1 BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
    2 VOLUME II
    IN THE MATTER OF: )
    )
    TIERED APPROACH TO CORRECTIVE ) R97-012
    ACTION OBJECTIVES, ) (
    Rulemaking)
    35 ILL. ADM. CODE 742 )
    (Pursuant to P.A. 89-431) )
    6
    The following is a transcript of a
    7 rulemaking hearing held in the above-entitled
    matter, taken
    stenographically by LISA H. BREITER,
    8 CSR, RPR, CRR, a notary public within and for the
    County of
    DuPage and State of Illinois, before
    9 CHUCK FEINEN, Hearing Officer, at the
    Thompson
    Center, 100 West Randolph Street, Room 9-040,
    10 Chicago, Cook County, Illinois, on the 3rd day of
    December 1996 commencing at 9:00 o'clock a.m.
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING
    (312) 419-9292
    242

    1 A P
    P E A R A N C E S:
    2 HEARING TAKEN BEFORE:
    3 ILLINOIS POLLUTION CONTROL BOARD
    100 West Randolph Street
    4 Suite 11-500
    Chicago, Illinois 60601
    5 (312) 814-4925
    BY: MR. CHUCK FEININ,
    6 HEARING OFFICER.
    7 ILLINOIS POLLUTION CONTROL BOARD MEMBERS PRESENT:
    8 Mr. Chuck
    Feinen
    Ms.
    Marili McFawn
    9 Mr. Joseph
    Yi
    Mr.
    Hiten Soni
    10
    ILLINOIS ENVIRONMENTAL PROTECTION AGENCY MEMBERS
    11 PRESENT:
    12 Mr. Gary P. King
    Ms. Kimberly A.
    Robinson
    13 Mr. John
    Sherril
    Dr. Thomas
    Hornshaw
    14 Ms.
    Tracey E. Virgin
    Mr. James Patrick
    O'Brien
    15 Mr. H. Mark
    Wight
    Mr. Douglas Clay
    16 Mr. Ken
    Liss
    Mr. Larry
    Eastep
    17 Ms. Vicky L.
    VonLanken
    18 OTHER AUDIENCE MEMBERS WERE PRESENT AT THE HEARING
    BUT NOT LISTED ON THIS APPEARANCE PAGE.
    19
    20
    21
    22
    23
    24
    L.A. REPORTING
    (312) 419-9292
    243

    1 I N D E X
    2 PAGE
    3 GREETING BY HEARING OFFICER 245-247
    4 FOLLOW-UP ANSWERS BY MR. KING 247-276
    5 PRE-FILED QUESTIONS 276-460
    6 CLOSING COMMENTS BY HEARING OFFICER 460
    7
    8
    9
    10
    11
    12
    13
    14
    15 E X H I B I T S:
    16
    17 (None marked by reporter.)
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING
    (312) 419-9292
    244

    1 HEARING OFFICER FEINEN: Let's go back
    2 on the record. Good morning. My name is Chuck
    3 Feinen. I'll be filling in for Kevin
    Desharnais
    4 today. This is R97-12, the Tiered Approach to
    5 Collective Action Objectives, 35 Ill. App. Code
    6 742. This is the second day of hearings. We're
    7 in the middle of questioning the agency as a panel
    8 group.
    9 A few things I want to point out is
    10 that the last exhibit entered in was Exhibit 8 so
    11 if there's any more exhibits entered by the
    12 agency, you can start off with Exhibit No. 9.
    13 With the multitude of questions and timing, we're
    14 going to be trying to move a little bit quicker
    15 today. I'll not be giving 10-minute breaks.
    16 We'll cut the breaks down. We'll also try to cut
    17 down the
    lunchtime so we can get through as much
    18 as possible.
    19 Even with those constraints today,
    20 I think the agency wanted to go back to the
    21 questions from, I don't know if it was
    22 Mr.
    Watson's questions, but it was the
    remediation
    23 advisor's questions concerning 742.305, if the
    24 agency is prepared to start out with their
    L.A. REPORTING
    (312) 419-9292
    245

    1 responses, and we'll skip over to I believe
    2 section 742.400 is where we left off.
    3 Also, remember that we're going to
    4 be doing the
    prefiled questions first, and then if
    5 there's follow-up, please state your name and the
    6 follow-up question, and at the end of the day, if
    7 time permitting, we'll allow questions from people
    8 who didn't
    prefile. With that, I'll turn it over
    9 to Kim
    Robinson.
    10 MS. MC FAWN: Before you turn it over,
    11 let me just mention so that the audience knows
    12 that the two attending board members, that is,
    13 Dr.
    Flemal and Kathleen
    Hennessey are down in
    14 Springfield today for their confirmation
    15 hearings. That's why they're not with us today.
    16 And
    Anand Rao is ill so Mr.
    Soni has joined us
    17 here. He has been here throughout. He will serve
    18 as our technical advisor during this hearing.
    19 Thank you.
    20 I apologize. Mr.
    Feinen just told
    21 me that Kathleen
    Hennessey is not an assigned
    22 board member. I know she's been tracking it very
    23 closely so I had coupled her with Ron
    Flemal and
    24 Joe
    Yi and myself. So I'm sure she won't mind
    L.A. REPORTING
    (312) 419-9292
    246

    1 that we've given her added responsibilities in her
    2 first two months here at the board.
    3 MS. ROBINSON: Good morning. This is
    4 Kimberly
    Robinson, and we would like to go through
    5 some follow-up this morning based on carry-over
    6 issues yesterday, and I think Mr. King is going to
    7 go ahead and proceed with those.
    8 MR. KING: Okay, we had -- as I counted
    9 matters at the end of yesterday, we really had
    10 four issues left over to really talk about at the
    11 start of today. The first issue was an item
    12 raised by Pat
    Sharkey as part of follow-up
    13 questions. A couple of times we deferred those.
    14 I'd like to respond to that. Then the other three
    15 issues came up right at the end of the day so I'd
    16 kind of like to go back to those.
    17 The first issue -- and I kind of
    18 would like make sure we have direct questions as
    19 far as
    prefiled questions -- was a follow-up
    20 issue, but I think this is probably good
    21 paraphrase, Pat -- you can correct me, if you
    22 think I'm wrong -- but I think the issue you were
    23 driving at was whether you can have an NFR letter
    24 that encompasses groundwater for a contaminant of
    L.A. REPORTING
    (312) 419-9292
    247

    1 concern without sampling the groundwater.
    2 MS. SHARKEY: Right.
    3 MR. KING: And the answer to that
    4 question is yes, that is possible, and it's
    5 possible if you've addressed the groundwater with
    6 the methodology that did not require groundwater
    7 sampling.
    8 For example, you could under Tier 3
    9 there would be a potential way of doing that there
    10 depending on the methodology it shows. The second
    11 issue that came up was --
    12 MS. SHARKEY: Excuse me, should we wait
    13 to ask any further questions on that then?
    14 HEARING OFFICER FEINEN: If it's
    15 particular to that response, why don't you ask him
    16 now so we know?
    17 MS. SHARKEY: Gary, are you saying that
    18 one would need to go to a Tier 3 level of
    19 evaluation in order to be able to avoid
    20 groundwater sampling, that the only way you can
    21 avoid groundwater sampling is by going through a
    22 Tier 3 evaluation?
    23 MR. KING: I'm not sure that's
    24 necessarily true. That to me was the clearest
    L.A. REPORTING
    (312) 419-9292
    248

    1 example of the situation.
    2 MS. SHARKEY: Could you elaborate a
    3 little bit on what one would be looking at under
    4 Tier 3, how that evaluation would go forward?
    5 MR. KING: It really is an issue of
    6 excluding that groundwater pathway using, for
    7 instance, in subpart C, there's a very specific
    8 way of excluding groundwater pathway, but that,
    9 however, is not the only methodology used to
    10 exclude the pathway, and we have seen that done in
    11 other ways and have approved that in other ways.
    12 MS. SHARKEY: If a Tier 3 evaluation
    13 were otherwise not involved, in other words, if
    14 somebody were able to demonstrate their soil
    15 values were Tier 1, fell under the Tier 1 tables,
    16 could they look to the Tier 3 factors that are
    17 considered under Tier 3 that might pertain to
    18 eliminating -- or excuse me -- excluding the
    19 groundwater routes and provide an analysis without
    20 going through a full Tier 3 analysis or
    21 evaluation?
    22 MR. KING: That's a way to do it, that's
    23 correct.
    24 MS. SHARKEY: Thank you.
    L.A. REPORTING
    (312) 419-9292
    249

    1 MR. KING: The second issue --
    2 MR. RIESER: Let me just follow up, if I
    3 may.
    4 Isn't it true that based on the
    5 scope of the investigation to document through the
    6 investigation that you had no impact of
    7 groundwater based on site features, for example,
    8 surface spill that you can document that you have
    9 reached the bottom of groundwater is not impacted
    10 or other site
    investigatory means of documenting
    11 the groundwater has not been impacted.
    12 In that situation, you would not be
    13 -- you would still get an NFR letter that would
    14 have the same -- it would be the same statutory
    15 NFR letter, and it would have the same impact
    16 according to 742.105(a), but you would not have
    17 specifically excluded a groundwater pathway
    18 through the use of either the pathway exclusion or
    19 the tiered process. You would have documented
    20 that that was not of concern by virtue of your
    21 investigation, isn't that also possible?
    22 MR. KING: I guess I was using the
    23 reference to Tier 3. I think that's true, what
    24 you're saying. However, I think we would probably
    L.A. REPORTING
    (312) 419-9292
    250

    1 kind of -- if we were going to pigeonhole it into
    2 something, we would call that a Tier 3 type of
    3 situation.
    4 MR. RIESER: Tier 3 in the sense that
    5 it's a decision not to be made by the project
    6 manager which involves other features, but not
    7 necessarily in the sense of a full-blown risk
    8 assessment or specific pathway exclusions, those
    9 things are provided for in subpart I?
    10 MR. KING: I think that's correct, yes.
    11 MS. SHARKEY: Maybe it would be helpful
    12 if you would point us to the provisions under the
    13 Tier 3 evaluation that might be relevant for doing
    14 an equivalent type of demonstration without doing
    15 a full Tier 3.
    16 HEARING OFFICER FEINEN: Well, Gary,
    17 please remember that you have to speak up for the
    18 court reporter to hear. Again if you're asking
    19 follow-up questions, please state your name
    20 beforehand so the court reporter can make sure she
    21 gets the name.
    22 MR. KING: There's a section, section
    23 742.925, which discusses exposure routes.
    24 MS. SHARKEY: So what one would do is
    L.A. REPORTING
    (312) 419-9292
    251

    1 look at under 925, exposure routes, and the
    2 factors that one would need to address then to
    3 make this demonstration would be those in (a)
    4 through (f)?
    5 MR. KING: That's correct.
    6 MS. SHARKEY: Thank you. I have no more
    7 questions.
    8 MR. RIESER: I'm sorry to get back to
    9 this, but isn't it true that if your investigation
    10 documented by virtue of site conditions that you
    11 had no groundwater impact, you would not be
    12 looking at your three factors, you would just be
    13 documenting that through your investigation, and
    14 then it's the same NFR letter -- it's the same NFR
    15 letter no matter what the site is?
    16 MR. KING: I think that's true. What we
    17 try to provide in (a) through (f) is really a
    18 description of a set of factors which I think
    19 would be the kind of things you would be looking
    20 at as part of the site investigation.
    21 MS. SHARKEY: If I could -- this is Pat
    22 Sharkey . If I could make one more clarifying
    23 point, my question I think in part went to the
    24 question of whether one could basically get a
    L.A. REPORTING
    (312) 419-9292
    252

    1 clean bill of health for a piece of property where
    2 there had been some sport of spill and the spill
    3 was
    remediated, and in terms of soil, soil
    4 removal, soil documentation of the soil meeting
    5 Tier 1, for example, and not be required to go to
    6 a groundwater monitoring in order to also get an
    7 NFR that said, and furthermore, you've achieved
    8 Tier 1 standards for groundwater.
    9 MR. HORNSHAW: I guess I'm a little
    10 confused because in the scenario you two are
    11 painting, you would never even be issued
    12 groundwater cleanup objectives if you documented
    13 that it never got there. The project manager
    14 wouldn't even be giving groundwater objectives.
    15 MS. SHARKEY: Yeah, I understand that an
    16 objective is designed to say, you've got a problem
    17 here and you need to
    remediate to this objective.
    18 As I understand it, with Tier 1, we also have
    19 established a table of groundwater objectives, do
    20 we not?
    21 MR. HORNSHAW: Correct, but they're not
    22 always given in every project either.
    23 MS. SHARKEY: I guess I'm wondering if
    24 one could elect to request that you could actually
    L.A. REPORTING
    (312) 419-9292
    253

    1 get a full NFR letter that covered both soil and
    2 groundwater in that sort of scenario so that any
    3 cloud that might exist over the property or any
    4 questions about whether or not there had been
    5 groundwater impact would be resolved with that
    6 letter.
    7 MR. KING: I thought that I answered
    8 that first. That was the first question that was
    9 asked, and I answered that.
    10 MS. SHARKEY: So the impact, that is the
    11 impact. Thank you.
    12 MR. KING: Okay, the second issue. The
    13 second issue related to a discussion with regards
    14 to Section 305, subsection (c) through (e) and how
    15 that fit into the context of the board's RCRA
    16 regulations as they appear in part 721.
    17 It's pretty clear that we used part
    18 721 as source material to develop (c) through (e),
    19 but we're not trying to say in any way that just
    20 because you are beyond the limits of (c) through
    21 (e) that that makes those materials a RCRA
    22 hazardous waste as it's defined in part 721.
    23 Whether materials are a hazardous waste will be
    24 determined in accordance with the definitions in
    L.A. REPORTING
    (312) 419-9292
    254

    1 part 721.
    2 The third issue again was
    3 discussing section 305, subsection (c) through
    4 (e), and the issue there was how do you determine
    5 if 305(c) through (3) have been met. Clearly if
    6 there's sampling done that shows that sampling is
    7 done in an acceptable way, that's going to resolve
    8 the matter, but whether you have to sample is
    9 going to depend on the specifics of what's being
    10 addressed relative to the site and the
    11 contamination at hand.
    12 I'll give you just a couple of
    13 examples. For instance, if you were addressing a
    14 recent release of a No. 6 fuel oil and you didn't
    15 have any other information with regards to the
    16 site relative to any of these other factors, then
    17 there would be really no reason to sample for (c)
    18 through (e) because those just wouldn't be factors
    19 and simply be enough to indicate what was being
    20 addressed.
    21 On the other hand, if you were
    22 looking at an acid spill and addressing that as
    23 the contaminants of concern, then you would have
    24 to look at, for instance, pH, and you may have to
    L.A. REPORTING
    (312) 419-9292
    255

    1 look at some of the other items there because that
    2 could be affecting mobility of other
    3 contaminants. The fourth issue --
    4 MR. WATSON: I've got a follow-up on
    5 that. For the record, my name is John
    Watson from
    6 Gardner, Carton & Douglas.
    7 Does that mean with respect to
    8 doing the sampling in sub (e) that only unless you
    9 have identified the applicable metals that are
    10 subject to that standard in your site
    11 characterization that you would have to go through
    12 and do that analysis?
    13 MR. KING: I wasn't really speaking to
    14 that as an example. What I was trying to say is
    15 that you really have to look at the specific site
    16 conditions and contaminants you would be looking
    17 at and then make a decision based on that. I was
    18 just giving out a couple of examples without
    19 speaking to other types of examples.
    20 MR. WATSON: Would that be a fair
    21 conclusion based on what you said as it relates to
    22 sub (e)?
    23 MR. KING: I guess we would have to sit
    24 down and go through and look at it. I can't
    L.A. REPORTING
    (312) 419-9292
    256

    1 answer that right as I sit here.
    2 MR. WATSON: I guess it seems to be a
    3 fundamental question as it relates to your
    4 response and specifically this provision in that
    5 if we're testing samples for contaminants of
    6 concern and determining risks based on the
    7 identification of contaminants of concern, the
    8 question is must there be a connection between
    9 those in order to impose an obligation to do the
    10 RCRA sampling that is being proposed here?
    11 And I guess it seemed that your
    12 first answer was, yeah, you had to have that
    13 connection, and then as it relates to (e), though,
    14 I'm not so sure that that's the requirement.
    15 MR. KING: Well, you have to, as I said
    16 initially, if you sample, that certainly should
    17 resolve things, but whether you have to sample is
    18 going to depend on the specifics of what's being
    19 addressed. We gave some examples yesterday about
    20 in certain situations, you could address those in
    21 a narrative fashion depending on the context that
    22 you're dealing with.
    23 MS. SHARKEY: I guess I'm still -- I
    24 understand what Mr. King is saying, I believe,
    L.A. REPORTING
    (312) 419-9292
    257

    1 with regard to (c) through (e), and I appreciate
    2 the clarification, but I continue to think the
    3 language is not clear on this, and so someone's
    4 going to have to go back and read this transcript
    5 in order to, you know, understand this, and I
    6 think particularly there's a problem with (c) and
    7 (d) which may not exist in (e).
    8 (E) reads, "Any soil which contains
    9 contaminants concerning the following list." So
    10 one is at least directed to specific contaminants
    11 of concern, and you know, if you have those
    12 contaminants of concern, this is telling you
    you
    13 need to test for toxicity. With regard to (c) and
    14 (d), however, it appears that any time you have
    15 soil which contains any contaminant of concern,
    16 you have a duty to determine whether or not it
    17 exhibits a characteristic of reactivity under (c)
    18 and a duty to determine the pH under (d), and it
    19 seems to me the language there simply is not clear
    20 and does not state what the agency has told us
    21 they believe it means, and we would be happy to
    22 propose some language in our testimony and bring
    23 it to the agency's attention to discuss at the
    24 next hearing on this.
    L.A. REPORTING
    (312) 419-9292
    258

    1 MR. KING: I guess that's a comment for
    2 us to consider.
    3 HEARING OFFICER FEINEN: That really
    4 wasn't a question. Is there any more follow-up
    5 from the previous day? Does that conclude the
    6 questions then on 305? Can we move to 400?
    7 MR. KING: The fourth issue that carried
    8 over from yesterday was really discussing whether
    9 there was a conflict between section -- I believe
    10 the reference was to section 310, and 225(d) would
    11 also apply to whether there was a conflict between
    12 315 and 225(d), in particular (d)(1).
    13 Our statement yesterday was that
    14 there was not a conflict, and that continues to be
    15 what we believe the case to be. We had intended
    16 the sampling alternative in 225(d)(1) as a method
    17 to provide some useful guidance as to -- an
    18 alternate approach to achieving compliance where
    19 you were averaging concentrations as opposed to
    20 requiring every single discrete sample to meet the
    21 compliance number.
    22 What I want to try to do is
    23 articulate the difference or why there's this
    24 three foot and this one foot and, you know,
    L.A. REPORTING
    (312) 419-9292
    259

    1 hopefully, if we can make some sense out of that
    2 and make it understandable, then I think we should
    3 continue with having (d)(1) in there. If we can't
    4 do it to have it make sense, then our inclination
    5 would be just to delete all of (d)(1) and then
    6 move the numbers up in the section.
    7 What we're talking about -- I tried
    8 to just illustrate on the easel at the other side
    9 of the room what we're talking about. If you look
    10 at section 315 -- I have to jump back and forth
    11 here a little bit -- but 315(c)(1) is saying that
    12 in essence you can have contaminants of concern at
    13 levels in excess of the Tier 1 numbers below that
    14 three-foot level, and that would be acceptable as
    15 long as the Tier 1 objectives for that route are
    16 met above that number, okay.
    17 Now, what we're saying in (d)(1),
    18 225 (d)(1) is that -- in contrast is that within
    19 that top foot, there's an additional element of
    20 flexibility. Between one foot and three foot,
    21 each discrete sample would have to meet those Tier
    22 1 numbers for that pathway. In that top one foot,
    23 you could average the discrete samples in a way
    24 that the average met the Tier 1 number for that
    L.A. REPORTING
    (312) 419-9292
    260

    1 pathway.
    2 So that the combination of the two
    3 would assure that within that top three feet, you
    4 were meeting the Tier 1 numbers within the first
    5 foot based on an averaging concept, within the
    6 next two feet, based on the discrete samples. So
    7 that's the way that was intended to work, and we
    8 may suggest a little bit of clarifying language to
    9 make that a little more clear, but we continue to
    10 think there's not a conflict between the two.
    11 HEARING OFFICER FEINEN: Just so the
    12 record is a little clearer, when Mr. King was
    13 referring to top foot, he is referring between the
    14 land surface and a foot down and the same way when
    15 he's referring to three feet down, land surface,
    16 three feet down.
    17 MR. KING: That's correct.
    18 MR. WATSON: I've got a couple of
    19 questions. What's the justification for not
    20 allowing
    compositing or averaging below the first
    21 foot of soil?
    22 MR. KING: We came up with that one-foot
    23 number or this alternative using a USEPA study
    24 which used averaging within that one foot. They
    L.A. REPORTING
    (312) 419-9292
    261

    1 did not extend the averaging below one foot
    2 because there was a concern relative to you could
    3 have a diluting impact lower than one foot which
    4 would tend to dilute the impact in that upper one
    5 foot, and that would be the most critical exposure
    6 area. If anybody wants to say any additional
    7 items.
    8 MR. WATSON: What was the specific study
    9 that you relied on? Is that incorporated in any
    10 of your testimony?
    11 MR. HORNSHAW: I believe it's in the
    12 USEPA's soil screening guidance, either the user
    13 guide or the technical background document, both
    14 of which are incorporated by reference.
    15 MR. WATSON: The second question that I
    16 would have relating to this in Section 225, there
    17 is no limitation in (d) in terms of how deep that
    18 sampling has to go in the soil to determine
    19 compliance with
    remediation objectives for
    20 inhalation, ingestion and exposure routes, and my
    21 question is shouldn't there be a limitation in
    22 terms of the sampling depth?
    23 MR. KING: Well, (d)(1) was intended to
    24 be an example methodology. Otherwise, we would be
    L.A. REPORTING
    (312) 419-9292
    262

    1 in a situation where there wouldn't be anything
    2 really very specific within (d) to indicate what
    3 would be an acceptable methodology.
    4 We could eliminate (d)(1), and
    5 somebody could come back and propose that as an
    6 alternative, and we would probably accept it, but
    7 we wanted to have something, a fairly explicit
    8 example in the regulations to give guidance as to
    9 what would be at least one acceptable approach.
    10 MR. WATSON: I guess my concern is that
    11 I think the testimony perhaps from Mr.
    Sherril
    12 yesterday was that you would have to meet the
    13 remediation objective at any location in the soil,
    14 whether it was down one foot, three feet or
    15 fifteen feet, and certainly at some point as you
    16 get to depth, issues of inhalation and ingestion
    17 are eliminated in terms of exposure pathways, and
    18 I guess I'm looking for some guidance as to what
    19 would be the depth at which you would be required
    20 to sample to determine compliance with your
    21 remediation objective for these exposure
    22 pathways?
    23 MR. SHERRIL: One thing, we've added a
    24 little clarification. Everyone should have a copy
    L.A. REPORTING
    (312) 419-9292
    263

    1 of the errata sheet. Under 742.225(d)(4), and
    2 it's on page 2 of the errata, we do have, which
    3 kind of further clarifies (d).
    4 MR. WATSON: What does that tell me,
    5 that my limit is one foot?
    6 MR. SHERRIL: Yes, you're still within
    7 that contamination within the top foot.
    8 MR. WATSON: So whether I'm -- does
    9 (d)(4) say that so whether I'm averaging or
    10 compositing or just comparing discrete samples for
    11 inhalation and soil ingestion, all I need to do is
    12 sample to a depth of one foot?
    13 MR. SHERRIL: It's not saying that.
    14 It's saying we're only looking at that
    15 contamination within the top foot. There again
    16 it's a separate issue for contaminants located
    17 below one foot.
    18 MR. KING: It seems to me that you're
    19 really trying to inject another pathway exclusion
    20 option. I mean, if the contaminants are at 10
    21 feet, you know, they would have to meet the
    22 numbers relative to ingestion, inhalation,
    23 migration of groundwater.
    24 They have to be concerned with all
    L.A. REPORTING
    (312) 419-9292
    264

    1 those numbers under Tier 1, but that was why the
    2 pathway exclusion number of three foot was put
    3 into subpart C as a way so that you could get away
    4 from that where the case was appropriate.
    5 MR. WATSON: I'm just saying in terms of
    6 a situation where you could exclude your
    7 groundwater and then all you'd have to worry about
    8 was soil ingestion, inhalation, and I'm going
    9 ahead and doing my sampling, what you're saying is
    10 that if I have contamination at 20 feet that
    11 exceeds the soil and inhalation number whether or
    12 not -- I mean, obviously there's no chance that
    13 that's going to be a legitimate exposure pathway,
    14 but under Tier 1, what you're saying is I could
    15 not get out of the requirement to move beyond the
    16 Tier 1 numbers and do a Tier 2 or a Tier 3
    17 analysis, is that right?
    18 MR. KING: No, I don't think that's what
    19 we were saying. You still could go into a
    20 different analysis. It's just you would not have
    21 complied with the Tier 1 numbers. So you'd have
    22 to use a different methodology. Again, for
    23 example, that's why subpart C is there and has
    24 that number in there to provide a real expressway
    L.A. REPORTING
    (312) 419-9292
    265

    1 out of that kind of situation.
    2 MS. SHARKEY: Could I ask some
    3 clarifying questions?
    4 MR. WATSON: Sure.
    5 MS. SHARKEY: The three feet that we're
    6 talking about comes out of subpart C and the
    7 exclusion of an exposure route?
    8 MR. KING: That's correct.
    9 MS. SHARKEY: If one is not interested
    10 in excluding an exposure route but is simply
    11 attempting to determine whether or not you meet
    12 the Tier 1 values for inhalation and soil
    13 ingestion, does one need to go beyond the one
    14 foot?
    15 MR. SHERRIL: Yes.
    16 MR. KING: Yes.
    17 MS. SHARKEY: And what in here tells me
    18 I need to go beyond the one foot?
    19 MR. KING: Well, I guess we're really
    20 jumping ahead to the discussion of Tier 1, and I
    21 think we'll get to that later on when we talk
    22 about how Tier 1 functions.
    23 MS. SHARKEY: We're kind of in --
    24 MR. KING: The notion of Tier 1 is
    L.A. REPORTING
    (312) 419-9292
    266

    1 you've got a set of criteria, you've got a set of
    2 contaminants of concern, and that if you meet the
    3 most conservative number out of those three
    4 pathways, then you've met the Tier 1 objectives.
    5 If you don't meet it for one of those pathways,
    6 then you go on to use a different methodology.
    7 MS. SHARKEY: So you're telling me later
    8 when we get to Tier 1, there's language in there
    9 that tells you how far you need to go for the soil
    10 inhalation and ingestion pathway, or do you look
    11 to the individual program requirement for the
    12 depth of sampling which is what we talked about
    13 yesterday in response to some of my questions?
    14 MR. KING: There's no discussion of
    15 depth. You have to meet it across the site.
    16 MS. SHARKEY: Right. So what Mr.
    Watson
    17 said then, in other words, if soil ingestion --
    18 what's odd to me, is that frankly, it's
    19 counter-intuitive, it seems to me, to say that one
    20 can composite for inhalation and ingestion in the
    21 first foot where one expects the greatest
    22 exposure, in fact, but you can't composite for
    23 these apparently at a greater depth.
    24 MR. SHERRIL: Let me interject there.
    L.A. REPORTING
    (312) 419-9292
    267

    1 If you would look at (f), 742.225(f), a person may
    2 propose an alternative method for determining
    3 compliance with the mediation objectives. So it
    4 is not accurate to say that you cannot composite
    5 and average below one foot.
    6 MS. SHARKEY: You could propose that?
    7 MR. SHERRIL: You could propose it.
    8 Under (d)(1), we have put in a methodology for
    9 doing that for just within the top one foot.
    10 MS. SHARKEY: Again what was the
    11 justification for only allowing
    compositing within
    12 the top foot?
    13 MR. SHERRIL: I just said you did not.
    14 MS. SHARKEY: The rule specifically says
    15 that. I know you can propose an alternative, but
    16 the rule is saying within one foot.
    17 MR. SHERRIL: As Tom
    Hornshaw mentioned,
    18 incorporation by reference the SSL document.
    19 MS. MC FAWN: Why don't you explain that
    20 theory to her. One of you said it fairly
    21 succinctly a few minutes ago.
    22 MR. HORNSHAW: The reason USEPA
    23 considers averaging and
    compositing appropriate
    24 because the soil screening guidance is designed to
    L.A. REPORTING
    (312) 419-9292
    268

    1 protect somebody living on a site for 30 years,
    2 and you don't expect a person to be in the same
    3 position over that whole 30 years. They're going
    4 to be more or less around the whole site. So they
    5 consider averaging to be an appropriate way of
    6 predicting the risk to that person over the 30
    7 years that they're assumed to be there, and so in
    8 that case, they want to look at what's the average
    9 amount of contamination a person's going to be
    10 exposed to, and they say that averaging and
    11 compositing is appropriate for that upper surface
    12 layer, and they specify depth of no more than one
    13 foot so that you don't get a dilution effect at
    14 some sites where all the contamination is at the
    15 surface.
    16 If you sample at one, two and three
    17 feet, you would be diluting out the true risk by
    18 averaging in basically non-detects at two and
    19 three feet. It's kind of a compromise that USEPA
    20 came to in order to make sure that a person is
    21 protected adequately over that 30-year period.
    22 The reason that we think that the cleanup
    23 objectives should be met at all points below that
    24 is because there's no guarantee that contamination
    L.A. REPORTING
    (312) 419-9292
    269

