ILLINOIS POLLUTION CONTROL BOARD
May 1, 2003
EARL’S MARATHON,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 03-200
(UST Appeal)
(90-Day Extension)
ORDER OF THE BOARD (by T.E. Johnson):
On April 24, 2003, the parties timely filed a joint notice to extend the 35-day period
within which Earl’s Marathon may appeal a March 11, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue is the Agency
approval of reimbursement of corrective action costs, with deductions, for Earl’s Marathon’s
leaking underground petroleum storage tank facility located at 8702 South Roberts Road,
Hickory Hills, Cook County. The Board extends the appeal period until July 21, 2003, which is
the first business day after the date the parties request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill.
Adm. Code 105.406. If Earl’s Marathon fails to file an appeal on or before that date, the Board
will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on May 1, 2003, by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board