1. SIGNED________________________
      2. TITLE ________________________
      3. DATE_____________________________
      4. Christan L. MoffetV, erkIllinois Pollution rol Board

ILLINOIS
POLLUTION
CONTROL BOAI
February
2,
1978
VILLAGE OF WAUCONDA,
Petitioner,
V.
PCB 77—191
ENVIRONMENTAL PROTECTION AGENCY,
Respondent
OPINION AND ORDER OF THE BOARD
~4r.Goodman)
This matter comes before
tha
llution Control
Board upon
the petition filed by the
Vi11ao~of
Wauconda
(Wa~iconda) on
July 13,
1977,
seeking variance
loom
Rule 404(f)
(ii)
~A)
of th~
Water Pollution Regulations,
Chapt~
3 of the
Board~s
Rules
and
Regulations.
The Agency
filed it~
:~ecorpJnendatj~
on October
24,
1977.
Hearings were held on
o~oember
~
and
13,
1977,
in
the Village of Wauconda, Lake
County,
Illinois,
Several
citizen
witnesses testified.
Wauconda seeks a variance from Rule 404(f)
so
that it may
discharge effluent containing levels of BOD5 and suspended
solids
which exceed those specified while
it upgrades its facilities.
Wauconda discharges its effluent to Bangs Lake Drain Creek which
flows for approximately two miles before discharging to Slocum
Lake.
Slocum Lake discharges to the Fox River.
Wauconda’s sewage treatment facilities are designed
for a
population load of 8,000 PE, and the current population
load is
6,000 PE.
Because Bangs Lake Creek is a low flow stream,
Wa~iconda~s
NPDES Permit and Rule 404(f) required the effluent from
its sewage
treatment facilities to meet BOD and SS limitions
of
4 and ~
mg/I,
respectively.
However, Waucond&s existing facility is
incapable
of complying with these limitations.
Therefore,
in
its Petition,
29
153

—2—
Wauconda
proposes to expand and upgrade its treatment plant from
8,000 PE
to 12,000 PB.
Wauconda contends that,
although the up-
graded facility will be unable to consistently meet 4/5 mg/i,
it
will be
capable of meeting the 10/12 mg/i standard which would
apply if
Wauconda secures a Pfeffer Exemption or a variance from
Rule 404(f).
Wauconda applied to the Agency for a Pfeffer exemption on
April
8,
1977.
On May
2,
1977,
the Agency denied the application
because
Wauconda had failed to demonstrate that its effluent would
not
result in dissolved oxygen water quality violations in Slocum
Lake,
which is expected to receive the majority of the deoxygen-
ating
wasteload.
The Agency also indicated its reservations as
to whether
any type of conceptual analysis could accurately predict
the
impact of Wauconda’s effluent on Slocum Lake without expensive
and time
consuming field verification.
Wauconda has already
obtained a
variance from the Board to discharge phosphorus in
excess
of the standards,
Wauconda currently contributes fifty—two
percent
(52)
of the phosphorus load to Slocum Lake.
Upon
comple-
tion of
construction, Wauconda will meet a phosphorus limit of 1.0
mg/I
and can be expected to contribute 26.3 percent of the total
load to
Slocum Lake,
if discharge remains to the lake.
Slocum Lake
is
nitrogen limited
(See Respondent’s Ex.
1).
The
central issue raised
in this
matter
is whether allowing
Wauconda
to upgrade and expand
its
facilities and continue to
discharge
to Bangs Lake Creek and ultimately to Slocum Lake will
cause
or contribute to a violation of the dissolved oxygen water
quality
standard in Slocum
Lake.
A study performed by U.S. EPA
in 1973
and published in 1975 indicates that Slocum Lake is
highly
eutrophic (Respondent~sEx.
1).
A fishery biologist with
the
Department of Conservation testified during the hearings
that there
is much blue-green
algae
in Slocum Lake,
that there
have been
many fish kills and that the predominant fish in the
lake is
carp, an indication of degraded conditions.
Even the
carp die
off occasionally (R.6l~64). Another witness at the
hearing
with a specialty in fisheries testified as to the eutro-
phic nature of Siocum Lake
(R.71).
The
Agency testified at hearing that even meeting a 10/12
mg/I BOD
and SS standard,
1.5
ammonia nitrogen standard and 1.0
phosphorus
standard will not prevent Wauconda’s facilities from
causing
or contributing to a violation of the dissolved oxygen
water
quality standard in Slocum Lake
(R.52,
Sec.
13).
The
Agency
testified that even this reduced amount of nutrient addi-
tion
will continue to spur algae and other plant growth in the
29
154

