1
    1 BEFORE THE POLLUTION CONTROL BOARD
    OF THE STATE OF ILLINOIS
    2
    3 IN THE MATTER OF: )
    )
    4 NATURAL GAS-FIRED, PEAK-LOAD ) R01-10
    ELECTRICAL POWER GENERATING )
    5 FACILITIES (PEAKER PLANTS). )
    6
    7
    8
    9 The following is a transcript of proceedings
    10 from the hearing held in the above-entitled matter,
    11 taken stenographically by ROSEMARIE LAMANTIA, CSR, a
    12 notary public within and for the County of Cook and
    13 State of Illinois, before AMY JACKSON, Hearing Officer,
    14 at 100 West Randolph Street, Assembly Hall Auditorium,
    15 Chicago, Illinois, on the 23rd day of August, 2000,
    16 A.D., scheduled to commence at the hour of 10:30 a.m.,
    17 commencing at 10:45 a.m.
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING (312) 419-9292

    2
    1 A P P E A R A N C E S:
    2 HEARING TAKEN BEFORE:
    3 ILLINOIS POLLUTION CONTROL BOARD,
    100 West Randolph Street
    4 Assembly Hall Auditorium
    Chicago, Illinois 60601
    5 (312) 814-3629
    BY: AMY JACKSON, HEARING OFFICER
    6
    7 ILLINOIS POLLUTION CONTROL BOARD MEMBERS PRESENT:
    8 Ms. Claire Manning, Chairman
    Mr. G. Tanner Girard
    9 Mr. Nicholas Melas
    Ms. Elena Kezelis
    10 Dr. Ronald Flemal
    Ms. Marili McFawn
    11 Mr. Samuel Lawton, Jr.
    Mr. Anad Rao
    12
    13 MEMBERS OF THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
    AS WELL AS OTHER INTERESTED ENTITIES AND AUDIENCE
    14 MEMBERS WERE PRESENT AT THE HEARING, BUT NOT LISTED ON
    THIS APPEARANCE PAGE.
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING (312) 419-9292

    3
    1 HEARING OFFICER JACKSON: Good morning again
    2 everyone. We're ready to get started. I apologize for
    3 the slight delay in our start time. Apparently, the
    4 sign on the door directing people to the EPA hearing on
    5 the second floor caused some confusion so we were giving
    6 people enough time to get back down to this room. Sorry
    7 about that. And I think we've probably got a sign on
    8 the door now indicating that these -- this hearing is
    9 the hearing to be held by the Illinois Pollution Control
    10 Board regarding the peaker plants. So I appreciate your
    11 understanding.
    12 My name is Amy Jackson and I'm the
    13 attorney assistant Board member to Elena Kezelis
    14 and at the request of Board chairman, Claire Manning, I
    15 am serving as the hearing officer for today's
    16 proceeding.
    17 We are very pleased to have the entire
    18 Board present today. I would like to take a moment to
    19 introduce you to the Board members.
    20 Chairman Claire Manning is immediately
    21 to my right.
    22 CHAIRMAN MANNING: Good morning.
    23 HEARING OFFICER JACKSON: Tanner Girard, G.
    24 Tanner Girard.
    L.A. REPORTING (312) 419-9292

    4
    1 MR. GIRARD: Good morning.
    2 HEARING OFFICER JACKSON: And Nicholas Melas is
    3 next to Mr. Girard.
    4 MR. MELAS: Good morning.
    5 HEARING OFFICER JACKSON: To my immediate left
    6 is Elena Kezelis.
    7 MS. KEZELIS: Good morning.
    8 HEARING OFFICER JACKSON: Dr. Ronald Flemal.
    9 DR. FLEMAL: Good morning.
    10 HEARING OFFICER JACKSON: And Marili McFawn.
    11 MS. MCFAWN: Good morning.
    12 HEARING OFFICER JACKSON: I do note that Samuel
    13 Lawton, Jr., who is also a Board member, has been
    14 unexpectedly delayed this morning and will be joining us
    15 later this morning.
    16 Also, at the head table down to my far
    17 right is Anand Rao, who is the head of the Board's
    18 technical unit. He will also be participating in the
    19 questioning today.
    20 MR. RAO: Good morning.
    21 HEARING OFFICER JACKSON: As some of you may
    22 know, this matter was brought to the Board in the July
    23 6, 2000, request by Governor George Ryan. In that
    24 request, Governor Ryan asked the Board to examine the

    L.A. REPORTING (312) 419-9292
    5
    1 following issues.
    2 Do peaker plants need to be more
    3 strictly regulated than currently provided under
    4 Illinois air quality rules and regulations?
    5 Second, do peaker plants pose a unique
    6 threat or a greater threat than other types of state
    7 regulated facilities with respect to air, noise or
    8 water pollution?
    9 Third, should new or expanding peaker
    10 plants be subject to citing requirements beyond
    11 applicable local zoning rules?
    12 Fourth, if stricter regulations are
    13 needed, should new regulations apply to currently
    14 permitted facilities or only to new or expanding
    15 facilities.
    16 And finally, fifth, how do other states
    17 regulate peaker plants.
    18 Through the information presented at
    19 these hearings, through questions and through public
    20 comments, the Board will develop a complete and
    21 well-rounded record that will enable it to provide an
    22 informed and well-reasoned response to each of the
    23 Governor's questions.
    24 At this time, the Board anticipates

    L.A. REPORTING (312) 419-9292
    6
    1 being able to present an informational order to
    2 the Governor that will include all of the Board's
    3 findings and recommendations by the end of this calendar
    4 year. The last Board meeting that is currently
    5 scheduled for this year is scheduled for December 21,
    6 2000.
    7 As indicated in my hearing officer
    8 order of July 15, 2000, today's hearing will focus
    9 primarily on testimony and information from state
    10 agencies. Present to provide testimony today are the
    11 Illinois Environmental Protection Agency, the Illinois
    12 Commerce Commission and the Illinois Department of
    13 Natural Resources.
    14 These agencies pre-filed their testimony
    15 and that testimony is available on the Board's website
    16 with a possible exception of the Illinois Commerce
    17 Commission and we are working on getting that on our
    18 website today.
    19 We have also provided extra copies of
    20 this testimony at the table at the top of the
    21 auditorium and I understand that we are out of copies
    22 right now, but we are in the process of making extra.
    23 Also present today to observe today's
    24 proceedings are representatives from the Illinois

    L.A. REPORTING (312) 419-9292
    7
    1 Department of Nuclear Safety and the Illinois Department
    2 of Commerce and Community Affairs. While not planning
    3 to testify today, they are here to observe the
    4 proceedings and will offer their input if needed to the
    5 Board later on down the road.
    6 The structure of tomorrow's hearing is
    7 very similar to today's except that tomorrow, we will
    8 focus on presentations of testimony and information
    9 from members of the peaker industry.
    10 On the table by the entrance, there is
    11 also an informational sheet prepared by the Board's
    12 public information officer. This sheet contains
    13 general information about these inquiry hearings, such
    14 as the dates, times and locations of hearings and other
    15 general information that you might need to know. If you
    16 did not get one when you came in, please feel free to
    17 pick one up.
    18 As I stated earlier, the pre-filed
    19 testimony for today and tomorrow is on the Board's
    20 website. Also on our website are all Board orders and
    21 hearing officer orders that have been issued in this
    22 proceeding.
    23 We do have a court reporter present who
    24 will be transcribing everything that is said today. The

    L.A. REPORTING (312) 419-9292
    8
    1 written transcript from all of our peaker hearings will
    2 be on the Board's website as soon as they're available.
    3 We have requested expedited transcripts from these
    4 proceedings so the transcripts should be available
    5 within three to five days after the hearing. You may
    6 download the transcript from the Board's website or if
    7 you need a hard copy, you can request a hard copy from
    8 the Board's clerk's office at 75 cents a page.
    9 I also want to note that testifying
    10 before the Board is not the only way to provide
    11 information to the Board in this proceeding. The Board
    12 will be accepting written public comments until November
    13 6th of this year. Those comments may be filed with the
    14 Board's clerk's office. The address is listed on the
    15 public information sheet that I referred to earlier.
    16 To the extent practicable, we will be
    17 attempting to place all written public comments on our
    18 website as well. The Board's website for those of you
    19 who do not know it is www.ipcb.state.il.us.
    20 One other thing I want to mention is we
    21 do have a notice list for these proceedings. For those
    22 persons wishing to be on the notice list, you will
    23 receive copies of all Board opinions and orders and all

    24 hearing officer orders. There is no obligation to those
    L.A. REPORTING (312) 419-9292
    9
    1 persons on the notice list that you serve other people
    2 with your own filing. You will just be receiving more
    3 documents if you're on the notice list.
    4 If you are not on the notice list and
    5 you wish to be put on the notice list, please contact
    6 the following person. Her name is Kim Schroeder. She
    7 is in our Springfield office. Her telephone number is
    8 area code 217-782-2633, or you can e-mail your request
    9 to Ms. Schroder at schroedk -- that's
    10 s-c-h-r-o-e-d-k@ipcb.state.il.us.
    11 A couple of other housekeeping matters
    12 that I wanted to mention before I go on to tell you
    13 about the other hearings that we have scheduled in this
    14 case, we do have a videotape set up over to my left.
    15 The proceedings will be videotaped today. If anyone --
    16 any of the witnesses has an objection to testifying in
    17 front of a videotape, please let me know and I'll make
    18 sure the videotape is turned off during your
    19 presentation.
    20 Also, as you can see, we have some large
    21 exhibits set up on the stage. If you need to move in
    22 from the ends of the aisles, you might be able to see
    23 the exhibits better. We will attempt to focus them so

    24 everyone can see them, but you may need to scoot in.
    L.A. REPORTING (312) 419-9292
    10
    1 In addition to the hearings this week,
    2 the Board has also scheduled three hearings during the
    3 month of September. They will be held as follows:
    4 September 7th in Naperville; September 14th in Joliet;
    5 and September 21st in Grayslake.
    6 These are the hearings where we really
    7 want to focus on presentations from interested members
    8 of the public, local government, citizen groups, et
    9 cetera. Because of the overwhelming public interest, we
    10 are expecting -- and the limited time we have for these
    11 hearings -- the procedures for these hearings will need
    12 to be very orderly.
    13 If anyone knows in advance that they
    14 will be attending one of these September hearings and
    15 would like to make a comment on the record, I encourage
    16 you to contact me in advance. My telephone number and
    17 e-mail address are available on the public information
    18 sheet that I referred to earlier and on the Board's
    19 website. Those individuals that contact me in advance
    20 will be allowed to speak before others who are present
    21 wishing to give comment.
    22 Speakers at the September hearings may

    23 be limited in the amount of time they're allowed to
    24 speak depending upon the number of people that are
    L.A. REPORTING (312) 419-9292
    11
    1 there wanting to speak on the record. Therefore,
    2 it would be very beneficial to you to have a prepared
    3 statement or set of questions that you would be easily
    4 able to read into the record during the hearing.
    5 Our final hearings in this proceeding
    6 are currently scheduled for October 5th and 6th
    7 in Springfield. These hearings will provide an
    8 opportunity for those outside of the Chicago area
    9 to provide their thoughts and information to the Board.
    10 Additionally, we hope to use these final
    11 days of hearings as sort of a wrap-up session to make
    12 sure that all of the questions the Board might have
    13 regarding the issues presented have been answered.
    14 Before we begin receiving testimony
    15 today, I want to emphasize for everyone present that
    16 this is an informational proceeding. The purpose of
    17 the Board's hearing in these matters is to gather as
    18 much information as possible to make a well-informed
    19 decision and recommendation for the governor's office.
    20 This is not an adversarial proceeding. I ask everyone
    21 to act appropriately as if you were in a court of law.
    22 At this time I will invite our chairman,

    23 Claire Manning, and any of the other Board members who
    24 wish to make opening remarks to make them at this time.
    L.A. REPORTING (312) 419-9292
    12
    1 CHAIRMAN MANNING: Good morning and welcome
    2 everyone. I'll be brief.
    3 Welcome, particularly members of the
    4 public, representatives of government, industry
    5 and environmental associations to this -- the Pollution
    6 Control Board's inquiry of matters concerning peaker
    7 plants.
    8 I see a lot of familiar faces out there,
    9 but for those who are unfamiliar with the Board, permit
    10 me just a moment to explain what we are a little bit and
    11 what our function is.
    12 We are an independent state body, a
    13 bipartisan seven-member state body, with both
    14 quasi-judicial and quasi-legislative function.
    15 In many ways, we operate, as Hearing
    16 Officer Jackson said, in specialized environmental
    17 court bringing impartial and technical expertise to
    18 bear on environmental issues and questions which are
    19 posed to us.
    20 In addition to citing cases pursuant to
    21 the Environmental Protection Act, as most of you know,

    22 we also promulgate rules and standards for the state
    23 generally pursuant to environmental rulemaking
    24 proposals brought to us by the Illinois EPA, followed by
    L.A. REPORTING (312) 419-9292
    13
    1 full sets of state-wide hearings with regard to
    2 environmental reporting proposals.
    3 For more general information about us,
    4 for those of you who are in need of that information, we
    5 have a very informational website found at
    6 www.ipcb.state.il.us.
    7 In this matter and under these very
    8 special circumstances, Governor Ryan has asked us
    9 to make an inquiry authority to hold a set of
    10 state-wide hearings concerning commercial and
    11 environmental impacts of peaker plants.
    12 As the hearing officer already
    13 indicated, we hope to have our informational order
    14 ready by the last Board meeting of this calendar year.
    15 This informational order will, in fact,
    16 examine all of the information presented in the record
    17 and that will include all of the testimony
    18 we hear, all of the exhibits that are put into the
    19 record, and all of the public comments we receive in
    20 this matter.
    21 Based on this record, the written order

    22 will, in fact, address all of the questions posed to us
    23 by the governor.
    24 At this time I'd also like to
    L.A. REPORTING (312) 419-9292
    14
    1 specifically thank the participation and the welcomed
    2 participation of all of the state agencies whose
    3 expertise has been brought to bear on this question as
    4 well.
    5 Director Tom Skinner is here from the
    6 Illinois EPA. He will be testifying shortly this
    7 morning, later this morning, probably not short in
    8 hindsight. But later this morning, Tom and his staff
    9 will be testifying from the Illinois EPA.
    10 Charles Skinner, the executive director
    11 of the Illinois Power Commission, is here to testify as
    12 well. And we have two people from the Illinois Office
    13 of Science and Research, the Illinois Department of
    14 Natural Resources, Drs. Brian Anderson and Derek
    15 Winstanley, are here to talk as well.
    16 So with those introductions, I would
    17 ask if there is any elected officials or government
    18 officials that would like to introduce themselves for
    19 purposes of the records that have not yet been
    20 acknowledged.

    21 Seeing none, I think it is time we move
    22 forward, unless any of the other Board members have
    23 anything they would like to say to welcome the members.
    24
    L.A. REPORTING (312) 419-9292
    15
    1 HEARING OFFICER JACKSON: Okay. The order of
    2 presentation today will be as follows: The Illinois
    3 Commerce Commission will present first, followed by the
    4 Illinois Environmental Protection Agency and followed
    5 then by the Illinois Department of Natural Resources.
    6 The presenters will not necessarily be
    7 reading their pre-filed testimony verbatim. However,
    8 they will be providing detailed summaries of their
    9 presentations.
    10 At the conclusion of each presentation,
    11 I will simply ask you to each submit a copy of your
    12 pre-filed testimony and any exhibits to the court
    13 reporter so that they can be marked as exhibits and
    14 attached to the transcripts of these proceedings.
    15 Do we have any questions before we get
    16 started?
    17 Okay. We'll begin with the Illinois
    18 Commerce Commission, Mr. Fisher.
    19 MR. FISHER: Thank you. Good morning. Thank
    20 you for the opportunity to offer my comments today. My

    21 name is Charlie Fisher. I'm the executive director of
    22 the Illinois Commerce Commission. The Commission, as
    23 you know, regulates public utilities in Illinois
    24 including the electric industry.
    L.A. REPORTING (312) 419-9292
    16
    1 In recent years, federal and state
    2 laws have required the Commission to oversee the
    3 transition of electric, as well as natural gases, the
    4 telecommunications industry from monopoly-based market
    5 structures to much more competitive market structures.
    6 The Commission consists of a chairman
    7 and four commissioners appointed by the governor and
    8 approved with the advice and consent of the Senate. By
    9 law, the Commission jointly hires an executive
    10 director, who is responsible for the supervision and
    11 direction of the Commission staff.
    12 I would note at the outset that the ICC
    13 as a body has not yet taken a position on any of the
    14 issues that Governor Ryan has asked you to address and
    15 that the comments are stated on my own and they do not
    16 necessarily represent the views of the Commission or of
    17 any individual commissioner. With that caveat, I do
    18 hope that they are helpful.
    19 I have been asked to offer some

    20 background for what will follow, as I understand in
    21 these proceedings, by talking about how the industry
    22 has come to this point and specifically why are so many
    23 peaker plants being or ultimately being proposed to be
    24 built in Illinois at this time.
    L.A. REPORTING (312) 419-9292
    17
    1 I would like to first offer some general
    2 historical context. For most of the 20th century, the
    3 electric industry in the United States was thought best
    4 to consist of natural monopolies. Government agencies
    5 designated stockholder-owned companies to provide
    6 electric service to the public within specific service
    7 territories.
    8 There are three major components in
    9 the provision of electricity to retail customers: The
    10 generation of power; the transmission of power,
    11 typically at high voltages from generating plants
    12 to substations; and third, the distribution of power,
    13 typically at lower voltages to homes and businesses.
    14 For the most part, the industry has been
    15 vertically integrated, that is, public utilities owned
    16 the assets for all three components.
    17 We have, in fact, the national electric
    18 transmission grid. The large map on the left is a map
    19 of that. Each and every day, excess power generated by

    20 a company in one area may, in fact, be sold and
    21 delivered over transmission lines to a company in
    22 another area for resell to customers in that utility's
    23 service territory.
    24 For the most of that last century, these
    L.A. REPORTING (312) 419-9292
    18
    1 transactions were primarily made by regulated utilities
    2 in the interest of security and reliability of the grid.
    3 The wholesale sale and interstate transmission of power
    4 was regulated by the Federal Energy Regulatory
    5 Commission.
    6 Distribution of power from the electric
    7 utility to the end-user customer is regulated in each
    8 individual state by a public utility commission, in
    9 Illinois, by the Illinois Commerce Commission.
    10 Electric utilities did not historically,
    11 and do not today, have a total monopoly on ownership of
    12 generation, but there, in fact, was little development
    13 of large-scale independent generation in this country
    14 because the utilities controlled access to and
    15 availability of the transmission network. The price of
    16 the necessary transmission services was not conducive to
    17 the independent generation of electricity.
    18 The model for traditional regulation

    19 of electric utilities is seldom a regulatory bargain.
    20 The essence of the bargain was that in exchange for
    21 governmentally granted monopoly service territory, the
    22 electric utility was obliged to serve all retail
    23 customers without discrimination and without delay at a
    24 price set by the regulatory commission during periodic
    L.A. REPORTING (312) 419-9292
    19
    1 cases which became known as rate cases.
    2 Rates set in such proceedings were
    3 statutorily required to be, quote, just and reasonable,
    4 unquote, both for the utility and for its customers.
    5 The basic theory was to allow the utility to recover its
    6 reasonable expenses as well as to provide a fair return
    7 on the investment.
    8 Focusing more specifically on the
    9 state of Illinois, today we have nine investor-owned
    10 companies that are certified as electric utilities. A
    11 map on the far right shows that service territories in
    12 the state of Illinois early in the last century split up
    13 the state.
    14 Commonwealth Edison is the blue, serves
    15 the -- serves the northern part of the state, and by
    16 far, most of the customers in the state of Illinois.
    17 Illinois Power is the green area, serves many of the
    18 urban areas in central and downstate Illinois. The

    19 yellow area is Central Illinois Public Service, its
    20 historical name. It was merged with the company that
    21 provides power in Missouri and in the East St. Louis
    22 area of Illinois two years ago. It is now
    23 referred -- now known as AMEREN. The Peoria area
    24 is the pink area and other parts of central Illinois is
    L.A. REPORTING (312) 419-9292
    20
    1 Certified Central Illinois Light Company or CCILCO.
    2 In addition, I should note that some
    3 cities, including commonly the city of Springfield,
    4 operates their own electric utility and some areas of
    5 the state are served by electric co-ops, which are, in
    6 fact, owned by their customers.
    7 For the first two-thirds of the 20th
    8 century, rate cases generally resulted in a gradual
    9 lowering of prices as utilities enjoyed the
    10 efficiencies of technological improvements and
    11 economies of scale. Generating plants were built
    12 by each utility in anticipation of growth in
    13 demand for electric power to meet their obligation to
    14 serve.
    15 In some circumstances, utilities chose
    16 not to build their own generating plants, but to import
    17 excess power from other utilities when doing so was, in

    18 fact, less expensive.
    19 In the '70s and '80s, things changed.
    20 Unexpectedly higher costs associated with building and
    21 operating nuclear plants resulted in significant
    22 increases in the price of electricity for customers of
    23 those utilities which chose to invest in nuclear power.
    24 Other utilities faced varying degrees
    L.A. REPORTING (312) 419-9292
    21
    1 of increasing costs to comply with air pollution
    2 standards and to keep up with general price inflation.
    3 As a result, while the retail price of electric power
    4 varied among utilities across the country and here in
    5 Illinois, there were significant price increases for
    6 most customers.
    7 The price increases of the 1980s set the
    8 stage for significant change in government regulatory
    9 policy at both the federal and the state levels.
    10 At the federal level, Congress enacted the Energy
    11 Policy Act of 1992 making a number of changes in
    12 national energy policy.
    13 Of greatest interest, for purposes of
    14 our discussion today, the new law gave the Federal
    15 Energy Regulatory Commission -- I'll refer to them as
    16 FERC -- clearly -- clear authority to require public
    17 utilities owning transmission lines to make those lines

    18 available to wholesale market participants who wished to
    19 move electricity from one part of the grid to another.
    20 This is generally called wholesale wheeling.
    21 Following these changes to FERC
    22 policy -- federal policy, the FERC issued its landmark
    23 order referred to as Order No. 888 in 1995. Order 888
    24 required electric utilities to implement open access,
    L.A. REPORTING (312) 419-9292
    22
    1 which means that access to the transmission grid had to
    2 be -- had to be provided to any generator that wanted to
    3 provide power.
    4 Maybe I can give an example. If
    5 access -- if a generator in Ohio, for example, wanted
    6 to, in fact, provide power to Illinois, to customers in
    7 -- to a utility in Illinois, it probably would -- it
    8 would in turn supply to those customers the generator
    9 and would have to buy transmission authority from the
    10 utilities in Ohio and utilities in Indiana and the --
    11 they didn't have to provide that to them before.
    12 As a result of this order, they, in
    13 fact, had to provide it and have provided it at
    14 a fair price. This economically attractive
    15 possibility, in effect, spurred non-utility
    16 entrepreneurs to build new generating plants to

    17 meet growing electric demand.
    18 At the retail level, industrial
    19 customers, who were faced with increasing international
    20 competition in the late '80s and early '90s, strove to
    21 cut costs including energy costs. Some looked longingly
    22 at the price of wholesale power compared to the retail
    23 prices they were paying to their utility. They went to
    24 their state capitols requesting the right to purchase
    L.A. REPORTING (312) 419-9292
    23
    1 power on the open wholesale market. Significant changes
    2 in state regulation happened first in California, then
    3 in Pennsylvania, and other states.
    4 In late 1997, the Illinois Electricity
    5 Choice Law was enacted. Among other objectives, this
    6 law was intended to spur innovation and drive down
    7 prices through competition among Illinois' traditional
    8 utilities and to attract new competitive power suppliers
    9 to the state.
    10 While the FERC's opening of the
    11 transmission grid to greater wholesale power
    12 transactions through Order 888 was a major impetus to
    13 the competitive generation of electricity, the Illinois
    14 Deregulation Law added to the economic attractiveness of
    15 non-utility generation.
    16 But perhaps even more of a factor in the

    17 growing economic interest in peaker plants is the
    18 increased peak demand for power. The remarkable
    19 economic expansion of the past several years, coupled
    20 with the proliferation of electronic devices in our
    21 homes and offices, has increased the overall demand for
    22 electricity.
    23 While baseload capacity remains
    24 adequate to meet base demand, peaking capacity has not
    L.A. REPORTING (312) 419-9292
    24
    1 expanded to keep up with increasing peak demand. As an
    2 example, one day last July, July 30th, I believe, ComEd
    3 set a new peak demand of 21,243 megawatts. Now, the
    4 previous -- the previous peak in the 19,000s was 2,000
    5 megawatts more, 10 percent more than what had been set
    6 in the previous preceding peak year.
    7 Usually, when you see a change in peak,
    8 it's at one percent, maybe a half of a percent. When
    9 you see a 10 percent change in one year, it was quite
    10 phenomenal. For your information, a megawatt of power
    11 serves approximately 500 homes at times of peak demand.
    12 The midwest also experienced two very
    13 warm summers in 1998 and 1999. Utilities throughout the
    14 region had to pay very high prices for wholesale power
    15 on peak demand days during those summers. Those prices

    16 attract new peaker plant development. Natural gas has
    17 become the fuel of choice for peaker generators.
    18 Peakers are typically powered by gas-fired turbines,
    19 similar in design, as you've heard, to aircraft jet
    20 turbine engines.
    21 As a matter of comparative economics,
    22 the last least cost energy plan filed by ComEd with the
    23 Commission was in 1996. Before that, the requirement
    24 was discontinued with the 1987 Choice Act, identified
    L.A. REPORTING (312) 419-9292
    25
    1 combustion turbines as the least cost alternative for
    2 construction of peaking capacity.
    3 Modern gas-fired combustion turbines
    4 cost about $400 per kilowatt of generating capacity
    5 whereas new coal-fired plants are estimated to cost
    6 about $1,600 per kilowatt of generating capacity, and a
    7 nuclear generating plant costs between $2,000 and $5,000
    8 per kilowatt of generating capacity.
    9 During the '70s and '80s, federally
    10 imposed restrictions on building gas-fired generation
    11 existed because of perceived tightness in natural gas
    12 supply. These restrictions had been removed. However,
    13 a number of factors have combined to enhance the
    14 economic attractiveness of gas-fired generation
    15 including lower natural gas prices in the '90s --

    16 however, it's not the case as we speak this summer;
    17 improved efficiency of gas-fired generation units; and
    18 the ease and speed of construction of gas-fired
    19 generation plants.
    20 Although the cost of natural gas has
    21 risen, as I mentioned, the push for gas-fired
    22 generation does not appear to have dampened. The
    23 apparent environmental consequences of gas-fired
    24 generation as compared to coal-fired generation in the
    L.A. REPORTING (312) 419-9292
    26
    1 absence of stigma and high costs associated with
    2 nuclear plants has also contributed to the increased
    3 economic desirability of gas-fired generation.
    4 Furthermore, peakers are very flexible
    5 in terms of their operating schedules. They can easily
    6 be turned on and off as demand rises and falls. I got
    7 to personally see one operated by Municipal Utilities of
    8 Springfield that can be turned off and on by the
    9 internet without actually having someone there. Their
    10 relatively low capital cost permits them to provide high
    11 capacity to sell into the market for short periods of
    12 time when the market prices reflect peak demand.
    13 Just as Illinois is a rail and air hub,
    14 many of the major natural gas pipelines terminate in or

    15 otherwise may be available to provide service to the
    16 state. The middle map shows the natural gas pipeline in
    17 the state and many of those which go into the Chicago
    18 area.
    19 In addition to ready access to fuel
    20 sources, electrical generating plants requires access to
    21 significant transmission capacity to move its product
    22 through the market. The closer a combustion turbine
    23 peaker is to a natural gas supply and electric
    24 transmission lines, the less expensive it is to bring it
    L.A. REPORTING (312) 419-9292
    27
    1 on-line.
    2 Public resistance to new power plant
    3 lines, transmission lines, has reduced the
    4 attractiveness of construction of those lines as
    5 a way to increase power availability.
    6 While the FERC's order guaranteed open
    7 wholesale access to utility transmission lines, open
    8 access has a price. Under the current FERC-approved
    9 transmission tariffs, longer transmission hauls cost
    10 more. For the use and the power, the more it costs the
    11 company that is selling the power.
    12 I would like to briefly address two
    13 other subjects, if I could. One, for decades, electric
    14 utilities would come to the Commission, Illinois

    15 Commerce Commission, requesting the authority to grant
    16 new -- to construct new generating plants in specific
    17 sites.
    18 Utilities sought a certificate of public
    19 convenience and necessity for a new plant when they
    20 were required to demonstrate at that time an economic
    21 need for the additional generating capacity. A lot of
    22 economic models forecasting of the demand for power were
    23 admitted into that record. If they did, and the ICC
    24 granted the authority, including its required eminent
    L.A. REPORTING (312) 419-9292
    28
    1 domaine, non-utility generators did not have to request
    2 such authority, either before or after the '97 law.
    3 Provisions of the Illinois law
    4 addressing -- siting of electric generating facilities
    5 have not changed. What has changed obviously is that
    6 utilities themselves are no longer primarily trying to
    7 build these plants. They're now trying -- they are now
    8 trying to be built by the -- by the private sector
    9 outletting utility industry. The FERC's order opened
    10 the interstate system to wider access and made
    11 non-utility generation economically attractive over
    12 short distance.
    13 One final point I want to touch upon,