    1 at depth is going to remain at depth over those 30
    2 years. It could be brought up to the surface, and
    3 with subsequent earth moving activities,
    4 construction, whatever, and present risks that
    5 weren't really accommodated by having the
    6 averaging done in the original setting of the
    7 cleanup numbers.
    8 MS. SHARKEY: It's not clear to me why
    9 if the rationale for
    compositing at the surface
    10 exists why it doesn't exist for
    compositing at
    11 lower levels, albeit at the same depth of your
    12 composites possibly. The risk, it seems to me, to
    13 somebody is if you hit a hot spot in a grab
    14 sample, a composite in fact dilutes your sample,
    15 no?
    16 MR. O'BRIEN: You could propose an
    17 alternative sampling for sub-sampling. It becomes
    18 very difficult to subscribe to a particular
    19 sampling strategy in
    rulemaking that would fit
    20 every site.
    21 So we have provided as an example a
    22 prescriptive methodology for
    compositing at the
    23 surface, and it would be more appropriate for
    24 people to propose a specific
    compositing strategy
    L.A. REPORTING
    (312) 419-9292
    270

    1 to the agency for sampling at greater depth.
    2 MS. SHARKEY: Going back to the
    3 exclusion pathway then, the exclusion of three
    4 feet -- and I think Mr. King or somebody yesterday
    5 said there was an assumption of gardening and
    6 other type of work, one could be digging down to a
    7 depth of approximately three feet. If you can
    8 exclude it three feet on that basis, why would you
    9 need to go deeper than three feet in any instance
    10 for demonstrating your compliance with these
    11 exposure pathways?
    12 MR. SHERRIL: The exclusions under
    13 subpart C required institutional control and
    14 possibly an engineered barrier. What we're
    15 looking under 742.225 does not address at that
    16 point institutional controls.
    17 We run into many instances, as Tom
    18 said, where subsurface soils 10, 15 feet below the
    19 surface end up being on the surface of the site,
    20 and unless we have an institutional control to
    21 control that, that would pose an unacceptable
    22 risk.
    23 MS. SHARKEY: What kind of institutional
    24 control would that be or engineered barrier? Are
    L.A. REPORTING
    (312) 419-9292
    271

    1 we talking, for example, paving, asphalt?
    2 MR. SHERRIL: It depends on the site.
    3 I've seen some that says that the soil are to
    4 remain in place as approved under the NFR
    5 determination. Sometimes it is paving. It
    6 depends on what's being proposed.
    7 MS. SHARKEY: We talked about, for
    8 example, that there may be geology and reasons
    9 that one can say we're comfortable that this
    10 contamination is not going to reach groundwater
    11 when we've got a spill situation, surface spill.
    12 We're comfortable it's not going to reach
    13 groundwater.
    14 Now we're saying that you can't use
    15 that same sort of information -- maybe I should
    16 ask this question. Could you use that same sort
    17 of information to demonstrate that this pathway is
    18 never going to be -- this risk exposure pathway is
    19 never going to be realistic and avoid this notion
    20 of having to put in a -- either test very down to
    21 an extraordinary depth or put in an engineered
    22 barrier? Do you understand?
    23 MR. SHERRIL: You sounded like you made
    24 a statement.
    L.A. REPORTING
    (312) 419-9292
    272

    1 MS. SHARKEY: No, it was a question.
    2 MR. SHERRIL: What's the question? You
    3 had about -- I didn't understand it.
    4 MS. SHARKEY: I was trying to make an
    5 analogy to our discussion earlier about the
    6 groundwater, and I'm asking why doesn't that
    7 reasoning apply here as well, that one may be able
    8 to in fact make a demonstration that these
    9 exposure pathways are just not realistic at a
    10 depth of 10 feet or 20 feet?
    11 MR. KING: I guess I keep coming back to
    12 I thought we did -- that's what subpart C is.
    13 It's laying out a set of procedures for how you're
    14 making that demonstration. I don't know what else
    15 we can say on the point, to tell you the truth.
    16 MR. WATSON: Are you saying that under
    17 Tier 3 then, you could also make that -- if you
    18 don't satisfy subpart C, that you could also make
    19 that showing under a Tier 3 analysis at 740.925?
    20 MR. KING: Right.
    21 MS. SHARKEY: Thank you. That's what I
    22 was asking.
    23 MR. WATSON: I've got one more follow-up
    24 question, and that is, why is not
    compositing and
    L.A. REPORTING
    (312) 419-9292
    273

    1 averaging appropriate for subpart C?
    2 MR. KING: Well, I think we just said
    3 you could. In the top foot you could use that.
    4 MR. WATSON: So in looking at excluding
    5 pathways --
    6 MS. MC FAWN: You're talking about
    7 subpart C of 325, right?
    8 MR. WATSON: I'm talking about subpart
    9 C, exposure route evaluations in general. This
    10 does not have a provision in here that talks about
    11 whether or not you can average and composite your
    12 samples, and in fact, the language, especially
    13 when you get into the RCRA test, is any soil which
    14 contains contaminants of concern shall not exhibit
    15 the specific characteristics.
    16 The question is can you use
    17 compositing and averaging to do the testing that
    18 is required to exclude a pathway under subpart C?
    19 MR. KING: You're kind of going across
    20 the board here, and you're not focusing this on a
    21 specific section so I don't know if you're talking
    22 about 305 or 310 or 315 or 320 or what.
    23 MR. WATSON: With respect to section
    24 305.
    L.A. REPORTING
    (312) 419-9292
    274

    1 MR. KING: Cannot average or composite
    2 relative to those.
    3 MR. WATSON: Why not?
    4 MR. KING: Because, I mean, the rules
    5 don't provide for it. Are you asking
    6 theoretically what's our philosophy behind that?
    7 MR. WATSON: Right, right.
    8 MR. KING: Why don't you answer that,
    9 John.
    10 MR. O'BRIEN: The reason why is that
    11 this is -- the contaminant source of free product
    12 determination in 305 is intended to screen out
    13 conditions which would violate the models upon
    14 which the Tier 1 and Tier 2 objectives are based,
    15 and those need to apply everywhere in order for
    16 the models to work everywhere.
    17 So it wouldn't be appropriate to
    18 average or composite. In addition pH is a
    19 logarithmic function, and it's not -- it would be
    20 inappropriate to average, to do an
    arithmatic
    21 average on pH.
    22 MR. WATSON: What about (c) and (e)?
    23 MR. SHERRIL: Also, this gets back to
    24 why -- this was asked a couple of times yesterday
    L.A. REPORTING
    (312) 419-9292
    275

    1 -- why we have this contaminant source and free
    2 product determination, and there again it's to
    3 ensure there's no migration of mobile free
    4 product, ensure there's no potential unacceptable
    5 health risks remain when there is a violation to
    6 either an engineered barrier, institutional
    7 control by unintentional or accidental exposure to
    8 the contamination left in place.
    9 In my testimony, I go on to say
    10 that T.A.C.O. does not address acute hazards and
    11 you could have potential acute hazards by
    12 violating some of these assumptions here, and we
    13 also want to provide sealing controls to limit the
    14 level of exposure from high contaminant
    15 concentrations from multiple
    organics. Those
    16 provide some of the reasoning for that.
    17 HEARING OFFICER FEINEN: More
    18 follow-up? Are we done with 305? Move to 400. I
    19 think the first question under 742.400, go to the
    20 Site
    Remediation Advisory Committee, Mr.
    Rieser.
    21 MR. RIESER: Thank you. This is
    22 question 1, what are the bases for appendix A,
    23 table F? I think it's still table F even after
    24 the new, revised table. Yes, continues to be
    L.A. REPORTING
    (312) 419-9292
    276

    1 appendix A, table F. Are these derived from
    2 Exhibit B of Dr.
    Hornshaw's testimony?
    3 MR. HORNSHAW: Yes.
    4 MR. RIESER: Are there other bases
    5 besides what you've attached as Exhibit B to your
    6 testimony, Dr.
    Hornshaw?
    7 MR. HORNSHAW: No.
    8 MR. RIESER: Are there other agency
    9 compilations of background levels for
    organics or
    10 PNAs in soil or for any substances in
    11 groundwater?
    12 MR. HORNSHAW: No, there are not.
    13 MR. RIESER: Is there any compilation
    14 that the agency is aware of or is willing to
    15 accept, say, regarding
    PNAs in the soil in the
    16 Chicago area representing disposal areas from the
    17 Chicago Fire?
    18 MR. HORNSHAW: There is a report. We
    19 have it back in my office, and I can't remember
    20 the name of it. We could look at that, I guess.
    21 MR. RIESER: You haven't ruled that out
    22 as a possible additional source for --
    23 MR. HORNSHAW: That's something we would
    24 have to talk about. It hasn't been part of our
    L.A. REPORTING
    (312) 419-9292
    277

    1 discussions up to this point.
    2 MR. RIESER: Thank you.
    3 HEARING OFFICER FEINEN: Any follow-up
    4 questions? Moving on to section 742.405,
    Mayer,
    5 Brown, Ms.
    Sharkey.
    6 MS. SHARKEY: My first question was how
    7 many samples are required for volatile
    organics?
    8 I think we've answered this in another context.
    9 Is the answer the same, that you looked to the
    10 program?
    11 MR. HORNSHAW: Basically you look to the
    12 distribution of the data set, and then you choose
    13 a statistically valid method which is most
    14 appropriate for that data set, propose it to the
    15 agency for review, and then we will accept or
    16 deny.
    17 MS. SHARKEY: Is that stated in here
    18 somewhere?
    19 MR. HORNSHAW: Yes, 405(b)(2),
    20 statistically valid approach for determining area
    21 background concentrations appropriate for the
    22 characteristics of the data set and approved by
    23 the agency. The same language applies for
    24 groundwater as well.
    L.A. REPORTING
    (312) 419-9292
    278

    1 MS. SHARKEY: Is that provision (b)(2)
    2 applicable only to volatile
    organics or is that
    3 applicable to volatile
    organics, other organics?
    4 MR. HORNSHAW: It's for all chemicals
    5 other than pH.
    6 MS. SHARKEY: In that provision, is
    7 there a standard? The term "appropriate" for the
    8 characteristics of the data set, how would one
    9 determine that?
    10 MR. HORNSHAW: A good statistics
    11 textbook.
    12 MS. SHARKEY: Are any such methods
    13 included in the documents that are incorporated by
    14 reference?
    15 MR. HORNSHAW: I've cited two in my
    16 testimony.
    17 MS. SHARKEY: But they're not included
    18 in the incorporation by reference?
    19 MR. HORNSHAW: No.
    20 MS. SHARKEY: Could you just tell us for
    21 the record which those two were from your previous
    22 testimony or your pre-submitted testimony.
    23 MR. HORNSHAW: The first one is
    24 Statistical Analysis of Groundwater Monitoring
    L.A. REPORTING
    (312) 419-9292
    279

    1 Data at RCRA Facilities, Interim Final Guidance,
    2 USEPA Office of Solid Waste, and the publication
    3 number is EPA/530-SW-89-026, April 1989. That's
    4 on page 5 of my testimony.
    5 And the second one is Statistical
    6 Training Course for Groundwater Monitoring Data
    7 Analysis, USEPA Office of Solid Waste and
    8 Emergency Response, publication
    9 No. EPA/530-R-93-003, 1992. I might add for the
    10 record that a book that we rely on fairly
    11 routinely in our office which is pretty much a
    12 standard statistical textbook is called
    13 Statistical Methods for Environmental Pollution
    14 Monitoring. The principal author is Richard O. --
    15 O as in middle name, not O as in Irish name -- O.
    16 Gilbert, G-I-L-B-E-R-T, published by
    VanNostrand
    17 Reinhold Company of New York published in 1987.
    18 MS. SHARKEY: Thank you. My second
    19 question is does historical contamination that is
    20 ubiquitous on a particular site qualify as area
    21 background? I think we talked about this the
    22 other day, and I don't know that we need to go
    23 over it again at this point unless you have
    24 anything to add in response to that.
    L.A. REPORTING
    (312) 419-9292
    280

    1 MR. HORNSHAW: No.
    2 MR. WATSON: Would you consider lead
    3 contamination found adjacent to highways to be
    4 area background?
    5 MR. HORNSHAW: For the most part, yes.
    6 It has to be considered in the context of the
    7 whole site that needs
    remediation. If the site
    8 that needs
    remediation is mainly in a residential
    9 neighborhood, that probably would not be the best
    10 background sample to take. Site specific, but
    11 generally, yes.
    12 MS. SHARKEY: The third one is maybe
    13 something of a nit, but does the agency object to
    14 modifying the term "releases" in subsection (a)(4)
    15 with the words "known or suspected" as in the
    16 subsection above?
    17 MR. KING: We had not put that --
    18 actually it's just a glitch here. The definition
    19 of area background doesn't use the term known or
    20 suspected in there so we really should have not
    21 had known or suspected in (a)(3).
    22 HEARING OFFICER FEINEN: Is that
    23 something maybe in the errata sheet, too, that
    24 should be taken care of or changes?
    L.A. REPORTING
    (312) 419-9292
    281

    1 MR. KING: Right.
    2 MS. SHARKEY: What would the meaning be
    3 then in areas of releases if we're not dealing
    4 with known or suspected releases?
    5 MR. KING: Well, I guess I'm not totally
    6 sure on that. As I was pointing out before, I
    7 think we just -- (4) was intended to be consistent
    8 with the language that was taken from the statute.
    9 MS. SHARKEY: I'm sorry, and where was
    10 that taken from the statute?
    11 MR. KING: Definition of area
    12 background, just used -- in that definition just
    13 uses the term releases and doesn't say known or
    14 suspected.
    15 MS. SHARKEY: And are you of the view
    16 that that language is required, that you parallel
    17 that language here?
    18 MR. KING: I don't know that it's
    19 mandated in this context, but we try to parallel
    20 the language whenever we can, and so that's what
    21 we did here.
    22 MS. SHARKEY: I guess what I'm wondering
    23 is if this isn't an instance where some
    24 amplification of the language wouldn't help
    L.A. REPORTING
    (312) 419-9292
    282

    1 everybody understand what it means, and I guess
    2 I'd like to ask my question again.
    3 If you take out known or suspected,
    4 if we don't mean known or suspected releases, what
    5 do we mean? How is one to know what areas one is
    6 to be sampling? Are you saying is that implied
    7 anyway, or is something else meant?
    8 MR. KING: It certainly would include
    9 known or suspected. Whether it includes other
    10 things, I guess that's kind of a statutory term.
    11 We're going to keep coming back to that.
    12 MS. SHARKEY: You're saying you can't
    13 tell me what else it means other than known or
    14 suspected, though?
    15 HEARING OFFICER FEINEN: Mr.
    Rieser, you
    16 have a follow-up?
    17 MR. RIESER: Yeah, if I can. The
    18 statute, when it talks about releases with respect
    19 to area background, it talks about it has to be
    20 something not primarily, not solely the release --
    21 not solely from releases at the site, but these
    22 sections 3 and 4, don't they refer to samples that
    23 you have to take in areas around the site to
    24 document what's background and what is and what is
    L.A. REPORTING
    (312) 419-9292
    283

    1 not, isn't that correct?
    2 MR. HORNSHAW: That is correct.
    3 MR. RIESER: Wouldn't you have to start
    4 out from an idea of what was known or suspected
    5 release in order to identify a background to show
    6 that it was not part of the known or suspected
    7 release?
    8 MR. HORNSHAW: Yes.
    9 MR. RIESER: So you really do need to
    10 talk about known or suspected releases in the
    11 context of the sampling because that's what you're
    12 looking for, that's what you're looking to
    13 distinguish, isn't that correct?
    14 MR. HORNSHAW: That's correct.
    15 MS. SHARKEY: Thank you. I think my
    16 question No. 4, there's a typo in it, but I also
    17 think we've already answered it. It was, are area
    18 background objectives only available for
    19 inorganics, or may such objectives also be
    20 established for
    organics. And I think what I
    21 meant there volatile
    inorganics, particularly
    22 using a statistically valid approach?
    23 MR. HORNSHAW: Volatile
    inorganics?
    24 MS. SHARKEY: Volatile
    organics. I
    L.A. REPORTING
    (312) 419-9292
    284

    1 think we've already answered that, haven't we?
    2 MR. HORNSHAW: Correct, we have.
    3 MS. SHARKEY: Thank you very much.
    4 MS. MC FAWN: I have a follow-up
    5 question. Based on Mr.
    Rieser's question to you,
    6 does that mean that the agency will or will not be
    7 changing the use of known or suspected releases in
    8 its 742.405?
    9 MR. KING: We committed to deal with
    10 this in the errata sheet. We have to go back and
    11 look at this a little further and address it at
    12 that point.
    13 MS. MC FAWN: Basically you're going to
    14 consider his question and comment, but you're not
    15 necessarily going to add this to an errata sheet?
    16 MR. KING: Right. We haven't made a
    17 decision on that at this point.
    18 HEARING OFFICER FEINEN: Any other
    19 follow-up questions on 405? Moving on to section
    20 742.410, Site
    Remediation Advisory Committee,
    21 Mr.
    Rieser.
    22 MR. RIESER: What will be the basis for
    23 approving alternate approaches for determining
    24 area background concentrations as allowed under
    L.A. REPORTING
    (312) 419-9292
    285

    1 subsection (b)(2)?
    2 MR. HORNSHAW: As I answered
    3 Ms.
    Sharkey's question, that's specific to the
    4 distribution and specific to the site.
    5 MR. RIESER: To do that, one would use
    6 the standard statistical text, some of which you
    7 referenced in your testimony?
    8 MR. HORNSHAW: Correct.
    9 MR. RIESER: And the presentation based
    10 on the site information and the standard
    11 statistical methodology?
    12 MR. HORNSHAW: That's correct.
    13 HEARING OFFICER FEINEN: It appears we
    14 might have to speak up a little louder now.
    15 There's applauding, it's hard to hear up here
    16 even. Yeah, I heard it.
    17 MR. RIESER: Thank you.
    18 HEARING OFFICER FEINEN: Any follow-up,
    19 Mr.
    Watson?
    20 MR. WATSON: I believe my question 5 has
    21 been addressed in an errata sheet already.
    22 HEARING OFFICER FEINEN: Does that also
    23 mean that the question 6 and 7 following aren't
    24 directed towards section 410?
    L.A. REPORTING
    (312) 419-9292
    286

    1 MR. WATSON: I'm sorry?
    2 MR. HORNSHAW: Don't the questions
    3 pertain to --
    4 MR. WATSON: Question 7 relates to the
    5 Tier 1 section.
    6 HEARING OFFICER FEINEN: I guess we're
    7 moving on to 415. Section 415, Site
    Remediation
    8 Advisory Committee, Mr.
    Rieser.
    9 MR. RIESER: What information is the
    10 agency requesting under subsections (a)(1) and (2)
    11 of 415?
    12 MR. HORNSHAW: In subsection (a)(1) what
    13 we're interested in is if a party alleges
    14 contamination from off site, the party should
    15 indicate where the contamination comes from, and
    16 in (2) again if there's an allegation that
    17 contamination is coming from off site, that should
    18 be substantiated by the physical chemical
    19 properties which would give an indication of why
    20 the chemicals migrated from the off-site source.
    21 MR. RIESER: So the answer to the first
    22 part of my question 2, which is, does the request
    23 for information under subsections (a)(1) and (2)
    24 assume that the substance proposed for evaluation
    L.A. REPORTING
    (312) 419-9292
    287

    1 occurs on site as a result of off-site
    2 contamination is yes?
    3 MR. HORNSHAW: Yes.
    4 MR. RIESER: Which makes the second part
    5 of my question, which is what if the material is
    6 naturally occurring?
    7 MR. HORNSHAW: That can be demonstrated
    8 with a proper sampling or the use of the agency
    9 background document for
    inorganics.
    10 MR. RIESER: Would the agency consider
    11 some language changes to (a) to add in some
    12 consideration for naturally occurring so that it
    13 allows for that -- these references for those
    14 circumstances when it is suspected that the
    15 material is from an off-site contamination source
    16 that you address 1 and 2, and if it's suspected
    17 that the site is -- that the material evaluating
    18 is a natural background, that you do what you've
    19 just suggested?
    20 MR. KING: Were you going to propose
    21 some language?
    22 MR. RIESER: I can. I can.
    23 MR. KING: That would be helpful for us.
    24 MR. RIESER: Okay, thank you. With
    L.A. REPORTING
    (312) 419-9292
    288

    1 respect to my question 3, it says, with respect to
    2 the reference on page 8 of Dr.
    Hornshaw's
    3 testimony to section 58.5(b)(2) of the act, would
    4 the establishment of remedial objectives based on
    5 area background require an institutional control
    6 if the value exceeds the Tier 1 residential
    7 value?
    8 MR. HORNSHAW: Yes.
    9 MR. RIESER: Would that still be true if
    10 it was demonstrated that the substance is
    11 naturally occurring?
    12 MR. HORNSHAW: Yes.
    13 MR. RIESER: Would that still be true if
    14 the property already has residential uses?
    15 MR. HORNSHAW: I think we're not clear
    16 on how that works. I think the language in the
    17 act itself is a little ambiguous. I'm not sure.
    18 MR. RIESER: And you have taken the
    19 language from that act and proposed to add it as
    20 part of your errata at 742.415(d)?
    21 MR. HORNSHAW: Yes.
    22 MR. RIESER: Doesn't the language of the
    23 act, which says that there has to be -- which
    24 prohibits the property may not be converted to
    L.A. REPORTING
    (312) 419-9292
    289

    1 residential use unless such
    remediation objective
    2 -- unless essentially a residential
    remediation
    3 objective is achieved, doesn't that imply that no
    4 such restriction would be necessary if it's
    5 already residential use property?
    6 MR. HORNSHAW: I think it could be read
    7 that way.
    8 MR. RIESER: Is that the agency's
    9 position?
    10 MR. KING: It is our position it could
    11 be read that way.
    12 (Laughter.)
    13 MR. RIESER: Is it the agency's position
    14 that that's how the board should interpret it if a
    15 case should come before it concerning this issue?
    16 MR. KING: It's just not real clear. I
    17 mean, that's why we've really struggled with it.
    18 It clearly says what's supposed to happen when
    19 there is a conversion. One can draw implications
    20 as to what happens if there's not a conversion,
    21 but it doesn't really say anything, and I guess
    22 we'd kind of like to reserve the opportunity to
    23 judge that on a case-by-case basis, you know,
    24 depending on what the context of the situation
    L.A. REPORTING
    (312) 419-9292
    290

    1 is. You may very well be right, but there may be
    2 other extenuating site circumstances that could
    3 compel a different result.
    4 MR. RIESER: So even if it was naturally
    5 occurring background levels above the Tier 1
    6 values, the property is already being used as
    7 residential property, there are circumstances in
    8 which the agency would say that there have to be
    9 restrictions on the use -- further restrictions on
    10 the use of that property?
    11 MR. KING: Again you have to really
    12 consider what the factual context might be
    13 relative to what's physically happening at the
    14 property. You might have a continuing residential
    15 use, but for instance, you might be going from an
    16 apartment type use to single family homes.
    17 The construction activities might
    18 end up bringing a lot of that naturally occurring
    19 contamination to the surface now in a way that
    20 there's more direct exposure and end up having a
    21 problem relative to that.
    22 MR. RIESER: Of course, in that instance
    23 it wouldn't be naturally occurring contamination,
    24 it would just be naturally occurring soil,
    L.A. REPORTING
    (312) 419-9292
    291

    1 correct?
    2 MR. HORNSHAW: Correct.
    3 MR. RIESER: Thank you.
    4 HEARING OFFICER FEINEN: Was that a
    5 "correct" answer to that, Mr.
    Rieser's last
    6 question?
    7 MR. HORNSHAW: Correct.
    8 MR. RIESER: Thank you. Follow-up?
    9 MS. SHARKEY: Yeah, I guess I'd like to
    10 follow up on Mr.
    Rieser's second question. I
    11 believe he was asking whether or not the section
    12 appears to assume that the background is a result
    13 of off-site contamination reaching the property
    14 and what if it was naturally occurring, and I
    15 think the answer was it may seem to assume that,
    16 and maybe some language will be put together to
    17 make it clear, that it's intended to be broader
    18 than that.
    19 I'd like to ask a slightly
    20 different question. What about contamination that
    21 has not reached the property from off site and is
    22 not naturally occurring but is of a nature that is
    23 widespread in an area and may be the result of
    24 very long ago operations on a broader area? This
    L.A. REPORTING
    (312) 419-9292
    292

    1 is similar to the situation I was describing
    2 yesterday with the old coal
    gasification sites,
    3 and I guess I'm trying to determine, you know, how
    4 that scenario would or would not fit in here on
    5 the same rationale that we're using.
    6 MS. ROBINSON: I think we discussed this
    7 at length yesterday, and I feel that it's been
    8 asked and answered. If the board would like us to
    9 continue on this line again, we can.
    10 MS. SHARKEY: We've talked about a
    11 rationale. I guess what we're getting at here is
    12 the rationale for area background being used is
    13 that it may have been generated on a neighboring
    14 site and let's say blown over or somehow been
    15 placed on this property. In that instance you
    16 could apparently identify it as background and not
    17 have to
    remediate it on the site. So that risk
    18 level would remain on that site.
    19 However, if you had a broader area
    20 that is now subdivided into a number of parcels
    21 and that contamination exists throughout that
    22 area, was not caused by the
    remediation applicant,
    23 the material could not be left on site. What is
    24 the difference in the risk that's remaining on
    L.A. REPORTING
    (312) 419-9292
    293

    1 site? I think that's how the agency addressed it
    2 yesterday, and I'm trying to figure out in this
    3 context what is the difference in the risk that
    4 remains on site?
    5 MS. MC FAWN: If I can just interject
    6 here. We did discuss this at length yesterday.
    7 I'm not sure that we ever --
    8 MS. SHARKEY: We didn't resolve it.
    9 MS. MC FAWN: I was going to say I don't
    10 know that we resolved it. It seems to me you are
    11 talking about liability and risk and questions of
    12 if you're not liable, should you really have to
    13 address the risk and possibly clean it up if there
    14 is a risk and that kind of thing, and I don't
    15 know. Unless the agency is prepared since
    16 yesterday to maybe give us a resolution on this
    17 issue, I think we should defer it until the
    18 January hearings.
    19 MR. KING: I don't believe we have
    20 anything additional to add on this issue from what
    21 we said yesterday.
    22 MS. MC FAWN: Your question is on the
    23 record. I think the agency has an understanding
    24 of where you're going with this, as do maybe the
    L.A. REPORTING
    (312) 419-9292
    294

    1 other participants on the board, and it probably
    2 needs some more thought, and certainly we would
    3 welcome your comments on it as well as your
    4 questions, on resolution of this quandary.
    5 MS. SHARKEY: I just wanted to be
    6 clear. I really have a question. I'm not just
    7 trying to make this point again, but I'm trying to
    8 see if there is some real thinking behind the
    9 difference in the risk because I think that's what
    10 Mr. King said yesterday is, you know, there's a
    11 residual risk, there's a remaining risk, and I
    12 thought that was the answer that we got, and I'm
    13 asking what is the difference in the risk in the
    14 scenarios that seem to be acceptable as area
    15 background from the one I'm describing?
    16 And maybe we can get some further
    17 comment on that from the agency at some point, but
    18 that's what I don't understand, and I'd like to be
    19 able to make that distinction.
    20 MR. KING: I don't think we have
    21 anything to add based on what we said yesterday.
    22 It's the same comments as yesterday.
    23 HEARING OFFICER FEINEN: Is there any
    24 other follow-up on 415? Let's start up with
    L.A. REPORTING
    (312) 419-9292
    295

    1 subpart E, Tier 1 evaluation, 742.500. I guess we
    2 want to take a break for five minutes. Be back
    3 here at 10:30.
    4 (Recess taken.)
    5 HEARING OFFICER FEINEN: I think we will
    6 get back on the record. I think we left off on
    7 the subpart E, Tier 1 evaluation, 742.500. Start
    8 out with the Site
    Remediation Advisory Committee,
    9 Mr.
    Rieser.
    10 MR. RIESER: On page 11 of Mr.
    Sherril's
    11 testimony, he states that, for those sites where
    12 the contaminants exceed Tier 1 values, one can
    13 either establish institutional controls or land
    14 use restrictions.
    15 Is it not more accurate to say that
    16 Tier 1 values can be used as screening conditions
    17 or tools and that if contaminants at a site exceed
    18 Tier 1, then one can either perform further
    19 evaluation regarding site conditions through Tier
    20 2 or Tier 3, achieve remedial objectives by the
    21 use of institutional controls and/or engineered
    22 barriers or
    remediate the contaminants?
    23 MR. SHERRIL: Generally, yes,
    24 residential Tier 1.
    L.A. REPORTING
    (312) 419-9292
    296

    1 MR. RIESER: Excuse me?
    2 MR. SHERRIL: Residential Tier 1 are
    3 remediation objectives, but Tier 1 can also be
    4 used as a screening value. Generally when
    5 contaminants are left behind that exceed the
    6 Tier 1 values, some type of institutional control
    7 or land use restriction or engineered barrier may
    8 be warranted, but generally yes to your question.
    9 MR. RIESER: Thank you. On page 11,
    10 Mr.
    Sherril discussed a determination as to
    11 whether there are sensitive ecological receptors
    12 at the site. How is this determination made?
    13 When will the agency require review of ecological
    14 risk factors?
    15 MR. HORNSHAW: We can think of four
    16 situations when ecological concerns might need to
    17 be addressed first or threatened or endangered
    18 species are known to be at a site. Second, if
    19 it's designated as conservation property by the
    20 state or local government or federal government.
    21 Third, if it's wetlands, that probably would have
    22 to be concerned about surface water impacts as
    23 well as groundwater and soil, and fourth is when
    24 the site owner operator actually designates the
    L.A. REPORTING
    (312) 419-9292
    297

