1 BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
    2
    3
    4
    5 IN THE MATTER OF:
    6
    7 PROPORTIONATE SHARE LIABILITY No. R97-16
    8 (35 ILL. ADM. CODE 741) (Rulemaking-Land)
    9
    10
    11
    12
    13
    14 Proceedings held on May 4, 1998 at 10:00 a.m., at
    15 the County Building, County Board Chambers, 2nd Floor,
    16 200 South Ninth Street, Springfield, Illinois, before
    17 the Honorable Cynthia Ervin, Hearing Officer.
    18
    19
    20
    21 Reported by: Darlene M. Niemeyer, CSR, RPR
    CSR License No.: 084-003677
    22
    23
    24 KEEFE REPORTING COMPANY
    11 North 44th Street
    25 Belleville, IL 62226
    (618) 277-0190 1
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 A P P E A R A N C E S
    2 Claire A. Manning, Chairman
    3 Board Member G. Tanner Girard
    4 Board Member Kathleen M. Hennessey
    5 Board Member Marili McFawn
    6
    7 ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
    BY: Mark Wight
    8 Assistant Counsel
    1021 North Grand Avenue East
    9 Springfield, Illinois 62794-9276
    On behalf of the Illinois EPA.
    10
    ROSS & HARDIES
    11 BY: David L. Rieser, Esq.
    150 North Michigan Avenue
    12 Chicago, Illinois 60601-7567
    On behalf of the Illinois Steel Group and
    13 the Chemical Industry Council of Illinois.
    14 ILLINOIS ENVIRONMENTAL REGULATORY GROUP
    BY: Whitney Wagner Rosen
    15 215 East Adams Street
    Springfield, IL 62701
    16 On behalf of IERG.
    17
    18
    19
    20
    21
    22
    23
    24
    25
    2
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 E X H I B I T S
    2 NUMBER ENTERED
    3 Hearing Exhibits 1 through 6 17
    4 Hearing Exhibit 7 67
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    3
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 P R O C E E D I N G S
    2 (May 4, 1998; 10:00 a.m.)
    3 HEARING OFFICER ERVIN: Good morning. I am
    4 Cynthia Ervin, and I am the Hearing Officer in this
    5 proceeding originally entitled, In the Matter of:
    6 Proportionate Share Liability, 35 Illinois
    7 Administrative Code, Part 741, docketed as R97-016.
    8 Present today on behalf of the Illinois Pollution
    9 Control Board is presiding Board Member in this
    10 rulemaking, Chairman Claire Manning.
    11 CHAIRMAN MANNING: Good morning.
    12 HEARING OFFICER ERVIN: To her right is Board
    13 Member Kathleen Hennessey.
    14 BOARD MEMBER HENNESSEY: Good morning.
    15 HEARING OFFICER ERVIN: To my immediate left is
    16 Board Member Marili McFawn.
    17 BOARD MEMBER McFAWN: Good morning.
    18 HEARING OFFICER ERVIN: To her left is Board
    19 Member Tanner Girard.
    20 BOARD MEMBER GIRARD: Good morning.
    21 HEARING OFFICER ERVIN: With us also today from
    22 the Board is Amy Hoogasian, Chairman Manning's
    23 attorney assistant from Chicago; and Chuck King, Board
    24 Member McFawn's attorney assistant.
    25 As background, on February 2nd, 1998, the Illinois
    4
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Environmental Protection Agency filed a rulemaking
    2 proposal with the Board to add a new Part 741 to the
    3 Board's waste disposal regulations. These proposed
    4 rules would establish procedures for the
    5 implementation of a Proportionate Share Liability
    6 scheme established by Public Act 89-443. This
    7 amendatory legislation repealed joint and several
    8 liability in environmental actions and replaced it
    9 with Proportionate Share Liability.
    10 In addition to establishing Proportionate Share
    11 Liability, Section 58.9 of the Act directed the Board
    12 to adopt rules implementing Section 58.9 by December
    13 31st, 1997. A statutory deadline was later extended
    14 until January 1st, 1999. According to Section 58.9,
    15 such rules shall provide criteria for the
    16 determination of apportioned responsibility based upon
    17 the degree to which a person directly caused or
    18 contributed to a release of regulated substances on,
    19 in, or under the site identified and addressed in the
    20 remedial action; procedures to establish how and when
    21 such persons may file a petition for determination of
    22 such apportionment; and any other standards or
    23 procedures which the Board may adopt.
