ILLINOIS POLLUTION CONTROL BOARD
    November 6, 1997
    SIERRA CLUB and JIM BENSMAN ,
    Petitioners,
    v.
    CITY OF WOOD RIVER and NORTON
    ENVIRONMENTAL,
    Respondents.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 98-43
    (Pollution Control Facility Siting Appeal)
    ORDER OF THE BOARD (by R.C. Flemal):
    This matter is before the Board on an appeal filed pursuant to Section 40.1(b) of the
    Illinois Environmental Protection Act (Act) (415 ILCS 5/40.1(b) (1996)) on September 22,
    1997 by Jim Bensman, from the August 18, 1997 decision of the City of Wood River (City)
    granting local siting approval to Norton Environmental for a pollution control facility located
    in Madison County.
    On October 14, 1997, Norton Environmental filed a motion to strike the September 22,
    1997 petition. Norton Environmental requests that the Board strike the entirety of the petition,
    or at a minimum, paragraphs 2, 8 through 13, 16, and 20. On October 24, 1997, Mr.
    Bensman filed a response to the motion to strike and a motion for sanctions against Norton
    Environmental. On October 29, 1997, Norton Environmental filed a reply to the motion to
    strike and motion for sanctions, and a motion to dismiss.
    1
    On November 5, 1997, Mr.
    Bensman filed a reply to Norton’s motion to dismiss and motion for additional sanctions
    against Norton.
    MOTION TO STRIKE THE ENTIRE PETITION
    Norton Environmental argues that Mr. Bensman’s petition is vague and unclear,
    “replete with errors, surplusage, summary statements and conclusions, but void of meaningful
    factual allegations” (Mot. at 2) which “fails to plead anything but mere conclusions” (Mot. at
    4). As a result, Norton Environmental claims it cannot prepare for hearing or present an
    adequate defense given the inadequacies of the petition. Furthermore, Norton Environmental
    1
    Mr. Bensman’s September 22, 1997 petition for review will be cited as “B. Pet. at”; Norton
    Environmental’s October 14, 1997 motion to strike will be cited as “Mot. at “; Mr. Bensman’s
    October 24, 1997 response and motion for sanctions will be cited as “Resp. at “; and Norton
    Environmental’s October 29, 1997 reply will be cited as “Reply at “.

    2
    claims that it has secured a “property right in siting” and is entitled to not only fundamental
    fairness, but also procedural and substantive due process. Reply at 1. Norton Environmental
    argues that the petition is “sufficiently infirm as to deny the Board of Jurisdiction.” Reply at
    2. Therefore, Norton Environmental requests that the Board grant its motion to strike and
    dismiss the petition.
    Mr. Bensman argues that because the Board accepted his petition and found that it was
    not duplicitous or frivolous, the Board cannot grant the motion to strike. Mr. Bensman states
    that pursuant to 40 ILCS 5/40.1 (1996), the Board must hear the petition. Resp. at 2.
    On October 2, 1997, the Board issued an order in this matter which found, among
    other things, that the complaint petition was neither duplicitous nor frivolous. Sierra Club and
    Jim Bensman v. City of Wood River and Norton Environmental (October 2, 1997), PCB 98-
    43. After analyzing the petition as a whole, the Board found that it does not fail to state a
    cause of action upon which relief can be granted. As noted by Mr. Bensman, Section 40.1(b)
    of the Act requires, where the Board determines that a petition is not duplicitous or frivolous,
    that the Board hear the matter. 415 ILCS 5/40.1(b) (1996). The matter was accordingly set
    for hearing.
    In ruling on the instant motion to strike the entire petition, or motion to dismiss, the
    Board must take all well-pleaded allegations as true and may not dismiss the petition unless it
    clearly appears that no set of facts could be proven which would entitle petitioner to relief.
    Illinois is a fact-pleading state and, as such, does not require petitioner to plead all facts
    specifically in the petition, but to set out ultimate facts which support his cause of action.
    LaSalle National Trust N.A. v. Village of Mettawa, 249 Ill. App. 3d 550, 557, 616 N.E.2d
    1297 (2d Dist. 1993), People ex. Rel. Fahner v. Carriage Way West, Inc., 88 Ill.2d 300, 430
    N.E.2d 1005, 58 Ill. Dec. 754 (1981), Bernice Loschen v. Grist Mill Confections, Inc.
    (September 18, 1997), PCB 97-174. Despite the requirement of fact pleading, courts are to
    construe pleadings liberally to do substantial justice between the parties. (Classic Hotels, Ltd.
    v. Lewis, 259 Ill. App. 3d 55, 60, 630 N.E.2d 1167 (1st Dist. 1994).) However, case law is
    consistent in finding that pleading requirements for administrative review are less exacting than
    for other causes of action. (Mueller v. Board of Fire and Police Commissioners of the Village
    of Lake Zurich, 267 Ill. App. 3d 726, 643 N.E.2d 255 (2d Dist. 1994).)
    Although there are specific paragraphs which are not properly pled in Mr. Bensman’s
    petition, which the Board today strikes, the petition itself is not devoid of meaningful factual
    allegations as alleged by Norton Environmental. The Board notes that Norton Environmental
    is incorrect in its statement that it has secured a property right in siting. The Appellate Court,
    First District, has recently held that “siting approval is not a property right.” Medical
    Disposal Services, Inc., v. PCB & IEPA, cite.
    The Board finds that the petition is sufficiently pled to proceed to hearing. However,
    the Board reminds the parties that the burden of proof is on Mr. Bensman and the Sierra Club
    in this matter. 415 ILCS 5/40.1(b) (1996). Further, the Board finds that Norton
    Environmental can prepare a defense based upon the criteria alleged in the petition to have

