ILLINOIS POLLUTION CONTROL BOARD
January 4, 2001
ILLINOIS AMERICAN WATER
COMPANY, ALTON REPLACEMENT
FACILITY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
)
)
PCB 01-100
(Provisional Variance – Water)
ORDER OF THE BOARD (by C.A. Manning):
On January 2, 2001, the Illinois Environmental Protection Agency (Agency) filed a
request for a provisional variance and notification of recommendation. The Agency
recommends that the Board grant a 45-day provisional variance to the Illinois American Water
Company, Alton Replacement Facility (IAWC), for its public water supply treatment plant,
located in Alton, Madison County, Illinois. The requested variance is from the requirement of
a National Pollutant Discharge Elimination System (NPDES) permit to allow it to bring the
replacement plant into service on December 28, 2000, before its pending NPDES permit has
been finally issued by the Agency.
In making its recommendation, the Agency states that failure to grant the requested
provisional variance for
45
days will result in an arbitrary or unreasonable hardship on the
petitioner.
The Board is required, in a provisional variance, to adopt a formal order, assure formal
maintenance of the record, assure the enforceability of the variance, and provide notification of
the action by press release. Pursuant to Section 35(b) of the Environmental Protection Act
(415 ILCS 5/35(b) (1998)), the Board must issue the provisional variance within two days of
the filing.
The Board grants the petitioner a provisional variance from 35 Ill. Adm. Code
309.102.
The provisional variance is granted, subject to the following conditions:
1. The variance begins December 28, 2000, and continues for 45 days or until the
effective date of the final NPDES permit for the Alton replacement facility.
2
2.
During the variance period, petitioner must comply with the terms of the
adjusted standard in
In re:
Petition of Illinois American Water Company’s
Public Water Supply Replacement Facility Discharge to the Mississippi River
for an Adjusted Standard from 35 Ill. Code 302.203, 304.106, and 304.124
(September 7, 2000), AS 99-6.
3.
Petitioner must sign a certificate of acceptance of this provisional variance and,
within ten days of the date of this order, forward that certificate to the
following address:
Illinois Environmental Protection Agency
Bureau of Water – Water Pollution Control
Compliance Assurance Section
Wastewater Compliance Monitoring Unit
Attention: Roger Callaway
1021 North Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
CERTIFICATION
I (We), _________________________________, hereby accept
and agree to be bound by all terms and conditions of the order of the
Pollution Control Board in PCB 01-100 dated January 4, 2001.
______________________________________
Petitioner
______________________________________
Authorized Agent
______________________________________
Title
______________________________________
Date
IT IS SO ORDERED.
Section 41 of the Environmental Protection Act (415 ILCS 5/41 (1998)) provides for
the appeal of final Board orders to the Illinois Appellate Court within 35 days of service of this
order. Illinois Supreme Court Rule 335 establishes such filing requirements. See 172 Ill. 2d
R. 335; see also 35 Ill. Adm. Code 101.520, Motions for Reconsideration.
3
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
the above order was adopted on the 4th day of January 2001 by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board