| - BEFORE THE POLLUTION CONTROL BOARD
- OF THE STATE OF ILLINOIS
- NOTICE OF FILING
- RECEIVED
- Royer Oil (Sorento Garage)
- PETITION FOR REVIEW OF ILLINOIS ENVIRONMENTAL• PROTECTION AGENCY DECISIONS
- Royer Oil (Sorento Garage)
- F-l(2)
- G-2(5)
- F. ANALYSIS COSTS BIOREMEDIATION
- F-l(6)
- G-1(6)
- G-2(6)
- I-i (6)
- Personnel
- 5 375.00
- 235,952.50236,136.50
- 5124,881.71
- 120,663.71
- Equipment Rate/mo.
- SAR/CAP, Phase I
- $ 20.00
- EXH~B~T
- POLLUTION CONTROL BOARDOF THE STATE OF ILLINOIS
- NOTICE
- Chicago, IL 60601
- EXH~B~T
- BEFORE THE POLLUTION CONTROL BOARDOF THE STATE OF ILLINOIS
- Illinois EPA respectfully states as follows:
- 1. On June 24, 2004, the Illinois EPA issued a final decision to the Petitioner.
- ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
- Dated: July 30, 2004
- 1021 North Grand Avenue EastPost Office Box 19276
-
- CERTIFICATE OF SERVICE
|
BEFORE THE POLLUTION CONTROL BOARD
OF THE STATE
OF ILLINOIS
ROYER OIL (SORENTO
GARAGE),
)
)
Petitioner,
)
)
V.
)
PCB
05-16
)
(UST Appeal)
)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
)
)
Respondent.
)
NOTICE
OF FILING
John Kim
Special Assistant Attorney General
Illinois Environmental Protection Agency
1021 North Grand Avenue East
P.O.
Box 19276
Springfield, Illinois 62794-9276
Carolyn S. Hesse
Barnes
& Thornburg LLP
One North Wacker Drive
Suite 4400
Chicago, Illinois 60606
(312)
357-1313
243400v
1
Carol Sudman
Hearing Officer
Illinois Pollution Control Board
1021
North Grand Avenue East
P.O.Box
19274
Springfield, Illinois
62794-9274
RECEIVED
CLERK’S OFFICE
OCT
2
8
2004
STATE OF ILLINOIS
Pollution Control Board
TO:
PLEASE TAKE
NOTICE
that on
October 28,
2004,
filed with the Clerk ofthe Illinois
Pollution
Control
Board
of the
State
of Illinois
an
original,
executed
copy of a
Petition
for
Review of Illinois Environmental Protection Agency Decision.
Dated:
October 28, 2004
Respectfully submitted,
Royer Oil (Sorento Garage)
By~
~
Ori~’of
Its Atto~ieys
This
filing submitted
on recycled
paper as defined
in
35
III.
Adm. Code
101.202
RECEIVED
CLERK’S OFFICE
OCT
2 82004
CERTIFICATE OF SERVICE
STATE
OF ILLINOIS
POII~tj~~
Control Board
I,
on
oath
state
that
I
have
served
the
attached
Petition
for
Review
of
Illinois
Environmental Protection Agency Decision. by placing a copy
in an envelope addressed to:
John Kim
Special
Assistant Attorney General
Illinois Environmental Protection Agency
1021
North Grand Avenue
East
P.O. Box
19276
Springfield, Illinois
62794-9276
from
One North
Wacker Drive,
Suite
this
28th
Day of October, 2004.
Carol Sudman
Hearing Officer
Illinois Pollution Control Board
1021
North Grand Avenue East
P.O. Box
19274
Springfield, Illinois
62794-9274
This
filing
submitted on recycled paper as defined
in 35
Ill. Adm. Code
101.202
2
4400,
Chicago, Illinois,
before the hour of 5:00
p.m.,
on
~
~
Carolyn S. H~se
~ECE~VED
CLERK’S OFFICE
BEFORE THE POLLUTION CONTROL BOARD
OCT
282004
OF THE STATE OF ILLINOIS
STATE OF
ILLINOIS
ROYER OIL (SORENTO GARAGE),
)
Pollution
Control Board
)
Petitioner,
)
)
v.
)
PCBO5-16
)
(UST Appeal)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
)
PETITION FOR REVIEW OF ILLINOIS ENVIRONMENTAL
•
PROTECTION AGENCY DECISIONS
Royer
Oil
Company,
by
its
attorney,
Carolyn S.
Hesse of Barnes
&
Thornburg,
pursuant
to
the
Illinois
Environmental
Protection Act,
415
ILCS
5/1
et. seq.
(the “Act”) and
35
Illinois
Administrative
Code
Section
105.400
et.
seq.,
hereby appeals
certain decisions
by
the
Illinois
Environmental
Protection Agency (the “Agency”).
1.
Royer
Oil
Company
(“Royer”
or
“Petitioner”)
is
the
owner
of property
referred
to
as
Sorento
Garage
located
on
Main
Street
in
Sorento,
Bond
•
County,
Illinois.
The
site
was
a
gasoline
service
station
that
had
underground
storage tanks (UST5)
on the property, which
stored gasoline
and diesel fuel.
2.
LUST
Incident
Number
20000692
was
obtained
following
a
site
investigation.
LPC #0050305009-Bond County has also been assigned.
3.
On May 13, 2004, Petitioner sent to the Agency a High Priority Corrective
Action Plan
Budget Amendment
(the “Budget
Amendment”)
to
perform
corrective action at the Station.
(See
Exhibit 1.)
The Agency received this
document
on May
14,
2004.
The Budget included
signed certifications to
This
filing submitted
on
recycled paper as defined
in 35
III.
Adm.
Code
101.2021
the
effect
that
the
submitted
Budget
complied
with
the
Environmental
Protection
Act
and
a
revised
budget
certification was
sent
to
IEPA
on
June 2, 2004.
(See
Exhibit 2)
4.
On June 24,
2004,
the Agency sent a letter to
Petitioner rejecting the High
Priority Corrective Action Plan Budget Amendment
(See
Exhibit 3.)
The
letter stated as follows:
The Budget Amendment
is rejected for the reasons(s)
listed below
~(Section
57.7(c)(4)
of the Act
and
35
Ill.
Adm.
Code
732.405(c)
and 732.503(b)).
*
*
*
The
Illinois
EPA previously notified
the
owner or operator of its
final action.
Further,
in accordance with 57.7(c)(4) of the Act and
35
Ill.
Adm.
Code 732.503(f), the Illinois EPA’s action to reject or
require
modification of the plan or budget, or the rejection of any
plan or budget
by
operation of law,
was
subject to
appeal
to
the
Illinois
Pollution
Control
Board
within
35
days
after the
Illinois
EPA’s final action.
The
letter
then
goes
on
to
state
that
Petitioner
has
the
right
to
appeal this decision to the Illinois Pollution
Control Board.
5.
The
Agency’s
letter
provides
no
additional
information
regarding
why
JEPA disapproved the Budget Amendment.
6.
Petitioner is appealing the Agency’s decision letter dated June 24, 2004.
7.
The
parties
timely
filed
a joint
notice
to
extend
the
35-day
period
for
Carter to file this appeal.
(See
Exhibit 4.)
8.
By
Order
dated
August
5,
2004,
the
Illinois
Pollution
Control
Board
extended the appeal period to
October 28, 2004.
(See
Exhibit
5.)
9.
•
Petitioner’s
submittal
dated May
13,
2004
to
the Illinois
EPA included a
•
detailed budget.
This
filing
submitted
on recycled paper
as
defined
in
35 III. Adm.
Code
101.2021
2
10.
The letter from Petitioner’s
consultant to the Agency dated May
13,
2004
that forwards the Budget Amendment states that:
The
approved
costs
have
been
reassessed
and
found
to
be
insufficient to complete the work required as described below.
(See
Exhibit
1)
11.
Section 732.405(e) provides as follows:
e)
If, following approval of any groundwater monitoring plan,
corrective action
plan or associated
budget plan, an
owner
or
operator
determines
that
revised
procedures
or
cost
estimates
are
necessary
in
order
to
comply
with
the
minimum
required
activities
for
the
site,
the
owner
or
•
operator
shall
submit,
as
applicable,
an
amended
groundwater
monitoring
plan,
corrective
action
plan
or
associated
budget
plan
for
review
by
the
Agency.
The
Agency
shall
review
and
approve,
reject
or
require
modifications
of the
amended
plan
in
accordance with
the
procedures contained in
Subpart E ofthis Part.
12.
Petitioner’s
Budget
Amendment
provides
costs
that
are
necessary
to
comply with the Act.
13.
Under the terms of Section
732.405(e),
the Agency
is
required
to
review
the
Budget Amendment
in
accordance with
the
procedures
contained
in
Subpart E
of part
732.
Illindis
EPA has
failed
to
perform the
detailed
review required by
Subpart E,
Section 732.505.
14.
Petitioner has determined that revised cost estimates are necessary in
order
to
comply
with the minimum required
activities for the
site
and
that
the
costs
IEPA previously approved
are not
adequate
to
allow
Petitioner
to
comply
with
the
Act
or to
perform the
work
described
in
the
approved
CAP.
This
filing submitted on
recycled paper as defined
in
35 Ill.
Adm.
Code
101.2021
3
15.
Petitioner’s
costs
to
perform
the
work
as
set
forth
in
the
Budget
Amendment are reasonable
costs.
WHEREFORE, Royer Oil
(Sorento
Garage) respectfully requests that the Board enter an
order that will provide that it be reimbursed from the UST Fund for its submitted costs and for its
attorneys’ fees
and costs in bringing this appeal.
Respectfully submitted,
Royer Oil (Sorento Garage)
By:
~
Oi~’
ofIts Attorn~ys
Carolyn S. Hesse, Esq.
Barnes
& Thornburg LLP
One North Wacker Drive
Suite 4400
Chicago, Illinois 60606
(312) 357-1313
243347v1
This
filing
submitted
on recycled
paper as defined
in 35 III. Adm.
Code
101.2021
•
C’V~I~1
Corn p any
•
701 W.South
Grand
Avenue
Environmental Consulting
•
Services
Phone:
Fax:
(217) 522-8001
(217)522-8009
!
•
May 13,
2004
Mr. Steve Jones, Project 1\’Ianager
LUST Section, B1ireau of Land
Illinois Environmental Protection Agency
1021
North
Grand Avenue East
Springfield, Illinois 62794-927 6
RE:
LPC #0050305009—Bond
County
Sorento/Royer
Oil Company (Sorento
Garage)
Main Street
LUST
Incident Number: 00-0692
LUST Technical Reports—Corrective
Action Plan Amendment
Dear Mr.
Jones:
This budget amendment is being submitted in response to the Agency’s letter
datedNovember
22,
2002.
The
approved costs have been reassessed and been found to be insufficient to
complete the work required as described below.
Since the
deductions were not made to a level of
detail which indicates
either hours or rates that were deducted, the budget amendment includes a
complete estimate of the required costs and subtracts out the previously approved amounts on the
B-i page.
Following our review of the deductions and the
associated budget, adjustments have been made.
Specifically, sand backfill, disposal charges and construction foreman costs have been modified.
It has been determined that the remaining requested amount will be necessary in order to
complete the approved work in accordance with the regulations.
Ifyou have any questions or require additional information, please do not hesitate to contact
Vince
E.
Smith,
P.E.
or me
at (217) 522-8001.
Sincer
y
~
~owe,P.G.
Senior Environmental Geologist
Enclosure
xc:
Mr.
Stephen Royer,
Royer Oil Company, Inc.
Mr.
Gary Wall,
Sorento
Garage Property Owner
Mr.
William T. Sinnott,
CW3M Company, Inc.
Ms. Carrie
L. DeVore,
CW3M Company, Inc.
D:\CW3M Projects\Royer Garage\CAP\3
cLdoc
A
EXHIBIT
701
W.
South
Grand
Avenue
400
W.
Jackson
Suite
C
Springfield, IL
62704
Marion,
IL
62959
(217) 522-8001
(618) 997-2238
Illinois Environmental Protectiod Agency
Owner/Operator
and
Professional
Engineer Budget Certification Form for
Leaking Underground
Storage Tanks
Sites
In accordance
with 415
ILCS
5/57,
if
an owner or operator
intends to seek
payment from
the UST Fund,
an
owner or operator must submit to the Agency, for the Agency’s
approval or modification, a budget
which
includes an accounting of all
costs associated with the implementation of the
investigative,
monitoring and/or corrective
bction plans.
I hereby certify that
I
intend to seek payment from the UST Fund for performing Corrective
Action
_____________________________________activities
at
Sorento
Garage
LUST site.
I
further certi~’that the costs
set forth
in
this budget are necessary activities and are reasonable and
accurate to the best of my knowledge and belief.
I also certify that the
costs included in this budget are
not for corrective action in excess of the minimum
requirements of 415 ILCS 5/57 and no
costs
are
included
in this budget which are not described
in the corrective action plan.
I further certify that costs
ineligible for payment from the Fund pursuant to 35 Illinois Administrative
Code Section
732.606 are
not included
in the budget proposal or amendment.
Such
ineligible costs
include but
are
not limited
to:
Costs
associated with ineligible tanks.
Costs associated with site restoration (e.g.,
pump
islands, canopies).
Costs associated with utility replacement (e.g., sewers,
electrical, telephone,
etc.).
Costs
incurred prior to IEMA notification.
Costs associated with planned tank pulls.
Legal de~fensecosts.
Costs incurred prior to July 28,
1989.
Costs
associated with installation of new USTs or the
repair of existing USTs.
Subscribed and sworn to before
me the
___________
day of
(Budget Proposals andBudget Amendments must be notarized when
(Notary
Public)
Seal:
The Agency
is
authorized to
require this
information under 415
ILCS
5/I.
Disclosure
of this
information
-
is required.
Failure
to
do
so may
result
in the delay or denial of any budget
or payment requested
hereunder.
This form
has been approved
by
theForms
Management Center.
IL
532
2273
LPC
499
Rev.
Mar-94
B
B
:j
k\97
1405 S .WPD
Owner/Operator:
~tephen
L. Royer, Royer
Oil
Signature:
Subscribed
amr’d sworn tdbm
(Budget Prop dsals and
Title:
Owner
Date:
P.E.:
~
P.E.
Signature:~~
BUDGET
AND
BILLING
FORM
FOR
LEAKING
UNDERGROUND
STORAGE
TANK SITES
-
A.
SITE INFORMATION
Site Name: Royer Oil
Company
-
Sorento
Garage
•
Site Address:
Corner of
Center and Main Street
City:
Sorento
Zip:
62914
County:
Bond
EPA
Generator No.:
0050305009
TEMA Incident No.:
00-0692
IEMA
Notification
Date:
4/18/00
Date
this
Form was Prepared:
May 13, 2004
This
form is being
submitted
as a:
__________Budget Proposal (Revised)
x
BudgetAmendment
(Budget Amendments must include only the co~
over the previous budget.)
-
Amendment Number:
2
_________Biliing
Package for
costs incurred pursuant to
35
Illinois Administrati
Code (IAC), Part 732 (“New
program”).
This
form is
being submitted for the
Site Activities indicated below
(che~kone):
•
Early
Action
__________
Site Classification
Low
Priority Corrective Action
X
High
Priority
Corrective Action
__________
Other (indicate activities)
____________________________________________________
DO NOT SUBMIT “NEW PROGRAM” COSTS AND
“OLD PROGRAM”
COSTS AT THE SAME TIME,
ON
THE SAME FORMS.
A-i
IL 532-2263
-
-
LFC
494
Rev.
11/97
This form must be submitted in duplicate.
IEMA No.
00-0692
Ifeligible for reimbursement where should
reimbursement checks be sent?
Please note that only
owners or operators
of USTs may be eligible for reimbursement.
Therefore, payment
can only be made
to
an owner
or operator.
Pay
to the order of:
Stephen L. Royer
Send in care of:
-
CW3M Company, Inc.
Address:
P.O. Box 571
-
-
City:
Carlinville
State:
Illinois
Zip:
62626
Number of Petroleum
USTs in Illinois presently owned
or operated
by the owner or operator;
any subsi
parent or joint stock company of the owner or operator, and any company owned by any parent,
subsidi
joint stock company
of the owner or
operator:
-
Fewer than 101:
X
101 or more:
Number of USTs at the
sit’
3
(Number of TJSTs includesUSTs presently at the site and USTs
that have been removed.)
Number
of incidents
reported to IEMA
1
Incident
Numbers assigned
to the site due to releases from 1.
00-0692
Please list
all tanks which have ever been located at the site and
are presently located at the site:
Product Stored
Size
Did UST
Type of
(gallons)
have a release?
Incident No.
Release
Gasoline
300
Yes
No
00-0692
tank
Gasoline
300
Yes
No
00-0692
tank
Gasoline
550
Yes
No
00-0692
Line leaks, overfills
__________________
Yes
No
_________
___________________
-
Yes
No
________
__________________
__________________
Yes
No
________
__________________
__________________
Yes
No
________
__________________
__________________
Yes
No
________
___________________
•
Yes
No
•
_____________________
Yes
•
No
_____________________
•
A-2
-
This form must be submitted in duplicate.
•
IBMA No.
99-2274
B.
PROPOSED BUDGET SUMMARY AND BUDGET TOTAL
REQUIRED
PREVIOUSLY
TOTAL
AMOUNT
APPROVED
REQUESTED
1.
Investigation Costs:
$
13,725.00
$
13,671.00
$
54.00
2.
Analysis
Costs:
$
16,265.00
$
16,265.00
$
3.
Personnel
Costs:
$
194,512.50
$
142,971,46
$
51,541.04
4.
Equipment
Costs:
$
1,328.00’
$
1,228.00
$
100.00
5.
Field
Purchases and Other Costs:
$
369,801.16
$
220,686.23
$
149,114.93
6.
Handling
Charges:
$
12,698.43
$
12,952.09
$
(253.66)
TOTAL PROPOSED BUDGET
=
$
200,556.31
B-l
This form must be
submitted in duplicate.
Other Costs
•
Number of
Units
Unit Cost
Total Cost
see attached “Other” sheet
2.
Professional
Services (eg., P.E., geologist)
-
These costs
must be
Listed in Section
I, the Persomel
section
of the forms.
E-Tl.
IEMA No.
00-0692
E.
INVESTIGATION COSTS
Method
I
_________
Method II
•
Method III
Not Applicable
X
Drilling Costs
-
This includes the costs for drilling labor, drill rig usage, and other drilling equipment.
Borings which are to be completed
as monitoring wells should
be
listed here.
Costs associated with
disiiosal of cuttings should not be included here.
An indication
must be made as to why each boring is
being conducted (I.e..
classification, monitoring wells, migration pathways).
14
borings
to
15
feet
•
210
feet to be bored for
investigation/monitorin
___________
borings
to
8
feet
___________
f~et
to be bored for
investigation
5
borings
to
10
feet
=
50
feet to be bored for
investigation
___________
borings
to
50
feet
=
feet to be bored for
classification
__________
borings
to
15
feet
=
‘
feet to be bored for
investigation/migrator~
Total Feet to be Bored:
260
•
•
Borings:
260
feet
x
$
20
per foot
‘$
5,200.00
(or)
Hours
•
x
$
__________
per hour
=
$
_____________________
__________
borings
thiough
__________
ft of bedrock
=
________Ft
bedrock
to be bored
__________
borings
through
__________
ft of bedrock
=
________Ft
bedrock to be bored
Total Feet bedrock
to be Bored:
_______________________
Borings:
__________
Ft bedrock x
$
___________
per ft bedrock
$
____________
(or)
Hours
x
$_________
per Hour
=
$
__________________
4
#
of
Mobilizations
@
$
260
per mobilization
$
1,040.00
This form must be submitted In duplicate.
IEMA No.
00-0692
3.
Monitoring Well Installation Materials
-
Costs listed must be costs associated
with well casing,
•
well screens, filter pack, annular seal, surface seal, well covers, etc.
List the items below in a time and
materials format.
Material
Number
of
Units
Unit Cost
Total Cost
15-foot monitoring wells
10-foot,
2” PVC screen
14
$
55.00
$
770.00
5-foot,
2” PVC riser pipe
14
$
25.00
$
350.00
Misc. PVC connectors, 0-rings,
etc.
14
$
25.00
$
350.00
2” bottom caps
14
$
20.00
$
280.00
2” Expandable
locking caps
14
$
30.00
$
420.00
•
Flush mount manway
14
$
105.00
$
1,470.00
Sand filter pack
(3
bags per well)
-
42
$
12.00
$
504.00
Bentonite
chips (annular seal’~
.
14
$
30.00
$
420.00
Concrete (surface seal)
14
$
19.00
$
266.00
Monitor well installation time
14
$
105.00
$
1,470.00
15-foot monitoring well with 10-foot well
screen,
PVC riser, flush mount manway,
filter
pack,_annular_seal,_and_surface_seal
Total
$
6,300.00
Disposal
Costs
-
This includes
the
costs for disposing of boring cuttings and any water generated
WhilE
performing borings or installatin
wells.
Disposal
of Cuttings:
9
drums
x
$
65
per drum
=
$
585.00
Disposal
of Water:
300
gallons
x
$
2
per gallon
=
$
600.00
Transportation Costs:
$
0.00
Describe how the water/soil
will be disposed:_____________________________________________________
TOTAL INVESTIGATION
COSTS
$13,725.00
E-2
4.
This form most be submitted in duplicate.
TEMA No.
00-0692
F.
ANALYSIS COSTS
INVESTIGATION & CAP DEVELOPMENT
1.
