ILLINOIS POLLUTION CONTROL BOARD
January 11,
1995
INGLESIDE
UNION
76 #70,
Petitioner,
v.
)
PCB 95—28
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by C.
A. Manning):
Pursuant to Section 35(b)
of the Environmental Protection
Act
(Act)
(415 ILCS 5/35(b)), Ingleside Union 76 #70 has
requested that the Illinois Environmental Protection Agency
(Agency) recommend that the Board grant a provisional variance to
allow Ingleside Union 76 #70’s gasoline dispensing operation
(service station) to continue operating even though it did not
install operational vapor recovery equipment by November 1,
1994.
This
provisional
variance
is
being
requested
because
petitioner’s
contractor was not available to perform the installation at the
facility
before
the
compliance
deadline.
This
request
for
a
provisional variance and the Notification of Recommendation was
filed with the Board by the Agency on Tuesday, January 10,
1995.
Pursuant to Section 35(b)
of the Act, the Board must issue the
variance
within
two
(2)
days
of
this
filing.
Specifically, the Agency recommends that we grant Ingleside
Union 76 #70 a forty-five
(45)—day provisional variance for its
facility located at Route 132 and Wilson Road,
Ingleside, Lake
County, Illinois in the Chicago metropolitan statistical area
from the Stage II vapor recovery requirements, as set forth in 35
Ill. Adm. Code 218.586, for the period beginning December 16,
1994,
and continuing for forty—five
(45)-days or until the
required vapor recovery equipment is installed, whichever comes
first.
This recommendation is essentially that the Board extend a
previously—granted provisional variance that expired December 15,
1994.
The docket number of the previous provisional variance was
PCB 94—334, granted on December 1,
1994.
Upon receipt of the request, the Agency issued its
recommendation, notifying the Board that the failure to grant the
requested forty—five
(45)—day provisional variance would impose
an arbitrary or unreasonable hardship on the petitioner.
Provisional variances are by their very nature temporary.
The responsibilities of the Agency and the Board in these short-
term provisional variances are different from the
2
responsibilities in standard variances.
(~
415 ILCS 5/35(b)
&
36(c)).
In provisional variances it is the responsibility of the
Agency to make the technical determinations and finding of
arbitrary or unreasonable hardship.
The Board’s responsibility
is to adopt a formal order, to assure the formal maintenance of
the record, to assure the enforceability of the variance, and to
provide notification of the action by a press release.
Having received the Agency recommendation notifying the
Board that a denial of the requested relief would impose an
arbitrary or unreasonable hardship, the Board hereby grants the
petitioner a provisional variance from 35 Ill. Adm. Code 218.586,
subject to the following conditions:
1.
The term of this provisional variance shall commence on
December 16,
1994, and continue for forty-five (45)-days or
until the required vapor recovery equipment is installed,
whichever comes first.
2.
The petitioner shall notify the Agency upon
installation of the Stage II gasoline vapor recovery
equipment, by sending notification addressed as follows:
Mr. Terry Sweitzer,
P.E.
Manager, Air Monitoring Section
Illinois Environmental Protection Agency
Division of Air Pollution Control
P.O. Box 19276
Springfield, Illinois
62794—9276
IT IS SO ORDERED.
I, Dorothy N.
Gunn,
Clerk of the Illinois Pollution Control
Board, do hereby certify
tI~a~
the above order was adopted on the
jJ~J.J~
day of ____________________________,
1995, by a vote of
c~7~
~~-~-~:z1
~L.
i~j
Dorothy M. G,~n,Clerk
Illinois Po~LutionControl Board