—3—
lake,
which is the primary basis for eutrophication and thus
depletion of dissolved oxygen
(R.52,
Sec.
13).
Two witnesses
testified that even eliminating the sewage treatment plant dis-
charge
to the Lake would not solve the eutrophication problem
(R,62,
76, Sec.
6),
The Agency outlined the alternatives open to Wauconda as:
1.
expand and upgrade the existing treatment plant
to meet 10/12 mg/l of BOD and suspended solids
respectively, with continued discharge of efflu-
ent to Banks Lake Creek and Slocum Lake;
2.
construct an interceptor sewer
to
transport
Wauconda’s wastewater to the proposed regional
Island Lake plant; thereafter, abandon the
Wauconda treatment plant;
3.
expand and upgrade the existing treatment plant
but construct an outfall sewer around Bangs Lake
Creek and Slocum Lake with direct discharge to
the Fox River.
A fourth alternative, diversion of the overflow from Bangs Lake
Creek along with the STP effluent into the Fiddle Lake marsh
before it enters the Slocum Lake drain, was presented at the
hearing by the Lake and McHenry Council of Governments
(LAMCOG).
However,
the environmental and financial implications of this
alternative have not been fully studied, and Wauconda strongly
opposes this alternative because of the overflow it could create
onto property adjacent to Fiddle marsh and because of potential
litigation from persons with riparian rights in Slocum Lake.
A consultant to the Village of Wauconda testified about
the difference in cost between the three alternatives outlined
in the Agency’s Recommendation.
He indicated that upgrading
and expansion alone would cost Wauconda $2,125,000
in capital
expenditures plus $85,000 for annual maintenance.
Upgrading
and expansion plus construction of an outfall sewer around Bangs
Lake Creek and Slocum Lake with direct discharge to the Fox
River would cost Wauconda $2,650,000 plus $90,000 annually for
maintenance.
Finally, transporting Wauconda’s sewage to the pro-
posed regional Island Lake plant would cost Wauconda $3,560,000
29— 155

—4—
plus $77,000 annually.
The figures are detailed in Petitioner~s
Exhibits
5,
6 and 7.
The Board agrees that the condition of Slocum Lake requires
that Wauconda, at some point, route its effluent to an outfall
sewer that bypasses Slocum Lake.
The Fox River, although itself
polluted, can better handle Wauconda’s effluent than can a very
shallow, relatively quiescent lake such as Slocum Lake.
The
Board finds that, based upon Wauconda’s present cost estimates,
construction of an outfall sewer to a tributary to the Fox River
is a more cost-effective means of bypassing Slocum Lake than
regionalizing its wastewater treatment with the Island Lake plant.
Wauconda is unable to meet even a 10/12 BOD and SS standard
prior
to upgrading and expansion of its facilities.
Wauconda’s
discharge Monitoring Reports indicate BOD levels ranging from 19
to 26 and suspended solids levels ranging from 17 to 22,
The
record herein indicates that Wauconda has been diligent in its
efforts to achieve compliance.
Therefore,
the Board finds that
denial of the requested variance would constitute an arbitrary and
unreasonable hardship.
Hbwever, the Board will impose as a condi-
tion of the variance a requirement that Wauconda begin and complete
construction of an outfall sewer to a tributary to the Fox River
as soon as funds become available but in no event later than three
years from the date of this Order,
The variance will be granted
for three years.
The Board recognizes that Wauconda’s financial
situation may prevent it from completing construction of the out-
fall sewer within three years.
Should Wauconda need more time,
it
can apply to the Board for a variance.
The Board will also impose
as conditions to the variance a requirement that Wauconda meet
interim BOD and SS limits of 30/30 mg/I and that Wauconda, as
agreed, install and utilize nitrification equipment,
acceptable to
the Agency, at its new plant.
This Opinion constitutes the findings of fact and conclusions
of law of the Board in this matter.
It is the Order of the Pollution Control Board that Wauconda
be granted a variance from Rule 404(f)
of Chapter
3:
Water
Pollution, until February 2,
1981,
subject to the following condi-
tions:
29
156

mrnediately begin to
a exIsting sewage
2.
Lha~
S
C
~
ent d
soJ~
3.
tra
txea
not
ri urtil construction
a
3hall limit its efflu—
~ nj/I BOD and
suspended
i
s upgraded sewage
a
s effluent shall
LOD and SS, respectively;
4.
tha
ecu ~
pIn
d utilize nitrification
the Agency,
at its new
5,
1
of
a
Sb
tarn
atai
b~
6.
tat
Age
t
~C
J
~d complete construction
a.
Bangs Lake Creek and
Juagn to an unnamed tribu—
-
a soon as funds
become
ye
Later than three
~hia Order;
a~m~annually to the
ability to install
I
fled in paragraph
7.
Wa
Lfl~
V
t~
a
p
~
S
I
(We)
underst~dT7I
prior
of this Order,
hall execute and
s
Er vironmental
hurcnill Road,
706 and the Pollution
i~cttiun
of Aoceptance
o
to all teams and
The 45 day
period
~ce daring any period
~c
led,
The form of
L
be as follows:
having
read and
fully
c’s Pollution Control Board
1.
tha
upga
a
treat. a
3
~1

—6—
in PCB 77-191 hereby accept said
Order and agree
to be bound
by all of the terms and conditions
thereof.
SIGNED________________________
TITLE
________________________
DATE_____________________________
I, Christan L. Moffett,
Clerk of
the Illinois
Pollution Control
Board, hereby certify the above Opinion
and
Order
were a~1optedon
the~AI~~__day
of
,
1978
by a vote
of
-s_p
Christan L. MoffetV,
erk
Illinois Pollution
rol Board
29— 158

Back to top