition.
IT
 IS SO ORDERED.
I,
 Christan
 L.
 Moffett, Clerk of the Illinois Pollution Contr~l
Board,
 hereby certify the above Interim Order was adopted on
 the
_______
day of
 ~
 1977, by a vote of
 4.c
(~.
 ~
~tan~ffe~.lerT~
Illinois Po11ution~4~.’ntrolBoard
24
—
 579