ORDER OF THE BOARD (by T.E. Johnson):
On December 20, 2002, the parties timely filed a joint notice to extend the 35-day period
within which Wabash Valley (Wabash) may appeal a November 13, 2002 determination of the
Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2000)
amended
by
P.A. 92-0574, eff. June 26, 2002; 35 Ill. Adm. Code 105.406. The Agency rejected the
amended site classification work plan budget regarding a leaking underground storage tank site
at 4 Elm Street in Albion, Edwards County. The Board extends the appeal period until March
18, 2003, as the parties request.
See
415 ILCS 5/40(a)(1) (2000),
amended by
P.A. 92-0574, eff.
June 26, 2002; 35 Ill. Adm. Code 105.406. If Wabash fails to file an appeal on or before that
date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on January 9, 2003, by a vote of 5-0.
Dorothy M. Gunn, Clerk