    1 post remedial use to be conservation property.
    2 MR. RIESER: Okay. How would these
    3 issues become known to the agency? Would this be
    4 part of the investigation under the specific
    5 program?
    6 MR. HORNSHAW: I guess the best way I
    7 can answer that is when these are issues, they're
    8 readily apparent to everybody. There aren't very
    9 many sites where we would go in and say, well, is
    10 this really a concern here or not? They're
    11 usually obvious at the site.
    12 MR. RIESER: Would it be the agency's
    13 intent that if the ecological risk is not
    14 specifically addressed to always require it for
    15 every site?
    16 MR. HORNSHAW: That is not the intent.
    17 MR. RIESER: We can bring this up later
    18 under Tier 3. I'll reserve my question till
    19 then. Thank you.
    20 And my next question is on page 12,
    21 Mr.
    Sherril states that, Tier 1 residential values
    22 are based on a one-time 10 to the minus 6th target
    23 risk for carcinogens. Is this always true? Are
    24 not many of the
    MCL's based on a lesser -- my
    L.A. REPORTING
    (312) 419-9292
    298

    1 question says greater, but it should be lesser --
    2 target risk?
    3 MR. HORNSHAW: To answer the first
    4 question, no, this is not always true, and as you
    5 say, many -- or a few of the maximum contaminant
    6 levels are based on a different target risk
    7 usually based on detection limits for the chemical
    8 or on a risk benefit analysis done by USEPA.
    9 MR. RIESER: Thank you.
    10 HEARING OFFICER FEINEN: Any follow-up?
    11 Moving on to section 742.505, Site
    Remediation
    12 Advisory Committee, Mr.
    Rieser.
    13 MR. RIESER: 505, question No. 1, with
    14 respect to subsection (a)(3)(c), which has to do
    15 with migration of groundwater -- portion of
    16 groundwater ingestion route, what happens if the
    17 soil pH is greater than 8.0?
    18 MR. SHERRIL: For Tier 1, a soil pH
    19 range of 4.5 to 8 is provided, I believe, for 23
    20 chemicals as a method to determine the migration
    21 to groundwater soil
    remediation objectives. If
    22 the soil pH exceeds 8, you may propose a Tier 3
    23 evaluation.
    24 MR. RIESER: But that would only apply
    L.A. REPORTING
    (312) 419-9292
    299

    1 to certain types of contaminants, i.e. the
    2 ionizable organics or inorganics?
    3 MR. SHERRIL: That's true.
    4 MR. RIESER: Thank you. On page --
    5 isn't there a footnote in the table that
    6 references only -- with respect to the range that
    7 you provided, the 4.6 to 8.0, is there a footnote
    8 that limits that only to
    ionizable organics?
    9 MR. HORNSHAW: Yes. That's
    10 appropriately footnote (
    i).
    11 MR. SHERRIL: But it's only for
    12 ionizable organics.
    13 MR. RIESER: So that for
    organics, to
    14 take one, is this an issue at all if the soil pH
    15 varies from 8.0.
    16 MR. HORNSHAW: Could you repeat that?
    17 MR. RIESER: For an organic if the --
    18 MR. HORNSHAW:
    Nonionizable organic?
    19 MR. RIESER:
    Nonionizable organic, the
    20 soil pH varies from 8.0, can you still use the
    21 Tier 1 table?
    22 MR. HORNSHAW: Yes.
    23 MR. RIESER:
    Ionizable organic, if the
    24 soil varies from 8.0, you can use the additional
    L.A. REPORTING
    (312) 419-9292
    300

    1 table you've provided, is that correct?
    2 MR. HORNSHAW: Up to pH 8.0.
    3 MR. RIESER: And at that point you would
    4 have to go to Tier 3 to establish a, quote, "Tier
    5 1 remediation objective"?
    6 MR. HORNSHAW: Correct.
    7 MR. RIESER: And then for metals, how
    8 would that work?
    9 MR. HORNSHAW: Again if it's above pH
    10 8.0, you would have to probably search the
    11 literature and find out how the chemical behaves
    12 at the much higher or much lower pH than what
    13 we've got in the table.
    14 MS. ROBINSON: Can we clarify for the
    15 record which table we're referring to.
    16 MR. SHERRIL: The footnote (
    i) is in
    17 appendix B, table A and table B.
    18 MR. RIESER: If the material that you
    19 were dealing with was not soil but some other
    20 substrate, would the same issues regarding pH
    21 apply?
    22 MR. HORNSHAW: Do you want to clarify?
    23 Are you talking about fill?
    24 MR. RIESER: For example, if the
    L.A. REPORTING
    (312) 419-9292
    301

    1 substrate was fill, slag, something like that.
    2 MR. HORNSHAW: I think the tables are
    3 for native soils. They were constructed from
    4 experiments done in native soils.
    5 MR. RIESER: So if you had a non-native
    6 soil, how would you deal with this issue?
    7 MR. HORNSHAW: My guess is it would
    8 probably have to be resolved as a Tier 3 issue.
    9 MR. RIESER: Going to my question 2, on
    10 page 18 of Mr.
    Sherril's testimony, where are the
    11 test methodologies for
    inorganics described?
    12 MR. HORNSHAW: Incorporated by reference
    13 SW-846, the
    USEPA's documents.
    14 MR. RIESER: Is this how tables A and B
    15 of appendix B are derived?
    16 MR. HORNSHAW: I'm not sure what you
    17 mean by derived. Are you talking about detection
    18 limits?
    19 MR. RIESER: Well, I think if you go to
    20 my next question, it's a little clearer, which is
    21 No. 3, are the inorganic values in appendix B,
    22 tables A and B, for migration to groundwater
    23 portion of the groundwater ingestion pathway for
    24 Tier 1 derived from the Toxicity Characteristic
    L.A. REPORTING
    (312) 419-9292
    302

    1 Leaching Procedure (TCLP) test or the pH test?
    2 MR. HORNSHAW: TCLP.
    3 MR. SHERRIL: I'd like to add to that.
    4 The actual numeric values in those two tables we
    5 referenced before are TCLP. However, when you get
    6 into the Tier 1, under the rule itself, that it
    7 does provide a different method which is the pH
    8 totals method.
    9 MR. HORNSHAW: And the numbers
    10 themselves are derived from the state's
    11 groundwater standards for the
    inorganics?
    12 MR. RIESER: The numbers themselves for
    13 each pathway?
    14 MR. HORNSHAW: For the migration to
    15 groundwater pathway for
    inorganics.
    16 MR. RIESER: They are derived from
    17 the --
    18 MR. HORNSHAW: The numbers that need to
    19 be achieved in the TCLP test are the state's
    20 groundwater standards for those
    inorganics.
    21 MR. RIESER: You've provided -- and I'm
    22 not sure if this is the point to get into it --
    23 but you've provided an additional appendix that
    24 you discussed in the errata that talked about how
    L.A. REPORTING
    (312) 419-9292
    303

    1 certain of the migration to groundwater pathway
    2 values for soils were derived using other values
    3 other than the state 620, part 620 standards.
    4 MR. HORNSHAW: That's correct. For
    5 organics some of the values that were used to
    6 create the Tier 1 values for the migration to
    7 groundwater pathway used
    USEPA's what they called
    8 a health-based level which is either the one in a
    9 million cancer risk for carcinogens or a hazard
    10 quotient equal to one for
    noncarcinogens which may
    11 or may not be -- probably are not -- the same as
    12 the state's values for some of those chemicals,
    13 the state's groundwater standards which I
    14 discussed in my testimony.
    15 And we added that appendix table
    16 because those values are not readily apparent in
    17 the rule at this point, and if somebody were to
    18 try and recreate the Tier 1 tables, they wouldn't
    19 have all the information they would need in the
    20 rules. So we added that table listing the values
    21 that were actually used as the groundwater term to
    22 calculate the Tier 1 numbers.
    23 MR. RIESER: I think I've got some other
    24 questions on those under some of the later
    L.A. REPORTING
    (312) 419-9292
    304

    1 sections so we'll get to those.
    2 Looking at subsection (b), my first
    3 question, how would a person classify groundwater
    4 if no groundwater is found at the site?
    5 MR. SHERRIL: You may need to -- I'm
    6 going to have a little statement here and then ask
    7 you to clarify it, also, because it's the agency
    8 experience that groundwater is at every site in
    9 Illinois. Whether it's contaminated or not is a
    10 different issue, and whether you need to classify
    11 groundwater, T.A.C.O. is a rule to develop
    12 remediation objectives for soil and groundwater,
    13 and we've kind of had this previous discussion on
    14 whether it needs to be sampled and so forth.
    15 MR. RIESER: Well, under a for example,
    16 under focus site investigation when you have
    17 situations as we've discussed where the scope of
    18 your investigation allowed you to conclude that
    19 you did not have impacted groundwater, wouldn't
    20 that occur?
    21 MR. SHERRIL: Correct.
    22 MR. RIESER: So in those instances --
    23 I'm sorry, looking at B, in order to meet -- to do
    24 your Tier 1 documentation, even though you had
    L.A. REPORTING
    (312) 419-9292
    305

    1 documented that you didn't have to -- that you had
    2 not impacted groundwater, would you still have to
    3 find the nearest -- the aquifer that was closer to
    4 the surface and do the work that would be
    5 necessary to classify it according to the agency's
    6 -- well, the appendix that they proposed for
    7 classifying groundwater under part 620 in every
    8 instance?
    9 MR. SHERRIL: Are you asking then in
    10 lieu of appendix D, how would you classify
    11 groundwater as Class 1 or Class 2?
    12 MR. RIESER: No. I'm asking in lieu of
    13 actually sampling the groundwater when those sites
    14 did not have to be sampled, how would you meet
    15 this requirement under appendix B?
    16 MR. SHERRIL: The agency assumes Class 1
    17 groundwater unless other information is provided
    18 demonstrating otherwise.
    19 MR. RIESER: Is that assumption included
    20 in any regulation including the appendix that's
    21 been proposed here or part 620?
    22 MR. KING: We did have that. As you
    23 recall, we had that in a prior draft, and you guys
    24 asked that it be taken out so we took it out.
    L.A. REPORTING
    (312) 419-9292
    306

    1 MR. RIESER: That's correct. So what's
    2 the answer to my question?
    3 MR. KING: It's not here.
    4 MR. RIESER: And it's not in 620
    5 either. So by saying that, that you assume, does
    6 that mean for a person using (d)(1) would have to
    7 say -- under the agency's formulation, they would
    8 have to say, well, it's a Class 1. We're going to
    9 use these Class 1 values, what has been assigned
    10 in Class 1 values tables unless we can document
    11 it's a Class 2 groundwater even though there's no
    12 groundwater present in the site in the context of
    13 the site investigation?
    14 MR. KING: If you're going to use Tier
    15 1, what we've laid out, are you talking about (b)
    16 or (a) here?
    17 MR. RIESER: (B)?
    18 MR. KING: 500(b).
    19 MS. ROBINSON: 505(b).
    20 MR. SHERRIL: 505(b).
    21 MR. KING: You have to look at that
    22 provision in the context -- I think in the context
    23 of the other sections and the way the appendices
    24 are set up. If you don't know what class of
    L.A. REPORTING
    (312) 419-9292
    307

    1 groundwater you have, then it's meaningless to
    2 look in Tier 1 for a groundwater
    remediation
    3 objective because you have to know that. You have
    4 to make that distinction.
    5 If you're in a situation where
    6 you're positing that groundwater is not an issue
    7 because it's not -- there's really no mechanism
    8 for a migration of contaminants to groundwater,
    9 then I guess I would see that as not being a Tier
    10 1 issue. If you're going to use the Tier 1
    11 tables, you've got to know what the groundwater
    12 classification is. If you are excluding the
    13 groundwater pathway for some reason under subpart
    14 C or under Tier 3, then this wouldn't be an issue.
    15 MS. ROBINSON: May I ask a follow-up
    16 here? What would be the significance of the
    17 agency assuming Class 1 rather than something
    18 else?
    19 Why would the agency assume a
    20 Class 1 rather than a Class 2 groundwater if it's
    21 unknown what the groundwater class type is at that
    22 site?
    23 MR. KING: We want to make sure that
    24 we're taking an approach that's protective of
    L.A. REPORTING
    (312) 419-9292
    308

    1 human health, and with no other information
    2 relative to a site, we want to take an approach
    3 that was most environmentally protective.
    4 MS. ROBINSON: Thank you.
    5 MS. MC FAWN: All right, I have to ask
    6 the follow-up question now. How come you were
    7 requested to take it out?
    8 MR. KING: Why were we requested to take
    9 it out?
    10 MS. MC FAWN: What was the rationale
    11 given to the agency that motivated it to take it
    12 out of the rule?
    13 MR. KING: Well, I think their
    14 motivation -- and I guess I'm speaking for them,
    15 which may be not the best thing to do, but I will
    16 anyways.
    17 MS. MC FAWN: Mr.
    Rieser is here. He
    18 can tell me.
    19 MR. KING: They were concerned about
    20 that presumption being written into the rules at
    21 this point when it hasn't appeared in the rules
    22 anyplace else. I mean, that's the presumption
    23 we've always operated under from an administrative
    24 standpoint and will continue to be the procedure
    L.A. REPORTING
    (312) 419-9292
    309

    1 we follow unless, for instance, there was
    2 directive that said you presume it's Class 2.
    3 MS. MC FAWN: Do you think that this
    4 type of presumption should be written into the
    5 rules maybe perhaps not in T.A.C.O. but
    6 elsewhere?
    7 MR. KING: I don't know that it's
    8 something that has to be anyplace. I mean, we've
    9 been functioning with it, and it's been pretty
    10 well accepted with the people we've been dealing
    11 with.
    12 I think if you were going to put
    13 that kind of presumption, I think you would put it
    14 here as opposed to I don't think you'd want to go
    15 back into 620 and put that kind of presumption in,
    16 and I think this would be the place to do it if
    17 you were going to do it.
    18 HEARING OFFICER FEINEN: I guess you
    19 have one more question, Mr.
    Rieser, under 505.
    20 MR. RIESER: No, that question I asked,
    21 I think.
    22 HEARING OFFICER FEINEN: I believe
    23 Mayer, Brown & Platt, Ms.
    Sharkey.
    24 MR. RIESER: I'm sorry?
    L.A. REPORTING
    (312) 419-9292
    310

    1 HEARING OFFICER FEINEN:
    Mayer, Brown &
    2 Platt, I think.
    3 MR. RIESER: Do they have --
    4 MS. MC FAWN: Did you conclude your
    5 questions concerning subsection (b)?
    6 MR. RIESER: No I have not.
    7 On page 17 of Mr.
    Sherril's
    8 testimony, he seems to indicate that the Tier 2
    9 model assumptions are threatened based on the
    10 presence of what he calls more permeable units.
    11 Is this accurate? Does this mean
    12 that a person will not be allowed to use Tier 2 if
    13 there are permeable units on the site?
    14 MR. SHERRIL: What I was trying to get
    15 at in my testimony there is the values derived
    16 from the Tier 2 models can be inaccurate if the
    17 assumptions by which the models are based are
    18 violated, and I gave an example of a -- let's say
    19 if groundwater was contaminated within a narrow
    20 sand seam, one of our groundwater model equations
    21 assumes that the contamination is pluming out from
    22 a source area, and groundwater in a narrow sand
    23 seam, let's say, for example, it had a confining
    24 unit above and below it, would not be dispersing
    L.A. REPORTING
    (312) 419-9292
    311

    1 out, diluting out as the model would be
    2 predicting.
    3 MR. RIESER: I would like to get back to
    4 this, but we should probably do it in the context
    5 of Tier 2. This question was probably misplaced
    6 so I defer at this point.
    7 HEARING OFFICER FEINEN: I think there's
    8 some questions from
    Mayer, Brown & Platt from
    9 Ms.
    Sharkey from Mayer, Brown & Platt.
    10 MS. SHARKEY: Thank you. I think I
    11 understand this better now than when I wrote my
    12 initial question. I'm going to ask it anyway just
    13 to make sure I understand it.
    14 Please explain in laymen's terms
    15 the two components of the groundwater ingestion
    16 route, i.e. migration to groundwater and direct
    17 ingestion, what each is designed to protect and
    18 how each is to be used.
    19 MR. KING: The challenge here, I think,
    20 is to try to put it in laymen's terms because it
    21 is, as with all of these things, fairly complex.
    22 There really is a need to look at -- first of all,
    23 to recognize that it is -- that groundwater
    24 ingestion route, that's what we're concerned
    L.A. REPORTING
    (312) 419-9292
    312

    1 about. Is there actual or potential human health
    2 impact through consumption of contaminated
    3 groundwater?
    4 Then the question is, well, how is
    5 that pathway effectuated, and we really saw that
    6 as having two elements to how a pathway would be
    7 completed. The first element is the movement of
    8 contamination from soil basically downward into
    9 groundwater through various mechanisms that impact
    10 how contamination moves in soil, and then once it
    11 reached the groundwater, the second component
    12 would be relative to how does contamination move
    13 once it is in groundwater, and that would be the
    14 second component.
    15 The combination of the two is
    16 really designed to protect that potential or
    17 actual end user of groundwater that is being
    18 consumed for drinking water purposes.
    19 MS. SHARKEY: Is the migration to
    20 groundwater is actually a soil standard? Am I
    21 correct on that? The way it's laid out here, it's
    22 under (a)(3), 505(a)(3), and then it appears in
    23 the table, appendix B, table B as a soil
    24 remediation objective.
    L.A. REPORTING
    (312) 419-9292
    313

    1 MR. SHERRIL: That's correct.
    2 MS. SHARKEY: Is the idea that what
    3 we're attempting to do is ensure -- is protect the
    4 groundwater from becoming contaminated with this
    5 breaking down this into two parts, both ingestion
    6 of the groundwater and then migration to
    7 groundwater, the latter being protecting the
    8 groundwater so that it does not become
    9 contaminated. Have I got that right?
    10 MR. KING: I think that's basically
    11 accurate. We're not trying to protect the
    12 ground. We're focused on whether the
    13 contamination is going to move from the ground to
    14 the groundwater.
    15 MS. SHARKEY: So it's really one
    16 exposure route, and that's consumption of the
    17 groundwater?
    18 MR. KING: That's correct.
    19 MS. SHARKEY: And the soil component is
    20 designed to ensure protection of that exposure
    21 route?
    22 MR. KING: You have to remember it's
    23 important to focus on both aspects because you
    24 could have a situation where the groundwater is
    L.A. REPORTING
    (312) 419-9292
    314

    1 already contaminated, and now there's a risk of
    2 additional contamination moving from the soil to
    3 the groundwater, or you could be in a situation
    4 where there is no contamination of the
    5 groundwater, and yet, there's a potential for
    6 contamination to move from soil to the
    7 groundwater. So you really have to think about
    8 both aspects of that pathway.
    9 MR. HORNSHAW: I guess the easiest way
    10 to put it in laymen's terms is that one portion of
    11 this pathway is to protect current users and the
    12 other portion is to protect future users of the
    13 groundwater.
    14 MS. SHARKEY: Just to make sure I've got
    15 it clear, it's possible to have the ingestion --
    16 direct ingestion pathway exceeding, for example, a
    17 Tier 1 standard and the migration to groundwater
    18 not exceeding that standard? Am I --
    19 MR. SHERRIL: That scenario could
    20 happen. That's possible.
    21 MR. HORNSHAW: That could happen, yeah.
    22 MS. SHARKEY: In other words, if, for
    23 example, there was a plume from off site moving in
    24 the groundwater, not moving down through the soil
    L.A. REPORTING
    (312) 419-9292
    315

    1 but moving laterally into another site.
    2 MR. SHERRIL: It's common for less sites
    3 to have their release in the groundwater.
    4 MS. SHARKEY: In that instance you would
    5 still look to your Tier 1 table and the migration
    6 to groundwater pathway? You would still, in doing
    7 your evaluation, look to that table, look to that
    8 column on migration to groundwater. You would
    9 need to do the evaluation, but you're not going to
    10 -- in that instance, you probably wouldn't
    11 exceed, in other words, because while you might
    12 exceed on the direct ingestion on the groundwater
    13 objective itself. The direct ingestion, then you
    14 look in the groundwater objective?
    15 MR. HORNSHAW: That's correct.
    16 MS. SHARKEY: I think I understand it
    17 better unless you want to clarify it some more.
    18 I think my second question has
    19 already been answered. Maybe I'll ask it. Maybe
    20 it's slightly different. If no one is ingesting
    21 groundwater in the area of the site, is
    22 groundwater sampling necessary for a Tier 1
    23 analysis?
    24 MR. KING: I don't know if this is
    L.A. REPORTING
    (312) 419-9292
    316

    1 really a direct answer to the question, but it's
    2 important to recognize that you cannot just ignore
    3 groundwater because there is no actual consumption
    4 because there may be a potential for future
    5 consumption.
    6 MR. SHERRIL: We also have program
    7 specific -- getting back again to LUST, where they
    8 have program specific guidelines or requirements.
    9 MS. SHARKEY: Is an institutional
    10 control, that is, a local ordinance necessary to
    11 ensure no one is drinking the groundwater in
    12 localities where a public water supply is
    13 universally available?
    14 And the second level question is,
    15 has the agency considered whether there are other
    16 satisfactory methods of demonstrating groundwater
    17 is not and will not be used for drinking water in
    18 the vicinity of a Tier 1 site?
    19 MR. KING: We have specified that, you
    20 know, unless you clean it up to the Tier 1
    21 objectives, that you would need to have some kind
    22 of institutional control in place. That
    23 institutional control could be a local ordinance
    24 that meets the criteria under subpart J, or it
    L.A. REPORTING
    (312) 419-9292
    317

    1 could be one of the other institutional controls
    2 that are listed in subpart J.
    3 MS. SHARKEY: So a local ordinance is
    4 not the only way to be able to demonstrate that no
    5 one is drinking the groundwater?
    6 MR. KING: Just be careful there because
    7 the purpose of the local ordinance is to restrict
    8 future use of the groundwater, and so with an
    9 institutional control, you're looking at -- you're
    10 really looking at focusing on that future use, and
    11 it may encompass a present use as well.
    12 MS. SHARKEY: Maybe we can talk about
    13 this under subpart J. What you're saying is that
    14 it is one avenue. There are other avenues the
    15 agency might consider?
    16 MR. KING: Right, I think that's
    17 correct, and I think it would be better to discuss
    18 that under subpart J.
    19 MS. SHARKEY: Okay.
    20 MR. FEINEN: Any follow-up questions?
    21 Moving on to section 742.510, Tier 1 tables, Site
    22 Remediation Advisory Committee.
    23 MR. RIESER: Actually looking at
    24 Mr.
    Watson's questions, they are kind of more
    L.A. REPORTING
    (312) 419-9292
    318

    1 generic, and it might be a good place to start.
    2 MR. WATSON: Question 6?
    3 MR. RIESER: Yeah, 6 and 7.
    4 MR. WATSON: Question 6 is why did the
    5 agency choose the USEPA soil screening guidance as
    6 a basis for its Tier 1 objectives?
    7 MR. HORNSHAW: USEPA soil screening
    8 levels are a procedure which can be used to
    9 develop site specific cleanup objectives. The
    10 SSL's were developed from a nationwide database,
    11 nationwide scientific personnel input and
    12 nationwide peer review. Literature was provided
    13 that discusses the key elements required to
    14 development risk-based cleanup objectives.
    15 It describes how background values
    16 may be used and directs the reader step-by-step
    17 through the risk-based approach. In the interest
    18 of public safety and well-being, the economy of
    19 public and private resources and this risk-based
    20 approach allows
    remediation efforts to be focused
    21 on those situations which pose a threat to human
    22 health and the environment. Please keep in mind
    23 in T.A.C.O., both the American Society for Testing
    24 and Materials, ASTM, standard ES38-94, emergency
    L.A. REPORTING
    (312) 419-9292
    319

    1 standard guide for risk-based corrective action
    2 applied at petroleum release sites, and
    USEPA's
    3 guidance for soil screening levels were used as
    4 models. Structure part 742 is similar to that of
    5 both ASTM and USEPA. The specific processes
    6 presented here are unique to Illinois.
    7 MR. WATSON: With respect to Tier 1, are
    8 you saying that the Tier 1 objectives also
    9 incorporate some level of the ASTM standard as
    10 well?
    11 MR. HORNSHAW: We selected
    USEPA's soil
    12 screening guidance as the primary model for the
    13 Tier 1 tables.
    14 MR. WATSON: Was there an evaluation
    15 done of which model would be more appropriate for
    16 the Tier 1?
    17 MR. HORNSHAW: Yes.
    18 MR. WATSON: Was there ever any thought
    19 about developing Tier 1 tables using both models?
    20 MR. HORNSHAW: No.
    21 MR. WATSON: Why not, given that you
    22 allowed that flexibility in Tier 2?
    23 MR. HORNSHAW: It's available in Tier
    24 2. Dueling Tier 1 tables probably would have been
    L.A. REPORTING
    (312) 419-9292
    320

    1 more confusing than helpful, and also,
    ASTM's
    2 procedure is designed to -- is designed for
    3 petroleum products primarily, whereas
    USEPA's soil
    4 screening guidance covers a much wider range of
    5 contaminant types.
    6 MR. WATSON: So the concept of broader
    7 applicability is the primary basis for choosing
    8 the soil screening guidance over ASTM?
    9 MR. HORNSHAW: Primarily.
    10 MR. WATSON: I'll proceed with my
    11 question 7, if that's okay. The Tier 1 objectives
    12 under subpart E of proposed part 742 and
    13 associated appendices and tables specify Tier 1
    14 objectives for chloride and lead. Question (a),
    15 what is the agency's basis for the Tier 1 level
    16 for chloride set forth in appendix B, Table A?
    17 MR. HORNSHAW: That's the state
    18 groundwater standard for chloride. It was
    19 developed from the 95th percentile occurrence in
    20 all public water supply monitoring data reported
    21 to the agency, and I guess that answers your
    22 question B.
    23 MR. WATSON: Question B, is the agency's
    24 Tier 1 level for chloride based on a toxicity
    L.A. REPORTING
    (312) 419-9292
    321

    1 analysis?
    2 MR. HORNSHAW: No. It's a percent
    3 occurrence.
    4 MR. WATSON: Are there other parameters
    5 in the Tier 1 tables that are also not based on a
    6 toxicity analysis?
    7 MR. SHERRIL: You mean other chemicals,
    8 not contaminants?
    9 MR. WATSON: Right.
    10 MR. HORNSHAW: Sulfate would be the
    11 other one.
    12 MR. WATSON: Those two are the only ones
    13 that are not based on the toxicity analysis?
    14 MR. HORNSHAW: Yes, that's correct.
    15 MR. WATSON: Question C, does the Tier 1
    16 lead level set forth in appendix B, table A, apply
    17 to sites where the naturally occurring background
    18 concentrations of lead in soils are greater than
    19 the Tier 1 lead limit?
    20 MR. O'BRIEN: Well, the agency isn't
    21 aware of any naturally occurring background
    22 concentrations greater than the Tier 1 lead
    23 limit. Our soil background study of 267 lead
    24 samples from background areas around the state
    L.A. REPORTING
    (312) 419-9292
    322

    1 showed only one result greater than the 400
    2 milligram per kilogram level which is the Tier 1
    3 lead level, and that sample was taken between an
    4 expressway and a landfill during an investigation
    5 of a lead-based paint removal complaint, and we
    6 don't believe it represents natural background.
    7 Samples from areas in the state
    8 which we would expect to exhibit high natural
    9 backgrounds such as
    JoDaviess County showed levels
    10 only as high as 211 milligrams per kilograms. In
    11 the mean of all samples for lead statewide was
    12 49.2 milligrams per kilogram.
    13 MR. WATSON: Is it the agency's
    14 experience that sites next to highways would not
    15 have area background concentrations routinely
    16 above the 400 part per million limit?
    17 MR. O'BRIEN: Within a few feet of
    18 highways, up to 10 feet, you may find some. I
    19 don't know that we've done an exhaustive study of
    20 that, and of course, that would not be naturally
    21 occurring, as your pre-submitted questions state.
    22 MR. WATSON: But it would be considered
    23 area background nonetheless?
    24 MR. O'BRIEN: Right.
    L.A. REPORTING
    (312) 419-9292
    323

    1 MS. MC FAWN: Is your question maybe
    2 what would happen if you asked your question and
    3 it said would the level apply to sites where the
    4 natural -- where the area background concentration
    5 of lead was greater? Is that really your question
    6 as opposed to naturally occurring?
    7 MR. WATSON: Yes. I mean, yeah, that
    8 would be a follow-up question, sure.
    9 MR. SHERRIL: Greater than what, greater
    10 than the 400 milligrams per kilogram?
    11 MR. WATSON: Correct.
    12 MS. MC FAWN: Yes.
    13 MR. SHERRIL: I think what Jim
    O'Brien
    14 said is we haven't seen any sites where the
    15 naturally occurring background is above 400.
    16 MR. HORNSHAW: But in cases where
    17 somebody has done the correct statistical approach
    18 to determine what area background is, that could
    19 be used as the Tier 1 -- or substituted for the
    20 Tier 1 value, if that's what your question is.
    21 MS. MC FAWN: Thank you.
    22 MR. WATSON: That would be subject to
    23 institutional controls at that point?
    24 MR. HORNSHAW: Yes.
    L.A. REPORTING
    (312) 419-9292
    324