    14 which is a concern, I think, in part brought on by what
    15 is going on elsewhere in the country which has to do
    16 with the price of retail power, retail price of power in
    17 Illinois.
    18 The 1997 restructuring law froze the
    19 rates for -- for base rates for customers at the 1996
    20 level. They are, in fact, frozen here in Illinois
    21 through the year 2004 under that law. That is
    22 associated with many other components of the law that
    23 are referred to technically in the law as the transition
    24 period.
    L.A. REPORTING (312) 419-9292
    29
    1 Some of those rates in 1996, had already
    2 been in effect for a number of years. During the
    3 period that the utility rates had been frozen to date,
    4 wholesale electric power prices throughout the country
    5 and the midwest have been rising and it is anticipated
    6 that those prices will continue to rise if, in fact, the
    7 power supply in the country and in the area does not
    8 keep pace with the demands for electricity.
    9 At the beginning of 2005, I
    10 anticipate -- we anticipate Illinois utilities
    11 that -- that are authorizing the law to be permitted to
    12 adjust the rates and they will come into the Commission
    13 to request to do that to reflect the wholesale price of

    14 power that is in place at that time, and as a result,
    15 given -- if this were to happen today, there would, in
    16 fact, probably be great arguments made to increase the
    17 cost of electrical -- of retail power here in the state
    18 of Illinois.
    19 Therefore, as policymakers address
    20 numerous issues related to the current boom in peaker
    21 plant construction, I -- they should be aware of, in
    22 fact, the need for reliable portfolio of electric power
    23 supply sources that are adequate to meet demand.
    24 I'd be happy to answer any questions
    L.A. REPORTING (312) 419-9292
    30
    1 and to admit my comments and attach them after to the
    2 record if that would be appropriate.
    3 HEARING OFFICER JACKSON: That would be fine.
    4 Your comments are so admitted. If you would, just pass
    5 them down to the court reporter so she can mark them.
    6 MR. FISHER: Thank you.
    7 HEARING OFFICER JACKSON: Thank you. Would the
    8 Board members and the Board's technical unit like to ask
    9 any questions of Mr. Fisher at this time?
    10 MS. KEZELIS: I have a question.
    11 Thank you, Mr. Fisher, for coming here
    12 today. Can you generally describe for the record the

    13 regulatory framework for natural gas as it exists today?
    14 MR. FISHER: Natural gas -- the natural gas
    15 industry is -- is in addition regulated at the federal
    16 level by the Federal Energy Regulatory Commission and at
    17 the state -- the individual state levels by a public
    18 utility commission better known as the Illinois Commerce
    19 Commission.
    20 The natural gas industry was, in fact,
    21 at the wholesale level de-regulated in the 1980s.
    22 In fact, the -- the model for the actions by the
    23 Federal Energy Regulatory Commission was based on
    24 actions they had taken which proved to be very
    L.A. REPORTING (312) 419-9292
    31
    1 successful in the 1980s. They regulate the transfer of
    2 gas through pipelines -- through interstate pipelines
    3 throughout the country and, in fact, is a very
    4 competitive market. The prices of gas have come down.
    5 I think today roughly between 40 and 50
    6 percent of the customers in the state of Illinois --
    7 retail customers in the state of Illinois buy their gas
    8 not from a utility, but from another provider. Excuse
    9 me. Forty to 50 percent of the gas, not of the
    10 customers itself.
    11 At the state level, the gas industry
    12 is -- has been regulated, as I said, traditionally in

    13 the judicial process in the electric industry.
    14 Currently, we have had some pilot projects that
    15 have gone around the state where customers -- where
    16 individual utilities are allowing certain numbers of
    17 customers and types of customers to, in fact, try to
    18 provide -- buy gas at the retail level through
    19 competitive suppliers.
    20 Just last week, NICOR filed a proposal
    21 with the Commission to open up the market for all
    22 of their customers in the state of Illinois, which is
    23 about half the -- half of the gas companies in the
    24 state of Illinois.
    L.A. REPORTING (312) 419-9292
    32
    1 MS. KEZELIS: Thank you.
    2 CHAIRMAN MANNING: Mr. Fisher, can you explain
    3 what, if any, role the Commerce Commission now plays in
    4 keeping track of what Illinois' energy needs are,
    5 specifically to the state?
    6 MR. FISHER: The commission -- the commission
    7 prior to the '97 restructuring law had a formal
    8 responsibility to have filed by each individual utility
    9 what was called a least cost of planning, and basically
    10 it was a 20-year forecast of power demand.
    11 The '97 law took away that requirement

    12 from -- from the utilities and, therefore, there is not
    13 a formal role for the Commission at this point in terms
    14 of the overall -- looking at the overall generation.
    15 I would say that in my tenure of the
    16 Commission, in 1998 -- the '98/'99 summers were very
    17 hot and there was extraordinary pressures on the system
    18 and we have worked very closely to staff of the
    19 Commission -- the Commission has held several hearings
    20 -- with the utilities monitoring the generation of
    21 power.
    22 When nuclear plants were down in 1998,
    23 in 1999, because of operating concerns from the Nuclear
    24 Regulatory Commission, there was a lot of pressure
    L.A. REPORTING (312) 419-9292
    33
    1 there.
    2 Right now, we are monitoring the
    3 development of both the existing plants in terms of
    4 their operating, looking at the existing life. One
    5 issue that's -- that we're looking at right now is the
    6 -- each of the nuclear power plants in the state have a
    7 licensed life at the NRC.
    8 The question is whether or not the NRC
    9 would consider lengthening those lives. Nuclear power
    10 had gone through -- gone through a very interesting
    11 cycle. It was -- it was originally going to be

    12 individually metered. It turned out to be more
    13 expensive than was thought. The plants had, you know,
    14 a lot of trouble with operating.
    15 Right now, the plants in Illinois are
    16 being operated at an efficient rate, better than they
    17 even have in -- in at least 10 years, if not longer.
    18 And so some of the nuclear plants on the east coast
    19 have, in fact, already applied to -- applied to the NRC
    20 to lengthen those -- the terms of that.
    21 But in answer to your question
    22 specifically, there is not a formal statutory role to
    23 continue least cost planning, but we are, in fact,
    24 continuing to look at the demand for power and supply of
    L.A. REPORTING (312) 419-9292
    34
    1 power.
    2 CHAIRMAN MANNING: Thank you.
    3 MS. KEZELIS: I have one question, if I may,
    4 Mr. Fisher.
    5 You testified generally about a
    6 de-regulation of the electric unit and the base rates
    7 were frozen until the end of 2004.
    8 Can you briefly describe for the record
    9 what happens in 2005 under the laws currently in place,
    10 and what role, if any, peakers would play in that so we

    11 can continue to build or not? Can you expand upon that?
    12 MR. FISHER: Well, what will happen is that the
    13 utilities, I would suspect, sometime in 2004, will file
    14 with the Commission a proposal to adjust their rates to
    15 reflect current costs and these are the rates that are
    16 for delivery of power primarily. The -- and so what
    17 that will -- will be reflective of what the cost of
    18 power is at that time.
    19 The cost of power is simply a function
    20 of supply and demand. As we're seeing right now, we
    21 had -- we have kind of an ironic situation, the last
    22 two winters have been very mild, which as a result, the
    23 natural gas industry has cut back on exploration and
    24 discovery of new gas supplies. We're now going into a
    L.A. REPORTING (312) 419-9292
    35
    1 winter and looking at a very high priced -- looking at
    2 probably very high prices for natural gas as a result of
    3 that because -- just to meet normal demand.
    4 The situation we have throughout the
    5 country in the California area this summer, they're
    6 having extreme heat and, therefore, facing some
    7 difficulties with situation.
    8 They, in fact, de-regulated their --
    9 they have taken on a different approach to
    10 de-regulation than we have and as a result, some of

    11 that -- some of those costs of wholesale power, in
    12 fact, is being passed on directly to the retail
    13 customers and there has been some feedback from the
    14 public about it.
    15 MS. KEZELIS: Okay.
    16 MR. FLEMAL: Okay.
    17 You mentioned that there has been an increase in
    18 the peak demands over the last several years that has
    19 been a thousand megawatts. Has there been a similar
    20 change in the base-load demand?
    21 MR. FISHER: Base-load demand has also
    22 increased, yes, over that period of time. It -- one of
    23 the things that's interesting, and I don't have the
    24 direct statistics, but there was a report done by the
    L.A. REPORTING (312) 419-9292
    36
    1 Federal Energy Regulatory Commission following the price
    2 spikes in the summer of 1998.
    3 One of the observations that they made
    4 was that in the midwest, the -- the demand for
    5 electricity over the '90s, had grown at a rate faster
    6 than the rate in the nation as a whole and much faster
    7 than the rate on the coast. I'm just reflecting again
    8 the economy expansion that occurred during that time
    9 decade.

    10 MR. FLEMAL: Have the state utilities been able
    11 to meet that increase in base-load demand?
    12 MR. FISHER: In base-load demand to date, yes.
    13 MR. FLEMAL: But not peak?
    14 MR. FISHER: When the plants are operating,
    15 which they are today.
    16 We did have a situation in 1990 to 1998,
    17 I think in 1999, when the major utilities in the state
    18 because, as I mentioned, nuclear power plants were not
    19 operating due to NRC concerns, that the utilities were
    20 importing substantial amounts of power and -- but that
    21 is not the case today.
    22 In fact, in the summer of 2000, the
    23 midwest and in general, Illinois specifically, when we
    24 have had a few hot days, and they've been very limited
    L.A. REPORTING (312) 419-9292
    37
    1 this summer, have -- have had plenty of excess in
    2 reserves.
    3 MR. FLEMAL: You used a phrase in your comments
    4 that there is a need for a reliable portfolio of
    5 electrical power supply sources. I take it you're
    6 including in there as one of the portfolio elements the
    7 peaker plant, the peaker power source?
    8 MR. FISHER: I think -- yes. I think it's --
    9 yes. I guess I don't have any particular -- the

    10 Commission doesn't have any particular preference
    11 of one power source over another, but I think it is
    12 important that the demand for power be considered
    13 as part of the equation when you are trying to decide
    14 your -- you're trying to address your issues.
    15 MR. FLEMAL: Does the Commission have any
    16 information on the projected magnitude peak demand? Is
    17 that -- is the peak demand going to grow and at what
    18 magnitude?
    19 MR. FISHER: We -- as I said, we no -- we're no
    20 longer required to go through this process of least cost
    21 planning. So there is -- there is no formal forecast of
    22 that, but we, in fact, have been working with -- working
    23 with utilities in trying to look at this issue in an
    24 informal basis.
    L.A. REPORTING (312) 419-9292
    38
    1 But so I guess the answer to your
    2 question do we have a formal estimate of what peak
    3 demand is going to be in Illinois two years, five years
    4 from now, not at this time, we do not. But it is -- it
    5 is something obviously of great interest to us.
    6 MS. KEZELIS: Is that a role that is partially
    7 played for the midwest area?
    8 MR. FISHER: There is an organization -- again,

    9 you can kind of see on the map here. There is an
    10 organization that is, in fact, responsible for
    11 reliability of the midwest. There are several of these
    12 organizations throughout the United States.
    13 One of the things that we're -- and, in
    14 fact, that is their job on a full day, long-term basis
    15 and on a daily basis is to manage the flow of power.
    16 Power, you know, when -- there has been
    17 a lot of heat in the south. There has been a lot of
    18 power flowing from Minnesota and Illinois down to the
    19 southern states and that is controlled through MAIN.
    20 The -- one of the things that is going
    21 on today is that there is a change, again part of the --
    22 what is going on at the federal level, that the order --
    23 the traditional organizations such as MAIN are kind of
    24 being phased out in favor of these new independent
    L.A. REPORTING (312) 419-9292
    39
    1 transmission organizations.
    2 That is because MAIN has been primarily
    3 operating by utilities. It gets into that issue I
    4 mentioned before where the independent power producers
    5 want to be able to have independent access to the
    6 transmission network.
    7 MR. MELAS: Mr. Fisher, I would presume that
    8 particularly this northeastern Illinois area, a

    9 significant portion of the baseload is satisfied
    10 through the use of the nuclear generator.
    11 What is the time frame when the NRC is
    12 going to be asking these plants to cease operation?
    13 MR. FISHER: The -- I don't have the -- the
    14 exact date of the expiration. I think the first one is
    15 within the next 10 years. There is already a couple of
    16 units that have already been, in effect, shut down, the
    17 Dresden unit and the Zion unit.
    18 But I would be happy to provide the --
    19 provide the Board with the specific dates of the
    20 licenses of all of these plants.
    21 MR. MELAS: Well, are there any specific plans
    22 being promulgated now -- being made now to replace the
    23 power that these plants are generating as they go
    24 off-line?
    L.A. REPORTING (312) 419-9292
    40
    1 MR. FISHER: There are -- there are no coal or
    2 no nuclear power plants under construction or,
    3 to my knowledge, contemplated at this point. That is an
    4 issue that we'll be dealing with in the coming decade.
    5 MR. MELAS: Thank you.
    6 HEARING OFFICER JACKSON: Just for the record, I
    7 do want to note MAIN that was referred to earlier

    8 stands for Mid America Interconnected Network, for any
    9 of you who might not know and for the court reporter.
    10 MR. FISHER: Thank you.
    11 MR. RAO: Mr. Fisher, do you have any
    12 information about how much energy is imported into
    13 Illinois and how much energy is sent from utilities in
    14 Illinois to other states?
    15 MR. FISHER: The -- I don't have -- we --
    16 for purposes of summer planning and so forth, we have
    17 information provided to us by the individual utilities.
    18 I do not have the specific information in the aggregate.
    19 It is possible that that information
    20 is available through the Federal Energy Regulatory
    21 Commission and I'd be happy to research that for you
    22 and to provide that.
    23 Increasingly, we're finding that the
    24 information which generally used to be very publically
    L.A. REPORTING (312) 419-9292
    41
    1 available about transactions of power here and there is
    2 the -- the industry itself doesn't want that to be
    3 available, because that, in fact, gives a competitive
    4 advantage to your competitors. But to the extent that
    5 that information is available, I'd be happy to get it
    6 and provide it to the Board.
    7 MR. RAO: Thank you. And on Page 3 of your

    8 pre-filed testimony, you referred to electricity choice
    9 law. Would it be possible for you to provide a citation
    10 to this law for the record?
    11 MR. FISHER: I will be happy to do so.
    12 MR. RAO: Thank you very much.
    13 MS. MCFAWN: You were talking about
    14 forecasting. How accurate is forecasting for demand
    15 peak and base-load where before in 1997, that
    16 requirement for the ICC was removed?
    17 MR. FISHER: I guess the forecast that -- the
    18 long answer to your question is that in a -- in the
    19 early period of the '60s and the '70s, the forecast for
    20 demand was forecasted to increase at about a six
    21 percent rate on annual basis. That didn't happen.
    22 That -- and -- and as a result for a
    23 period of time in the 1980s, we had an excess capacity
    24 of power here in the state of Illinois.
    L.A. REPORTING (312) 419-9292
    42
    1 The forecasts that were made in the early '90s and the
    2 last forecasts that were made in the mid '90s have
    3 proven to be generally for base-load demand
    4 are generally accurate.
    5 MS. MCFAWN: Did they foresee the peak demand
    6 that you referenced in your testimony?

    7 MR. FISHER: No, they did not. That was
    8 not -- that was not projected. The -- part of that is,
    9 in fact, too, in 1998 -- I've learned a lot about the
    10 weather in this position.
    11 In 1998 and 1999, we had two of the
    12 hottest summers certainly in the decade and -- and, in
    13 fact, in our workings with Commonwealth Edison over the
    14 last year, we have been debating the issue about how
    15 they should design their overall system, not just the
    16 generation, but also the distribution in terms of what
    17 is, in fact, the appropriate temperature.
    18 Traditionally, the temperature was set
    19 at a 95-degree level. Now -- they are now redesigning
    20 it for 99. A forecast I saw from the -- from a U.S.
    21 government agency reading about the century -- about the
    22 temperature changing over the coming century, it
    23 suggests maybe we should sit down and talk some more,
    24 so.
    L.A. REPORTING (312) 419-9292
    43
    1 MS. MCFAWN: You had mentioned also that
    2 transmission tariffs makes longer transmissions more
    3 costly. Could you elaborate on that?
    4 For instance, what I'm wondering about
    5 in connection with that statement is what are those
    6 tariffs and will they -- how will they affect building

    7 peaker plants?
    8 MR. FISHER: The tariffs were filed with the
    9 Federal Energy Regulatory Commission and basically the
    10 tariff -- when you pass -- it's kind of like toll roads.
    11 When you try and pass your power from a site that is in,
    12 for example, from Ohio to Illinois, you're going through
    13 several different utility companies, each of which owns
    14 the individual transmission lines.
    15 So you're required by the tariffs filed
    16 by those utilities to pay -- to pay, in effect, a cost
    17 to those. One of the things that is being looked at
    18 today is the idea of establishing through these
    19 independent transmission organizations a way of avoiding
    20 that what is referred to as pancaking of rates to try
    21 to figure out a way -- try to figure out a way of
    22 reducing the overall costs for purposes of
    23 transmission. And I'm not sure I answered your
    24 question.
    L.A. REPORTING (312) 419-9292
    44
    1 MS. MCFAWN: But you explained how it works for
    2 me. Right now, do the tariffs discourage long haul
    3 transmission or encourage it?
    4 MR. FISHER: I think they encourage it more
    5 than they used to. I think that independent power

    6 producers -- and I understand you will hear from some of
    7 them -- would argue that the -- that there is a need for
    8 more changes in the -- at the federal level.
    9 MS. MCFAWN: Thank you.
    10 HEARING OFFICER JACKSON: Any other questions?
    11 MS. MCFAWN: I have one question.
    12 MR. FISHER: Sure.
    13 MS. MCFAWN: I don't know if you can answer it
    14 or not. I've also heard there was some discussion about
    15 a natural gas pipeline across Lake Michigan. Would the
    16 ICC regulate that or be involved in that decision
    17 making?
    18 MR. FISHER: No. The pipeline that is being
    19 proposed would be outside of the state of Illinois,
    20 first of all. It goes, as I understand, from Indiana to
    21 Wisconsin, and it would be -- it's a Federal Energy
    22 Regulatory Commission, because it's an interstate
    23 pipeline, they would be the ones that would have to --
    24 that would have to sign off on that.
    L.A. REPORTING (312) 419-9292
    45
    1 If the -- the Illinois Commerce
    2 Commission citing responsibilities are -- do have -- we
    3 had a situation a couple of years ago where there was a
    4 proposal to build an oil pipeline from Canada to the
    5 Joliet refinery by the Lake Head Company. They came to

    6 the Commission requesting eminent domain authority
    7 before the public -- for the Commission to find it was
    8 in the public interest.
    9 The Commission had hearings on that and
    10 decided not to grant eminent domain authority for that
    11 particular line, but I understand the line is in fact,
    12 being built anyway, just not as straight as it was
    13 originally proposed.
    14 MS. MCFAWN: Interesting.
    15 HEARING OFFICER JACKSON: Anything else?
    16 Okay. I do want to note on the record
    17 that the Commerce Commission did file their pre-filed
    18 testimony yesterday along with the motion to file
    19 instanter. Just for the record, the motion to file
    20 instanter is granted.
    21 Thank you, Mr. Fisher.
    22 MR. FISHER: Thank you.
    23 HEARING OFFICER JACKSON: Okay. At this point
    24 we'll ask the representatives from the Illinois
    L.A. REPORTING (312) 419-9292
    46
    1 Environmental Protection Agency to step forward to the
    2 witness table, the presenter's table.
    3 We'll go off the record for a few
    4 minutes and let them set up.

    5 (Off the record.)
    6 HEARING OFFICER JACKSON: What we're going to do
    7 with the Environmental Protection Agency is ask that
    8 each of the presenters today offer and make their
    9 presentation to the Board and then when all the
    10 presentations have been completed, then we will address
    11 our questions to the panel.
    12 Okay. Please proceed.
    13 MR. PHILLIPS: Good morning. Madam Chairman
    14 Manning, Madam Hearing Officer, my name is Scott
    15 Phillips. I'm an attorney with the Illinois
    16 Environmental Protection Agency.
    17 This morning, the Agency will be
    18 presenting testimony --
    19 THE COURT REPORTER: I can't hear you. Please
    20 speak into your microphone.
    21 MR. PHILLIPS: This morning, the Agency will be
    22 presenting testimony from seven witnesses. Our first
    23 witness will be Director Thomas Skinner. Our second
    24 witness will be Christopher Romaine from the Bureau of
    L.A. REPORTING (312) 419-9292
    47
    1 Air. The third witness will be Robert Kaleel from the
    2 Bureau of Air. The fourth witness will be Greg Zak from
    3 the Illinois EPA Noise Program. Our fifth witness will
    4 be Stephen Nightingale from the Bureau of Water. The

    5 sixth witness will be Tom Marvel from the Bureau of
    6 Water presenting testimony on groundwater issues. And
    7 our seventh witness will be Todd Marvel from the Bureau
    8 of Land.
    9 We have two group exhibits that I would
    10 like to get identified, marked, and into the record so
    11 we don't have to worry about those later on.
    12 The first is Illinois Environmental
    13 Protection Agency Group Exhibit 1, which consists
    14 of the seven written pre-filed testimony that we
    15 submitted to the Board and I'll hand those to the court
    16 reporter at this time.
    17 HEARING OFFICER JACKSON: They will be so
    18 admitted.
    19 MR. PHILLIPS: The second group exhibit will be
    20 -- consists of the 20 exhibits that the Agency has
    21 already pre-filed with the Board and I believe those
    22 exhibits will be or are currently available on the
    23 Board's website as well. So I will hand those to the
    24 court reporter at this time.
    L.A. REPORTING (312) 419-9292
    48
    1 HEARING OFFICER JACKSON: Exhibit 2 is also
    2 admitted.
    3 MR. PHILLIPS: I would also like to note that

    4 before we begin, there is just a correction on some
    5 numbers that were in Director Skinner's testimony
    6 regarding the number of permit applications. We have
    7 some more current information and thought we would
    8 provide those at this time.
    9 There are permit applications submitted
    10 to the Agency for 46 sites. Twenty-nine permits have
    11 been issued. There have been two withdrawals. One
    12 permit application has expired and there are currently
    13 18 permit applications pending for peakers. Some of
    14 these sites have more than one permit application that
    15 is why the numbers don't add up to the 29.
    16 Director Skinner?
    17 MR. SKINNER: Good morning. I'd like to thank
    18 all of you for the opportunity to appear before you, if
    19 for no other reason than the Agency has certainly been
    20 taking the brunt of the peaker heat, so to speak, over
    21 the course of the last 18 months, and it's nice to have
    22 someone to share the pure pleasure with, I guess.
    23 To those members of the audience who
    24 don't often visit this particular building and thought
    L.A. REPORTING (312) 419-9292
    49
    1 or made the statement that we were having this cool
    2 summer here, I would always welcome you to the State of
    3 Illinois Center.

    4 Because the transcript does not always
    5 reflect attempts at humor, I'm going to forego the
    6 obligatory joke on behalf of the Environmental
    7 Protection Agency for another peaker plant in the air
    8 conditioning system in this building. Besides that's
    9 implicating, I would hate to have the videotape be
    10 played at a later date.
    11 You have before you or in your offices
    12 my full written testimony as well as the written
    13 testimony of my colleagues up here with me. I don't
    14 intend to read that testimony verbatim into the record
    15 here today. You'll be even happier to know that my more
    16 technically oriented colleagues do not intend to read
    17 their testimony into the record either. Instead, we're
    18 going to provide you with summaries.
    19 One of the things you probably noticed
    20 in the written testimony is that we have not really
    21 made any recommendations with regard to peaker plants.
    22 And to the extent that it was possible not to do so, we
    23 really haven't offered opinions with regard to peaker
    24 issues up to this point.
    L.A. REPORTING (312) 419-9292
    50
    1 We did that quite intentionally. We
    2 wanted to provide you with some sort of background on

    3 peakers and the facts of the situation to the extent
    4 that we had them in our possession.
    5 On the other hand, having said that,
    6 we're more than happy to take questions and in
    7 adherence to the policy set by the hearing officer,
    8 we'll be glad to take those questions after we've all
    9 said our peace, I guess. We'll be glad to offer you our
    10 opinions if you want our opinions. Some of us are
    11 probably more easier than others to offer those
    12 opinions, but if you ask us a question, we'll be glad to
    13 answer it.
    14 What I'll also do this morning in
    15 addition to giving you a brief overview of peakers, is
    16 to provide some comments as well on what I'll call local
    17 land use and citing issues related to peaker
    18 facilities. And I'm going to offer that perspective
    19 from my current position as director of the Illinois
    20 Environmental Protection Agency, but I will admit to
    21 you up front that those -- that that perspective will
    22 probably be colored by my experiences both as an
    23 elected local official and in my former life as an
    24 attorney who represented, at various times, folks on
    L.A. REPORTING (312) 419-9292
    51
    1 both sides of citing issues. So you can filter it
    2 yourselves, I guess, but I'll try to give you a --

    3 really one prospective on local citing.
    4 In the past year and a half, you guys
    5 have seen a number, and it's an increasing number
    6 of permits, for what we call peaker power plants or
    7 natural gas-fired power facilities. We seem to get
    8 more every day. The current total is, as Scott said,
    9 46. Sometimes we say 50. Sometimes we say 42. It
    10 really depends on how you interpret what a facility is
    11 and facilities are often made up of specific units.
    12 Scott gave you the numbers as to
    13 issuance and withdrawal of the various permits. You
    14 know, please note that my comments are going to be
    15 directed specifically at natural gas-fired peaker power
    16 plants, which is the subject of, as I understand it, of
    17 these proceedings.
    18 Peakers operate only during peak demand
    19 situations such as on hot summer days when residential
    20 and commercial usage of electricity creates more demands
    21 than the baseload plants that exist in Illinois make
    22 available.
    23 I -- one of the things I found in the
    24 time that I've been in my current position is that I
    L.A. REPORTING (312) 419-9292
    52
    1 have a series of regular correspondents, whether they be

    2 from state government or from the citizens of the state
    3 at large, and one of my somewhat regular correspondents
    4 wrote to me a while back and said, in essence, in
    5 talking about peaker plants, you know, the problem since
    6 deregulation is that nobody is regulating these
    7 facilities.
    8 It really caused me to stop and think
    9 about it. I found it kind of funny in a way, the way it
    10 was put, juxtaposing the de-regulation with the
    11 regulation. I understand what he was driving at, and I
    12 have to say that to some extent, I disagree with that.
    13 These facilities are regulated. They are regulated by
    14 our Agency, but they are regulated only with our Agency
    15 and with regard to certain issues, largely related to
    16 air, and as we'll hear from Christopher Romaine in a
    17 little while, the Bureau of Air does some extensive
    18 reviews when we get a peaker application.
    19 The various technical and policy issues
    20 with regard to peaker plants can be complex and there is
    21 a lot of opinion on this. It's a developing situation,
    22 but I can tell you that from the Agency's perspective,
    23 from a regulatory standpoint right now, based on our
    24 given authority, it is fairly straightforward.
    L.A. REPORTING (312) 419-9292
    53
    1 In the broadest sense, we categorize it

    2 as three basic principals that we implement at this
    3 point. Number one is that no permit shall be issued
    4 for the construction of a peaker plant unless the
    5 permit applicant proves that the facility will not
    6 violate existing environmental laws and regulations.
    7 The second principal is peaker plants
    8 must be constructed and operated in full compliance
    9 with their permits and in full compliance with existing
    10 environmental laws and regulations.
    11 And third, that based on our growing
    12 experience and knowledge regarding these facilities, we
    13 as an agency are in the process of regularly
    14 reevaluating the standards that exist out there right
    15 now in order to make sure that we're adequately
    16 protecting human health and the environment and
    17 maintaining consistency with the national air quality
    18 standards. Now, I want to touch on each of those
    19 principals fairly briefly this morning.
    20 With regard to the first principle,
    21 compliance with existing laws and regulations with
    22 regard to the environment, all peaker plants require air
    23 emission permits in order to construct and operate from
    24 our Agency. Peakers must pass air emissions and
    L.A. REPORTING (312) 419-9292
    54