Physical Soil Analysis
-
This must only include
analiisis
costs for classification of soil types at
the
_____
Moisture Content samples
x
$
$
5.00
per sample
=
$
Soil Classification samples
x
$
_______________
per sample
=
$
Indicate method to be performed:
______________________________
_____
Soil Particle Size samples
x
$
•
$
135.00
per sample
=
$
______________
____
Ex-situ Hydraulic Conductivity/Permeability
samples
x
$
$
900.00
per sample
=
$
_______________
Indicate method to be performed:
_____________________________
____Rock
Hydraulic Conductivity/Permeability
samples
x
$
___________
persample$
Natural
Organic
Carbon Fraction
(foc) samples
x
$
•
per sample=
$
Indicate the ASTM or SW-846 method
to be performed:
___________________
______________________
samples
x
$
______________
per sample
=
$
0
___________________
samplesx
$
•
per sample
$
0
•
samples
x
$
_____________
per sample
= $
0
______________________
samples
x
$
______________
per sample
= $
0
•
samples
x
$
______________
per sample
= $
•
0
2.
Soil Analysis
Costs
-
This must be for laboratory
anali/sis
only.
17
BTEX
samples
x
$
75.00
per sample
=
$
1,275.00
_____PNA samples
x
$
•
175.00
per sample
=
$
-
17
Total Lead samples
x
•
5
20.00
per sample
=
$
340.00
F-i
0
0
0
0
0
0
This form must be submitted in duplicate
_____
pH Samples x
10.00
per sample
= $
-
_____
Paint Filter samples
x
$
per sample
=
$
-
17
TCLP © samples
x
85.00
per sample
=
$
1,445.00
_____
Flash Point samples
x
$
per
sample
= $
-
_____
Lab and/or Field Bank samples x
$
per sample
= $
-
LUST Appendix
B
samples x
$
900.00
per sample
= $
-
1
Waste Char,
samples
x
$
400.00
per sample
=
$
400.00
TACO Parameters
samples
x
$
‘
100.00
per sample
=
$
-
__________________________
samples x
$
______________
per sample
=
$
-
__________________________ samples x
$
______________
per sample
=
$
-
3.
Groundwater
Analysis
Costs
-
This must be for laboratory
analysis
only.
14
BTEX
samples x
$
75.00
per sample
=
$
1,050.00
_____PNA
samples x
175.00
per sample
=
$
-
14 Total Leadsamples
x
$
20.00
per sample
“~$
280.00
_____pH
Samples x
$_____________
per sample
=
$
0
_____Lab
and/or Field Blank samples x
$
per sample
= $
-
•
Flash Point samples
x
$
per sample
=
$
0
•
1
Waste Charactertzatioi
samples x
$
375.00
Per sample
=
$
375.00
___________________________
samples x
$
•
Per sample
= $
-
•
samples x
$
_______________
Per sample
=
$
-
___________________________
samples
x
$
_______________
Per sample
=
$
-
___________________________
samples
x
$
_______________
Per sample
=
$
-
___________________________
samples
x
$
_______________
Per sample
= $
-
TOTAL ANALYSIS
COSTS
$
5,165.00
F-2
This form must be submitted in duplicate.
IEMA No.
00-0692
G.
PERSONNEL
INVESTIGATION
ALl personnel costs
that are not included elsewhere in the budget/billing
form must be listed here.
Cos
be
Listed per task,
not personnel type..
The following are some examples of tasks:
Drafting, data collecti
plan, report,
or budget preparation fa CAP
&
(i.e., site classification work plan, 45 day report, or
hi
priority
corrective action budget),
sampling,
field oversite
I CAP Dev.i
(i.e.,
drilling/well installatioi
corrective action, or early action)of maintenance
Sorento G~.The above list is not inclusive
of all
possible tasks.
Environmental Engineer
29.75
hours
x
$
105.00
per hour
=
$
3,123.75
(Title)
Task to be performed for the above hours:
site mv.
(drilling, sampling, surveying, off-site access)
Senior Env. Engineer
0
hours
x
$
115.00
per hour
=
$
(Title)
Task to be performed for the abovehours:
site mv.
(drilling, sampling,
surveying, off-site access)
Senior Env. Geologist
23.25
hours
x
$
92.00
per hour
=
$
2,139.00
(Title)
Task to be performed for the above hours:
site mv.
(drilling, sampling,
surveying, off-site access)
General Project Manager
3
hours
x
$
100.00
per hour
=
$
300.00
(Title)
Task to be performed for the above hours:
site inv. (drilling, sampling, surveying, off-site access)
Env. Project Geologist
49.25
hours
x
$
81.00
per hour
=
$
3,989.25
(Title)
Task to be performed for the
above hours:
site inv,
(drilling, sampling,
surveying, off-site access)
Env, Project Scientist
29.5
hours
x
$
81.00
per hour
=
$
2,389.50
(Title)
Task to be performed for the above hours:
site inv.
(drilling, sampling, surveying, off-site access)
Engineering Technican
9.25
hours
x
$
55.00
per hour
=
$
508.75
(Title)
Task to be performed for the
above hours:
site inv.
(drilling, sampling,
surveying, off-site access)
Laborer
0
hours
x
$
40.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
site inv.
(drilling,
sampling,
surveying, off-site access)
G-l
This form must
be submitted in duplicate.
IEMA No.
00-0692
G.
PERSONNEL
INVESTIGATION
All personnel costs
that are not included elsewhere in the budget/billing
form must be
listed here.
Cos
be listed per task, not personnel type.
The following are some examples of tasks: Drafting, data coLlectit
plan, report,
or budget preparation fo CAP &
(i.e., site classification work plan, 45 day report,
or hi~
priority
corrective action budget), sampling,
field oversite
I CAP Dev.~l (i.e., drilling/well installation
corrective action, or early action)of maintenance Sorento G~.The above list
is not inclusive
of all
possible tasks.
Technical Editor
0
hours
x
$
55.00
per hour
=
$
•
-
(Title)
Task to be performed for the above hours:
site inv.
(drilling, sampling, surveying, off-site access)
Draftsman
8.25
hours
x
$
65.00
per hour
‘
$
536.25
(Title)
Task to be performed for the
above hours:
site inv. (drilling, sampling, surveying, off-site access)
Technical Coordinator
0
hours
x
$
65.00
per hour
=
$
-
(Title)
Task to be performed for the
above hours:
site inv. (drilling, sampling, surveying, off-site access)
Administrative Assistant
11.5
hours
x
$
45.00
per hour
=
$
517.50
(Title)
Task to be performed for the above hours:
site inv.
(dril Lii g, sampling, surveying, off-site access)
Office Manager
3
hours
x
$
40.00
per hour
=
$
120.00
(Title)
Task to be performed for the above hours:
site inv. (drilling, sampling, surveying, off-site access)
Principal
0
hours
x
$
130.00
per hour
=
$
-
(Title)
Task to be performed.for the above hours:
site inv.
(drilir~g,sampling, surveying, off-site access)
Field Supervisor/Coordinator
0
hours
x
$
110.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
site inv.
(drilling, sampling, surveying, off-site’ access)
Wastewater Trtmt. Operator
0
hours x
$
100.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
site inv.
(drilling,
sampling, surveying, off-site access)
•
G-ia
This form must be submitted
in duplicate.
•
•
IBMA No.
00-0692
•
G.
PERSONNEL
CAP DEVELOPMENT
All personnel costs that are not included elsewhere in the budget/billing
form must be listed here.
Co~
be listed per task,
not personnel type.
The following are some examples of tasks: Drafting, data collect
plan, report,
or budget preparation
fo CAP &
(i.e.,
site classification work plan, 45 day report,
or hi
•
priority
corrective action budget), sampling, field oversite
I CAP Dev.~ (i.e., drilling/well
installatioj
corrective action, or early action)of maintenance Sorento G~.The above list is not inclusive
of all
•
possible tasks.
Environmental Engineer
22.75
hours
x
$
105.00
per hour
=
$
2,388.75
(Title)
Task to
be performed for the above hours:
Site Assessment Report and
CAP Development
Senior Fnv. Engineer
•
2
hours
x
$
115.00
per hour
=
$
230.00
(Title)
Task to be performed for the above hours:
Site Assessment Report and CAP Development
Senior Env. Geologist
11.25
hours x
$
92.00
per hour
=
$
1,035.00
(Title)
Task to be performed for the above hours:
Site Assessment Report and CAP Development
General Project Manager
8.5
hours x
$
100.00
per hour
=
$
850.00
(Title)
Task to be performed for the above hours:
Site Assessment Report and CAP Development
Env. Project Geologist
65.5
hours x
$
81.00
per hour
=
$
5,305.50
(Title)
Task to be performed for the above hours:
Site Assessment Report andCAP Development
Env. ProjectScientist
0
hours x
$
81.00
per hour
=
$
-
•
(Title)
Task
to be performed for the above hours:
Site Assessment Report and CAP Development
EngineeringTechnican
0
hours x
$
55.00
per
hour
=
$
-
(Title)
Task to be performed for the above hours:
Site Assessment Report
and CAP Development
Laborer
0
hours x
$
40.00
perhour
=
$
-
(Title)
•
Task to
be
performed for the above hours:
Site Assessment Report
and CAP Development
G-1b
This form must be
submitted in
duplicate.
Technical Editor
(Title)
Task to be performed for the above hours:
Draftsman
7.5
(Title)
Task to be performed for the
above hours:
Technical Coordinator
(Title)
Task to be performed forthe
above hours:
Administrative Assistant
10.75
1.
ItiC)
Task to be performed
for the above hours:
Office Manager
(Title)
Task to be performed for the
above hours:
Principal
(Title)
Task to be performed forthe
above hours:
Field Supervisor/Coordinator
(Title)
Task to be performed for the
above hours:
Wastewater Trtmt. Operator
(Title)
Task to be performed for the above hours:
(Title)
Task to be performed for the above hours:
IEMA No.
00-0692
5
hours
x
$
55.00
per hour
=
$
275.00
Site Assessment Report and ‘CAP Development
hours x
$
65.00
per hour
=
$
487.50
Site Assessment R~portand CAP Development
0
hours
x
$
65.00
per hour
=
$
-
Site Assessment Report and CAP Development
hours x
$
45.00
per hour
=
$
483.75
Site Assessment Report and CAP Development
hoursx
$
40.00
perhour
=
$
120.00
Site Assessment Report
and CAP Development
0
hoursx
$
130.00
per hour
=
$
-
Site Assessment Report and CAP Development
0
hours
x
$
110.00
per hour
=
$
-
Site Assessment Report and CAP Development
0
hours x
$
100.00
per
hour
=
$
-
Site Assessment Report and CAP Development
hours
x
per hour
=
$
-
TOTAL PERSONNEL COSTS:
$
24,799.50
G-2
This form must be submitted in duplicate.
IEMA No.
00-0692
H.
EQUIPMENT
COSTS
INVESTIGATION
& CAP DEVELOPMENT
All equipment used must be listed below in
a
time
and
materials
format.
Handling
charges
should
not
added
here;
use
Section
J.
Equipment
Own
or
Rent
Time
Used
Units
Unit
Rate
Total
Cost/Item
PID Rental
.
rent
4.00
/day
$
125.00
$
500.00
Water
Level Indicator
rent
8.00
/day
$
21.00
$
168.00
Survey Equipment Rental
rent
4.00
/clay
$
65.00
$
260.00
Measuring WheelRental
rent
5.00
/day
S
15.00
$
75.00
Slug Rental
rent
0.00
/day
$
36.00
$
-
0
0
0
0
0
0
0
0
0
0
0
0
0
0
.
0
0
0
0
0
0
0
0
0
0
0
0
.
0
0
0
0
0
0
0
0
Total
Page H-i
$
1,003.00
H-i
This form must be submitted in duplicate
IEMA No.
00-0692
I.
FIELD PURCHASES AND OTHER COSTS
INVESTIGATION
& CAP DEVELOPMENT
All equipment used must be listed below in a time and materials
format.
Handling charges shouldnot
I
added here; use Section
~.
Purchases
Quantity
Item
Price/Item Total Cost
Handling
Charges
0
/each
$
1.25
$
-
yes
0 /each
$
600.00
$
-
yes
0
/each
$
1.00
$
-
yes
0 /each
$
4.00
$
-
yes
14
/each
$
12.00
$
168.00
yes
1
/each
$
6.00
$
6.00
yes
‘Copies
1
/each
$
15.00
$
15.00
yes
34
/each
$
10.00
$
340.00
yes
$
64.96
yes
9
/each
$
50.00
$
450.00
yes
$
-
$
-
$
-
$
-
.
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
-
$
-
S
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
r
L
I—1
Subtotal Page
1-1
$
1,043.96
This form must be submitted in
duplicate
IEMAl~00-0692
INVESTIGATION
& CAP DEVELOPMENT
Other Costs
-
A listing
and description
of all other costs which will be/were
incurred and
are not specificall~y
listed on this form should be attached.
The listing should include a cost breakdown in a time and materials
format.
Other
Costs
No.
Rate
Cost
Copies
•
2518
$
0.10
$
251.80
Mileagefor CW3M trips
1200.00
$
0.37
$
444.00
Per Diem
0.00
$
36.00.
$
-
Total Other
$
695.80
*Nlileage
8
trips at
150
miles/trip
4 trips for
drilling, 4
for surveying
and sampling
TOTAL OTHERCOSTS
=
$
1,739.76
1-2
jsubt
Total (Pages
I-i
otal Page 1-2
and 1-2)
$
$
695.80
1,739.76
*
P
This form must be submitted
in duplicate
IEMA No.
00-0692
J.
HANDLING
CHARGES
INVESTIGATION & CAP DEVELOPMENT
Handling
charges are eligible for payment on subcontractor billings and/or
field purchases
only if they
equal to or less than
the amounts determined by the following table:
Subcontractor or Field
Purchase
Cost
$-i-$5,o’oo
$5,001
-
$15,000
$15,001
-
$50,000
$50,001
-
$100,000
$100,001
-
$1,000,000
Eligible Handling Charges as a
Percentage
of Cost
12
$600
+
10
of amt. Over $5,000
$1,600
+
8
of amt. Over $15,000
$4,400
+
5
of amt. Over $50,000
$6,900
+
2
of amt. Over $100,000
A.
Subcontractor
Charges
Subcontractor
Section
where cost
is
listed
SubcontractAmount
Drilling
Costs
E-1
$
6,240.00
Monitoring
Well Installation
E-2
$
6,300.00
Disposal
of Cuttings
E-2
•
$
585.00
Disposal of Water
E-2
$
600.00
Transportation
•
E-2
$
-
Laboratory Analysis
F-2
$
5,165.00
J-1
Subtotal J-1 Subtota
S
18,890.00
This form must be submitted
in duplicate
H
IEMANo.
00-0692
INVESTIGATION
& CAP DEVELOPMENT
Isubtotal
Page 1-2:
$
1,043.96
Subtotal of Pages J-1 and J-2
$
19,933.96
Handling
Charge
*:
See Handling Charge Total
*
Use chartat
top
ofPage J-i
to calculate the allowable
handling
charge.
Copies of invoices for subcontractor costs
and
receiptsfor field purchases
are reqinre&foT billing
su1omiSSiOflS
J-2
B.
Field Purchase
Field Purchase
Field Purchase
Amount
Color Copies
$
-
Carbon Filter Purchase
$
-
Manifests
$
-
Truck
Liner
$
-
Bailers
‘
‘
$
168.00
Film
$
•
6.00
Photo Development& Copies
.
$
15.00
Encore Samplers
$
340.00
Postage
$
64.96
Drums
$
450.00
This form must be submitted in duplicate
IEMA No.
00-0692
HIGH PRIORITY CORRECTIVE ACTION
Corrective
Action
at
High Priority Sites
may involve both soil and groundwater
remediation.
Below
provide
a summary
of costs
for
the remediation type(s)
chosen
and attach the appropriate
sections of
the
budget/billing
forms
to support
the
summary
of
costs.
A.
Preparation
of the Corrective Action Plan.
-
1.
Investigation Costs:
$
13,725.00
2.
Analysis Costs:
$
5,165.00
3.
Personnel Costs:
$
24,799.50
4. Equipment Costs:
$
1,003.00
5.
Field Purchases
and Other Costs:
$
1,739.76
6. Handling Charges:
See Handling Charge Total
B.
________Months
of O&Mx
__________
per month
=
$
•
-
(includes utilities, maintenance and expendable items)
C.
Excavation and Disposal
1.
Analysis Costs:
$
4,180.00
2.
Personnel Costs:
$
77,760.00
3.
Equipment Cosis:
$
-
4,
Field Purchases and Other Costs:
$235,952.50
5.
Handling Charges:
See Handling Charge Total
Of the above costs, please provide
a break
down of the costs associated with excavation,
transportation, and disposal as
requestd below:
Excavation
4,102.59
cubic yards X
$
13.45
per cu yd
$
55,200.00
Transport:
4,102.59
cubic yards X
$
11.28
per cu yd
=
$
46,280.00
Disposal:
4,102.59
cubic yards
X
$
31.05
per cu yd
=
$127,385.50
•
L-l
1.
2.
3.
4.
5.
Groundwater Remediation
Analysis
Costs:
•
$
3,420.00
Personnel
Costs:
$
-
Equipment
Costs:
$
268.00
Field Purchases and Other Costs:
$
-
Handling Charges:
See Handing
Charge Total
Of the
above costs, please provide
a break
down of the costs associated with operation and
maintenance (O&M). if applicable, as requested below.
This form must be submitted in duplicate
IEMA No.
00-0692
D.
Alternative Technology,
Type
1.
Investigation Costs:
2.
Analysis
Costs:
3.’
Personnel Costs:
4.
Equipment
Costs:
5.
Field Purchases and Other Costs:
6.
Handling
Charges:
Bioremediation Treatability Study
S
-
$
3,500.00
5
4,675.00
8
57.00
$
201.20
$
444.14
Of the above costs, please provide a break
down of the following costs
as requested below if
applicable:
Excavation:
Transport:
___________
Disposal:
________
cubic yards
X
$
cubic yards
X
$
cubic yards
X $
_________per cu yd
=
___________
per cu yd
=
____________
per cu yd
=
Operation
and Maintenance (O&M):
_________Months
of O&M
x
$
E.
Backfill
Costs
_____________
per month
=
$
1.
Personnel Costs:
$
69,750.00
2.
Equipment Costs:
$
-
3.
Field Purchases and Other Costs:
$
124,881.71
4.
Handling
Charges:
See Handling Charge Total
Of the above costs, please provide a break down of the following costs
as requested below if
applicable:
Type
of Backfill:
Sand Backfill
3897.46
cubic yards
X
_____________
__________
__________
$
8.10
per cu yd
=
$31,569.45
Type of Backfill:
Aggregate Backfffl
205.13
cubic yards
X
$
18.98
per cu yd
=
$
3,894.26
Type of Backfill:
Septic Gravel
Backfill
_________
cubic yards
X
_____________per
cu yd
=
$
-
Type of Backfill:
Concrete
for Trailer Pad
__________
cubic yards X
______________
per cu yd
=
$
-
L-2
This form must be submitted in duplicate
H
IEMA No.
00-0692
F.
ANALYSIS
COSTS
‘
GW REMEDIATION
1.
Physical Soil Analysis
-
This must only include
anczlvsi’s
costs for classification of soil types at the
Moisture Content samples
x
$
_______________
per sample
=
$
_______________
Soil
Classification
samples
x
$
______________
per sample
=
$
Indicate method
to be performed:
______________________________
Soil Particle Size samples
x
$
•
per sample
=
$
_____Ex-situ
Hydraulic Conductivity/Permeability samples
x
$
____________
per sample
$
____________
Indicate method to be performed:
______________________________
_____RockHydraulic Conductivity/Permeabilitysamples
x
$ ____________persample
$
____________
Natural Organic Carbon
Fraction (foc) samples
x
$ ______________per
sample
=
$
Indicate the ASTM or SW-846 method
to be performed:
___________________
____________________________
_________________
0
____________________________
_________________
0
___________________________
________________
0
___________________________
________________
0
__________
______
0
2.
Soil Analysis
Costs
-
This must
be for laboratory
analysis
only.
_____
BTEX
samples
x
$
_____________
per sample
=
$
•
0
_____
PNA samples
x
$
______________
per sample
=
$
0
_____LUST Pollutants
samples
x
$
per sample
=
$
0
F-l(2)
0
0
0
0
0
0
samples
x
$
______________
per sample
=
$
samples
x
$
______________
per sample
= $
samples
x
$
______________
per sample
= $
samples
x
$
______________
per sample
= $
samples
x
$
______________
per sample
=
$
This form must be submitted in duplicate
~
_____
pH Samples
x
$
per sample
=
$‘
0
_____
Paint Filter samples x
$
per sample
=
$
0
_____TCLP @ samples
x
$_____________
per sample
=
$
0
_____
Flash Point samples
x
$
per sample
=
$
0
_____Lab and/or Field Bank samples
x
$
per sample
=
$
0
___________________________
samples x
$
_______________
per sample
= $
•
0
___________________________
samples x
$
_______________
per sample
= $
0
___________________________
samples x
$
_______________
per sample
= $
0
_________________________
samples x
$
______________
per sample
= $
0
•
samples x
$
______________
per sample
= $
0
3.
Groundwater
Analysis
Costs
-
This must be for
laboratory
analysis
only.