    1 MR. WATSON: Question (d), does the
    2 agency believe that the Tier 1 lead levels were
    3 reliable or appropriate given the fact that in
    4 many sites in Illinois, naturally occurring or
    5 area background levels of lead in the soil may be
    6 greater than the Tier 1 TCLP lead level?
    7 MR. O'BRIEN: Well, we're not of the
    8 opinion that the naturally occurring sites are
    9 above the 400 milligrams per kilogram of lead.
    10 MR. SHERRIL: On that question (d) it
    11 says, the fact that at many sites in Illinois
    12 naturally occurring levels of lead in the soil may
    13 be greater than the Tier 1 TCLP lead levels.
    14 We have not provided a TCLP
    15 background level, and so it would be possible
    16 through the background determination to determine
    17 what a background TCLP is, but we have not done
    18 that.
    19 MR. WATSON: I guess the question is --
    20 the concern is that you've got lead levels in the
    21 state that are within the background range set
    22 forth in the tables that would fail the .0075 Tier
    23 1 limit for lead.
    24 MR. SHERRIL: Is that a statement?
    L.A. REPORTING
    (312) 419-9292
    325

    1 MR. WATSON: Yes, that is a statement.
    2 MR. KING: All three of these questions,
    3 (c), (d) and (e) as part of section 7 of the
    4 questions, really presuppose a factual situation
    5 that we don't believe the record demonstrates is
    6 true. So really from our standpoint, it's kind of
    7 fruitless to proceed along answering -- trying to
    8 answer a question when kind of the whole basis of
    9 the question is just not correct.
    10 I mean, if these questions need to
    11 be reformulated, then I think they should be
    12 reformulated and resubmitted rather than us kind
    13 of proceeding along with a faulty basis in mind
    14 here.
    15 MR. WATSON: I think the record is clear
    16 with respect to your position or your view on the
    17 presence of background lead contamination at sites
    18 in Illinois. So that's all I have with respect to
    19 question 7.
    20 HEARING OFFICER FEINEN: Mr.
    Rieser, do
    21 you have some questions you want to ask starting
    22 with 742.510? I do notice a question 13 from
    23 Mr.
    Watson seems to be also on 5. I don't know if
    24 you want to split it up that way or however you
    L.A. REPORTING
    (312) 419-9292
    326

    1 want to do it, it doesn't matter to me.
    2 MR. RIESER: Actually I had some of the
    3 same questions he's got in 13, either way.
    4 MR. WATSON: I'll let you go ahead.
    5 MR. RIESER: This is under 742.510,
    6 subsection (a)(3), is it accurate that the values
    7 for
    inorganics in appendix B, tables A and B, are
    8 the TCLP test and that the values in tables C and
    9 C are from the pH test?
    10 MR. SHERRIL: Yes.
    11 MR. O'BRIEN: I'd like to clarify that a
    12 little bit. By the pH test, what we mean is the
    13 test for total metals for the total, and then the
    14 objective would depend, also, on a test of pH of
    15 the soil to determine what the correct objective
    16 is. The pH test itself does not test for the
    17 chemicals in the table.
    18 MR. RIESER: Are these alternate
    19 options?
    20 MR. SHERRIL: Yes, these are alternate
    21 options and either may be used.
    22 MR. RIESER: And then the footnote (
    i)
    23 in appendix B, Table A -- which we talked about --
    24 says that for
    ionizable organics, one must use
    L.A. REPORTING
    (312) 419-9292
    327

    1 table C and D if the soil pH does not equal 6.8?
    2 MR. SHERRIL: Yes.
    3 MR. RIESER: So for
    ionizable organics,
    4 these are options, but it's mandatory that under
    5 those circumstances, you must use tables C and D?
    6 MR. SHERRIL: Or Tier 3.
    7 MR. RIESER: Were there metals that did
    8 not have -- back it up again.
    9 Were there metals that did not have
    10 MCL values that were used in formulating the -- I
    11 should say
    inorganics. Were there
    inorganics that
    12 didn't have MCL values used in formulating these
    13 tables?
    14 MR. HORNSHAW: That's correct. Chloride
    15 and sulfate are two examples already noted, and I
    16 believe vanadium is a third.
    17 MR. RIESER: In arriving at the values,
    18 did you use 620, subpart F standards?
    19 MR. HORNSHAW: The groundwater values?
    20 MR. RIESER: Yes, the procedure -- I
    21 should say the procedures under subpart F for
    22 arriving at
    remediation for groundwater values and
    23 then translate those into
    remediation objectives.
    24 MR. HORNSHAW: Yes, with the exception
    L.A. REPORTING
    (312) 419-9292
    328

    1 of vanadium. We used
    USEPA's health-based level
    2 for vanadium.
    3 MR. RIESER: What was the basis for
    4 using 620, subpart F for those metals instead of
    5 the SSL values?
    6 MR. HORNSHAW: Subpart F, we used 410
    7 and 420 from part 620, not subpart F.
    8 MR. RIESER: I thought earlier you said
    9 that subpart F was used for deriving some values,
    10 groundwater objectives for some of the
    inorganics.
    11 MR. HORNSHAW: If I said that, I was
    12 mistaken. All those values with the exception of
    13 vanadium came from 410 and 420 --
    14 MR. RIESER: Thank you.
    15 MR. HORNSHAW: -- of part 620.
    16 MR. RIESER: We've answered one. With
    17 respect to (a)(6), are there any values in
    18 appendix B, tables A and B, expressed which are
    19 lower than the acceptable detection limit or ADL?
    20 MR. HORNSHAW: Yes, and these have the
    21 ADL listed in that table or those tables.
    22 MR. RIESER: Those tables. Will the
    23 agency confirm that the ADL for those substances
    24 is always as listed in the appendices and cannot
    L.A. REPORTING
    (312) 419-9292
    329

    1 be changed without board action?
    2 MR. HORNSHAW: Yes.
    3 MR. RIESER: On page 19 of Mr.
    Sherril's
    4 testimony, he indicates that the value for
    5 pentachlorophenol was adjusted by a factor of .5
    6 for dermal exposure. Was this multiplied by .5 as
    7 an adjustment?
    8 MR. HORNSHAW: Yes.
    9 MR. RIESER: What was the basis for this
    10 adjustment?
    11 MR. HORNSHAW: This was to account for
    12 the fact that
    pentachlorophenol has been shown to
    13 be significantly absorbed across the skin so that
    14 the value was adjusted downward to account for the
    15 additional dose from soil through the skin as well
    16 as for ingestion.
    17 MR. RIESER: I noticed in some of the
    18 tables -- unfortunately, I don't have them at
    19 hand -- that were modified by the errata, some of
    20 the appendices there were changes for
    21 pentachlorophenol or there was an addition of a
    22 column for
    pentachlorophenol.
    23 MR. HORNSHAW: Do you know which table?
    24 MR. RIESER: I'll find it, and maybe we
    L.A. REPORTING
    (312) 419-9292
    330

    1 can come back to this later.
    2 With respect to subsection (c), why
    3 is 35 Ill. Admin. Code 620 referenced in
    4 describing the development of a remedial objective
    5 for a substance not listed in the current appendix
    6 B?
    7 MR. HORNSHAW: 35 IAC 620 is referenced
    8 as one method of developing the groundwater value
    9 for chemicals that aren't already in the T.A.C.O.
    10 tiered tables.
    11 MR. RIESER: So it's correct that this
    12 rule allows a person opposing such an objective to
    13 use either the 35 Ill. Admin. Code 620, subpart F
    14 factors or factors under subpart I?
    15 MR. HORNSHAW: That's correct.
    16 MR. RIESER: If this determination is
    17 made under subpart I of the part 742 proposal,
    18 which factors will be considered instead of those
    19 in 35 Ill. Admin. Code 620, subpart F?
    20 MR. HORNSHAW: That would be all the
    21 factors that are discussed in Ms. Virgin's
    22 testimony about subpart I.
    23 MR. RIESER: And those are?
    24 MS. MC FAWN: Can this question be
    L.A. REPORTING
    (312) 419-9292
    331

    1 deferred until we get it?
    2 MR. RIESER: We can do that.
    3 MS. MC FAWN: Why don't we do that.
    4 MR. HORNSHAW: Okay.
    5 MR. RIESER: Just one more question, I'm
    6 sorry.
    7 It's true that for compounds
    8 without MCL migration to groundwater portion of
    9 the groundwater ingestion exposure route for Class
    10 1 was based on the USEPA health-based limits from
    11 the SSL, correct?
    12 MR. HORNSHAW: Correct.
    13 MR. RIESER: And those compounds were
    14 identified in your additional table F that was
    15 added to the appendices?
    16 MR. HORNSHAW: Correct.
    17 MR. RIESER: And the Class 2 values for
    18 those substances were five times that value?
    19 MR. HORNSHAW: Not necessarily. It
    20 depended on their physical chemical constants. We
    21 compared the chemical's ability to be removed by
    22 activated carbon, and we used
    ethylbenzene as the
    23 cutoff chemical and also their ability to be
    24 removed by air stripping, and we used
    methylene
    L.A. REPORTING
    (312) 419-9292
    332

    1 chloride as the chemical for the cutoff point, and
    2 if the chemical was not able to be removed by
    3 either type of treatment technique, then it did
    4 not get five times increase over the Class 1
    5 value.
    6 MR. RIESER: In those instances would
    7 they always be the same as the Class 1 value?
    8 MR. HORNSHAW: That's correct.
    9 MR. RIESER: Are there instances of
    10 which you're aware where there were chemicals that
    11 were on this additional appendix B, table F, where
    12 the ratio between the Class 1 and Class 2 values
    13 is neither 5 nor 1 but some other value?
    14 MR. HORNSHAW: That's correct, and most
    15 chemicals, the treatment efficiency was determined
    16 by USEPA when they promulgated the final MCL for
    17 that chemical.
    18 MR. RIESER: Do you discuss that method
    19 -- did you discuss that methodology in your
    20 testimony?
    21 MR. HORNSHAW: I think in my testimony I
    22 have a statement in parentheses, something to the
    23 effect that
    ethylbenzene is one example but
    24 doesn't work or the treatment efficiency was only
    L.A. REPORTING
    (312) 419-9292
    333

    1 43 percent, but I don't go through all of them.
    2 MR. RIESER: Thank you.
    3 HEARING OFFICER FEINEN: Mr.
    Watson, I
    4 think you had some questions.
    5 MR. WATSON: Right. We've got to jump
    6 back to my question 13. Question (a), can the
    7 agency discuss why it did not follow the USEPA SSL
    8 procedures for determining metals concentrations
    9 for Tier 1?
    10 MR. SHERRIL: Could you clarify your
    11 question.
    12 MR. WATSON: Sure, yes, sorry. As I
    13 understand it with respect to
    inorganics, the Tier
    14 1 tables for the migration to groundwater pathway
    15 is based on TCLP values, correct?
    16 MR. SHERRIL: We have TCLP values, and
    17 then for many of the
    inorganics, we have a pH.
    18 MR. WATSON:
    PH option?
    19 MR. SHERRIL: Option.
    20 MR. WATSON: Why did you choose to use
    21 the TCLP values?
    22 MR. HORNSHAW: Partly because the TCLP
    23 values could be plugged in for each contaminant.
    24 If we were going to list the pH dependent value,
    L.A. REPORTING
    (312) 419-9292
    334

    1 there would have been a lot of holes in the Tier 1
    2 table. Where the data is available to predict
    3 movement based on pH, that's what chemicals got
    4 put into the tables C and D.
    5 MR. WATSON: And the pH, that's the
    6 USEPA SSL approach?
    7 MR. HORNSHAW: Correct, for pH 6.8, and
    8 I guess that would be another reason is because we
    9 have a lot of different pH's around Illinois so it
    10 would be more easily handled in a table where you
    11 have specific value for each pH or each pH range
    12 as we've done it.
    13 MR. WATSON: Question B -- this really
    14 gets to the heart of my concerns about the TCLP
    15 test being used here.
    16 Why did the agency not consider a
    17 dilution attenuation factor for establishing the
    18 TCLP concentrations in Tier 1?
    19 MR. SHERRIL: Could you clarify that?
    20 MR. WATSON: As I understand it, in
    21 looking at the migration to groundwater pathway,
    22 what you have done is identified TCLP levels but
    23 not have allowed a dilution factor for attenuation
    24 dilution as consistent with the USEPA model, is
    L.A. REPORTING
    (312) 419-9292
    335

    1 that true?
    2 MR. O'BRIEN: Actually there is a
    3 20-fold dilution attenuation factor. The way the
    4 TCLP test is normally run is that a weighted
    5 sample of the soil to be extracted is added to 20
    6 times that weight of extracted solution, and the
    7 TCLP test procedure normally requires that the
    8 result be reported out as the concentration in the
    9 extracted solution.
    10 In other analytical tests that are
    11 fairly done, the calculation is back calculated to
    12 what was in the original sample irrespective of
    13 how much
    extractant they use, but because TCLP is
    14 a widely used test, we didn't want to change the
    15 test parameters. So we're just using that, and
    16 therefore, we didn't need to add a 20-fold
    17 dilution since it was already part and parcel of
    18 the procedure, and the way the test is normally
    19 reported out, it includes that 20-fold dilution.
    20 MR. WATSON: I'm not going to promise to
    21 understand all this stuff, but I just want to make
    22 the point that it's your testimony that the
    23 current TCLP numbers in the Tier 1 table for
    24 inorganics include a factor of 20 dilution?
    L.A. REPORTING
    (312) 419-9292
    336

    1 MR. SHERRIL: That's correct.
    2 MR. WATSON: With respect to the pH
    3 tables -- and I don't know if we asked this
    4 question or not -- why did the agency stop at pH
    5 of 8?
    6 MR. HORNSHAW: That data was -- that was
    7 done because the tables that USEPA provides in the
    8 technical background document for soil screening
    9 guidance only go to pH 8. The graphs don't go
    10 beyond there, and we didn't want to try and
    11 extrapolate beyond them.
    12 MR. WATSON: So if you have a pH of 8.5
    13 in your soil, you have to do a Tier 3 analysis?
    14 MR. HORNSHAW: For the most part, yes.
    15 In a few cases those graphs are totally flat up at
    16 the upper pH, and you can probably extrapolate
    17 beyond that, and we would accept that readily, but
    18 on other cases, the graphs are very different with
    19 even a small change of pH, and extrapolating
    20 beyond that would be risky.
    21 MR. WATSON: Question C, does the agency
    22 have data on the
    correlations between TCLP
    23 concentrations and background concentrations of
    24 lead, silver, cobalt or vanadium?
    L.A. REPORTING
    (312) 419-9292
    337

    1 MR. SHERRIL: We have data, but we have
    2 no what you would call compiled data as such that
    3 it shows any correlation between -- any
    4 correlation.
    5 MR. O'BRIEN: When we have tried to look
    6 at that, we have not found any correlation.
    7 MR. WATSON: You have looked at it?
    8 MR. O'BRIEN: When we have looked at it,
    9 we have not found any correlation.
    10 MR. WATSON: So it's your view that
    11 background concentrations of these metals would
    12 not exceed the TCLP standards?
    13 MR. SHERRIL: Could you clarify that?
    14 Well, I think from what he's just saying, we don't
    15 have a correlation so we couldn't.
    16 MR. HORNSHAW: We don't know.
    17 MR. SHERRIL: We don't know.
    18 MR. WATSON: My question 8 also relates
    19 to 510, but that has been addressed in the errata
    20 sheet.
    21 HEARING OFFICER FEINEN: There's a
    22 question from
    Mayer, Brown & Platt for 742.510.
    23 MS. SHARKEY: That question has been
    24 answered.
    L.A. REPORTING
    (312) 419-9292
    338

    1 HEARING OFFICER FEINEN: Go off the
    2 record for a second.
    3 (Discussion off the record.)
    4 (Lunch recess taken.)
    5 (Discussion off the record.)
    6 HEARING OFFICER FEINEN: Back on the
    7 record in the afternoon after lunch. Mr.
    Reott is
    8 going to begin asking some questions, and we'll go
    9 from there in the normal course. Then we can
    10 proceed.
    11 MR. REOTT: Let me start with the errata
    12 sheet 742.415(d) which is the errata that comes
    13 out of the statute. Let me just direct your
    14 attention to that. In the Tier 1 tables, the
    15 board would set objectives for risk to
    16 groundwater, the same for residential and
    17 commercial industrial properties, in other words,
    18 risk to groundwater is the same numbers in the
    19 tables.
    20 Is the agency going to interpret
    21 the risk to groundwater pathway number that the
    22 board adopts in Tier 1 tables as a quote,
    23 " remediation objective adopted by the board," end
    24 quote, within the language of the statute in
    L.A. REPORTING
    (312) 419-9292
    339

    1 415(d)? And the reason I ask obviously is the
    2 risk to groundwater pathway, it's not really tied
    3 to residential or commercial, it's just the same
    4 for everyone, and the statute talks about
    5 residential objectives so I'm not sure how you
    6 would interpret that value in Tier 1.
    7 MR. KING: I don't understand what
    8 difference it makes because of the way the
    9 statutory language is set up.
    10 MR. REOTT: Let me try to clarify,
    11 Gary. The statutory language which you put in the
    12 errata sheet 415(d) kicks in for
    remediation
    13 objectives adopted by the board for residential
    14 land use, and obviously the ingestion and
    15 inhalation numbers for residential are based upon
    16 explicit residential scenarios where someone is
    17 using the property as a residence.
    18 I assume the agency would regard
    19 those two numbers as being residential land use
    20 remediation objectives adopted by the board. I
    21 mean, is that part of it at least something we can
    22 agree on?
    23 MR. KING: That's true.
    24 MR. REOTT: For the groundwater window,
    L.A. REPORTING
    (312) 419-9292
    340

    1 it's a little different because it's not clear
    2 that it's merely based upon residential land use
    3 because you have the same risk to groundwater
    4 number for commercial and residential land use.
    5 So my question is how are you going
    6 to interpret that?
    7 MR. KING: It doesn't make a difference
    8 because if it's converted to residential use, it's
    9 still the same objective so I don't know that it
    10 really -- it doesn't make a difference.
    11 MR. SHERRIL: The groundwater at a site,
    12 whether it be residential or industrial
    13 commercial, can be either dependent on the
    14 groundwater classification.
    15 MR. REOTT: So in other words, what
    16 you're saying is that you will regard the Tier 1
    17 residential risk to groundwater number as being a,
    18 quote,
    remediation objective adopted by the board
    19 for residential land use within the meaning of the
    20 statute?
    21 MR. KING: Yeah, I would certainly.
    22 MR. REOTT: I'm going to turn to the
    23 prefiled written questions, and what I did over
    24 lunch, Gary, and the rest of you, is I tried to
    L.A. REPORTING
    (312) 419-9292
    341

    1 pick out the ones we just covered. So I'm going
    2 to not do these necessarily in exactly the order
    3 they're there. I'm going to skip around so I
    4 don't jump ahead to other topics.
    5 Let me start with number one, which
    6 I actually think relates to Tier 1, although I
    7 phrased it in terms of Tiers 2 and 3. Does the
    8 agency believe that the ASTM model which it
    9 proposes to use for Tier 2 and 3 produces results
    10 which are sufficiently protective of human health
    11 and the environment?
    12 MR. KING: Yes, that's correct, as long
    13 as the model is used correctly in accordance with
    14 the limits that the model describes.
    15 MR. REOTT: Does it accurately predict
    16 the amount of contamination that can remain in
    17 place without undue risk from all of the exposure
    18 pathways?
    19 MR. KING: I think it can do that
    20 accurately. Again it's going to be predicted
    21 within the limits of its use and within the limits
    22 of the data that have been put into the model.
    23 MR. REOTT: In other words, if you run
    24 the model correctly, you'll get a protective
    L.A. REPORTING
    (312) 419-9292
    342

    1 number, protective result?
    2 MR. KING: If you have accurate data as
    3 well.
    4 MR. REOTT: Question No. 2, in its
    5 September 1994 order in the R94-2(B)
    6 proceedings -- actually I guess at that point I'm
    7 not sure if it was labeled 2B, it may have been
    8 just 94-2 -- the board ran tables of soil cleanup
    9 objectives calibrated for different distances to
    10 the point of compliance in the UST program (the
    11 closer of 200 feet or the property line). The
    12 distance to the point of compliance affects risk
    13 to groundwater in Tier 1 tables. It doesn't
    14 affect ingestion or inhalation.
    15 Would the agency be willing to
    16 modify it's proposed Tier 1 table to add a
    17 point-of-compliance-based table for the risk of
    18 migration to groundwater pathway so that you could
    19 have a Tier 1 table that had different calibrated
    20 distances?
    21 MR. KING: No. The first point is you
    22 make an assumption there that I don't think is
    23 correct. When you said the distance to the point
    24 of compliance is affecting the risk, it's not the
    L.A. REPORTING
    (312) 419-9292
    343

    1 point of compliance, it's the point of human
    2 exposure that affects the risk.
    3 MR. REOTT: But from a regulatory
    4 standpoint, particularly in the UST program, it's
    5 explicit that you have to meet the applicable
    6 standards of the 200 foot or property line
    7 boundary, you're not proposing to change that, are
    8 you?
    9 MR. KING: No, that's designated in the
    10 statute and the regulations for the tank program.
    11 MR. REOTT: But you're not willing to
    12 try to construct a Tier 1 table that incorporates
    13 different distances like the board did in its 1994
    14 order?
    15 MR. KING: No. That would just make
    16 for -- this regulatory proposal is complex enough
    17 as it is, and it's difficult enough to understand,
    18 and to try to incorporate within part 742 all the
    19 potential points of compliance that exist under
    20 the various programs that would be using this
    21 would make it too unwieldy.
    22 In essence you would have to have a
    23 set of Tier 1 tables for every separate compliance
    24 point distance, and we've included the equation
    L.A. REPORTING
    (312) 419-9292
    344

    1 methodologies to deal with those gap situations.
    2 MR. REOTT: In the subsequent tiers?
    3 MR. KING: Right.
    4 MR. REOTT: Which version of the SSL
    5 model has the agency endorsed in this
    rulemaking?
    6 And I think I understand the answer to this
    7 question to be the one that came out last year,
    8 not the original version.
    9 MR. KING: I quibble with the word
    10 "endorse." I'm not sure that we really endorse
    11 it. We've incorporated by reference the final
    12 version.
    13 MR. REOTT: Dr.
    Hornshaw, you testified
    14 yesterday about various changes to that model that
    15 were made in developing the agency's proposal.
    16 Were the list of changes that you
    17 gave yesterday in your testimony the only changes
    18 that the agency made to the SSL model or were
    19 there others?
    20 MR. HORNSHAW: They were the ones that
    21 were important. The changes that we made we made
    22 because of language in the original legislation,
    23 for instance, TRC or group C carcinogens. We also
    24 had to add chemicals that had existing state
    L.A. REPORTING
    (312) 419-9292
    345

    1 groundwater standards, and we deleted a couple of
    2 chemicals due to lack of appropriate toxicity
    3 criteria for the class C carcinogens. Everything
    4 else that was incorporated by USEPA in their basic
    5 model we included into the program, into the Tier
    6 1 tables.
    7 MR. REOTT: So if I looked at the
    8 transcript of your testimony from yesterday and
    9 also your written testimony, whatever changes you
    10 made or laid out there?
    11 MR. HORNSHAW: Correct.
    12 MR. REOTT: In one of those two places?
    13 MR. HORNSHAW: That's correct.
    14 MR. REOTT: Earlier today you referenced
    15 the 1994 version of the ASTM model, and there was
    16 an updated standard issued in 1995, and I don't
    17 know if its changes in any way affected the
    18 agency's proposal here, but which version of the
    19 ASTM model is the agency using for purposes of
    20 this proposal?
    21 MR. HORNSHAW: The final standard, not
    22 the emergency standard.
    23 MR. REOTT: The 1995 version?
    24 MR. HORNSHAW: Correct. I believe we've
    L.A. REPORTING
    (312) 419-9292
    346

    1 incorporated that by reference, also.
    2 MR. REOTT: What changes did you make to
    3 the 1995 version of the ASTM model from the form
    4 in which it was originally drafted by ASTM?
    5 MR. HORNSHAW: We dropped out the
    6 migration to indoor air pathway calculations from
    7 that model.
    8 MR. REOTT: Why was that?
    9 MR. HORNSHAW: In
    USEPA's view and in
    10 our view, the science behind the calculations to
    11 predict what could be in an indoor air situation
    12 from subsurface contamination were not
    13 scientifically correct enough or rigid enough --
    14 not rigid.
    15 MR. REOTT: Reliable?
    16 MR. HORNSHAW: Rigorous enough. So in
    17 the interest of basically allowing that science to
    18 develop some more, we deleted that from the --
    19 that pathway from the ASTM model that's used in
    20 Tier 2.
    21 MR. REOTT: Did you make any other
    22 changes to the originally drafted ASTM model, the
    23 1995 version?
    24 MR. HORNSHAW: The final guidance?
    L.A. REPORTING
    (312) 419-9292
    347

    1 MR. REOTT: Did you do anything else?
    2 In developing the rule proposal that's on the
    3 table here for the board, did you make any other
    4 changes to the 1995 version of the ASTM model?
    5 MR. HORNSHAW: No.
    6 MR. REOTT: What would you need to do to
    7 calculate a Tier 1 risk of migration to
    8 groundwater table using ASTM?
    9 MR. HORNSHAW: Before you go on, there
    10 is one minor thing I just recalled. I think the
    11 ASTM model specifies some physical chemical
    12 constants or recommends or suggests some physical
    13 chemical constants.
    14 I don't know for sure, but they may
    15 be different than the ones that we have in our
    16 table of physical chemical constants so that may
    17 be another minor change from
    ASTM's model.
    18 MR. REOTT: When we reconvene in
    19 January, do you think it would be possible for you
    20 to identify any of those changes that were made?
    21 MR. HORNSHAW: Physical constant
    22 chemical changes?
    23 MR. REOTT: Yeah.
    24 MR. HORNSHAW: I could do that.
    L.A. REPORTING
    (312) 419-9292
    348

    1 MR. REOTT: No. 7, what would you need
    2 to do to calculate a Tier 1 risk of migration to
    3 groundwater table using the ASTM model? What
    4 default values would need to be established in
    5 order to prepare such a table?
    6 MR. SHERRIL: We would need more work,
    7 and what we mean by that, we would need, as Gary
    8 explained earlier, a specific chemical by
    9 compliance point distance kind of criteria set up,
    10 and then it would be unwieldy because we would be
    11 trying to fit it to all the different bureau of
    12 land programs. We would have to pre -- we would
    13 have to assume all these compliance points
    14 distances which would become unwieldy, we believe.
    15 MR. REOTT: Wouldn't the particular
    16 program just look up in the table whatever the
    17 compliance point was that was applicable to that
    18 program?
    19 MR. SHERRIL: Compliance points can
    20 change. I think we have gone over this yesterday,
    21 but compliance points can change the distance
    22 depending on whether you're the end of your
    23 institutional control is. You could have them in
    24 increments really.
    L.A. REPORTING
    (312) 419-9292
    349

    1 MR. KING: Even under the tank program,
    2 it's 200 feet of the property line, and the
    3 property line varies all over the place as far as
    4 the compliance point.
    5 MR. REOTT: Let's assume for a minute no
    6 one was going to go to the trouble of doing it in
    7 one-inch increments. The board did it, I believe,
    8 in either five or ten-foot increments in 1994.
    9 Wouldn't that be generally sufficient for people
    10 to figure out what number they really need to
    11 meet?
    12 MR. SHERRIL: In five-foot increments?
    13 MR. REOTT: Yeah, if you gave them a
    14 table.
    15 MR. KING: It means you would have to
    16 have an entire set of Tier 1 tables for every
    17 five-foot increment.
    18 MR. REOTT: If you were to choose
    19 five-foot increments, that's right.
    20 MR. KING: It just seems like that
    21 really kind of defeats the whole purpose of having
    22 a fairly unified set of tables.
    23 MR. SHERRIL: It would probably need to
    24 go out to 2500 feet, maybe even further. That
    L.A. REPORTING
    (312) 419-9292
    350

    1 would be an awful lot of tables.
    2 MR. O'BRIEN: Since Tier 2 provides the
    3 calculation, at some point it's going to be easier
    4 just to do the calculation than to try to thumb
    5 through hundreds of tables to figure out which one
    6 to use.
    7 MR. REOTT: There isn't anything
    8 theoretically that would stop you from
    9 constructing such a set of tables, though, to
    10 different distances, is there?
    11 MR. O'BRIEN: No, there wouldn't be.
    12 MR. REOTT: It's just a question of how
    13 much paper the board wants to make this
    14 rulemaking. If they want it to be an extra 50
    15 pages thick, they can have an extra 50 pages?
    16 MR. O'BRIEN: That's true.
    17 MR. KING: If you're willing to run all
    18 the numbers, maybe you can present them to the
    19 board.
    20 MR. REOTT: That may be what's done,
    21 Gary. I want to make sure there's nothing from
    22 the agency's perspective that that would be a
    23 futile effort. If it's run and the board is
    24 interested in adopting it, it can.
    L.A. REPORTING
    (312) 419-9292
    351