    1 therefore they're required to come to the state and to
    2 the Illinois EPA.
    3 Depending on the characteristics of
    4 the particular project, some peaker plants require
    5 permits from our Bureau of Water as well if they have
    6 discharge, water discharge. We would consider what is
    7 commonly referred to as SPDS permit.
    8 Groundwater withdrawal issues, which
    9 can exist with regards to some types of peaker
    10 facilities, are somewhat A different animal. Rick Cobb
    11 from our Bureau of Water will talk about that
    12 a little bit. We do not have authority right now over
    13 the ground leak withdrawal of groundwater, groundwater
    14 consumption of Illinois.
    15 As you all are all too aware, I guess,
    16 Section 39(a) of the Environmental Protection Agency
    17 states that, quote, it shall be the duty of the Agency
    18 to issue a permit upon proof by the applicant that the
    19 facility will not cause violation of the act or of
    20 regulations, unquote, promulgated thereunder.
    21 When we receive an application for a
    22 permit to construct a peaker or for any structure for
    23 that matter, we review the application to determine
    24 whether the proposal will comply with applicable state
    L.A. REPORTING (312) 419-9292
    55

    1 and federal laws and regulations.
    2 Where the permit application does not
    3 prove compliance and where the applicant cannot or
    4 chooses not to correct the problem, we deny the permit.
    5 Where the permit application indicates
    6 compliance, on the other hand, by law, we have to issue
    7 the permit. However, we may and we often do include in
    8 the permit conditions that limit, to some extent,
    9 certain aspects of the operation of the project such as
    10 the number of hours that the equipment may operate or
    11 the parts per million of the emission or discharge of a
    12 pollutant into the ambient environment. All of this is
    13 intended to ensure compliance with applicable state and
    14 federal laws and regulations.
    15 Public participation is an important
    16 part of our permit process and that's particularly true
    17 with regard to peakers. A number of residents of the
    18 localities where it is independent power producers
    19 sought to build new peakers have expressed their
    20 opposition, have expressed it eloquently and may have
    21 even expressed it loudly at times.
    22 Concerns raised included emissions from
    23 peaker plants, the impact of those emissions on local
    24 air quality, impact on regional air quality, the impact
    L.A. REPORTING (312) 419-9292

    56
    1 of those emissions on their health, and our
    2 interpretation and application of the regulations
    3 providing for permitting of these. Our testimony
    4 in these proceedings will address these concerns.
    5 In addition, members of the public
    6 have also raised other land use issues, what I
    7 would term perhaps environmentally related, but
    8 not environmental issues such as esthetics of the
    9 proposed facilities, local zoning, citing, affect
    10 on property values and issues of that sort. I will
    11 touch on those issues briefly in a little while as
    12 well.
    13 The second principal you may recall is
    14 that peaker plants must be constructed and operated in
    15 full compliance with their permits and full compliance
    16 with environmental laws and regulations. To further
    17 this objective, we have inspectors and other compliance
    18 personnel who investigate possible violations. If we
    19 find violations at a facility, we can tell the facility
    20 to correct them and if appropriate, we refer the matter
    21 to the Office of the Attorney General for the state of
    22 Illinois for prosecution and for a civil penalty.
    23 Ordinarily, unless a particular
    24 compliance problem is identified of a peaker, we would
    L.A. REPORTING (312) 419-9292

    57
    1 inspect facilities of this type and of this size every
    2 three years. In the interim, we would analyze the
    3 quarterly data which is required to be submitted on
    4 facilities operations.
    5 However, because of the present number
    6 of peakers appearing in Illinois in a relatively short
    7 period of time, their relative proximity to residences
    8 in some instances, we have decided as a policy matter to
    9 conduct annual inspections rather than every three years
    10 of each natural gas-fired peaker plant. This, we hope,
    11 will allow us to identify and quickly address any
    12 violations of permitting conditions and environmental
    13 laws and regs, and we will, of course, continue on a
    14 quarterly basis to monitor very closely the data that we
    15 receive with regard to the ongoing operations of
    16 any and all of these facilities.
    17 The third principal I referred to
    18 earlier is continual eval -- continual re-evaluation. I
    19 have to say over the past 18 months, we as an Agency,
    20 and I as director have spent as much or more time
    21 dealing with peaker issues as any other single subject.
    22 We understand and we understand very
    23 clearly that there is significant concern among the
    24 residents of Illinois and among the folks who live near
    L.A. REPORTING (312) 419-9292

    58
    1 these proposed peakers about the air quality and health
    2 effects that these facilities may have. Now, after a
    3 thorough analysis of computer runs and continuing that
    4 analysis and modeling, we do not believe the plants that
    5 have been proposed to date and permitted represent
    6 significant health or environmental threat.
    7 However, as we gain additional
    8 experience with peakers, we will regularly re-evaluate
    9 whether the air requirements provide protection of
    10 health and environment, and be -- are consistent with
    11 national air quality standards. If and when we find the
    12 existing requirements are lacking, we either
    13 administratively address the problem, if we have the
    14 legal authority to do so, or we will propose appropriate
    15 regulatory changes to the Board or legislative changes
    16 to the Illinois General Assembly.
    17 As examples of the first of those, since
    18 January of this year, we have made two administrative
    19 changes in the way we review peaker permits.
    20 First, we have decided to hold public
    21 hearings on each construction permit. This is not a
    22 measure that is required by law. These proceedings are
    23 discretionary but as -- we really wanted to -- I've had
    24 more important acts that I've undertaken, but I have
    L.A. REPORTING (312) 419-9292

    59
    1 undertaken to exercise that discretion across the Board
    2 with regard to peaker plants.
    3 We now, as a matter of course, have a
    4 hearing before we take final action on a permit. That
    5 helps us in two ways. Number one, it allow us to
    6 receive additional information that might not otherwise
    7 be obtained and that sometimes does happen. And it also
    8 allows the peaker developers, proposed operators, if you
    9 will, and the Agency, to some extent, to provide
    10 additional information about the project and about our
    11 process for permitting the project to the public and
    12 specifically to residents in the area where the project
    13 is proposed.
    14 The second change that we have
    15 undertaken is that we require applicants of peaker
    16 permits to perform and submit for our review a
    17 comprehensive analysis of the potential environmental
    18 effects. In essence, it's modeling the effect of the
    19 proposed facility on air quality.
    20 We require that this modeling include
    21 emissions from all major sources near the proposed
    22 peaker source as well as all others proposed new
    23 electrical generating plants in the area. Prior to
    24 January of this year, this type of analysis was
    L.A. REPORTING (312) 419-9292

    60
    1 performed only on so called major projects, a category
    2 that most of the peaker proposals do not fall.
    3 Again, this change is not mandated
    4 by law, but what we decided to do is institute that
    5 requirement and to require the information as an
    6 additional safeguard and as an additional tool for us to
    7 use to consider these applications.
    8 Finally, on a related issue, the
    9 effect on air quality of peakers, but also of other
    10 similar sources, in July of this year, as you all know,
    11 we proposed a rule to the Board to reduce statewide
    12 nitrogen oxides, or NOx, from electrical generator
    13 facilities among which peaker plants are a subcategory.
    14 This proposal was in response to US
    15 EPA's call for state implementation plans requiring
    16 significant reductions in emissions or the so called
    17 NOx SIP call, an area in which Illinois, as a state,
    18 has been the leader nationwide among the states and has
    19 put in a significant amount of work over the course of
    20 the past five to 10 years.
    21 Now, NOx is the main air pollutant
    22 produced by these peakers. There are other emissions,
    23 but NOx is the predominant emissions. The portion of
    24 the NOx SIP call applicable to peaker plants establishes
    L.A. REPORTING (312) 419-9292

    61
    1 caps on NOx emissions from electrical generating units
    2 or EGUs.
    3 The owners and operators of these units
    4 must relinquish an allowance for each ton of NOx
    5 emitted between May 1st and September 30th, usually
    6 categorized as the ozone season beginning in the year
    7 2003.
    8 If adopted, this rule will result in a
    9 reduction of NOx emissions during the ozone season from
    10 over 200,000 tons statewide to less than 31,000 tons
    11 statewide, which I think by any measure is a
    12 significant improvement and you will certainly diminish
    13 overall the effect that NOx has on air quality in
    14 Illinois.
    15 Switching gears somewhat, I promised to
    16 talk about local land use proposals and sitings earlier
    17 and I would like to take the opportunity to do that.
    18 As I mentioned during our public comment
    19 period, we frequently receive comments regarding the
    20 potential effect of peakers on things like aesthetics,
    21 appearance, traffic, property values, things that the
    22 folks in the local community would be expected to be
    23 concerned about.
    24 I will state first that the Agency is

    L.A. REPORTING (312) 419-9292
    62
    1 not authorized by state law to consider these types of
    2 issues in its review of permit applications. These
    3 types of land use issues are left to local units of
    4 government. And while we attach tradition occasionally
    5 to these air permits, we don't have the latitude to
    6 impose conditions that are unrelated to air quality.
    7 Now, while important, these types of
    8 issues that I refer to historically have been left by
    9 the legislature to the local units of government on the
    10 basis that local government better evaluates these
    11 matters in determining its citizens preferences.
    12 I'm particularly sensitive to the
    13 separation of local and state functions because in my --
    14 in addition to my role at the Agency, I sit on the
    15 village board in a community north of Chicago, Lake
    16 Bluff, and I know when I take my state bureaucratic hat
    17 off and put on my village hat, the last thing I want and
    18 the last thing my village wants is some bureaucrat in
    19 Springfield telling us how we have to use our land, how
    20 we have to spend our money, or anything else for that
    21 matter.
    22 As a result of that experience, I -- as
    23 I travel around to the various parts of the state,
    24 talking to groups and individuals with regard to peaker

    L.A. REPORTING (312) 419-9292
    63
    1 plants in other areas, I try to emphasize the power the
    2 vote communities currently do possess through local
    3 zoning and land use to control whether peakers can be
    4 built.
    5 I have tried to emphasize that the
    6 Illinois EPA air permit to construct a peaker
    7 plant does not supercede a local zoning land
    8 restrictive barriers. There are two separate issues,
    9 two separate areas of responsibility. The fact that the
    10 applicant may have met the air quality requirement or
    11 air emission requirements with regard to peaker plants,
    12 and, therefore, we issue a permit does not mean we've
    13 addressed the local issues. That's left to the locals.
    14 In establishing this docket, the Board
    15 would like to comment on the following issues and that
    16 is a specific issue. Should new or expanding peaker
    17 plants be subject to citing requirements beyond
    18 applicable zoning requirements.
    19 By this question, I assume that the
    20 Board was referring to what is commonly called the
    21 SP172 or local citing process with regard to pollution
    22 control facilities.
    23 Our Agency has no direct involvement in
    24 the actual SP172 hearing process. Those hearings are

    L.A. REPORTING (312) 419-9292
    64
    1 conducted locally. However, our role is essentially
    2 limited to making sure that the permit applicant
    3 submits approval of local siting was obtained pursuant
    4 to SP172.
    5 We can, though, I think, provide the
    6 Board with a summary of the circumstances that gave
    7 rise to the existing state requirements for siting that
    8 are contained in the Environmental Protection Act and we
    9 have, in fact, done that in the written testimony that
    10 we submitted.
    11 This summary, I hope, will provide a
    12 useful context from which you as Board members can
    13 evaluate whether peaker presents similar issues to
    14 pollution control facilities and whether they address
    15 warrant sections from beyond local zoning.
    16 What I'll do, I think, right now is
    17 provide maybe a summary of the summaries as follows. In
    18 1981, the Environmental Protection Act was amended to
    19 create the requirement that permit applicants for a
    20 pollution control facility must first obtain local
    21 citing approval from the applicable unit of the local
    22 government that is located within the municipality,
    23 that is a special hearing panel of municipality, the
    24 facility is located in an unincorporated area of the

    L.A. REPORTING (312) 419-9292
    65
    1 county, it would be a special hearing panel of
    2 essentially the county board.
    3 The concept of local siting I referred
    4 to embodied originally in Senate Bill 172. It was
    5 later enacted into law on November 12, 1981, but has
    6 been in the industry, I think, commonly referred to as
    7 SP172 since then.
    8 Prior to 1981, the comments of local
    9 authorities in Illinois were not binding on the state
    10 and specifically were not binding under Illinois
    11 Environmental Protection Agency in the siting and
    12 permitting of sanitary landfills and other pollution
    13 control facilities such as transfer stations and
    14 incinerators.
    15 SP172 dramatically changed that
    16 scenario, or dramatically changed the permit process by
    17 requiring the county or municipalities in which the
    18 facility was located to conduct hearings, specifically
    19 on the proposed project in order to determine whether
    20 the facility met certain enumerated statutory criteria.
    21 The Agency may not issue development or
    22 construction permits until those criteria are met and
    23 local siting is obtained. SP172 resulted in division of

    24 decision making responsibility and authority between
    L.A. REPORTING (312) 419-9292
    66
    1 local government and the state.
    2 The Agency itself acknowledged and
    3 continues to acknowledge that it does not have the same
    4 degree of local land use expertise that local units of
    5 government do. By splitting this authority, local
    6 governments and local citizens could then determine
    7 whether a proposed facility is appropriate to their
    8 specific area.
    9 Section 397.2 of the act, which many of
    10 you are familiar, provides that local authorities are to
    11 consider nine criteria in reviewing applications for
    12 siting approval.
    13 Section 39.2(g) also provides siting
    14 approval procedures, criteria and appeal procedures to
    15 be followed. The local siting authority may develop its
    16 own siting procedures, but only if those procedures are
    17 consistent with the act and if they augment or
    18 supplement rather than supplant the existing state
    19 requirements.
    20 The end result of placing 172 siting,
    21 local siting's approval in their permitting issuing
    22 process was to place local government in the role of
    23 making all relevant decisions regarding location,

    24 suitability for a proposed facility either to the local
    L.A. REPORTING (312) 419-9292
    67
    1 siting approval process or through tradition zoning
    2 ordinances.
    3 Now, peakers are currently not subject
    4 to SP172 because the natural gas-fired peaker plant
    5 does not meet the definition in the statutes of a
    6 pollution control facility. Natural gas used in the
    7 peaker fashion does not meet the definition of a waste.
    8 Hence, the question of, as we sit here today, whether
    9 they should be subject to SP172 or something similar.
    10 Now, as I pointed out earlier, it's not
    11 to say, though, that these facilities are exempt or
    12 preempted from any kind of restriction as to land usage
    13 because the mere fact that SP172 does not apply, does
    14 not mean the local zoning doesn't apply and does not
    15 relieve the peaker applicant from going to the local
    16 community in order to assure that it is compliant with
    17 all necessary zoning approvals as were necessary in
    18 obtaining either a special use permit or some other sort
    19 of zoning changes from the local government. The normal
    20 zoning process still applies in these instances.
    21 When I've made that local control pitch
    22 in various places to various groups, I've heard

    23 essentially two basic objections. The first is that
    24 most local government are not sophisticated enough to
    L.A. REPORTING (312) 419-9292
    68
    1 undertake the necessary analysis with regard to these
    2 peaker facilities.
    3 The second is that if a peaker is
    4 located on the edge of town, residents of the adjacent
    5 community do not have a meaningful opportunity to impact
    6 its neighboring community's land use decision.
    7 To offer an opinion in the first
    8 instance, as to the former, I disagree with all
    9 due respect. Local governments address the aesthetic
    10 issues, traffic issues, property value issues every day.
    11 To a large extent, that is what local governments are
    12 there for, to kind of keep a large part of their
    13 function.
    14 Now, while local communities can
    15 undertake air analysis separate from the air analysis
    16 that we undertake if they so desire and can impose, in
    17 fact, through their local process, stricter
    18 requirements, if they so desire, it is not necessary
    19 that they do that. There is a logical splitter of
    20 responsibility. The Agency is equipped to deal with
    21 the statewide, regional and local air issues while
    22 local government can deal with the traditional local

    23 air issues.
    24 On the other hand, there are instances
    L.A. REPORTING (312) 419-9292
    69
    1 where I think, in fact, communities have undertaken
    2 these separate analysis. There's a current situation up
    3 in Libertyville, Illinois. Within a facility up there,
    4 there is an example where I think a great deal of time
    5 and money has been expended by the local community in
    6 attempting to determine whether or not the facility is
    7 desirable for them as a community and some of what
    8 they've undertaken is what I would describe as technical
    9 analysis that sometimes is left to us, but obviously
    10 sometimes it is undertaken by the local community as
    11 well.
    12 As to the second objection, perceived
    13 lack of influence over existing government, I will
    14 fully agree that this is a legitimate issue and is
    15 something that the Board and perhaps the general
    16 assembly ought to consider.
    17 However, it's also an issue that goes
    18 beyond peaker plants. It's an issue that existed
    19 in the SP172 context as well. It's an issue that has
    20 been -- there has been complaints about over the course
    21 of time. Some communities variably deal with it better

    22 than others.
    23 Libertyville is an example where folks
    24 that live outside of the actual municipality of
    L.A. REPORTING (312) 419-9292
    70
    1 Libertyville had a fair amount of success in getting
    2 their viewpoints across to the local bodies that are
    3 going to make those procedural -- those land use
    4 decisions up there, but having said that, I think it is
    5 an issue that deserves further consideration.
    6 I think what I'll do is stop there. If
    7 you have questions, I, of course, will be glad to take
    8 them now, but Hearing Officer Jackson being in charge
    9 has decided to hold them off and I'll take a breath and
    10 turn it over to Chris Romaine who is going to talk about
    11 air issues.
    12 HEARING OFFICER JACKSON: Before you start,
    13 I just wanted to say we're probably going to take a
    14 lunch break around 12:30 today. We'll go ahead and get
    15 started with the next witness now. Obviously, we won't
    16 finish before lunch.
    17 Okay. You may proceed.
    18 MR. ROMAINE: Good morning. Thank you for
    19 allowing me to speak today. My name is Christopher
    20 Romaine. I have been manager of the utility unit
    21 in the air permit section since 1998.

    22 The purpose of my testimony is to assist
    23 the Board in its inquiries by providing information on
    24 the air pollution control aspects of peaker plants and
    L.A. REPORTING (312) 419-9292
    71
    1 emissions permitting.
    2 As chairman of the utility unit, I
    3 oversee a staff of engineers who review all air
    4 pollution control permit applications for electric
    5 power facilities. This includes the review of
    6 construction permit applications submitted for proposed
    7 new power plants.
    8 My tenure in the utility unit has
    9 coincided with the influx of proposals for new natural
    10 gas-fired power plants in Illinois, which apparently has
    11 accompanied economic deregulation of the generation of
    12 electricity in the state.
    13 I have assisted in the review of many
    14 of these applications for these plants and have
    15 participated in most of the public hearings held
    16 by the Bureau of Air on these projects.
    17 Through my work with applications for
    18 new peaker plants, I also have acquired a general
    19 familiarity with aspects of these plants unrelated to
    20 air emissions.

    21 The first point I want to make is that
    22 peaker power plants are not a new phenomenon. There
    23 are a small number of existing peaker power plants in
    24 Illinois that have operated as needed to meet peak
    L.A. REPORTING (312) 419-9292
    72
    1 electric power demands or provide emergency power.
    2 In this regard, electric power is
    3 supplied by a mix of power plants. Economics dictates
    4 this mix of generating capacity because the use of and
    5 demand for electricity varies greatly depending upon the
    6 time of year and the time of day, and the power system
    7 must have the capability to respond to this variation.
    8 This mix includes so-called baseload
    9 power plants and peaker plants. In fact, we can get
    10 more technical. People also refer to them in the
    11 intermediate category referred to as cyclic power
    12 plants.
    13 In any event, baseload power plants
    14 run around the clock, essentially day in, day out, at
    15 relatively stable levels of operation. These
    16 are the least expensive and most efficient plants
    17 to operate and include fewer coal-fired boilers and
    18 nuclear plants.
    19 Cyclic power plants operate on a daily
    20 cycle, tracking the daily cycle of power demand

    21 as it rises and falls during the day. These plants
    22 include some of the older plants and some of the plants
    23 specifically designed to interpret the steam and boiler
    24 plants.
    L.A. REPORTING (312) 419-9292
    73
    1 The peaker power plants have had a
    2 critical place in the power supply system as they have
    3 operated to meet the demand for electricity when the
    4 demand is at its highest.
    5 In Illinois, this peak demand occurs
    6 on hot summer days due to the use of electricity
    7 for air-conditioning.
    8 The engines that are used in peaker
    9 plants are the most expensive to operate because they
    10 use high cost natural gas, light oil. However, peaker
    11 plants can be turned on and off very quickly, compared
    12 to steam power plants, which allows them to respond to
    13 the demand in power.
    14 As Director Skinner has already
    15 indicated, what is new in Illinois is the large number
    16 of peaker power plants proposed since mid-1998,
    17 coincidental with the economic deregulation of power
    18 generation in Illinois.
    19 These plants are being proposed

    20 throughout the state, not only in rural areas where new
    21 power plants were historically sited, but also in
    22 developed and developing areas in the greater Chicago
    23 metropolitan area.
    24 In the Chicago area, some plants are
    L.A. REPORTING (312) 419-9292
    74
    1 being sited for existing industrial locations, but many
    2 have selected sites that are not in industrial areas and
    3 might be best characterized as open, often close to
    4 residential areas.
    5 Moreover, unlike existing peaker plants,
    6 which were developed by Illinois' historical electric
    7 utilities like Illinois Power or Commonwealth Edison,
    8 most of the new plants are being developed by companies
    9 that are new to Illinois, who, as we understand it,
    10 intend to sell power on the wholesale power market.
    11 Thus, it is not clear whether all
    12 this additional generating capacity is needed to meet
    13 local needs or that proposed plants are being developed
    14 at the most appropriate locations.
    15 At the same time, it is important to
    16 note that there are certainly new peaker projects that
    17 are being proposed by our historic utilities. Like the
    18 existing peaker plants, some of these projects are
    19 occurring at or adjacent to existing coal-fired power

    20 plants.
    21 At the same time, there are certainly
    22 some nuclear power plants that are being proposed by
    23 our historical utilities. Like these peaker plants,
    24 some of these projects are occurring at or adjacent to
    L.A. REPORTING (312) 419-9292
    75
    1 existing peaker power plants.
    2 Some doctrines are appropriate on what
    3 these units are when they already use gas turbines.
    4 These units are more commonly known as jet engines.
    5 They're also technically known as combustion turbines.
    6 Simply speaking, a gas turbine is a
    7 rotary internal combustion engine with three major
    8 parts. I think somebody has an overhead for me
    9 at this point.
    10 The three parts are the air compressor,
    11 burners, or combustion chamber and a power turbine. We
    12 have diagram on the overhead. There is also a diagram
    13 for you on the easel.
    14 In the air compressor, a series of
    15 electric bladed rotors compresses the incoming air from
    16 the atmosphere. A portion of this compressed air is
    17 then diverted through the combustors or burners where
    18 fuel is burned raising the temperature of the compressed

    19 air. This very hot gas is mixed with the rest of the
    20 compressed air and passes through the power turbine.
    21 In the diagram, that's the turbine fan.
    22 Turbine fans are powered when the force of the hot
    23 compressed gas quickly expands and pushes another
    24 series of blades rotating the shaft. Some of the
    L.A. REPORTING (312) 419-9292
    76
    1 energy produced by the power turbine is consumed
    2 to drive the air compressor. The remainder, however, is
    3 available for useful work in the diagram below. In case
    4 of a gas turbine power plant, the power turbine turns
    5 the generator and makes electricity.
    6 In this basic form, gas turbines are
    7 compact, powerful machines. Unlike steam electric
    8 power plants, where a boiler is used to make steam and
    9 drive a steam turbine generator, in a gas turbine, the
    10 combustion of fuel occurs in the gas turbine itself.
    11 See, one piece of equipment fuels burning combustion
    12 chambers.
    13 In addition, a separate cooling system
    14 is not required to condense steam for reuse. The waste
    15 heat from the exhaust -- from the gas turbine is
    16 directly discharged to the atmosphere with the exhaust
    17 gases out a short stack, which is typically no more than
    18 100 feet tall. You can see this is the exhaust gases on

    19 the atmosphere.
    20 However, the trade off for the
    21 simplicity of the gas turbine is the required fuel. Gas
    22 turbines rely on the availability of a supply of clean
    23 fuel such as natural gas, kerosene, or light oil. In
    24 this regard, gas turbines are called gas turbines
    L.A. REPORTING (312) 419-9292
    77
    1 because they work with a hot gas, not because they burn
    2 natural gas.
    3 Due to their characteristics, gas
    4 turbines are useful in particular applications.
    5 One of these applications is providing peak electricity.
    6 It should be understood that as a point of background
    7 that gas turbines are also used to generate electricity
    8 in hybrid systems known as combined cycle turbines.
    9 The diagram you have got in front of you
    10 is the simple turbine, the basic model. It shows you
    11 peak. In a combined cycle system, which aren't used at
    12 peak, the combined cycle system is, in fact, designed
    13 generally to operate year 'round to supply electricity.
    14 The difference between the simple cycle
    15 turbine used for peaking and the combined cycle turbine
    16 is that in a combined cycle turbine, the hot exhaust
    17 gases discharged from the turbine do not go directly to

    18 the atmosphere. Instead, the hot exhaust gases from the
    19 turbine which are typically about 1,000 degrees
    20 Farenheit, are ducted to a waste heat boiler and used to
    21 generate steam.
    22 This steam is then used to drive the
    23 steam turbine generator as in more traditional steam
    24 power plants. If you look at this diagram, you'll be
    L.A. REPORTING (312) 419-9292
    78
    1 adding another boiler on top of the hot exhaust gases.
    2 There would be steam. That steam would then also be
    3 used to drive another steam turbine involving a power
    4 load either the same generator or a separate electrical
    5 generator.
    6 The recovery of the heat energy in
    7 the exhaust of a gas turbine in this combined cycle
    8 fashion can increase the energy efficiency of a
    9 combined cycle plant by about 50 percent as compared to
    10 a simple cycle turbine which doesn't recover any heat
    11 energy from its exhaust.
    12 The additional electricity that can be
    13 produced by a combined cycle turbine is accompanied, of
    14 course, by additional capital expense, a waste heat
    15 boiler, the steam turbine and a cooling system. But the
    16 additional output of the plant makes the natural
    17 gas-fired combined cycle plant more cost-competitive

    18 with coal-fueled plants for electric power generation.
    19 In addition, combined cycle plants
    20 generally pose more issues than simple cycle plants.
    21 For example, they do have the cooling towers associated
    22 with the steam power plants. Combined cycle plants are
    23 also subject to regulatory requirements more stringent
    24 in certain respects than those for peaker plants.
    L.A. REPORTING (312) 419-9292
    79
    1 Along with the influx of new peaker
    2 plants, Illinois has also experienced a much smaller
    3 influx of combined cycle plants. We've received
    4 applications for 10 new plants roughly. Six are
    5 permitted. One of the reasons that it is difficult to
    6 keep a standardized approach with the numbers of plants
    7 is that there is some overlap between simple cycle
    8 peaker plants and combined cycle plants.
    9 In this regard two of new natural
    10 gas-fired plants are permitted to operate initially as
    11 peaker plants, but then they're also permitted
    12 to act additionally -- combined cycle use.
    13 In addition, we have one permitted --
    14 cylinder permitted to involve both simple cycle and
    15 combined cycle turbines even though at this point it's
    16 only constructed as simple cycle turbines.

    17 Looking at the actual pieces of
    18 equipment, the actual turbine, there are two basic
    19 types of turbines, so-called heavy duty or framed
    20 turbines or an aeroderivative, that is an aircraft
    21 derivative turbine. Frame turbines are specifically
    22 designed for land based utility or industrial
    23 applications.
    24 Aeroderivative turbines, while adapted
    L.A. REPORTING (312) 419-9292
    80
    1 for land-based applications, are derived from aircraft
    2 engines and generally have counterpart models of engines
    3 that are used on jet aircraft.
    4 There are a handful of manufacturers
    5 of utilities with gas turbines. The gas turbines are
    6 being proposed for plants being built in Illinois.
    7 Actually, they include turbines from all of the major
    8 manufacturers.
    9 Each manufacturer makes a number of
    10 different models of gas turbines in a range in sizes.
    11 Gas turbines are rated by their power output, i.e., the
    12 amount of electricity in megawatts that they can
    13 nominally produce.
    14 The new peaking plants being developed
    15 in Illinois have turbines that range in size from
    16 a nominal output of about 20 megawatts to 190

    17 megawatts. Except for two small plants, the new peaker
    18 power plants being developed in Illinois have two or
    19 more turbines, which are usually the same model.
    20 The largest number of identical units
    21 proposed at a single site is 16 units. This allows the
    22 plant to manage the amount of power produced by turning
    23 off and on turbines. Gas turbines normally operate in
    24 the upper load range, which is where they were.
    L.A. REPORTING (312) 419-9292
    81
    1 A key factor in the design of a peaker
    2 plant is the capability to maximize the power output of
    3 the plant to be able to meet peak electric power
    4 demand. This leads to a number of variations on the
    5 basic simple cycle turbine, which are all due to the
    6 scientific facts that the power output of a gas turbine
    7 varies based on the density of the air being used in the
    8 turbine.
    9 The denser the air, the more air that
    10 can be pushed through the turbine, the higher the power
    11 output. This means that in the absence of any
    12 adjustments, the output of a given gas turbine will be
    13 significantly less on a 95-degree Farenheit day in July,
    14 when peak power is most likely to be needed, than on a
    15 20-degree Farenheit day in January.