•
36 BTEX samples x
$
75.00
per sample
=
8
2,700.00
0 PNA
samples x
$
175.00
per sample
=
$
-
_____LUST Pollutants
samples x
$
per sample
$
0
_____
pH Samples
x
$_____________
per sample
= $
0
_____
Lab and/or
Field Blank samples
x
$
per sample
=
$
0
_____
Flash Point samples
x
$
per sample
= $
0
36 Total Lead
samples x
$
20.00
Per sample
=
$
720.00
_________________________
samples
x
$
______________
Per sample
=
$
-
___________________________
samples
x
$
_______________
Per sample
=
$
-
___________________________
~amp1es x
$
_______________
Per sample
=
$
-
___________________________
samples x
$
_______________
Per sample
= $
0
___________________________
samples
x
$
_______________
Per sample
= $
0
TOTAL
ANALYSIS
COSTS
~3,420.00
F-2 (2)
This form must be submitted
in duplicate.
I
IEMA No.
00-0692
G.
PERSONNEL
QUARTERLY GW MONITORING
All personnel costs that are not included elsewhere in the budget/billing
form must be listed here.
Cos
be listed per task, not personnel type.
The following are some examples of tasks: Drafting, data collecti
plan, report,
or budget preparation
fo GW Rem.
(i.e., site classification work plan, 45 day report,
or
I
pribrity corrective action budget),
sampling,
field oversite for
__________
(i.e., drilling/well installatio
corrective action, or
earlyaction),
of maintenance
Sorento G~.The above list is not inclusive
of all
possible tasks.
Environmental Engineer
32
hours x
$
105.00
per hour
=
$
3,360.00
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly M
Senior
Env. Engineer
0
hours
x
$
115.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly M
Senior
Env. Geologist
4
hours x
$
92.00
per hour
=
$
368.00
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly M
General Project Manager
0
hours x
$
100.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Drilling/MW Install,
Post-Remediation QuarterlyM
Env. Project Geologist
32
hours x
$
81.00
per hour
=
$
2,592.00
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remed.iation Quarterly M
Env. Project Scientist
0
hours x
$
81.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly M
Engineering Technican
.
0
hours x
$
55.00
per houx
=
$
-
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly M
Laborer
0
hours
x
$
40.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly M
G-ld(2)
.
This form must be submitted in duplicate.
I
IEMA
No.
00-0692
•
G.
PERSONNEL
QUARTERLY
GW
MONITORING
All personnel
costs
that
are not included elsewhere in the budget/billing
form must be listed here.
Costs must
be
listed per task, notpersonnel
type.
The following are
some examples of tasks: Drafting, data collection,
plan,
report,
or
budget
preparation for
GW
Rem.
(i.e.,
site classification
work plan,
45
day report, or high
priority corrective action budget),
sampling,
field oversite for
_____________
(i.e., drilling/well
installation,
corrective action, or early action), of maintenance of
Sorento
Ga
.
The above list is not inclusive
of all
possible tasks.
Technical
Editor
0
hours
x
8
55.00
per hour
=
8
-
(Title)
Task to be performed for the above
hours:
Drilling/MW
Install, Post-Remediation Quarterly M
Draftsman
0
hours x
$
65.00
per
hour
=
8
-
(Title)
Task to be performed for
the above hours:
Drilling/MW
Install, Post-Remediation Quarterly
M
Technical
Coordinator
0
hours x
$
65.00
per hour
=
$
-
(Title)
Task to be performedfor the above hours:
Drilling/MW
Install, Post-Remediation Quarterly NI
Administrative
Assistant
2
hours
x
S
45.00
per hour
=
$
90.00
(Title)
Task to be performedfor
the
above hours:
Drilling/MW Install, Post-Remediation Quarterly M
Office Manager
0
hours x
$
40.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly M
Principal
0
hours
x
$
130.00
per hour
=
$
-
(Title)
Task to be performed for the
above hours:
Drilling/MW Install, Post-Remediation Quarterly M
Field Supervisor/Coordinator
0
hours
x
$
110.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Drilling/MW Install, Post-Remediation Quarterly lvi
Wastewater
Ti-t’mt.
Operator
0
hours
x
$
100.00
per hour
=
$
-
(Title)
Task to be performed for the
above hours:
Drilling/MW
Install, Post-Remediation QuarterlyM
G-le(2)
This form
must
be submitted
in duplicate.
IEMA No.
00-0692
G.
PERSONNEL
QUARTERLY GW REPORTING
All personr~el
costs that are not included elsewhere in the budget/billing
form must be listed here.
Cos
be listed per
task, not personnel type. The following
are some examples of tasks: Drafting, data collecti
plan, report,
or
budget preparation
fo Quart. Rept
(i.e., site classification work plan, 45 day report,
or
I
priority
corrective action budget), sampling, field oversite for___________
(i.e., drilling/well installatia
corrective action, or early action),
of maintenance
Sorento G~.The above list is
not inclusive
of all
possible tasks.
Environmental Engineer
20
hours
x
$
105.00
per hour
=
$
2,100.00
(Title)
Task to be performed for the above hours:
Protect/Data Management, Quarterly Reporting
Senior
Env. Engineer
8
hours
x
$
115.00
per hour
=
$
920.00
(Title)
Task to be performed for the above hours:
Project/Data Management, Quarterly Reporting
Senior Env. Geologist
0
hours
x
$
92.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Project/Data Ivlanagement, Quarterly
Reporting
General Project Manager
4
hours
x
$
100.00
per hour
=
$
400.00
(Title)
Task to be performed for the
above hours:
Project/Data Management, Quarterly Reporting
Env. ProjectGeologist
0
hours
x
$
81.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Prolect/Data Management, Quarterly Reporting
Env. Project Scientist
.
0
hours
x
$
81.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Project/Data Management, Quarterly Reporting
Engineering Technican
0
hours
x
$
55.00
per hour
=
$
-.
-
(Title)
Task to be performed for the above hours:
Project/Data Management, Quarterly Reporting
Laborer
,
0
hours
x
$
40.00
per hour
=
$
-
(Title)
Task to be performed
for the above hours:
Project/Data Management, Quarterly Reporting
G-lh(2)
This form must be submitted in duplicate.
IEMA No.
00-0692
Technical Editor
0
hours
x
$
55.00
per hour
=
$
$
-
(Title)
Task to be performed for
the
above
hours:
Project/Data
Management,
Quarterly
Reporting
Draftsman
10
hours
x
$
65.00
per hour
=
$
$
650.00
(Title)
Task to be performed for the above hours:
.
Project/Data Management,
Quarterly Reporting
Technical Coordinator
0
hours
x
$
65.00
per hour
=
$
$
-
(Title)
Task to be performed for the above hours:
Project/Data Management, Quarterly Reporting
Administrative
Assistant
20
hours x
5
45.00
per hour
=
$
$
900.00
~11t1e)
Task to be performed for the above hours:
Project/Data Management, QuarterlyReporting
Office Manager
0
hours
x
$
40.00
per hour
=
$
$
-
(Title)
Task to be performed for
the
above hours:
Project/Data Management,
Quarterly Reporting
Principal
0
hours
x
$
130.00
per hour
=
$
$
-
(Title)
Task to be performed for the
above hours:
Project/Data Management, Quarterly Reporting
Field Supervisor/Coordinator
0
hours
x
$
110.00
per hour
=
$
$
-
(Title)
Task to be performed for the above hours:
Project/Data Management, Quarterly Reporting~
Wastewater
Trtmt. Operator
0
hours
x
$
100.00
per hour
=
$
$
-
(Title)
Task to be performed
for the above hours:
Project/Data Management, Quarterly Reporting
hours
x
_________
per hour
=
$
$
-
(Title)
Task to be performed foi~the above hours:
__________________
TOTAL PERSONNEL COSTS:
$
11,380.00
G-2(2)
This form must be submitted in duplicate.
IEMA No.
00-0692
H.
EQUIPMENT COSTS
GW REMEDIATION
All equipment used must be listed below in a time and materials
format.
Handling
charges should not
added here; use Section
J.
Equipment
Own or
Rent
Time
Used
Units
Unit Rate
Total
Cost/Item
Groundwater
Treatment
Unit (includes t’raile Rent
0
/mnth
$
2,070.00
$
-
surge
tank,
oil/water
separator,
shallow tray
0
air stripper,
vent pipes, air compressor/blower
0
holding
tank,
effluent pump, particulate filter,
0
initial set carbon filters, sampling tank,
-
0
autodialer, lights, exhaust fans and climate
0
control)
0
PID Rental
Rent
1.0 /day
$
125.00
$
125.00
Survey Equipment Rental
Rent
1.0
/day
$
65.00
$
65.00
Water
Level Indicator
Rent
3.0
/day
$
21.00
$
63.00
Measuring
WheelRental
•
Rent
1.0
/day
$
15.00
$
15.00
0
0
0
0
.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
I
0
T
H-1(2)
Total Page
H.-1
$
268.00
This form must be submitted
in duplicate
IEMA No.
00-0692
I.
FIELD
PURCHASES AND OTHER COSTS
GW MONITORING
-
All equipment used must be listed below in a time and materials format.
Handling
charges should not
be
added here; use Section
J.
Field Purchases
Quantity
Item
Price/Item
Total Cost
Handling
Charges
Color Copies
0 /each
$
1.25
$
-
yes
Carbon-Filter Purchase
0
/each
$
600.00
$
-
yes
Manifests
0
/each
$
1.00
$
-
yes
Truck Liner
-
0
/each
$
4.00
$
-
yes
Bailers
54
/each
$
12.00
$
648.00
yes
Film
1
leach
$
6.00
$
6.00
yes
Photo Development
& Copies
1 /each
$
15.00
5
15.O0~yes
Injection Point Installation
0.0
/each
$
500.00
$
-
yes
Postage
-
5
40.00
yes
Drums
0
/each
$
50.00
$
-
yes
Permit Fees
0
/each
$
100.00
$
-
yes
Subcontractors
Sand Backfffl
0.00 /ton
$
5.00
$
-
yes
Aggregate Backfill
0.00 /ton
$
11.25
$
-
yes
Septic Gravel Backfill
0.00 /ton
$
7.75
$
-
yes
Concrete
0.00 Icy.
$
61.00
$
-
yes
Disposal Charge
0.00 /ton
$
20.00
$
-
yes
Trackhoe
0.00
/hour
$
145.00
$
-
yes
Backhoe
0.00
/hour
$
95.00
5
-
yes
Trucking Charge (10 c.y.)
0.00
/hour
$
65.00
$
-
yes
End Loader
0.00 /hour
$
95.00
$
-
yes
Trucking Charge
(15 c.y.)
•
0.00
/hour
$
85.00
$
-
yes
Baker Tank
0.00
/month
$
1,200.00
$
-
yes
Electrician
0.00
/hour
$
40.00
$
-
yes
Electrician Mileage
0.00
/mile
$
0.37
$
-
yes
Plumber/Inspector
0.00
/hour
$
45.00
$
-
yes
Plumber Mileage
0.00
/mile
$
0.37
$
-
yes
Carbon Filter Disposal
0 /each
$
1,000.00
$
-
yes
Electricity
•
0
/mo.
$
200.00
$
-
-
yes
Sewer Disposal
Charge
-‘
0
/gal.
0.001
$
-
yes
Recovery Sump Installation
0
/each
$
2,500.00
$
-
yes
Recovery Sump Closure
0
/each
$
1,200.00
$
-
yes
Monitoring Well Closure
0
/each
$
350.00
$
-
yes
Telephone Line Installation
0
/each
$
150.00
$
-
yes
Telephone Line (autodialer)
0
/month
$
30.00
$
-
yes
Recovery Well Installation
0
/each
$
800.00
$
-
yes
Recovery Well Closure
0
/each
$
400.00
$
-
yes
Drilling (15 ft. wells)
105
/ft.
$
20.00
$
2,100.00
yes
MW Installation
(replacement)
7
/each
$
450.00
$
3,150.00
yes
Drill Rig Mobilization
1
/each
$
260.00
$
260.00
yes
$
r
1-1
(2)
Subtotal Page
1-1
$
6,219.00
This form must be submitted
in duplicate
IEMA 00-0692
I
GW MONITORING
Other Costs
-
A listing and
description of
all- other costs which wifi be/were incurred
and are not specifically
listed on this form should be attached.
The listing
should include a costbreakdown in a
time and materials
format.
-
Other
Costs
No.
Rate
Cost
Copies
550.0
5
0.10
/each
$
55.00
Mileage for C.W3M trips
1380.0
$
0.37
/each
$
510.60
Per Diem
‘
0.0
$
36.00
/day
$
-
GWTUMobi.lizationtoSit
0.0
$
350.00
/each
$
-
Maintenance Cost
•
0.0
$
50.00
/month
$
-
Total
Other
$
565.60
*Number of Trips
3 trips each at
150
miles/trip
for Environmental Engineer
(1 forMW replacement, 2 for Quarterly Monitoring)
3
tips
each
at
310
miles/trip
-
for Environmental Project G~oiogist
(1 for
MW replacement,
2 for Quarterly Monitorii~g)
TOTAL OTHER
COSTS
=
$
565.60
Total (Pages
1-1 and 1-2)
$
6,784.60
1-2
(2)
*
This form must be submitted in
duplicate
IEMA No.
00-0692
J.
HANDLING
CHARGES
QUARTERLY REPORTING/BIO-TRENCH
Handling charges are eligible for payment on subcontractor
billings
and/or field purchases
only if they
equal to or less
than the
amounts
determined by
the following table:
Subcontractor
or Field
Purchase Cost
$1
-
$5,000
$5,001
-
$15,000
$15,001
-
$50,000
$50,001
-
$100,000
$100,001
-
$1,000,000
Eligible Handling
Charges as
a
Percentage of Cost
12
$600
+
10
of amt. Over $5,000
$1,600
+
8
of amt. Over $15,000
$4,400
+
5
of amt. Over $50,000
$6,900
+
2
of amt. Over $100,000
A.
Subcontractor Charges
Subcontractor
Section where cost
is listed
Subcontract Amount
Laboratory Analysis
F-2(2)
$
3,420.00
Sand Backfill
1-1(2)
$
-
Aggregate Backfill
1-1(2)
$
-
Septic Gravel Backfill
1-1(2)
$
-
Concrete
1-1(2)
$
-
Disposal Charge
1-1(2)
$
-
Trackhoe
1-1(2)
$
-
Backhoe
1-1(2)
$
-
Trucking Charge
(10
c.y.)
.
1-1(2)
$
-
End Loader
1-1(2)
$
-
Trucking Charge (15
c.y.)
1-1(2)
$
-
Baker Tank
1-1(2)
-
$
-
Electrician
1-1(2)
$
-
Electrician Mileage
1-1(2)
$
-
Plumber/Inspector
1-1(2)
$
-
Plumber Mileage
-
1-1(2)
$
-
Carbon Filter Disposal
•
1-1(2)
$
-
Electricity
1-1(2)
$
Sewer Disposal Charge
1-1(2)
$
-
Recovery Sump Installation
1-1(2)
$
-
Recovery Sump Closure
1-1(2)
$
-
Monitoring Well Closure
1-1(2)
$
-
Telephone Line Installation
1-1(2)
$
-
Telephone Line (autodialer)
•
1-1(2)
$
-
Recovery Well Installation
1-1(2)
$
-
Recovery Well Closure
•
1-1(2)
$
-
Telephone Line
(autodialer)
1-1(2)
$
-
Drilling (15 ft. wells)
1-1(2)
$
2,100.00
MW Installation
(replacement)
1-1(2)
$
3,150.00
Drill Rig Mobilization
1-1(2)
$
260.00
Injection Point Installation
1-1(2)
$
-
j-1(2)
Subtotal 1-1 Subtotal:
$
8,930.00
This form must
be submitted
in duplicate
IEMA No.
00-0692
QUARTERLY REPORTING
/
BIO’-TRENCH
Subtotal Page 1-2:
$
709.00
Subtotal of Pages J-1 and 1-2:
$
9,639.00
Handling Charge’
See Handling Charge Total
*
Use
chart at
top
ofPage J-1 to calculate the allowable handling charge.
Copies of invoices for subconmict~rcosts and receipts for field purchases are required for billing submissions
J-2(2)
B.
Field Purchase
•
Field Purchase
Field Purchase Amount
Color Copies
-
-
$
-
Carbon Filter Purchase
$
-
Manifests
-
Truck Liner
$
-
Bailers
$
648.00
Film
$
6.00
Photo Development & Copies
-
$
15.00
Postage
$
40.00
Drums
-
•
$
-
Permit Fees
$
-
This form must be submitted
in duplicate
IEMA No.
00-0692
F.
ANALYSIS COSTS
EXCAVATION
AND
DISPOSAL
1.
Physical Soil Analysis
-
This
must
only include
analysis
costs for
classification
of
soil types at the
Moisture Content samples
x
$
______________
per sample
=
$
______________
Soil Classification samples
x
$
______________
per
sample
=
$
Indicate method to be performed:
______________________________
_____
Soil Particle Size samples
x
$
______________
per sample
=
$
______________
____
Ex-situ Hydraulic Conductivity/Permeability
samples
x
$
•
per sample
$
___________
Indicate method
to be performed:
-
_____________________________
____
Rock Hydraulic Conductivity/Permeability samples
x
$
___________
per
sample
$
Natural Organic CarbonFraction (foc) swnples
x
$
______________
per sample
=
$
Indicate the ASTM or SW-846 method
to be performed:
__________________
_______________________
samples x
$
______________
per sample
= $
0
________________________ samples x
$
-
per sample
=
$
0
_______________________
samples x $
______________
per sample
= $
0
________________________ samples x
$
_______________
per sample
=
$
0
•
samples x
$
_______________
per
sample
=
$
0
2.
Soil Analysis
Costs
-
This
must be for laboratory
analysis
only.
21
BTEX samples
x
$
75.00
per sample
=
$
1,575.00
0 PNA samples
x
$
175.00
per sample
=
$
-
_____LUST Pollutants samples
x
$
per sample
=
$
-
-
-
F-l(3)
This form must be submitted
in
duplicate
0
0
-
0
0
0
0
I
_____pHSamples x
$
per sample
= $
0
_____
Paint
Filtersamples
x
$
per sample
= $
0
21 TCLP © samples x
85.00
per sample
= $
1,785.00
_____
Flash Point samples x$
per sample
= $
0
_____
Lab and/or Field Bank samples
x
$
-
per sample
=
$
-
1 Waste Characterizatior
samples x
$
400.00
per sample
=
$
400.00
____________________
samples x
$
______________
per sample
= $
-
_________________________ samples x
$
______________
per sample
=
$
-
_________________________ samples x
$
______________
per sample
=
$
-
________________________
samples x
$
_____________
per sample
= $
-
3.
Groundwater Analysis
Costs
-
This must be for laboratory
analysis
only.
_____BTFX samples x
$
-
per sample
=
$
-
-
_____PNA samples x
$______________
per sample
= $
-
____LUST
Pollutants
samples x
$
per sample
‘$
0
_____
pH Samples
x
$
per sample
= $
0
_____Lab and/or FieldBlank samples x
$
per sample
=
$
______________
•
Flash Point samples
x
$
per sample
= $
0
-
_________________________
samples
x
$
______________
Per sample
=
$
0
_________________________
samples
x
$
______________
Per sample
=
$
0
samples
x
$
Per sample
= $
0
_________________________
samples
x
$
______________
Per sample
=
$
0
_________________________
samples
x
$
Per sample
= $
0
_________________________
samples
x
$
______________
Per sample
= $
0
TOTAL ANALYSIS
COSTS
4,180.00
F-2(3)
This form thust
be submitted in duplic-ate.
IEMA No.
00-0692
G.
PERSONNEL
EXCAVATION AND DISPOSAL
All personnel costs that are not included elsewhere in the budget/billing
form
must
be listed here.
Cos
be listed per task, not personnel type.
The following are some examples of tasks: Drafting, data collectic
plan, report, or budget preparation fa Excavation
(i.e., site classification work plan, 45 day report, or
I
priority
corrective
action budget), sampling, field oversite for
__________
(i.e., drilling/well installatia
corrective action, or early action),
of maintenance
i
Sorento G~.The above list is not inclusive
of all
possible tasks.
-
Environmental Engineer
288.00
hours
x
$
105.00
per hour
=
$
30,240.00
(Title)
Task to be performed for the above hours:
Excavation activities
Senior Env.
Engineer
-
hoursx
$
115.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Excavation activities
Senior
Env.
Geologist
-
hours
x
$
92.00
per hour
=
$
-
(Title)
Task to be performed for the
above hours:
Excavation activities
General Project Manager
-
hours
x
$
100.00
per hour
=
$
-
(Title)
-
Task to be performed for the above
hours:
Excavation activities
Env. Project Geologist
-
hours x
$
81.00
per hour
=
$
-
(Title)
-
Task to be performed for the above hours:
Excavation activities
Env. Project Scientist
-
hours
x
$
81.00
per hour
=
$
-
(Title)
-
Task to be performed for the above hours:
Excavation activities
Engineering Technican
288.00
hours x
$
55.00
per hour
=
$
15,840.00
(Title)
Task to be performed for the above hours:
Excavation activities
Laborer
-
hours x
$
40.00
per hour
=
$
(Title)-
Task to be performed for the above hours:
Excavation activities
G-1(3)
This form must be submitted in duplicate.
TOTAL PERSONNEL
COSTS:
$
77,760. 00-
-
G-2(3)
-
This form must be submi~tedin duplicate.
Technical
Editor
(Title)
Task to be performed for the above hours:
Draftsman
•
-
.
(Title)
Task to be performed-for the above hours:
Technical Coordinator
(Title)
Task to be performed
for the
above hours:
Administrative
Assistant
(1. ILIC)
Task to be performed for the
above hours:
Office Manager
(Title)
Task
to be performed
for the above hours:
Principal
(Title)
Task to be
performed for the above hours:
Field Supervisor/Coordinator
(Title)
Task to be performed for the above hours:
Wastewater Trtmt. Operator
(Title)
Task to be performed for the above hours:
Construction
Foreman
•
•
(Title)
IEMA No.
