ILLINOIS POLLUTION CONTROL BOARD
June
7,
1979
CITY OF NEOGA,
Petitioner,
v.
)
PCE 79—115
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by Mr. Dumelle):
On May 30, 1979 Petitioner requested a variance from
Rule 602(b)
of Chapter
3:
Water Pollution.
The Petition
is deficient in several respects.
First,
it fails to give
a specific timetable
for compliance as required by Procedural
Rule 401(a)(6).
Second,
it fails to describe the environmen-
tal impact of granting a variance
as requred by Procedural
Rule 401(a)(7).
Third,
it fails to specifically request or
waive a hearing
as required by Procedural Rule 401(b).
If
these deficiencies are not corrected within 45 days of the
date of this Order,
this matter will be subject to dismissal.
The statutory ninety day decision period shall run from the
date an amended petition is filed.
IT
IS SO ORDERED.
I, Christan L.
Moffett, Clerk of the Illinois Pollution
Control
Board, hereby certify the above Order was adopted on
the
~-day
of
_____________,
1979 by a vote of
5-p
Ck~fa-~-~
L.
Christan L.
Moffett, Cler
Illinois Pollution Control Board
34—23