    16 To compensate for this phenomenon, the
    17 modern simple cycle turbines used in peaking plants are
    18 routinely equipped with devices to cool the air going
    19 into the turbine. While it may appear
    20 counterproductive to cool the air in a turbine before
    21 heating it, cooling the air allows more air to be
    22 handled by the air compressor, thereby allowing more
    23 fuel to be burned and increasing the power output of
    24 the turbine.
    L.A. REPORTING (312) 419-9292
    82
    1 Gas turbines can be equipped with
    2 several different types of air cooling systems that
    3 vary in effectiveness with which they can cool the
    4 inlet air to boost a gas turbine's power output. In
    5 the simplest system, water is injected directly into
    6 the incoming air to cool the air by evaporative cooling.
    7 Clean demineralized water must be used to prevent excess
    8 build up of scale on the rotor blades in the turbine.
    9 In more complex systems, water may also
    10 be injected at a point in the air compressor itself.
    11 The inlet air may also be cooled by indirect systems in
    12 which the air passes through cooling coils. In this
    13 case, water may still be used in an open cooling tower
    14 where evaporation of water is used to dissipate the heat
    15 generated by a mechanical refrigeration unit.

    16 Alternatively, a dry cooling system
    17 may be used in which the heat generated by a
    18 refrigeration unit is dissipated to the atmosphere by
    19 dry cooling towers or radiators. Obviously, the more
    20 complex the cooling system, the greater the amount of
    21 energy that is consumed in its pumps and compressors,
    22 which offsets some of the additional increase in power
    23 output.
    24 Another approach to boost power output
    L.A. REPORTING (312) 419-9292
    83
    1 of a gas turbine is to inject clean water or steam into
    2 the burners or to inject steam after the burners. All
    3 these measures increase the gas flow through the power
    4 turbine and thus increases its power output. This can
    5 increase the effects on efficiency, however, because you
    6 do have to burn fuel to heat that water to evaporate.
    7 In summary, while simple cyclic gas
    8 turbines are similar in concept, the new peaker power
    9 plants proposed in Illinois can vary greatly due to the
    10 type and number of turbines and the associated systems
    11 that have been selected by the developer.
    12 Some comments on emissions and Director
    13 Skinner has mentioned the -- related to the greatest
    14 amount of gas turbines generally measured oxides. The

    15 fact that gas turbines are no different than burning
    16 natural gas for any purpose.
    17 The NOx is formed. It's not a
    18 cyclosporin, but is formed thermally by a combination of
    19 oxygen and nitrogen in the air at the temperatures and
    20 conditions experienced in the burners of the gas
    21 turbine.
    22 In addition, gas turbines can and do
    23 also emit carbon monoxide or CO, which is formed
    24 as a result of incomplete combustion fuel. CO is
    L.A. REPORTING (312) 419-9292
    84
    1 associated with most combustion processes and is found
    2 in low, but measurable amounts in turbine exhaust.
    3 Volatile organic material, or VOM,
    4 which is also a product of incomplete combustion,
    5 is also present in smaller amounts. Factors affecting
    6 CO and VOM formation from a gas turbine again include
    7 burner design and firing rate, which directly influence
    8 the time, temperature and turbulence of the combustion
    9 conditions experienced in the burners and the
    10 efficiency of combustion.
    11 In the absence of other measures,
    12 emissions of NOx and carbon monoxide and volitile
    13 organic material are generally considered to be related
    14 inversely. That is, everything else being equal,

    15 increasing flame temperatures and turbulence in a
    16 burner, which improves combustion efficiency and lowers
    17 emissions of CO/VOM, results in conditions that are more
    18 conducive to formation of NOx.
    19 Likewise, lowering peak flame
    20 temperatures and turbulence, which reduces NOx
    21 formation, tends to lower combustion efficiency and
    22 increase emissions of CO/VOM. Thus, one objective in
    23 combustion modifications to reduce NOx formation is to
    24 also take other compensatory steps to also maintain or
    L.A. REPORTING (312) 419-9292
    85
    1 even improve combustion efficiency.
    2 I've attached to my testimony a USEPA
    3 reference on emissions from gas turbines, which is
    4 a supplement of the chapter, USEPA's Compilation of Air
    5 Pollutant Emission Factors, and it provides a lot more
    6 information on emissions.
    7 Due to the particular features of
    8 different gas turbines and continuing developments in
    9 burner design, however, the preferred source of
    10 information the expected emissions of a particular
    11 model of turbine is the manufacturer of the turbine.
    12 Manufacturers prepare detailed data
    13 sheets providing the maximum expected emissions of

    14 a particular model of turbine, along with other
    15 performance data, under different conditions of gas,
    16 turbine load and operating conditions and ambient
    17 temperature.
    18 Once gas turbines are installed, actual
    19 emission rates can be determined by measuring the
    20 amount of pollutants in the exhaust of the turbine as it
    21 passes through the stack. In addition to the gas
    22 burners themselves, there are other emission units at
    23 peaker power plants other than gas turbines.
    24 The other type of unit most commonly
    L.A. REPORTING (312) 419-9292
    86
    1 found is fuel heaters. These heating systems are used
    2 to warm natural gas prior to its use as fuel. The fuel
    3 heaters are essential if the pressure of the natural gas
    4 pipelines serving a plant is above the pressure required
    5 for its gas turbines so that the natural gas cools when
    6 it is decompressed for use.
    7 Ancillary boilers or engines, which may
    8 be used for start-up, power augmentation or emission
    9 control, and emergency firewater engines, if present,
    10 will also have emissions due to combustion of fuel in
    11 these units. Again, these types of emissions are
    12 similar to those of turbine -- turbine fuel.
    13 Finally, cooling towers, if present,

    14 will also be sources of emissions. This is due to the
    15 presence of dissolved or suspended solids in water
    16 droplets lost from the cooling tower and other
    17 substances in the water that may be lost to the
    18 atmosphere. Losses of particulate matter from cooling
    19 towers can be minimized by using high-efficiency mist
    20 eliminators which reduce the loss of water droplets and
    21 managing the solids content of the water being
    22 circulated in the cooling tower.
    23 HEARING OFFICER JACKSON: Mr. Romaine, are you
    24 finished with your emission information right now?
    L.A. REPORTING (312) 419-9292
    87
    1 MR. ROMAINE: Yes, ma'am.
    2 HEARING OFFICER JACKSON: It looks like
    3 the next thing in your testimony goes to the applicable
    4 regulations. We will pick up with that when we return
    5 in exactly one hour.
    6 Before we break, though, I do want to
    7 note for the record there was a NOx rule that is
    8 currently pending before the Board that was referred to
    9 in Director Skinner's testimony and just for those of
    10 you who may not be familiar with the Board's docket,
    11 that rule is currently docketed at R01-9. It is a fast
    12 track rule under Section 28.5 of the Environmental

    13 Protection Act. The Board anticipates completion of
    14 this rulemaking, the NOx rulemaking, before the end of
    15 the year.
    16 The first hearing is currently scheduled
    17 for next Monday in Springfield, that is Monday, August
    18 28th, in Springfield. Cathy Glenn is the hearing
    19 officer for that rulemaking. If you have any questions
    20 today, I'm sure you can track Cathy down and ask her.
    21 She is around. So that is it.
    22 We'll be back in exactly one hour.
    23 1:30.
    24 (Lunch break taken.)
    L.A. REPORTING (312) 419-9292
    88
    1 HEARING OFFICER JACKSON: Good afternoon.
    2 Welcome back. I think we'll go ahead and get started.
    3 We're back on the record.
    4 As indicated before we took a lunch break, we're
    5 going to pick up where we left off with testimony from
    6 the Illinois Environmental Protection Agency.
    7 Mr. Romaine was just beginning to discuss the
    8 applicable regulations, in his pre-filed testimony. So,
    9 Mr. Romaine, I'll hand it over to you.
    10 MR. ROMAINE: Thank you.
    11 I'm now going to talk about the applicable air
    12 control standards for gas turbines.

    13 Modern gas turbines are able to readily comply
    14 with the specific emissions standards that have been
    15 adopted for them, which address emissions of NOx and
    16 SO2.
    17 Accordingly, my testimony focuses on the
    18 applicability of the federal rules for Prevention of
    19 Significant Deterioration of Air Quality or PSD.
    20 The Illinois Environmental Protection Agency
    21 administers the PSD permit program for sources in
    22 Illinois under a delegation agreement with the U.S.
    23 Environmental Protection Agency.
    24 PSD can have an effect on a proposed peaker
    L.A. REPORTING (312) 419-9292
    89
    1 project because a proposed plant that qualifies as major
    2 for a pollutant under PSD is subject to additional
    3 requirements for that pollutant under the PSD rules. In
    4 particular, a major plant must be operated to comply
    5 with control requirements that represent best available
    6 control technology, or BACT, for a pollutant, as
    7 determined and approved on a case-by-case basis during
    8 issuance of a construction permit for the project.
    9 A construction permit that contains such
    10 approval is commonly referred to as a PSD permit.
    11 Otherwise, with respect to the PSD rules, a "non-major"
    12 peaker project need only manage and control its future

    13 emissions so as to comply with the terms of its permit
    14 so that it does not constitute a major source. Most,
    15 but certainly not all, of Illinois' new peakers are not
    16 major sources and are not subject to BACT under the PSD
    17 program.
    18 Given this situation, interest has been
    19 expressed by the public as to why such peaker plants are
    20 not considered major so as to be subject to BACT or some
    21 other stringent level of emission control set on a
    22 case-by-case basis during permitting, especially since
    23 peakers will likely operate on the hot summer days that
    24 are most conducive to the formation of ozone.
    L.A. REPORTING (312) 419-9292
    90
    1 The need for a PSD approval or a PSD permit for
    2 a proposed project is determined by its potential
    3 emissions of pollutants. Because enforceable limits
    4 must be considered in determining potential emissions,
    5 the permitted emissions of a proposed new source
    6 effectively become the source's potential emissions.
    7 Permitted emissions generally reflect the hours of
    8 operation or throughput requested by a source in its
    9 application, with emissions in compliance with
    10 applicable standards or at such lower rate as also
    11 specified in the application. Accordingly, the need for

    12 a PSD permit is triggered for a proposed new peaker
    13 plant, if the permitted emissions of a pollutant, for
    14 example, NOx or CO requested by the applicant equal or
    15 exceed the major source threshold of the PSD rules.
    16 For peaker plants this threshold is 250 tons per year.
    17 One question about the applicability of PSD to
    18 new peaker plants arise because of the seasonal nature
    19 of peaker plants, where peaking plants will operate
    20 primarily on a relatively small number of days during
    21 the summer. In contrast, the applicability thresholds
    22 of PSD are expressed in terms of annual emissions.
    23 People wonder whether a program like PSD should be
    24 applied to the new peaker plants as if the peaker plants
    L.A. REPORTING (312) 419-9292
    91
    1 would operate the rest of the year as they are allowed
    2 to operate in the summer months. Certainly, the impacts
    3 of a peaker plant on the days that it operates are
    4 potentially much greater than a comparable manufacturing
    5 plant permitted for the same amount of emissions but
    6 operating over the course of an entire year. However,
    7 the applicability provisions of the PSD rules do not
    8 provide a basis to trigger applicability of PSD on a
    9 basis other than annual emissions. Section 169 of the
    10 Clean Air Act clearly provides that for purposes of PSD,
    11 major sources are to be defined in terms of their annual

    12 emissions.
    13 Another question about the applicability of PSD
    14 to peaker plants arises only for peaker projects in the
    15 Chicago ozone nonattainment area. In particular, why is
    16 only PSD being considered for NOx? If NOx were
    17 considered to be an ozone precursor in this area, a
    18 proposed new peaker plant would have to be addressed
    19 under the nonattainment new source review rules as well
    20 as under PSD. This is because the applicability
    21 threshold for a major new source under the nonattainment
    22 new source review rules in a severe ozone nonattainment
    23 area like Chicago is annual emissions of only 25 tons of
    24 an ozone precursor. Applicability of the nonattainment
    L.A. REPORTING (312) 419-9292
    92
    1 new source review rules would almost certainly require
    2 any new peaker plant proposed in the Chicago
    3 metropolitan area to comply with the lowest air emission
    4 rate for NOx. The answer to this question is that the
    5 U.S. Environmental Protection Agency has granted the
    6 states bordering to Lake Michigan a -- called a NOx
    7 waiver under Section 182(f) of the Clean Air Act. This
    8 waiver is based on the scientific analyses that found
    9 that controlling NOx emissions only in the nonattainment
    10 area would actually increase ozone levels in the air,

    11 instead, for NOx reductions to improve ozone air quality
    12 must be provided on a statewide basis and preferably on
    13 a multi-state regional basis.
    14 Because of these questions concerning the
    15 applicability of PSD to a new peaker plant, the Illinois
    16 Environmental Protection Agency formerly sought guidance
    17 from U.S. Environmental Protection Agency on these
    18 points. U.S. Environmental Protection Agency confirmed
    19 that the Illinois Environmental Protection Agency is
    20 properly implementing the applicability provisions of
    21 the PSD rules for these plants.
    22 A review of the regulatory programs in other
    23 states indicates that there are states that are similar
    24 to Illinois that apply BACT to a proposed project only
    L.A. REPORTING (312) 419-9292
    93
    1 when triggered by the federal PSD rules. Wisconsin is
    2 an example of such a state. There are other states like
    3 Indiana and Ohio where there are state-based BACT
    4 requirements that apply to proposed projects that would
    5 not trigger BACT under the federal PSD rules. A brief
    6 description of the requirements in other states is
    7 provided in Attachment 2 to my testimony. This
    8 attachment also includes some information on the state
    9 process for approval of the sitings of new plants, if
    10 such a process exists. It also includes what I would

    11 characterize as anecdotal comments, opinions about
    12 people that we talked to about the situation with regard
    13 to peaker plants in their particular state.
    14 The next topic of my testimony is emissions
    15 control technology. Emissions from turbines can be
    16 reduced by combustion modifications and by add-on
    17 control devices. As emissions of pollutants like NOx
    18 and CO from gas turbines are related to combustion
    19 conditions, combustion modifications are the preferred
    20 control technique as they can reduce the formation of
    21 pollutants. Combustion modifications involve only the
    22 burners of a turbine and other components of the turbine
    23 may be unchanged. Over time a particular design of gas
    24 turbine may be produced with several different models of
    L.A. REPORTING (312) 419-9292
    94
    1 burners, as the turbine manufacturer makes improvements
    2 in the design of the burners, which then become
    3 available for newer units.
    4 One approach to modifying the burners of a gas
    5 turbine to reduce NOx emissions is to inject water,
    6 either as a liquid spray or as steam, into the burner in
    7 the immediate vicinity of the flame. This reduces the
    8 peak temperatures in the flame zone, "slowing down" the
    9 combustion process to reduce the formation of NOx. This

    10 technique can reduce NOx emissions by 60 percent or
    11 more. Depending on the particular design, the amount of
    12 water injected can range from about half a pound to 2
    13 pounds of water per pound of fuel.
    14 The other approach to combustion modifications
    15 doesn't involve water, instead it focuses on the way
    16 that air and fuel mix so as to minimize the "hot spots"
    17 in the flame where NOx is actually formed. These types
    18 of burners are commonly referred to as "dry low NOx"
    19 burners. When they are available for a model of
    20 turbine, dry low NOx burners can be very effective when
    21 burning gaseous fuels, achieving 90 percent or more
    22 reduction in NOx emissions when compared to the earlier
    23 models of conventional burners.
    24 Add-on control devices are not commonly used for
    L.A. REPORTING (312) 419-9292
    95
    1 NOx emissions from simple cycle gas turbines.
    2 Nevertheless, some familiarity with these types of
    3 systems is appropriate so as to be able to understand
    4 some of the reasons why these systems are not used. The
    5 traditional add-on device for NOx emissions from a gas
    6 turbine selective catalytic reduction is also known as
    7 SCR. SCR relies on a catalyst material, which
    8 facilitates a reaction between ammonia and NOx that
    9 reduces the NOx to nitrogen, forming water as a

    10 by-product. Beds of catalyst are installed at an
    11 appropriate location in the exhaust ductwork of the
    12 turbine. Ammonia is injected into the hot exhaust gas
    13 through a grid system located upstream of the catalyst.
    14 The difficulty with SCR is that conventional selective
    15 catalytic reduction of catalysts typically have an
    16 operating temperature window ranging from 450 Farenheit
    17 to 850 Farenheit, however the exhaust gas temperatures
    18 of a simple cycle gas turbine are typically above 900
    19 degrees Farenheit. So these systems are in the correct
    20 temperature range for simple cycle turbine exhaust.
    21 There are high-temperature SCR catalysts that
    22 are being built and are available but they are not as
    23 rugged as the conventional catalysts and there is
    24 limited experience with their use. One of the concerns
    L.A. REPORTING (312) 419-9292
    96
    1 with the SCR system in making sure that it operates
    2 properly is that some of the ammonia passes through the
    3 SCR system unreactive. This ammonia slip becomes larger
    4 as the amount of the ammonia injected into it is
    5 increased either to get greater removal or to compensate
    6 for deterioration of the catalyst. Although ammonia is
    7 not a criteria pollutant, it is of environmental
    8 concern. Like NOx itself, emissions of ammonia do

    9 contribute to fine particulate matter levels in the
    10 atmosphere. They also contribute to acid deposition.
    11 Add-on control devices are also available for CO
    12 and VOM emissions from gas turbines. These devices use
    13 an oxidation catalyst to complete the combustion of CO
    14 and VOM, which are products of incomplete combustion.
    15 These devices are installed in an appropriate location
    16 in the exhaust ductwork of the turbine and allow
    17 combustion to be continued at the temperatures in
    18 their -- present in the exhaust ductwork without the
    19 need for supplemental heat. The new peaking plants in
    20 Illinois, which rely on -- do rely on good combustion
    21 practices to minimize emissions that are not routinely
    22 used in oxidation catalyst systems. There is an
    23 exception to that, that is the peaker plants approved
    24 proposing to use Pratt & Whitney aero-derivative
    L.A. REPORTING (312) 419-9292
    97
    1 turbines. On a national basis, oxidation catalysts are
    2 used more commonly in areas of the country where ambient
    3 air quality problems with the CO have been experienced.
    4 For detailed information on NOx control measures
    5 for gas turbines, I recommend that you look at the
    6 Alternative Control Techniques Document prepared by U.S.
    7 Environmental Protection Agency in the early 1990s.
    8 It's a little bit out of date but it does have a lot of

    9 good information.
    10 And onto my final comment, permitting of gas
    11 turbines. I have to make a pitch for the Agency.
    12 The volume of applications for new natural
    13 gas-fired power plants, including peaker plants, has
    14 strained our resources and is slowing down other
    15 initiatives, notably the issuance of initial Title 5
    16 permits to sources. These applications for new peaker
    17 plants consume effort in review of applications, review
    18 of modeling, responding to requests for information,
    19 holding public comment periods and especially hearings
    20 and other outreach activities.
    21 Like other construction permit applications,
    22 construction permit applications for peaker plants are
    23 reviewed to determine whether the application shows
    24 compliance with the applicable air pollution control
    L.A. REPORTING (312) 419-9292
    98
    1 requirements. If compliance is shown, permits are
    2 prepared with detailed conditions that identify
    3 applicable rules and requirements and, that is, set
    4 forth appropriate testing, monitoring and record keeping
    5 to verify compliance when and if the proposed facility
    6 is built.
    7 As previously stated, modern gas turbines

    8 readily comply with the adopted emission standards that
    9 apply to them. The principle technical task in
    10 processing an application for a peaker plant is to
    11 address the federal PSD rules, as it may establish
    12 project-specific emission standards. As previously
    13 explained, based on the data for maximum emissions and
    14 operation provided in the application, a proposed plant
    15 or project may constitute a major source subject to PSD
    16 for one or more pollutants. Alternatively, it may
    17 constitute a non-major source for many or all
    18 pollutants, as is the case for most new peaker plants
    19 proposed in Illinois.
    20 For a proposed minor source, the task in
    21 permitting is to develop a permit that contains
    22 appropriate conditions to limit the emissions of the
    23 relevant pollutant from the source to below major source
    24 thresholds. This generally requires establishment of
    L.A. REPORTING (312) 419-9292
    99
    1 first short-term limits on emissions, usually expressed
    2 in pounds per hour; second, long-term limitations on
    3 hours of operation or fuel consumption; three, annual
    4 limits on emissions expressed in tons per year and
    5 provisions for testing, monitoring and record keeping.
    6 For a proposed major source, conditions
    7 delineating permitted emissions must also be developed

    8 as described above for a minor source. However, the
    9 limits for a major source provide for permitted
    10 emissions in excess of major thresholds and are based on
    11 the emissions described in the application, which are
    12 addressed by the BACT determination, impact analyses and
    13 other requirements for major projects.
    14 Permit analysts rely on the information in the
    15 application, including the emission data provided by the
    16 manufacturer of the gas turbine.
    17 Emission data -- or testing to date has shown
    18 the turbine manufacturers are able to reliably predict
    19 maximum emission levels of new turbines as needed for
    20 the purposes of permitting. Actual emission testing
    21 shows compliance with projected emission rates, often
    22 with a substantial margin of compliance for pollutants
    23 other than NOx where manufacturers are more conservative
    24 in their predictions.
    L.A. REPORTING (312) 419-9292
    100
    1 Likewise, while many peaker projects request
    2 permitted emission levels just below the PSD
    3 applicability threshold of 250 tons per year, it is not
    4 apparent that developers are unrealistically
    5 constraining the operation of projects. It is quite
    6 probable that the actual operation of some plants is

    7 being overstated, so as to maximize their capability to
    8 provide peak power. In this regard, independently owned
    9 peaker plants do enter into advanced contracts to
    10 provide the power on demand. Accordingly, the requested
    11 level of operation may be related to the ability to
    12 establish contractual obligations, even though the
    13 plant's anticipated levels of actual operation are much
    14 lower than that. In any event, the developers of peaker
    15 projects have generally demonstrated an interest in
    16 maximizing the permitted hours of operation of plants
    17 and their ability to supply power. For certain plants,
    18 this certainly makes it necessary for the developers to
    19 select new models of gas turbines that have low NOx
    20 emission rates, if the plant is to be permitted as a
    21 non-major source.
    22 For a major project requiring a PSD permit, the
    23 additional technical tasks in permitting are to review
    24 the air quality impact analysis and the BACT
    L.A. REPORTING (312) 419-9292
    101
    1 demonstration submitted as a part of the permit
    2 application. The air quality impact analysis prepared
    3 for peaker plants subject to PSD indicate that these
    4 plants do not pose a threat to air quality.
    5 Since January of this year, the Illinois
    6 Environmental Protection Agency has also been requiring

    7 applicants for non-major peaker plants to provide air
    8 quality impact analyses to support their applications.
    9 These analyses also show that the proposed peaker plants
    10 that are non major do not threaten air quality. In most
    11 cases, peak impacts are below the numerical significant
    12 impact levels set in the PSD rules. This is a
    13 consequence of low concentration of pollutants in the
    14 exhaust of modern gas turbines accompanied by good
    15 dispersion to the high temperature of the exhaust.
    16 As already indicated, most peaker plants are
    17 being developed as non-major sources. To date, there
    18 have only been three BACT determinations for NOx that
    19 have been made for simple cycle turbines in Illinois.
    20 All involved, General Electric frame turbines burning
    21 only gaseous fuel. Dry low-NOx burner systems were
    22 determined to constitute best available control
    23 technology. Add-on control devices have not been
    24 required as best available control technology for either
    L.A. REPORTING (312) 419-9292
    102
    1 NOx or CO. The BACT demonstrations in these
    2 applications have evaluated the use of add-on controls,
    3 and the demonstrations have shown that add-on control
    4 devices were not routinely being used on new simple
    5 cycle turbines. The cost-effectiveness of the add-on

    6 devices, if they were to be applied, was shown to be in
    7 excess of a level considered reasonable. Lastly, air
    8 quality impacts of the new peaker plants, as addressed
    9 in the modeling analysis, have not necessitated further
    10 control of emissions to protect the ambient air quality.
    11 Applications are currently pending that require
    12 determinations of BACT for additional General Electric
    13 frame turbines burning only gaseous fuel and for frame
    14 turbines with burners designed for both natural gas and
    15 fuel oil as a backup fuel and also for aero-derivative
    16 turbines.
    17 The further tasks associated with the Illinois
    18 EPA's processing of applications for peaker plants are
    19 related to public involvement in the permitting process.
    20 The Illinois EPA's administrative rules dealing with
    21 public comment periods mandate a public comment period
    22 on a draft permit before a construction permit is issued
    23 for a major source of engine modification. This allows
    24 for public input before a case-by-case BACT
    L.A. REPORTING (312) 419-9292
    103
    1 determination is made. These rules also provide for a
    2 public comment period on any construction permit
    3 application at the discretion of the director of the
    4 Illinois Environmental Protection Agency. Under this
    5 authority, the Illinois Environmental Protection Agency

    6 routinely holds public comment periods, usually with a
    7 public hearing, for proposed projects in which the
    8 public has expressed a significant degree of interest or
    9 opposition. Because of the interest in proposed peaker
    10 plants generally expressed by the public, Director
    11 Skinner has indicated he has decided that all
    12 applications for proposed new peaker plants will be
    13 subject to a public comment period before a permit would
    14 be issued. As with the public comment period for a
    15 major project, a public hearing is held as part of the
    16 comment period, if one is requested, by the applicant or
    17 in response to request from the public or local elected
    18 officials or if the Illinois Environmental Protection
    19 Agency expects a significant degree of public interest
    20 in a particular project.
    21 As a result of this, almost half of the peaker
    22 permits that have been issued have been through public
    23 hearings and certainly if there was any sort of request
    24 for public hearing, it would be allowed.
    L.A. REPORTING (312) 419-9292
    104
    1 At hearings, the public expresses many concerns
    2 about the proposed peaker plants. It's already been
    3 indicated the public is certainly concerned with the
    4 potential effects of the emissions from these plants,

    5 and also with impacts on water quality and noise.
    6 Members of the public also routinely express concerns
    7 about the impacts of proposed plants on property values,
    8 local water wells and the character of the area in which
    9 the plant is proposed to be located. They are also
    10 concerned that proposed plants are not needed to provide
    11 local power, believing that the plants would be better
    12 developed elsewhere.
    13 In response to these latter types of concerns,
    14 the Illinois Environmental Protection must explain that
    15 its authority under state law is narrowly limited to
    16 consideration of environmental issues and in the case of
    17 construction permits for emission sources, matters
    18 related to emissions and air quality.
    19 In conclusion, peaker power plants are not a new
    20 phenomenon in Illinois. What is new, however, is the
    21 large number of new peaker plants that have been
    22 proposed in the two-year span since mid-1998 in
    23 conjunction with the economic deregulation of electric
    24 power generation. These plants do pose a range of
    L.A. REPORTING (312) 419-9292
    105
    1 concerns for the public. The Bureau of Air has enhanced
    2 its procedures for reviewing peaker plant applications
    3 to attempt to address concerns expressed by the public
    4 to the extent that such concerns are within the existing

    5 scope and authority of the Illinois EPA.
    6 When the panel concludes, we will be happy to
    7 answer questions.
    8 HEARING OFFICER JACKSON: Thank you, Mr.
    9 Romaine.
    10 We'll have the next agency witness, please.
    11 MR. PHILLIPS: The next agency witness will be
    12 Robert Kaleel. Mr. Kaleel will be providing testimony
    13 on air modeling as it relates to peaker plants.
    14 HEARING OFFICER JACKSON: Thank you.
    15 MR. KALEEL: If it is okay, I was going to use
    16 the overhead projector and perhaps be a little less
    17 formal in my presentation than some of the prior ones.
    18 I apologize for the lights here.
    19 MS. KEZELIS: If you would move one of the
    20 speakers. Thank you.
    21 MR. KALEEL: Are you ready to proceed?
    22 My name is Robert Kaleel of the Air Quality
    23 Modeling Unit in the Illinois Environmental Protection
    24 Agency, Bureau of Air, proposed planning section. My
    L.A. REPORTING (312) 419-9292
    106
    1 responsibilities include the supervision and oversight
    2 of modeling that is performed both for permitting of
    3 major new sources and also in air quality and planning

    4 for non-attainment areas where we have requirements to
    5 show the administrative attainment over a specified time
    6 period.
    7 As I was -- I guess my presentation is based on
    8 the information that is in the presubmitted testimony.
    9 This particular table computers in Exhibit 10 of my
    10 presubmitted testimony, for those of who you have a
    11 little difficulty reading that, hopefully, I'm not
    12 blocking the view of too many people back in the
    13 audience.
    14 The Agency has been engaged in performing or
    15 requiring performance of air quality modeling for all of
    16 the peaker plants that have been the subject of this
    17 hearing. As Chris Romaine had indicated earlier, most
    18 of these sources are not large enough to trigger the
    19 requirements for modeling as under the provision of
    20 significant deterioration program or the PSD program.
    21 The threshold for requiring modeling are emissions based
    22 and many of these sources, at least on a tons-per-year
    23 basis, are too small to require air quality modeling.
    24 The Agency has been requiring this kind of detailed
    L.A. REPORTING (312) 419-9292
    107
    1 modeling of all of these sources whether they were big
    2 enough to trigger PSD or not, so at least since January
    3 of this year, as Director Skinner had indicated.

