    TIMBER RIDGE MOBILE HOME PARK,
    )
    Petitioner,
    V.
    )
    PCB 78—310
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    OPINION AND ORDER OF THE BOARD
    (by Mr. Young):
    This
    matter
    comes before the Board on a Petition filed
    on December 29,
    1978,
    by the Timber Ridge Mobile Home Park
    for a variance from Rule 962(a) of Chapter
    3:
    Water Pollution,
    of the Board’s Rules and Regulations to allow the connection
    of certain properties to a sanitary sewer extension in lieu
    of a like number of connections presently permitted.
    The
    Environmental Protection Agency filed a Recommendation on
    February
    2,
    1979, which recommended a grant of the variance,
    subject to certain conditions.
    No hearing was held; Petitioner
    waived hearing and made no request pursuant to Rule
    406 of the
    Procedural
    Rules after receipt of the Agency recommendation.
    Timber Ridge Mobile Home Park is located on Ridgeland
    Avenue, Matteson, Cook County,
    Illinois and Petitioner
    is
    engaged in the development and leasing of residential mobile
    home sites.
    The Timber Ridge Mobile Home Park Phase
    1 consists
    of 211 mobile home lots served by a sanitary sewer extension
    constructed under Agency permit #l976-HB-490-COP issued
    on
    April
    9,
    1976.
    One hundred forty-five
    (145)
    of the 211 lots
    permitted in Phase
    1 are connected,
    On November 15,
    1978,
    Petitioner was issued a construct only permit for a sanitary
    sewer extension to serve a Phase
    2 development of
    the facilities
    by the addition of 344 additional lots.
    No operating permit
    was granted because the treatment plant to which the sewers
    are tributary was hyc~rau1icallyoverloaded and has been on
    restricted status since February
    9,
    1978.
    The treatment plant,
    owned and operated by Prestwick Utilities,
    is currently
    being expanded from the present
    0.15
    mgd capacity to 0.4 mgd.
    Plant expansion is scheduled for completion
    in the
    spring of
    1979
    (Pet.
    1—3,
    Rec.
    2).
    33—47

    —2—
    The variance requested would allow the Petitioner to
    connect 50
    lots
    in Phase
    2
    in lieu of the connection of
    50
    lots in Phase
    1.
    The Petitioner agrees to defer the connection
    of
    50 lots
    in Phase
    1 under permit until the expansion of
    the treatment plant is complete
    (Pet.
    3-5).
    Since the substitution proposed will involve no additional
    flow over that currently permitted, the Board
    will
    grant
    Petitioner’s reque~t.
    This Opinion constitutes the Board’s findings
    of
    fact
    and conclusions of law in this matter.
    ORDER
    1.
    Timber Ridge Mobile Home Park
    is granted
    a variance
    from Rule 962(a) of Chapter
    3:
    Water Pollution,
    of the
    Pollution Control Board Rules and Regulations
    to
    allow the
    connection of 50 lots
    (125 P.E.)
    in its Phase
    2 to the
    sanitary sewer permitted under permit #1978-HC-2659.
    2.
    Fifty
    (50) of the lots permitted under permit #1976-
    HB-490-COP
    in Phase
    1 shall not be connected until the
    expansion of the main sewage treatment plant of Prestwick
    Utilities
    is completed and the Illinois Environmental Protection
    Agency has approved such connections in writing.
    3.
    Within forty-five
    (45) days of the
    date
    of this Order,
    the Petitioner shall submit to the Manager, Variance Section,
    Division of Water Pollution Control, Illinois Environmental
    Protection Agency, 2200 Churchill Road, Springfield,
    Illinois,
    62706, an executed Certification of Acceptance and Agreement
    to he bound to all terms and conditions of the variance.
    The
    forty-five day period herein shall be stayed during judicial
    review of this variance pursuant to Section
    41 of the Environ-
    mental Protection
    ~ct.
    The form of said certification shall
    be as follows:
    CERTIFICATION
    I,
    (We),
    ___________________________
    having read
    the
    Order of the Pollution Control Board in PCB 78-310,
    understand and accept said order, realizing that such
    acceptance
    renders
    all terms and conditions thereto
    binding and enforceable.
    SIGNED
    TITLE
    DATE
    33—48

    —3—
    IT IS SO ORDERED
    I, Christan L.
    Foffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Opini n and Order
    were adopted on the
    1
    ‘~‘
    day of
    1)’)
    ,
    1979,
    byavoteof
    Ij’.~o
    Illinois Polluti
    33—49

    Back to top