ILLINOIS
POLLUTION CONTROL
BOARD
March 29,
1979
ILLINOIS
POWER COMPANY
(Vermilion Power Plant),
Petitioner,
v.
)
PCB 79—61
ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER
OF
THE
BOARD
(by Mr. Dumelle):
On
March
22, 1979 Petitioner moved the Board to stay
the following conditions of NPDES Permit No.
1L0004057 pending
appeal:
a.
Attachment B1, the monitoring of the parameters of
suspended solids,
boron,
sulfates,
and total dissolved
solids by a composite sample type;
b.
Attachment Bi, the monitoring of the flow parameter on
a daily frequency;
c.
Attachment B3,
in its entirety;
d.
Attachment
G, Paragraph
2;
e.
Attachment G,
Paragraph
5;
f.
Attachment H, Standard Condition No.
3;
g.
Attachment G, Standard Condition No.
7;
h.
Attachment H,
Standard Condition No.
9;
i.
Attachment H,
Standard Condition No.
27;
j.
Attachment H,
Standard Condition No.
28;
k.
Attachment H,
Standard Condition No.
29.
The motion is hereby granted.
IT
IS SO
ORDERED.
I, Christan L.
Moffett,
Clerk of the Illinois Pollution
Control Board,
hereby certify the above Order was adopted on
the
________
day of
______________,
1979 by a vote
Christan
L. Moffet
Illinois Pollution
33—215