    4 There are two different types of air quality
    5 limits that we're looking for in the performance of air
    6 quality modeling. The National Ambient Air Quality
    7 Standards shown in this column on this table. The
    8 National Air Quality Standards and National Ambient Air
    9 Quality Standards or NAAQS are based on health studies
    10 performed and reviewed by the United States
    11 Environmental Protection Agency on an every five-year
    12 basis. The health studies or other facts are human
    13 health effects with some margin of safety and these
    14 standards are revised from time to time. Even to think
    15 of the NAAQS or these specific pollutants as being
    16 limits that are generally not conceded anywhere in the
    17 country including the state of Illinois, the form of the
    18 standard does allow for occasional exceedances on
    19 short-term basis. For example, the 24 hour standard for
    20 sulfur dioxide, which is a value precursing 365
    21 micrograms per cubic meter can be exceeded at a given
    22 location on a once per year basis. The ozone standard,
    23 which many people are familiar with, can be exceeded as
    24 many as three times in a three-year period. It isn't
    L.A. REPORTING (312) 419-9292
    108
    1 until the fourth exceedance in a three-year period at a
    2 given location that constitutes a violation. But at any

    3 rate, you can think of each of the NAAQS limits as a
    4 meet limits that are not to be exceeded. There are
    5 specific averaging times for each of these limits based
    6 on whether the health effects that have been identified
    7 through health studies are acute or short term or
    8 whether they're more chronic or long term. So they're
    9 both annual and short-term standards.
    10 Also, shown on the table are what are called PSD
    11 increments or Class II readings. In both areas a Class
    12 II reading. PSD or prevention of significant
    13 deterioration increments are defined again by U.S.
    14 Environmental Protection Agency on a pollutant by
    15 pollutant basis and for specific averaging times. These
    16 also are fixed limits but they apply to attainment
    17 areas, to areas already meeting the air quality
    18 standard. The idea is that PSD or prevention of
    19 significant deterioration program is that air quality is
    20 never allowed to get much worse than it was after a
    21 specific baseline date. For most pollutants the
    22 baselines were established shortly after the PSD
    23 programs, I believe, implemented in 1978 but they -- the
    24 idea is if an air -- a region has air quality that meets
    L.A. REPORTING (312) 419-9292
    109
    1 or much better than the air quality standard that for
    2 all time it's never going to get significantly worse.

    3 Air quality as predicted through modeling or measured
    4 through monitoring that is worse than the baseline,
    5 above the increments that are shown, that's called a
    6 significant deterioration and that would violate the PSD
    7 programs. So that is what we're looking for in terms of
    8 air quality degradation, is it a significant
    9 deterioration above the baseline as provided by the PSD
    10 program or does it exceed the primary or secondary
    11 National Air Quality Standards. And in the case of the
    12 NAAQS, we're looking not just at the effects of the new
    13 source but of all existing sources in the region.
    14 There are a number of different types of air
    15 quality models that the Agency uses for a range of
    16 different applications. You will see the title. In
    17 this particular figure, I should point out, which is
    18 contained in Exhibit 11 of my testimony, the impact that
    19 we're showing here was a result of a commonly used air
    20 quality model. I need to, I guess, take a minute and
    21 describe some of the kinds of models that we would use
    22 for the different applications before us. In areas
    23 where we're looking at concentrations on very low
    24 scales, such as the impacts of individual emission
    L.A. REPORTING (312) 419-9292
    110
    1 sources like a peaker or any new industrial facility, we

    2 would use what's called a house seating room or a steady
    3 state or sometimes referred to as a dispersion model.
    4 We would look at something that impacts very close to
    5 the source, within a matter of kilometers or miles from
    6 a particular source, varying neighborhood scale effects.
    7 These models are very good for them. One thing that
    8 these models don't do is account for chemical reaction
    9 to the transformations in the atmosphere. So these
    10 models are not appropriate for pollutants like ozone
    11 where we obviously have a -- chemical reactions that
    12 cause the ozone pollutant. In this particular case,
    13 we're using the steady state models I described.
    14 They're called the industrial source complex model or
    15 ISC. We've modeled a large peaker, I wasn't going to
    16 use the name of a peaker but it is one of the largest
    17 ones that is before the Agency, is a 950 megawatt plant.
    18 I'm using this one just as an example of the types of
    19 air quality mix that we've seen submitted by the various
    20 applications before us.
    21 NOx standards as shown in previous slides is an
    22 annual standard as to what the impact footprint, if you
    23 will, that we're showing in this particular figure based
    24 on the application of the ISC model is an annual
    L.A. REPORTING (312) 419-9292
    111
    1 concentration. Under the PSD program, there is a

    2 definition of what kind of an impact is called
    3 significant. And I try to -- it's an unfortunate choice
    4 of words, a significant impact versus a significant
    5 deterioration, I'll try to distinguish those. In terms
    6 of what is a significant impact, of course, what's
    7 significant, I guess, depends on who it is that is
    8 looking at it but for the -- what the Agency uses as the
    9 definition of significance as contained within the PSD
    10 rules. Significant impact isn't one that is unlimited
    11 like the increments are or like the NAAQS are. A
    12 significant impact is really a trigger for the Agency to
    13 require more detailed modeling. In the case of all of
    14 these peakers, we not only require re-modeling, but
    15 we're required to fund the modeling, so it isn't serving
    16 a function as far as the Agency's requirements here but
    17 I'm using it as a way of giving you an idea of how
    18 important these impacts are, at least based on objective
    19 determination of what is significant.
    20 For NOx, the PSD definition of a significant
    21 impact is any impact that is above 1 microgram per cubic
    22 meter on an annual average. And this is -- this grey
    23 shaded area represents the area where this hypothetical,
    24 if you will, peaker plant has an impact that exceeds 1
    L.A. REPORTING (312) 419-9292
    112

    1 microgram per cubic meter. Of course, areas further
    2 down where you got lesser impacts, but at least the
    3 impact that is considered by the Agency to be
    4 significant is shown in the shaded area on this map.
    5 The highest concentration is 3.24 micrograms per cubic
    6 meter. So in this case the impact of a peaker is
    7 significant, at least for NOx for the very larger
    8 peakers. One other thing to note on this particular
    9 image is that the -- most of this impact is actually due
    10 to fuel heaters and not due to the actual natural
    11 gas-fired turbine itself. The turbine didn't act as
    12 less than a tenth of a microgram, certainly would not be
    13 significant, but for completeness we wanted to show you
    14 the footprint of the entire facility, not just of the
    15 peaker itself. In terms of spatial extent, the impact
    16 is relatively small. I guess some of that depends on
    17 whether or not your house is underneath that -- that
    18 particular shaded area. But, in general, I guess,
    19 looking at the scale of the distance that we're dealing
    20 with here, the impacts are certainly less than a mile,
    21 probably in the range of hundreds of feet, maybe a
    22 thousand feet down wind from the facility's fence line.
    23 With reference to the NOx PSD increment whether
    24 or not this represents a significant deterioration of
    L.A. REPORTING (312) 419-9292
    113

    1 air quality for the NOx, the PSD increment is 25
    2 micrograms per cubic meter, so even though the source
    3 has a significant impact, it does not exceed or cause
    4 what we would call a significant deterioration under the
    5 PSD program. This is a similar type of a depiction of
    6 the air quality footprint for the same large peaker
    7 unit. I should point out there are some, I've certainly
    8 seen, that have higher impacts. The vast majority of
    9 them have much lower impacts but, again, this is a
    10 fairly large one. I can give you an idea of what kinds
    11 of things we're seeing. This figure, by the way,
    12 appears in Exhibit 11, again, in my pre-submitted
    13 testimony. This is an 8 hour concentration for the
    14 print. The footprint is even somewhat smaller than it
    15 is for NOx. And I should refer back to the significant
    16 impact threshold that I described before, which is kind
    17 of a trigger that we use to decide when a more detailed
    18 modeling would normally be performed. For carbon
    19 monoxide, that significant threshold is 500 micrograms
    20 per cubic meter. The footprint I'm showing is for 50
    21 micrograms per cubic meter or only 10 percent of what we
    22 would be considered to be significant. So, I guess, the
    23 message that I will leave you with on this particular
    24 figure is for carbon monoxide, even the largest
    L.A. REPORTING (312) 419-9292

    114
    1 facilities, do not have a significant impact. There is
    2 no PSD increment for carbon monoxide but certainly this
    3 source would not exceed what we would consider to be
    4 significant or call what we would consider to be
    5 significant impact.
    6 I should point out this 50 microgram can impact
    7 the air quality standard for an 8 hour basis is 10,000
    8 micrograms per cubic meter just as a reference.
    9 This is a footprint for our 24 hour PM10
    10 concentration particulate matter of 10 microns or less.
    11 Again, the footprint that we're looking at is very
    12 small. The significant impact threshold under PSD is 5
    13 micrograms. The highest concentration from this
    14 facility is actually less than 5. So this wouldn't be
    15 considered a significant impact. Peak occurs right at
    16 this little pencil line. The PSD increment is 30
    17 micrograms for 24 hour averages, and, again, this
    18 doesn't approach the PSD increment. The Ambient Air
    19 Quality Standard for 24 hours is 150 micrograms per
    20 cubic feet. Again, this figure appears in Exhibit 11 in
    21 my testimony. This impact is for sulfur dioxide or SO2.
    22 Again, this is a 24 hour ambient concentration. The
    23 significant threshold under PSD is 5 micrograms per
    24 cubic meter. There were no hurdling impacts from this
    L.A. REPORTING (312) 419-9292

    115
    1 particular source of 5 micrograms. The highest impact
    2 is only .13 micrograms per cubic meter. And the area
    3 I'm showing is .05 micrograms per cubic meter. This is,
    4 what, about 1 percent of the significant impact
    5 threshold. So this is a very insignificant source at
    6 least as far as sulfur dioxide is concerned. The PSD
    7 increment is 91, just as a point of reference, the NAAQS
    8 for 24 hour impact is 365 micrograms per cubic meter.
    9 So for each of the pollutants of concern, NOx,
    10 sulfur dioxide, PM10 and carbon monoxide, the modeling
    11 has indicated, modeling we reviewed today supplied by
    12 the elements, has indicated that PSD increments will not
    13 be exceeded as a result of any of these projects, even
    14 the largest ones, so, therefore, we wouldn't consider
    15 the deterioration of air quality to be significant.
    16 Certainly don't exceed those increments. In terms of
    17 whether or not we would exceed the actual health based
    18 Ambient Air Quality Standards, I'll spare you the
    19 details of going through all of these air quality
    20 studies one at a time. What I've done on this
    21 particular table, which, again, appears in -- I guess
    22 this is in Exhibit 10 of my testimony, is compared with
    23 the National Ambient Air Quality Standards with the sum
    24 of the peaker impacts, a representative background
    L.A. REPORTING (312) 419-9292

    116
    1 concentration and a total concentration. And I'll walk
    2 you through each of those columns. In terms of the
    3 maximum peaker impact, we've looked at new ones,
    4 different air quality studies from a whole range of
    5 sizes. What I've done for this particular table is
    6 select the highest impact for that -- that pollutant in
    7 that averaging time. Highest impact from any of the
    8 peakers, subject -- the 2 microgram PM10 impact, for
    9 example, may not be from the same plant for the same
    10 location causing the 12. What I'm representing here is
    11 a 2 PM10 impact is the highest one we see from any one
    12 of the peaker plants. The 12 also similarly is the
    13 highest 24 hour from any of the plants anywhere.
    14 To represent the background concentration, I've
    15 selected from our ambient air monitoring data the
    16 highest concentration recorded anywhere in the Chicago
    17 area during 1999. So we're trying to be very
    18 conservative in my representation of impacts from
    19 background sources. All the sources other than the
    20 peakers are subject to the modeling. Of course, when we
    21 do the modeling on an individual basis, we provide
    22 emissions inventories to the consultant, to the
    23 application's consultant and they would incorporate all
    24 major sources in the area of the modeling study. They
    L.A. REPORTING (312) 419-9292

    117
    1 would explicitly model those. In addition, we
    2 explicitly model any of the peakers that happen to be
    3 nearby along with what the applicant's looking at. So
    4 we've done a much more thorough job in modeling than
    5 what I'm trying to represent here, but here I think what
    6 I'm trying to do is just show that even in the areas of
    7 Chicago where you have the worst major air quality for
    8 each of these pollutants and the highest impact from any
    9 of the peakers, of course, these impacts wouldn't be
    10 coincident, just bear with me assuming that they are,
    11 compare the total of the sum of these two columns and
    12 compare this total concentration to the values in the --
    13 in this column, which represent the air quality
    14 standards, in each and every case these sum or total
    15 concentrations are less than the Ambient Air Quality
    16 Standards. So we, I think, have shown here that these
    17 peakers will not be a threat to attainment for any of
    18 the groups that we've modeled for this -- for this type
    19 of a model.
    20 Now, I mentioned before that the dispersion
    21 models that we've -- that we've required to be used for
    22 each of these sources on a case-by-case basis are not
    23 appropriate for use for ozone. In fact, the ozone
    24 modeling techniques that are required are very complex,
    L.A. REPORTING (312) 419-9292

    118
    1 those ones that -- as a result of a complex series of
    2 chemical reactions in the atmosphere. It's not a
    3 pollutant that's emitted directly from a stack but it is
    4 the sum or the end product of a series of reactions from
    5 what are called precursor emissions. NOx, what I'll
    6 call again compounds and carbon monoxide.
    7 The different modeling approaches we require are
    8 called the urban air shed models, it's a grid based
    9 model, that's a much, much more complicated modeling
    10 approach. We don't require that of individual
    11 applicants for a couple of reasons. One, it's probably
    12 cost prohibitive on a project-by-project basis, but more
    13 importantly, you'd never see the impact from the
    14 individual sources, even large ones under the PSD
    15 program would not appear in the context of a poor
    16 chemical grid modeling.
    17 Before I get into the modeling results, I wanted
    18 to, I guess, kind of set the stage by looking at where
    19 we are today with ozone air quality in the Chicago or
    20 Lake Michigan region and what the trends have been over
    21 the last several years. What I'm preparing in this
    22 slide is a side-by-side slide or image is the monitor of
    23 this ambient value at each of the monitors in the Lake
    24 Michigan area from 1987 to '89 period, and contrast that
    L.A. REPORTING (312) 419-9292

    119
    1 with the measurements in the most recent three-year
    2 period we have data available, only those monitors that
    3 have the measured violations of the standard. In other
    4 words, design values above 125 as shown on them. Now,
    5 I've -- I guess before I get too much further I should
    6 define what a monitor design value is. The form of the
    7 ozone standard, as I mentioned before, the standard
    8 allows for three exceeds in a three-year period.
    9 Three-year exceeds on a given monitor is okay. It's the
    10 fourth one that triggers the violation. So what I'm
    11 showing in this particular slide design represents the
    12 fourth highest in a three-year period. Back in the '87
    13 - '89 time frame the highest design values in the region
    14 were occurring just at the Illinois, Wisconsin border.
    15 The highest in that time frame was 190 parts per billion
    16 or actually in the context of this slide, .19 parts per
    17 billion. I'll just use parts per billion as my
    18 convention here. Design value concentration above the
    19 standard occurred throughout the Chicago area as well as
    20 in Wisconsin and Michigan and Indiana. Design values of
    21 this type occurred in 70 parts per billion occurred
    22 right in downtown Chicago. 180 parts per billion over
    23 in Michigan City. See that we had a pretty serious
    24 problem 10 years ago, and, of course, the Agency

    L.A. REPORTING (312) 419-9292
    120
    1 proposed has many things and the Board has acted on many
    2 things to reduce precursor emissions over the last 10
    3 years and through the limitation of those programs and
    4 programs required by the U.S. Environmental Protection
    5 Agency made tremendous strides. In the last three-year
    6 period we have data available, I guess we're happy to
    7 report that we only have exceedances in Wisconsin and
    8 even those are much lower than they were ten years ago.
    9 There are no exceedances in northern Illinois, I
    10 shouldn't say exceedances, no violation, no designed
    11 values greater than the level of standard in northern
    12 Illinois in the last three-year period. None in
    13 Indiana. None in Michigan. So there has been
    14 tremendous improvement. The highest one in the region
    15 now is 134, maybe not marked here, just over in
    16 Milwaukee, kind of contrasted in the 190 that we had 10
    17 years ago.
    18 So there have been major improvements on ozone.
    19 We still have a little ways to go. We're still not
    20 showing attainment. And the Agency, through the NOx SIP
    21 call, what we were maybe talking about earlier, will be
    22 presenting its case, I guess, for additional control
    23 measures that should be in containment in the coming
    24 years. I didn't present you with results for the metro

    L.A. REPORTING (312) 419-9292
    121
    1 east area, that's another remaining non-attainment area.
    2 The results from trends are very similar. There is
    3 still some monitor exceedances in the metro east and St.
    4 Louis region, but the trend is very favorable, similar
    5 to what we're seeing here.
    6 I guess I apologize to the audience, you don't
    7 necessarily have these figures available to you and the
    8 colors are really kind of looking kind of bad here, but
    9 try to bear with me.
    10 This particular figure is -- I believe this is
    11 Exhibit 13 of my testimony. I didn't have it written
    12 down, but I think you have it available to you. Ozone
    13 modeling is a completely different animal than modeling
    14 that I described to you before. What we try to do with
    15 that ozone model is try to account for the chemical
    16 reactions that cause ozone concentrations. Typically we
    17 use what is called the grid model or the region or
    18 domain subdivided into series of grid squares, 4
    19 kilometers on side is usually about the finest
    20 resolution we use. With a 4 kilometer resolution, of
    21 course, you can't look at very low scale effects.
    22 You're looking at regional or urban scale effects. What
    23 I've represented in each of the panels on this figure
    24 are the results, a highest 1 hour concentration

    L.A. REPORTING (312) 419-9292
    122
    1 projected by the model for each of a series of days in
    2 an episode. I'm going to try to explain that.
    3 What we try to do with ozone modeling is to try
    4 to show the photochemical model, in this case, the UAM,
    5 urban air shadow model, can accurately reproduce a
    6 historical event or a historical episode. Back in 1991,
    7 which the dates you'll see across each of these figures,
    8 both Illinois and Wisconsin, Indiana, Michigan, under
    9 the direction of the Lake Michigan area looking for a
    10 landfill sponsor in a major field study, $6 or 7 million
    11 field study, were collected, are data, air quality data
    12 and UR logical data, solely for the purpose of
    13 validating this model, developing this model to try to
    14 show that it works. We have been working on getting
    15 this model over the Chicago region for over ten years
    16 now. And what we've -- what we're trying to do here is
    17 to use either logical conditions that occurred during
    18 that episode to make a leap of faith that these same
    19 meteorological conditions will occur in the attainment
    20 area in Chicago in the year 2007, will overlay future
    21 year emissions or control strategies for the year 2007
    22 on these historical meteorological conditions and
    23 project these kinds of concentrations. So it's, I
    24 guess, kind of a different animal, trying to use the

    L.A. REPORTING (312) 419-9292
    123
    1 model in a predicted way. We can't predict what the
    2 year modeling conditions will be in the year 2007, but
    3 we know these kinds of conditions have happened in the
    4 past and something like this will undoubtedly occur in
    5 the future. So, each of these periods represent an
    6 episode case and these would be the peak predicted 1
    7 hour ozone concentrations in our modeling domain,
    8 assuming all of the controls required by the Clean Air
    9 Act. This includes our enhanced special maintenance
    10 program, reformulated gasoline, the state's 15 percent
    11 programs, all of the previous NOx, the COC limits
    12 approved by the Board are in the ranking program.
    13 Everything that is in the Clean Air Act except the SIP
    14 call is represented in this particular figure. On each
    15 of these episode cases, I guess what were looking for --
    16 I apologize again to the audience, what our attention is
    17 focused on are the red zones. These are areas where the
    18 predicted concentrations exceed 120 parts per billion,
    19 roughly the level of your air quality standard. There
    20 are still some violations that are shown, our
    21 exceedances that are shown, mostly along the Ohio River
    22 Valley, southern Indiana and around Cincinnati. In
    23 Illinois, the Clean Air Act Controls, for the most part,

    24 yield great improvements. We're not showing exceedances
    L.A. REPORTING (312) 419-9292
    124
    1 of the standard. Of course, as I mentioned before, may
    2 be hidden, we're showing -- we're not seeing the
    3 exceedances of violation even today. But there is at
    4 least one day of this ozone episode of a modeling where
    5 violations are shown, exceedances are shown, levels
    6 above 120 parts per billion both in the metro east and
    7 in the Lake Michigan region, not in Chicago per se, but
    8 in the Lake Michigan region. That corresponds pretty
    9 well to -- are still observing high ozone along the
    10 eastern Wisconsin shoreline.
    11 This figure is, I believe, Exhibit 14. These
    12 are the results that we're seeing from the model as a
    13 result of not only the Clean Air Act Controls that I
    14 described previously but also any limitation of the NOx
    15 SIP call. It's a little hard to compare visually two
    16 figures against, you know, one against the other when
    17 you don't see them both in front of you, even harder
    18 when the colors are blurry but throughout Illinois
    19 concentrations have been reduced as a result of the SIP
    20 call and many of the exceedances that were shown along
    21 the Ohio River Valley are either gone or much, much less
    22 prevalent than they were before. There is still one
    23 small sliver of exceedances shown over Lake Michigan,

    24 more or less parallel to the eastern shoreline of
    L.A. REPORTING (312) 419-9292
    125
    1 Wisconsin. Again, no exceedances shown in Chicago, only
    2 very minor exceedances shown in the metro east area on
    3 this particular item. I guess my purpose here is not to
    4 try to show attainment, I'm not here making an
    5 attainment demonstration here today. What I wanted to
    6 show or convey to you was that the NOx SIP call is
    7 providing very large benefits and when you overlay the
    8 results, when we obtain -- when we overlay the emissions
    9 of the peakers in the next results that I'll show you,
    10 you kind of get an idea of whether or not emissions in
    11 those peakers will affect our ability to attain in
    12 Chicago in 2007. I won't spend too much time on this
    13 one because you're not able to really see it too well
    14 anyway.
    15 I wanted to introduce a different way that we
    16 process the modeling results. This is called a
    17 difference plot. This doesn't depict the concentrations
    18 that occur at any given red zone. What this is actually
    19 showing is the difference between two different
    20 scenarios. In this case, what we're looking at is the
    21 difference between the Clean Air Act scenario in the
    22 year 2007 to the SIP call scenario that I described

    23 previously. The benefits of the SIP call, if you will,
    24 are shown, I believe, in the blue colors, the benefits
    L.A. REPORTING (312) 419-9292
    126
    1 accrue or get more intense on each successive day of the
    2 episode, which is expected, the lowest ozone
    3 concentration occurring early and are largely locally
    4 generated by the time we're well within the episode, we
    5 have much more of an effect from transporting ozone and,
    6 therefore, the effect of the transport or SIP call is
    7 much greater. Benefits due to the SIP call and
    8 throughout Illinois is as high as -- as -- based on this
    9 color scale, 10 parts per billion, 14 parts per billion,
    10 18 parts per billion in some areas. And in the Chicago
    11 region, Lake Michigan, benefits of at least 2 to 6 parts
    12 per billion are evident across Lake Michigan on its
    13 hottest days and in some cases those benefits are even
    14 greater, as high as 10 to 14 parts per billion just due
    15 to the NOx SIP call.
    16 In this modeling scenario, back to showing you,
    17 peak ozone concentration, peak hourly, but in this case,
    18 added to the previous scenario, a NOx SIP call scenario,
    19 the emissions from all of the peakers. Actually, we
    20 went overboard at adding Michigan in this particular
    21 scenario. We added not just the peakers but all the
    22 combustion sources that we have permits before us and

    23 we've added not just those at -- where we received
    24 permits or already been instructed but all of the ones
    L.A. REPORTING (312) 419-9292
    127
    1 that we know about to this date. So some of those that
    2 are still pending before the Agency they're in here.
    3 Now, the peakers, at least as -- as it rolls
    4 before the Pollution Control Board in that that is
    5 implemented, peakers would fall under the control
    6 requirements of the NOx SIP call. In this modeling, I'm
    7 adding them to the SIP call. So this is a worst case
    8 scenario. We're looking at impacts above the SIP call,
    9 and, in fact, they would have all of those caps.
    10 And, I guess, I put this up there to try to
    11 compare those to what we saw before just for the SIP
    12 call. Maybe we won't do this very well. Let's just try
    13 to look at this one hot day, which is July 20, 1991. At
    14 least looking at these colors that are nice and bright
    15 in front of you, I don't know if you folks can see here
    16 or not, you can't notice any difference between these
    17 two scenarios based on looking only at peak ozone. The
    18 impacts or the response to the model to these additional
    19 emissions is very small. Probably the better way to
    20 look at the effect of the peakers is through that other
    21 type of plot that I gave you just a minute ago, this

    22 so-called difference plot where we look at the
    23 incremental effect of the peakers on top of the impact
    24 of the SIP call. Now, in terms of their impacts stated
    L.A. REPORTING (312) 419-9292
    128
    1 they are relatively small. The color scale I changed
    2 here, instead of being a 2 ppb from an increase or an
    3 increment on both scales a half of a ppb at a small
    4 scale just so that you can see the effect. There are
    5 effects that are occurring, generally very low, low
    6 effects on the early days of the episode. The further
    7 in the episode, the more important transport is
    8 occurring now, by these later days or certainly July
    9 19th, 1991, there is transport even from those peakers,
    10 they're located downstate, all the way up into the Lake
    11 Michigan area.
    12 Are these effects significant, I don't know.
    13 There is no real clear definition of what significance
    14 is. In EPA's NOx SIP call, they didn't make an attempt
    15 to define significance, but it is a very murky
    16 definition, I think deliberately on the part of the
    17 Environmental Protection Agency to -- people are really
    18 saying particulate impact is significant. The -- the
    19 basic idea of the NOx SIP call was that the entire
    20 state's emissions is judged against some threshold of
    21 significance, not just incremental emissions from one

    22 particular category of emissions. So, I would -- I
    23 guess I'm going to try to avoid saying whether or not
    24 these effects are significant. What I will say is that
    L.A. REPORTING (312) 419-9292
    129
    1 in the Chicago area and on some days we have impacts
    2 that we're seeing through the peakers of as much as 1 or
    3 2, maybe in some cases 3 parts per billion in the
    4 metropolitan area, Chicago, and in other areas of the
    5 state. In the key areas where we need to be able to
    6 demonstrate attainment, in those areas along the eastern
    7 shore of Wisconsin, we have impacts on more like half a
    8 part per billion to 1 and a half. So the effects are
    9 not real admissable along any areas that we're still
    10 showing a high ozone. They can certainly pose an air
    11 quality issue in Chicago will be worse but as I
    12 demonstrated both with modeling and with monitoring,
    13 we're already maintaining the standard in Chicago. We
    14 expect that we will continue to. Elsewhere in the Lake
    15 Michigan region it doesn't appear that the effects are
    16 occurring in the worst locations.
    17 So does this result of a peaker complicate our
    18 efforts to showing attainment? It certainly complicates
    19 our efforts. It would be easier to demonstrate
    20 attainment without having synergies.