    24 On December 5th, 1996, the Board opened a docket
    25 to solicit proposals to assist the Board in the
    5
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 promulgation of rules and procedures implementing the
    2 proportionate share provisions of Section 58.9. The
    3 proposal filed by the Agency is in response to that
    4 request. The purpose of today's hearing is to allow
    5 the Agency to present its testimony in support of this
    6 proposal and to allow questioning of the Agency.
    7 Procedurally, this is how I would like to
    8 proceed. We will take the Agency's two pre-filed
    9 testimonies as if read and mark each as an exhibit.
    10 We will then allow the Agency to present a summary of
    11 each testimony. We will then proceed to the pre-filed
    12 questions submitted by the Illinois Environmental
    13 Regulatory Group and the Illinois Steel Group, and the
    14 Chemical Industry Council of Illinois. Following
    15 completion of the pre-filed questions we will then
    16 open it up for other questions to the Agency.
    17 This hearing will be governed by the Board's
    18 procedural rules for regulatory proceedings. All
    19 information which is relevant and not repetitious or
    20 privileged will be admitted. All witnesses will be
    21 sworn and subject to cross questioning. Please note
    22 that any questions asked by a board member or staff
    23 member are intended to help build a complete record
    24 and do not express any perceived opinion.
    25 Are there any questions regarding the procedure we
    6
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 will be following today?
    2 Seeing none, there are two housekeeping matters I
    3 would like to get to before we go to the Agency.
    4 There are two motions pending before the Board. The
    5 first is a motion by the Chemical Industry of Illinois
    6 requesting leave to file the testimony of David Rieser
    7 which was filed one day after the April 20th deadline
    8 for filing pre-filed testimony.
    9 Seeing as no prejudice will result, I am granting
    10 the motion. This motion is hereby granted.
    11 The second motion is also a motion by the Chemical
    12 Industry of Illinois requesting leave to file Exhibits
    13 A and B to the testimony of Mr. Rieser. These
    14 documents were inadvertently not included when the
    15 testimony was filed.
    16 Again, seeing as no prejudice will result, those
    17 motions will be granted.
    18 Having ruled on these motions, I will now ask if
    19 Chairman Manning or any of the other Board Members
    20 would like to make any comments.
    21 CHAIRMAN MANNING: Thank you, Madam Hearing
    22 Officer. I do. Welcome on behalf of the Board to
    23 this very important proceeding.
    24 The Board appreciates, first of all, the
    25 discussion of all of the participants and the work
    7
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 that has gone into the proposal that the Agency has
    2 brought forward to us today. Specifically, I would
    3 like to, on behalf of the Board, thank the Agency for
    4 coming forward with the proposal. I realize it was a
    5 lot of work and a lot of discussion went into it and
    6 that sort of thing. The Board is very happy to be in
    7 the position of receiving the proposal and being in
    8 the position of having all of the input from all of
    9 the parties this morning.
    10 The Board realizes that there are some very large
    11 looming legal issues in this proceeding, and that this
    12 proceeding is little different than our normal Board
    13 proceeding in that economic issues and technical
    14 issues really are not the focus of our discussion or
    15 the focus of any burden of the Agency presenting this
    16 proposal. But, rather, we really need to make a
    17 determination on some serious legal issues and
    18 legislative issues.
    19 The Board fully intends to develop a full record
    20 on those issues and create a dialog with the
    21 participants so that we have a full understanding of
    22 the proposal and the issues that are before us. I
    23 think what we have to do here is do what was
    24 envisioned by the legislature in their crafting of the
    25 Proportionate Share Liability, and I realize there is
    8
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 a dispute as to what they did, and we have to sort of
    2 resolve that to the best of our ability, to the best
    3 of the party's ability.
    4 I think what we have to do is do really what is
    5 right for the State of Illinois and what is workable
    6 for the environmental remediation process and how all
    7 of you relate to that process. So that is kind of
    8 what we are going to be doing in these proceedings.
    9 We welcome all of you here, and we welcome an
    10 interchange toward those ends. Thank you.
    11 Does anybody else have anything they wanted to
    12 say? Marili? Tanner?
    13 BOARD MEMBER McFAWN: No thank you.
    14 BOARD MEMBER GIRARD: No.
    15 HEARING OFFICER ERVIN: Mr. Wight, would you like
    16 to make an opening statement?