    1 Let me go back to question No. 7,
    2 what would you need to do to the ASTM model to be
    3 able to run a Tier 1 table? In other words, were
    4 all the values you need already there, or do you
    5 need to make any assumptions?
    6 MR. O'BRIEN: Distance is the only
    7 variable that we wouldn't immediately have
    8 available, and so we'd have to make a decision on
    9 what distances to include in such a table.
    10 MR. REOTT: I'm going to skip No. 8
    11 because I think it really relates to a different
    12 kind of problem.
    13 No. 9, what was the risk level used
    14 for the construction of the Tier 1 tables?
    15 MR. HORNSHAW: We were still having a
    16 sidebar conversation.
    17 MR. REOTT: Sorry. What was the risk
    18 level used for the construction of the Tier 1
    19 tables?
    20 MR. HORNSHAW: Generally, one in a
    21 million. As I stated earlier, for some of the
    22 chemicals whose
    MCLs are either based on detection
    23 limits for risk benefit analysis, that one in a
    24 million risk level may be different or it may be
    L.A. REPORTING
    (312) 419-9292
    352

    1 different from the one in a million risk level. I
    2 might add that for all the
    noncarcinogens, they
    3 aren't specified as a risk level at all.
    4 MR. REOTT: It's target quotient of
    5 one?
    6 MR. HORNSHAW: That's correct.
    7 MR. WATSON: I've got a follow-up on
    8 that question, and that is what's the significance
    9 in appendix B, table B of footnote (e) which
    10 states that calculated values correspond to a
    11 cancer risk level of one in one million. Site
    12 specific conditions may warrant use of a greater
    13 risk level but not to exceed 1 in 10,000.
    14 MR. SHERRIL: Could you repeat again the
    15 table and the --
    16 MR. WATSON: Appendix B, table B, this
    17 is Tier 1 numbers for soil for industrial
    18 commercial property footnote (e).
    19 MR. SHERRIL: E as in elephant?
    20 MR. WATSON: Right.
    21 MS. ROBINSON: That's page 106 of the
    22 board's version, and the people have that.
    23 MR. HORNSHAW: I think that may be left
    24 over from an earlier draft and we didn't strike
    L.A. REPORTING
    (312) 419-9292
    353

    1 that.
    2 MR. WATSON: So the site specific risks
    3 evaluated at 10 to the minus 4 are not available
    4 under Tier 1 analysis?
    5 MR. HORNSHAW: That's correct.
    6 MR. WATSON: Were they in prior drafts?
    7 Was that possibility available in prior drafts?
    8 MR. HORNSHAW: I don't think for
    9 Tier 1.
    10 MR. WATSON: With respect to Tier 1
    11 numbers, has the agency ever considered a risk
    12 level less than 10 to the minus 6?
    13 MR. KING: You mean greater than 10 to
    14 the minus 6?
    15 MR. WATSON: I'm sorry, greater.
    16 MR. KING: Generally, that's true. Of
    17 course, you have to remember that some of the
    18 drinking water standards are not necessarily based
    19 on the 10 to the minus 6 risk.
    20 MR. WATSON: But in evaluating and
    21 developing these proposed regulations, did the
    22 agency ever consider the appropriateness of 10 to
    23 the minus 5 number, for instance, as part of the
    24 Tier 1 default tables?
    L.A. REPORTING
    (312) 419-9292
    354

    1 MR. KING: We considered it and we
    2 rejected it.
    3 MR. WATSON: What was the basis for
    4 rejecting it?
    5 MR. KING: We really are looking at --
    6 the focus of our analysis was where was the point
    7 of human exposure, and if you have a point of
    8 human exposure, whether that's a person who lives
    9 at a site or as a child playing at a site or as a
    10 worker working at a site, we felt that that person
    11 should have the same -- the equivalent level of
    12 protection and that it should be focused in that
    13 way.
    14 Obviously with different types of
    15 persons who can be exposed and the conditions
    16 under which they are exposed, you would adjust the
    17 numbers based on that, but still, the goal is that
    18 you protect any person who be might be potentially
    19 exposed, that they are exposed only at a 10 to the
    20 minus 6 level.
    21 MR. WATSON: Are you familiar with other
    22 states that have developed Tier 1 numbers at 10 to
    23 the minus 5th risk level?
    24 MR. KING: Yeah. I am familiar that
    L.A. REPORTING
    (312) 419-9292
    355

    1 there are other states that are doing that, yes.
    2 MR. WATSON: Do you know what the
    3 rationale is for the appropriateness of a 10 to
    4 the minus 5th number?
    5 MR. KING: I think they have confused
    6 the concepts in doing that, and I think what we
    7 try to do is be very careful in how we use numbers
    8 like 10 to the minus 6th, 10 to the minus 5th, 10
    9 to the minus 4th because if you just start
    10 throwing those numbers out without being extremely
    11 careful in the way you're using them, your logic
    12 ends up being flawed as to who and why you are
    13 providing the level of protection.
    14 MR. WATSON: The states that have
    15 developed these numbers, what's the problem?
    16 Where is the flaw in their logic in terms of the
    17 appropriateness of 10 to the minus 5th?
    18 MR. KING: As we were saying before, if
    19 you have a person that's working at a site as
    20 opposed to another person residing at a site,
    21 they're both deserving of that equivalent level of
    22 protection.
    23 Why should a person who is working
    24 at a site be subjected to a greater risk of cancer
    L.A. REPORTING
    (312) 419-9292
    356

    1 than a person who is residing at a site?
    2 HEARING OFFICER FEINEN: Mr.
    Reott.
    3 MR. REOTT: Let me follow up in response
    4 to that question while we're on this topic. The
    5 ASTM 1995 standard and the discussion about how do
    6 you select particular risk levels, I think, is
    7 that right, Dr.
    Hornshaw?
    8 MR. HORNSHAW: That's correct.
    9 MR. REOTT: And I admit that I'm
    10 somewhat summarizing this, but they go through a
    11 list of states that have set risk levels that were
    12 greater than one in a million, as my colleague had
    13 said, and they characterize the use of the one and
    14 a million as being done for when large, very, very
    15 large populations are exposed to things such as
    16 systemic, City of Chicago drinking water context,
    17 but they seem to indicate that the greater risk
    18 levels, 1 in a 100,000, are more typical when
    19 you're looking at a small exposed populations. Is
    20 that a fair characterization of where ASTM comes
    21 out on this question?
    22 MR. HORNSHAW: I think that's a fair
    23 characterization. I'm not sure I want to delve
    24 into why states chose a particular risk level.
    L.A. REPORTING
    (312) 419-9292
    357

    1 I'm not familiar enough with why each individual
    2 state has done that to touch into that very much.
    3 MR. REOTT: Let me go back to my
    4 prefiled questions. No. 10, by volume, how much
    5 contaminated soil is assumed to be ingested each
    6 day in the residential Tier 1 scenario, the
    7 industrial Tier 1 scenario and in the construction
    8 worker scenario -- inhalation portion of the
    9 construction worker scenario?
    10 MR. SHERRIL: The inhalation?
    11 MR. REOTT: I'm sorry, ingestion
    12 portion.
    13 MR. HORNSHAW: For the residential
    14 scenario, 200 milligrams per day by a child. For
    15 the industrial scenario, 50 milligrams per day by
    16 an adult, and for the construction worker
    17 scenario, 480 milligrams per day, also by an
    18 adult.
    19 MR. REOTT: Any idea what that would
    20 translate in volume terms? It would probably
    21 depend upon
    compaction and so forth.
    22 MR. HORNSHAW: I wouldn't even want to
    23 try and guess at it.
    24 MR. REOTT: We'll save that for another
    L.A. REPORTING
    (312) 419-9292
    358

    1 day. By volume how much contaminated water would
    2 you assume an exposed individual would drink in
    3 Tier 1? Is that two liters?
    4 MR. HORNSHAW: Yes, it's not
    5 specifically stated. It's one of the assumptions
    6 that go into the drinking water
    MCL's at the
    7 federal level, or that was used by USEPA to
    8 develop the health-based levels. It's not
    9 specifically stated in there as a rule.
    10 MR. REOTT: Skipping ahead to No. 16,
    11 which is the next one that relates to Tier 1, for
    12 metals the agency's Tier 1 numbers are based upon
    13 the amount of metals in -- it should be the
    14 leachate test run on the soil at the site using
    15 the Federal Hazardous Waste Leaching Procedure,
    16 TCLP. The TCLP procedure is designed to mimic the
    17 highly acidic conditions inside municipal waste
    18 landfills.
    19 Does the agency contend that the
    20 physical conditions present at typical Illinois
    21 contaminated sites are comparable to the physical
    22 conditions within a municipal landfill?
    23 MR. SHERRIL: Under Tier 1, we provide
    24 the option of not only the TCLP method, but for
    L.A. REPORTING
    (312) 419-9292
    359

    1 many of the
    inorganics we also provide the pH
    2 method. So the way your question is phrased
    3 there, it's not a complete question because we do
    4 provide more than one method under Tier 1.
    5 MR. REOTT: Do you contend that the
    6 physical conditions present in typical Illinois
    7 contaminated sites are comparable to the physical
    8 conditions present in municipal landfill?
    9 MR. O'BRIEN: They can be. We've had
    10 locations where compost, mulching on the ground
    11 ate into an underlying petroleum product pipeline
    12 and caused it to rupture so that typical
    13 conditions that can occur such as compost can
    14 result in low pH conditions that would be similar
    15 to what could be found in the TCLP test, and this
    16 test is used in Tier 1, which is the screening
    17 tool. So we think it's appropriate there as a
    18 screen for conditions that can easily occur at
    19 typical sites.
    20 MR. REOTT: Do you think that conditions
    21 like those in a municipal landfill easily occur at
    22 Illinois contaminated sites?
    23 MR. KING: I think at this point you're
    24 really putting into the record some information
    L.A. REPORTING
    (312) 419-9292
    360

    1 which I don't think is there. I mean, you're
    2 making an assumption about the physical conditions
    3 at a typical Illinois landfill, and I don't know
    4 that there's anything here that talks about what
    5 that is.
    6 MR. REOTT: I think, Gary, that's really
    7 already been established by the TCLP test itself.
    8 That's what that's designed to mimic, and I think
    9 even Dr.
    Hornshaw testified to that in his
    10 testimony, that that's what that test is designed
    11 to mimic.
    12 MR. KING: I don't think that's the
    13 question you were asking.
    14 MR. REOTT: If you do not have the very
    15 acidic pH conditions that are typical of a
    16 municipal landfill that TCLP is designed to
    17 mimic --
    18 MR. KING: It's going to be impossible
    19 for us to answer a question when you keep assuming
    20 that that's the condition of Illinois landfills,
    21 that they're highly acidic conditions. You're
    22 assuming that.
    23 MS. MC FAWN: How about if we go on to
    24 question 17? Is this where you might be leading
    L.A. REPORTING
    (312) 419-9292
    361

    1 with your question?
    2 MR. REOTT: That's fine. I think 17 is
    3 more of a Tier 2 question. I was going to hold
    4 that one. I was going to skip to 20. For lead,
    5 the agency has set the risk of ingestion values
    6 using USEPA criteria that were developed in one
    7 particular federal program , you know, where you
    8 get the 400 parts per million number. There are
    9 other federal criteria that are approximately 10
    10 times as high as the one endorsed by this proposal
    11 for the board.
    12 In addition other federal programs
    13 have substantially different values for
    14 residential and industrial settings while the IEPA
    15 proposal used the same lead ingestion value for
    16 both residential and industrial settings.
    17 Would the agency be willing to look
    18 at adjustments to the lead ingestion criteria in
    19 Tier 1 for industrial facilities based upon
    20 information from other federal programs?
    21 MR. KING: I think that would only be
    22 true if those federal programs were identified and
    23 it was demonstrated that the procedures they used
    24 have been equivalent to what's gone on as far as
    L.A. REPORTING
    (312) 419-9292
    362

    1 the SSL process.
    2 Mr.
    Hornshaw described the
    3 extensive peer review that was done in developing
    4 those. Those were clearly designed to deal with
    5 remediation objectives at sites that were being
    6 evaluated for cleanup. We really have no idea
    7 what you're talking about when you say other
    8 federal programs in this context.
    9 MR. REOTT: But if they were well
    10 supported, you would be willing to at least
    11 consider them?
    12 MR. KING: I mean, when you say well
    13 supported, you really have to bring forward the
    14 specifics of what you're talking about before we
    15 really could even say we would address them.
    16 MR. REOTT: As the agency has mentioned
    17 before for certain metals -- not all of them --
    18 you have an option to use a total metals content
    19 in the soil as adjusted by the pH in the soil
    20 within the range of up to 8 and down into 4. The
    21 typical pH test measures the pH of a liquid. How
    22 does the agency propose to set soil for pH using
    23 the SW-846 methods, for example?
    24 MR. O'BRIEN: The answer to that is the
    L.A. REPORTING
    (312) 419-9292
    363

    1 SW-846 methods.
    2 MR. REOTT: For testing soils?
    3 MR. O'BRIEN: Yes, they have methods for
    4 taking the pH of soil.
    5 MS. MC FAWN: I would note for the
    6 record that you have posed question 21, and this
    7 is what was answered.
    8 MR. REOTT: Jim, help me here because
    9 I'm not sure I completely understand how SW-846
    10 does this, and I want to try to get it on the
    11 record.
    12 Would they be tested by mixing them
    13 with neutral pH water and then testing the pH of
    14 the resulting solution? Is that what happens in
    15 laymen's terms?
    16 MR. O'BRIEN: I haven't looked at the
    17 test methodology lately so I don't remember
    18 precisely, but that's my general recollection is
    19 that you're correct.
    20 MR. REOTT: And then the next question,
    21 if you feel like you have to postpone this one, go
    22 ahead. Should the soils be left in their natural
    23 state during testing, i.e. not ground mixed or
    24 significantly disturbed, to replicate actual site
    L.A. REPORTING
    (312) 419-9292
    364

    1 conditions?
    2 MR. O'BRIEN: I'm not sure about that.
    3 A lot of SW-846 test methods do prescribe that the
    4 soils have to be sieved through a 200 sieve. I
    5 don't remember whether that's specified for this
    6 test method or not.
    7 MR. REOTT: Would this be something that
    8 maybe we could resolve again in January when we
    9 reconvene?
    10 MR. O'BRIEN: Right.
    11 MR. REOTT: If you could look at that
    12 before then.
    13 The next two questions or the next
    14 two questions you're going to be more familiar, I
    15 think, because they've come up before back in
    16 1994. No. 22, during development of the part 620
    17 groundwater standards, the agency testified that
    18 groundwater should be tested for metals
    19 contamination using filtered samples that measure
    20 the dissolved metals in the groundwater rather
    21 than the total metals in the groundwater and
    22 particulates that are captured by the sampling
    23 technique.
    24 During the hearings in the R-94, 2B
    L.A. REPORTING
    (312) 419-9292
    365

    1 rulemaking, agency personnel also endorsed
    2 filtering groundwater used for metal sampling.
    3 For compliance with the groundwater cleanup
    4 criteria in this
    rulemaking, how does the agency
    5 propose that samples be taken for determining
    6 compliance with the metals criteria, filtered or
    7 unfiltered?
    8 MR. KING: Were you going to answer
    9 that? Before you answer that, can you give us a
    10 citation there because we've been hunting through
    11 the hearing record, and we have not located that
    12 statement. You made an assumption about what was
    13 said by agency personnel in the context of 94-2,
    14 and there's no citation in the record.
    15 MR. REOTT: I would be happy to supply
    16 that. I have a vague recollection it was not one
    17 of the principal agency witnesses. It may have
    18 been Todd Gross. He was in Springfield. Now I
    19 have to look up the transcript Doug Clay.
    20 MR. CLAY: Todd Gross works in
    21 the program.
    22 MR. REOTT: I may have the person
    23 wrong. There's someone in the back who wasn't in
    24 the front row with all of the agency people, and
    L.A. REPORTING
    (312) 419-9292
    366

    1 we got to the issue, and it was someone who joined
    2 in.
    3 MS. MC FAWN: Which program did you say
    4 he's with?
    5 MR. CLAY: He's with the regal project
    6 section and would not have even attended the LUST
    7 hearings.
    8 MR. O'BRIEN: The agency's feeling at
    9 this point is that because very few residential
    10 wells are routinely filtered, it's not a criteria
    11 of the well installation, licensing that the
    12 Department of Public Health has is that the sample
    13 should be unfiltered. However, under Tier 3, we
    14 would consider proposals for filtered depending
    15 upon sufficient justification.
    16 MR. REOTT: Gary, did you guys look for
    17 -- I had previously cited in the '94 hearings the
    18 testimony from several years earlier in the part
    19 620
    rulemaking when the agency did endorse
    20 filtered. Were you also having trouble finding
    21 that?
    22 MS. ROBINSON: Yes.
    23 MR. KING: We were just focusing on what
    24 your statement was.
    L.A. REPORTING
    (312) 419-9292
    367

    1 MR. REOTT: I just want to clarify what
    2 I need to supply for you, that's all.
    3 MR. KING: Any citations you have
    4 relative to this issue, I think, would be helpful
    5 as far as discussing the matter further.
    6 MR. REOTT: Because I think even if you
    7 now believe that filtering is inappropriate, when
    8 the 620 rules were written to develop those
    9 standards which in turn formed the basis for much
    10 of this, the agency said filtering was
    11 appropriate.
    12 MR. O'BRIEN: That's why we'd like to
    13 see what was said because we would like to see the
    14 context
    15 MR. REOTT: In the 620 rules what was
    16 said is quoted in my testimony from R-94. So if
    17 you look at my testimony, either of the two rounds
    18 of testimony, I think it's in both of them.
    19 MS. MC FAWN: Why don't you provide him
    20 those cites, if you can, even before the January
    21 hearings.
    22 MR. REOTT: I will. The next one --
    23 MR. RIESER: Is there anything in this
    24 rule that specifies filtering or non-filtered
    L.A. REPORTING
    (312) 419-9292
    368

    1 methodology?
    2 MR. SHERRIL: No.
    3 MR. RIESER: Is there anything in any
    4 other rule that specifies with respect to
    5 groundwater sampling using filtered or
    6 non-filtered?
    7 MR. LISS: My name is Kenneth
    Liss. In
    8 the municipal solid waste landfill rules, they are
    9 federal rules, subtitle D, it's required for
    10 totals analysis.
    11 MS. ROBINSON: What's required?
    12 MR. LISS: The groundwater sampling is
    13 based on unfiltered.
    14 MR. RIESER: For total metals, is that
    15 correct?
    16 MR. LISS: Totals, that's correct
    17 MR. RIESER: Assuming -- and I think
    18 this is a big assumption -- the question of
    19 filtered or unfiltered samples would be a subject
    20 of a Tier 3 evaluation under sufficient
    21 justification, what would that justification
    22 include?
    23 MR. O'BRIEN: The bottom line is we're
    24 looking at the risk to potentially exposed
    L.A. REPORTING
    (312) 419-9292
    369

    1 individuals. So I think for the most part, we
    2 would prefer the unfiltered samples. If it was
    3 clear the sample would be undrinkable by a person
    4 unless it were filtered, that might be an issue
    5 where that would be a sufficient justification.
    6 MR. SHERRIL: I would include the
    7 geology itself that is a factor.
    8 MR. RIESER: Excuse me just a second.
    9 What would the differences in the samples be
    10 between filtered and unfiltered sample?
    11 MR. O'BRIEN: Sometimes
    particulates
    12 that would be filtered out in the filtering
    13 process, sometimes they can capture certain
    14 contaminants on their surfaces, and so therefore,
    15 filtered samples may show less contamination than
    16 unfiltered.
    17 MR. RIESER: What they would show is
    18 they would show the particles of contamination
    19 adhered to the -- I'm sorry, molecules of the
    20 substance that you're evaluating is contamination
    21 adhered to the particles but not the materials
    22 that are actually dissolved in the groundwater?
    23 MR. O'BRIEN: That's right, but it would
    24 be pulling out small particles that would probably
    L.A. REPORTING
    (312) 419-9292
    370

    1 normally be ingested by someone, and therefore,
    2 contribute to risk unless that sample had so much
    3 sediments or
    particulates in it that it would be
    4 unpalatable.
    5 MR. LISS: Yeah, I'll add that there's
    6 just the methodology that you sample, the device
    7 that you're using for sampling is going to put
    8 some bias, if it's not done properly, in your
    9 sample results. Another way to preserve your
    10 sample --
    11 MR. RIESER: Thank you.
    12 MR. REOTT: Can I follow up two of those
    13 things. When you mentioned geology as a reason
    14 you might want to prefer filtered versus
    15 unfiltered, I'm going to take a crack at this, are
    16 you referring to like a
    Karst geology where an
    17 unfiltered sample might be more appropriate?
    18 MR. LISS: No, more so what we have here
    19 in our glacial sediments in the state here. Some
    20 of the
    particulates are more mobile due to their
    21 size and the effective porosity, the size of the
    22 pores of the
    hydro-geologic unit that you're
    23 measuring these samples in. Some units have the
    24 capability of filtering these out or not allowing
    L.A. REPORTING
    (312) 419-9292
    371

    1 those
    particulates to move while others would.
    2 MR. REOTT: To follow up on another
    3 point -- I think this was Jim's point back
    4 there . You had indicated, Jim, that one of the
    5 reasons the agency might allow you to use a
    6 filtered sample would be without filtering the
    7 water was unpalatable. There is a standard for
    8 drinking water that measures
    turbidity and
    9 essentially captures how much
    turbidity -- how
    10 much
    particulates is in the water, and I can't
    11 remember what the abbreviation stands for, but
    12 it's five
    NTU's. I never quite had the unit
    13 spelled out to me.
    14 Would water that exceeded five
    15 NTU's, which is the drinking water
    turbidity
    16 standard, be, quote, "unpalatable" so that you
    17 could start to use a filtered number as opposed to
    18 an unfiltered number?
    19 MR. O'BRIEN: I don't know if I can
    20 answer that right now. I mean, that would be the
    21 type of thing that we would consider. It's not
    22 very practical, though, to run the
    turbidity
    23 sample in the field to decide whether you are
    24 going to filter the samples or not because the
    L.A. REPORTING
    (312) 419-9292
    372

    1 filtering is done as you obtain the sample at the
    2 wellhead.
    3 MR. REOTT: The same topic, next
    4 question No. 23, in Dr.
    Hornshaw's testimony, page
    5 22, he indicated that the Tier 1 table for Class 2
    6 groundwater relies on, quote, "the removal of the
    7 chemical from groundwater by routine drinking
    8 water treatment techniques for organic chemicals."
    9 And my question was should the
    10 agency rely upon the same potential for removal of
    11 metals in their particulate form from groundwater
    12 by routine drinking water treatment techniques
    13 which are designed to achieve low
    turbidity, i.e.
    14 less than five
    NTU's, quality groundwater with
    15 virtually no
    particulates?
    16 MR. HORNSHAW: No. Actually in the 620
    17 rulemaking, the basis for developing the Class 2
    18 standards for the
    inorganics for the most part was
    19 based on protection of crops or livestock rather
    20 than any kind of a treatment technique. That's
    21 already locked into the standards already decided
    22 in 620 so that wouldn't be appropriate for this
    23 rulemaking.
    24 MR. REOTT: And I have one last Tier 1
    L.A. REPORTING
    (312) 419-9292
    373

    1 question which is No. 43, which was for
    2 noncarcinogens, how does Tier 1 consider
    3 cumulative effects?
    4 MR. HORNSHAW: Cumulative effects of
    5 noncarcinogens aren't considered in Tier 1.
    6 That's only considered in Tier 2 or 3.
    7 MR. REOTT: I think that catches us up,
    8 and then they can resume with Tier 2.
    9 HEARING OFFICER FEINEN: We'll start out
    10 with subpart F, Tier 2, general evaluation from
    11 the Site
    Remediation Advisory Committee, 742.600,
    12 Mr.
    Rieser.
    13 MR. RIESER: Yes, thank you,
    14 Mr.
    Feinen.
    15 Will the agency confirm per
    16 Dr.
    Hornshaw's testimony that the USEPA prefers
    17 users of its SSL guidance to calculate risk-based
    18 results using site specific physical and chemical
    19 values and that the EPA will also prefer users to
    20 calculate site specific values through Tier 2
    21 formulas?
    22 MR. HORNSHAW: We're allowing people to
    23 use the Tier 2 methodology. We aren't actually
    24 showing any preference for any of the three
    L.A. REPORTING
    (312) 419-9292
    374

    1 tiers.
    2 My testimony specifically talked
    3 about USEPA wanting their personnel to use it. It
    4 should be implied that the IEPA has taken that
    5 same position.
    6 MR. RIESER: Would it be useful to have
    7 people develop the objectives based on the actual
    8 site conditions?
    9 MR. HORNSHAW: Yes.
    10 MR. RIESER: On page 33, when discussing
    11 the Tier 2 soil screening level, SSL soil
    12 equations, Mr.
    Sherril states that the, quote,
    13 "Tier 2 equations to model leaching into
    14 groundwater have been developed to give the agency
    15 assurance that the part 620, Class 1 or 2
    16 groundwater quality standards and health advisory
    17 concentrations will not be exceeded," end quote.
    18 Would the agency agree that it is
    19 more accurate to say that the purpose of the Tier
    20 2 model is to achieve Tier 1 groundwater values at
    21 the point of human exposure?
    22 MR. SHERRIL: The agency agrees that it
    23 is accurate to say that the Tier 2 model to
    24 achieve Tier 1 groundwater objectives at the point
    L.A. REPORTING
    (312) 419-9292
    375

    1 of human exposure.
    2 MR. RIESER: And would it also be more
    3 accurate to say that the
    remediation objectives to
    4 be achieved are based on the Tier 1 levels and not
    5 part 620 groundwater quality standards?
    6 MR. SHERRIL: It is accurate to say that
    7 the
    remediation objectives to be achieved are
    8 based on Tier 1 levels and not part 620
    9 groundwater quality standards even though several
    10 of the Tier 1 objectives are equal to the
    11 groundwater quality standards.
    12 MR. RIESER: Dr.
    Hornshaw's testimony
    13 indicates that the industrial SSL scenario might
    14 not be appropriate for sites where contamination
    15 is larger than one acre. Is this limitation in
    16 the proposal?
    17 MR. HORNSHAW: No.
    18 MR. RIESER: Will the agency limit the
    19 use of Tier 2 for models when the contamination is
    20 larger than one acre?
    21 MR. SHERRIL: A distinction on this
    22 question -- a distinction needs to be made between
    23 -- we've kind of discussed this before -- the
    24 site size versus the source size.
    L.A. REPORTING
    (312) 419-9292
    376

    1 For example, we may have a 10-acre
    2 site that may only have a half acre of
    3 contamination source, and that shouldn't provide
    4 any limitation just because the site is 10 acres
    5 and the source is a half acre.
    6 MR. RIESER: If the source is larger
    7 than one acre, would the agency include the use of
    8 the Tier 2 model?
    9 MR. HORNSHAW: Let me preface my answer
    10 by saying in our experience, very few sites are
    11 greater than one acre of contamination, but
    12 usually these probably deserve a closer look in
    13 Tier 2 or 3, and that would include having a
    14 project manager make a determination whether a
    15 different volatilization factor might be
    16 appropriate or dilution factor for migration to
    17 groundwater, for instance.
    18 MR. SHERRIL: And again we're looking at
    19 the source really being an acre, you know, fairly
    20 large it would be.
    21 MR. RIESER: Is this discussion equally
    22 true of groundwater contamination and soil
    23 contamination?
    24 MR. HORNSHAW: Yes.
    L.A. REPORTING
    (312) 419-9292
    377

    1 MR. RIESER: So if you had a plume that
    2 was larger than one acre, the Tier 2 models would
    3 not be available?
    4 MR. HORNSHAW: Not necessarily, but
    5 again when you get a big plume like that, you've
    6 lost some of your dilution factor that's inherent
    7 in the half acre assumption that goes into Tier 1
    8 and Tier 2.
    9 MR. SHERRIL: The Tier 1 and Tier 2 soil
    10 remediation -- most of the Tier 2 soil
    remediation
    11 objectives are based on an infinite source
    12 assumption, and so these calculate -- like the
    13 Tier 1 pre-calculated
    remediation objectives are
    14 protective of larger source areas as well so we do
    15 have the safety factor built in.
    16 MR. RIESER: And then I think you've
    17 answered the final question, which was how will
    18 such larger sites be handled?
    19 MR. HORNSHAW: Usually as a Tier 3
    20 issue.
    21 MS. ROBINSON: But potentially, they
    22 could be used in a Tier 2 scenario?
    23 MR. SHERRIL: Yes.
    24 MR. RIESER: That would be a call --
    L.A. REPORTING
    (312) 419-9292
    378

    1 MR. HORNSHAW: Well, that could be
    2 done, for instance, by developing a site specific
    3 dilution factor. We have an equation in Tier 2
    4 that will do that. If you have a very large
    5 source, you can develop the dilution factor
    6 appropriately.
    7 MS. SHARKEY: Could I follow up on that,
    8 David?
    9 MR. RIESER: Sure.
    10 MS. SHARKEY: What are the factors that
    11 you might look at in allowing someone to use a
    12 Tier 2 for a larger site?
    13 MR. HORNSHAW: How closely the site
    14 still approximates the assumptions that go into
    15 the calculation of the Tier 1 tables, the basic
    16 underlying assumptions. If they're not violated
    17 or violated that badly, you would probably still
    18 be appropriate to use the Tier 2 equations.
    19 MR. SHERRIL: Generally on these larger
    20 sites as well, even if it's a 10-acre site, the
    21 actual sources, you may have a quarter acre source
    22 over here and a quarter acre source over here so
    23 the models are still protective. It's rare that
    24 you have a really huge source.
    L.A. REPORTING
    (312) 419-9292
    379