    21 The Agency is in the process of preparing its
    22 attainment demonstration. It needs to be submitted to
    23 U.S. EPA by December of this year. We will consider the
    24 effects of these peakers in the demonstrating attainment
    L.A. REPORTING (312) 419-9292
    130
    1 for the Chicago state implementation plan or that
    2 submittal. Whether or not we're able to show
    3 attainment, I guess my expectation is that we probably
    4 will, but that we think SIP call shows attainment and
    5 that the effect of the peakers is not so great as to
    6 really affect that judgment, that the improvements that
    7 are seen from all of the programs that have been
    8 implemented to date far exceed the negative consequences
    9 of the peaker emissions. With that I'll conclude my
    10 testimony.
    11 HEARING OFFICER JACKSON: Thank you, Mr. Kaleel.
    12 MR. PHILLIPS: The next Agency witness will be
    13 Greg Zak. Greg will be providing testimony on the noise
    14 pollution implications of peakers.
    15 HEARING OFFICER JACKSON: You may begin whenever
    16 you're ready. Mr. Zak.
    17 MR. ZAK: Thank you. My name is -- ladies and
    18 gentlemen of the Board, my name is Greg Zak. I'm the
    19 noise advisor for the Illinois Environmental Protection
    20 Agency. I've been asked to testify today to provide

    21 information related to potential noise issues at natural
    22 gas-fired peakers plants.
    23 I'm going to skip over my background. I think a
    24 lot of you are familiar with it and to save time, I'll
    L.A. REPORTING (312) 419-9292
    131
    1 go right to the issue here, which is the potential noise
    2 impact of the proposed peaker plants.
    3 I currently manage the noise program at the
    4 Illinois Environmental Protection Agency. My annual
    5 responsibilities include assisting approximately 2,000
    6 citizens with noise complaints and approximately 1000
    7 informational calls dealing with technical questions
    8 about noise pollution measurement and control. I also
    9 testify at many enforcement hearings. I take noise
    10 measurements when necessary.
    11 In addition to the noise advisor, there is an
    12 additional person in the noise program. This person is
    13 an assistant.
    14 The current responsibilities of the noise
    15 program consume all of our available work hours.
    16 Since previous testimony has described peaker
    17 plants in detail, I will confine my narrative to
    18 potential noise issues related to today's topic.
    19 Peaker plants propose a greater threat than

    20 other types of noise -- I'm sorry -- than other types of
    21 state regulated facilities with respect to noise
    22 pollution because the gas turbine engine used in peakers
    23 is one of the most powerful, loudest, noise sources in
    24 the United States. The noise power that must be
    L.A. REPORTING (312) 419-9292
    132
    1 contained and neutralized in the peaker is tremendous.
    2 The potential for releasing great amounts of sound power
    3 poses a greater threat than most other types of state
    4 regulated facilities. Its characteristic emissions can
    5 be described as nuisance noise, broadband noise and
    6 tonal noise.
    7 Peaker noise emissions can greatly exceed the
    8 limits required in the Board's noise regulations. This
    9 can occur if the noise is not controlled in the peaker
    10 housing and also utilizing whatever land buffer or
    11 setback is needed when choosing a site.
    12 Peaker noise control is accomplished through
    13 four major noise control strategies.
    14 The first three of these address noise reduction
    15 at the peaker itself. Rough approximations are
    16 presented in the form of percentages rather than in
    17 detailed decibel limits found in the noise regulations.
    18 I've included these percentages because I think they're
    19 easier for the average person to understand who is not

    20 acoustically inclined.
    21 Accurate and adequate noise control of peakers
    22 must be based on the decibel limits set in the Board
    23 regulations. The first control strategy is comprised of
    24 combustion air intake silencers, which when properly
    L.A. REPORTING (312) 419-9292
    133
    1 designed and installed in the average peaker reduce the
    2 intake noise to a tiny percentage of uncontrolled level.
    3 Second, a hard acoustic enclosure completely
    4 contain the gas turbine you will trap approximately the
    5 same amount of sound as the intake does, silencers will,
    6 down to a very tiny percentage.
    7 Third, a combustion gas exhaust silencer, which
    8 when properly designed and installed, reducing the
    9 exhaust noise even less -- to even lesser amount than
    10 the intake silencer in the enclosure.
    11 Finally, a buffer of land controlled by the
    12 peaker plant sufficient to provide enough distance for
    13 the noise escaping the plant to dissipate sufficiently
    14 to meet all state noise pollution requirements. This
    15 land buffer should be based on the amount of noise
    16 reduction needed at the property lining the power
    17 facility.
    18 Another control strategy involves a new

    19 technology called active noise cancellation. This
    20 promises the potential of being able to cancel much of
    21 the very low frequency, rumble type sound associated
    22 with large gas turbines. This technology should be
    23 viewed with caution, however, due to its unproven record
    24 when used in low cost applications. However, it could
    L.A. REPORTING (312) 419-9292
    134
    1 be considered when the more traditional silencer
    2 technology is not able to satisfactorily address the
    3 rumble problem.
    4 Setbacks are an important concept in addressing
    5 peaker noise. A need exists for setbacks, land buffers,
    6 consisting of land owned or controlled by the peaker
    7 plant. The setback distance necessary would depend upon
    8 what level of noise abatement was included in the
    9 initial design of the peaker plant. The most frequently
    10 encountered noise pollution problem seen in complaints
    11 and noise pollution enforcement cases before the Board,
    12 is at a residential development eventually coming to a
    13 noise -- a nuisance noise emission source. A facility
    14 may be in compliance even though noisy because it is not
    15 near residential property. If the facility does not
    16 control the use of the surrounding property, such a
    17 scenario is likely to occur. There is nothing to stop
    18 the farm owner, which is a typical situation, from

    19 selling his air cultural land for residential
    20 development and the facility then no longer has the
    21 luxury of a large distance to the nearest home.
    22 To avoid the problem of peaker noise impacting
    23 noise sensitive areas, compliance reviews on paper of
    24 the facility designs are essential to insure future
    L.A. REPORTING (312) 419-9292
    135
    1 compliance with the noise regulations. Then before full
    2 operation is started, peakers should show that it can
    3 operate at or below the nighttime limits of the Board.
    4 If a peaker plant cannot show compliance through
    5 demonstration, the problems then would be resolved at
    6 the beginning. All this argues strongly the design and
    7 noise compliance review of that design are the most
    8 important project events. Designing and adding on noise
    9 compliance after the plant is built may be next to
    10 impossible.
    11 Other state noise programs were reviewed to see
    12 if new or unique regulatory methods are in use. My
    13 review of report of noise regulation in the United
    14 States, see our Exhibit No. 19, shows that noise
    15 abatement is not regulated by 43 states. Six states
    16 have very little noise regulations. Illinois is more
    17 active than the others in regulating noise. Peaker

    18 noise is not regulated by the other regional five
    19 states, California, Texas or New York. However, please
    20 remember that the noise may be regulated by local
    21 ordinance in some of these states. It should also be
    22 noted that in many of these states that have little
    23 state regulations, the larger cities may conduct
    24 regulation of noise through local ordinances. Finally,
    L.A. REPORTING (312) 419-9292
    136
    1 peaker noise is not regulated at the federal level.
    2 Another concern over potential peaker problems
    3 is the potential for impacting property values, as with
    4 any other type of industrial noise source, if peakers
    5 exceed the noise regulations, they could significantly
    6 affect negatively on property values. Noise at such
    7 levels would likely be noticeable by prospective
    8 purchasers of property and any potential commercial
    9 investors.
    10 Local zoning has been a significant factor in
    11 many of the noise complaints I've handled. In my
    12 experience with the noise complaints filed with the
    13 Board, it appears that local zoning has not been
    14 considered -- is not considered the land buffer
    15 component of noise control in making zoning decisions.
    16 Of course, the reason may be that the local -- that the
    17 noise level from the facility may not be appreciated or

    18 even understood until the facility is built and
    19 operated.
    20 This issue also strongly argues for the
    21 importance of preconstruction design review. The
    22 Illinois Environmental Protection Agency has received no
    23 noise complaints regarding existing peaker plants so it
    24 would be difficult for me to comment on the more
    L.A. REPORTING (312) 419-9292
    137
    1 stringent regulation of existing plants. Stricter noise
    2 emission controls could first be considered for new
    3 facilities and expansions. Upgrading costs would be
    4 extremely high, if not prohibitive, for added noise
    5 control, in other words -- noise control is -- I tried
    6 to -- is added after the plant is built. Silencing
    7 equipment comprises the bulk of the peaker plant and is
    8 carefully tuned to match the turbine. In some cases it
    9 may be less expensive to install a whole new unit than
    10 try to upgrade the old one.
    11 Questions will arise regarding the economic
    12 impact of potential additional requirements. The cost
    13 could be anywhere in the spectrum depending on how
    14 stringent the requirements are made. However, I can
    15 confidently say that additional noise control in the
    16 design stage is much less expensive than adding it on

    17 after the installation is operational.
    18 I cannot say that there are currently any gaps
    19 in the regulations. It may be that there is inadequate
    20 preconstruction design work and design review relevant
    21 to noise compliance issues. I believe that considerable
    22 information would be available from a turbine
    23 manufacturer that could be evaluated by a competent
    24 noise consultant to help design for the four components
    L.A. REPORTING (312) 419-9292
    138
    1 of noise control I mentioned earlier. Intake, turbine
    2 enclosure, exhaust and the land buffer. Failure to
    3 adequately plan for any of the four could lead to future
    4 non-compliance. It may be too late and/or too expensive
    5 to look at the problem only after numerous citizens are
    6 impacted by the noise.
    7 Thank you for listening.
    8 HEARING OFFICER JACKSON: Thank you, Mr. Zak.
    9 We'll go ahead and take the next Agency witness
    10 then.
    11 MR. PHILLIPS: The next agency witness would be
    12 Steve Nightingale who will be testifying as to water
    13 pollution implications of peakers.
    14 MR. NIGHTINGALE: Good afternoon.
    15 My name is Steve Nightingale and I am the
    16 manager of the Industrial Unit in the Bureau of Water's

    17 permit section at the Illinois Environmental Protection
    18 Agency. I've been with the Agency for just over 14
    19 years and I am a licensed professional engineer.
    20 The testimony that I have submitted is response
    21 to the governor's question with regard to the impact of
    22 natural gas-fired peak load electrical power generated
    23 facilities or peaker plants on water.
    24 Initially, it must be stated that not all peaker
    L.A. REPORTING (312) 419-9292
    139
    1 plants produce wastewater. However, if wastewater is
    2 generated from the peaker plant, the discharge from the
    3 plant will be subject to existing local, state and
    4 federal regulations.
    5 The testimony is -- this testimony is intended
    6 to address peaker plants that are used during peak power
    7 demand to generate electricity. They are natural gas
    8 powered turbines, peaker plants that may choose to
    9 discharge directly to surface waters or to a publically
    10 owned treatment works or POTW and discharge its surface
    11 waters.
    12 General speaking, wastewater generated from
    13 peaker plants will either be subject to the Federal
    14 National Pollutant Discharge Elimination System or NPDES
    15 permit program or the state construction and/or

    16 operating permitted program, depending on actual
    17 wastewater disposal method. The Illinois Environmental
    18 Protection Agency administers both permit programs.
    19 Surface water discharges will be required in an
    20 NPDES permit in accordance with Board CFR 122 and 35
    21 Illinois Administrative Code 309. Permit limits that
    22 will apply will be the water quality limitations from 35
    23 Illinois Administrative Code 302, the effluent
    24 limitations found in 35 Illinois Administrative Code 304
    L.A. REPORTING (312) 419-9292
    140
    1 or other technology based limitations using best
    2 professional judgment in accordance with 40 CFR 125.3.
    3 It has been determined that surface discharges from
    4 these facilities are not subject to any federal
    5 industrial categorical effluent guideline discharge
    6 limitation. Discharges to a POTW will be required to
    7 obtain a state construction and/or operating permit in
    8 accordance with 35 Illinois Administrative Code 309.
    9 Applicable limitations that will apply are those
    10 established by the local POTW, 35 Illinois
    11 Administrative Code 307 and the federal general
    12 pretreatment regulations found in the 40 CFR 403.
    13 During the NPDES permit review process, a draft
    14 permit will be developed with the required applicable
    15 limitations. In addition, the draft memo will also

    16 include appropriate monitoring requirements and special
    17 conditions to verify continued compliance.
    18 Upon completion of the Illinois Environmental
    19 Protection Agency review process, a public notice, fact
    20 sheet and a draft permit will be sent out on a 15-day
    21 notice, followed by a 30-day public notice period.
    22 Changes can be made to the draft within following the
    23 notice period and the general public has the opportunity
    24 to participate in the process through hearing comments.
    L.A. REPORTING (312) 419-9292
    141
    1 Some peaker plants will require a construction
    2 authorization from the Illinois Environmental Protection
    3 Agency if they must treat the wastewater to a level
    4 below NPDES permit limitation.
    5 Final action on the construction authorization
    6 will not be taken until the NPDES permit has completed
    7 the public notice period and the permit is ready to be
    8 issued.
    9 The state permit review process is followed when
    10 peaker plants propose to discharge to a POTW.
    11 As previously stated, the state construction in
    12 our operative permits are required in accordance with 35
    13 Illinois Administrative Code 309. Prior to permit and
    14 issuance, the applicant must be able to show the

    15 discharge will be in compliance with the limitations
    16 established by the local POTW, 35 Illinois
    17 Administrative Code 307 and in compliance with the
    18 federal general pretreatment regulations found in the 40
    19 CFR 403.
    20 The composition of the wastewater generated from
    21 peaker plants will vary and is dependent on the type of
    22 plant design. Waste streams that have been identified
    23 in the permit applications submitted to the Illinois
    24 Environmental Protection Agency include evaporative
    L.A. REPORTING (312) 419-9292
    142
    1 cooling water blowdown, cooling tower blowdown, reverse
    2 osmosis waste discharge, demineralization blowdown,
    3 filter backwash, chiller system water, various drains
    4 and sanitary waste.
    5 Pollutants that could be expected in the
    6 wastewater includes such things as total suspended
    7 solids, total residual chlorine, PH, temperature, total
    8 dissolved solids, calcium, magnesium, iron, manganese,
    9 sulfate, chloride, oil & grease, water conditioning
    10 chemicals for bio-fouling and corrosion control as well
    11 as radioactive isotopes in some areas.
    12 There may be some peaker plants that generate
    13 wastewater containing a thermal component, but the
    14 quality of the wastewater would be small as compared to

    15 other types of power plants. As a result, these plants
    16 should be able to be operated in a way that is in
    17 compliance with appropriate discharge regulations.
    18 Illinois Environmental Protection Agency expects
    19 that all sanitary wastewater should be discharged to a
    20 sanitary sewer.
    21 My testimony has not addressed radioactive
    22 isotopes because they are to be under the jurisdiction
    23 of the Illinois Department of Nuclear Safety.
    24 I have included an Illinois Environmental
    L.A. REPORTING (312) 419-9292
    143
    1 Protection Agency Exhibit 18 as an overview of the
    2 information received by the Illinois Environmental
    3 Protection Agency's Bureau of Water as part of the
    4 permit application process.
    5 The Illinois Environmental Protection Agency's
    6 Bureau of Water does not participate in the accuracy of
    7 environmental impact on the waters of the state as a
    8 result of the discharge from peaker power plants,
    9 provided the appropriate permits are obtained and the
    10 established permit limitations met.
    11 This concludes the summary of my testimony. I
    12 would be happy to address any questions.
    13 HEARING OFFICER JACKSON: Thank you, Mr.

    14 Nightingale.
    15 Before we go on with the final two Agency
    16 witnesses, just a procedural note, we have two
    17 individuals from the Department of Natural Resources and
    18 I know one of them is going to be needing to catch a
    19 train later this afternoon, so what we're going to do
    20 is -- I don't think we've got a whole lot more from the
    21 two remaining Agency witnesses. We'll conclude with
    22 them, take a very brief recess and then bring the
    23 Department of Natural Resources on for their witnesses
    24 to present their testimony to us, and then ask if the
    L.A. REPORTING (312) 419-9292
    144
    1 Agency would be kind enough to please come back after
    2 that and answer any questions that the Board might have.
    3 Okay. That's the plan.
    4 Thank you. Go ahead.
    5 CHAIRMAN MANNING: The Board may, in addition to
    6 that, we have lots of prepared questions that we've done
    7 because of the pre-filed testimony. Those that we're
    8 not able to ask you orally today we will put in writing
    9 and we will ask you to respond either in writing or in
    10 one of our future hearings. So a lot of the detailed
    11 questions that we have for you today we may follow up
    12 with the written hearing officer order.
    13 MR. PHILLIPS: Okay. Thank you.

    14 Our next witness then will be Rick Cobb. Rick
    15 has a few brief comments on the groundwater limitation
    16 of peaker plants.
    17 MR. COBB: As Mr. Phillips indicated, my name is
    18 Rick Cobb and I manage the groundwater sections of the
    19 Bureau of Water of the Illinois Environmental Protection
    20 Agency.
    21 My testimony is really just to respond to the
    22 governor's executive order, he did ask us to address
    23 particular groundwater related issues and as Director
    24 Skinner indicated, testified earlier today, the Agency
    L.A. REPORTING (312) 419-9292
    145
    1 has no authority under the Environmental Protection Act
    2 to regulate the quantity of groundwater, however, we do
    3 have regulations for the Pollution Control Board and the
    4 Environmental Protection Act that do relate to
    5 groundwater quality protection provisions.
    6 However, just to touch on what type of law does
    7 apply to groundwater quantity, simply because we have
    8 had numerous questions and that is a related topic and
    9 one of the issues that the Governor indicated in his
    10 executive order. Essentially, the law that does apply
    11 is what is called the Water Use Act of 1983, and in
    12 January of 1984, really brought Illinois

    13 under identified I guess doctrine of common law, which
    14 covers the development and use of both surface and
    15 groundwaters.
    16 That public act in Section 3F includes the
    17 definition of reasonable use. And key thing there is
    18 the -- primarily the groundwater is -- that for
    19 groundwater is non-restricted except from malicious and
    20 wasteful purposes of that water.
    21 Concurrent with the executive order that require
    22 these hearings, it also required the establishment of
    23 the Water Resources Advisory Committee.
    24 And that committee's task is to examine the
    L.A. REPORTING (312) 419-9292
    146
    1 various economic and social issues related to energy
    2 producing facilities and water use in Illinois. That
    3 committee has not convened yet. The first meeting is
    4 actually August 31st. And as I understand, I will be
    5 participating in that committee.
    6 Secondly then in terms of groundwater quality,
    7 and I'm sure the Board is aware of the authority through
    8 the Board's groundwater quality standards regulations,
    9 non-degregation provisions, the regulation in total are
    10 applicable as well as force of water under Section 12A
    11 of the Environmental Protection Agency Act.
    12 That really concludes my testimony with respect

    13 to potential groundwater issues from an agency
    14 perspective.
    15 HEARING OFFICER JACKSON: Okay. Thank you, Mr.
    16 Cobb.
    17 Looks like Todd Marvel is the last witness.
    18 MR. PHILLIPS: The final Agency witness, last
    19 but not least, is Todd Marvel, who will be providing
    20 some brief comments on the land pollution implications
    21 of peakers, limited as they are.
    22 MR. MARVEL: Good afternoon.
    23 As Mr. Phillips said, my name is Todd Marvel.
    24 I'm employed with the Illinois Environmental Protection
    L.A. REPORTING (312) 419-9292
    147
    1 Agency's Bureau of Land as the assistant manager of the
    2 field operations section and as the RCRA coordinator and
    3 U.S. Environmental Protection Agency liaison for the
    4 hazardous waste programs. And RCRA is an acronym. It's
    5 spelled R-C-R-A, all caps. And, of course, as we
    6 hopefully all know, it stands for the Resource
    7 Conservation and Recovery Act, which was passed by
    8 Congress in 1976. And it established standards for the
    9 identification and management of hazardous waste,
    10 federal standards.
    11 The Illinois Environmental Protection Agency is

    12 authorized by the U.S. Environmental Protection Agency
    13 to implement the RCRA hazardous waste program in the
    14 state of Illinois and my testimony will address land
    15 pollution issues as they relate to natural gas-fired
    16 peaker plants.
    17 Peaker plants may generate various types of
    18 waste that must be managed in accordance with waste
    19 disposal regulations found in Subtitle G of Title 35 of
    20 the Illinois Administrative Code.
    21 By comparison, peaker plants are no different
    22 than any other generator of the following types of
    23 wastes in terms of how the waste is regulated.
    24 Any municipal waste generated at the facility,
    L.A. REPORTING (312) 419-9292
    148
    1 such as general office waste, must be sent to a facility
    2 permitted to treat, store or dispose of municipal waste.
    3 Any special waste generated at the facility,
    4 must be managed properly in accordance with the
    5 regulations applicable to the specific type of waste
    6 that is generated. Special waste is defined as
    7 industrial process waste, pollution control waste or
    8 hazardous waste.
    9 And all special waste is subject to the
    10 requirement to make a hazardous waste determination,
    11 which is found in the RCRA Subtitle C hazardous waste

    12 regulations.
    13 If the waste is determined to be a non-hazardous
    14 special waste, the waste cannot be accumulated on site
    15 for any more than one year. Typically they are sent off
    16 site on a regular basis. In general, such waste must
    17 also be properly sent off site to a permitted treatment
    18 storage or disposal facility and this waste may be
    19 declassified as municipal waste if certain requirements
    20 are met and certain documentation is maintained.
    21 If any special waste generated at a facility is
    22 determined to be a hazardous waste, such as waste
    23 cleaners or solvents, then the facility must consider
    24 the amount of hazardous waste generated on a monthly
    L.A. REPORTING (312) 419-9292
    149
    1 basis in order to determine their generator category and
    2 subsequent regulatory requirements.
    3 The Illinois Environmental Protection Agency
    4 anticipates that most, if not all, peaker plants will
    5 generate less than 100 kilograms per month of hazardous
    6 waste. Such facilities would be classified as a
    7 conditionally exempt small quantity generator.
    8 A conditionally exempt small quantity generator
    9 is subject to three primary regulatory requirements.
    10 First, as I said before, a proper hazardous

    11 waste determination must be made on all special wastes
    12 generated at the facility.
    13 Second, the hazardous waste generated must be
    14 accumulated in tanks or containers.
    15 And third, these wastes must eventually be sent
    16 off site to a permitted hazardous waste treatment
    17 storage or disposal facility.
    18 The other two categories of generators are a
    19 small quantity generator and a large quantity generator.
    20 There is some more detail in my testimony, which I won't
    21 go into, but I will just say that there are differing
    22 levels of regulatory requirements and waste accumulation
    23 time limits that apply to the three different categories
    24 of hazardous waste generators.
    L.A. REPORTING (312) 419-9292
    150
    1 If these requirements are met, no hazardous
    2 waste permit or typically any other permit would be
    3 required from the Bureau of Land.
    4 Finally, I'll briefly address some past -- I'll
    5 briefly address past land use information that is
    6 available from the Illinois Environmental Protection
    7 Agency and specifically the Bureau of Land.
    8 Peaker plants may be located on property that
    9 was once used for commercial or industrial activities
    10 such as gas stations, small manufacturing and assembly

    11 operations. Information regarding whether or not there
    12 have been any reported releases to the environment at
    13 these sites can be obtained from Illinois Environmental
    14 Protection Agency, as well as documentation of any
    15 cleanup activities that have been completed in response
    16 to these releases.
    17 Thank you.
    18 HEARING OFFICER JACKSON: Thank you, Mr. Marvel.
    19 Mr. Phillips, do you have any concluding remarks that
    20 you would like to make or would you like to reserve them
    21 for questions the Board may --
    22 MR. PHILLIPS: We'll reserve them for later.
    23 HEARING OFFICER JACKSON: All right. Why don't
    24 we take a very short break. Let's say five minutes.
    L.A. REPORTING (312) 419-9292
    151
    1 Try to be back here as quickly as possible. We need to
    2 get in line because of the Department of Natural
    3 Resources testimony.
    4 (Off the record.)
    5 HEARING OFFICER JACKSON: Okay. We're going to
    6 go back on the record. We have some presentations from
    7 the Department of Natural Resources now. Mr. Anderson,
    8 if you want to begin.
    9 MR. ANDERSON: Thank you.

    10 First of all, I'd like to thank the Board for
    11 the opportunity to appear today and also thank you for
    12 indulging our schedule.
    13 My pre-filed testimony is short. My summary of
    14 that testimony will be shorter.
    15 I am Brian Anderson. I am the Director of the
    16 Office of Scientific Research and Analysis of the
    17 Illinois Department of Natural Resources.
    18 I have three purposes here today. The first of
    19 those is to extend the expertise in Illinois Scientific
    20 Survey to the Pollution Control Board and their staff in
    21 these deliberations. Secondly, I'm here to represent
    22 Director Brent Manning, Director of the Department of
    23 Natural Resources. Director Manning and Director
    24 Skinner are co-chairing the Governor's Water Resources
    L.A. REPORTING (312) 419-9292
    152
    1 Advisory Committee. And you've already heard something
    2 about that committee today. You may ask, others may
    3 ask, why do we need to be discussing peaker power plants
    4 in two different forms, your deliberations and the
    5 discussions that will take place in the Water Resource
    6 Advisory Committee? That has somewhat been alluded to
    7 by the Agency but let me be more explicit. In Illinois,
    8 except for withdrawals of water from Lake Michigan,
    9 there is extremely limited regulatory authorities

    10 associated with water withdrawals from our other surface
    11 waters and from groundwater. It's, therefore, more
    12 appropriate to deal with water quantity issues in front
    13 of -- in the context of Water Resources Advisory
    14 Committee, however, we do acknowledge the relationship
    15 between these issues and I have asked Dr. Derek
    16 Winstanley, Chief of the Illinois Water Survey, to
    17 provide a concise summary of some of the water quantity
    18 issues relating to peaker power plants.
    19 That ends my testimony and I ask that my
    20 pre-filed testimony be entered into the record.
    21 HEARING OFFICER JACKSON: It will be so entered.
    22 Thank you.
    23 DR. WINSTANLEY: Thank you. My name is Derek
    24 Winstanley. I am Chief of the Illinois State Water
    L.A. REPORTING (312) 419-9292
    153
    1 Survey. We are a division of the Department of Natural
    2 Resources. We're also an affiliated member of the
    3 University of Illinois at Champaign, Urbana.
    4 I will be speaking about groundwater resources
    5 as they relate to peaker power plants. I will provide a
    6 summary of some of the key points in my written
    7 testimony that I've already submitted. I do also plan
    8 to give testimony at the first meeting of the Water

    9 Resources Advisory Committee at its first meeting on the
    10 31st of August where I understand water resource issues
    11 relating to power plants will be the subject of more
    12 detailed discussion.
    13 One focal point that I do wish to make is that
    14 the discussion of peaker power plants and the impacts on
    15 groundwater resources should be placed within the
    16 context of all other water demands including those for
    17 combined cycle plants as well as Illinois' growing water
    18 needs for domestic, municipal, agricultural and other
    19 industrial uses. We do need to look at total demands
    20 from the groundwater resources as a basis for sound
    21 water resource management. The water demands from the
    22 peaker power plants vary widely depending upon plant
    23 design, their intended use and the number of days of
    24 operation.
    L.A. REPORTING (312) 419-9292
    154
    1 I would like to give you some examples of the
    2 quantities of water that may be associated with
    3 operations of peaker power plants by putting that in
    4 context of some other water uses. First of all, peaker
    5 power plants, and I am going to focus on just a simple
    6 cycle power plant when I refer to the peaker power
    7 plants, these are typically small producing a few tenths
    8 to a few hundred, perhaps a thousand megawatts of

    9 electricity. They do not operate everyday of the year.
    10 The typical period of operation is from perhaps 20 to 90
    11 days per year. The range of water use there is from
    12 less than 100,000 gallons per day to about 2 million
    13 gallons per day. Translating that into an annual use
    14 that gives us a range of from about 1.4 to 180 million
    15 gallons of water per year.
    16 Turning to baseload power plants, which is
    17 combined cycle, these are obviously much larger,
    18 typically generate maybe 500 to several thousand
    19 megawatts of electricity and are intended to operate
    20 more or less continuously throughout the year. They
    21 consume water within the range of about 5 to 20 million
    22 gallons per day. Translating that to an annual water
    23 use, that gives us a range from about 1,500 million
    24 gallons per year to 6,000 million gallons per year.
    L.A. REPORTING (312) 419-9292
    155
    1 So in context, the peaker power plants consume
    2 about a fraction of 1 percent to about 3 percent of the
    3 water used by typical baseload combined cycle plants.
    4 Another example of water use, municipal water
    5 use, and I give you data from Champaign, Urbana, for
    6 context. Champaign, Urbana, has a population of about
    7 120,000 people, and they need that water supply

    8 regularly 365 days per year. Champaign, Urbana,
    9 currently consumes about 20 million gallons per day of
    10 groundwater, which translates into an annual use of
    11 about 7,300 million gallons per year.
    12 So to put the water use by peaker plant in
    13 context of a municipal use, a typical peaker plant would
    14 use the same amount of water as between about 25 and
    15 3,000 people, depending upon the nature of the peaker.
    16 One concept that is important in examining not
    17 only peaker power plants but all groundwater use is the
    18 concept of sustainable yields. And in my written
    19 testimony, I refer to that as potential yield.
    20 Sustainable yield is a fairly diffuse concept but
    21 generally, it tends to mean the yield of water that can
    22 be sustained over the long term so that it can be used
    23 not only by the current population but also by future
    24 generations and a yield that will have no significant
    L.A. REPORTING (312) 419-9292
    156
    1 impacts.
    2 The determining sustainable yield is a complex
    3 scientific exercise that involves consideration of
    4 variables such as rainfall, recharge rates, geology and
    5 impacts. Impacts not only on existing wells, but on
    6 peaker systems and on stream flows.
    7 The point here is that for most aquifers in

    8 Illinois, we do not have a very highly accurate estimate
    9 of sustainable yield. We need much better scientific
    10 data and modeling capabilities to be able to estimate
    11 sustainable yields.
    12 Another important point is that aquifers
    13 themselves are not very sensitive to the end uses of
    14 water. That is an aquifer doesn't really differentiate
    15 whether a million gallons of water is going to be used
    16 for drinking water or for peaking power plants or for
    17 golf courses but the public often does differentiate
    18 among those end uses and, I think, trying to incorporate
    19 the public values and preferences into the equation on
    20 water resource management is an important consideration
    21 as well as the actual amount of water used.
    22 Water quality has been mentioned by people from
    23 Environmental Protection Agency giving previous
    24 testimony. There are natural occurrences of various
    L.A. REPORTING (312) 419-9292
    157
    1 chemicals in the groundwaters throughout Illinois.
    2 These lead to mineral concentrations that can effect not
    3 only the operation of the peaker plants, but also the
    4 discharges from the peaker plants. So the water quality
    5 also needs to be considered.
    6 In conclusion, I would like to make two points,