    17 MR. WIGHT: Yes, I would.
    18 Thank you and good morning. My name is Mark
    19 Wight. I am Assistant Counsel with the Illinois
    20 Environmental Protection Agency. With me today are
    21 four witnesses, three from the Bureau of Land and one
    22 from the Division of Legal Counsel.
    23 On my immediate right we have Gary King from the
    24 Bureau of Land. He is the manager of the Division of
    25 Remediation Management.
    9
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Behind me, in the blue shirt, is Larry Eastep who
    2 is the manager of the Remedial Project Management
    3 Section in the Bureau of Land.
    4 To my immediate left is John Sherrill who is a
    5 Unit Supervisor under the Remedial Project Management
    6 Section.
    7 From the Division of Legal Counsel, behind me, is
    8 Bill Ingersoll who is Associate Counsel in the
    9 Division of Legal Counsel and manages an enforcement
    10 unit for the Bureau of Land.
    11 Also with us today is Vicky VonLanken who is a
    12 legal assistant. Vicky is helping with document
    13 distribution and providing other support as
    14 necessary.
    15 We are here to explain our proposal for the
    16 implementation of Proportionate Share Liability as
    17 passed by the legislature in 1995. Just to summarize
    18 how we will be approaching our testimony, two of our
    19 witnesses submitted pre-filed testimony, and those two
    20 witnesses will be speaking today. We will changeup
    21 the order a little bit in that Gary King will be
    22 starting and providing some introductory remarks as
    23 well as some background on the negotiation and
    24 regulatory development as it has taken place over the
    25 last year.
    10
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 We will then switch to John Sherrill who will talk
    2 a little bit about the 4(q) process, the Agency notice
    3 process, and how that has worked over the years, and
    4 the types of sites and how they are likely to find
    5 their way into a proportionate share proceeding.
    6 Then we will switch back to Gary King. Gary will
    7 then go into more detail on a section-by-section
    8 approach to the proposal explaining how the proposal
    9 works and spending a little bit more time with some of
    10 the more key positions of the proposal.
    11 Then we will return to John Sherrill for some
    12 brief remarks about the allocation factors. Following
    13 that, we will be done with our presentation and then
    14 we will be ready for the questions.
    15 I think that the testimony today will demonstrate
    16 several important points about the Agency's proposal
    17 including the following: The proposal is entirely
    18 consistent with Title 17 and Section 58.9 of the Act.
    19 The proposal anticipates some of the difficulties of
    20 proportionate share allocation, such as information
    21 collection and dealing with indivisible harms, and
    22 provides tools to help address those difficulties.
    23 The proposal makes good economic policy or is good
    24 economic policy because it supports Brownfields
    25 redevelopment by eliminating liability for persons who
    11
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 have not caused or contributed in some way to
    2 contamination problems.
    3 And, finally, the proposal also is good public
    4 policy because within the proportionate share context,
    5 it attempts to maximize the multiplier affect on the
    6 public resources available for remediation. It is a
    7 good proposal. It deserves full consideration by the
    8 Board and adoption of all of its key elements.
    9 Last, but not least, I would like to thank the
    10 members of the Site Remediation Advisory Committee,
    11 the Attorney General's office, and the other
    12 participants who have been involved in this for
    13 approximately the last year.
    14 We haven't or were not able to reach an agreement
    15 on all of the key elements of the proposal. However,
    16 a lot of people have given a lot of thought to this
    17 and they have worked long and hard, and I am sure that
    18 they all will contribute to a full hearing and
    19 discussion of the issues today.
    20 With that, we would be ready to swear in the
    21 witnesses and introduce the exhibits.
    22 HEARING OFFICER ERVIN: Thank you. Just to
    23 clarify, the two witnesses will be testifying, but all
    24 four members will be ready to answer questions in the
    25 panel?
    12
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. WIGHT: That's correct.
    2 HEARING OFFICER ERVIN: All right. Would the
    3 court reporter then please swear in the witnesses.
    4 (Whereupon Gary King, John Sherrill, Larry Eastep
    5 and Bill Ingersoll were sworn by the Notary
    6 Public).
    7 MR. WIGHT: We have six exhibits here. We will be
    8 starting with the introduction of the photographic
    9 exhibits because those were marked as pre-filed
    10 submittals so, therefore, I think it will be
    11 consistent and a little less confusing if we stay with
    12 the numbers as we have previously marked them rather
    13 than change them.