    1 MR. HORNSHAW: And in most of these
    2 cases, they're already in the Super Fund program.
    3 MS. SHARKEY: Does the shape of the, for
    4 example, spill area make a difference apart from
    5 its size? If you've got, for example, an L-shaped
    6 spill area, does that affect some of the dilution
    7 and other assumptions underlying the --
    8 MR. HORNSHAW: It could.
    9 MS. SHARKEY: Thank you.
    10 MS. MC FAWN: Could I ask a
    11 clarification. You had said to develop sites,
    12 specific dilution factors is available under Tier
    13 2. Whereabouts in the regulations?
    14 MR. HORNSHAW: That's equation S-22. I
    15 don't have the page numbers on my copies
    16 MS. ROBINSON: What appendix and what
    17 table?
    18 MR. HORNSHAW: Appendix C, table A,
    19 equation S-22.
    20 MS. ROBINSON: That's on page 122 of the
    21 board's copy.
    22 MR. SHERRIL: We're still looking up our
    23 answer.
    24 MS. MC FAWN: If you find any others,
    L.A. REPORTING
    (312) 419-9292
    380

    1 you might want to just submit them to the board.
    2 MR. HORNSHAW: Also, we have a table, an
    3 appendix C, table H, which gives Q over C values
    4 which are needed to calculate the volatilization
    5 factor per different acreage sources, source area
    6 by acre.
    7 MS. ROBINSON: And that's page 161 of
    8 the board's copy.
    9 MS. MC FAWN: Thank you.
    10 HEARING OFFICER FEINEN: Are we done
    11 with follow-up?
    12 MR. RIESER: No, I was going to go on --
    13 actually, I'm sorry, earlier we had a discussion
    14 about -- a statement in Mr.
    Sherril's testimony
    15 where it talked about models might not be
    16 applicable to areas of higher permeability. Do
    17 you recall that, Mr.
    Sherril?
    18 MR. SHERRIL: Yes.
    19 MR. RIESER: Is this another factor
    20 where -- another type of factor that would be
    21 considered in evaluating whether the use of the
    22 Tier 2 model would be appropriate?
    23 MR. SHERRIL: Yes. For example, if you
    24 had a
    Karst geology, it would not be appropriate.
    L.A. REPORTING
    (312) 419-9292
    381

    1 MR. RIESER: Is there any language in
    2 the regulation itself which references this
    3 limitation on the use of the Tier 2 model?
    4 MR. HORNSHAW: I don't think in the rule
    5 itself. In the
    incorporations by reference, we
    6 have the original USEPA soil screening guidance,
    7 and they talk about that in there, but it's not in
    8 the rule itself.
    9 MR. RIESER: If there are restrictions
    10 placed on the use of the Tier 2 model based on
    11 accuracy, which is what I'm hearing with respect
    12 to these measures, how this model measures up with
    13 this specific type of site condition and their
    14 ability to predict actual physical behavior.
    15 If it can be shown in a specific
    16 case that these Tier 2 model equations are not
    17 necessarily accurate in that sense but are
    18 conservative, in other words, overprotective with
    19 respect to actual exposure and risk, would the use
    20 of these Tier 2 equations still be acceptable for
    21 deriving
    remediation objectives?
    22 MR. SHERRIL: Most likely.
    23 HEARING OFFICER FEINEN: Just to clarify
    24 the record, the basis of the original questions
    L.A. REPORTING
    (312) 419-9292
    382

    1 was from the
    prefiled questions of section
    2 742.505, subsection (b), question 2, I think, is
    3 where you wanted to get back to, just so the
    4 record reflects that.
    5 MR. RIESER: That's right. Thank you
    6 very much, Mr.
    Feinen.
    7 I'm going to go on to question 4.
    8 On page 20 of Mr.
    Sherril's testimony, he states
    9 that exposure is a function of concentration. Is
    10 it not more accurate that there cannot be risk
    11 without exposure and that concentration is one of
    12 many factors in exposure along with transport and
    13 the presence of barriers?
    14 MR. SHERRIL: In regards to page 20 of
    15 my testimony, the agency agrees that concentration
    16 is just one of the factors along with exposure,
    17 transport and the presence of barriers when
    18 evaluating risk.
    19 MR. RIESER: On page 21 of Mr.
    Sherril's
    20 testimony, he states that, quote, "Tier 2 are
    21 designed to protect against chronic health
    22 impacts. Tier 2 is not designed to protect
    23 against acute hazards which are addressed by
    24 OSHA," unquote.
    L.A. REPORTING
    (312) 419-9292
    383

    1 Is it correct that the derived Tier
    2 2 remediation objectives would be as protective as
    3 any other objective derived under any other tier?
    4 MR. SHERRIL: The Tier 2 equations are
    5 designed to protect against long term chronic
    6 health impacts.
    Remediation objectives developed
    7 under Tier 1 and Tier 2 are also protective of
    8 acute health hazards as well.
    9 MR. RIESER: Let's get to the first
    10 question which is that the Tier 2
    remediation
    11 objectives properly performed, et cetera, would be
    12 as protective as any objective derived under the
    13 other two tiers.
    14 MR. SHERRIL: Yes.
    15 MR. RIESER: And that it is more
    16 accurate to say that if a site needs Tier 2
    17 remedial objectives based on chronic risk, then
    18 there are no acute threats?
    19 MR. HORNSHAW: I would say yes with just
    20 a few exceptions. There are a couple of chemicals
    21 in the Tier 1 tables in which the inhalation value
    22 for construction workers is actually more
    23 restrictive than the inhalation value for
    24 residential scenario, and in those few instances,
    L.A. REPORTING
    (312) 419-9292
    384

    1 it's a stretch, but the Tier 1 residential values
    2 might not be protective of a worker -- of a
    3 construction worker, sorry.
    4 MR. RIESER: These are based on the
    5 assumptions of the construction worker actually
    6 being present in the soil and thereby inhaling
    7 more of the contaminant concerned?
    8 MR. HORNSHAW: That's correct.
    9 MR. RIESER: And then are not the Tier 2
    10 objectives more conservative, and therefore,
    11 protective of acute threats? I think we've
    12 answered that already.
    13 MR. HORNSHAW: Yes.
    14 MR. RIESER: On page 23, Mr.
    Sherril
    15 uses the term "intended future use." Would the
    16 agency agree that this is the same as the term
    17 post
    remediation use as stated in the regulation
    18 and that both refer to the use intended after the
    19 remedial process is completed?
    20 MR. SHERRIL: I had intended that future
    21 use refers to post remedial use, yes.
    22 MR. RIESER: May Tiers 2 or 3 be used to
    23 determine a
    remediation objective in situations
    24 where the post
    remediation use will be
    L.A. REPORTING
    (312) 419-9292
    385

    1 residential?
    2 MR. SHERRIL: The Tier 2 and/or 3 may be
    3 used to make determinations when post remedial
    4 land use is residential.
    5 MR. RIESER: If so, would the issued NFR
    6 letter contain use restrictions with respect to
    7 residential land use or nonresidential land use?
    8 MR. SHERRIL: If Tier 2 or Tier 3 is
    9 used, the NFR may have conditions upon which the
    10 NFR determination was made, NFR referring to no
    11 further
    remediation.
    12 For example, a residential -- and
    13 this is an example, not across the board --
    14 property use in Chicago may not exceed, let's say,
    15 the
    remediation objectives except for let's say
    16 the migration to groundwater, but under a Tier 3
    17 demonstration, for example, that that groundwater
    18 route is excluded, there may be no use
    19 restrictions on the property.
    20 MR. RIESER: Thank you.
    21 On page 23 of his testimony,
    22 Mr.
    Sherril describes the factors for residential
    23 land use. Does this term always include
    24 apartments?
    L.A. REPORTING
    (312) 419-9292
    386

    1 MR. SHERRIL: Yes.
    2 MR. RIESER: Under Tier 3 and with
    3 appropriate use restrictions, would the agency
    4 allow nonresidential
    remediation objectives for an
    5 apartment building with no soil exposure?
    6 MR. SHERRIL: Under Tier 3, apartments
    7 may be considered as something different.
    8 MR. RIESER: Something different than
    9 residential?
    10 MR. KING: They would still be a
    11 residential use. What's confusing to us is when
    12 you use the term, with appropriate use
    13 restrictions. Are you meaning like a land use?
    14 Are you talking about a use between residential
    15 and industrial and commercial, or are you talking
    16 about conditions relative to the property?
    17 MR. RIESER: I had intended to use
    18 something like barrier, the presence of barriers
    19 or the prohibition against drinking water,
    20 something of that nature.
    21 MR. KING: Okay. Then that is something
    22 that's feasible, to end up with a nonresidential
    23 remediation objective for an apartment building if
    24 the soil exposures have been -- there's been a
    L.A. REPORTING
    (312) 419-9292
    387

    1 barrier applied.
    2 MR. RIESER: On page 25 of Mr.
    Sherril's
    3 testimony, he indicates there are chemicals to
    4 which Tier 2 would not apply. Can these chemicals
    5 be identified?
    6 MR. SHERRIL: No. Let me give you an
    7 example. There's tens of thousands of hazardous
    8 substances, and if certain specific chemical
    9 properties are not available -- say, Henry's Law
    10 Constant is a parameter that's used in many of the
    11 Tier 2 equations -- then you can't use those Tier
    12 2 equations.
    13 There's not a Henry's Law Constant
    14 for nitrate so there's not an organic carbon
    15 prohibition coefficient available for that either
    16 so it becomes the equations don't accurately --
    17 can't use the equations.
    18 MR. RIESER: Are all of the -- can you
    19 use the Tier 2 for all of the substances listed in
    20 appendix B, tables A and B?
    21 MR. HORNSHAW: I can think of two that
    22 you wouldn't be able to do a Tier 2 evaluation on,
    23 PCB's and lead. PCB's are regulated, or we've
    24 intended them to be regulated by federal
    L.A. REPORTING
    (312) 419-9292
    388

    1 regulations pertaining to PCB spill cleanups. So
    2 it's either Tier 1 or Tier 3 for PCB's, and for
    3 lead, the physical -- I'm sorry, the transport
    4 equations are not available.
    5 USEPA hasn't developed a database
    6 to -- or a graph of movement of lead with
    7 different changes in pH so we weren't able to
    8 include that in the table, for instance, so you
    9 couldn't do that as a Tier 2 issue either.
    10 MR. RIESER: Is there any language in
    11 the regulation which identifies this limitation on
    12 the use of the Tier 2 table -- Tier 2 models,
    13 excuse me?
    14 MR. HORNSHAW: No.
    15 MR. SHERRIL: No, but I guess we
    16 provided -- within the part 742 in appendix C --
    17 excuse me, appendix C, table E is a table called
    18 default physical and chemical parameters, and some
    19 of the -- along some of the chemicals there like,
    20 for example,
    atrazin, you go there and look for
    21 the first order degradation constant, and in the
    22 column it says no data, which means there's no
    23 data available for that.
    24 MS. ROBINSON: Just for clarification,
    L.A. REPORTING
    (312) 419-9292
    389

    1 that starts on page 148 of the board's copy.
    2 MR. RIESER: Didn't you add a footnote,
    3 at least on the first order of degradation
    4 constant, if it's not readily available, then you
    5 use zero as a value?
    6 MR. SHERRIL: That's correct.
    7 MR. RIESER: And that footnote was added
    8 to appendix C, table C. This business about the
    9 inapplicability of models, is that true of both
    10 the ASTM and the RBCA models?
    11 MR. HORNSHAW: I believe for PCB's,
    12 that's true because PCB's is a mixture of many
    13 individual components so you wouldn't have a
    14 single physical chemical constant to plug into
    15 either model.
    16 MR. WATSON: I've got a follow-up. I'm
    17 confused. If there is a reference in the tables
    18 to the absence of data, then we are to assume that
    19 for that contaminant, you cannot use the Tier 2
    20 equations, or was the answer that if there is no
    21 data, you use zero, and you can still use the
    22 Tier 2 equations?
    23 MR. HORNSHAW: For first order of
    24 degradation constant, that's true.
    L.A. REPORTING
    (312) 419-9292
    390

    1 MR. WATSON: I'm sorry, what? My
    2 question was a bad one. Your answer relates to
    3 what, that you can't use the data or you use
    4 zero?
    5 MR. HORNSHAW: You use zero for first
    6 order degradation constant if the value isn't
    7 provided in --
    8 MR. WATSON: That's table C?
    9 MR. HORNSHAW: Appendix C, table E.
    10 MR. SHERRIL: Also like in that appendix
    11 C, table E, like the chemical nitrate is a
    12 nutrient, I guess. It's not even listed in there,
    13 and we just know from experience that many of
    14 those -- some of those values are not available.
    15 MR. WATSON: So if your chemical doesn't
    16 show up on the list, you can't use the Tier 2
    17 analysis?
    18 MR. SHERRIL: No, not necessarily. What
    19 you would need to do is obtain the --
    20 MR. HORNSHAW: Not immediately because
    21 you would have to either develop or obtain from
    22 the literature the appropriate physical chemical
    23 constants and then submit them to the agency for
    24 review which is by definition a Tier 3 issue.
    L.A. REPORTING
    (312) 419-9292
    391

    1 Once the agency accepts the values proposed, then
    2 they could be used in Tier 2.
    3 MR. WATSON: Okay.
    4 MR. FEINEN: No more follow-up. I think
    5 Mayer, Brown & Platt, Ms.
    Sharkey, I think you had
    6 some questions on 742.600, at least one.
    7 MS. SHARKEY: My question as written
    8 here is, please explain the applicability of
    9 Tier 1 or Tier 2 objectives under subsections (f)
    10 and (g). What I mean by that is in taking a look
    11 at those two subsections, I really had trouble
    12 making out where I could use a Tier 2 objective
    13 and where I would be using a Tier 1 objective.
    14 MR. SHERRIL: Are you specifically
    15 742.600 (f) and (g)?
    16 MS. SHARKEY: Yeah. I'll read it in the
    17 record just so everybody is thinking about it.
    18 "If the calculated Tier 2 soil
    remediation
    19 objective for an exposure route is more stringent
    20 than the Tier 1 soil
    remediation objectives for
    21 the other exposure routes, then the Tier 2
    22 calculated soil
    remediation objective applies and
    23 Tier 2 soil
    remediation objectives for the other
    24 exposure routes are not required."
    L.A. REPORTING
    (312) 419-9292
    392

    1 MR. SHERRIL: We wanted to clarify what
    2 that is saying (f) there, is that if you calculate
    3 a Tier 2 objective that is more stringent than a
    4 Tier 1 pre-calculated objective, then the Tier 1
    5 objective would still apply.
    6 This is expected to occur very
    7 infrequently, and we do not think it would be of
    8 significance in regards to impacts to human health
    9 and the environment and in fact would probably
    10 only incur -- if one were to change, probably only
    11 one variable in a Tier 2 equation, and you're not
    12 really changing the other variables in the Tier 2
    13 equations, and the model would probably be
    14 incorrectly modeling what was actually occurring.
    15 MS. SHARKEY: John, I'm looking at (e),
    16 and I think (e) talks about if the Tier 2
    17 objective is more stringent than the corresponding
    18 Tier 1, then Tier 1 applies.
    19 MR. SHERRIL: Correct, that's (e).
    20 MS. SHARKEY: (F) is the one that I'm
    21 finding confusing. (F) appears to say that if
    22 Tier 2 is more stringent than Tier 1 for a
    23 particular exposure route, then the Tier 2
    24 remediation objective applies and the other -- for
    L.A. REPORTING
    (312) 419-9292
    393

    1 that route. I'm not sure. That's why I'm asking
    2 the question.
    3 MR. SHERRIL: When you go through the
    4 different tiers -- and let's say for an example
    5 for soil, you were looking at ingestion,
    6 inhalation and migration of groundwater, and when
    7 we use the term conservative, we intend that to
    8 mean the most health protective, and you pick the
    9 most -- unless a route is excluded, as we've
    10 discussed earlier, you pick the most restrictive
    11 remediation objective of those three.
    12 Then what (f) is saying is if you
    13 were to go on then and calculate a Tier 2 soil
    14 objective for an exposure route that is more
    15 stringent than the Tier 1 soil objectives for the
    16 other exposure routes, then the Tier 2 objective
    17 applies. What we're trying to -- what we're
    18 trying to do is -- we're trying to make it clear
    19 is when you drop out, in other words, if you
    20 calculated the Tier 2 for a particular exposure
    21 route, then that Tier 1 number would not apply
    22 then.
    23 So then you would go to the Tier 2
    24 number, but you've got to keep in mind which
    L.A. REPORTING
    (312) 419-9292
    394

    1 exposure routes are we looking at and are all
    2 three exposure routes still applicable. It's
    3 almost like you had six different -- for soil, you
    4 have the six -- you have inhalation, ingestion,
    5 migration to groundwater. Let's say you had those
    6 three under Tier 1, and then you had three for
    7 Tier 2 so you're up to six
    remediation
    8 objectives. Well, the most restrictive value
    9 would apply if all three routes are still in
    10 consideration.
    11 MS. SHARKEY: Under (e), the Tier 1, if
    12 the Tier 2 is more restrictive than the Tier 1,
    13 the Tier 1 is going to apply?
    14 MR. SHERRIL: Correct.
    15 MS. SHARKEY: Now, under (f), if the
    16 Tier 2 is more restrictive than the Tier 1 for
    17 other -- now, the other, are we talking about
    18 those other than the one looked at under (e)?
    19 What does "other" refer to, other exposure
    20 routes?
    21 MR. KING: Let me try. If you take a
    22 chemical, you know, under Tier 1, you're going to
    23 find three pathways so you're going to come up
    24 with three different numbers, okay. If you go
    L.A. REPORTING
    (312) 419-9292
    395

    1 then into Tier 2 and you do your calculation under
    2 Tier 2, and if you come up -- let's just say for
    3 the inhalation route, you go through and you do
    4 your Tier 2 number, if that Tier 2 number is more
    5 conservative than the Tier 1 number for the other
    6 two pathways for ingestion and migration of
    7 groundwater, you don't have to do the Tier 2
    8 calculations for those other two pathways, okay,
    9 that Tier 2 number.
    10 MS. SHARKEY: Because you're just going
    11 with the most stringent?
    12 MR. KING: The most stringent. So you
    13 would only do one Tier 2 calculation in that
    14 instance.
    15 MS. SHARKEY: If my Tier 2 had been more
    16 stringent than the Tier 1 for an exposure pathway,
    17 and under (e) I'm using Tier 1, now I go to look
    18 at my other two pathways, and now I compare those
    19 to the Tier 1 or the Tier 2? I'm trying to put
    20 (e) and (f) together.
    21 MR. SHERRIL: (E) and (f) should be
    22 looked at separate. We put (e) in there because
    23 we had a few people giving us
    remediation
    24 objectives that were more restrictive than what
    L.A. REPORTING
    (312) 419-9292
    396

    1 we've given them as our Tier 1, and so we said,
    2 oh, we better put something in here to let them
    3 know that they don't have to use this more
    4 restrictive number if they calculate it, and so
    5 (e) kind of stands alone on -- stands on its own.
    6 Don't try to combine (e) and (f).
    7 MS. SHARKEY: So all (f) is saying is
    8 the most restrictive of your three numbers is
    9 going to be your restriction, is going to be the
    10 one that applies?
    11 MR. SHERRIL: Yes.
    12 MS. SHARKEY: Could you help me on (g)
    13 again as well?
    14 MR. SHERRIL: On (g) there again we're
    15 saying that the most stringent -- or I like to use
    16 the word health protective -- Tier 2 objective
    17 applies of the applicable exposure routes.
    18 MS. SHARKEY: So if it's --
    19 MR. SHERRIL: An example there, what we
    20 see a lot of times is people, their most
    21 restrictive route in a lot of instances is the
    22 migration to groundwater route. So they go and
    23 calculate a Tier 2 migration to groundwater route,
    24 and they like that number because it's less
    L.A. REPORTING
    (312) 419-9292
    397

    1 restrictive, but then they think, well, heck, I'm
    2 going to go ahead and then let's say you calculate
    3 a Tier 2 on migration to groundwater, then you go
    4 back and say, well, my most health protective
    5 number now is inhalation for -- let's say,
    6 inhalation.
    7 Then they go, I'm going to
    8 calculate a Tier 2 for that, also, and if that
    9 number ends up being the most restrictive, then
    10 you would use that number. So it's up to the
    11 party on which one -- if they want to calculate
    12 Tier 2 or not. I mean, it's to your favor to
    13 calculate Tier 2 numbers and compare them with the
    14 Tier 1s and see which one is the less restrictive.
    15 MS. SHARKEY: With regard to any of
    16 these options, if the Tier 1 is less restrictive,
    17 you can use the Tier 1 for that exposure pathway?
    18 MR. SHERRIL: If the Tier 1 is the --
    19 correct. Then the next level from that would be
    20 the Tier 2 number. Like I said, it's rare, but it
    21 is possible that you can calculate a Tier 2. It
    22 becomes more restrictive than the Tier 1. So that
    23 (e) --
    24 MS. ROBINSON: And in the instance where
    L.A. REPORTING
    (312) 419-9292
    398

    1 they calculate a Tier 2 number that ends up being
    2 more restrictive, they still have the option to go
    3 back to the Tier 1 number, is that correct?
    4 MR. SHERRIL: Correct.
    5 MR. KING: Let me just add something
    6 because this (e) becomes an important point in the
    7 context of the underground storage tank program.
    8 We do not want people doing calculations coming up
    9 with more restrictive numbers and then cleaning up
    10 to those more restrictive numbers.
    11 We want to stop any kind of
    12 remediation in the tank program because it's going
    13 to be paid for out of the tank fund. We want to
    14 stop it at Tier 1. We don't want to go past that.
    15 MS. SHARKEY: In (g) in the second line,
    16 there's a term soil
    remediation objectives, and it
    17 reads, if the calculated Tier 2 soil
    remediation
    18 objective is less stringent than one or more of
    19 the soil
    remediation objectives for the remaining
    20 exposure routes. Does that mean Tier 1 soil
    21 remediation objectives, or that -- in that second
    22 line, what --
    23 MR. SHERRIL: Tier 2.
    24 MS. SHARKEY: In order to figure out if
    L.A. REPORTING
    (312) 419-9292
    399

    1 it was less stringent, you would have had to have
    2 calculated all three of them anyway, wouldn't
    3 you?
    4 MR. SHERRIL: Correct.
    5 MS. SHARKEY: You just simply take the
    6 most restrictive of those three once again?
    7 MR. SHERRIL: Correct.
    8 MS. SHARKEY: Thank you. I don't know
    9 if I was the only person that was confused by
    10 this, but it was difficult for me to unpack these.
    11 MS. MC FAWN: On that line I think I
    12 grasp it, but I wonder if the agency could outline
    13 some examples, not at this time, but maybe showing
    14 us how this works knowing that they're just
    15 examples.
    16 MR. SHERRIL: I provided two examples in
    17 my testimony.
    18 MS. MC FAWN: Okay, I guess I lost sight
    19 of that. How these three work together.
    20 MR. KING: We can do that. We'll come
    21 up with some examples to show that.
    22 MS. MC FAWN: Trying for the other board
    23 to members follow that.
    24 MR. KING: It points out the difficulty
    L.A. REPORTING
    (312) 419-9292
    400

    1 of trying to take what is in essence an equation
    2 and table-based system and write narrative words
    3 explaining that. It becomes something that is
    4 easier to see visually in a table or equation
    5 format, and that becomes more difficult to write
    6 and have it understood in a narrative fashion.
    7 HEARING OFFICER FEINEN: Is there any
    8 more follow-up on that question? I think we'll
    9 take another five-minute break here.
    10 MS. ROBINSON: Is there any indication
    11 of like if we're going to break today and resume
    12 in January because I have a feeling we're not
    13 going to get close enough to being finished to
    14 quit at 6:00, and you know, we have several hours
    15 of driving ahead, too.
    16 HEARING OFFICER FEINEN: I think we can
    17 go off the record.
    18 (Discussion off the record.)
    19 (Recess taken.)
    20 HEARING OFFICER FEINEN: Go back on the
    21 record. I got a couple of things to say. First
    22 of all, I think it has been decided that we're
    23 going to continue this matter on December 10th in
    24 Springfield at 10:00 a.m. at the Stratton
    L.A. REPORTING
    (312) 419-9292
    401

    1 Building, Room A-1.
    2 Hopefully, tomorrow we'll have an
    3 Hearing Officer order addressed in this issue
    4 going out, and that should be circulated and going
    5 on the Web and so forth and so on. The other
    6 issue was how far we're going to go today.
    7 MS. MC FAWN: The reason we're going to
    8 have this hearing is we believe that it's very
    9 important that we get through the
    prefiled
    10 questions now so that when we find any glitches,
    11 they can be corrected in January, and we're really
    12 bumping up against our second notice in January,
    13 preparing for the second notice.
    14 So we anticipate that the hearing
    15 on Tuesday, that we're continuing until next
    16 Tuesday is for the purpose of getting through the
    17 prefiled questions. Today I think that it's
    18 advisable that we get at least to the questions up
    19 to subpart I, that is, Tier 3, leaving Tier 3 for
    20 next Tuesday.
    21 I don't want to end up in such a
    22 time crunch next Tuesday that the board doesn't
    23 have before it and the participants don't have
    24 before them the information they need for the
    L.A. REPORTING
    (312) 419-9292
    402

    1 January hearings. So today I want to go as long
    2 as necessary to get to Tier 3, okay.
    3 HEARING OFFICER FEINEN: So with that, I
    4 think we'll start out with the Site
    Remediation
    5 Advisory Committee.
    6 MS. MC FAWN: Before we go on to the
    7 questions again, is there any other comments that
    8 you want to make on the record about the
    9 continuation of the hearing? I know for the most
    10 part, you have during the break committed to
    11 coming. I know that Ms.
    Sharkey has informed us
    12 that's not a good day for her but maybe someone
    13 else from her firm could come.
    14 MR. RIESER: Did you say a time?
    15 MS. MC FAWN: 10:00 a.m. I would also
    16 note on the record that there is a hearing
    17 scheduled in that very room. The board has
    18 scheduled an underground storage tank hearing. We
    19 have checked with the hearing officer in that
    20 matter, and she, along with some of the critical
    21 participants in the agency in that hearing,
    22 believe that they will only need the Monday before
    23 to wrap up the public testimony on the underground
    24 storage tank rule before the board.
    L.A. REPORTING
    (312) 419-9292
    403

    1 So if any of you have that day
    2 reserved on your calendar for underground storage
    3 tanks, you can come and hear more about T.A.C.O.,
    4 at least that's how we anticipate it going. Any
    5 comments from anyone? Any questions?
    6 HEARING OFFICER FEINEN: Mr.
    Reott.
    7 MR. REOTT: No, it got answered.
    8 HEARING OFFICER FEINEN: Can we start
    9 out then with Site
    Remediation Advisory Committee,
    10 742.610.
    11 MR. RIESER: Yes. Will the agency --
    12 and I think this has been asked and answered --
    13 will the agency confirm that this section applies
    14 only to Tier 2 and Tier 3 remedial objectives and
    15 not to Tier 1 objectives?
    16 MR. HORNSHAW: Yes.
    17 HEARING OFFICER FEINEN: Any follow-up
    18 questions? 742.615, Site
    Remediation.
    19 MR. RIESER: Must an applicant use
    20 appendix C, table E, for these parameters?
    21 MR. HORNSHAW: Yes.
    22 MR. RIESER: Can other values be
    23 substituted under Tier 3?
    24 MR. HORNSHAW: Yes.
    L.A. REPORTING
    (312) 419-9292
    404

    1 MR. RIESER: With respect to subsection
    2 (b)(2), will the agency clarify that a person does
    3 not need an evaluation for each
    stratigraphic
    4 unit?
    5 MR. SHERRIL: I want to make a
    6 distinction on under Tier 2 here, we're using this
    7 to determine site specific soil parameters for
    8 input into the Tier 2 equations. These site
    9 specific parameters can accurately or more
    10 accurately reflect a site's conditions, and while
    11 we're not requiring sampling from each
    12 stratigraphic unit, the agency would tend to look
    13 on the more conservative unit.
    14 If you had a sand unit and a clay
    15 unit, we wouldn't just say, well, the sand unit's
    16 indicative of the whole site, and I also wanted to
    17 refer part of this question to Doug Clay.
    18 MR. CLAY: I think the term
    19 stratographic unit is at issue in the 732 LUST
    20 hearings, and that's still being worked out and
    21 defined, and the use of
    stratigraphic unit in this
    22 context and in LUST is a little bit different
    23 where in the LUST hearings, you're looking at
    24 stratigraphic unit to compare it to the Berg
    L.A. REPORTING
    (312) 419-9292
    405

    1 Circular.
    2 MS. MC FAWN: B-E-R-G.
    3 MR. CLAY: And in this context, you're
    4 looking at doing physical soil sampling on the
    5 soil of the unit below the contamination, between
    6 the contamination and groundwater.
    7 MR. RIESER: Thank you, Mr. Clay,
    8 because what you're doing is confirming that these
    9 are really separate issues and under this program,
    10 the focus on evaluating each
    stratigraphic unit is
    11 not as driven by the statutory framework but is
    12 instead a function of trying to provide a total
    13 site evaluation.
    14 MR. CLAY: That's correct.
    15 MR. RIESER: Are all of the Tier 1
    16 residential values in appendix B, table A
    17 calculated from Tier 2 SSL equations using default
    18 values identified in the appendices? And if not,
    19 how are they different?
    20 MR. HORNSHAW: In three cases the Tier 1
    21 value could not be derived from Tier 2 equations.
    22 That's the case for PCB's, lead and
    23 pentachlorophenol. We've discussed the reasons
    24 for all three of those previously.
    L.A. REPORTING
    (312) 419-9292
    406

