ILLINOIS POLLUTION CONTROL BOARD
February 19,
1976
REDWOOD CASKET SHELL COMPANY,
)
)
Petitioner,
)
)
v.
PCB 76—42
ENVIRONMENTAL PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD
(by Mr.
Duinelle):
Petition filed February 13,
1976 is inadequate
in that emissions
from the boiler are not shown to be in excess of the allowable
regulation and the regulation itself is not identified from which
variance is desired.
Petitioner
shall amend the Petition within 45 days from
the date of this Order to provide the information listed above.
A
waiver of the 90-day period set by statute for decision to run
from the filing date of the Amended Petition shall be made at the
same time.
Failure to timely file the Amended Petition shall render the
Petition liable to dismissal for inadequacy.
IT IS SO ORDERED.
I,
Christan L. Moffett, Clerk of the Illinois Pollution Control
Board,
hereby certify the above Order was adopted on the
/?‘~‘
day
of February,
1976 by a vote of
~
~sta~.off3~rk
Illinois Polluti
ontrol Board
20— 127