    14 Our first exhibit actually encompasses two of the
    15 photographs. They have been marked Exhibit Number 1
    16 on the left and Exhibit Number 2 on the right. So I
    17 will be handing this one panel to John for
    18 identification of both exhibits.
    19 John, would you please take a look at the photo on
    20 your left marked Exhibit 1 for identification.
    21 (Witness complied.)
    22 MR. WIGHT: Do you recognize the photo?
    23 MR. SHERRILL: Yes.
    24 MR. WIGHT: Would you please explain what that
    25 photo is?
    13
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. SHERRILL: It is a photograph that the Agency
    2 took on November 6, 1985, at a case example that I
    3 will be discussing today, the Steagall Landfill.
    4 MR. WIGHT: Okay. The photograph on the right
    5 marked Exhibit 2 for identification, would you please
    6 take a look at that.
    7 (Witness complied.)
    8 MR. WIGHT: Do you recognize it?
    9 MR. SHERRILL: Yes, this also is a photograph
    10 taken on November 6, 1985, at the Steagall Landfill as
    11 well. It is a picture of some hogs.
    12 MR. WIGHT: Okay. Thank you very much. Next we
    13 have marked as Exhibit 3 for identification an
    14 enlarged photograph. Would you please take a look at
    15 that?
    16 (Witness complied.)
    17 MR. WIGHT: Do you recognize that photo?
    18 MR. SHERRILL: This was a photograph collected by
    19 Agency personnel at another case example that I will
    20 be giving today. It is a picture of open refuse,
    21 uncovered landfill. And it was taken in August of
    22 1996.
    23 MR. WIGHT: And is this enlargement identical with
    24 the versions that were submitted along with your
    25 pre-filed testimony to the Board?
    14
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. SHERRILL: Yes, this is the same picture. It
    2 has just been enlarged.
    3 MR. WIGHT: Okay. Finally, another enlarged
    4 photograph marked Exhibit 4 for identification. Would
    5 you please take a look at that?
    6 (Witness complied.)
    7 MR. WIGHT: Do you recognize that photo?
    8 MR. SHERRILL: This is a picture of this Logan
    9 Landfill after an Agency directed remedial action. It
    10 is an after picture. The other one was before
    11 remedial action.
    12 MR. WIGHT: By "the other one," you mean Exhibit
    13 3?
    14 MR. SHERRILL: Exhibit 3, yes. This picture was
    15 also taken by Agency personnel in September of 1997.
    16 MR. WIGHT: Is the enlargement identical with the
    17 smaller version that was submitted to the Board along
    18 with the pre-filed testimony?
    19 MR. SHERRILL: Yes.
    20 MR. WIGHT: Okay. Thank you very much.
    21 There are two additional documents that we also
    22 would like to take the time to identify. Marked as
    23 Exhibit 5 is the testimony of Gary King.
    24 Mr. King, would you please take a look at this
    25 document?
    15
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 (Witness complied.)
    2 MR. WIGHT: Do you recognize the document?
    3 MR. GARY KING: Yes, I do.
    4 MR. WIGHT: Would you explain for us what it is,
    5 please?
    6 MR. GARY KING: This is a photocopy of the written
    7 testimony that I submitted for purposes of this
    8 proceeding.
    9 MR. WIGHT: This document is a true and correct
    10 copy of that testimony?
    11 MR. GARY KING: Yes, I believe so.
    12 MR. WIGHT: Okay. Thank you.
    13 Mr. Sherrill, I am handing you a document marked
    14 Exhibit 6 for identification. Would you please take a
    15 look at that document?
    16 (Witness complied.)
    17 MR. WIGHT: Do you recognize the document?
    18 MR. SHERRILL: Yes, this is a photocopy of the
    19 written testimony that I submitted to the Board.
    20 MR. WIGHT: This is identical to the testimony as
    21 pre-filed with the Board?
    22 MR. SHERRILL: Yes, I believe so.
    23 MR. WIGHT: Okay. Thank you very much.
    24 At this time I would move to have Exhibits 1
    25 through 5 admitted into the record.
    16
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 HEARING OFFICER ERVIN: 1 through 6.