00-0692
0.00
hours
x
$
55.00
per hour
=
$
-
Excavation activities
0.00
hours
x
$
65.00
per hour
=
$
Excavation activities
0.00
hours
x
$
65.00
per hour
=
$
-
Excavation activities
0.00
hours
x
$
45.00
per hour
=
$
-
Excavation activities
0.00
hours
x
$
40.00
per hour
=
$
-
Excavation activities
0.00
hours
x
$
130.00
per hour
=
$
Excavation activities
288.00 hours x
$
110.00
per
hour
=
$
31,680.00
Excavation activities
0.00
hours x
$
100.00
per
hour
=
$
Excavation activities
0.00
hours x
$
65.00
per hour
Task to beperformed for the above
hours:
IEMA
No.
00-0692
•
H.
EQUIPMENT
COSTS
EXCAVATION AND DISPOSAL
-
All
equipment
used must be
listed below in
a time and materials format.
Handling
charges should not
added here; use Section
J.
H-1(3)
This form must be ~ubmitted
in duplicate
Total Page H-i
$
Equipment
Own or
Rent
fime Usec
Units
-
Unit Rate
Total
Cost/Item
$
•
0
0
0
0
0
0
•
0
0
0
0
0
.
0
0
0
•
0
0
0
-____
0
0
-
0
0
0
0
0
0
0
0
-
0
0
0
.
0
-
0
0
0
-
0
-
0
0
•
0
IEMA No.
00-0692
FIELD
PURCHASES AND OTHER
COSTS
EXCAVATION AND DISPOSAL
All
equipment
used must be listed below in a time and materials format.
Handling charges -should not be
added here; use Section
J.
-
Field Purchases
Quantity
Item
Price/Item
Total Cost
Handling
Charges
Color Copies
0
/each
$
1.25
$
-
yes
Carbon Filter Purchase
0
/each
$
600.00
$
-
yes
Manifests
-
530
/each
$
1.00
$
530.00
yes
Truck Liner
-
530 /each
$
4.00
$
2,120.00
yes
Bailers
0 /each
$
12.00
$
-
yes
Film
1 /each
$
6.00
$
6.00
yes
Photo Development & Copies
1 /each
$
15.00
$
15.00
yes
Encore Samplers
42 /each
$
•
10.00
$
420.00
yes
Postage
•
$
-
yes
Drums
0
/each
$
5000
$
-
yes
•
$
Subcontractors
$
-
UST Removal
0
/gallon
$
1.00
$
-
yes
Building
Demolition
•
0.00
L.S.
$
8,000.00
$
-
yes
Asbestos Inspection
0.00
/each
$
900.00
$
-
yes
Sand Backfill
-
0
/ton
$
5.00
$
-
yes
Aggregate Backfill
0 /ton
$
11.25
$
-
yes
Septic Gravel Backfill
0
/ton
$
7.75
$
•
-
yes
Concrete
0
/c.y.
$
61.00
$
•
-
yes
Disposal Charge
•
-
6,369.28
/ton
$
20.00
$127,385.50
yes
Trackhoe
230.00
/hour
$
145.00
$
33,350.00
yes
Backhoe
•
230.00
/hour
$
95.00
$
21,850.00
yes
Trucking Charge
(10 c.y.)
712.00
/hour
$
65.00
$
46,280.00
yes
End Loader
0
/hour
$
95.00
$
-
yes
Trucking Charge
(15 c.y.)
0
/hour
$
85.00
$
•
-
yes
Baker
Tank
0 /month
$
1,200.00
$
-
yes
Electrician
0
/hour
$
40.00
$
-
yes
Electrician Mileage
0
/mile
$
0.37
$
-
yes
Plumber/Inspector
0
/hour
$
45.00
$
-
yes
Plumber Mileage
0
/mile
$
0.37
$
-
yes
$
-
$
$
$
•
$
$
•
$
.
$
-
-
$
1-1
(3)
Subtotal Page I-I
$
231,956.50
This form must be submitted
in duplicate
IRMA
00-0692
-
EXCAVATION AND DISPOSAL
Other Costs
-
A
listing
and description
of all
other
costs
which wifi be/were incurred
and are not specifically
listed
on
this form should be attached.
The listing
should include
a cost breakdown in a time and materials
format.
Other
Costs
No.
Rate
Cost
Copies
•
-
0
$
0.10
/each
$
-
Mileage for CW3M trips
10800
$
0.37
/each
•
$
3,996.00
Per Diem
•
0
$
36.00-
/day
$
-
•
$•
-
$
Total Other
$
3,996.00
*Number ofTrips
48 trips at
24
trips at
150
miles
per trip for field crew
150 miles per trip for Environmental
Engineer
Total
(Pages
1-1 and 1-2)
1-2
(3)
I 5
235,952.50
I
I
*
TOTAL OTHER COSTS
=
$
3,996.00
This form must be
submitted in duplicate
IEMA
No.
00-0692
J.
-
HANDLING CHARGES
EXCAVATION AND DISPOSAL
Handling charges are eligible
for payment
on subcontractor billings and/or
field purchases
only if they
equal
to
or
less
than the amounts determined by the following table:
Subcontractor
or Field
Purchase Cost
$1
-
$5,000
$5,001
-
$15,000
$15,001
-
$50,000
$50,001
-
$100,000
$100,001
-
$1,000,000
Eligible Handling Charges
as a
Percentage of Cost
12
$600
±
10
of amt. Over$5,000
$1,600
+
8
of amt. Over
$15,000
$4,400
+
5
of amt. Over $50,000
$6,900
+
2
of
amt.
Over $100,000
J-1(3)
$233,045.50
A.
Subcontractor
Charges
Subcontractor
Section
where cost
is listed
SubcontractAmount
Laboratory Analysis
F-2(3)
$
4,180.00
UST Removal
1-1(3)
$
-
Building Demolition
-
1-1(3)
•
$
-
-
Asbestos Inspection
1-1(3)
-
$
-
Sand Backfill
1-1(3)
$
-
Aggregate Backfill
1-1(3)
•
$
-
Septic Gravel Backfffl
1-1(3)
$
-
Concrete
-
1-1(3)
$
-
Disposal
Charge
1-1(3)
$127,385
50
Trackhoe
1-1(3)
$
33,350.00
Backhoe
-
-
•
1-1(3)
$
21,850.00
Trucking Charge
(10 c.y.)
1-1(3)
$
46,280.00
End Loader
1-1(3)
5
-
Trucking Charge
(15 c.y.)
1-1(3)
$
-
Baker Tank
1-1(3)
-
$
-
-
Electrician
1-1(3)
$
-
-
Electrician Mileage
1-1(3)
$
-
Plumber/Inspector
1-1(3)
$
-
Plumber Mileage
1-1(3)
$
-
-
Subtotal
T-1 Subtotal:
This form must be submitted in
duplicate
B.
Field Purchase
EXCAVATION AND DISPOSAL
IEMA No.
00-0692
Subtotal Page 1-2:
$
3,091.00
L~ubtotalof Pages
J-1
andj-2:
$236,136.50
Handling Charge
See Handling
Charge Total
*
Use chartat top
of Page J-1
to
calculate the allowable handling
charge.
Copies of invoices for subconmictor
costs and receipts
for field purchases are required for billing submissions
J-2(3)
-
Field Purchase
Field Purchase Amount
Color Copies
$
-
Carbon Filter Purchase
$
-
Manifests
$
530.00
Truck Liner
-
$
2,120.00
Bailers
-
$
-
Film
$
6.00
Photo
Development & Copies
-
$
15.00
•
$
420.00
Postage
$
-
Drums
•
S
-
This form must
be submitted in duplicate
•
IEMA
No.
00-0692
G.
PERSONNEL
BACKFILL
All personnel costs that are not included elsewhere in
the budget/billing
form
must
be
listed here. Cos
be
Listed per task, not personnel type.
The following are some examples
oftasks: Drafting, data
collecti
plan, report, or budget preparation
fo Backfill
(i.e., site
classification work plan,
45 day report, or
I
priority
corrective
action
bud-get), sampling, field
oversite
for
__________
(i.e.,
drilling/well installatia
corrective action, or early action),
of maintenance
Sorento G~.The
above list
is
not inclusive of
all
possible tasks.
Environmental
Engineer
225.00
hours
x
$
105.00
per hour
=
$
23,625.00
(Title)
-
Task to be performed for the above hours:
Backfill activities
Senior Env. Engineer-
0.00
hours
x
$
115.00
per
hour
=
$
-
-
(Title)
-
Task
to be performed
for the above hours:
Backfffl activities
Senior Env. Geologist
0.00
hours
x
$
92.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Backfill activities
General Project Manager
-
0.00
hours
x
$
100.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Backfill activities
Env. Project Geologist
0.00
hours
x
$
81.00
per hour
=
$
-
(Title)
-
Task to be performed
for the above hours:
Backfill activities
Env. Project Scientist
.
0.00
hours
x
$
81.00
per hour
=
$
(Title)
Task to be performed for the above hours:
-
Backfill activities
-
Engineering Technican
225.00
hours x
$
55.00
per hour
=
$
12,375.00
(Title)
Task to be performed
for the above hours:
Backfill activities
Laborer
225.00
hours
x
$
40.00
per hour
=
$
9,000.00
(Title)
Task to be performed for the above hours:
Backfill activities
-
-
~
G-1(4)
This
form must be submitted in duplicate.
IEMA
No.
00-0692
Technical Editor
0.00
hours
x
$
55.00
per hour
=
$
_____________
(Title)
Task to be performed for the
above hours:
Backfill activities
Draftsman
0.00
hours
x
$
65.00
per hour
=
$
-
-
(Title)
-
Task to be performed
for the
above
hours:
Backfill activities
-
-
Technical Coordinator
0.00
hours
x
$
65.00
per hour
=
$
(Title)
Task to be performed for the
above hours:
Backfill activities
Administrative Assistant
0.00
hours
x
$
45.00
per
hour
=
$
I
1UC)
Task to be performed for the above hours:
Backfill activities
Office Manager
-
0.00 hours x
$
40.00
per hour
-=
$
-
(Title)
Task to be performed for the
above hours:
Backfill activities
Principal
0.00
hours
x
$
130.00
per hour
=
$
-
-
(Title)
Task to be performed
for the
above hours:
-
Backfill activities
Field Supervisor/Coordinator
225.00
hours
x
$
110.00
per hour
=
$
24,750.00
(Title)
‘
-
Task to be performed
for the
above hours:
Backfill activities
-
Wastewater Trtmt
Operator
0.00
hours
x
$
100.00
per hour
=
$
(Title)
-
-
Task to be performed
for the above hours:
Backfill activities
Construction Foreman
0.00
hours
x
$
65.00
per hour
=
$
(Title)
Task to be performed
for the
above hours:
TOTAL PERSONNEL COSTS:
$
69,750.00
G-2(4)
This form must be submitted
in duplicate.
IEMA No.
00-0692
H.
EQUIPMENT
COSTS
BACKFILL
-
All equipment used must be listed below in a time and materials format.
Handling charges should not
added here; use Sectionj.
1
Own
or
1
Equipment
J
Rent
Time Use
Units
Unit Rate
Total
Cost/Item
-
-
0
0
0
0
0
0
0
0
0
0
0
0
0
-__________________
0
0
0
0
0
0
0
0
0
-
0
0
0
0
0
0
0
0
0
0
0
0
Q
0
0
.
0
0
-
Total Page H-I.
$
H-1(4)
This form must be submitted
in duplicate
-
-
—
IEMA
No.
00-0692
I.
--
FIELD PURCHASES
AND OTHER COSTS
BACKFILL
All equipment used must be listed below in a time and materials format.
Handling charges should not be
added here; use Section
J.
-
Field Purchases
Quantity
Item
Price/Item
Total Cost
Handling
Charges
Color Copies
0
/each
$
1.25
$
-
yes
Carbon Filter Purchase
0
/each
$
600.00
$
-
yes
Manifests
0
/each
$
1.00
$
-
yes
Truck Liner
0
/each
$
4.00
$
-
yes
Bailers
0
/each
$
12.00
$
-
yes
Film
-
0
/each
$
6.00
$
-
yes
Photo Development & Copies
0
/each
$
15.00
$
-
yes
$
-
yes
Postage
-
$
-
yes
Drums
-
0
/~ach
$
50.00
$
-
-
yes
$
Subcontractors
$
-
Sand Backfill
6,313.89 /ton
$
5.00
$
31,569.45
yes
Aggregate Backfill
346.16 /ton
$
11.25
$
3,894.26
yes
Septic Gravel Backfill
0.00 /ton
$
7.75
$
-
yes
Concrete
0.00
/c.y.
$
61.00
$
-
-
yes
Disposal Charge
0.00
/ton
$
20.00
$
-
yes
-
Trackhoe
0.00
/hour
$
145.00
$
-
yes
Backhoe
240.00 /hour
$
95.00
$
22,800.00
yes
Trucking Charge (10 c.y.)
960.00
/hour
5
65.00
$
62,400.00
yes
End Loader
0.00 /hour
$
95.00
$
-
yes
Trucking Charge
(15
c.y.)
0.00
/hour
$
85.00
$
-
yes
Baker Tank
-
0.00
/month
$
1,200.00
$
-
yes
Electrician
-
0.00 /hour
$
40.00
$
-
yes
Electrician Mileage
0.00
/mile
$
0.37
$
-
yes
Plumber/Inspector
-
0.00
/hour
$
45.00
$
-
yes
Plumber Mileage
0.00
/mile
$
0.37
$
-
yes
Drill Rig Mobilization
0 /each
$
260.00
$
-
yes
Replacement MW Install. 25ft
0
/each
$
550.00
$
-
yes
$
$
$
$
-
$
$
$
-
-
$
-
$
Subtotal Page 1-1
5
120,663.71
-I-I.
(4)
This form must be submitted in duplicate
IEMA 00-0692
-
BACKFILL
Other Costs
-
A
listing and description
of all other costs
which will be/were
incurred and are not specifically
listed on
this form should be
attached.
The listing should include
a cost breakdown in a
time
and materials
format.
Other Costs
-
No.
Rate
Cost
Copies
0.00
5
0.10
/each
$
-
Mileage for CW3M
trips
11,400.00
$
0.37
/each
$
4,218.00
Per Diem
-
-
0.00
$
36.00
/day
$
-
$
$
Total Other
$
4,218.00
*Number of Trips
57 trips at
150
miles per
trip for field crew
19 trips at
150
miles per trip for Environmental Engineer
-
-
TOTAL
OTHER COSTS
=
$
$
4,218.00
ITotal (Pages I-i
and 1-2)
I
S
124,881.71
1
1-2 (4)
This form must be submitted
in
duplicate
IEMA
No.
00-0692
J.
HANDLING CHARGES
BACKFILL
Handling charges are eligible
for
payment
on subcontractor
billings and/or field purchases
only if they
equal to
or less
than the amounts
determined by
the following table:
Subcontractor
or Field
Purchase
Cost
$1
-
$5,000
$5,001
-
$15,000
$15,001
-
$50,000
$50,001
-
$100,000
$100,001
-
$1,000,000
Eligible Handling Charges as a
Percentage of Cost
12
$600
+
10
of amt.
Over $5,000
$1,600
+
8
of amt. Over $15,000
$4,400
±
5
of
amt.
Over $50,000
$6,900
+
2
of
amt.
Over $100,000
A.
Subcontractor
Charges
-
Subcontractor
Section where cost
is listed
-
-
Subcontract Amount
Sand
Backfill
1-1(4)
$
31,569.45
Aggregate Backfill
1-1(4)
$
3,894.26
Septic Gravel
Backfill
-
1-1(4)
$
-
Concrete
1-1(4)
$
-
Disposal Charge
-
1-1(4)
$
-
Trackhoe
1-1(4)
-
$
-
Backhoe
1-1(4)
$
22,800.00
Trucking Charge
(10 c.y.)
1-1(4)
-
$
62,400.00
End Loader
1-1(4)
$
-
Trucking Charge
(15 c.y.)
1-1(4)
$
-
Baker Tank
1-1(4)
$
-
Electrician
1-1(4)
$
-
Electrician Mileage
1-1(4)
$
-
-
Plumber/ Inspector
1-1(4)
$
-
Plumber Mileage
1-1(4)
$
-
Drill Rig Mobilization
1-1(4)
-
$
-
ReplacementMW
Install. 2Sft
1-1(4)
$
-
J-1(4)
Subtotal J-1 Subtotal:
$120,663.71
This form must be submitted in duplicate
00-0692
Subtotal Page 1-2:
$
Subtotal of Pages J-1
and 1-2:
$
120,663.71
Handling
Charge
See Handling
Charge Totai
*
Use chart at top
of Page J-1
to calculate
the allowable handling charge.
Copies of invoices
for subcontractor costs and receipts for field purchases are required for billing submissions
J-2(4)
B.
Field Purchase
BACKFILL
Carbon Filter Purchase
IEMANo.
Manifests
-
Field Purchase
Field Purchase
Amount
Truck Liner
Color Copies
$
-
Ballers
-
-
Film
-
$
Photo Development & Copies
-
Postage
$
Drums
$
$
$
$
$
$
$
This form must be submitted in duplicate
IEMA
No.
00-0692
G.
PERSONNEL
REIMBURSEMENT PREPARATION
All
personnel
costs
that
are not included elsewhere in the budget/billing
form
must
be listed here.
Costs mas
be listed per task, not personnel type.
The following are some examples of tasks: Drafting, data collection,
plan, report,
or budget preparation for
Reimb~
(i.e., site classification work plan, 45 day report,
or high
priority corrective action budget), sampling,
field oversite for
___________
(i.e.,
drilling/well installation,
corrective action, or early action),
of maintenance
Sorento G~.The above list is not inclusive
of all
possible tasks.
Environmental Engineer
4.25
hours
x
$
105.00
per hour
=
$
446.25
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
Senior Env. Engineer
3.25
hours
x
$
115.00
per hour
=
$
373.75
(Title)
-
Task to be performed for the above hours:
Reimbursement claim preparation
Senior Env. Geologist
21.50
hours x
$
92.00
per hour
=
$
1,978.00
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
-
General Project Manager
16.50
hours
x
$
100.00
per hour
=
$
1,650.00
(Title)
-
Task to be performed for the above hours:
Reimbursement claim
preparation
Env. Project Geologist
0.00
hours
x
$
81.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
Env. Project Scientist
0.00 hours x
$
81.00
per
hour
=
$
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
Engineering Technican
-
0.00
hours
x
-$
55.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
Laborer
-
0.00
hours
x
$
40.00
per
hour
=
$
(Title)
G-i(5)
This form must be
submitted in duplicate.
IEMA
No.
00-0692
Technical Editor
0.00
hours
x
$
--
55.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
Draftsman
0.00
hours
x
$
65.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
Technical Coordinator
0.00
hours
x
$
65.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Reimbursement claim
preparation
-
Administrative
Assistant
32.00
hours
x
$
45.00
per hour
=
$
1,440.00
(Title)
-
Task to be performed for the above hours:
Reimbursement claim preparation
Office Manager
0.00
hours
x
$
40,00
per hour
=
$
(Title)
Task to be performed for the
above hours:
Reimbursement claim preparation
-
Principal
2.00
hours x
$
130.00
per hour
=
$
260.00
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
-
Field Supervisor/Coordinator
0.00
hours x
$
110.00
per hour
$
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
Wastewater Trtmt. Operator
-
0.00
hours x
$
100.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Reimbursement claim preparation
0.00 hours x
$
__________
per
hour
=
$
(Title)
Task to be performed for the above hours:
-
TOTAL PERSONNEL COSTS:
$
6,148.00
G-2(5)
This form must be submitted
in duplicate.
IEMA
No.
00-0692
I.
-
FIELD
PURCHASES AND OTHER
COSTS
REIMBURSEMENT
All
equipment
used must be listed below in a ilme and materials format.
Handling charges should not
added here; use Section
J.
-
Field Purchases
Quantity
Item
Price/Item Total Cost
Handling
Charges
Color Copies
0
/each
$
1.25
$
-
yes
Carbon Filter Purchase
0
/each
$
600.00
$
-
yes
Manifests
0
/each
5
1.00
$
-
yes
Truck Liner
0
/each
5
4.00
5
-
yes
Bailers
0 /each
-
$
12.00
$
-
yes
Film
0
/each
-
$
6.00
$
-
yes
Photo
Development
& Copies
0 /each.
$
15.00
$
-
yes
$
-
-
yes
Postage
$
27.39
yes
Drums
0 /each
$
50.00
$
-
yes
-
$
-
I-I.
(5)
Subtotal Page
1-1
$
27.39
This form must be submitted in
duplicate
IEMA
No.
00-0692
-
REIMBURSEMENT
Other Costs
-.
A
listing and description
of all other
costs
which will be/were incurred
and are not specifica
listed
on
this
form
should be attached.
The listing should include
a cost breakdown in a time and materia
format.
Other Costs
-
No.
Rate
Cost
Copies
-
2,140.00
$
0.10
/each
$
214.00
Mileage for CW3M trips
0.00
$
0.37
/each
$
-
Per Diem
-
0.00
$
36.00
/day
$
-
$
-
$
-
Total Other
5
214.00
TOTAL OTHER COSTS
=
$
214.00
Total
(Pages I-i and l~2)
I
$
241.39
1
1-2 (5)
This form must be submitted
in duplicate
IEMA No.
00-0692
J.
HANDLING
CHARGES
REIMBURSEMENT
Handling charges are eligible
for payment on subcontractor billings and/or
field purchases
only if thel
equal to or less than the amounts determined by
the following table:
Subcontractor
or Field
Purchase Cost
$1- $5,000
$5,001
-
$15,000
$15,001
-
$50,000
$50,001
-
$100,000
$100,001
-
$1,000,000
Eligible
Handling
Charges as
a
Percentage
of
Cost
12
$600
+
10
of amt.
