ILLINOIS POLLUTION CONTROL BOARD
January 23, 1973
JERRY
R.
FRYE, Petitioner,
vs.
)
PCB 72—461
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
Frederick Patton and Richard N. McCarthy Attorneys
for Petitioner
Larry
R.
Eaton, Assistant Attorney General for the EPA
OPINION AND ORDER OF THE BOARD
(by Mr. Henss)
On October
17, 1972 we ordered Jerry Frye to close his landfill
if he had not obtained a permit for its operation in 45 days,
(P03 72-
243).
On December
1,
1972 the date by which Petitioner was to have
thc required permit,
he requested a
90 day extension of
time for the
raascn that the engineering firm he had employed to perform the re—
auired soil testing had been unable
to complete the testing during
the allotted time.
The Environmental Protection Agency contacted the engineer to
learn the reason for the delay.
The engineer stated that urainy
weather had made it impossible to obtain the soil borings for well
over one month”.
Nevertheless the EPA has recommended that the
extension be denied and that the Petitioner be required to take any
refuse
to a site located approximately
20 miles north of the Peti-
tioner’s site.
This other site is owned by another disposal service
and has been issued a permit by the EPA.
Upon further reflection we believe that our original time
limitation of
45 days was too short.
We could have anticipated
that adverse weather conditions
at this time of year might make it
difficult to obtain the necessary soil borings within the time
allotted.
We will allow an additional
90 days to comply with the
permit requirement.
Petitioner Frye has engaged the services
of an engineering firm
and has attempted to comply with the Board Order.
We do not feel
that he should be forced to cease operations at this
time because
of soil conditions brought on by rainy weather-—a condition over
which he had no control.
The fact that another disposal area is
located
20 miles away would not necessarily mean that Jerry Frye
would have access or be allowed to deposit refuse at that site or
6— 611
—2—
that
he
would
have
the
capability
of
maintaining
the
service
to
his
11,000
households
if
we
deny
this
extension
of
time.
ORDER
It
is
ordered
that:
1.
Petitioner
be
granted
an additional time period to
March
1,
1973
to
obtain
an
EPA
permit
for
the
operation of his landfill.
If a permit is not ob-
tained by
this date,
Petitioner will close his land-
fill and shall not resume operations until
a permit
is obtained from the EPA.
2.
Parts
2 and
3 of our Order shall remain in full
force and effect.