    2 MR. WIGHT: 1 through 6. Excuse me. We would
    3 like to use the photographs in our presentation.
    4 HEARING OFFICER ERVIN: Are there any objections
    5 to the admittance of these exhibits?
    6 Seeing none, these six exhibits will be entered
    7 into the record.
    8 (Whereupon said documents were entered into
    9 evidence as Hearing Exhibits 1 through 6 as of
    10 this date.)
    11 MR. WIGHT: Okay. I think with that we are ready
    12 to begin our presentation. Again, Mr. King will
    13 start. We will then switch to Mr. Sherrill for some
    14 remarks about the 4(q) process, and then back to Mr.
    15 King, and then close with Mr. Sherrill. So if you are
    16 ready to begin we are.
    17 HEARING OFFICER ERVIN: All right. Please
    18 proceed.
    19 MR. GARY KING: Okay.
    20 MR. WIGHT: Excuse me. I am sorry. Before we
    21 start, do you all have copies of the testimony and the
    22 photographs? I have additional copies if you need
    23 them. Okay. And for all of you who are watching
    24 today, we have copies of all of our documents on the
    25 back table, so feel free to help yourselves.
    17
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. GARY KING: Thank you. My name is Gary King,
    2 and I am manager, as Mark was saying, of the Division
    3 of Remediation Management within the Bureau of Land.
    4 I have testified before the Board on a number of other
    5 occasions including the other proceedings we have had
    6 related to Title 17.
    7 What I wanted to do is start off by -- we are
    8 going to take some time to go through our proposal
    9 this morning. I have committed that I am not going to
    10 read word for word, and John is not going to read word
    11 for word. But we wanted to take -- rather than do a
    12 short summary, we wanted to spend some time talking
    13 about the proposal and talking about what kind of the
    14 history has been and some of the case studies.
    15 One of the reasons why we wanted to do this is
    16 because I don't think -- as far as I can recall, I
    17 don't think the Agency has ever had an opportunity to
    18 sit down in a formal proceeding and really go through
    19 what our process is all about for the Board. So we
    20 have really taken that occasion, and we think it fits
    21 into the context of this proceeding. And hopefully
    22 the Board won't find it over lengthy or
    23 uninteresting. We felt it was important to provide
    24 that background.
    25 The legislation that really formed the basis for
    18
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 this proceeding -- of course, it occurred in two
    2 parts. There was a piece that was passed and became
    3 law on December 15th of 1995, and then there was an
    4 amendment that became effective shortly thereafter.
    5 It was signed into law on December 21st and then
    6 became effective on July 1st of 1996.
    7 As I see it, Title 17 is -- both of these were
    8 affecting Title 17, of course. Title 17 is a complex
    9 piece of legislation. And as we have seen it, it
    10 really addresses three distinct sets of issues. The
    11 first set of issues which was contained in the rules
    12 that are incorporated in Part 742 was a set of rules
    13 dealing with the concept of risk based remediation
    14 objectives.
    15 The second set of rules that was necessitated by
    16 Title 17 was a set of rules dealing with how private
    17 parties proceeded with site remediation either under a
    18 voluntary program or pursuant to State enforcement
    19 action. Those were laid out in Part 740 and, of
    20 course, the Board adopted those rules.
    21 The third set of rules necessitated by Title 17
    22 addresses the whole concept of how to apply
    23 Proportionate Share Liability to the State Hazardous
    24 Substance Cleanup Program as it applies outside of
    25 RCRA or LUST or the Federal Superfund sites. That's
    19
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 really the focus of Section 58.9. It is the focus of
    2 the proceeding that we have here today.
    3 I would note that if you look at the objectives
    4 that are set forth in Title 17 as to what kind of the
    5 purpose of the title is, the first four of those were
    6 addressed with the first two sets of rules. Those
    7 were laid out in the first piece of legislation that
    8 was passed and became law December 15th, 1995. It is
    9 the fifth objective that is really the -- kind of the
    10 objective that underlies what 58.9 is about.
    11 I will just read that for you just to refresh you
    12 about it. It says, these objectives are, and then it
    13 goes down to number five, to assure that the resources
    14 of the Hazardous Waste Fund are used in a manner that
    15 is protective of human health and environment relative
    16 to the present and future uses of the site and the
    17 surrounding area.