Over $5,000
$1,600
±
8
of amt. Over $15,000
$4,400
+
5
of amt.
Over $50,000
$6,900
+
2
of amt
Over $100,000
A.
Subcontractor
Charges
Subcontractor
Section where cost
-
is listed
Subcontract Amount
Sand Backfill
Aggregate Backfill
Septic Gravel
Backfill
Concrete
-
Disposal
Charge
Trackhoe
Backhoe
Trucking Charge
(10 c.y.)
-
End Loader
Trucking Charge (15 cv.)
.
Baker Tank
Electrician
Electrician Mileage
Plumber/Inspector
Plumber Mileage
J-i(5)
Subtotal
J-l.
Subtotal:
$
This form must be submitted in duplicate
REIMBURSEMENT
IEMA
No.
00-0692
-
Field
Purchase
Field Purchase
Amount
Color Copies
$
-
Carbon Filter Purchase
$
-
Manifests
$
-
Truck
Liner
$
-
Bailers
$
-
Film
-
-
$
-
-
Photo Development
&r Copies
$
-
-
$
-
Postage
-
$
27.39
Drums
-$
-
Subtotal Page J-2:
$
27.39
I
Subtotal of Pages
J-1 and J-2
:
-
$
27.39
Handling Charge
*:
See Handling Charg~Tota
*
Use chartat
top of Page
J-l
to calculate the allowable
handling
charge.
Copies of invoices for subcontractor costs
and
receiptsfor field purchases are required for billing submissions
-
-
J-2(5)
B.
Field
Purchase
L
This form must be submitted in duplicate
-
IEMANo.
00-0692
E.
INVESTIGATION
COSTS
BIOREMEDIATION
PILOT STUDY
Method I
_________Method II
_________Method
III
Not Applicable
X
1.
Drilling Costs
-
This includes the costs
for drilling labor, drill rig usage, and other drilling equipment.
Borings which are to be complefed as monitoring
wells
should be
listed here.
Costs associated with
-
disposal
of
cuttings
should not be included here.
An indication must be made as to why each boring is
being conducted
(I.e..
classification,
monitoring
wells,
migration pathways).
___________
borings to
10
feet
=
feet to be bored for
investigation/monitoring
___________
borings to
12
feet
=
feet to be bored for
Injection wells
-
12
foot
___________
borings
to
__________
feet
=
feet to be bored for
________________________
___________
borings
to
__________
feet
=
feet to be bored for
________________________
___________
borings
to
__________
feet
=
feetto be bored for
________________________
Total
Feet to be Bored:
____________________
Borings:
__________
feet
x
5
20
per foot
$
0.00
(or)
Hours
-
x
$
__________
per hour
$
______________________
__________
borings
through
__________
ft of bedrock
=
Ft
bedrock to be bored
-__________
borings
through
__________
ft
of bedrock
=
Ft bedrock to be bpred
-
Total Feet bedrock tobe Bored:
-
Borings:
__________
Ft bedrock
x
$
__________
per ft bedrock
= $
___________
(or)
-
_________Hours
x
$________
per Hour
=
$
_________________
-
#
of Mobilizations @
$
260 per
mobilization
=
$
0.00
Other Costs
-
Number of Units
Unit Cost
Total Cost
see attached ‘Other’
sheet
Well Closure
0 /each
$
350.00
$
-
2.
Professional Services (eg., P.E., geologist)
-
These costs must be listed in Section
I, the Persomel
sectioti of the forms.
E-i(6)
This form must be submitted In duplicate.
IBMA No.
00-0692
3.
Monitoring Well Installation
Materials
-
Costs listed
must
be
costs associated with well casing,
well screens, filter pack, annular seal, surface seal, well covers, etc.
List
the items below in a
time
and
-
materials format.
-
Material
Number
of Units
Unit Cost
Total Cost
15-foot Injection wells
-
10-foot, 4’
PVC screen
-
-
$
200.00
$0.00
5-foot,
4” PVC riser pipe
$
125.00
$0.00
Misc. PVC connectors, 0-rings, etc.
-
-
$
25.00
$0.00
411
bottom
caps
$
40.00
$0.00
4” Expandable
locking
caps
$
60.00
$0.00
Flush mount manway
‘
$
105.00
$0.00
Pea gravel filter pack (4 bags perwell)
$
30.00
$0.00
Bentonite chips (annular
seal)
-
$
35.00
$0.00
Concrete
(surface seal)
$
30.00
$0.00
15-foot injection well with 10-foot well
screen, PVC riser, flush mount manway, filter
pack, annular seal,
and
surface seal
Total
$0.00
4.
Disposal
Costs
-
This includes
the
costs for disposing of boring cuttings and any water generated whili
performing borings or installatin wells.
-
-
Disposal of Cuttings:
_________
drums
x
$
65
per drum
=
$
Disposal of Water:
________
gallonsx$
2
per gaflon
$
0.00
Transportation
Costs:
$
0.00
Describe how the water/soil
wifi be disposed:
TOTAL INVESTIGATION
COSTS
E-2(6)
$0.00
0.00
This form most be submitted in duplicate.
IEMA No.
00-0692
F.
ANALYSIS
COSTS
BIOREMEDIATION
1.
Physical Soil Analysis
L
This
must
only
include
analt~sis
costs for classification of soil types at the
Moisture
Content samples
x
$
______________
per sample
=
$
0
-
Soil Classification samples
x
$
_______________
per sample
=
$
0
Lndicate method
to be performed:
______________________________
_____
SoilParticle Size samples
x
$
______________
per sample
=
$
0
____
Ex-situ Hydraulic Conductivity/Permeability
samples
x
$
____________
persampie=
$
0
-
-
Indicate method
to be performed:
______________________________
____Rock
Hydraulic Conductivity/Permeability
samples
x
$___________persample
$
0
Natural Organic Carbon Fraction
(foc) samples
x
$ ____________per
sample
$
0
Indicate, the ASTM or SW-846 method to be performed:
___________________
-
samples
x
$
______________
per sample
=
$
0
________________________ samples
x
$
______________
per
sample
=
$
0
_______________________
samples
x
$
______________
per sample
=
$
0
-
samples
x
$
-
per sample
=
$
0
_______________________
samples
x
$
______________
per sample
=
$
0
2. Soil Analysis
Costs
-
This must be for laboratory
cLnclhjsis
only.
-
0
BTEX & PCE sampl
$
75.00
per sample
=
$
0.00
0
PNA samples
x
$
175.00
per sample
=
$
0.00
_____LUST
Pollutants
samples
x
$
per
sample
=
$
0
F-l(6)
This form must be submitted in duplicate
_____
pH Samples x
$
per sample
=
$
0
_____
Paint Filter samples
x
$
per sample
=
$
-
0
_____TCLP
@ samples x
$_____________
per sample
=
$
0
_____
Flash Point samples x
$
per sample
=
$
0
_____Lab and/or Field Bank
samples x
$
per sample
=
$
0
_________________________
samples
x
$
______________
per sample
=
$
-
0
Soil
-
BETX, D.O., Nut
samples
x
$
200.00
per sample
=
$
-
0
GW
-
BETX, DO., Nut
samples
x
$
-
180.00
per sample
=
$
-
_________________________
samples
x
$
______________
per sample
=
$
0
-
samples
x
$
-
per sample
=
$
0
3.
Groundwater Analysis
Costs
-
This
must be for laboratory
anaZi~sis
only.
O
BTEX
PCE samples x
75.00
per sample
=
$
-
0
PNA
samples
x
$
175.00
per sample
=
$
-
_____LUST Pollutants
samples
x
$
per sample
=
,$
0
_____‘pH Samples x
$
per sample
= $
0
_____Lab and/or Field Blank samples
x
$
per sample
=
$
0
Flash
Point samples x
$
per
sample
=
$
-
0
0
Total Lead
samples
x
$
20.00
Per sample
=
$
-
1
Microbial Degradatior
samples
x
$
3,500.00
per sample
= $
3,500.00
_________________________
samples
x
$
______________
Per sample
= $
-
_________________________
samples
x
$
______________
Per sample
= $
-
_________________________
samples
x
$
______________
Per sample
=
$
0
_________________________
samples
x
$
______________
Per sample
= $
0
TOTAL
ANALYSIS COSTS
=
3,500.00
F-2(6)
-
This
form must be submitted in duplicate.
IEMA No.
00-0692
G.
PERSONNEL
BJOREMEDIATION PILOT
I
All personnel costs
that
are not included elsewhere in the budget/bffling form must be listed here.
Costs mus
be
listed per task, not
personnel
type.
The following
are
some examples of tasks: Drafting, data collection,
plan,
report,
or
budget preparation
for
Biorem.
(i.e.,
site
classification
work plan, 45 day report,
or
high
priority
corrective
action budget), sampling,
field oversite
for
___________
(i.e.,
drilling/well
installation,
corrective
action,
or early action),
of maintenance
Sorento
G~.The
above list
is
not
inclusive
of all
possible tasks.
Environmental
Engineer
20.00
hours
x
$
105.00
per hour
=
2,100.00
(Title)
Task to be performed for the above hours:
Bioremediation/ Pilot Study Dril.ing/
Sampling, Slug test
Senior
Env. Engineer
4.00
hours
x
$
115.00
per hour
=
$
460.00
(Title)
-
Task to be performed for the above hours:
Bioremediation/Piot
Study Drilling/Sampling, Slug test
Senior
Env. Geologist
0.00 hours x
$
-
92.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Bioremediation/Piot
Study Drilling/Sampling,
Slug test
General Project Manager
0.00
hours
x
$
100.00
per hour
=
$
(Title)
-
-
-
Task to be performed for the above hours:
Bioremed.iation/Piot Study Drilling/Sampling, Slug test
Env. Project Geologist
20.00
hours
x
$
81.00
perhour
$
-
1,620.00
(Title)
Task to be performed for the above hours:
.Bioremediation/Piot
Study Drilling/Sampling,
Slug test
Env. Project Scientist
0.00
hours
x
$
81.00
per hour
=
$
(Title)
Task to be performed for the above hours:
Bioremediation/ Pilot Study Drilling/Sampling,
Slug test
Engineering Technican
-
9.00
hours
x
$
55.00
per hour
=
$
495.00
(Title)
Task to be performed for the above hours:
Bioremediation/Piot
Study Drilling/Sampling,
Slug test
Laborer
0.00 hours x
$
40.00
per hour
=
$
(Title)
G-1(6)
This form must be submitted
in duplicate.
IEMA No.
00-0692
Technical Editor
0.00
hours
x
$
--
55.00
per hour
=
$
-
(Title)
I
Task to be performed for the above hours:
Bioremediation/Piot Study Drilling/Sampling, Slug tes’
Draftsman
0.00
hours
x
$
65.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Bioremediation/ PilotStudy Drilling/Sampling, Slug
tesi
Technical
Coordinator
0.00
hours x
$
65.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Bioremediation/ Pilot Study Drilling/Sampling, Slug~
Administrative
Assistant
0.00
hours
x
$
45.00
-
‘
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Bioremediation/Piot Study Drilling/Sampling, Slug tesi
Office Manager
0.00
hours
x
$
40.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Bioremediatiori/Pilot Study Drilling/Sampling,
Slug test
Principal
0.00
hours
x
$
13O.O0
per
hour
=
$
-
(Title)
Task to be performed for the above hours:
Bioremediation/Piot
Study Drilling/Sampling,
Slug test
Field Supervisor/Coordinator
0.00
hours
x
$
110.00
per hour
=
$
-
-
(Title)
Task to be performed for the above hours:
-
Bioremediation/Piot Study Drilling/Sampling,
Slug test
Wastewater Trtmt. Operator
0.00
hours
x
$
100.00
per hour
=
$
-
(Title)
Task to be performed for the above hours:
Bioremediation/ Pilot Study Drilling/Sampling,
Slug test
0.00
hours
x
$
per hour
=
$
-
(Title)
Task to be performed for the above hours:
TOTAL PERSONNEL
COSTS:
$
4,675.00
G-2(6)
This form must be submitted
in duplicate.
IEMA
No.
00-0692
H.
EQUIPMENT
COSTS
BIOREMEDIATION
PILbT
All equipment
used
must
be listed below
in a
time
and materials format.
Handling charges should not
added here; use Section
J.
Equipment
Own
or
Rent
Time
Use4
Units
,
Unit Rate
Total
Cost/Item
P~mp
-
Rent
0
days
$
50.00
-
Water Level Indicator
Rent
1
days
$
21.00
21.00
Slug Rental
-
Rent
1
days
$
36.00
-
36.00
Water Truck
Rent
0
days
$
200.00
-
0
0
0
0
0
0
,
0
0
0
0
0
0
-__________________
0
0
-__________________
—
0
0
0
0
0
0
0
-
0
.
0
0
0
0
0
0
-
0
0
0
0
0
0
0
0
Total Page H-i
-
$
57.00
H-1(6)
This form must be submitted
in duplicate
IEMA No.
00-0692
I.
FIELD PURCHASES
AND
OTHER COSTS
BIOREMEDIATION
All equipment used must be listed below in a time and materials format.
Handling charges should not be
added here;use Section
J.
Field Purchases
Quantity
Item
Price/Item
Total Cost
Handling
Charges
Color Copies
0
/each
$
1.25
$
-
yes
Bailers
0
/each
$
12.00
$
yes
Film
-
1
/each
$
6~00
$
6.00
yes
Photo Development & Copies
1
/each
$
15.00
$
15.00
yes
Encore
Samplers
0 -/each
$
10.00
$
-
yes
Postage
$
-
$
-
yes
Water
Truck,
Fittings,
Hoses
-
0
L.S.
$
500.00
$
-
yes
Drums
0
/each
$
50.00
$
-
yes
Bacteria,
Nutrients,
Catalyst
.
0
/C.Y.
$
35.00
$
-
yes
I-i (6)
Subtotal Page
I-I.
$
21.00
This form must be submitted in duplicate
I
-
IEMA
No.
00-0692
-
BIOREMEDIATION
Other Costs
-
A
listing and
description of all other costs which will be/were
incurred and are not specifically
Listed on this
form should be attached.
The
listing
should include
a cost breakdown in a time and materials
format.
-
-.
*
Note:
Number of trips
2
trips
*
*
Based on estimate of
75
nii.les
each way.
150
miles round
trip.
for Environmental Engineer
1
-X
150
150
miles
Based on estimate of
155
miles each way.
310
miles round
trip.
for Environmental Project Geologist
1
X
310
310
miles
TOTAL
OTHER COSTS
=
$
180.20
1-2
(6)
Total
(Pages I-i and 1-2)
I
$
201.20
I
Other Costs
INo.
Rate
Cost
Copies
100.00
$
0.10
/each
$
10.00
Mileage for CW3M trips (EE)
-
150.00
$
0.37
‘/each
$
55.50
Mileage for CW3M trips (Gec
310.00
$
0.37
/each
$
114.70
Per Diem
0.00
-
$
36.00
/day
S
-
$
$
Total Other
$
180.20
#
-
Description
2 PiotStudy
0
Installation and I.nnociilations
0
Quarterly Sampling
-
-
0
Closure
This form must be submitted
in duplicate
I
IEMA No.
00-0692
J.
HANDLING
CHARGES
BIOREMEDIATION
Handling
charges are eligil2le for payment on
subcontractor
billings and/or
field purchases
only if they an
equal to or less than the amounts determined by the following table:
Subcontractor or Field
Purchase Cost
$1
-
$5,000
$5,001
-
$15,000
$15,001
-
$50,000
$50,001
-
$100,000
$100,001
-
$1,000,000
Eligible Handling Charges as a
Percentage of Cost
12
$600
+
10
of amt. Over $5,000
$1,600
+
8
of amt. Over $15,000
$4,400
+
5
of amt. Over $50,000
$6,900
+
2
of amt. Over $100,000
A.
Subcontractor
Charges
Subcontractor
Section where cost
,
is listed
Subcontract Amount
Drilling Costs
E-1(6)
-
$
-
Mobilizations
E-1(6)
$
-
Injection Well Installation
-4 inch
diameter, 12 ft. depth
E-2(6)
$
-
Well Closure
E-i (6)
$
-
Disposal of Cuttings:’
E-2(6)
$
-
Disposal
of Water (gallons)
E-2(6)
$
-
Laboratory
Analysis
F-2(6)
$
3,500.00
J-1(6)
Subtotal 1-1 Subtotal:
$
3,500.00
This form must be submitted
in
duplicate
BIOREMEDIATION
IEMA
No.
00-0692
B.
Field Purchase
-
Field Purchase
Field Purchase Amount
Color Copies
$
-
Ballers
$
-
Film
$
6.00
Photo Development & Copies
$
15.00
EncoreSamplers
$
-
Postage
$
-
Water Truck, Fittings,
Hoses
-
$
-
Drums
$
-
Bacteria, Nutrients, Catalyst
‘
-
$
-
Subtotal
Page J-2:
$
21.00
Subtotal of Pages J-1 and J-2:
$
3,521.00
Handl~gCharge
*:
See Handling Charge Total
*
Use
chart
at top
of PageJ-l
to calculate
the allowable handling
charge.
Copies ofinvoices for subcontractor costs
and
receipts for field purchases are
required for billing submissions
J-2(6)
This form must be submitted
in duplicate
Sorento Garage
-
5/13/0410:26
AM
~__________________
Ours
EPA
IDifference
E
‘Investigation
$
13,725.00
$
13,725.00
-
$
-
F
Analysis
$
16,265.00
$
16,265.00
$
-
G
Personnel
$
194,512.50
$
194,512.50
$
-
1-1
Equipment
$
1,328.00
$
1,328.00
$
-
I
Field
Purchases
$
369,801.16
$
369,801.16
$
-
J
Handling
Charges
$
389,921.56
$
389,921.56
$
-
-
Totals
I
$
608,330.09
I
$
608,330.09
I
-
I
-
I
Sorento Garage
Summary
Investigation Costs
=
$
13,725.00
Analysis Costs
$
16,265.00
Personnel Costs=
$
-
194,512.50
Equipment Costs=
$
1,328.00
Field Purchases
and Other Costs
5
369,801.16
Handling Oha~ges=
$
12,698.43
Total
Project Cost
=
$
608,330.09
Eligible
for handling
charge
$
389,921 .56
From EPA sheets
$
389,921.56
Base
1.00 8/9/00
Sorento Garage
Inputs
Subcontractor
Material and Services
I
Sand
Backfill
.‘l
5.00
lton
Aggregate
Backfill
5
11.25
lton
Septic
Gravel
Backfill
-
5
7.75
lton
Concrete
61.00
/cy.
UST Removal
5
1.00
lgallon
BETX
-
$
75.00
/each
PNA Analysis
$
175.00
/each
Moisture Content
$
5.00
/each
LUST
Appendix B
900.00
/each
Particle Size, AL.,
USCS
$
135.00
/each
-
Total
Metal
$
20.00
/each
Waste Characterization
(soil)
$
400.00
/each
Waste Characterization
(water)
$
375,00
/each
TCLP
Metal
-
85.00
/each
Disposal
Charge,
soil
(bulk)
$
20.00
/ton
Disposal
Charge,
soil
(drum)
$
65.00
/drum
Disposal
Charge, water
$
2.00
/gallon
Trackhoe
‘
145.00
/hour
Backhoe
-
$
95.00
lhour
Trucking Charge
(10 c.y.)
$
65.00
/hour
End
Loader
$
95.00
Ihour
Trucking Charge
(15
c.y.)
$
85.00
lhour
Baker Tank
‘
$1,200.00
/month
Electrician
$
40.00
Ihour
Plumber/Inspector
$
45.00
/hour
Drilling
$
20.00
/foot
Drill
Rig
Mobilization
$
260.00
Itrip
MW
Installation
-
15
foot
$
450.00
/each
MW
Installation
-
18
foot
$
500.00
/each
MW
Installation
-
23
foot
$
550.00
leach
MW
Installation
-
35
foot
-
$
600.00
/each
Recovery
Sump Installation
$
2,500.00
/each
Recovery Well
Installation
$
800.00
leach
Piping, Hose and
Fittings
$ 4000.00
hump sum
Electricity
-
$
200.00
lmonth
Sewer Disposal
Charge
$
0.00 1’
Igallon
Telephone Line Installation
$
150.00
/each
Telephone
Line (autodialer)
$
30.00
lmonth
Recovery Sump Closure
$
1,200.00
/each
Recovery Well
Closure
$
400.00
/each
Monitoring
Well Closure
-
$
-350.00
/each
Labor Rates
J
Environmental
Engineer
$
105.00
/hour
Senior
Env. Engineer
S
115.00
Ihour
Senior
Env. Geologist
$
92.00
/hour
General Project Manager
$
100.00
/hour
Env. Project Geologist
$
81.00
Ihour
Env.
Prolect
Scientist
$
81.00
/hour
Engineering Technican
5
55.00
Ihour-
Laborer
5
40.00
Ihour
Technical Editor
$
55.00
Ihour
Draftsman
$
65.00
Ihour
Technical Coordinator
$
65.00
/hour
Administrative Assistant
$
45.00
Ihour
Office Manager
$
40.00
/hour
Principal
$
130.00
Ihour
Field Supervisor/Coordinator
$
110.00
Ihour
WastewaterTrtmt. Operator
$
100.00
/hour
Construction Forentan
$
65.00
/hour
Other Costs
Bailers
$
12.00
/each
Film
$
6.00
/each
Photo
Dev.
