ILLINOIS POLLUTION CONTROL BOARD
    July 20, 1978
    ILLINOIS POWER
    COMP~ANY,
    )
    (BALDWIN STATION),
    )
    )
    Petitioner,
    )
    V.
    )
    PCB 75—109
    )
    PCB
    78—189
    ENVIRONMENTAL PROTECTION
    )
    CONSOLIDATED
    AGENCY,
    )
    Respondent.
    ORDER
    OF
    THE
    BOARD
    (by
    Mr.
    Goodman):
    On June 30,
    1978
    Petitioner
    filed
    a
    “Motion
    to
    Amend
    Order”
    in PCB 75—109.
    The Board will treat this motion as a Petition
    for Variance and assign it PCB 78-189.
    The Board will incorporate the record of PCB 75-109 into
    this proceeding; however, the Board will require that Petitioner
    within 45 days specifically request or waive a hearing in accord-
    ance with Procedural Rule 401(b).
    Failure to do so shall subject
    the Petition to dismissal for inadequacy.
    IT
    IS
    SO
    ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board,
    hereb
    certify the above Order wa; adopted on
    the~~~_dayof
    ,
    1978 by a vote of
    ~
    Illinois Pollution
    ntrol Board
    31-67

    Back to top