    3
    been violated. The Board therefore denies Norton Environmental’s motion to strike the
    petition in its entirety. However, the Board will independently address each of the paragraphs
    raised in Norton Environmental’s motion to strike.
    MOTION TO STRIKE PARAGRAPHS IN THE PETITION
    Norton Environmental requests that the Board strike the following paragraphs of the
    petition: 2, 8 through 13, 16, and 20. First, Norton Environmental alleges that paragraph 2,
    referring to the Sierra Club members who live in “close proximity” to the facility, should be
    stricken because it is “vague, unclear and consists of mere conclusions.” Mot. at 2. The
    Sierra Club has, in accordance with the Board’s order (Sierra Club and Jim Bensman v. City
    of Wood River and Norton Environmental (October 2, 1997), PCB 98-43), filed an amended
    petition for review (see supra p.4-5) which specifically addresses the Sierra Club’s position in
    this matter. Paragraph 2 of Mr. Bensman’s petition specifically refers to the Sierra Club’s
    involvement in this matter. Because Mr. Bensman is prohibited from representing the Sierra
    Club, and by virtue of the fact that the Sierra Club has filed its own petition, the Board will
    strike paragraph 2 of Mr. Bensman’s petition for review.
    Second, Norton Environmental requests that the Board strike paragraphs 8 through 13
    of the petition which address fundamental fairness. As Norton Environmental points out, Mr.
    Bensman’s petition addresses the fundamental fairness of the hearing before the City of Wood
    River in paragraphs 8 through 13. Mot. at 3 citing B. Pet. at 3. However, Mr. Bensman
    states in paragraph 13 of his petition, “[p]etitioners have chosen to not raise the issue of
    fundamental fairness.” B. Pet. at 3. Furthermore, Mr. Bensman later confirmed his intention
    and stated that “the petition only challenges the criteria.” Resp. at 2. Mr. Bensman has
    thereby waived his ability to raise arguments at hearing relating to fundamental fairness.
    2
    Therefore, any arguments relating to the fundamental fairness of the hearing before the City of
    Wood River are irrelevant to the instant petition for review and are not appropriately before
    the Board in this matter. Accordingly, the Board hereby strikes paragraphs 8 through 13 of
    Mr. Bensman’s petition.
    Third, Norton Environmental argues that paragraph 16 of the petition is unclear, and
    cites a presumption which does not exist. Mot. at 3. Paragraph 16 states that the City’s
    finding of bias and lack of credibility of the County’s Environmental Committee Chair was
    against the manifest weight of the evidence because there is a “presumption that administrative
    officials are objective and capable of fairly judging a particular controversy.” B. Pet. at 4.
    As the Board has noted above, the State of Illinois is a fact-pleading state, and Mr. Bensman is
    not required to plead all the facts specifically in his complaint. The Board believes, while
    acknowledging that Mr. Bensman could have pled more facts, that it is clear that he has
    included paragraph 16 to support his allegation that Norton Environmental did not demonstrate
    compliance with criterion #1 (415 ILCS 5/39.2(a) (1996)), and the City of Wood River erred
    in determining that criterion #1 was met. Mr. Bensman clearly included this argument under
    2
    The Board notes that issues of fundamental fairness are similarly not raised in the Sierra
    Club’s petition for review.