& Copies
$
15.00
/each-
Measuring Wheel
Rental
$
15.00
Copies
$
0.10
/each
Color Copies
$
1.25
leach
Truck Liner
-
$
4.00
leach
Manifests
$
1.00
/each
Carbon Filter Purchase
‘5
600.00
/each
Carbon Filter Disposal
$1,000.00
/each
Per Diem
$
36.00 ~y
PlO Rental
$
125.00
~y
Survey Equipment Rental
$
65.00
Water Level Indicator
$
21.00
Mileage
$
0.370
/mile
Drums
$
50.00
/each
GWTU Mobilization to Site
$
350.00
/each
GWTU Lease
$2,070.00
/mnth
GWTU Maintenance
$
750.00
/mnth
Encore Samplers
$
10.00
/each
Slug
Rental
$
36.00
Distances
To
Landfill
20
miles 1-way
To
Sand
Pit
20
miles 1-way
To Septic Gravel Source
50
miles 1-way
CA6 Aggregate Source
50
miles 1-way
Engineer to Site
75
miles 1-way
Geologist to Site
155
miles 1-way
Field Coordinator to
Site
‘
75
miles 1-way
Engr. Tech. to Site
75
miles 1-way
Electrician
to Site
75
miles 1-way
Plumberto
Site
75
miles 1-way
Wastewater Trtmt. Operator
75
miles 1-way
Quantities
Contaminated
Soil
Excavation
Recovery Trench Excavation
Disposal
Sand
Backfill
4,102.59
0.00
4,1 02.59
3897.46
205.13
0.00
c. y.
C.
Y.
c.y.
c.y.
c.y.
0.
V.
C.
V.
Aggregate
Backfill
Septic Gravel
Backfill
Concrete
0.00
Bio
Microbial Pilot Study
$3,500.00
L.S.
Bacteria, Nutrients,
Catalyst
$
35.00
C.Y.
Sorento Garage
Inputs
Assumptions
,
Soil
Bulk
Density
115
pcf
Sand Bulk
Denisity
120
pcf
Aggregate
Bulk
Density
125
pcf
Truck Travel Speed
to
Landfill
50
mph
Truck Travel Speed
to Sand
Pit
50
mph
Truck Travel
Speed to Gravel
Pi
50
mph
Excavate Fill/Dump
Time
0.5
hour
Backfill/Dump
Time
0.5
hour
15
c.y. Trucks Available
0
each
10
c.y. Trucks Available
4
each
Truck D~y
8
hours
Excavation
Truck
10
c.y.
Backfill
Truck
10
c.y.
GW Plant Capitalization
0
years
GW Treatment Duration
0
years
GW
Monitoring
Network Wells
18
each
Total Monitoring
Wells
18
each
Recovery Sumps
0-
each
Recovery Wells
0
each
Method
I
Method
II
Method
III
Not Applicable
Fittings,
Hoses
$
500.00
L.S.
Soil
-
BETX-,
Nutrients
$
200.00
each
GW
-
BETX,
Nutrients
5
180.00
each
Injection
well
installation
$
650.00
each
No.
of injection wells
0
No.
monitoring
wells
18
Years
of Operation
0
Pump
-
$
50.00
day
Water Truck
$
200.00
day
Include Closure
No
NOTE:
Only
I of
these
boxes should be checked.
Site Name
-
to
fill in
reports
Sorenta Gar
Sorento Garage
Investigation
Description/Boring
Type
Depth
Footage
Cost
classification
50
0
$
-
invBstigation/migratory
‘
-15
0
$
-
investigation/monitoring
15
210
$
4,200.00
investigation
8
0
$
-
investigation
-
10
50
$
1,000.00
Total
©
$15.00/foot
=
$
5,200.00
No.
4
Cost
5
1,040.00
Monitoring
Well
Installation
No.
Rate
Cost
15 foot
14
-
$
450.00
$
6,300.00
20
foot
-
0
$
500.00
$
-
25
foot
0
$
550.00
$
-
-
35
foot
0
$
600.00
$
-
Total
Monitoring Well
Installation-
$
6,300.00
*MW Installation
includes
well casing,
well screens,
filter pack,
annular seal,
surface seal, well covers, etc.
*
Disposal Costs
No.
Rate
Cost
Disposal of Cuttings
—
9
$
65.00
5
585.00
Disposal of Water (gallons)
-
300
$
2.00
$
600.00
Total Disposal Costs
$
1,185.00
Mobilization
Borings
& wells
-
drill
rig, eqpt. crew
Rate
Personnel
$
260.00
Environmental
Engineer
Senior Env. Engineer
Hours
Senior Env. Geologist
Rate
29.75
General Project Manager
-
S
Env. Project Geologist
Cost
105.00
0
S
$
Env. Project Scientist
23.25
115.00
3,123.75
$
S
Engineering Technican
92.00
3
Laborer
S
S
49.25
100.00
2,139.00
S
S
Technical Editor
81.00
29.5
300.00
0raftsman
S
S
9.25
81.00
3,989.25
S
S
Technical
Coordinator
55.00
2,389.50
0
S
$
Administrative Assistant
40.00
0
508.75
S
Office Manager
S
55.00
8.25
Principal
S
S
65.00
0
S
S
11.5
65.00
Field Supervisor/Coordinator
536.25
$
S
45.00
3
Wastewater Trtrnt. Operator
S
S
40.00
0
517.50
Subtotal:
Personnel/Investigation
S
S
H
130.00
0
120.00
S
S
110.00
0
S
S
100.00
S
$
13,624.00
Sorento Garage
Investigation
Equipment
Rate
Qty.
-
Charges
PID
Rental
S
125.00
/day
4
S
500.00
Water
Level
Indicator
$
21.00
/day
8
S
168.00
Survey Equipment Rental
$
65.00
/day
4
5
260.00
Measuring Wheel
Rental
S
15.00
tday
5
S
75.00
Slug
Rental
$
36.00
/day
0
S
-
Subtotal Equipment/lnv.
I
S
1,003.00
JTOTAL
INVESTIGATION COSTS
=
$
13,725.00
*
This transfers
to the
total
on
Page
E-2 of the
IEFA budget form.
Total
Investigation Costs
do
not include other
costs,
field
purchases,
report costs,
handling charges,
etc.
-
Other Costs
-
,
No.
Rate
Cost
Copies
876
S
-
0.10
5
87.60
Mileage for CW3M
trips
1,200
5
0.37
5
,
444.00
Per Diem
0
5
36.00
5
-
Total Other
$
531.60
Other Costs/Field
Purchases
No.
Rate
Cost
Color Copies
0
$
1.25
$
-
Carbon Filter Purchase
0
5
600.00
5
-
Manifests
‘
0
S
1.00
$
-
Truck Liner
0
5
4.00
$
-
-
Bailers
14
$
12.00
S
168.00
Film
1
5
6.00
$
6.00
Photo Development & Copies
1
$
15.00
$
15.00
Encore Samplers
34
$
10.00
$
340.00
Postage
$
35.56
Drums
9
S
50.00
$
450.00
Total Field Purchases
$
1,014.56
Sorento Garage
Sampling
Physical Soil Analysis
Type
No.
Rate
Cost
Moisture Content
0
5
5.00
$
-
Hydraulic
Conductivity
0
$
900.00
$
-
Particle Size, A.L.,
USCS
0
$
135.00
$
-
SUBTOTAL:
PHYSICAL SOIL
ANALYSIS
S
-
Soil
Analysis
Costs
Type
No.
Rate
-
Cost
BETX
-
-
17
$
75.00
$
1,275.00
PNA
0
$
175.00
$
-
Total
Lead
17
$
20.00
$
340.00
LUST
Appendix
B
0
S
900.00
S
-
Waste Char.
1
$
400.00
$
400.00
pH
‘
0
$10.00
S
-
TACO
Parameters
0
$
100.00
$
-
-
TCLP
Barium
0
$
85.00
5
-
TCLP
Lead
17
$
85.00
5
1,445.00
SUBTOTAL:
SOIL ANALYSIS
COSTS
=
5
3,460.00
Groundwater
Analysis
Costs
Type
B ETX
FNA
Total
Lead
Total
Barium
Waste Char.
SU BTOTAL:
GW
ANALYSIS COSTS
=
No.
14
0
14
0
1
Rate
75.00
S
175.00
S
20.00
$
20.00
S
5
375.00
Cost
S
1,050.00
S
S
280.00
S
S
375.00
$
1,705.00
ITOTAL
ANALYSIS
COSTS
I
I
$
5,165.00
~
*This
amount transfers to
the Total Analysis Cost
on
F-2
of
budget forms.
Sorento Garage
Days
Excavation
Contaminated
Soil
Excavation
4,102.59
-
c.y.
Recovery Trench Excavation
0.00
c.y.
Excavation Truck
Loads
530.77
each
Landfill Travel Time
1 .3
hours
Landfill Trips/Day
6.00
each
Excavation Truck
88.46
89
days
Excavation (based
on trucking)
22.12
23
days
Rec. Trench
Exc Loads
0.00
each
Rec. Exc. Truck
0.00
0
day~
Rec. Trench Exc. (trucking)
0.00
0 days
Trackhoe
Days
22.12
23
days
Backhoe
Days
-
45.96
46
days
Backfill
Septic
Gravel
Volume
0.00
-
c.y~
Septic
Gravel
Truck Loads
0.00
each
Septic Gravel Travel Time
2.5
hours
Septic Gravel Trips/Day
3.00
each
Septic
Gravel
Truck
0.00
0
days
Septic Gravel
Days
0.00
0
days
Backfill
CA-6 Aggregate
-
205.13
c.y.
Backfill Aggregate Truck Loads
23.08
each
Backfill Aggregate Travel
Time
2.5
hours
Backfill Aggregate Trips/Day
3.00
each
Backfill Aggregate Truck
7.69
8
days
Backfill Aggregate Days
1 .92
2
days
Backfill Sand
3897.46
c.y.
Backfill Sand
Truck Loads
526.16
each
Backfill Sand Travel
Time
1
.3
hours
Backfill Sand
Trips/Day
6.00
each
Backfill Sand
Truck
87.69
88 days
Backfill Sand l~ays
21.92
22 days
Backfill Truck-Days
23.85
24 days
CW3M
Days
Site Preparation
1
1
days
Excavation
-
22.12
23
days
Backfill
23.85
24
days
Site Restoration
-
1
1
days
Total
CW3M
in
Field
47.96
48
days
Sorento Garage
Volume
Soil
Excavation Volume
Area
Depth
‘Volume
Volume
(sq.
ft.)
(ft.)
(cu.
ft.)
(c.y.)
10,070.00
10
100,700.00
3,729.63
0.00
-
0
0.00
0.00
Subtotal
=
3,729.63
c.y.
Subtotal
w/
10=
4,102.59
c.y.
Recovery Trench
Soil Disposal
Vo ume
Length
Width
Depth
Volume
Volume
(ft.)
(ft.)
(ft.)
(cu. ft.)
(c.y.)
0
0
0
0.00
0.00
0
0
0
0.00
0.00
0
Subtotal
=
0.00 c.y.
Subtotal w/10
0.00
c.y.
Total Disposal
Volume
=
3729.63
c.y.
-
Total Disposal Volume
w/
10=
4102.59
c.y.
Septic
Gravel
for Recovery Trench
Area
Depth
Volume
Volume
(sq. ft.)
-
(ft.)
(cu.
ft.)
(c.y.)
0
-0.5
0.00
0.00
with
10
0.00
Concrete
for GWTU Trailer Pad
Area
Depth
Volume
Volume
(sq. ft.)
(ft.)
(cu.
ft.)
(c.y.)
0
0
0
0.00
0
0.5
0
0.00 Trailer Pad
Total
=
0.00 c.y.
Aggregate Gravel
for
Excavation Area
Area
J
Depth
Volume
Volume
(sq. ft.)
(ft.)
(cu.
ft.)
(c.y.)
10,070.00
~
0.5
5035
with
10
186.48
205.13
c.y.
-
Backfill Sand for Excavation Area
-
-
Area
Depth
Volume
Volume
(sq. ft.)
(ft.)
(Cu.
ft.)
(c.y.)
10,070.00
9.5
95665
3543.15
c.y.
with
10
3897.46
Bio-remediation
volum e
Area
Depth
Volume
Volume
(sq.
ft.)
0.00
(ft.)
(Cu,
ft.)
20
-
0
(c.y.)
0
c.y.
Rounded
0
Sorento
Garage
Excavation
Excavation
Activities
Analysis
Rate
Qty.
Charges
BETX
Analysis,
Soil
-
$
75.00
/each
21
$
1,575.00
PNA
Analysis,
Soil
$
175.00
/each
S
-
TCLP Lead
$
.
85.00
leach
21
$
1,785.00
Total
Lead
‘
$
20.00
leach
21
5
420.00
Waste
Characteristics, Soil
$
400.00
/each
1
$
400.00
Subtotal: Analysis/Excavation
‘
-
$
4,180.00
CW3M
Personnel
Rate
Qty.
Charges
Environmental
Engineer
$
105.00
lhour
288.00
$
30,240.00
Senior
Env.
Engineer
S
115.00
/hour
-_________
$
-
Senior
Env.
Geologist
S
92.00
/hour
-
$
-
General Project Manager
S
100.00
/hour
$
-
-
Env. Project Geologist’
S
81.00
/hour
.
$
-
Env. Project Scientist
$
81 .00
/hour
$
-
Engineering Technican
5
55.00
/hour
288.00
5
15,840.00
Laborer
5
40.00
/hour
-
$
-
Technical
Editor
5
55.00
/hour
$
-
Draftsman
$
65.00
/hour
$
-
Office/Technical Coordinator
$
65.00
/hour
‘
$
-
Administrative
Assistant
$
45.00
/hour
$
-
Office Manager
$
40.00
/hour
S
-
-
Principal
S
130.00
/hour
$
-
-
Field
Supervisor/Coordinator
$
110.00
/hour
288.00
$
31,680.00
WastewaterTrtmt.
Operator
5
100.00
/hour
$
-
Construction Foreman
$
65.00
/hour
$
-
Subtotal: Personnel/Excavation
$
77,760.00
Equipment
Rate
Qty.
Charges
PlO Rental
$
125.00
/day
0
$
-
Subtotal EquipmentlExc.
$
-
Subcontractor
Costs
Rate
Qty.
Charges
UST Removal
$
1.00
/gal.
Building
Demolition
5
8,000.00
L.S.
0.00
$
-
Asbestos
Inspection
$.
900.00
/each
0.00
$
-
Sand Backfill
$
5.00
/ton
Aggregate Backfill
$
11
.25
/ton
Septic Gravel
Backfill
$
7.75
/ton
Concrete
,
$
-
61.00
/cy.
Disposal
Charge
$
20.00
/ton
6,369.28
$
127,385.50
Trackhoe
$
145.00
/hour
230.00
$
33,350.00
Backhoe
5
95.00
/hour
230.00
$
21,850.00
Trucking Charge
(10 c.y.)
-
S
65.00
/hour
--
712.00
$
46,280.00
End
Loader
S
95.00
Ihour
0.00
5
-
Trucking Charge
(15 c.y.)
$
85.00
/hour
$
-
Sorento Garage
Excavation
Baker Tank
5
1,200.00
/month
Electrician
$
40.00
/hour
Electrician
Mileage
$
0.37
/mile
Plumber/Inspector
$
45.00
/hour
Plumber Mileage
S
0.37
/mile
Subtotal
Subcontractor/Exc.
$
228,865.50
Excavation
Cost
=
$
55,200.00
*
Transportation
Cost
-
$
46,280.00
Disposal Cost
=
$
127,385.50
*
These costs
transfer to the
Exc
avation, Transportation and Disposa I Costs
on Page
L-1
Other Costs
Rate
Qty.
Charge
Copies
S
0.10
/each
$
-
Mileage for
CW3M
trips
-
$
0.37
/each
1 O,800
$
3,996.00
Per Diem
$
36.00
lday
5
-
$
$
Subtotal Other/Exc.
-
$
3,996.00
Other Costs/Field
Purchases
Color Copies
$
1.25
/each
$
-
Carbon
Filter Purchase
$
600.00
/each
5
-
Manifests
$
1.00
/each
530.00
$
530.00
Truck
Liner
-
$
4.00
leach
530.00
$
2,120.00
Bailers
$
12.00
/each
$
-
Film
5
6.00
/each
1
$
6.00
Photo
Development
& Copies
$
15.00-
/each
1
$
15.00
Encore Samplers
S
10.00
/each
42
$
420.00
Postage
-
Drums-
$
50.00
/each.
$
-
Subtotal Field Purchases/Exc.
$
3,091.00
Total
Field, Other,
Subcontractor/Exc.
Arhountto
Apply
Handling-Charge
5
5
235,952.50
236,136.50
Sorento
Garage
Backfill
Backfill Activities
CW3M
Personnel
Rate
Oty.
Charges
Environmental
Engineer
$
105.00
/hour
225.00
$
23,625.00
Senior
Env.
Engineer
$
115.00
/hour
S
-
Senior
Env.
Geologist
$
92.00
/hour
$
-
General Project
Manager
$
100.00
/hour
-
$
-
Env. Project Geologist
$
81
.00
/hour
S
-
Env. Project Scientist
$
81
.00
/hour
-
S
-
Engineering Technican
S
55.00
/hour
225.00
$
12,375.00
Laborer
$
40.00
/hour
225.00
$
9,000.00
Technical
Editor
$
55.00
/hour
5
-
Draftsman
5
65.00
/hour
$
-
Office/Technical
Coordinator
$
65.00
/hour
$
-
Administrative Assistant
$
45.00
/hour
$
-
Office Manager
$
40.00
/hour
-
$
-
Principal
$
130.00
/hour
-
S
-
Field Supervisor/Coordinator
$
110.00
/hour
225.00
$
24,750.00
WastewaterTrtmt.
Operator
S
100.00
/hour
$
-
Construction
Foreman
5
65.00
/hour
S
-
Subtotal:Personnel/Backfill
-
$
69,750.00
Equipment
Subtotal Equipment/Exc.
Subcontractor Costs
Rate
Qty.
Charges
Sand
Backfill
$
5.00
/ton
6313.89
5
31,569.45
Aggregate Backfill
$
11.25
/ton
346.16
$
3,894.26
Septic
Gravel
Backfill
$
7.75
/ton
0
$
-
Concrete
for Trailer Pad
-
$
61.00
lc.y.
0.00
S
-
-
Disposal Charge
$
20.00
/ton
$
-
Trackhoe
$
145.00
/hour
$
-
Backhoe
$
95.00
/hour
240.00
$
22,800.00
Trucking Charge
(10 c.y.)
$
65.00
/hour
960.00
$
62,400.00
End Loader
-
$
95.00
/hour
0.00
5
-
Trucking Charge (15 c.y.)
$
85.00
/hour
$
-
Baker Tank
5
1,200.00
/month
5
-
Electrician
$
40.00
/hour
$
-
Electrician
Mileage
$
0.37
/mile
$
-
Plumber/Inspector
$
45.00
/hour
$
-
Plumber Mileage
$
0.37
/mile
$
-
Subtotal:Subcontractor/Back
5
120,663.71
Total
Backfill Costs
=
I
-
I
I
$190,413.71
*
*
This
is the
backfill
cost
on PageL-2 of the
IEPA budget
form.
Other Costs
Rate
Qty.
Charge
Copies
‘
5
0.1-0
/each
5
-
Rate
Qty.
Charges
r
L
Sorento Garage
Backfill
Mileage for CW3M Trips
S
0.37
/mile
11,400.00
$
4,21 8.00
Per
Diem
5
36.00
/day
,
S
-
S
-
S
-
Subtotal Other/Backfill
-
$
4,218.00
Other Costs/Field
Purchases
Rate
Qty.
Charge
Color Copies
S
1 .25
/each
$
-
Carbon
Filter
Purchase
$
600.00
/eabh
$
-
Manifests
$
1 .00
/each
$
-
Truck Liner
5
4.00’
/load
$
-
Bailers
$
12.00
/each
5
-
Film
5
6.00
/each
0
$
-
Photo Development &
Copies
5
15.00
/each
0
$
-
5
-
Postage
Drums
$
50.00
/each
-
S
-
Subtotal
FId Purchases/Back
$
-
Total
Amou
Field,
Other,
Subcontractor/Backfill
I
ntto
Apply
Handling Charge
I
5
5
124,881.71
120,663.71
Sorento Garage
GW Mon
No. of Monitoring
Wells
=
-
Years
of Operation
18
0
Factor
-
0
Annual GW
Monitoring
&
Operating Costs
Variable Operating
Costs
Reglace
MWs
Qtrs.
1-2
Analysis
Rate
Qty.
Charges
9~y~
Charges
9~.
Charges
BETX
Analysis, Plant
$
75.00
/each
$
-
0
$
-
0
$
-
PNA Analysis:
Plant
$
175.00
/each
$
-
0
$
-
0
$
-
Total
Lead,
Plbnt
$
20.00
/each
0
5
-
0
S
-
Total
Barium,
Plant
S
20.00
/each
0
$
-
0
$
-
BETX Analysis,
Groundwater
5
75.00
/each
0
S
-
$
-
36
S
2,700.00
PNA Analysis,
Groundwater
$
175.00
/each
0
$
-
$
-
—
$
-
Total
Lead,
Groundwater
S
20.00
/each
0
5
-
-
36
5
720.00
Total
Barium, Groundwater
5
20.00
/each
0
$
-
‘
Subtotal: Analysis/Monitoring
S
-
S
-
$
3,420.00
Subtotal
Year
1
Analysis Costs=
5
3,420.00
(Total
=
Variable
+
Annual Costs)
CW3M
Personnel
Rate
Qty.
