ILLINOIS POLLUTION CONTROL BOARD
    August 19, 2004
     
    UNION COUNTY OIL COMPANY,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB
    05-17
    (UST
    Appeal)
    (90-Day
    Extension)
     
    ORDER OF THE BOARD (by J.P. Novak):
     
    On August 5, 2004, the parties timely filed a joint notice to extend the 35-day period
    within which Union County Oil Company may appeal a June 28, 2004 determination of the
    Illinois Environmental Protection Agency (Agency).
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill.
    Adm. Code 105.402, 105.406. Because the postmark date of the joint request is within the time
    for filing, the joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The
    Agency rejected petitioner’s revised site investigation status report budget amendment for Union
    County Oil Company’s leaking underground petroleum storage tank facility located at 8375 State
    Route 127, in Alto Pass, Union County.
     
    The Board extends the appeal period until November 1, 2004, as the parties request.
    See
     
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Union County Oil Company fails to
    file an appeal on or before that date, the Board will dismiss this case and close the docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on August 19, 2004, by a vote of 4-0.
     
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    Back to top