    1 MR. RIESER: Thank you.
    2 MS. SHARKEY: Could I do one? Are you
    3 saying then that the default values are the Tier 1
    4 values for every other chemical besides those that
    5 you've mentioned?
    6 MR. HORNSHAW: Yes.
    7 MR. SONI: Before we go to 615, 742.610,
    8 the equation calculate the weighted average. It
    9 seems to be missing left side of the equation. It
    10 says weighted average equals.
    11 MR. HORNSHAW: You're correct.
    12 MS. ROBINSON: We'll take a look at
    13 those for correcting in errata No. 2. While we're
    14 on this topic, since we're now going to meet next
    15 Tuesday, it's going to be a little more difficult
    16 for us to commit to getting you an errata sheet
    17 next Tuesday rather than in January. So is it
    18 still okay to do those follow-up issues we
    19 committed to in January in January?
    20 MS. MC FAWN: Yes. That's what I was
    21 anticipating.
    22 MS. ROBINSON: Okay.
    23 HEARING OFFICER FEINEN: Any more
    24 follow-up? 742.615,
    Mayer, Brown & Platt,
    L.A. REPORTING
    (312) 419-9292
    407

    1 Ms.
    Sharkey.
    2 MS. SHARKEY: My question has been
    3 answered. Thank you.
    4 HEARING OFFICER FEINEN: Should we move
    5 on to 742.700, subpart G, Tier 2 soil evaluation,
    6 Site
    Remediation Advisory Committee.
    7 MR. RIESER: This section --
    8 MR. WATSON: Excuse me, I have one other
    9 follow-up question -- and forgive me if I'm
    10 missing the boat here.
    11 On 615(b)(2), the Site
    Remediation
    12 group's question 2, are all of the Tier 1
    13 residential values in appendix B, table A
    14 calculated from Tier 2 SSL equation using default
    15 values identified in the appendices. Just for my
    16 purposes, not all of the values in that table are
    17 calculated from the SSL equations, correct? There
    18 are some of those that are calculated using TCLP
    19 values, right?
    20 MR. HORNSHAW: That's correct, also.
    21 It's not calculated. It's just the result of the
    22 TCLP test.
    23 MR. WATSON: And two of those values are
    24 calculated using the sulfates, and the chlorides
    L.A. REPORTING
    (312) 419-9292
    408

    1 are calculated based on something else, is that
    2 right?
    3 MR. HORNSHAW: Those values were in the
    4 620
    rulemaking and established the standards for
    5 Class 2 and 1. In the case of sulfate and
    6 chloride, the standard was based on 95th
    7 percentile occurrence in monitoring data rather
    8 than any toxicological criteria.
    9 MR. WATSON: Could you just explain that
    10 standard, that 95th percentile standard.
    11 MR. HORNSHAW: Public water supplies are
    12 required to monitor for chloride and sulfate and
    13 report the results to the agency, and the agency
    14 maintains all this information in a database and
    15 pulled out the 95th percentile occurrence of all
    16 the monitoring results that had been reported at
    17 the time of that
    rulemaking.
    18 MR. WATSON: Thank you.
    19 HEARING OFFICER FEINEN: Any more
    20 follow-up? Mr.
    Rieser, section 742.700.
    21 MR. RIESER: Thank you. This is with
    22 respect to subsection (d), which should be
    23 subsection (f) under this section. This section
    24 indicates that a person must calculate
    L.A. REPORTING
    (312) 419-9292
    409

    1 construction worker objectives and be bound by
    2 those objectives if more stringent than for other
    3 pathways.
    4 For a construction worker scenario,
    5 is it possible to use an institutional control
    6 which identifies the area of contaminated media
    7 and requires compliance with OSHA for workers
    8 performing invasive construction work in that
    9 area?
    10 MR. SHERRIL: Let me say generally yes
    11 and kind of break that up into three parts. It
    12 identifies the area of the contaminated media.
    13 This word compliance with OSHA for workers, let's
    14 say, performing in basic construction work in that
    15 area, maybe a better term would be like place a
    16 duty upon an employer.
    17 I may have used the word compliance
    18 in my testimony, I'm not sure, but it's more like
    19 placing a duty on the employer for safe working
    20 conditions, and then also some kind of
    21 notification, which would include some kind of
    22 notification for construction and emergency
    23 workers prior to work in these contaminated areas.
    24 MR. RIESER: So the basic point being
    L.A. REPORTING
    (312) 419-9292
    410

    1 that you can address levels that are in excess of
    2 the construction worker scenario by the use of
    3 institutional controls such as the types you
    4 described rather than
    remediating a level --
    5 remediating the contaminants to those levels?
    6 MR. SHERRIL: Yes.
    7 MR. HORNSHAW: While we're on the
    8 subject of construction worker, could I correct a
    9 minor problem in my earlier testimony? In
    10 response to Mr.
    Reott's question about what the
    11 agency changed from the ASTM model, I neglected to
    12 include that we have included the use of
    13 subchronic reference doses and reference
    14 concentrations for the construction worker,
    15 whereas
    ASTM's approach only uses the chronic
    16 reference doses and reference concentrations.
    17 Thanks.
    18 MR. RIESER: Going to page 2 -- I'm
    19 sorry, item 2. On page 29 of Mr.
    Sherril's
    20 testimony, he indicates that the default values
    21 for physical soil properties are, quote, "health
    22 protective," unquote.
    23 Does this mean that they are values
    24 which will produce a low remedial objective when
    L.A. REPORTING
    (312) 419-9292
    411

    1 used in the Tier 2 formulas or values that
    2 represent typical Illinois soil conditions?
    3 MR. SHERRIL: Let me answer that by
    4 saying for a low remedial objective, I assume you
    5 mean the more health protective remedial
    6 objective.
    7 MR. RIESER: I guess a mean a more
    8 conservative or valued number.
    9 MR. SHERRIL: We've thrown this word out
    10 "default" several times, and there's been some
    11 confusion. We've heard what that means. Many of
    12 the, quote, default values were primarily provided
    13 for USEPA documents which are incorporated by
    14 reference and ASTM, and a default value is not to
    15 be interpreted as if the agency like no other
    16 value could be obtained so we just thought up some
    17 number.
    18 It is not to be interpreted as
    19 that, and the Tier 1 objectives were calculated,
    20 though, using these default, let's say, values
    21 which we have provided in the appendices, and they
    22 do present values which are conservative and
    23 health protective, and we have a little trouble,
    24 though, with like typical Illinois soil
    L.A. REPORTING
    (312) 419-9292
    412

    1 conditions.
    2 It represents values that are
    3 protective of, for example, soils that would tend
    4 to migrate -- lets contaminants migrate freely,
    5 and since we have such a wide variety of soils in
    6 Illinois, we really don't have typical Illinois
    7 soil conditions.
    8 There's some soil parameters in the
    9 -- and I kind of went through some of them like
    10 soil particle density is a value that generally
    11 almost all the textbooks give one value for it,
    12 and there's no use really even obtaining another
    13 value for it and the equations aren't sensitive to
    14 it anyway.
    15 MR. RIESER: But where there were
    16 potential range of physical chemical values, you
    17 could assign -- the default values that were
    18 selected were based on a soil scenario that would
    19 be, let's say, identified more permeability, more
    20 transport opportunities.
    21 MR. SHERRIL: That would be fair to
    22 characterize that, yes.
    23 MR. RIESER: And yet the purpose of Tier
    24 2, of course, is that an applicant can evaluate
    L.A. REPORTING
    (312) 419-9292
    413

    1 the in-site specific soil for certain parameters
    2 which you've identified and put into the equations
    3 those values that are representative of site
    4 conditions?
    5 MR. SHERRIL: Yes.
    6 MR. RIESER: On page 33 of Mr.
    Sherril's
    7 testimony, he states that, the purpose of Tier 2
    8 soil objectives is to ensure that the 35 Illinois
    9 Administrative Code standards are not exceeded.
    10 Is not it more accurate to say that the purpose of
    11 Tier 2 soil equations is to ensure that the
    12 appropriate groundwater
    remediation objectives are
    13 met at the point of human exposure?
    14 MR. SHERRIL: Yes.
    15 MS. MC FAWN: I would note for the
    16 record that you're referring to the standards,
    17 that's part 620. I think you skipped that.
    18 MR. RIESER: The 620 standards are
    19 identified, and then the appropriate groundwater
    20 remediation objectives which I have in the
    21 question are really the groundwater
    remediation
    22 objectives identified in this, the Tier 1
    23 groundwater
    remediation objectives which are
    24 identified in this proposal.
    L.A. REPORTING
    (312) 419-9292
    414

    1 Mr.
    Sherril, is that how you
    2 understood that?
    3 MR. SHERRIL: Yes.
    4 HEARING OFFICER FEINEN: Any follow-up
    5 questions? Move on to 742.805, subpart H, Tier 2
    6 groundwater evaluations, Site
    Remediation.
    7 MR. REOTT: You know, I've actually got
    8 questions I think fit more into the prior section.
    9 MR. RIESER: I think that's correct.
    10 MR. REOTT: I want to do these. Turn to
    11 question 18. For both metals and other
    12 contaminants regulated by part 742, may the site
    13 use
    leachate data obtained from actual site
    14 leaching tests to replace the calculated target
    15 soil
    leachate values -- which was the form of the
    16 terms -- used in formula S18 for the SSL model and
    17 formula R14 for the ASTM model. And then I go on,
    18 actual site leaching tests eliminate the
    19 uncertainty of estimating
    leachability based on
    20 laboratory analysis and literature values and
    21 already have been approved by the agency in some
    22 contexts such as landfill modeling?
    23 MR. SHERRIL: The part that you have on
    24 the question, we would say yes. Under Tier 3, we
    L.A. REPORTING
    (312) 419-9292
    415

    1 would think this is quite a more extensive and
    2 rigorous approach, more samples would be needed
    3 and so forth, and then on the second part, I guess
    4 which is a statement, I don't have any response
    5 one way or the other on that.
    6 MR. REOTT: You see what I'm trying to
    7 say. Instead of trying to guess at -- based on
    8 the science, to guess at
    leachability, why not do
    9 actual leaching testing and then plug that into
    10 the formula?
    11 MR. O'BRIEN: That would be a Tier 3
    12 issue. We could consider that, yeah.
    13 MR. REOTT: Then skip ahead to No. 40,
    14 may you meet cleanup criteria by demonstrating the
    15 site does not exceed background for one pathway or
    16 contaminant and then use one of the models for the
    17 other pathways?
    18 MR. SHERRIL: Yes.
    19 MR. REOTT: And then in 41, in the Tier
    20 2 calculations, do the formulas assume Class 1
    21 groundwater?
    22 MR. SHERRIL: No.
    23 MR. REOTT: So if you had a site with
    24 Class 2 groundwater, if that was the actual
    L.A. REPORTING
    (312) 419-9292
    416

    1 groundwater beneath the site, you could use
    2 Class 2 groundwater, plug them into the formulas
    3 and then rerun the Tier 2 numbers?
    4 MR. SHERRIL: Yes.
    5 MR. REOTT: I skipped one, No. 15. I
    6 just realized I skipped one.
    7 MS. ROBINSON: Was that 15?
    8 MR. REOTT: 15. The use of the Tier 2
    9 equations for metals is unclear. How do sites
    10 with metals contamination problems use the
    11 equations in Tiers 2 -- and I said in 3, but you
    12 just focus on 2 -- to determine more realistic
    13 site specific cleanup objectives?
    14 MR. SHERRIL: Appendix C, table J, has
    15 12 inorganic values in these pH specific ranges
    16 that can be used to determine a more realistic
    17 migration of groundwater objective.
    18 MR. REOTT: But that doesn't use the SSL
    19 model or the ASTM model?
    20 MR. SHERRIL: It's an SSL model.
    21 MR. REOTT: The pH table comes from
    22 SSL?
    23 MR. HORNSHAW: Correct.
    24 MR. REOTT: From their fact sheet or
    L.A. REPORTING
    (312) 419-9292
    417

    1 whatever it's called?
    2 MR. HORNSHAW: Well, yes, and it also
    3 derives from equation.
    4 MS. ROBINSON: Just for clarification
    5 for the record, it's on page 164 of the board's
    6 copy.
    7 MR. SHERRIL: This is a different pH
    8 table than what we were talking about before.
    9 This one is a pH table that you obtain these
    10 values from this table depending on your pH and
    11 then plug them right into the Tier 2 equations
    12 versus the other pH table you look at the pH and
    13 it gives you the
    remediation objective just right
    14 out of the table.
    15 MR. HORNSHAW: And for
    inorganics, the
    16 KD value, which is defined in equation S19 as KOC
    17 times FOC, the KOC times FOC part is irrelevant
    18 for
    inorganics. So you just use the KD that's in
    19 the table and use it in equation S17.
    20 MR. REOTT: Appendix C, table J, has the
    21 substitution values for, I think, 12
    inorganics.
    22 For the other
    inorganics that don't have the
    23 values, are you not able to do Tier 2 analysis?
    24 MR. HORNSHAW: That's correct. That
    L.A. REPORTING
    (312) 419-9292
    418

    1 would have to be handled as a Tier 3 issue. For
    2 instance, you could derive a site specific KD
    3 using I think it's
    USEPA's Minteq, M-I-N-T-E-Q,
    4 model and then plug that KD value again into that
    5 equation that I just mentioned.
    6 You could also do a literature
    7 search and propose a KD value based on studies
    8 that have been reported in the literature for the
    9 agency to review. These would be ways that
    10 somebody could do the
    inorganics that aren't
    11 included in the tables we've already provided.
    12 MR. REOTT: One of the things that's
    13 hard to evaluate from your proposal is it's very
    14 difficult to figure out all the gaps when you
    15 can't use the formulas for particular
    16 contaminants, and we went through this before
    17 where, you know, it isn't until you go through the
    18 list you realize that you just skipped the
    19 contaminant and it wasn't listed so you don't have
    20 any values and you can't use the formulas.
    21 Would you mind putting together a
    22 list of the instances where the use of the
    23 formulas is unavailable for particular
    24 contaminants because we don't have values listed
    L.A. REPORTING
    (312) 419-9292
    419

    1 in the back.
    2 MR. SHERRIL: I don't think we have the
    3 time to do that because there again there's tens
    4 of thousands of hazardous substances, and to go
    5 through each one and make a determination --
    6 MR. REOTT: John, let me make it
    7 simple --
    8 MR. SHERRIL: -- it would be unwieldy.
    9 MR. REOTT: Let me make it simple. Just
    10 start with the list that's in Tier 1 and look at
    11 that list because what happens, I think, is -- and
    12 some of these were discovered this morning, at
    13 least I haven't focused on them before.
    14 When you go back into the tables,
    15 if you don't actually have values for certain
    16 contaminants, you can't run the formulas. You're
    17 stuck then with Tier 3 or Tier 1, and you don't
    18 have any Tier 2 options
    19 MR. SHERRIL: I would be hesitant to
    20 agree to that because some of the chemicals you
    21 can use in some of the equations. It's not a
    22 blanket like you can use them and you can't use
    23 them because that first order of degradation
    24 constant, when we ran into that problem, we said,
    L.A. REPORTING
    (312) 419-9292
    420

    1 okay, we'll use a substitution of zero.
    2 Well, that applies for certain of
    3 the chemicals, but I would be hesitant to do it
    4 for time constraints, but also, you know, we could
    5 easily miss something on that.
    6 MR. REOTT: I think it's hard for us to
    7 evaluate the proposal fully without being able to
    8 figure out exactly which of the contaminants are
    9 listed in Tier 1 we can even do a Tier 2 analysis
    10 for, and if we can do it, can we only do it with
    11 SSL or do we have to use ASTM or are both options
    12 available?
    13 You end up having to search through
    14 the real fine detail here to find what's sometimes
    15 very important issues. I'm not saying you need to
    16 have it by Tuesday, but I don't think it's
    17 unreasonable to ask for it by January. If you
    18 tell me you're not going to do it, I can't make
    19 you do it.
    20 MR. KING: That's a comment we have to
    21 evaluate. If we don't have the time and resources
    22 to do it, we won't be able to do it.
    23 MR. REOTT: That's all at this point.
    24 HEARING OFFICER FEINEN: Next we switch
    L.A. REPORTING
    (312) 419-9292
    421

    1 back to the Site
    Remediation Advisory Committee,
    2 742.805.
    3 MR. RIESER: I had a couple of questions
    4 that probably come up under 700 that really come
    5 out of the provisions that the agency made to
    6 their appendices which we got yesterday, and if I
    7 can ask those real quick and if you want to answer
    8 them at a later time, that's fine. I think this
    9 is pretty much where they happen.
    10 The primary one I wanted to ask
    11 about is that the target risk that is described in
    12 appendix C, table B, originally had different
    13 values between the commercial and residential and
    14 construction worker or at least allowed the range
    15 for the commercial and residential and
    16 construction worker and not for the residential,
    17 and there's also other points in the regulation
    18 itself, 710(b)(3), 710(c)(2)(a), 710(3)(b)(c) and
    19 715(d), that talk about a shifting target risk of
    20 more than 1 million, and the question is how do
    21 these all work together now with the change in the
    22 appendix?
    23 MR. KING: I don't think we can give an
    24 organized answer to that question as we sit here.
    L.A. REPORTING
    (312) 419-9292
    422

    1 We'll have to do that later.
    2 MR. RIESER: Okay, thank you. One of
    3 the other values that was changed again in the
    4 same table was the Q over C, used the VF
    5 equations, and one was added, a Q over C used in
    6 the PEF equations, and the parameter values
    7 between the two -- well, at least the parameter
    8 values for residential appear to be different.
    9 Am I understanding that these are
    10 values that are derived from USEP -- I'm sorry,
    11 the SSL tables per a five-acre site and that the
    12 68.81 value is for a site in Los Angeles. A
    13 residential site in Chicago would be a larger
    14 value. And
    amy question is why not use -- why do
    15 we have two different Q over Cs, and why not use
    16 the Chicago value from the SSL?
    17 MR. HORNSHAW: We continue to use
    18 USEPA's Q over C value for the residential
    19 scenario so that our table would be consistent
    20 with their table. We didn't want to do a complete
    21 recalculation of the residential table. Since
    22 USEPA doesn't have an industrial commercial table,
    23 we felt we could use the Chicago Q over C value in
    24 constructing that table.
    L.A. REPORTING
    (312) 419-9292
    423

    1 MR. RIESER: But isn't the Chicago value
    2 higher than the value you are using here?
    3 MR. HORNSHAW: Yes, it is.
    4 MR. RIESER: So the Chicago value was
    5 used or was not used?
    6 MR. HORNSHAW: Was used for the
    7 industrial tables, was not used for the
    8 residential tables.
    9 MR. RIESER: Is there any thought about
    10 recalculating based on the Chicago -- using the
    11 Chicago value?
    12 MR. HORNSHAW: I think we would prefer
    13 to maintain consistency with the federal program
    14 as much as possible, which is, for instance, the
    15 reason we continued to use their health base
    16 levels instead of the 620, subpart F values where
    17 the chemical doesn't have MCL
    18 MR. RIESER: Wouldn't using the Chicago
    19 values be more consistent with the federal
    20 program?
    21 MR. HORNSHAW: Consistent in what way?
    22 MR. RIESER: Consistent with using the
    23 values they identified as being appropriate for
    24 the climate conditions in Chicago.
    L.A. REPORTING
    (312) 419-9292
    424

    1 MR. HORNSHAW: Possibly, but if we're
    2 going to be consistent with Illinois, then we
    3 would probably want to go to the Illinois
    4 groundwater values, too.
    5 MR. RIESER: And in most instances where
    6 you would have them, that's what you did, is that
    7 correct?
    8 MR. HORNSHAW: For groundwater?
    9 MR. RIESER: Yeah.
    10 MR. HORNSHAW: No. As I stated in my
    11 testimony, we decided to use the health-based
    12 levels so that the values in our look-up table
    13 would be consistent with the values in the
    USEPA's
    14 look up table, even though the use of groundwater
    15 values for subpart F of 620 would have been
    16 probably five times more stringent than the
    17 health-based values that the USEPA used.
    18 MR. RIESER: I'm sorry, I cut you off.
    19 What did you say?
    20 MR. HORNSHAW: If we used 620, subpart F
    21 to calculate groundwater values for chemicals that
    22 don't have
    MCL's, those values would have probably
    23 in most cases been five times more stringent than
    24 the
    USEPA's health-based levels which we decided
    L.A. REPORTING
    (312) 419-9292
    425

    1 to use in the interest of being consistent as much
    2 as possible.
    3 MR. RIESER: But when you had values
    4 from 620 that were adopted and didn't require
    5 calculations through subpart F, you used those
    6 values, isn't that correct?
    7 MR. HORNSHAW: I'm not sure I'm
    8 following your question.
    9 MR. RIESER: I'm just going to leave
    10 this.
    11 Also, in the same table with
    12 respect to infiltration rates, you've got an
    13 infiltration rate and then an infiltration rate to
    14 be used for the mass loading equation.
    15 MS. ROBINSON: Is that in the errata
    16 sheet?
    17 MR. RIESER: Yes, it is.
    18 MS. ROBINSON: You're looking at the
    19 appendices, I believe.
    20 MR. RIESER: This is the revised
    21 appendices.
    22 MS. ROBINSON: Right, and some of those,
    23 as we stated yesterday, have not gotten into the
    24 errata yet. They're going to go into errata 2.
    L.A. REPORTING
    (312) 419-9292
    426

    1 They may be shaded there but not referenced here.
    2 I want to see if the reference here we're looking
    3 at the same place.
    4 MR. RIESER: I am looking at the
    5 appendices that were passed out that were provided
    6 yesterday with shading, and obviously we haven't
    7 had time to cross reference these to the errata
    8 sheet.
    9 MS. ROBINSON: Is that appendix C, table
    10 B?
    11 MR. RIESER: Yes, it is.
    12 MS. ROBINSON: Can we defer this
    13 question until we get errata No. 2 done?
    14 MR. RIESER: That's fine.
    15 MR. HORNSHAW: If you're referring to I,
    16 sub M-L --
    17 MR. RIESER: Yes.
    18 MR. HORNSHAW: -- the value that's in
    19 there is the one that's specified in
    USEPA's
    20 document, if that answers your question.
    21 MR. RIESER: How is that different from
    22 I?
    23 MR. HORNSHAW: Numerically or -- both of
    24 the values are specified by USEPA, and I'm not
    L.A. REPORTING
    (312) 419-9292
    427

    1 sure how either of them were derived.
    2 MR. RIESER: Thank you.
    3 MS. ROBINSON: I'd like to clarify here,
    4 too, if we are referring to I, sub M-L, that that
    5 is in the first errata sheet on page 8.
    6 MR. RIESER: Okay, thanks very much, and
    7 I'm ready to go on to 805
    prefile.
    8 HEARING OFFICER FEINEN: We have a
    9 follow-up question in the back.
    10 MR. JAMES: Ken James,
    Carlson
    11 Environmental. I have a follow-up to Mr.
    Rieser's
    12 question about the table in appendix C, that you
    13 spoke to the SSL parameters and the RBCA
    14 parameters in regards to TR cancer risk. I know
    15 you mentioned it briefly in his question about
    16 this table, but I would like a little
    17 clarification, in that the
    TR's that were allowed
    18 originally were 10 to the minus 4 and ranged up to
    19 10 to the minus 6 down to 10 minus 6, and now in
    20 your new errata sheet and in this new appendix
    21 that was handed out, they have been limited to 10
    22 to the minus 4 at the point of exposure, and I
    23 would just like to hear the agency's --
    24 MR. REOTT: 10 to the minus 6.
    L.A. REPORTING
    (312) 419-9292
    428

    1 MR. JAMES: 10 to the minus 6 at the
    2 point of exposure, and I would like to hear the
    3 agency's reason for that change and how would
    4 that, in the agency's opinion, affect the
    5 calculation of objectives at the Tier 2 level and
    6 how that would affect the use or nonuse of an
    7 engineered barriers?
    8 MR. KING: I thought we -- at least the
    9 first part of that, I thought we answered that
    10 already.
    11 MS. MC FAWN: You know, I don't believe
    12 Mr. James was here when we had that discussion,
    13 could you summarize it? Is that possible?
    14 MR. KING: I really hate to try to do
    15 that because I'm going to end up with a different
    16 statement than what I had on the record earlier,
    17 and then the record is going to be confused on
    18 that point. So perhaps, Mr. James, I could have a
    19 conversation at some point in the future on that
    20 off the record. If need be, we can go over it.
    21 MS. MC FAWN: I would just note for your
    22 information, Mr. James, we did discuss the change
    23 from 10 to the minus 4 to 10 to the minus 6, I
    24 believe, this morning before lunch, but I'm not
    L.A. REPORTING
    (312) 419-9292
    429

    1 even sure of the time.
    2 MR. JAMES: And how it ties into the use
    3 and nonuse of engineered barriers?
    4 MS. MC FAWN: And how it -- pardon me?
    5 MR. JAMES: Ties into the use and nonuse
    6 of engineered barriers.
    7 MR. KING: I don't think we directly
    8 discussed that. The engineered barrier, when it's
    9 coupled with an institutional control, is a
    10 mechanism to shift the point of human exposure
    11 away from the source.
    12 MR. JAMES: So then the use of an
    13 engineered barrier would eliminate the need to
    14 calculate an objective?
    15 MR. KING: No, I wouldn't agree with
    16 that. It depends on the context that you're using
    17 it in. That would not be true in all cases.
    18 MS. ROBINSON: Mr. King, isn't it true
    19 that any time you use an engineered barrier, you
    20 also have to have an institutional control?
    21 MR. KING: Right, that's correct.
    22 MR. JAMES: Yeah, so?
    23 HEARING OFFICER FEINEN: More
    24 follow-up?
    L.A. REPORTING
    (312) 419-9292
    430

    1 MR. JAMES: No, no thank you.
    2 MR. FEINEN: I guess we're ready to
    3 begin I think for the third time 742.805.
    4 MR. RIESER: Thank you very much.
    5 Subsection (a)(1) requires that the horizontal and
    6 vertical extent of the contamination be
    7 identified. Can this be done through a
    8 combination of modeling and sampling?
    9 MR. SHERRIL: Yes. The extended
    10 groundwater contamination can be determined
    11 through a combination of modeling and sampling.
    12 MR. RIESER: Will the agency allow
    13 direct push technology for identifying the extent
    14 of the contamination?
    15 MR. SHERRIL: The agency allows direct
    16 push technology such as a
    geoprobe, if you're
    17 familiar with that. We've recently purchased a
    18 geoprobe for use. The term direct push technology
    19 incorporates other sampling techniques and methods
    20 other than just a
    geoprobe. If it was a technique
    21 we're not familiar with, I can't really state on
    22 the record whether we would approve of that.
    23 MR. RIESER: Are there direct push
    24 technologies that you determined to rule out at
    L.A. REPORTING
    (312) 419-9292
    431

    1 this point that you're familiar with?
    2 MR. SHERRIL: I don't think we've
    3 necessarily ruled any out. The technology is
    4 still somewhat new, and the techniques, for
    5 example, to collect groundwater samples, collect
    6 soil samples is still an emerging technology on
    7 their proper use.
    8 MR. RIESER: Okay, thank you.
    9 Subsection (a)(2) requires that corrective action
    10 be taken to the maximum extent practicable to
    11 remove free product. If the default values in
    12 section 742.215 (determination of soil attenuation
    13 capacity) and 742.220 (determination of soil
    14 saturation limit) are not exceeded, does the
    15 agency consider free product present in the
    16 soils?
    17 MR. SHERRIL: It may not necessarily be
    18 in the soils. It may be in groundwater.
    19 MR. RIESER: I think we had a discussion
    20 yesterday that there was an addition to the -- an
    21 addition to the evaluation of groundwater where --
    22 there was an addition in the errata where it was
    23 in 320(b), to the maximum extent practicable,
    24 corrective action has been taken to remove any
    L.A. REPORTING
    (312) 419-9292
    432

    1 free product where there was this discussion, that
    2 these particular sections, Section 215 and 220,
    3 would not be applied to the valuation of
    4 groundwater, is that correct?
    5 MR. SHERRIL: Correct.
    6 MR. RIESER: So this is sort of an
    7 extension of that same thought?
    8 MR. SHERRIL: Correct.
    9 MR. RIESER: What are the standards for
    10 determining the practicability of removing free
    11 product?
    12 MR. SHERRIL: The items that are used to
    13 determine the practicability of free product
    14 removal includes site specific criteria such as
    15 the concentration of contaminants, the toxicity of
    16 the contaminants, the amount of contaminants, the
    17 estimated migratory pathways, whether any free
    18 product, free faced contaminant is present,
    19 whether the soil attenuation capacity is exceeded,
    20 whether a sheen is visible either in the soil,
    21 groundwater or surface water, whether remaining
    22 contamination will be disturbed by construction
    23 workers or other human activities, whether
    24 remaining contamination will be disturbed by
    L.A. REPORTING
    (312) 419-9292
    433

