ILLINOIS POLLUTION CONTROL BOARD
November 4, 2004
CITY OF SULLIVAN,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB
05-73
(UST
Appeal)
(90-Day
Extension)
ORDER OF THE BOARD (by J.P. Novak):
On October 21, 2004, the parties timely filed a joint notice to extend the 35-day period
within which City of Sullivan may appeal a September 13, 2004 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The Agency modified
petitioner’s high priority corrective action plan budget for City of Sullivan’s leaking
underground petroleum storage tank facility located at North Park Street, Sullivan, Moultrie
County.
The Board extends the appeal period until January 17, 2005.
1
See
415 ILCS 5/40(a)(1)
(2002); 35 Ill. Adm. Code 105.406. If City of Sullivan fails to file an appeal on or before that
date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on November 4, 2004, by a vote of 5-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board
1
The request was for January 18, 2005, which is beyond the time allowed under the
Environmental Protection Act.