Charges
Q~
Charges
Q~.Charges
Environmental Engineer
S
105.00
/hour
5
-
12
$1,260.00
20
$
2,100.00
Senior
Env. Engineer
$
115.00
/hour
$
-
$
-
5
-
Senior Env. Geologist
5
92.00
/hour
S
-
2
$
184.00
2
S
184.00
General Project Manager
$
100.00
/hour
$
-
12
$
-
$
-
Env. Project Geologist
$
81.00
/hour
5
-
$
972.00
20
$
1,620.00
Env. Project
Scientist
$
81.00
/hour
$
-
-
—
$
-
—
5
-
Engineering Technican
$
55.00
/hour
$
-
$
-
$
-
Laborer
$
-40.00
/hour
$
-
$
-
-
$
-
Technical Editor
$
55.00
/hour
$
-
$
-
S
-
Draftsman
$
65.00
/hour
$
-
$
-
$
-
Office/Technical Coordinator
$
65.00
/hour
$
-
$
-
$
-
Administrative Assistant
-
$
45.00
/hour
$
-
$
-
2
$
90.00
Office Manager
$
40.00
/hour
‘
$
-
—
$
-
$
-
Principal
S
130.00
/hour
$
-
—
$
-
$
-
Field Supervisor/Coordinator
5
110.00
/hour
$
-
$
-
$
-
WastewaterTrtmt.
Operator
$
100.00
/hour
S
-
S
-
$
-
Subtotal
Monitoring
SObtotal Year
1 CW3M Personnel Costs=
5
-
—
$
2,416.00
—
$
3,994.00
$
6,41 0.00
(Total
=
Variable
+
Annual Costs)
Equipment
Rate
/mo.
Qty.
Charges
9~
Charges
Q~.Charges
Plant Lease
$ 2,070.00
0
$0.00
0
$0.00
PID
Rental
5
125.00
‘
1
$125.00
0
$0.00
Survey Equipment Rental
$
65.00
1
$65.00
0
$0.00
Water
Level
Indicator
$
21.00
1
$21
.00
2
$42.00
Measuring Wheel
Rental
$
15.00
1
$15.00
‘0
$0.00
Subtotal Equip/Monitoring
-
S
-
$226.00
$42.00
Subtotal
Year
1
Equipment Costs=
$
268.00
(Total
=
Variable
+
Annual Costs)
Subcontractor
Charges
Rate
I
jQty.
Charges
IQty.
Charges
Qty.~Charges
-
—‘
-,~W~,:,:-,t~’~:.
~
‘,.,,‘t.-,..
:,~,,-sJ,s,:.,:,h,,,,
~
‘‘;t,’’,_,’,~’:’_,~-~
Sorento Garage
GW
Mon
Carbon
Filter Disposal
S
1,000.00
I/each
0
$
-
$
-
$
-
-
Electricity
$
200.00
/mo.
0
$
-
$
-
$
-
Telephone
Line (autodialer)
S
30.00
/mo.
0
$
-
$
-
—
Drilling
(15
ft. wells)
S
-
20.00
/ff
0
105
5
2,100.00
—
‘
MW
Installation
(replacement
$
450.00
/ea.
0
7
$
3,150.00
—
Drill
Rig Mobilization
$
260.00
/ea.
0
1
$
260.00
Sewer
Disposal Charge
$
0.001
/gal.
0
$
-
$
-
$
-
Subtotal Subcontractors/Monit oring
$
-
5
5,510.00
5
-
Subtotal Year
1
Subcontractor
Costs
S
5,510.00
(Total
=
Variable
+
Annual Costs)
Other
Costs
Rate
Qty.
-
Charges
Copies
$
0.10
leach
150
S
15.00
Mileage for CW3M Trips
S
0.37
/mile
1380
S
510.60
Per Diem
$
36.00
5
-
S
-
Maintenance Cost
Subtotal Year
1
Other/Monitor
$
ng
750.00
/mon
0
S
S
525.60
Total Year
1
Costs
=
$16,822.60
Total
Field,
Amount to
Other,
Apply
H
Subcontactor/Monitoring Year
1
andling Charge
I
I
5
S
6,724.60
9,619.00
Other Costs/Field
Purch.
‘Rate
Qty.
Charges
Color Copies
5
1 .25
/each
S
-
Carbon
Filter Purchase
$
-
600.00
/each
0
5
-
Manifests
$
1.00
/each
S
-
Truck Liner
$
4.00
/each
$
-
Bailers
$
12.00
/each
54
$
648.00
Film
$
6.00
/each
1
$
6.00
Photo Development
& Copies
S
15.00
/each
1
$
15.00
Survey Equipment Rental
$
65.00
$
-
Postage
-
/each
$
20.00
Drums
$
50.00
$
-
Subtotal Year
1 Field/Monitoring
S
689.00
H
Sorento Garage
Bioremediation
Number
of
Monitodng
WeDs:
-
-—
Number
of Injection
Wells:
-
18 j_#olvears:
0
0
‘
Pilot
Study
Initial
Innoculatior’
Subse,g~y~
Innoculations
-
1
at
Quarter
Remaining’
Quarters
Ouarter/,y,,
Reporting
Closure
Sampling
Cbsure
Rejorling
—
Total
(3
(rips)
-1
-1
Personnel
Hours
Rate
Cost
Environmental
Engineer
20
$
105.00
$
2,10000
20
.,3f)
Senior
Env.
Engineer
-
4
$
115.00
$
460.00
4
._
Senior Env.
Geologist
0
$
92.00
-
._,_~._..
~__~
General
Prolact Manager
Env. Project Geologist
-
0
$
100_Do
-
0
20
$
81.00
1,620.00
‘
20
~_._,,,.
Env. Project Scientist
0
$
81.00
$
-
Engineering Technican
9
$
55.00
495.00
9
Laborer
0
$
40.00
$
-
-
0
Technical
Editor
0
55.00
-
-
0
Draftsman
0
$
-
65.00
-
-
0
Technical Coordinator
0
$
65.00
-
—
0
Administrative Assistant
0
$
46.00
-
.
-
,_________
Office Manager
-
0
$
40.00
-
0
Principal
-
0
$
13000
-
U
Field
Supervisor/Coordinator
‘
0
$
110.00
-
~————
WastewaterTrtmt, Operator
0
$
100.00
-
.______
.______._0
Subtotal:
Personnel/Investigation
$
4,675.00
‘
.~__..
Laboratory
No
Rate
Cost
-
Microbial Degradation Study
Soil
-
BETx. 0.0..
Nutrients,
pH
3,500.00
$
3,500.00
.
1
1
0
200.00
$
-
~~jJ
GW
-
BETx,
0.0.,
Nutrients,
pH
0
$
180.00
$
-
.~_P
GW
-
BETX
and
PCE
0
$
75.00
-
.
OW
-
PNAs
0
$
175.00
-
.
Soil
-
BETX and
PCE
0
$
75.00
-
-
Soil
-
PNAs
0
$
175.00
-
0
Total
=
3,500.00
‘
~.
Mobilization
No.
Rate
Cost
‘
Borings & welts
-
~____
drill rig,
egpt. crew
0
$
260.00
$
-
0
-
0
Description/Boring
Type
No.
Rate
Cost
nvestigalion
-
10 foot
0
$
20.00
$
-
-
0
0
njection wells
-
12 foot
0
$
20.00
$
-
.
.
.~
Well
Closure
0
$
350.00
$
-
0
TolaI=
$
-
‘
-
Injection Well
Installation
No.
Rate
Cost
,.........
~_
16
foot
Oj$
650.00
$
-
0
Total
Inlection
Well
Installation
$
—
——--—
—~
Disposal
Costs
No.
Rate
-
Cost
Disposal
of Cuttings
-
0
$
65.00
$
-
0
Disposal
ofWater
(gallons)
0
$
2.00
$
-
.
0
‘‘“
-
-
‘r
~~--
—-‘------
-~---
-
Sorento
Garage
Bioremediation
Total
Disposal
Costs
I
I
8
-
------
-
---
-
--
~v~attonTot~
$
-
—
Eq~gpment
Rate
~JQty.
Charges
0__
—
~mp
$
50.00
/day
0
$
-
o
Water
Level
Indicator
$
21.00
/day
1
$
21.00
1
1
1
Slug
Rental
$
36.00
/day
I
$
36.00
WalerTruck
$
200.00
/day
0
$
-
0
Subtotal
Eguipment/lnv.
‘_________
.
$
57.00
.
Dlher
Costs
No.
Rate
Cost
-
-
——
Cgp~g~___________________
100
$
0.10
10.00
100
—~
100
Mileage
for
CW3M
trips
fEE)
150
$
0.37
55.50
-
1
1
1
MJj~g~9e
for
CW3M
trips
(GeoL
Per
Diem
310
$
0.37
114.70
-
I
-
0
$
36.00
-
.
,
0
0
0
Total
Other
180.20
Other
Costs/Field
Purchases
No.
Rate
Cost
-
ColorCopies
0
$
1.25
-
...__
Bailars
0
$
12.00
-
‘
—
0
Film
1
$
600
6.00
0
Photo
Development
&
Copies
Encore
Samplers
1
$
15.00
15.00
0
-
0
$
10.00
-
Pg~fgge
-
0 0
Fillings,
Hoses
0
$
so&.00
-
Drums
0
$
50.00
-
—
0
Bacteria,
Nutrients,
Catalyst
0.00
$
35.00
.________
Total
Field
Purchases
21.00
,
-______
—
—
‘Eligible
for
Handling
Charges
$
3,521.00
Sorento Garage
Reporting
SAR/CAP,
Phase
I
CW3M
Personnel
Rate
Oty.
Charges
Environmental
Engineer
$
105.00
/hour
22.75
5
2,388.75
Senior Env. Engineer
$
115.00
/hour
2
5
230.00
Senior
Env. Geologist
5
92.00
/hour
11.25
5
1,035.00
General Project Manager
S
100.00
/hour
8.5
$
850.00
Env.
Project Geologist
S
81.00
/hour
65.5
$
5,305.50
Env.
Project Scientist
$
81.00
/hour
0
$
-
Engineering Technican
$
55.00
/hour
0
5
-
Laborer
$
40.00
/hour
0
$
-
Technical Editor
$
55.00
/hour
5
5
275.00
Draftsman
5
65.00
/hour
7.5
$
487.50
Office/Technical Coordinator
5
65.00
/hour
0
$
-
Administrative Assistant
$
45.00
/hour
10.75
$
483.75
Office
Manager
$
40.00
/hour
.
3
$
120.00
Principal
S
1-30.00
/hour
0
S
-
Field Supervisor/Coordinator
5
110.00
/hour
0
$
-
WastewaterTrtmt.
Operator
$
100.00
Ihour
0
$
-
Subtotal Personnel
SI/CAP
$
11,175.50
Other SARJCAP
Rate
Qty.
Copies
5
0.10
/each
-
Charges
1642
S
164.20
Field SARICAP
Rate
Qty.
Color Copies
$
1.25
/each
Postage
Subtotal Reporting
SI/CAP
Charges
0
$
-
5
29.40
$
29.40
Sorento Garage
Reporting
Quarterly Reporting
CW3M
Personnel
Rate
Qty.
Charges
—
Environmental
Engineer
5
105.00
Ihour
20
5
2,100.00
Senior Env. Engineer
$
115.00
/hour
8
$
920.00
Senior
Env. Geologist
5
92.00
/hour
0
$
-
General Project Manager
S
100.00
lhour
4
$
400.00
Env.
Project Geologist
$
81.00’
/hour
0
$
-
Env.
Project
Scientist
5
81.00
/hour
0
5
-
Engineering Technican
5
55.00
/hour
0
$
-
Laborer
5
40.00
lhour
0
$
-
Technical Editor
-
-
5
55.00
-
Ihour
0
$
-
Draftsman
5
65.00
/hour
10
$
650.00
Office/Technical Coordinator
5
65.00
/hour
0
$
-
-
Administrative Assistant
5
45.00
/hour
-20
$
900.00
Office Manager
S
40.00
/hour
0
$
-
Principal
5
130.00
/hour
0
$
-
Field Supervisor/Coordinator
$
110.00
Ihour
0
$
-
WastewaterTrtmt. Operator
5
100.00
/hour
0
5
-
Subtotal Personnel/Closure
Rept.
$
4,970.00
Lother
Progress
Report
Rate
Copies
5
Qty.
0.10
/each
Charges
400
$
40.00
Field
Progress
Report
Rate
Color Copies
5
Postage
Subtotal Reporting
Progress
Qty.
1
.25
/each
Charges
0
$
-
-
$
20.00
$
20.00
Sorento
Garage
Reporting
Annual
Environmental
Reporting
(Fouryears)
CW3M
Personnel
Rate
Qty.
Charges
Environmental
Engineer
$
105.00
/hour
5
-
Senior
Env. Engineer
S
115.00
Ihour
S
-
Senior
Env. Geologist
S
92.00
/hour
$
-
Generaf
Project Manager
$
100.00
/hour
S
-
-
Env. Project Geologist
$
81.00
/hour
$
-
Env. Project Scientist
S
81.00
Ihour
$
-
Engineering Technican
$
55.00
/hour
$
-
Laborer
5
40.00
/hour
5
-
Technical
Editor
$
55.00
/hour
S
-
Draftsman
$
65.00
/hour
S
-
Office/Technical
Coordinator
5
65.00
/hour
S
-
Administrative Assistant
$
45.00
/hour
5
-
Office
Manager
S
40.00
/hour
5
.
-
Principal
$
130.00
/hour
S
-
Field
Supervisor/Coordinator
S
110.00
/hour
S
-
WastewaterTrtmt.
Operator
S
100.00
Subtotal Personnel/Environmental
Reporting
/hour
5
S
-
-
Other
Env. Reporting
Rate
-
Qty.
Copies
5
0.10
/each
Charges
0
$
-
Field Env. Reporting
Rate
Qty.
Color Copies
$
1.25
/each
Postage
Subtotal Reporting
Environmental
Charges
0
$
5
S
-
-
-
Sorento Garage
Reporting
Reimbursement
Claim
Preparation
Other Reimbursement
Rate
Qty.
Charges
Copies
$
0.10
leach
2140
$
214.00
I
Field Reimbursement
Rate
Qty.
Charges
Color Copies
5
1.25
/each
$
-
Postage
5
27.39
Subtotal Reimbursement
Prep.
-
$
27.39
CW3M
Personnel
Rate
Qty.
Charges
Environmental
Engineer
$
105.00
/hour
4.25
$
446.25
Senior
Env.
Engineer
-
S
115.00
lhour
3.25
$
373.75
Senior
Env.
Geologist
$
92.00
/hour
21.5
$
1,978.00
General
Project Manager
$
100.00
/hour
16.5
$
1,650.00
Env.
Project Geologist
S
81.00
/hour
0
5
-
Env.
Project Scientist
$
81.00
/hour’
0
$
-
Engineering
Technican
$
55.00
/hour
0
$
-
Laborer
$
40.00
/hour
0
$
-
-
Technical
Editor
$
55.00
Ihour
0
$
-
Draftsman
5
65.00
/hour
0
5
‘
-
Office/Technical Coordinator
$
65.00
Ihour
0
$
-
Administrative Assistant
$
45.00
/hour
32
$
1,440.00
Office Manager
$
40.00
Ihour
0
$
-
Principal
$
130.00
/hour
2
$
260.00
Field Supervisor/Coordinator
$
110.00
/hour
0
5
-
WastewaterTrtmt.
Operator
$
100.00
/hour
0
$
-
Subtotal Personnel/Reimbursement
Claims
$
6,148.00
Sorento Garage
Reporting
Total
Field,Other/CAP
I
S
193.60
lAmount
to Apply Handling Chargel
I
5
29.40
Total
Field, Other/Closure
I
S
60.00
Amount to Apply Handling Charge
I
5
20.00
Total
Field,
Other,
Subcontactor/Annual Environmental
Reporting
$
-
Amount to Apply Handling Chargel
I.
I
S
-
Total
Field,
Other/Reimbursment Prep
‘
$
241.39
Amount to Apply Handling Charge~
5
27.39
Notes:
1.
Report Preparation
Costs
include development
of
field
reports,
documentation
of site
investigation
activities, reviewing and
logging
soil and groundwater analytical data,
plume
delineation,
drilling summaries,
well completion
reports,
drafting, off-site property owner
correspondence, corrective action
design and engineering
development of site assessment report,
corrective action
plan, and reimbursement package preparation.
June
2,
2004
Mr.
Steve Jones,
Project Manager
-
LUST
Section, Bureau of Land
Illinois Environmental
Protection Agency
1021
North Grand Avenue East
Springfield,
Illinois 62794-9276
RE:
LPC
#0050305009—Bond
County
Sorento/Royer
Oil Company
(Sorento
Garage)
Main
Street
LUST Incident
Number:
00-0692
LUST
Technical Reports—Corrective
Action Plan
Budget Amendment
Revised Budget
Certification
Dear Mr.
Jones:
-
As
a follow-up
to the budget
amendment dated May
13,
2004,
enclosed, please find
a revised
budget certification.
Following
the submittal,
we realized that
the Professional
Engineer’s
certification was
not
notarized.
Accordingly,
we have
completed a new certification for
the
package.
‘
‘
‘
We apologize for any inconvenience
this oversight
may have caused.
Ifyou have any
questions
or require
additional
information, please do not hesitate to
contact Vince
B.
Smith,
P.E.
or
me
at (217)
522-8001.
Thank you for your consideration of our request.
Rowe,
P.G.
Senior Environmental
Geologist
--
-
Enclosure
-
xc:
Mr.
Stephen Royer,
Royer Oil Company,
Inc.
Mr.
Gary Wall,
Sorento
Garage Property Owner
Mr. William T.
Sinnott,
CW3M Company, Inc.
D:\CW3M Projects\Royer
Garage\CAPCertcI .doc
701
W. South
Grand Avenue
400
W.
Jackson Suite C
Springfield,
IL
62704
Marion, IL
62959
(2171
522-8001
(6181
997-2238
CW~M
Company
Environmental Consulting Services
-
701
W.
South
Grand
Avenue
Springfield,
IlL
627124
Phone:
(217)
522-8001
Fax:
(217)
522-8009
EXH~B~T
Illinois Environmental Protection Agency
Owner/Operator
and Professional Engineer Budget Certification
Form for
Leaking Underground
Storage Tanks
Sites
In accordance with 41
5 ILCS
5/57,
if
an owner or operator intends to seek payment from
the UST Fund,
an owner or operator must submit to the Agency, for the Agency’s approval
or modification,
a budget
-
which includes an accounting of all
costs associated with the implementation
Qfthe investigative,
monitoring and/or corrective action plans:
I
hereby
certi~’that
I intend to seek payment from the UST Fund for performing
________________________
Corrective
Action
activities ,at
Sorento
Garage
LUST site.
I
further certi~’that the costs set forth
in this
budget are necessary activities
and are reasonable and
accurate
to the
best of
my
knowledge and belief.
I also certify that the costs included
in
this budget are
not
for corrective action in excess of
the
minimum
requirements of 415 ILCS
5/57 and
no
coals are
included
in
this budget which
are not described
in
the
dorrective action plan.
I further certi~’that costs
ineligible for payment from
the
Fund
pursuant to
35
Illinois Administrative
Code Section
732.606 are
not inclLtded
in
the
budget
proposal
or amendment.
Such ineligible costs include
blAt are not limited
to:
Costs associated with ineligible tanks.
Costs associated
with site restoration (e.g., pump islands, canopies).
Costs associated
with utility replacement
(e.g., sewers, electrical,
telephone, etc.).
Costs’ incuri~edprior to IEMA notification.
Costs associated with plan-ned tank pulls.
-
Legal defense costs.
Costs incurred prior to July 28,
1989.
“
-
Costs associated with installation of new USTs
or the repair of existing
USTs.
Owner/Operator:
Stephen
L.
Royer, Royer Oil Company
Title:
Owner
Signature:
~
(5(
~
~_—~
-
Date:
__________
Subscribed and sworn to before
me the
~J’~~L
day of ___________________________
(Budget Proposals andBudget Amendments must be notarized when the
ce~t//Ication is
signed.)
~
-~
-
(Notary Public)
-
PB.:
Vince
E.
Smith
-
FE. Signature:___________________________________
Subscribed
and sworn to
b
ore me the
___________
day ~
(Budget ProJ~a~
get
mendmentsmust be notarized i~vhen
(Notary Public)
The Agency
is
authorized to require this
information under 415
ILCS
5/1.
Disclosure of this information
is
required.
Failure
to do
so
may result
in
the delay
or denial of any budget
or payment requested
hereunder.
This
form
has been approved by
the Forms
Management Center.
-
IL~2227.D
L°C490
D
M
94
.
CAROL
L.
Fiu4ic-
BB1-\97140S
WFD
NOTARY
PUBLIC,
STATE OF
ILLINOIS
MY
COMMISSION
EXPIRES 2~26~2OO5
Se1?11:
OFFICIAL
SEAL
WILMA
L.
SIMNOTT
NOTARY
PUBLIC,
STATE
OF
ILLINOIS
MY
COMMISSION
EXPIRES 2-27~2OO6
Date:
ILLINOIS
ENVIRONMENTAL
PROTECTION
AGENCY
~
1021
NoRTH
GRAND AVENUE
EAST,
P.O. Box
1
9276,
SPRINGFIELD,
ILLINOIS
62794-9276,
21 7-782-3397
JAMES
R.
THOMPSON
CENTER,
100
WEST
RANOOLPH,
SUITE
11-300,
CHICAGO,
IL
60601,
312-814-6026
ROD
R.
BLAGOJEVICH,
GOVERNOR
RENEE
CIP-RIANO,
DIRECTOR
217/782-6762
CERTIFIED
MAIL
?00~
~150
0000
1~S?