    18 And I think that it really is a real strong
    19 underpinning within that objective that what we are
    20 doing has to be done in a way that is protective of
    21 human health and the environment, and has to be in a
    22 way that is meaningful relative to the resources of
    23 the Hazardous Waste Fund.
    24 We have proposed that the PSL rule go into Part
    25 741. It seemed to us that was kind of a natural fit
    20
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 between Part 740, which applies to the Site
    2 Remediation Program and 742, which is the TACO rules.
    3 The rulemaking efforts in this, although it became
    4 law back in December of 1995, we really didn't start
    5 the rulemaking efforts on this until last May. That,
    6 I think, was a result of the Agency being very
    7 involved in the TACO and SRP program, and the industry
    8 side as well. It really was until we got that process
    9 kind of out of the way that we really didn't have the
    10 time for anybody to work on the PSL rule.
    11 After that we did -- both groups were very
    12 active. As I noted in the testimony, we met no less
    13 than nine times. Starting last October the Attorney
    14 General's office became very closely involved and
    15 continued so throughout the fall and winter. And as
    16 Mark was saying, we are certainly very appreciative of
    17 the efforts of the Attorney General's office and the
    18 people from SRAC and the private sector in assisting
    19 in putting together a meaningful proposal here.
    20 As far as the rulemaking efforts, and the three
    21 rulemaking efforts that I have been involved with
    22 under Title 17, this was the most difficult. And for
    23 me it was probably the most difficult rulemaking I
    24 have ever been involved with. And the difficulties
    25 don't -- they certainly were not because of the people
    21
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 involved. Sometimes, yes, you get in a situation
    2 where there is animosity and that kind of thing. That
    3 wasn't the case. I think everybody worked very
    4 professionally and with a great deal of consideration
    5 on issues and on proposals. And I think the process
    6 was very good in that context. It is just that we
    7 ended up with critical differences of opinions on some
    8 important issues.
    9 But what made it very difficult, and I described
    10 three important factors in my testimony:
    11 First, there is no model for what we are doing.
    12 You know, we really don't have anything else in
    13 Illinois similar to this. Other states, they have
    14 adopted some things related to the PSL rules in their
    15 states, but they have not gone very far or very well
    16 in some cases. On a national level, we still have all
    17 those major efforts to change joint and several
    18 liability under the Federal Superfund a few years
    19 back. That failed. And joint and several liability
    20 still continues to be the national standard, the
    21 national liability standard under federal law. And
    22 then, finally, we really don't find much in the way of
    23 support from the Illinois common laws as to how
    24 directly to handle this.
    25 The second big issue for us is kind of the limited
    22
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 number of sites to which this rule is even going to
    2 apply. It is not like you can take the historical
    3 experience and use it in a statistical kind of way.
    4 It is much more of an anecdotal kind of approach. To
    5 compare this to TACO, with TACO we have got thousands
    6 of sites being impacted. With the SRP rule you are
    7 talking about hundreds of sites impacted annually.
    8 With the PSL rule, you know, we are a finger
    9 counting activity. We have issued, as John will go
    10 into the statistics on that later -- our use of the
    11 4(q) notice process has been fairly infrequent because
    12 of funding shortages. The Attorney General, the
    13 number of cases that they file on an annual basis, you
    14 know, is in the range of five to ten per year on new
    15 sites. Even not all of those are really -- on those
    16 cleanup or cost recovery cases not all of those would
    17 be subject to a proportionate share allocation. So we
    18 have to factor all of these things into the context
    19 that we are really talking about applying this rule to
    20 a limited number of sites. And it has a much more
    21 limited history than some of the other concepts that
    22 we have dealt with in Title 17.
    23 Then, finally, I think for me the most important
    24 part as to what made this rule difficult to develop a
    25 proposal for, was the difficulties in interpreting
    23
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 what Section 58.9 actually means. As I have stated in
    2 my testimony, I found it to be vague and ambiguous.
    3 It has internal inconsistencies. It has
    4 inconsistencies with other parts of the Environmental
    5 Protection Act. It provides just the barest guidance
    6 as to what really needs to occur. I don't think the
    7 legislative history provides very much help either.
    8 But as I have looked at Section 58.9 I have seen
    9 four basic principles involved. I have laid those out
    10 in my testimony. And I will just go over those
    11 briefly.