    7 one focusing exclusively on groundwater, the other
    8 combining groundwater with surface water.
    9 Focusing on groundwater, it's important to
    10 recognize that in the use of groundwater resources, all
    11 uses of groundwater, not just peakers, that we need to
    12 consider the scale of the natural resource, that is the
    13 aquifer.
    14 Groundwater typically is found in discrete
    15 aquifers that transcends political jurisdictions. They
    16 cut across municipalities, counties and even states.
    17 Plumbing management by individual communities will not
    18 solve problems in the long term, we need to take an
    19 aquifer-wide perspective. Beyond just groundwater, I
    20 think that we need much more consideration of the
    21 conjunctive use of surface and groundwater. There can
    22 be many efficiencies gained in water supplying usages by
    23 considering conjunctive uses of surface and groundwater.
    24 So my bottom line is that I think Illinois would
    L.A. REPORTING (312) 419-9292
    158
    1 benefit from moving towards much more comprehensive
    2 regional water resource planning and management. This
    3 will bring together communities and cut across
    4 jurisdictions and we'd -- much more appropriate to the
    5 scale of the natural resources, that is the aquifers in
    6 the case of the groundwater supplies and river basins

    7 and water sheds for surface waters.
    8 With that I conclude my testimony and will be
    9 pleased to take any questions.
    10 HEARING OFFICER JACKSON: Thank you, Dr.
    11 Winstanley.
    12 Do the Board member have any questions for the
    13 Department of Natural Resources?
    14 MS. KEZELIS: Doctor, I do. With respect to
    15 your testimony that comprehensive groundwater quantity
    16 law in Illinois is needed, and you don't need to answer
    17 this now, but I would like to see some factors that you
    18 would propose such a law include or some other state
    19 that you would propose that such a law would be modeled
    20 after.
    21 DR. WINSTANLEY: Could I clarify what I think I
    22 said, may be the difference between your question and
    23 what I was recommending?
    24 I was recommending comprehensive regional water
    L.A. REPORTING (312) 419-9292
    159
    1 resource planning and management, not necessarily new
    2 laws. It may require new laws.
    3 Let me give you one example I think is an
    4 excellent model of what is going on in one part of
    5 Illinois and that is in central Illinois. We have a

    6 major aquifer, the Muhammed aquifer, that extends from
    7 the Illinois River across to Indiana, which embraces 15
    8 counties. Now, in the past couple of years, the local
    9 communities in that 15 county area have bonded together
    10 to form what is called the Muhammed aquifer consortium
    11 and they're collectively concerned about the future of
    12 their own water resources, want to better characterize
    13 those resources and opportunities as a basis for
    14 self-management to the water resources.
    15 So, I think, on the one hand we may need new
    16 laws, regulations, but I think we also need to encourage
    17 local communities to attempt to solve their own
    18 problems.
    19 MR. ANDERSON: I might also -- in my testimony,
    20 I referenced the 1966 assessment of Illinois water law.
    21 HEARING OFFICER JACKSON: Use the microphone
    22 phone, please.
    23 MR. ANDERSON: I'm sorry.
    24 In my testimony, I referenced the 1966
    L.A. REPORTING (312) 419-9292
    160
    1 assessment of Illinois water law. It provides a very
    2 good and detailed assessment of existing statutes in
    3 Illinois, does some comparisons with other states in
    4 terms of regulating water withdrawals and looking at
    5 water quantity and it does reference several model

    6 codes.
    7 HEARING OFFICER JACKSON: Anything else?
    8 MR. RAO: I have a question for Dr. Winstanley.
    9 In your testimony you focused a whole lot on the use
    10 of --
    11 HEARING OFFICER JACKSON: Anad, use --
    12 MR. RAO: Oh, I'm sorry.
    13 In your testimony, you focused a lot on the use
    14 of surface water and groundwater for the peaker plants.
    15 Have you considered use of other sources -- other
    16 sources like reclaimed exposed lake water, you know, to
    17 be used in peaker plants or any such, you know, power
    18 plants?
    19 DR. WINSTANLEY: I think we should look at all
    20 alternative sources of water. I focused on groundwater
    21 because that was my requirement in presenting testimony
    22 here today. But we equally need to look at alternative
    23 sources from rivers and streams, lakes, reservoirs, Lake
    24 Michigan and conservation and water reuse. That is why
    L.A. REPORTING (312) 419-9292
    161
    1 I'm advocating a comprehensive regional approach that
    2 would incorporate all of those considerations.
    3 MR. RAO: So the water resources that try to
    4 be -- focus on other sources of water --

    5 DR. WINSTANLEY: I cannot speak for the
    6 committee. It is not made yet and I have had no input
    7 into the agenda.
    8 MR. RAO: Thank you.
    9 HEARING OFFICER JACKSON: Anyone else?
    10 Okay. Thank you. Mr. Winstanley, if you would
    11 also provide a copy of your testimony to the court
    12 reporter so she can mark that as an exhibit.
    13 DR. WINSTANLEY: I'd be happy to record my
    14 written testimony in the record.
    15 HEARING OFFICER JACKSON: Yes. Thank you very
    16 much.
    17 At this point we'd be happy to invite the IEPA
    18 to come forward again.
    19 Express on the record my sincere appreciation
    20 for the Agency's patience in dealing with these
    21 scheduling problems.
    22 We do have some questions that the Board members
    23 and the technical unit would like to ask on the record.
    24 However, as Chairman Manning indicated earlier, a
    L.A. REPORTING (312) 419-9292
    162
    1 majority of our questions will be submitted in written
    2 form to the Illinois Environmental Protection Agency and
    3 we would also ask them to respond in written form to the
    4 Board then so that will become part of the record as

    5 well.
    6 CHAIRMAN MANNING: I have a question. I'll go
    7 ahead and start.
    8 Director Skinner, as one of the co-chairs of the
    9 Water Resources Advisory Committee, I note pending their
    10 first meeting on August 31st, is it your understanding
    11 that the subject of those committee meetings is going to
    12 be the whole idea of the use of water and those kinds of
    13 things in terms of what the committee will be doing?
    14 MR. SKINNER: Yes. The answer to that in short
    15 is yes. It's kind of interesting. The -- the separate
    16 committee came about in part because of the peaker plant
    17 question in general. I mean, water consumptions, is one
    18 of the issues that is often raised as something we ought
    19 to be concerned about with regard to peaker plants.
    20 When we sat down to actually start to hash that
    21 out a little bit, it became clear in very short order
    22 that this wasn't strictly a peaker plant issue, that it
    23 really cuts across any number of types of facilities and
    24 then when you attempt to even to start to put numbers to
    L.A. REPORTING (312) 419-9292
    163
    1 limits to groundwater withdrawal, you start to impact
    2 operations across the boards; agricultural operations,
    3 utilities, manufacturing operations. So, it has many

    4 more components to it than strictly peaker plants.
    5 For that reason, I think the Governor decided to
    6 go ahead and appoint this separate panel to really
    7 consider those broader issues with -- in order not to
    8 distract the Board from considering the specific peaker
    9 plant issues. But, yes, groundwater consumption and
    10 water use in general is the main mission of that
    11 separate board.
    12 CHAIRMAN MANNING: I have a question, too, for
    13 the panel directly. On the issue of noise regulations
    14 and whether a particular facility that is going through
    15 the permitting process as the Environmental Protection
    16 Agency, does a facility have to make a demonstration at
    17 all that they will meet the way -- they're construction
    18 and design will meet any of the Board's noise
    19 regulations in order to get any of the air permits or is
    20 the noise process completely separate from the air
    21 permitting process? Can you sort of explain that
    22 connect?
    23 MR. SKINNER: Sure. I'm trying to decide where
    24 to start.
    L.A. REPORTING (312) 419-9292
    164
    1 You may have noticed from Greg's written
    2 testimony that very few states across the country have
    3 state noise programs.

    4 In fact, we're one of the exceptions to the rule
    5 to the extent that we have a noise expert that works
    6 with communities and that keeps Greg busy year round.
    7 Most noise regulation and enforcement is left to locals
    8 across the country.
    9 We do have -- there are noise standards in
    10 Illinois. We do not, as a state -- and we don't, as an
    11 agency, have a -- what I would consider to be a
    12 substantial noise enforcement program because of
    13 resource limitations.
    14 The way that we chose to approach it is to make
    15 Greg, our expert, available to local communities to the
    16 extent that they have noise problems that arise. Greg
    17 works with them to try and kind of walk through the
    18 issues and in some cases ends up testifying in court, if
    19 the cases end up going to court.
    20 With regard to peaker plants specifically, we
    21 don't do noise permitting. So, while companies may
    22 submit documentation and, again, Greg, you can stop me
    23 if I'm wrong, submit documentation with regard to what
    24 their noise output is going to be, It's not something
    L.A. REPORTING (312) 419-9292
    165
    1 that we review in the course of issuing our air permit.
    2 MR. ZAK: That's correct.

    3 CHAIRMAN MANNING: That's correct. Is that
    4 correct?
    5 MR. SKINNER: Yes. That's correct.
    6 MR. FLEMAL: Just as a follow-up. Mr. Zak, have
    7 you actually looked at any of the applications that are
    8 before the Agency to see whether or not the kind of
    9 noise abatement devices you've mentioned are employed in
    10 these?
    11 MR. ZAK: No, I have not.
    12 MR. FLEMAL: Is it your understanding generally
    13 that it is a standard practice to include abatement
    14 procedures --
    15 MR. ZAK: As far as --
    16 MR. FLEMAL: -- in designs?
    17 MR. ZAK: Well, as far as noise is concerned, I
    18 think that it's only rarely submitted with the -- with
    19 the -- through the permit process. I think Chris
    20 Romaine addressed that more -- in more detail as far as
    21 what actually comes in on a permit, but --
    22 MR. FLEMAL: I guess I am not really so
    23 concerned whether it is in the permit application or
    24 not. I am concerned whether or not noise abatement is a
    L.A. REPORTING (312) 419-9292
    166
    1 standard part of the design of peaker plants, whether or
    2 not it is mentioned in the permit.

    3 MR. ZAK: Yes. The -- all the peaker plants
    4 I've seen to date have noise control built in to varying
    5 degrees, but they are not uniform in the way they would
    6 handle the noise question. Some have more noise control
    7 built in and some less.
    8 To date, we have had many that you might say are
    9 on the noisier side that have been located in a
    10 residential area. Fortunately, those have been placed
    11 in rural areas where they don't create a problem, that
    12 there is enough buffer there to prevent there from being
    13 a problem.
    14 CHAIRMAN MANNING: Mr. Zak, can you explain in
    15 laymen's terms or scientific terms, whichever works best
    16 for you, what kind of noise we're talking about as far
    17 as levels as well as types?
    18 You had mentioned a rumbling noise and also you
    19 did put it in percentages as far as the reductions that
    20 can be achieved, but I wonder how noisy are they, in
    21 general?
    22 MR. ZAK: The -- the noise emissions associated
    23 with your peaker tend to be in the broadband area a low
    24 frequency noise, more of a rumbling type noise. That's
    L.A. REPORTING (312) 419-9292
    167
    1 one noise characteristic of the peaker.

    2 The other characteristics that can be there are
    3 tones. Although they're not exactly the same, I would
    4 kind of draw an analogy to the jet engine, you hear on
    5 an aircraft. You'll notice that on your jet engine you
    6 hear a rumbling sound that can be heard for really
    7 several miles away from a large aircraft that is under
    8 full power. You'll also tend to hear a bit of a whining
    9 sound. That would be the tone.
    10 So the areas you've got that generate noise
    11 would be of a rumble sound, of a whining sound, and all
    12 these different types of -- these two types of sounds
    13 can be controlled in the design stage of the peaker. As
    14 a matter of fact, I think that a large portion of the
    15 cost of the entire system is -- consists of noise
    16 control.
    17 MR. MELAS: Staying on that same area of the
    18 noise, Mr. Romaine, does the Agency have a policy as you
    19 have it right now to require in the permit application
    20 that they indicate whatever noise controls they are
    21 planning before a peaker plant permit is granted?
    22 MR. ROMAINE: I can't speak to our authority.
    23 As a practical matter, following the Reglet decision,
    24 our air permit section, as a matter of policy, or as a
    L.A. REPORTING (312) 419-9292
    168
    1 matter of law, does not go out beyond issue of air

    2 pollution control issues. We have certainly allowed
    3 people to include information on noise with their
    4 applications as an attachment, but it is not something
    5 that we review as part of our decision on the air
    6 pollution control application.
    7 MS. KEZELIS: Mr. Zak, can you explain for us in
    8 a bit more detail what active noise cancellation is?
    9 MR. ZAK: Yes. Active noise cancellation is a
    10 relatively new technology and what it consists of is a
    11 computerised system that -- I'll put this in very much
    12 laymen's terms, and -- the system itself will listen to
    13 the sound and analyze what the sound is like and it will
    14 then, through a speaker, generate the same sound, but
    15 what it does to it is it reverses it by 180 degrees.
    16 When they -- this new -- the sound creates combined with
    17 the existing noise, they cancel each other out. In
    18 other words, you've got -- let's say the wave goes
    19 positive by a factor of one, it will generate a wave
    20 that is negative by a factor of one and that will then
    21 cancel out the sounds.
    22 The technology has been used by the Department
    23 of Defense in a number of engine applications where cost
    24 was of no consequence. They simply wanted to quiet
    L.A. REPORTING (312) 419-9292
    169

    1 something down and they didn't -- they wanted to do it
    2 in a -- without putting in a -- very, very large
    3 muffler. So, the big advantage factor of noise
    4 cancellation is that it allows you to, with a relatively
    5 small device, to cancel quite a bit of noise, but,
    6 again, the cost factor has to be considered. It's much
    7 more expensive than the conventional one.
    8 MS. KEZELIS: Is there a difference in the noise
    9 emitted by coal-fired peakers as opposed to the gas --
    10 natural gas peakers that we're talking about today?
    11 MR. ZAK: Well, if I can expand upon that a
    12 little bit. I think perhaps what you mean, in
    13 coal-fired powered plants, you wouldn't normally have
    14 the peaker associated with that just because -- it's my
    15 understanding the fuel isn't quite right, solid fuel as
    16 opposed to say liquid or gas fuel. The -- but
    17 historically with the coal-fired plants, we have had
    18 some noise problems. Specifically, the induced
    19 raffans(phonetic) used in some of the plants have
    20 created tonal noise problems, specifically under Section
    21 901.106.
    22 Again, what we were talking about there is
    23 usually -- I would describe it as something like the
    24 sound you have for your home vacuum cleaner. The vacuum
    L.A. REPORTING (312) 419-9292
    170

    1 cleaner sound is an example of a medium to low frequency
    2 pure tone. And we've had those type of sounds come from
    3 coal-fired plants. And they have been corrected with
    4 the use of silencers.
    5 And in the peaker, again, we have the potential
    6 for that to happen. So far, we've had no complaints on
    7 peakers. However, with the new influx of permit
    8 applications and peakers coming on-line, we're keeping
    9 an eye on that to see if we do have a -- have a problem.
    10 And I tend to think that the -- the proper way to
    11 address that in my testimony was to examine the -- the
    12 plans for the installation before it's actually built,
    13 again, to the benefit of the peaker company whether --
    14 whoever does the actual work, say it's a private
    15 consultant, a local zoning authority, whoever, needs to
    16 look at that to determine if there is going to be a
    17 problem or not before the plant actually comes on-line.
    18 MR. GIRARD: I have a question, Mr. Zak. Do you
    19 know of any local governments in the state that have
    20 more stringent noise standards than the state standards?
    21 MR. ZAK: No, I do not.
    22 MR. GIRARD: Do you know of any reason why a
    23 local government could not pass a more stringent
    24 standard in relation to peaker plants?
    L.A. REPORTING (312) 419-9292

    171
    1 MR. ZAK: They could. The -- I think the
    2 reluctance on some of the local governments, though, is
    3 the cost of the personnel and the instrumentation in
    4 order to enforce that type of noise regulation. It
    5 is -- the instrumentation is expensive and typically the
    6 salaries are also expensive for the folks that can take
    7 those kind of measurements and enforce those kinds of
    8 regulations.
    9 MR. GIRARD: Thank you.
    10 CHAIRMAN MANNING: Some one of the Agency
    11 witnesses, I think it was Mr. Romaine, testified that
    12 peaker plants have been around for a long time. They're
    13 just really increasing in numbers at this point in time.
    14 Mr. Fisher asked actually as well and the
    15 Commerce Commission gave an example of one we've have
    16 had in Springfield that I was honestly unaware of.
    17 I guess my question is are the peaker plants
    18 that are being proposed now in up state -- in the
    19 Northern part of Illinois, are they larger in terms of
    20 days of output or days of usage and those types of
    21 things compared to those that might have historically
    22 been built over the course of the years in downstate
    23 Illinois?
    24 MR. ROMAINE: I'm not in a position to answer
    L.A. REPORTING (312) 419-9292

    172
    1 that question. The existing power -- peaker power
    2 plants have been grandfathered sources. They have not
    3 gone through the construction permitting process so they
    4 have not been subject to limitations on their operating
    5 hours.
    6 Many of them are, in fact, permitted -- could
    7 operate around the clock, if they wanted to. So they've
    8 been constrained really by the demand for their
    9 services. To the same extent that the proposed plants
    10 are constrained by the demand for their services, they
    11 may operate in similar period of time. And I've heard
    12 statements that say the new power plants because they're
    13 larger, more efficient, may, in fact, be operated
    14 preferentially to the existing peaker power plants. So
    15 because of that they may, in fact, operate more hours
    16 than the peaker plants would operate. In fact, some
    17 developers have suggested they will replace the existing
    18 peaker power plant.
    19 So I think it would be speculation on the
    20 Agency's part to comment on what is going to happen in
    21 terms of actual operations comparing the new peaker
    22 power plants to existing peaker power plants. All we
    23 can tell is what they have requested and what they're
    24 being permitted for.
    L.A. REPORTING (312) 419-9292

    173
    1 MR. SKINNER: That's from a more technical
    2 perspective. I think from the more day-to-day common
    3 sense perspective what we're is seeing different now
    4 compared to the peaker plants that exist currently is
    5 that they're being proposed for different areas, in
    6 closer proximity to where people live.
    7 I mean, to the extent that the older facilities
    8 are located adjacent to or near by the existing baseload
    9 power plants, intuitively, I believe that it is not
    10 going to be as big an issue as if you take a facility
    11 and propose it for someplace where its surrounded by
    12 residential homes or at least, you know, within a half a
    13 mile. That's more what we're seeing. We're seeing it
    14 more in northeastern Illinois than we have in the past.
    15 CHAIRMAN MANNING: Right. I understand the
    16 density issue. I was more concerned about whether we
    17 knew anything about whether they were larger or more
    18 noisy or more output than some of the ones that are
    19 proposed.
    20 MR. SKINNER: You know, again, just from my
    21 perspective, I doubt very much whether there are any --
    22 I think they're probably cleaner. The technology has
    23 come much further than when these old facilities were
    24 first proposed. So from an emission standpoint, you're
    L.A. REPORTING (312) 419-9292

    174
    1 getting more state-of-the-art engines at this point than
    2 you did previously. State-of-the-art has advanced.
    3 MS. KEZELIS: Director Skinner, you testified
    4 that you would be -- that your agency would be
    5 inspecting these peakers annually as opposed to
    6 tri-annually as would have been the case but for their
    7 number. Do you -- you do not inspect peakers today or
    8 do you?
    9 MR. SKINNER: No.
    10 MS. KEZELIS: The old ones we're talking about,
    11 you inspect those every three years?
    12 MR. SKINNER: Yeah. No, we -- right.
    13 MS. KEZELIS: Can you describe for us generally
    14 the type of inspection that is undertaken?
    15 MR. SKINNER: Sure. And I think I'll let Chris
    16 do that, but before I do, when we say we generally
    17 inspect every three years, it is a general statement. I
    18 mean, there are facilities that we inspect with much
    19 more frequently than every three years. We're kind of
    20 averaging it out and we're taking a stab at a number.
    21 If we believe that there is a problem, we get complaints
    22 from the public, from local governments, if they think
    23 something is wrong, we're out there right away. And
    24 I'll let Chris talk about -- walk you through what an
    L.A. REPORTING (312) 419-9292

    175
    1 inspection or -- forgot what an inspection really looks
    2 like.
    3 MR. ROMAINE: Well, I want to stress what
    4 Director Skinner said, that certainly the frequency of
    5 inspection does depend on the performance of a facility
    6 and if a facility triggers complaints or previous
    7 inspections have indicated problems, we will inspect
    8 them more frequently.
    9 I -- inspecting a peaker plant may, in fact, be
    10 a difficult activity given the nature of their
    11 operations. By that, I mean it may be difficult to
    12 actually get to a peaker plant when it is operating. So
    13 that would require specific effort on our part to try to
    14 track down a hot summer day when they're operating and
    15 have an inspector present.
    16 So, I think in a lot of cases, what the
    17 investigators will really be looking at is operating
    18 records for the facility, the logbooks, the records for
    19 a facility, fuel usage and that sort of information to
    20 make sure that we are getting accurate information from
    21 a report that we are receiving from a facility.
    22 If there were complaints, then there would be
    23 specific effort made to get to the facility while it was
    24 in operation, working it out with a company and having
    L.A. REPORTING (312) 419-9292

    176
    1 them notify us when they expect to be operating or,
    2 alternatively, to make arrangements to visit the
    3 facility when they're doing some of their test
    4 operation. Facilities of this type, in addition to
    5 actually working to supply power, they certainly have to
    6 operate for some small period of time to make sure they
    7 are available to operate. You don't want to have an
    8 emergency engine, which these really are, that has not
    9 been exercised. So that would be another option to
    10 coordinate an on-site inspection during the exercising
    11 of the engine.
    12 MS. KEZELIS: Several of the Agency witnesses
    13 had suggested that their department or bureaus resources
    14 are being taxed by peakers.
    15 Are your resources sufficient to handle the
    16 additional load of inspections?
    17 MR. SKINNER: I don't know whether you noticed,
    18 but I specifically, in my comments, did not talk about
    19 how our resources are being taxed.
    20 MS. KEZELIS: I noticed that.
    21 MR. SKINNER: Because it -- generally, it tends
    22 to be counterproductive. It is our job to insure that
    23 there is a safe environment and that the state's
    24 citizens are being protected and nobody out there wants

    L.A. REPORTING (312) 419-9292
    177
    1 to hear that, you know, we can only get to a facility
    2 every three years because we don't have enough money no
    3 do that.
    4 The answer to your question is we're still doing
    5 what we need to be doing. It means that our people are
    6 working harder to do it than they -- than they might
    7 otherwise be and I know we all, as a state, appreciate
    8 their efforts in doing that. We would love to have more
    9 resources. I haven't run across a state government
    10 entity yet that would say it wouldn't love to have more
    11 resources.
    12 You know, the Illinois' program is an example of
    13 something where -- an area where if we had any kind of
    14 funding to run those programs, the program would look
    15 different than it does today, but I know it is not
    16 within your authority to grant us those extra dollars.
    17 So, you know, we do what we can with the resources that
    18 we have. We think we have an effective noise program.
    19 If the general assembly wants us to be expanded in some
    20 way and more active with regard to peaker plants, for
    21 example, then we'll have to have that discussion with
    22 them.
    23 MS. KEZELIS: Thank you.
    24 MR. FLEMAL: Mr. Romaine, you observed that some

    L.A. REPORTING (312) 419-9292
    178
    1 gas turbines may be fueled by fuels other than natural
    2 gases.
    3 Are any of the peaker turbines that have come to
    4 you in applications been non-natural gas proposals?
    5 MR. ROMAINE: All the applications have proposed
    6 use of natural gas as their primary fuel, but some
    7 applications have also included provisions to have fuel
    8 oil as a backup fuel.
    9 MR. FLEMAL: I gather from statements that were
    10 made earlier today that natural gas prices have been
    11 quite mobile recently and would lead to the possibility
    12 that some of these plants originally intended for
    13 natural gas may ultimately use a different fuel should
    14 the market allow that or promote it?
    15 MR. ROMAINE: That certainly could occur. My
    16 understanding is the plants that are going in with fuel
    17 oil capacity are really looking at being able to supply
    18 the winter peaking market. And certainly during winter
    19 period of time, there can be both much higher natural
    20 gas prices as well as possible shortage of natural gases
    21 used at peaker plants. So I think that's their
    22 principle reason for going to fuel oil, but I have to
    23 agree that certainly gives the peaker plants more
    24 flexibility to operate with oil, when oil becomes less

    L.A. REPORTING (312) 419-9292
    179
    1 expensive than natural gas at some point during the
    2 summer.
    3 MR. FLEMAL: So far, we've heard that all of the
    4 peak demand, though, is summer. Is there, in fact, a
    5 peak demand that occurs on occasions in winter?
    6 MR. ROMAINE: I think I'd have to let the
    7 sources answer that question tomorrow.
    8 The point that has been made to us is that
    9 peaker plants do serve emergency supplies of fuel. So
    10 if there is an unexpected outage of a power plant during
    11 the winter period of time, there is an event to be able
    12 to turn on the peaker plant. So that would be a time
    13 where we might call upon a peaker plant some other
    14 period of the year than summer.
    15 MR. FLEMAL: Assuming we had a non-natural gas
    16 peaker plant operating during the summer season for
    17 whatever reason, I mean, or other, would we expect any
    18 difference in the character of the emissions, any of the
    19 environmental problems or conditions associated with
    20 peakers that have been addressed today?
    21 MR. ROMAINE: The emissions would certainly be
    22 higher because --
    23 MR. FLEMAL: In all of the pollutants that have
    24 been mentioned? Probably?

    L.A. REPORTING (312) 419-9292
    180
    1 MR. ROMAINE: In general, yes. Certainly it's
    2 more difficult to control nitron ox as compared to oil
    3 than it is burning natural gas. Oil has more ash than
    4 natural gas. Oil has some fats as our sulfur engine
    5 creates sulfur dioxide. It's a more difficult fuel to
    6 burn than natural gas, higher emissions. When
    7 facilities do have the ability to burn oil, our modeling
    8 evaluation do address them as if they were burning that
    9 type of fuel, the impacts may be higher but, again, they
    10 do not pose a threat to the ambient air quality
    11 standards.
    12 MR. FLEMAL: Fair, but it's still small? Is
    13 that a fair characterization?
    14 MR. ROMAINE: Yes, it is.
    15 CHAIRMAN MANNING: When the Agency analyzes an
    16 air permit for a peaker plant, what consideration or
    17 what information do you have regarding the expected
    18 hours of operation and how does that fit into either the
    19 modeling analysis or the permit analysis?
    20 MR. ROMAINE: The information that we have on
    21 expected hours of operation is the information given to
    22 us by the applicant. So the applicant is basically
    23 telling us we'd like to have a permit that allows us to

    24 operate for these many hours or we'd like to be able to
    L.A. REPORTING (312) 419-9292
    181
    1 burn this much fuel per year. That information on
    2 operating hours doesn't enter into short term modeling.
    3 The short term modeling assumes that the
    4 facility is operating during that particular hour or
    5 eight hours a day. Where the operating hours may factor
    6 in the modeling is when you're looking at annual air
    7 quality standards. So for purposes of annual air
    8 quality modeling -- standard modeling, you can factor in
    9 the annual emission rates and you -- one approach to
    10 that is simply assuming that the facility operates at an
    11 average annual emission rate.
    12 CHAIRMAN MANNING: Is that the approach that
    13 agency generally uses when it deals with that question?
    14 MR. ROMAINE: Some facilities have simply
    15 assumed that the facility is operating day in, day out,
    16 at the short term emission rates. Others have, in fact,
    17 used the average emission rates. So both approaches
    18 have been used.
    19 MR. GIRARD: I have a follow-up question in
    20 terms of that.
    21 In terms of the annual air modeling, do you look
    22 at the cumulative effect of potentially all 46 peaker
    23 plants operating at the same time or do you do it

    24 individually, you know, permit application by permit
    L.A. REPORTING (312) 419-9292
    182
    1 application?
    2 MR. KALEEL: I guess in terms of the annual
    3 modeling or even short term modeling that I was
    4 describing in my testimony, we would actually look at a
    5 couple of different levels of analysis. For PSD type
    6 projects, where we're only looking at impacts of new
    7 sources then the applicant would model their source in
    8 addition to any other new sources including in new
    9 peakers address the increments. If we're looking at the
    10 ambient air quality standards, where it is more of a
    11 cumulative impact of all sources, we would include the
    12 emissions of the new source and I guess to reiterate one
    13 that Chris made, we would do that at maximum operating
    14 rates with the worst case fuels. And in conjunction to
    15 that, we would add any nearby sources, including nearby
    16 peakers, and add on top of that a background
    17 concentration that would represent impacts from very
    18 distant sources or low level sources, various sources,
    19 other types of sources that are too numerous or too
    20 small to include in modeling. So it is a cumulative
    21 effect. We try to look at the effects of all emission
    22 sources both close by and I guess through the background

    23 sources that are more distant.
    24 MR. GIRARD: But I guess are you looking at all
    L.A. REPORTING (312) 419-9292
    183
    1 of the past that can potentially be cited or is it just
    2 the ones that have been -- are operating up to that
    3 point in time while you're reviewing a particular
    4 application for a peaker in one area?
    5 MR. KALEEL: We would provide the inventories
    6 for all of the plants that would be expected to impact
    7 the impact area of the peakers we're aware of through
    8 prior permit application, even if it hasn't been
    9 permitted yet, we would include that information to the
    10 modeling organization, consultant or who ever to include
    11 in their modeling. So it is -- as we find out about it,
    12 we are continually updating the inventory we provide to
    13 the consultants so all of them are included in and at
    14 least those that we know of at the time that were first
    15 approached by a company.
    16 MR. GIRARD: Thank you.
    17 MR. RAO: May I follow up?
    18 SPEAKER: Go ahead, Anad, and then I have a
    19 follow up.
    20 MR. RAO: Thank you.
    21 Mr. Kaleel, in the -- this portion of modeling
    22 that you do to evaluate for PSD increment, in that case,

    23 do you just consider only the proposed -- emissions from
    24 the proposed plant only?
    L.A. REPORTING (312) 419-9292
    184
    1 MR. KALEEL: We would typically include from the
    2 proposed plant and any other proposed plants and any
    3 other sources that have been permitted that trigger PSD
    4 and that --
    5 MR. RAO: But when you have modeling -- when you
    6 are modeling the impact on the local area?
    7 MR. KALEEL: Yes. When we're -- we're trying to
    8 evaluate whether or not increments, PSD increments have
    9 been consumed or that the increment thresholds have been
    10 exceeded, we're required through the PSD program to
    11 address all PSD sources, that is, all source, that have
    12 been permitted since the baseline date has been
    13 triggered. Baseline dates vary from area to area and
    14 pollutant to pollutant, but we include all sources of
    15 increment. We provide that to the consultants when they
    16 do their modeling.
    17 MR. RAO: So any impact of clustering of these
    18 peaker plants in a particular area is considered in your
    19 evaluation?
    20 MR. KALEEL: Yes.
    21 MR. RAO: Thank you.