    4
    the section of the petition titled “Count I Criterion #1”. B. Pet. at 4. The Board will not
    strike paragraph 16 of Mr. Bensman’s petition.
    Fourth, Norton Environmental requests that the Board strike paragraph 20 of Mr.
    Bensman’s petition because it is unclear and misstates the statutory language of criterion 5.
    Mot. at 3. Paragraph 20 is placed under the section of Mr. Bensman’s petition titled “Count
    III Criterion 5.” B. Pet. at 5. The petition states that “Norton was required to ‘demonstrate’
    that ‘the facility is located so as to …minimize the effect of the value of the surrounding land.’
    (Criterion 5.)” Pet. at 5.
    Mr. Bensman incorrectly quoted the statutory language of Section 39.2(a)(5), which
    states an applicant must demonstrate that “the plan of operations for the facility is designed to
    minimize the danger to the surrounding area from fire, spills, or other operational accidents.”
    415 ILCS 5/39.2(a)(5) (1996). Criterion #5 does not address the value of the surrounding
    land, which is referenced in criterion #3 (415 ILCS 5/39.2(a)(3) (1996)). Norton
    Environmental is correct that Mr. Bensman has misstated criterion #5. In Mr. Bensman’s
    response he states that Norton Environmental did correctly point out this typo in his petition,
    “the citing of the language of Criterion III and referring to it as Criterion V.” Resp. at 4.
    Mr. Bensman does not explicitly explain which criterion he is alleging was violated.
    Criterion #3 states that the applicant must demonstrate that “the facility is located so as
    to minimize incompatibility with the character of the surrounding area and to minimize the
    effect on the value of the surrounding property.” 415 ILCS 5/39.2(a)(3) (1996). The Board
    believes, given the fact that Mr. Bensman’s petition has quoted from criterion #3, that he
    mistakenly referred to criterion #3 as criterion #5. The Board will therefore interpret Count
    III of Mr. Bensman’s petition, including paragraphs 19 and 20, as alleging a violation of
    criterion #3 (415 ILCS 5/39.2(a)(3) (1996)). The Board denies Norton Environmental’s
    motion to strike paragraph 20.
    MOTION FOR SANCTIONS
    Mr. Bensman requests that the Board order sanctions against Norton Environmental in
    the amount of $1000 for his cost in responding to Norton’s October 14th motion to strike, and
    the costs for the Board hearing the motion. Mr. Bensman alleges that Norton Environmental’s
    motion to strike is frivolous and designed to harass him and to waste the Board’s time. Resp.
    at 1, 2, 3, and 4. Further, Mr. Bensman alleges that Norton Environmental’s motion does not
    reference any law, regulation, Board policy, guidance, or case that supports the motion. Resp.
    at 1. Norton Environmental does not specifically address the motion for sanctions.
    Mr. Bensman requests Norton be sanctioned an additional $1000 for his time and
    expenses in responding to Norton’s October 29th motion to dismiss. Mr. Bensman states
    several reasons including that it is a frivolous and harassing motion, untimely filed, and fails to
    cite legal authority.
    The Board clearly has the ability to sanction parties. 35 Ill. Adm. Code 101.280
    (1996); Grigoleit Co. v. IPCB, 245 Ill. App.3d 337 at 346, 613 N.E.2d 371 at 377 (1993)

    5
    citing EPA v. Celotex Corp., 168 Ill.App.3d 592, 522 N.E.2d 888 (1988). In determining
    whether to sanction a party, the Board will consider such factors as “the relative severity of the
    refusal or failure to comply, the past history of the proceeding, and the degree to which the
    proceeding has been delayed or prejudiced” (35 Ill. Adm. Code 101.280(b) (1996)). Norton
    Environmental’s motion to strike does not delay or prejudice this proceeding to such a degree
    as to warrant sanctions. In fact, the Board today grants a portion of the motion to strike. The
    Board denies Mr. Bensman’s requests for sanctions.
    AMENDED PETITION FILED BY THE SIERRA CLUB
    By order of October 2, 1997, the Board found, among other things, that pursuant to the
    provisions of the Attorney Act (705 ILCS 205/1 (1996)) and the Corporation Practice of Law
    Prohibition Act (705 ILCS 220/1 (1996)), Mr. Bensman, as a non-attorney, could not
    represent the Sierra Club in this action. Sierra Club and Jim Bensman v. City of Wood River
    and Norton Environmental (October 2, 1997), PCB 98-43. The Board allowed the Sierra Club
    30 days in which to retain an attorney and for that attorney to file an amended petition and
    appearance on behalf of the Sierra Club on or before October 31, 1997. On October 30,
    1997, an attorney on behalf of the Sierra Club filed an appearance and amended petition for
    review. The Sierra Club filed its petition on its own behalf, not on behalf of Mr. Bensman.
    The Sierra Club challenges all of the Section 39.2(a) criteria. The Board hereby accepts the
    Sierra Club’s amended petition for review and also dockets that petition as PCB 98-43. Mr.
    Bensman’s September 22, 1997 petition and the Sierra Club’s October 30, 1997 petition, will
    be treated as consolidated matters and as such will proceed, for purposes of hearing and
    decision, as consolidated.
    CONCLUSION
    The Board hereby denies Norton Environmental’s motion to strike Mr. Bensman’s
    petition in its entirety. The Board grants Norton Environmental’s motion to strike paragraphs
    2, 8, 9, 10, 11, 12 and 13 of Mr. Bensman’s petition for review. The Board denies Norton
    Environmental’s motion to strike paragraphs 16 and 20 of Mr. Bensman’s petition for review.
    The Board denies Mr. Bensman’s motions for sanction against Norton Environmental.
    IT IS SO ORDERED.
    Board Members G. Tanner Girard and J. Theodore Meyer concurred.

    6
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
    the above order was adopted on the 6th day of November 1997, by a vote of 7-0.
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board