ILLINOIS POLLUTION CONTROL BOARD
September 15,
1976
CITY OF
OTTAT~k,
)
Petitioner,
V.
)
PCB 76—187
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
OPINION AND ORDER OF THE BOARD
(by ~1r. Young):
This matter comes before the Board on the variance petition
filed June
28,
1976, by the City of Ottawa seeking relief from
Rule
602(d) (3)
of Chapter
3:
Water Pollution Rules and Regula-
tior-is.
An Agency Recommendation was filed with the Board on
August
12,
1976;
no hearing was held in this matter.
Rule 602(d) (3) establishes a compliance date of December
31,
1975 for Rule 602 Cc), which requires in part that all combined
sewer overflows shall be given sufficient treatment to prevent
pollution or
a violation of applicable water quality standards.
The City of Ottawa owns and operates
a sewage treatment plant
which
has a design average flow of 4.0 MGD, and an average daily
flow of 2.5 MGD.
Although the plant has a design maximum flow of
8.0 MGD,
during periods of heavy precipitation flows in excess of
5.5
MGD are diverted to a three cell storm lagoon which has a capa-
city of fourteen million gallons.
When the third cell of the storm
lagoon becomes full,
its contents are redirected
to the chlorine
contact tank for chlorination and admixture with the plant’s
final
effluent.
The City’s wastewater collection system consists of
both
comb
i
nod
and
san
i.
~ary sewers
.
A
t.
Lhoucjh
mos
t
0
Lhe
sewers
constructed
prior
to
1956
were
combined
sewers,
Lhc
City
aileqes
t-
!hi
t.
s
I nce
1
()
56
t:
has
been
coiis
L ruc
L
i
ny
S0)d
ra
t.
~.‘
~ewc
r:~ ~n
flew
developments
and
installing
storm
relief
sewers
in
existing
develop-
ments.
There
are
eighteen
overflow
points
on
the
collection system
which discharge directly to the Illinois or Fox Rivers when the
system becomes hydraulically overloaded during periods of wet
weather.
The City alleges that it has been diligently working
to bring
its system into compliance.
On June
3,
1975,
the City was awarded
a Step
I
grant to prepare a Facilities
Plan for the City.
At the
same time, the City was awarded a Step
II and III grant to separate
storm and sanitary flows within a specific area of the City, the
Central District.
Construction on this project has been initiated
and is expected to be complete in 1977.
The Agency expects that
23
—
521
—~,—
the City’s Facilities Plan, which will focus on remaining com-
bined sewer overflow points, will be submitted within the month
and
the Agency will
then consider the award of additional Step
II and III grants.
In view of the high cost of improvements,
the City alleges an arbitrary and unreasonable hardship would be
placed upon it if
it
were forced to proceed with sewer improve-
ments prior to obtaining assistance from existing grant funds.
The Agency and the Board have recognized the fact that many
municipalities and sanitary districts throughout the State have
not met and cannot presently meet the 602(d) (3) compliance date.
On December 22, 1975,
the Agency filed an Amended Petition for
Regulatory Change
(R75—15) with the Board specifically requesting
the compliance date be extended, provided the discharger has
applied
for a grant and is diligently pursuing the grant program.
Although the Board has not taken final action on this proposal,
at its May 20,
1976 meeting,
the Board authorized for publication
a proposed final draft of the Rule Change which would adopt the
substance of the Agency’s proposal.
The economic impact hearings
were conducted on August 26, and September
1,
1976.
In view of the foregoing,
the
Board is disposed to grant the
City of Ottawa the relief requested.
We believe an arbitrary and
unreasonable hardship would be placed on the City by requiring the
massive capital outlays necessary for compliance without first
allowing the City
to obtain assistance from existing grant program
and particularly so when the City would be precluded from any reim
-
bursement from State/Federal grant
funds if the City were to proceed
in advance of a particular grant award
(The Clinton Sanitary Distric~-
PCB 75-498;
The Sanitary District of Elgin, PCB 75-501).
This Opinion constitutes the Board’s findings of fact and con-
clusions
of law in this matter.
ORDER
1.
The City of Ottawa is granted variance from the compliance
(Ia
t:e
for
the
trea
t
men
t;
o I comb
i nod su~o
r
OV(
r
1
1
ow~
~ S
(‘S
1 ~ib
1.
i.
shod
by
!~ti
Jo
602 (d
) (3)
ol
Lhc
WaLer
1~()1
I.
Ut.
Ion
Ru
1 os
~nitI
1~O(JII
1
d
L
ions
Such
Vd
r i ance
i s
q
ran Led
un
Lii ~July
I
,
I
977
,
or un ~
I
Llic
board
takes final action
in consideration of Regulatory Proposal R75-15,
whichever
is earlier.
2.
During the period of the variance the City shall main-
tain optimum plant operating efficiency and convey as much com-
bined sewer flow to its plant as is practicable.
3.
This variance will immediately terminate
if the City
is
offered a State or Federal grant during this period and the City
does not respond with appropriate action to bring the combined
sewer system into compliance.
23
—
522
—3—
IT IS SO ORDERED.
I,
Christan
L. Moffett, Clerk of the Illinois Pollution
Control Board, hereb
certify the above Opinion and Order were
adopted on the
/
~
day
of
__________________,
1976 by a
vote of
______
Illinois
Pollution
trol Board
23
—