ILLINOIS POLLUTION CONTROL BOARD
May 17, 1973
)
IN
TIlE MATTER OF:
)
)
R72-l7, R72-l8
FARM
GRAIN
DRYER
REGULATIONS
)
)
ORDER
A proposed final draft was authorized by the Board on
May
3,
1972.
Upon Motion to Reconsider,
the proposed final
draft
is hereby modified in the following respects:
1.
The new date for requiring operating permits
for grain handling and conditioning operations
shall be September
1,
1974,
2.
We delete the proposal for granting exception
from the permit requirement for on-farm grain
dryers having
a throughput capacity of 1,000 bushels
or
less per hour.
This type of exception shall
be considered at
a later date,
following the
development of more information by
a Task Force.
I, Christan
L. Moffett, Clerk of the Illinois Pollution Control Board,
hereby certify
that the above Order
was
adopted on the
17~
day
of May, 1973 by
a vote
of __________________________________
Christan
L.
Moffett, Clerk
Illinois Pollution Control Board
$—51