    22 MS. KEZELIS: Mr. Kaleel, the figures that you
    23 discussed with us, Figures 1 through 4, the significant
    24 area -- impact areas for NOx, carbon monoxide and so on,
    L.A. REPORTING (312) 419-9292
    185
    1 was the modeling performed by the peaker plant or was
    2 this performed by the Agency?
    3 MR. KALEEL: The modeling is performed by the
    4 applicants and we wouldn't serve in advance of this
    5 little -- or modeling to provide guidance as to what it
    6 is we're looking for, what kind of models, what kind of
    7 procedures they should use, what kind of inventories
    8 they should apply to the modeling.
    9 Once they've submitted the application, we do a
    10 thorough review to make sure that they follow what we
    11 told them to do and we would also perform an audit where
    12 we would -- without letting them know exactly which one
    13 we're going to do, we try to redo one of their runs and
    14 make sure that we agree with the results that they have.
    15 MS. KEZELIS: So for clarification, Figures 1
    16 through 4 were peaker applicant prepared or Agency
    17 prepared?
    18 MR. KALEEL: Actually, my staff had prepared
    19 those maps, but we used model results provided by an
    20 applicant.
    21 MS. KEZELIS: By the applicant. Okay.

    22 The significant impact areas for NOx, for
    23 example, that is reflected in Figure 1, is that at the
    24 emission point of the smoke stack or is that at ground
    L.A. REPORTING (312) 419-9292
    186
    1 level? Where is that?
    2 MR. KALEEL: The ambient concentrations that are
    3 depicted in all of those figures represent ground level
    4 impacts. The modeling, of course, takes into account
    5 the height of release of each emission point. So if a
    6 source has a 100-foot stack or a 30-meter stack, that is
    7 the common form of modeling.
    8 MS. KEZELIS: And modeling also takes into
    9 account if, for example, the largest applicant at this
    10 time is -- is it 16 turbines, is that correct? I think
    11 that is what somebody testified to. So there is 16
    12 smoke stacks. So it would be the cumulative of that or
    13 16 operating simultaneously, if that were the source of
    14 this particular modelling?
    15 MR. KALEEL: I guess I would refer to Chris. My
    16 -- guess I my understanding is that it would typically
    17 involve their emissions to fuel stacks. But there could
    18 be -- depending how many were operating, there could be
    19 multiple units vented to one or more stacks. If there
    20 are multiple stacks, we would model the stacks, but --

    21 MS. KEZELIS: For clarification, is there -- is
    22 there more than one turbine per stack?
    23 MR. ROMAINE: The usual configuration is one
    24 stack per turbine. The particular application with the
    L.A. REPORTING (312) 419-9292
    187
    1 16 units, though, is not a usual application. It is, in
    2 fact, proposed to combine turbines to go to a control
    3 device that go through -- I don't know, a limited -- a
    4 fewer number of stacks.
    5 This is one of the peaker applications that
    6 would, in fact, be large enough to be subject to PSD.
    7 When we started our BACT evaluation, the conclusion was
    8 that they had not proposed that with technology. It
    9 appears as those turbines may, in fact, be amenable to
    10 their size on one hand and high emission rates that has
    11 been proposed on the other to use of that on control.
    12 Sources then proposed to put an add on control once
    13 flexibility is either installed, simple cycle turbine or
    14 combined cycle turbine, it hasn't made up its mind yet.
    15 It's a very curious application that we're doing.
    16 CHAIRMAN MANNING: Could you explain what type
    17 of information you expect to get within the BACT
    18 demonstration?
    19 I mean, just typically, just for purposes of the
    20 record, could you sort of go through what a typical BACT

    21 demonstration might entail, what kind of information the
    22 applicant is going to have to provide?
    23 MR. ROMAINE: Well, one piece of information for
    24 the record is that we do require people to follow the
    L.A. REPORTING (312) 419-9292
    188
    1 United States Environmental Protection Agency's
    2 guidelines for PSD applications. That includes going
    3 through the so-called top-down BACT methodology that
    4 U.S. Environmental Protection Agency has developed.
    5 The first step in that evaluation is to go
    6 through an evaluation of the types of control techniques
    7 that could theoretically apply to a particular unit.
    8 This is sort of an across-the-board technology
    9 evaluation.
    10 The next step is to determine whether some of
    11 those techniques are, in fact, technologically
    12 infeasible. If they are, then they don't have to be
    13 pursued.
    14 The next step then is to evaluate the
    15 effectiveness of the techniques that are feasible. And
    16 If the applicant is proceeding with the most effective
    17 technique, then the application doesn't to be pursued or
    18 the demonstration doesn't have to be pursued. That's
    19 the end of it.

    20 If on the other hand, the applicant is proposing
    21 something less effective than the most effective
    22 technique, then they have to go through and do a cost
    23 evaluation or design study to decide how costly that
    24 technique would be, how effective it would be, if, in
    L.A. REPORTING (312) 419-9292
    189
    1 fact, it were applied to the facility. They also have
    2 to go through an evaluation or a search of the US
    3 Environmental Protection Agency's records of other
    4 states, back through their clearing house, to determine
    5 what has been complied at other facilities that are
    6 subject to BACT requirements.
    7 Based on that information, we have to make a
    8 judgment as whether something less than the technology
    9 that has been applied somewhere else would be acceptable
    10 as BACT or not. Obviously, if we have gone to the top,
    11 that is fine, we wouldn't pursue it, but given the fact
    12 that there are what I would call special projects in
    13 places like California where they have applied SCR to
    14 simple cycle turbines, we have to go through the full
    15 evaluation to evaluate whether or not, in fact, as
    16 applied to the proposal in Illinois, whether that would
    17 be appropriate or not.
    18 So far, those detailed evaluations of SCR,
    19 controlled technology that could applied to the turbine,

    20 have been concluded that is not appropriate to apply
    21 them on projects in Illinois. And part of the reason
    22 for that, again, is going back to the list, what
    23 determinations have been made for projects and in
    24 examining them, you find out that places like Texas, the
    L.A. REPORTING (312) 419-9292
    190
    1 Midwest and other areas outside of California, control
    2 devices are not routinely being used for simple cycle
    3 turbines. In that circumstance, we don't think it is
    4 appropriate to use what might be done in California
    5 given their circumstances as an appropriate level of
    6 control with Illinois.
    7 MS. KEZELIS: Mr. Kaleel, Exhibits 13 through
    8 17, which address ozone concentrations, can you
    9 generally describe for me the metrological conditions
    10 that existed during this July 16th through 20th, 1991,
    11 period? Only for purpose of my own understanding
    12 whether that was anomalistic set of meteorological
    13 conditions creating a high ozone level in the Illinois
    14 region or whether it was typical of summer months in the
    15 Midwest?
    16 MR. KALEEL: Sure. I'd be happy to.
    17 What the various annals on each of those blocks
    18 represent are peak ozone concentrations predicted by the

    19 model for individual days. Obviously, for a multi-day
    20 period or multi-day episode, meteorological conditions
    21 changed slightly, but we got a lot of familiarity
    22 through the years as to the types of meteorological
    23 conditions that cause high ozone in the Lake Michigan
    24 area.
    L.A. REPORTING (312) 419-9292
    191
    1 Typically, we're looking at the kinds of
    2 conditions that will occur in the mid summertime period,
    3 kind of on the back slide of a high pressure system,
    4 basically high pressure systems centered over Ohio or
    5 some point east of Chicago, under those kinds of
    6 conditions, where we're looking at light wind speeds,
    7 clear skies, hot, humid conditions. Typically, the wind
    8 directions vary a little bit through the duration of the
    9 episode as the high pressure system migrates to the
    10 east. Typically, early in the episode, perhaps on July
    11 16, July 17, winds would be in Chicago basically
    12 southeasterly or easterly. As the high pressure system
    13 migrates, winds turn and become more and more southerly.
    14 By the end of the episode, July 19th and 20th, we're
    15 looking at southerly and southwesterly winds in Chicago.
    16 The July '91 period was -- I don't know whether I want
    17 to characterize it as typical, but it was probably above
    18 average as far as ozone severity or ozone conduciveness.

    19 Certainly, it's not the most extreme measurement that
    20 we've seen over the last ten years, but certainly above
    21 average. It is a good episode for ozone planning.
    22 MS. KEZELIS: Thank you.
    23 MR. KALEEL: Again, I should mention when I say
    24 hot, we're looking at conditions above 90 degrees, those
    L.A. REPORTING (312) 419-9292
    192
    1 kinds of things.
    2 CHAIRMAN MANNING: Mr. Romaine, you discussed
    3 California. In your prepared testimony, you have a list
    4 of other states and controlled -- different kinds of
    5 issues that they've been dealing with the peaker plants
    6 in their states.
    7 Do you care to comment on any of the states that
    8 you have listed in your attachment to sort of compare
    9 them to the strategies Illinois -- you may suggest
    10 Illinois may or may not want to consider, what -- what
    11 they're doing and why those states are doing what
    12 they're doing?
    13 MR. ROMAINE: Simply stated, there are other
    14 states that do have BACT programs that apply at lower
    15 thresholds. Simply, as part of the history of the
    16 development of their state programs, they have decided
    17 that it's an appropriate practice in their state to have

    18 best available control technology at some lower
    19 threshold. For example, I believe Indiana has a
    20 threshold of 25 tons per year for new source. Beyond
    21 that, I guess the information speaks for itself.
    22 MR. SKINNER: Just to supplement that somewhat,
    23 it's difficult to define, as we sit here in Illinois
    24 today, the exact reasons that other states here adopted
    L.A. REPORTING (312) 419-9292
    193
    1 whatever measures they've adopted; some more strict,
    2 some less strict than Illinois has.
    3 There may be legislative policy reasons, things
    4 as simple as, you know, a state wanted to encourage the
    5 use of coal as opposed to the use of natural gas so they
    6 imposed stricter standards than otherwise might be the
    7 case in natural gas facilities. I say that only to
    8 caution you that it's almost impossible to define
    9 intention in what we do on a day-to-day basis.
    10 And it will probably be somewhat difficult
    11 without substantial research and one-on-one
    12 conversations for the Board to determine the same thing.
    13 That is not to say that the Board shouldn't look at what
    14 other states have done and determine whether or not
    15 something stricter is appropriate for Illinois.
    16 CHAIRMAN MANNING: I understand that. And I was
    17 just responding to one of the specific questions the

    18 Governor asked us to consider as to what other states
    19 are doing and to the extent to which the Agency wanted
    20 to offer any information, we'd welcome that and we thank
    21 you for the appendix that you've attached to the
    22 testimony.
    23 MR. ROMAINE: I guess just one point to follow
    24 up, those are states that have statewide BACT
    L.A. REPORTING (312) 419-9292
    194
    1 departments for all projects. These are not statewide
    2 BACT requirements. They're simply focusing on peakers.
    3 CHAIRMAN MANNING: Okay.
    4 MR. ROMAINE: And that ties in with the
    5 director's statement that these reflect historical
    6 development and policy in their states.
    7 MS. MCFAWN: You mentioned that New York takes
    8 about 18 months to get a permit. Well, actually get
    9 settled. How long does it take to get through the
    10 permit process -- the air permit process -- on average,
    11 if you can tell us?
    12 MR. SKINNER: Well, by law, it's 180 days. Now,
    13 there are instances where we get a permit out more
    14 quickly than that. There are instances where we go back
    15 and request further information and get an extension.
    16 And there are instances where the applicant will

    17 withdraw the application and it's happened quite a bit
    18 and in order to modify it as a result of some more
    19 recent developments.
    20 In terms of an average time that we process a
    21 permit, they vary so much from permit to permit because
    22 of the complexity or simplicity of the type of operation
    23 they're proposing, but, you know, it's somewhere in the
    24 neighborhood of 120 days probably, isn't it?
    L.A. REPORTING (312) 419-9292
    195
    1 MR. ROMAINE: Right.
    2 MR. SKINNER: Probably more.
    3 MR. ROMAINE: More.
    4 MR. SKINNER: Yes.
    5 MS. MCFAWN: That's what I would have expected.
    6 MR. ROMAINE: I think, in fact, if that's
    7 something you would like information on, we just provide
    8 it project by project in written form.
    9 MS. MCFAWN: If you wouldn't mind, it would just
    10 give us a good sense of, you know, are we expeditious?
    11 Are we frugal? Or, you know, how are we behaving?
    12 MR. SKINNER: Well, I think one of the things
    13 that we have made a decision to do internally is not to
    14 rush through with regard to peaker permit applications
    15 and to do a very careful analysis of each one that comes
    16 in and oftentimes, if not usually, that means that we're

    17 bumping up against the 180-day limit by the time we get
    18 the permit out.
    19 But given how rapidly changing this situation is
    20 right now, we just felt that was appropriate. If -- we
    21 often get requests from applicants to move more quickly
    22 and they give us all sorts of compelling reasons to do
    23 that.
    24 If it's a project where it is very simple and
    L.A. REPORTING (312) 419-9292
    196
    1 very clear, and we have seen ten of them before, maybe
    2 we can get it out for them in 180 days, but we're taking
    3 a fair amount of time to do this.
    4 MS. MCFAWN: Thank you.
    5 MR. SKINNER: I might just supplement that
    6 answer a little bit on an issue that is related, but not
    7 exactly the same, and that is there have been calls from
    8 various folks for the Agency and/or the Governor to
    9 impose a moratorium on issuance of peaker permits.
    10 We've looked at that issue extensively and concluded
    11 that we don't have the authority to do that.
    12 By operation of law, these permits issue after
    13 180 days. So, we've had it suggested to us, well, just
    14 don't act on it. That doesn't do any good. I mean, if
    15 we don't act on it, the permit is granted. That

    16 actually is counterproductive compared to what we want
    17 to do. So we're forced to proceed. Similarly, the
    18 Governor has concluded that he doesn't have the legal
    19 authority to impose a moratorium by executive order. It
    20 literally requires legislative action.
    21 HEARING OFFICER JACKSON: Do we have any other
    22 questions at this time for our Agency panel?
    23 MS. MCFAWN: Well, I had some more questions
    24 about the noise area, if we can return to that, Mr. Zak.
    L.A. REPORTING (312) 419-9292
    197
    1 MR. ZAK: Yes.
    2 MS. MCFAWN: I'm curious as to how these peaker
    3 plants fit into our existing noise regulation. You
    4 stated in your testimony that we don't have any gaps in
    5 our regulations. So are you saying there then that the
    6 existing noise regulations would apply to peaker plants
    7 could be used to enforce adequately noise control?
    8 MR. SKINNER: Before I pass the microphone to
    9 Mr. Zak and let him answer that question, obviously
    10 noise is an issue that seems to be of great interest to
    11 the Board. I would only reiterate something that Greg
    12 said earlier, which is we have -- I don't know,
    13 somewhere more than five of these facilities operating
    14 currently. I don't have the exact number in front of
    15 me. We have not received a single noise complaint from

    16 any of these -- from any residents nearby the facilities
    17 up to this point. So -- and I feel comfortable saying
    18 that if noise were a big issue for any of those folks,
    19 they'd be making their own noise about it because
    20 they're very sensitive to it.
    21 I think to some extent the applicants, when they
    22 propose these projects, are well aware that noise is an
    23 issue or going to be an issue for their operation. And
    24 I think they are taking measures, if you want to call it
    L.A. REPORTING (312) 419-9292
    198
    1 on their own, I guess voluntarily, I guess you could,
    2 but it's compulsory almost for an applicant, a
    3 developer, at this point to do that. So, I don't want
    4 to at all inhibit the line of questioning, but to me,
    5 it's probably not the biggest issue that we face with
    6 regard to peakers. That's something that a lot of times
    7 is going to be worked out between the developer and the
    8 local municipalities as opposed to us at the state
    9 level. Having filibustered for awhile, I'll pass the
    10 mic to Greg.
    11 MR. ZAK: I'm sorry. But can you kind of repeat
    12 the question? I lost my train of thought there.
    13 MS. MCFAWN: Certainly.
    14 I'm curious, you state in your testimony that

    15 you reference our existing noise regulations, three
    16 sections exactly, and then you say there is no gap in
    17 the regulation. And I just want to make sure that those
    18 regulations are adequate, that if there is a noise
    19 problem, you feel that they would be applicable and
    20 would be sufficient for enforcement purposes and health
    21 purposes and that type of thing.
    22 MR. ZAK: Yes, they would be. I can fairly
    23 competently say that, the -- if we look at all of the
    24 various types of noise emissions we can have associated
    L.A. REPORTING (312) 419-9292
    199
    1 with a peaker system, the current regulations that we
    2 have will address all of those issues and in addition,
    3 if we have something a little unusual happen, let's just
    4 say that we had some infrasonic sound that is associated
    5 with a peaker, and just throwing this out as a
    6 possibility, not that we've ever had this problem yet,
    7 but in infrasonics, what they will do is it will appear
    8 as vibration to most people and people will think that
    9 their house is vibrating, the ground is a vibrating and
    10 in effect, what it is is an air wave that is being
    11 generated by the -- let's say the Agency example, the
    12 peaker, that can be addressed through the Board's
    13 nuisance noise regulation even though the numeric
    14 regulations only go down to, say, really 31 and a half

    15 hertz, which is a low frequency end of a regulations,
    16 infrasonics typically occur below 20 hertz. We can
    17 still measure something, say, between 10 and 20 hertz,
    18 and make a good nuisance case before the Board, if there
    19 was a problem where we had significant a number of
    20 residences that were experiencing this type of problem
    21 from a peaker facility.
    22 So, yes, I think to answer your question that
    23 the current regulations that we have will address, I
    24 think, virtually any noise issue that would happen to
    L.A. REPORTING (312) 419-9292
    200
    1 come forward from a peaker facility.
    2 MS. MCFAWN: Thank you.
    3 MS. MANNING: Director Skinner, you said that
    4 noise wasn't one of our biggest issues. Do you care to
    5 comment on what you feel are the biggest issues in terms
    6 of what we're doing today with the peaker power plant?
    7 MR. SKINNER: No.
    8 CHAIRMAN MANNING: Well, I'll ask a follow-up.
    9 MR. SKINNER: I sat here and jotting down notes
    10 in terms of the very brief summary for conclusion,
    11 conclusion notes, if I was going to make conclusionary
    12 remarks, but maybe I'll give you that part of it now.
    13 It strikes me that the General Assembly made a

    14 decision a couple of years ago with regard to the
    15 question of electric supply and whether or not we needed
    16 more electric supply. I mean, they made the decision to
    17 deregulate the electric industry in Illinois. Implicit
    18 in that is taking off of the ICC's docket the question
    19 of whether or not we ought to be building more electric
    20 power plants and whether -- implicit in that question is
    21 whether the power is going somewhere within the state or
    22 outside of the state.
    23 Now, that may be a question that the General
    24 Assembly ought to readdress. I don't know whether there
    L.A. REPORTING (312) 419-9292
    201
    1 were unforeseen ramifications or consequences to
    2 deregulation or not. There -- peaker plants may have
    3 been an unforeseen development, if you will, of the
    4 deregulation process, but it's certainly not within our
    5 Agency's authority to consider that question. I'll
    6 leave it to you to determine whether or not it is within
    7 your authority to consider that question.
    8 The Agency -- I mean, we're peaker neutral, if
    9 you will. We're neither for nor against the development
    10 of these facilities.
    11 Our foremost concern is when presented with a
    12 proposal to determine whether or not it's -- the proper
    13 controls are being applied and whether they are

    14 adequately protective of the environment and of human
    15 health. We've devoted a lot of resources to trying to
    16 make sure that that is the case.
    17 My own opinion is that if gaps exists right now,
    18 they largely exist on the sitings or local control side
    19 of this issue. Property values, noise, esthetics, those
    20 are to a large extent the complaints that were we're
    21 hearing that ring truer, if you will, than some of the
    22 complaints about emissions.
    23 The fact of the matter is whether we like it or
    24 not and whether the opponents of peaker plants like it
    L.A. REPORTING (312) 419-9292
    202
    1 or not, these facilities are cleaner in terms of their
    2 power production than our coal-fired facilities.
    3 So, I think when pressed, some of the
    4 environmental groups would say that given a choice,
    5 assuming the demand is going to be what it is, or
    6 increase, and assuming that power to meet that demand is
    7 going to come from some place, either a coal-fired plant
    8 or a peaker plant, my guess is that even some of the
    9 environmentalists would say, well, given that choice, we
    10 prefer peakers over increased coal production.
    11 But be that as it may, I guess I would -- in
    12 answer -- in direct answer to your question finally, I

    13 have would say that the siting aspects of this deserves
    14 some scrutiny. I don't know whether I really believe
    15 that the full blown SP172 requirements ought to be
    16 applied in the peaker context, but I can see an
    17 argument, I can make an argument that some sub set of
    18 those ought to be applied, if only the subset that
    19 prescribes certain procedures with regard to
    20 consideration of these applications because those
    21 procedures provide resources to the local hearing panel
    22 that allow them to deal with some of these issues, to
    23 hire the lawyers and the consultants that they might
    24 find necessary to address the concerns that are being
    L.A. REPORTING (312) 419-9292
    203
    1 raised by the constituents.
    2 The other question that I think you've been
    3 asked to consider it and it's fully appropriate, is
    4 whether BACT or some additional controls ought to be
    5 imposed upon these peaker plants.
    6 Now, I think we've answered the question to the
    7 best of our ability as to whether these facilities are
    8 being permitted in a way that meets the National Ambient
    9 Air Quality Standards and protects human health and the
    10 environment. In terms of those standards, we believe
    11 that, in fact, we're permitting these facilities the
    12 right way. We're imposing the right level of controls

    13 on them to meet those standards.
    14 You're really being asked to go beyond that and
    15 say that is a given, should we impose controls beyond
    16 that, for whatever reason, in order to be more
    17 protective of health and the environment. Again, that
    18 is a question that is really outside, I think, the
    19 purview of the Agency. When you get to that level of
    20 question, it becomes a cost benefit analysis as to are
    21 you going to -- is the added cost so significant that
    22 you're going to discourage these power plants from
    23 coming in? Is that a good thing or a bad thing? That
    24 is something that I have no desire to get into nor any
    L.A. REPORTING (312) 419-9292
    204
    1 real expertise. The whole power side and supply side
    2 and demand side of the issue is frankly beyond me.
    3 CHAIRMAN MANNING: Thank you.
    4 I would just like to thank all of you from the
    5 Environmental Protection Agency for all of the work you
    6 did in the presentation, obviously straining your
    7 resources, in terms of obviously you've spent a lot of
    8 time and a lot of work advising us and, you know, for
    9 purposes of the public that are present here today, the
    10 Agency staff would continue to be present throughout the
    11 rest of the hearings for us if questions come up that

    12 need to be answered. Certainly, the last set of
    13 hearings on October 5th and 6th, we will regroup and if
    14 there are other questions that we need answered or
    15 asked, we'll go ahead and do that.
    16 MR. SKINNER: We'll have some subset of the
    17 folks that are here today at the subsequent hearings.
    18 To the extent that you can anticipate that you're going
    19 to want certain areas of expertise represented, I guess,
    20 you can let us know ahead of time. We're glad to
    21 accommodate that. To the extent that you want me there
    22 at these -- any of these particular hearings, I would
    23 discourage you, but I would -- but I would be willing.
    24 CHAIRMAN MANNING: I'll bet you'll work that
    L.A. REPORTING (312) 419-9292
    205
    1 out.
    2 MR. SKINNER: Yeah. I would be willing to
    3 accommodate you in any event.
    4 HEARING OFFICER JACKSON: I get all the fun.
    5 Okay. Before we conclude, I just want to make a
    6 couple of final remarks on the record.
    7 Right. We do still have some written questions
    8 that we'll be submitting to the Agency and we'll get
    9 those to you as soon as possible.
    10 MR. SKINNER: Sure.
    11 HEARING OFFICER JACKSON: I'm just told that

    12 we'll also be posting those written questions on the
    13 website, for anyone here who would like to take a look
    14 at those additional questions that we will be posing to
    15 the Agency. They will be on the website as soon as they
    16 are available.
    17 Okay. I also want to note Director Skinner
    18 mentioned that we seem to be asking a lot of noise
    19 questions. I just want to point out for everyone that
    20 the Board members may ask a variety of questions at
    21 these hearings, that they're not intending to focus the
    22 scope of the hearings on any particular issue. They're
    23 just simply trying to develop a complete and concise
    24 record. So please don't assume anything other than the
    L.A. REPORTING (312) 419-9292
    206
    1 development of a complete record by any of the questions
    2 that are asked by any of the Board members during
    3 today's proceeding or any other proceedings of this
    4 matter.
    5 We still have a lot of information to gather
    6 before we're completed with these proceedings and the
    7 Board will not begin its deliberation until all the
    8 information is submitted and the record is closed.
    9 Okay. I would mention again that we have
    10 requested expedited transcript. As soon as that is

    11 available, we will be posting that on our website. If
    12 you require hard copies of the transcript, please
    13 contact the Board's clerk's office and hard copies can
    14 be obtained at a cost of 75 cents a page.
    15 The next hearing in this matter will begin
    16 tomorrow, August 24th at 10:30 a.m. We'll be in the
    17 same room and the procedures for tomorrow's hearing will
    18 be very much like today's. Tomorrow, we'll be focusing
    19 on presentations by members of the peaker industry and
    20 we'll again be focusing on questions from the Board
    21 members and the Board's technical unit. If any member
    22 of the public here today has questions prepared by
    23 today's presentation, please feel free to submit those
    24 questions to the Board in the form of a written comment.
    L.A. REPORTING (312) 419-9292
    207
    1 That's all I have.
    2 Thank you all for attending. We appreciate your
    3 patience and your attention and we're adjourned for
    4 today. See you tomorrow.
    5 (Whereupon, the proceedings in the above-entitled cause
    6 were adjourned scheduled to reconvene on August 24,
    7 2000, at 10:30 a.m.)
    8 (OFFICIAL copies of this transcript can also be ordered
    9 directly from the reporter for 75 cents a copy by
    10 calling (800)419-3376.)

    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING (312) 419-9292
    208
    1 STATE OF ILLINOIS )
    )SS:
    2 COUNTY OF DU PAGE )
    3 I, ROSEMARIE LA MANTIA, being first duly sworn,
    4 on oath says that she is a court reporter doing business
    5 in the City of Chicago; that she reported in shorthand
    6 the proceedings given at the taking of said hearing, and
    7 that the foregoing is a true and correct transcript of
    8 her shorthand notes so taken as aforesaid, and contains
    9 all the proceedings given at said hearing.

    10
    11 ------------------------------
    12 ROSEMARIE LA MANTIA, CSR
    License No. 84 - 2661
    13
    14 Subscribed and sworn to before me
    this day of , 2000.
    15
    ------------------------------------
    16 Notary Public
    17
    18
    19
    20
    21
    22
    23
    24
    L.A. REPORTING (312) 419-9292

    Back to top