    1 natural or animal forces, high infiltration rates,
    2 highly permeable units such as a
    Karst geology,
    3 burrowing animals, whether the release point of
    4 the contamination can be located.
    5 Such as in the LUST program, we
    6 know where the release point is at the tank versus
    7 many sites in the site
    remediation program where
    8 we do not know where the release points are, and
    9 the intended post remedial use of the property, if
    10 it's going to be residential, is it going to be a
    11 playground. Those are factors that we look at.
    12 MR. RIESER: Could you list among those
    13 whether there were technologies available to
    14 remove the free product?
    15 MR. SHERRIL: I didn't hear you.
    16 MR. RIESER: Did you include among that
    17 list whether there were technologies available to
    18 remove the free product?
    19 MR. SHERRIL: No.
    20 MR. RIESER: Would you consider that as
    21 well?
    22 MR. SHERRIL: Yes.
    23 MR. RIESER: And so you would consider
    24 the technical and practicability, whether it was
    L.A. REPORTING
    (312) 419-9292
    434

    1 technically possible to remove the free product as
    2 part of the consideration?
    3 MR. SHERRIL: Yes. The list I gave was
    4 not intended to be an all-inclusive list. This is
    5 just things we looked at.
    6 MR. WATSON: Let me ask you a follow-up
    7 on that question. That is, what kind of showing
    8 would have to be made to show that something
    9 wasn't technically practicable?
    10 MR. SHERRIL: Really to the items that I
    11 just listed would be we look at those and then we
    12 look at, you know, with the state of engineering
    13 that it is today, whether it's feasible to remove
    14 free product.
    15 MR. WATSON: If someone used the -- if
    16 someone went out and did a free product removal
    17 action out there with the recognized technical
    18 equipment available to do free product removal,
    19 would the agency consider that sufficient --
    20 whatever the results of that removal activity
    21 yield, would the agency consider that sufficient
    22 to satisfy what was technically practicable?
    23 MR. SHERRIL: I guess that's such a site
    24 specific question. Sometimes free product is just
    L.A. REPORTING
    (312) 419-9292
    435

    1 a couple of feet below the surface and all you
    2 have to do is dig it out with an excavator and you
    3 remove it.
    4 Sometimes free product is 40 feet
    5 below the surface and pumping technology becomes
    6 difficult, or under buildings, and it becomes
    7 difficult. But it's such a site specific
    8 question, I don't know if I could answer that.
    9 MR. WATSON: I guess it's my
    10 understanding that removing free product is a
    11 difficult task, and regardless of the equipment
    12 you're using, you're still only going to be able
    13 to remove, you know, some consultants will say
    14 only as much as 30 percent of the free product in
    15 the soil, and I guess what I'm wondering is what
    16 kind of good faith effort has to be made before
    17 the agency will say enough is enough on free
    18 product removal?
    19 MR. SHERRIL: We've stated to the
    20 maximum extent practicable -- and I wouldn't agree
    21 that -- I've had many sites where they removed all
    22 the free product 100 percent. So --
    23 MR. WATSON: I guess I'm concerned about
    24 the factors you've articulated because really what
    L.A. REPORTING
    (312) 419-9292
    436

    1 you've articulated are site specific factors where
    2 free product would create a problem if left in the
    3 soil as opposed to what the regulations really
    4 focus on and that is what is the level of
    5 technical capability available to remove free
    6 product from the soil?
    7 MR. KING: That's not what the rule
    8 says.
    9 MR. WATSON: It says that you have an
    10 obligation to take corrective action to the
    11 maximum extent practicable to remove any free
    12 product.
    13 MR. KING: Right.
    14 MR. WATSON: Doesn't that necessarily
    15 involve limitations on the technologies used to
    16 remove free product?
    17 MR. KING: Among the other factors that
    18 Mr.
    Sherril talked about, I mean, if you're going
    19 to do it based on a technology base, then you
    20 would say, tear the building down, then you can
    21 get to it and then the technology could remove the
    22 material. That would not be an appropriate
    23 conclusion.
    24 That would not be practical to look
    L.A. REPORTING
    (312) 419-9292
    437

    1 at it that way. That's why we've tried to
    2 enumerate a series of factors that you need to
    3 consider the entirety of the site that you're
    4 dealing with and not just focus on one single
    5 factor as being the determinative issue.
    6 HEARING OFFICER FEINEN: Any further
    7 follow-up?
    8 MR. RIESER: Just real quickly, is it
    9 safe to take from Mr. King's last answer that
    10 among the things that would be considered is a
    11 comparison of the potential risk which is among a
    12 lot of the factors that Mr.
    Sherril listed in
    13 comparison to the risk and cost and technical
    14 practicality of dealing with a free product?
    15 MR. KING: I think that's correct.
    16 MR. RIESER: Will the agency approve
    17 corrective action plans in which free product is
    18 managed and controlled but not removed if it can
    19 be demonstrated that those conditions will not
    20 cause
    exceedences of Tier 1 groundwater objectives
    21 at the property boundaries? And I should add that
    22 appropriate institutional controls are placed on
    23 the property.
    24 MR. KING: If you did that as part of a
    L.A. REPORTING
    (312) 419-9292
    438

    1 Tier 3 evaluation, that would be correct.
    2 MR. RIESER: With respect to subsection
    3 (a)(5), must a person show that a contaminant
    4 released will not exceed applicable surface water
    5 quality standards or that the affected surface
    6 water body will not exceed the water quality
    7 standard?
    8 MR. KING: The way we have written that,
    9 the contaminant levels have to meet the surface
    10 water quality standards when the contaminant --
    11 basically when it hits the surface water. There's
    12 no mixing zone compound.
    13 MR. RIESER: Are there methods for
    14 determining the levels of contaminants when they
    15 hit a surface water body?
    16 MR. SHERRIL: You could sample for it.
    17 You could model it.
    18 MR. RIESER: Are there models that
    19 identify that along --
    20 MR. HORNSHAW: That's what model or
    21 equation R26 does. You just back calculate from
    22 the surface water quality standard whatever
    23 distance there is to the nearest surface water
    24 body is what's plugged in to get that equation
    L.A. REPORTING
    (312) 419-9292
    439

    1 run.
    2 MR. RIESER: Okay, thank you.
    3 MR. WATSON: I got one follow-up
    4 question. What you're saying on free product is
    5 that you can leave free product in place if you
    6 can show under a Tier 3 analysis that there's an
    7 appropriate risk attached to that?
    8 MR. SHERRIL: On that particular issue,
    9 it encompasses many of those factors that I
    10 discussed before. Because it may be very easily
    11 obtained to remove free product from a practical
    12 viewpoint, I mean, it may be almost acidic sitting
    13 there on the surface, and there could maybe be
    14 relatively little risk associated with it, but we
    15 would want it removed so it encompasses many
    16 different criteria looking into removal.
    17 HEARING OFFICER FEINEN: Mr.
    Rieser.
    18 MR. RIESER: The discussion of free
    19 product removal that we've had, that applies to
    20 free product that's actually on the water table,
    21 not free product -- not necessarily I should say
    22 free product in the soil, is that correct, because
    23 free product in the soil is, so long as it doesn't
    24 exceed the values of 215 and 220, is not an
    L.A. REPORTING
    (312) 419-9292
    440

    1 issue?
    2 MR. SHERRIL: That's correct, and we
    3 wouldn't -- that's correct.
    4 MR. RIESER: Okay.
    5 MR. WATSON: But if it exceeds the
    6 values in 215 and 220, then would you have the
    7 ability to argue under a Tier 3 analysis that it
    8 may be appropriate to leave that free product in
    9 the ground?
    10 MR. SHERRIL: Yes.
    11 HEARING OFFICER FEINEN: Further
    12 follow-up on that? Mr.
    Watson, I think you have a
    13 question on 742.805. It's marked as No. 9, I
    14 believe. Has that been answered?
    15 MR. WATSON: That has been answered.
    16 HEARING OFFICER FEINEN: Mr.
    Reott, do
    17 you have any more questions?
    18 MR. REOTT: I think everything else I've
    19 got really goes to Tier 3.
    20 HEARING OFFICER FEINEN: Tier 3, okay.
    21 Off the record for a second.
    22 (Discussion off the record.)
    23 HEARING OFFICER FEINEN: Let's go back
    24 on the record. I believe Mr.
    Soni has one
    L.A. REPORTING
    (312) 419-9292
    441

    1 question for the agency.
    2 MR. SONI: In Tier 2 does your equations
    3 or any equations take into consideration life
    4 safety factors?
    5 MR. HORNSHAW: How are you using the
    6 term safety factors, on the toxicity end or the
    7 model end?
    8 MR. SONI: Model end.
    9 MR. KING: That was a question -- that
    10 is one of Mr.
    Reott's questions as well. When we
    11 were discussing that, we were having a little bit
    12 of difficulty with it because when I think of
    13 safety factor, I really think of it in terms of
    14 when you do a design relative to a structure where
    15 you incorporate and you come up with a design
    16 level for what the structure could support and you
    17 multiply it by a safety factor, and so we
    18 struggled with that because it doesn't seem like
    19 the term safety factor really fits into the
    20 context of these models.
    21 MR. SONI: In the context of safety
    22 factor, what I meant was there exist degree of
    23 uncertainty with all the model parameters, and the
    24 agency has suggested in the past that for every
    L.A. REPORTING
    (312) 419-9292
    442

    1 uncertain parameter, we use a factor of 10 for
    2 amount, and in R94-2B, I believe agency had
    3 recommended that we use safety factor of 100. The
    4 board had to use the safety factor of 1,000, but
    5 there are similar equations in appendix C,
    6 equation R12 or R13 where a safety factor may be
    7 used to incorporate or account for any
    8 uncertainties in the models associated with it.
    9 MR. KING: I don't think these models
    10 work that way.
    11 MR. SONI: In R94-2?
    12 MR. KING: Right. I recall that was
    13 done. I think with these models, because of the
    14 way the whole toxicity issues are structured and
    15 the way the modeling is done, I think the models
    16 incorporate what we call a safety factor into it
    17 without getting to a result and then multiplying
    18 it by some additional factor.
    19 MR. SONI: Do you know if soil screening
    20 level, does it do that?
    21 MR. HORNSHAW: The soil screening levels
    22 were developed by USEPA with a very large
    23 database, and they picked 95th percentile or 90th
    24 percentile values out of that database so as to be
    L.A. REPORTING
    (312) 419-9292
    443

    1 protective of most sites around the country. So
    2 the safety factor approach is more or less built
    3 in, even though there isn't a single number that
    4 says what the safety factor is.
    5 MR. SONI: What about in RBCA?
    6 MR. HORNSHAW: I'm not as familiar with
    7 the RBCA equations as I am with the SSL equations,
    8 but I think you can probably assume that the same
    9 thing is true. However, with the RBCA system --
    10 MR. SONI: At that time the agency has
    11 supported safety factor of 100 and never the same
    12 model that's being used now so is that something
    13 you could --
    14 MR. KING: I think that's something we
    15 can look at.
    16 HEARING OFFICER FEINEN: Mr.
    Reott, do
    17 you have some follow-up?
    18 MR. REOTT: I do, two things. In the
    19 R94-2
    rulemaking -- it's hard to believe that was
    20 even on a more abbreviated schedule than this one
    21 with regard to these issues. From the development
    22 of testimony to the development of the board's
    23 actual rule was very, very compressed, and I think
    24 the safety factor was partially a result of the
    L.A. REPORTING
    (312) 419-9292
    444

    1 board's decision to take a divergent view from
    2 what the agency originally proposed and knowing
    3 that it was an interim rule and that it was going
    4 to be revisited again promptly.
    5 As far as the way the models work,
    6 they all start with something based on
    MCL's, and
    7 MCL's have huge safety factors in them. So
    8 there's a safety factor at the very, very
    9 beginning of the process in the
    MCL's themselves
    10 if you go back.
    11 MS. MC FAWN: Mr.
    Reott, I think you're
    12 trying to help explain, but you are testifying.
    13 Would you like to be sworn in?
    14 MR. REOTT: All right.
    15 HEARING OFFICER FEINEN: Mr.
    Reott, we
    16 have some questions.
    17 MS. MC FAWN: Did you have something
    18 further to add?
    19 MR. REOTT: No. I was the one who used
    20 the term safety factors, Gary said, and that's the
    21 source of it, and that's how I used it in my
    22 question which has now been answered.
    23 HEARING OFFICER FEINEN: Mr.
    Reott, I
    24 want to make sure that we're covered with your
    L.A. REPORTING
    (312) 419-9292
    445

    1 questions. You stated the questions haven't been
    2 answered or asked for Tier 3?
    3 MR. REOTT: Either Tier 3 or the things
    4 that were already done previously that I'll pick
    5 up at the very end.
    6 HEARING OFFICER FEINEN: And the very
    7 end, you mean like the end of the hearings on
    8 December 10th?
    9 MR. REOTT: Well, hopefully.
    10 MS. MC FAWN: Are those the questions
    11 you have concerning --
    12 MR. REOTT: Halfway exclusions, the
    13 things I would have done at the end of today. A
    14 lot of those have been asked but there's a couple
    15 of them that haven't so I'll have to go through
    16 and pick them.
    17 MS. MC FAWN: Do you think you could do
    18 that now?
    19 MR. REOTT: Yeah.
    20 MS. MC FAWN: I would very much just
    21 like to leave, break this afternoon looking
    22 forward to Tier 3.
    23 MR. REOTT: That's fine.
    24 MR. WATSON: Question 12, is that a Tier
    L.A. REPORTING
    (312) 419-9292
    446

    1 2 question?
    2 MR. REOTT: I think they've already
    3 answered that one, which the answer is no.
    4 HEARING OFFICER FEINEN: Can we just go
    5 through the beginning and just --
    6 MR. REOTT: No. 8 was the first one I
    7 skipped then, and this has to do with the point of
    8 compliance which in the UST program would sort of
    9 be the property line. If you're doing T.A.C.O.
    10 modeling for the site
    remediation program, what
    11 are you using as your point of compliance?
    12 And if I've heard you right, I
    13 think what you're saying is the point of human
    14 exposure is your point of compliance.
    15 MR. KING: Well, not necessarily. You
    16 could use the point of human exposure and then
    17 back calculate and establish a point of compliance
    18 at a place closer to the source which is then
    19 predictive of meeting the required number at the
    20 point of human exposure. In essence your point of
    21 monitoring might be different than the point of
    22 human exposure.
    23 MR. REOTT: In other words, you might
    24 monitor at the edge of your property for access
    L.A. REPORTING
    (312) 419-9292
    447

    1 reasons, but you're actually trying to predict
    2 what's another 100 feet down the road or
    3 something?
    4 MR. KING: That's exactly right.
    5 MR. REOTT: Does the agency have any
    6 proposal with regard to trying to pick a specific
    7 point of compliance for the site
    remediation
    8 program that we would use here?
    9 MR. KING: No.
    10 MR. REOTT: So that will just be a site
    11 specific determination?
    12 MR. KING: That's correct.
    13 MR. REOTT: I thought this was answered,
    14 but then somebody else thought maybe it wasn't so
    15 I'm going to ask No. 12.
    16 At this point am I correct that
    17 there's no longer any ability to use different
    18 risk levels in Tiers 2 and 3?
    19 MR. HORNSHAW: Not in Tier 2. That's
    20 still an option in Tier 3.
    21 MR. REOTT: Oh, it's still an option in
    22 Tier 3 so the errata sheets don't change that
    23 option then?
    24 MR. HORNSHAW: No.
    L.A. REPORTING
    (312) 419-9292
    448

    1 MR. REOTT: What do you have to show
    2 then -- I guess this is really a Tier 3 question.
    3 We'll hold that one then.
    4 Skip ahead to 24. This is the
    5 averaging and
    compositing section. The agency set
    6 this up so you could do it within the
    borehole,
    7 you know, vertically. At some sites, though, you
    8 might be more interested in going horizontally at
    9 given depths. Would the agency be willing to
    10 modify its proposal to be able to do that?
    11 MR. KING: You're not very clear on what
    12 pathway you're talking about there. We would
    13 assume that you're talking about the migration to
    14 groundwater pathway.
    15 MR. REOTT: Right.
    16 MR. KING: And the answer would be no.
    17 MR. REOTT: Why not?
    18 MR. KING: I'll let you guys --
    19 MR. SHERRIL: It would require extensive
    20 sampling of multiple
    boreholes. We would --
    21 because we don't know where the center line of the
    22 plume is, what we try to be is consistent with
    23 USEPA policy in their SSL guidance, and you would
    24 be -- I don't want to say guessing. You would be
    L.A. REPORTING
    (312) 419-9292
    449

    1 trying -- taking a chance on trying to figure out
    2 where the center line of the plume is versus doing
    3 it vertically within the
    borehole.
    4 MR. REOTT: In 225(e) you have a
    5 provision that deals with what happens with
    6 non-detect results in the averaging process, and
    7 the way it's written if less than 50 percent of
    8 the results are non-detect, you included it one
    9 half of the reported analytical detection limit of
    10 the contaminant for purposes of averaging.
    11 And then it says, if more than 50
    12 percent of the sample results are non-detect,
    13 another procedure acceptable to the agency may be
    14 used to determine an average. Do you always have
    15 to go get agency approval at that point before you
    16 can do your averaging?
    17 MR. HORNSHAW: You mean greater than 50
    18 percent non-detects?
    19 MR. REOTT: Right.
    20 MR. HORNSHAW: Yes.
    21 MR. REOTT: So you're not able to use
    22 the other options?
    23 MR. HORNSHAW: That's correct.
    24 MR. REOTT: Why don't we skip to 29. I
    L.A. REPORTING
    (312) 419-9292
    450

    1 think the others have been dealt with. This is
    2 the pathway exclusion. In the House 300 reforms,
    3 you know, Illinois adopted the concept of
    4 excluding pathways based on geology. Essentially
    5 I think that's sort of shorthand for what House
    6 300 did, you know, if you tried to convert it to
    7 more modern language.
    8 And given favorable geology, many
    9 UST sites become no further action sites based
    10 largely on geology. How does your pathway
    11 exclusion proposal preserve this option for (a)
    12 UST sites and (b) other types of sites?
    13 MR. KING: I don't want to get into a
    14 discussion as far as your statements how the Berg
    15 Circular works with 300 and the geology thing. I
    16 don't think your statement is quite correct the
    17 way you've got them, but nonetheless, the option
    18 of going through the no further action
    19 classification procedure that's in 732 is still
    20 available for UST sites, and that's preserved
    21 under part 732, and for other types of sites, it
    22 doesn't apply.
    23 MR. REOTT: Let me stipulate ahead to a
    24 couple of these. We're going to get it when we
    L.A. REPORTING
    (312) 419-9292
    451

    1 get to the barrier stuff at the end. Skip ahead
    2 to 34. 305(c), it's the one that deals with
    3 characteristics of reactivity.
    4 How does the reactivity limit on
    5 being able to use pathway exclusion relate to the
    6 risk to groundwater pathway?
    7 MR. SHERRIL: There's two different
    8 aspects here. It can relate to the risk of -- it
    9 can relate to the migration of the contaminant by
    10 changing the properties of the soil, but one of
    11 the reasons we put the reactivity limit on there
    12 is to protect from chronic and acute hazards. It
    13 also violates the models. We just don't want
    14 these excessive risks potentially out there. Did
    15 you want to add anything?
    16 MR. O'BRIEN: That's fine.
    17 MR. REOTT: I'm just trying to break
    18 those risks down into their components, John, and
    19 focusing just on the risk to groundwater pathway,
    20 how does this affect that particular pathway? I
    21 realize that it would obviously affect things like
    22 human contact. How does it affect risk to
    23 groundwater?
    24 MR. O'BRIEN: Well, things that don't
    L.A. REPORTING
    (312) 419-9292
    452

    1 pass this are source material that need to be
    2 removed so that we can address contamination, and
    3 that anything that doesn't pass these tests is
    4 pretty aggressive material reactivity-wise and
    5 toxic-wise, and the agency just feels that that
    6 needs to be addressed in a manner that is more
    7 forthright and doesn't rely on management criteria
    8 that we would otherwise feel more comfortable
    9 with.
    10 MR. REOTT: Is there a specific link,
    11 though? I understand the policy decision you're
    12 articulating Jim. Is there a specific link
    13 between having soils that flunk for reactivity and
    14 whether that is in fact a risk to groundwater --
    15 an increased risk to groundwater?
    16 MR. O'BRIEN: No, it's a qualitative
    17 decision that the agency has made. I can't take
    18 an equation that show that failing these criteria
    19 violate -- you know, through some calculation,
    20 they're going to cause a problem.
    21 MR. REOTT: When you say "these," you
    22 mean both (c), (d) and (e) then, all three of
    23 those? Are you lumping them together or breaking
    24 them out separately?
    L.A. REPORTING
    (312) 419-9292
    453

    1 MR. O'BRIEN: I'm lumping them together.
    2 MR. RIESER: Just something to follow up
    3 on Mr.
    O'Brien's statement. To a certain extent,
    4 you addressed it during his statement, but when we
    5 first started talking about the soils that failed
    6 the reactivity test, what he said was soils have
    7 to be removed, but then later he said they have to
    8 be addressed.
    9 I just want to clarify that the
    10 subpart C which includes 305 is a voluntary
    11 activity that a
    remediation applicant can go
    12 through to include pathways and so that that's
    13 number one. Just because the soils are reactive
    14 doesn't mean they necessarily have to be removed,
    15 but they just have to be addressed in a more
    16 thorough way in the rest of the program.
    17 MR. O'BRIEN: I misspoke. I meant
    18 addressed. It may be possible with a pH soil to
    19 change the pH without having to remove the
    20 material. Other techniques are available for the
    21 other hazards.
    22 MR. RIESER: Thank you.
    23 MR. WATSON: It may also be possible to,
    24 under a Tier 3 cleanup standard, not address those
    L.A. REPORTING
    (312) 419-9292
    454

    1 conditions?
    2 MR. SHERRIL: You would have to at least
    3 address it.
    4 MR. WATSON: Right, but consistent with
    5 -- but if you went through a Tier 3 risk analysis
    6 and addressed those issues as part of the risk,
    7 there could be circumstances where the result
    8 would be that you would not have to take
    9 corrective action to remove that soil?
    10 MR. O'BRIEN: That's possible and
    11 allowed under Tier 3, as you stated.
    12 MR. RIESER: Thank you.
    13 MR. REOTT: I think the other ones were
    14 done.
    15 MR. WATSON: I've got one follow-up
    16 question on what Mr.
    Reott said or his questions,
    17 and I just wanted to confirm the answer to
    18 No. 12. At what point in Tier 2 is the regulated
    19 community able to use different risk levels? Is
    20 it true that your answer was that you cannot use
    21 anything other than 10 to the minus 6 risk level?
    22 Is that true in Tier 2?
    23 MR. HORNSHAW: At the point of human
    24 exposure, yes.
    L.A. REPORTING
    (312) 419-9292
    455

    1 MR. WATSON: So risk levels of 10 to the
    2 minus 5 and 10 to the minus 4 are not available
    3 under Tier 2?
    4 MR. HORNSHAW: Correct.
    5 HEARING OFFICER FEINEN: Mr.
    Rieser.
    6 MR. RIESER: Isn't there language -- and
    7 I think I mentioned the sections earlier -- in 710
    8 in particular where they talk about or the
    9 proposal talks about allowing target risk more
    10 than one in a million if applicable exposure
    11 routes have been managed through institutional
    12 controls, and how --
    13 MR. HORNSHAW: My answer was at the
    14 point of human exposure.
    15 MR. RIESER: Okay. So if you had an
    16 institutional control on the site, that the point
    17 of human exposure would be the edge of that
    18 institutional control?
    19 MR. HORNSHAW: Correct.
    20 MR. RIESER: And within that
    21 institutional control, the target risk varied
    22 wherever --
    23 MR. KING: Let's not get too far. We
    24 promised that we would try to do an organized
    L.A. REPORTING
    (312) 419-9292
    456

    1 statement with regards to that, and let's not get
    2 too far afield because if you're within the
    3 institutional control, then we don't want to talk
    4 about a higher risk level because there's not a
    5 risk level.
    6 HEARING OFFICER FEINEN: Then I think if
    7 there's no more --
    8 MR. RIESER: I'm really sorry, but I do
    9 have one more just to get that Tier 2 behind us,
    10 and we don't have to worry about it.
    11 In Tier 2 is it correct that
    12 chemical specific default degradation rates, as
    13 listed in appendix C, table E, can be used in
    14 equation R26?
    15 MR. SHERRIL: State that again, please.
    16 MR. RIESER: In Tier 2 is it correct
    17 that chemical specific default degradation rates,
    18 as listed in appendix C, table E, can be used in
    19 R26?
    20 MR. SHERRIL: Yes.
    21 MR. RIESER: Is it also correct that in
    22 Tier 2, a degradation constant for measured
    23 groundwater can be used in R26?
    24 MR. HORNSHAW: Are you talking about a
    L.A. REPORTING
    (312) 419-9292
    457

    1 laboratory derived value instead of the default
    2 value? Is that what you're asking?
    3 MR. RIESER: A laboratory or in situ
    4 derived value, yes.
    5 MS. ROBINSON: Could you read back the
    6 question just to make it clear.
    7 MR. RIESER: Maybe this would be a
    8 suggestion. Maybe I can write these down, get
    9 them to the agency and everybody else on the list,
    10 and this will be something that we could hit on
    11 Tuesday unless you have specific answers right
    12 now.
    13 MR. LISS: I would prefer to have them
    14 written, and I think that's something we need to
    15 discuss. What we were discussing there's a big
    16 variation between field-derived values and
    17 laboratory values, not only due to the methods
    18 that's used for in situ but the laboratory methods
    19 themselves.
    20 I'll give you one that's not
    21 related to your question by the parameters
    22 specifically, but say it's a good one that's well
    23 documented is the hydraulic conductivity
    24 measurements. They can vary in orders of degree
    L.A. REPORTING
    (312) 419-9292
    458

    1 and magnitude. So I don't think that we would
    2 accept as a blanket proposal somebody to
    3 substitute for a laboratory derived value without
    4 us looking at it. Maybe under Tier 3 would be the
    5 more appropriate place to do that. We're talking
    6 about Tier 2, right?
    7 MR. RIESER: I'm sorry, I think within
    8 the rule itself, 805 -- I'm sorry, 810 (a)(1)(h)
    9 talks about the first order of degradation
    10 constant can be obtained from appendix C, table E,
    11 or from measured groundwater data. Do you see
    12 where I am, the measuring?
    13 How would the agency envision
    14 people measuring? That measured groundwater data,
    15 how would that be obtained?
    16 MR. LISS: Let me find the exact, you
    17 said it was 810(a)? I got it. I can't answer
    18 that today. You want to know how specifically we
    19 expect somebody to measure that in the field?
    20 MR. RIESER: Yes.
    21 MR. LISS: That's your question. I
    22 can't answer that right now.
    23 MS. ROBINSON: Mr.
    Rieser, would you put
    24 the specific questions in writing, please, and
    L.A. REPORTING
    (312) 419-9292
    459

    1 we'll address them in January?
    2 MR. RIESER: I'll do that.
    3 MR. LISS: You had also mentioned when
    4 you made that statement, that earlier question,
    5 laboratory derived values.
    6 MR. RIESER: I realize that. I'll put
    7 them in writing, and that would be something we
    8 can get on Tuesday.
    9 HEARING OFFICER FEINEN: Any other
    10 questions? I guess then we'll stop here and
    11 continue on the record until December 10th at
    12 10:00 o'clock at A-1, the Stratton Building.
    13 Please remember that even though we're having the
    14 hearing on December 10th, which is a Tuesday, the
    15 hearing officer order of October 28th established
    16 prefiled testimony for the hearings which have
    17 been set for January 15th through 17th in
    18 Springfield.
    19 Those dates are the
    prefiled
    20 testimony must be in by December 23rd, 1996, and
    21 the
    prefiled questions from that testimony -- for
    22 that testimony, I should say, is January 6, 1997.
    23 MS. MC FAWN: Those were the dates
    24 agreed to at the pre-hearing conference, also.
    L.A. REPORTING
    (312) 419-9292
    460

    1 And just for the record, you're going to get that
    2 last series of questions dealing with Tier 2 to
    3 the agency in sufficient time for them to possibly
    4 address those on Tuesday?
    5 MR. RIESER: I will get it out
    6 tomorrow. It's a simple set, and I'll send them
    7 to everybody here.
    8 MS. ROBINSON: Okay.
    9 HEARING OFFICER FEINEN: I guess that's
    10 it, and then we'll close -- or we'll continue on
    11 Tuesday.
    12 MS. MC FAWN: Yes, we are continued
    13 until Tuesday morning. Thank you for your
    14 participation today.
    15 (Whereupon, these proceedings
    16 were continued until December
    17 10, 1996, at 10:00 o'clock a.m.)
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING
    (312) 419-9292
    461

    1 STATE OF ILLINOIS )
    ) SS:
    2 COUNTY OF COOK )
    3
    4
    5 LISA H. BREITER, CSR, being first duly
    6 sworn, on oath says that she is a court reporter
    7 doing business in the City of Chicago; that she
    8 reported in shorthand the proceedings at the
    9 taking of said hearing and that the foregoing is a
    10 true and correct transcript of her shorthand notes
    11 so taken as aforesaid, and contains all of the
    12 proceedings had at said hearing.
    13
    14
    15
    16
    LISA H. BREITER, CSR, RPR, CRR
    17
    L.A. REPORTING
    79 West Monroe Street
    18 Suite 714
    Chicago, Illinois 60603
    19 (312) 419-9292
    License No. 84-003155
    20
    21
    22
    23
    24
    L.A. REPORTING
    (312) 419-9292
    462

    Back to top