7400
JUN-2 ~ 2004
.jUh
~
5-
2(i04
Stephen
Royer
‘
-
‘
‘
(ThM
911
Railroad
Street
.
~-.,
.
Greenville, Illinois
62246
‘
Re:
LPC#0050305009--BondCounty
-
Sorento/Royer
Oil
(Sorento
Garage)
-
Main Street
‘
LUST Incident No. 20000692
-
LUST Technical
File
-
Dear Mr.
Royer:
The
Illinois Environmental
Protection A~ency
(Illinois EPA) has reviewed the High Priority
Corrective Action
Plan
Budget Amendment (budgetamendment) submitted for the above-
referenced
incident.
This
budget amendment, dated
May
13,
2004, was received by
the Illinois
EPA
on
May’14, 2004.
CitatiOns in
this letter are
from
the
Environmental Protection Act (Act)
and
35
Illinois Administrative
Code
(35
Iii.
Adm.
Code).
-
The budget amendment is rejected for the reason(s)
listed below (Section
57.7(c)(4) of the Act
and
35
Ill.
Adm. Code
732.405(c)
and
732.503(b)).
-
-
1.
In accordance with
Section
57.’7(c)(4)
of the Act
and
35
Ill. Adm. Code
732.503(b),
any
action by
the Illinois
EPA to disapprove
or
modify a
piäfl or budgot submitied
pursuant
to
Title
XVI
ofthe Act
shall
be provided to
the owner or operator in writing within 120
days
of receipt.
The
Illinois EPA previously
notified
the owner or operator
of its final action.
Further,
in
accordance with Section
57.7(c)(4)
of
the
Act
and
35
Ill. Adm.
Code 732.503(1), the
Illinois EPA’s action to reject or require modification of the plan or budget, or the
rejection ofany plan or budget by operation of
law, was subject to appeal to the Illinois
Pollution Cor~trolBoard within
35
days
after the
Illinois EPA’s final action.
All flature
correspondence must be submitted to:
ROcKFORD
-4302
NoDh
Main
Street,
Rockforb,
IL 61103—18151
987-7760
•
Oss
PLAINES—
9511
W.
Harrison St.,
Des
Plaines,
EXHIBIT
ELGIN
-
595
South
Stale, Elgin,
IL 60123
—18471
608-3131
•
PEORIA
—5415
N.
University
St.,
Peoria,
IL
61614—13
BURE,’,u
oF
LAND
.
PEORIA
—
7620
N.
University
St.,
Peoria,
IL
61614—
13091
693.3462
•
CHAMPAION
—2125
South
First
Street,
Champs
:~
SPRINGEIEL0—
4500S. SixthStreet
Rd.,
Springfield,
IL 62706—1217) 786-6892
•
COLLINSVILLE
—2009
MalI Street,
Collinsville,
IL
~
MARION
—2309
W. Main
St.,
Suite
116,
Marion,
IL 62959
—
16181
993-7200
__________________
-
PR,NTPO
ON
Ri’rvni ,n
~
Page
2
Illinois Environmental
Protection
Agency
-
Bureau of
Land
-
#24
Leaking Underground Storage
Tank
Section
1021
North Grand
Avenue
East
Post Office Box
19276
Springfield,
IL
62794-9276
Please submit
all correspondence in duplicate
and
include
the Re:
block
shown
at the beginning of
this letter.
.
An
underground
storage
tank
system owner or operator may appeal
this decision to
the Illinois
Pollution Control Board.
Appeal rights
are
attached.
If you have
any
questions
or
nbed
further
assistance,
please
contact the
Illinois EPA project
manager,
Steve Jones,
at 217/524-1253.
-
Sincerely.
Hemando A. Albarracin
Unit Manager
Leaking Underground Storage
Tank
Section
Division of Remediation Management
-
Bureau of
Land
HAA:~Royer
Oil 20000692
CAP
amend May 04.doc
Attachthents:
Appeal Rights
cc:
CW3M
Company
Division
File
Appeal Rights
An underground storage
tank
owner or operatormay appeal
this final
decision to
the Illinois
Pollution Control Board
pursuant to Sections
40
and
57.7(c)(4)(D)
ofthe Act
by filing a petition
for a hearing
within
35
days after the date of issuance of the final decision.
However, the 35-day
period may
be
extended for a period oftime not to exceed
90
days by
written
notice
from the
own~r
o~operator
and
the
Illinois EPA within the initial
35-day appeal
period.
If the owner or
operator wishes to receive a 90-day
extension, a
written
request that
includes a statement of
the
date the final decision
was received,
along with a copy
of this decision, must
be sent to the
Illinois
EPA as soon as possible.
-
For information regarding
the filing of
an appeal, please contact:
Dorothy
Gurm,
Clerk
-
Illinois Pollution Control Board
State of Illinois
Center
100 West Randolph,
Suite 11-500-
Chicago,
IL
60601
-
312/814-3620
-
For information regarding the filing of an extension,
please
contact:
~-
~004
-
~.---,,,-.--.-.
Illinois Environmental Prot~ctionAgency
Division
o.f
Legal Counsel
1021
North Grand
Avenue East
Post Office
Box 19276
Springfield,
IL
62794-9276
217/782-5544
BEFORE THE
POLLUTION CONTROL BOARD
OF THE
STATE OF ILLINOIS
ROYER OIL (SORENTO
GARAGE),
Petitioner,
V.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
NOTICE
PCB No.
05-
(LUST
—
NinetyDay Extension)
Dorothy M.
Gunn, Clerk
Illinois Pollution Control Board
James
R. Thompson
Center
100 West Randolph Street
Suite
11-500
Chicago, IL
60601
Assistant Counsel
Special Assistant Attorney
General
Division
ofLegal Counsel
1021
North
Grand Avenue, East
P.O. Box 19276
-
Springfield, Illinois 62794-9276
217/782-5544
217/782-9143
(TDD)
Dated: July 30, 2004.
Carolyn
S. Hesse
Barnes
&
Thornburg
Suite 4400
One
North Wacker Drive
Chicago, IL
60606-2809
office of the
Clerk of the
Pollution
APPEAL
PERIOD,
copies of which
EXH~B~T
PLEASE
TAKE
NOTICE
that
I
have --today
filed
with
the
Control Board
a
REQUEST
FOR NINETY DAY EXTENSION OF
are
herewith served upon
you.
-
Respectfully submitted,
ILLINOIS
ENVIRONMENTAL
PROTECTION AGENCY,
Respondent
BEFORE THE
POLLUTION CONTROL BOARD
OF THE STATE
OF ILLINOIS
ROYER OIL
(SORENTO GARAGE),
)
-
Petitioner,
)
)
PCBNo.05-
ILLINOIS ENVIRONMENTAL
)
(LUST
—
Ninety Day Extension)
PROTECTION AGENCY,
)
-
Respondent.
)
REQUEST FOR NINETY DAY EXTENSION
-
OF
APPEAL
PERIOD
-
NOW
COMES
the
Respondent,
the
illinois
Environmental Protection Agency (“Illinois
EPA”), by
one
o-f its
attorneys,
John
J.
Kim,
Assistant
Counsel
and
Special
Assistant
Attorney
General,
and,
pursuant
to
Section
40(a)(1)
of
the
Illinois
Environmental
Protection Act
(415
ILCS
5/40(a)(1))
and
35
Ill.
Adm.
Code
105.208,
hereby
requests
that the
Illinois
Pollution
Control Board (“Board”)
grant
an extension of the thirty-five
(35)
day period for petitioning for a
hearing
to
October 28, 2004,
or
any
other
date not more than
a total of one hundred twenty-five
(125)
days
from the
date of service of the
Illinois
EPA’s final decision.
In
support
thereof,
the
Illinois EPA respectfully states
as follows:
1.
On
June
24,
2004,
the
Illinois
EPA
issued
a
final
decision
to
the
Petitioner.
(Exhibit A)
-
2.
On July
25,
2004,
the
Petitioner
made a
written
request to
the illinois
EPA
for an
extension of
time
by which
to file
a petition
for review,
asking
the Illinois EPA join
in requesting
that
the
Board.
extend
the
thirty-five
day
period
for
filing
a
petition
to
ninety
days.
The
Petitioner’s
request included documentation
that represented
the
final
decision was
received on
June
25,
2004.
(Exhibit B)
3.
The additional time requested by
the
part~s
may
eliminate
the need for a
hearing
-
in
this matter
or, in
the alternative,
allow
the parties
to identify
issues
and limit the scope
of any
hearing that may be necessary
to resolve this
matter.
-
WHEREFORE,
for the
reasons stated
above,
the
parties
request
that
the
Board,
in
the
-
interest of
administrative
and judicial
economy,
grant this
request
for
a ninety-day
extension
of
the thirty-five
dayperiod for petitioning for a hearing.
Respectfully submitted,
ILLINOIS
ENVIRONMENTAL PROTECTION AGENCY,
Johi~J.Ki
-
Assistant Counsel
-
-
Special Assistant Attorney General
-
-
-
Division of Legal Counsel
-
1021
North
Grand Avenue, East
-
-
-
-P.O. Box
19276
-
.
Springfield, Illinois 62794-9276
-
217/782-5544
r
2 17/782-9143
(TDD)
Dated: July
30, 2004
This filing submitted on recycled paper.
7
~5,
2~/2B84
18
47
2175228889
CWM
-
F~GE
82
ILLINOIS
ENVIRONMENTAL
P~OTECTIONAGENCY
1021
NORTH
GPAND
AVENU8
5AST,
PC.
Box
19276,
5P~INCFInD,Fwr’~OS
62794-9276, 217-782-3397
J~.aEs
R.
THOMPSON
CENr~,
100
WEST
RANDOLPH.
Sutis 11-300,
Ct-lIcAco,
IL
60601,
312-814-6026
Roo
R.
BL.’ICOJEV!CH,
GOVERNOR
RENEE
C1PRIANO,
DIREcTOR
217/782—6762
-
CERTIFIED
MAIL
-
-
-
?QO~
~15O
GOOD -1~5?
7400
-
JUN242TJfl4
--
-
-
-
Jl\~
-~
:i.
2004
Stephen Royer
911
Railroad
Street
-
-
Greenville,
Illinois
62246
Re:
LPC
# 0050305009— Bond County
-
-
-
Sorento/Royer
Oil (Sorento Garage)
-
Main
Street
LUST
Ixicident No. 20000692
-
-
LUST Technical
File
-
Dear
Mr. Royer:
-
-
The Illinois
Environmental
Protection Agency (illinois EPA)
has
reviewed
the High
Priority
Corrective Action
Plan Budget
Amendment (budget amendment)
subm.itted for
the above-
referenced
incident.
ThIs
budget amendment,
dated May 13, 2004,was
received by
the
Illinois
EPA on -May
14, 2004.
Citations
In
this
letter
are
from the
Environmental
Protection Act (Act)
and
35
Illinois Admjnjstratjve
Code (35
III.
Mm.
Code).
-
The
budget
amendment
is rejected for the reason(s)
listed below (Section 57.7(c)(4) of the Act
and
35
III.
Adm.
Code 732.405(c)
and
732.503(b)).
-
1.
In accordance with Section
57.7(c)(4)
of the-Act
and
35
III.
Adra.
Code
732.503(b),
any
action by
the
Illinois
EPA ~o di~appzcrieor modify
a pian or budgot
submitted
purz.mzit to
Title XVI of the-Act shall
be provided to the
owner or operator in wrIting within 120
days
of
receipt.
-
-
The
illinois EPA
previously notified
the
owner or
operator of
its final
action.
Further,
in
accordance
with
Section
571(c)(4)
of the
Act
and
35111.
Adrn.
Code
732.503(t),
the
Illinois
EPA’s action to
reject
or require modification of the
plan
or budget,
Or the
rejection
of any
plan
or budget by operation of law, was subject to
appeal
to
the Illinois
Pollution Control
Board
within
35
days
after
the Illinois EPA’s
final action~
AU
future
correspondence
must
be submitted
to:
-
•
-.
.
EXHIBIT
Ro0~ogo
—
4302
North
Main
urea!.
Ro~ktcrd. IL 6)103
—
(815)
.
\‘.
H4~1I50flSr. Des
Ptsinm,
IL
60016
—
(8471
294-4000
—
595South
State.
Elgiri.
IL
60123
—18471
608
-
‘sIly
Se..
Peoria,
IL
61614—1309)
693-5463
Swe~uc~
L-~r~b
-
Pttta~A
—
7620 N.
Uni~ersuy
St.. Peoria.
IL.
61614
—13
~
.Lt.....
25
South
PIr~t
Street.
Cl
moaign,
IL
61820
—12171
2755600
SI~R.’~CrICLO
—
4500
3.
Si~LhStr~~t
Rd.. Spri~i~Id,
IL 62706
—(21
-
I
‘~
09
MalI
Street.
CcI)ins’~iIIe.
II
62224
—
1618)
346-6120
—
2309
W.
~
6181 993-7200
-
4b/~/2804
10:47
-
2175228009
Page 2
Illinois Environmental Protection
Agency
Th~reau
of
Land
-
#24
Leaking IJrider~oundStorage Tan.k
Section
1021
North Grand
Avenue
East
Post Office Box-19276
-
Springfield, tL
62794-9276
Please
submit
all correspondence
lxi
duplicate
and
include
the Re: block
shown
at the
beginning
of
this
letter.
An underground storage
~n.ksystem
owner
or operator may
appeal
this
decision
to the illinois
Pollution
Contol
Board.
Appeal
rights are
attached.
.
-
If
you
have
any
questions
or need
further assistance,
please
contact the
funds
EPA project
manager,
Steve
Jones,
at 217/524-1253.
Sincerely,
d1d14AAJQ4~
4~M~
Hernando A.
Aibarracin
Unit Manager
-
-
-
.
-
Leaking
Underground
Storage
Tank
Section
Division ofRemediation Management
Bureau
of
Land
-
HAA:S~Royer
Oil 20000692 CAP
amend
May 04.doc
Attachments:
Appeal
Rights
cc:
CW3M
Company
Division
File
08/25,2004
10:
47
2175228009
CWM
PAGE
04
Appeal
Rights
-
An
underground
storage
tank owner
or operator may appeal
this final
decision
to
the
ruinois
Pc1luri~nCon~olBoard
pursuant to
Sections
40
and
57.7(c)(4)(D)
of the Act
by
filing
a petition
for
a
hearing within
35 days
after the daze
of issuance
of the final decision.
However, the 35-day
--
period
may
be extended
for
a period of
time
not
to exceed
90 days by
written
notice
from
the
owner or operator and
the Illinois
EPA within the
initial
35-day
appeal pexiod~If the owner
or
operator
wishes
to receive a 90-day extension, a
written
request that includes
a statement
of the
date the
final
decision
was
received,
along with a copy of
this
decision,
must
be sent to the
Illinois
EPA
as soon
as
possible.
-
-
-~
For
information
regarding the filing of
an appeal, please contact;
Dorothy
Gunn,
Clerk
-
-
.,
•j~j~J4
flhinois Pollution
Control Board
State offlhinois
Center
-
100
West Randolph,
Suite
11-500
-
Chicago,
IL
60601
3l2/~l4-3620
For
information
regarding the filing of an extension, please contact:
Illinois
Environmental
Protection Agency
Division
ofLegal
Counsel
1021
North
Grand
Avenue East
Post Office Box
19276
Springfield, JL
62794-9276
-
21717g2-5544
BARNES &THCRN
BURG
--
-
Sute
4400
One
~N’or~h
W,cker Drv~
Chcg,
lh~~
60606-:~
U.S
A.
Fax(312)759~5646
Entad:
chesse.@bc!aw corn
-
-
July
15,
2004
_________________
REC
.
VIA
FACSIMILE
&
FEDERAL
EXPRESS
D1~j~0
E
V~
~
-
flOfLeg~j00~,
-.
Mr.
John Kim
-
JUL
1
Illinois Environmental Protection Agency
1021
North
Grand
Avenue East
-
-
Environrnenta1
Prot
Springfield, Illinois
62702
-
Agency
Re:
LPC
#0050305009
-
Bond County
Sorento / Royer Oil (Sorento Garage)
Main
Street
-
LUST
IncidentNo.
20000692
-
LUST Technical File
Dear
John:
On June
24, 2004,
the Illinois
Environmental Protection Agency
issued
a
letter with
respect to
the
above-referenced
LUST
Incident
regarding
the
new
amended
High
Priority
Corrective Action
Plan
and
Budget Amendment
dated May
13, 2004, which was received
by.
the Agency on May
14,
2004.
The Royer Oil (Sorento
Garage)
is
located in
Sorento,
Bond
County,
Illinois.
A
copy
of the
letter
is.
attached.
Royer
Oil
submitted
these
documents
pursuant to Section
732.405(e)
which states as follows:
-
If,
following
approval of
any
groundwater
monitoring plan,
corrective
action
plan
or
associated
budget plan,, an
owner
or
operator
determines that revised
procedures
or
cost
estimates
are
necessary
in
order
to
comply
with
the
minimum required activities for the
site,
the
owner or operator shall- submit,
as
applicable, an amended groundwater monitoring plan,
corrective action plan or
associated
budget plan
for review
by
the Agency.
The
Agency
shall
review
-
and
approve,
reject
or
require
modifications
of
the
amended
plan
in
-.
accordance with the procedures contained in
Subpart
E of this Part.
-
-
-
EXHIBIT
-
E!khar~
Frr
Wayne
s
South
Bend
Wa.~h~ngnn,
P.C.
Mr.
John Kim
July
15, 2004
Page 2
It appears that the Agency did not
review
these documents
in accordance with the procedures
contained in
Subpart E.
-
Royer
Oil
(Sorento
Garage)
believes
that,
based
upon
discussions
with
Illinois
Environmental Protection
Agency
and for
other reasons, that
we will be
able
to resolve
the
issues raised
in the A-gency’s 1ett~r. However,
we believe that
we
will
not
be
able to resolve
these
issues
by
the
deadline
for
filing
an
appeal
of
these
issues
to
the
Illinois
Pollution
Control
Board.
Thus,
this
is
a
request
for
a
90-day
extension
pursuant
to
the
Illinois
Environmental
Protection
Act Section
40(a)(1)
and
35
JAC
105.406
to allow us to
continue
these discussions
and
to
try
to resolve this issue.
If,
for
any
reason,
the
Agency
will not
seek
the
90-day
extension, please notify me
immediately
so
that
I
may
file
the
appeals
to
the
Board.
If you
have
any
questions
or
comments, please do not hesitate to contact me.
-
Sincerely yours,
BARNES
& THORNBURG LLP
-
.
Carolyn
S. Hesse
CSHIjnir
-
-
Enclosure
-
-
-
cc:
William
Sinnott
-
Carol L.
Rowe
227738v1
--
BARNES
&~ORNBURG
ap
CERTIFICATE OF SERVICE
I,
the
undersigned
attorney
at law, hereby certify
that
on July
30,
2004,
I served true and
-
correct
copies
of
a
REQUEST
FOR
NINETY DAY
EXTENSION
OF
APPEAL
PERIOD,
by
placing
true
and
correct
copies
in
properly
sealed
and
addressed
envelopes
and
by
depositing
said sealed envelopes in a U.S. mail
drop
box located within Springfield,
Illinois, with sufficient
First Class Mail postage affixed thereto,
upon the following named persons:
-
Dorothy M.
Gunn, Clerk
Carolyn S. Hesse
-
-
Illinois Pollution Control Board
-
Barnes & Thornburg
-
James R. Thompson
Center
Suite 4400
100 West Randolph Street
One North Wacker Drive
Suite 11-500
Chicago, IL
60606-2809
Chicago, IL 60601
-
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
John~J.
Kim
Assistant Counsel
-
-
Special Assistant Attorney General
Division of Legal Counsel
1021
North
Grand Avenue,
East
P.O. Box 19276
Springfield, Illinois
62794-9276
217/782-5544
217/782-9143 (TDD)
ILLINOIS POLLUTION CONTROL B~ARD
-
August
5,
2004
ROYER
OIL COMPANY
)
(Sorrento Garage),
)
)
Petitioner,
)
)
v.
)
PCBO5-16
-
)
(UST Appeal)
ILLiNOIS ENVIRONMENTAL
)
(90-Day Extension)
PROTECTION AGENCY,
)
-
)
Respondent.
)
ORDER
OF THE
BOARD
(by J.P. Novak):
On August 2, 2004, the parties timely filed
a joint notice to extend the 35-day period
within which Royer Oil Company may appeal a June 24, 2004 determination of the Illinois
Environmental
Protection Agency
(Agency).
See
415 ILCS 5/40(a)(l) (2002); 35 Ill. Adm. Code
105.206(c),
105.208(a),
(c).
Because
the postmark
date of
the joint request is within the time for
filing, the
joint request was timely filed.
35 Iii.
Adm.
Code 10l.300(b)(2),
105.404.
The
Agency
approved corrective action
costs,
with modifications, for Royer
Oil Company’s leaking
underground petroleum storage tank
facility
located on Main Street
,
in Sorrento, Bond County.
The Board extends the appeal period until October 28, 2004,
as the ~arties request.
See
415
ILCS
5/40(a)(1)
(2002);
35 Ill. Adm. Code
105.208(a).
If Royer
Oil Company fails to file
an appeal on or before that date, the Board will dismiss
this case
and
close the docket.
IT
IS SO
ORDERED.
-
-
I,
Dorothy M.
Gunn,
Clerk ofthe Illinois Pollution Control Board, certify that the Board
adopted the above order on August
5,
2004, by a vote of4-0.
-
Dorothy M. Gunn, Clerk
-
Illinois Pollution Control Board