October
~L1,
±~,.,
)
FANSTEEL,
INC.
)
)
)
v.
)
PCB 73-423
)
)
ENVIRONMENTAL PROTECTION AGENCY
)
)
ORDER OF THE BOARD
(by Mr. Dumelle):
Petition filed October
3,
1973
is inadequate since
is
titled
a “Petition for Extension of Variance’1 and yet refers
to
a previous enforcement case.
Petitioner should amend the
petition within 30 days
into either;
(a) variance petition or,
(b)
a motion to amend the order in PCB 72-76.
If
a variance is desired it should specify the rules
from
which variance is requested and detail the injury to the public
that will result in
a grant of the variance
(see Board Procedural
Rules
401(a) (2)
and 401(a) (3)).
Failure to timely amend the petition in accordance with the
requirements listed above will render the petition liable to dismissal
for inadequacy.
IT
IS SO ORDERED.
I, Christan L. Moffett,
Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the ,/~
day
of October, 1973 by a vote of
i~/_O
q~~rn
~Qat
C ristan L. Moffett,~/~lerk
Illinois Pollution ~C~ntrol Board
9— 483