ILLINOIS POLLUTION CONTROL BOARD
July
8,
1976
S
&
S DEVELOPMENT,
Petitioner,
v.
)
PCB 76—178
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by Mr.
Young):
On June
21,
1976 Petitioner filed a petition for variance
with the Board.
The petition is inadequate in that
it fails to
comply with the requirements of our Procedural Rule
401.
It is the Order of the Board that Petitioner shall amend
its petition within 45 days of this Order.
Petitioner
is directed
to supply information, including,
but not limited to the following
data:
the average dry weather flow of the treatment plant;
the
designed dry weather flow of the treatment plant; the maximum hy-
draulic capacity of the treatment plant;
the BOD and suspended
solids concentration of the effluent and of the receiving stream;
the design and construction grant status of the treatment plant
improvements; and the estimated construction completion date of
the housing project.
Failure to timely file an amended petition shall cause the
petition to be denied without prejudice for inadequacy.
The 90-
day decision period set by Section
38 of the Environmental Pro-
tection Act shall run from the date of the filing of the amended
petition.
IT IS SO ORDERED.
I,
Christan L.
Moffett, Clerk of the Illinois Pollution Con-
trol Board, hereby ce tify the above Order was adopted on the
~‘
day of
_______________,
1976 by
a vote of
_______
Christan
L. Moffe
lerk
Illinois Pollution
trol Board
23 —65