ILLINOIS POLLUTION CONTROL BOARD
    February 3,
    1994
    THE FINISHING COMPANY,
    )
    Petitioner,
    )
    v.
    PCB 94—50
    (Provisional Variance)
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by
    C.
    A. Manning):
    Pursuant to Section 35(b) of the Environmental Protection
    Act
    (Act)
    (415 ILCS 5/35(b)), The Finishing Company has requested
    that the Illinois Environmental Protection Agency
    (Agency)
    recommend that the Board grant a provisional variance to allow
    The Finishing Company to continue accumulating hazardous waste
    for a period in excess of ninety
    (90)
    days.
    Such request for a
    provisional variance and the Notification of Recommendation was
    filed with the Board by the Agency on Tuesday, February
    1,
    1994.
    Pursuant to Section 35(b)
    of the Act, the Board must issue the
    variance within two
    (2) days of this filing.
    Specifically, the Agency recommends that we grant a thirty
    (30)-day provisional variance from the ninety (90)-day limitation
    on the accumulation of hazardous wastes, as set forth in 35
    Ill.
    Adm. Code 722.134(b),
    for the period from January 14,
    1994 to
    February 12,
    1994.
    Upon receipt of the request, the Agency issued its
    recommendation, notifying the Board that due to unforeseen,
    temporary and uncontrollable circumstances, failure to grant the
    requested thirty (30)—day provisional variance would impose an
    arbitrary or unreasonable hardship on petitioner.
    Provisional variances are by their very nature temporary.
    The responsibilities of the Agency and the Board in these short-
    term provisional variances are different from the
    responsibilities in standard variances.
    (~
    415 ILCS 5/35(b)
    &
    (c)).
    In provisional variances it is the responsibility of the
    Agency to make the technical determinations and finding of
    arbitrary or unreasonable hardship.
    The Board’s responsibility
    is to adopt a formal order, to assure the formal maintenance of
    the record, to assure the enforceability of the variance, and to
    provide notification of the action by a press release.
    Having received the Agency recommendation notifying the
    Board that a denial of the requested relief would impose an
    arbitrary or unreasonable hardship, the Board hereby grants

    2
    Petitioner a provisional variance from 35 Ill.
    Adm. Code
    722.134(b)
    from January
    14,
    1994 to February
    12,
    1994.
    IT IS SO ORDERED.
    I, Dorothy N.
    Gunn,
    Clerk of the Illinois Pollution Control
    Boa~d,0dohereby certi
    that the above order was adopted on the
    ~
    day of
    ___________________________,
    1994, by a vote of
    7-c).
    Control Board

    Back to top