    12 First, where you are talking about cleanup and
    13 cost recovery actions, under Title 17 liability is to
    14 be based on cause or contribution. That is a definite
    15 change from where things were at before.
    16 Second, for such cases liability is to be
    17 allocated amongst the parties based upon proportionate
    18 share. It is not to be a joint and several type of
    19 situation.
    20 Third, existing delegation and authorization
    21 programs that the Agency operates should not be
    22 disturbed by what is going on under 58.9.
    23 And fourth, the Board has broad discretion to
    24 promulgate a workable procedure. This last point I
    25 really don't want to -- I can't underestimate that as
    24
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 far as the importance of that for us. We think that
    2 it is critical for the Board to see its authority as
    3 one of crafting and adopting a workable rule.
    4 If the Board thinks it is just supposed to recite
    5 the existing words of the statute and not resolve
    6 those ambiguities and inconsistencies, you know, then
    7 they should just do that and we can be done with it.
    8 I don't think it is -- that is not our view of the
    9 legislation. That is not our view of the legislative
    10 history, that the Board is to have that type of
    11 function.
    12 There are, of course, several places in the
    13 legislative history where the sponsors of the bill
    14 were asked questions and they really deferred to the
    15 nature of the Board rulemaking to provide answers to
    16 that. So it is really fundamental, from our
    17 perspective, to view this as the -- to view this
    18 process as the Board having one of developing a
    19 workable proposal.
    20 Now, given all these difficulties for us that have
    21 been putting this together has been, and I use the
    22 analogy in my testimony of walking a tightrope over a
    23 deep chasm. If you interpret the statute too
    24 narrowly, that is disaster on one side. But if you
    25 interpret it too broadly on the other, you have a
    25
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 disaster on the other side.
    2 I will give you a couple of examples. One is the
    3 definition of a remedial action. It would be possible
    4 to interpret that definition consistent with Section
    5 58.9 and consistent with Title 17 in a way that this
    6 whole process would apply to almost zero sites. We
    7 didn't think that was really what was intended. So we
    8 tried to strike a middle ground with that issue. So
    9 that is one side, how you can end up with a disaster.
    10 On the other side, you can interpret 58.9 so
    11 broadly, without any -- without respect to any
    12 limitations under the applicability criteria, that it
    13 would disrupt all of the Agency's authorization and
    14 delegations under RCRA under Subtitle C, D and I.
    15 Again, we don't think that is what was really
    16 intended.
    17 So I was saying that we really have tried to walk
    18 a tightrope as far as having a middle ground as far as
    19 interpretations between these difficult issues. We
    20 think it is the Board's authority and it is the
    21 Board's job to kind of fix that tightrope to the other
    22 side of the chasm.
    23 And we have divided our proposal into three
    24 subparts:
    25 Subpart A deals with the applicability provisions,
    26
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 definitions, and other general information and
    2 procedures.
    3 Subpart B, as we will talk about later on, is
    4 really the crux of things, as far as we are
    5 concerned. And that contains the procedures for
    6 determining liability and proportionate share.
    7 And then Subpart C is a procedure available to
    8 PRPs who are not the subject of a State filed
    9 complaint, where they can go in and get a formal
    10 determination from the Board.
    11 Now, as we have developed this, we have had two
    12 real important goals we worked through:
    13 One is consistency. We have to be consistent with
    14 Section 58.9, Title 17, and the rest of the Act.
    15 Then second, in addition to being consistent it
    16 has to be workable. It has to be workable for the
    17 State, for both the Agency and the Illinois Attorney
    18 General, and it has to be workable for responsible
    19 parties, both that are private and public. That's
    20 what we have really tried to focus on. If we are
    21 going to have a rule that is just going to be
    22 consistent without resolving those ambiguities and
    23 inconsistencies, we really haven't resolved anything.
    24 We think -- as Mark was saying, we think our
    25 proposal is, in fact, consistent, and we think that
    27
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 the people who are opposed to what we have put
    2 together are going to be hard-pressed to find that it
    3 is inconsistent with the legislation. I think they
    4 are going to be even more hard-pressed to argue that
    5 the system that they favor is more favorable to PRPs
    6 and is going to be workable for the State, given our
    7 legitimate responsibility to effectuate cleanups with
    8 the finite resources that protect public health and
    9 the environment.
    10 In my testimony I put together a brief chart.
    11 This is on page 11. It really kind of focuses, and I
    12 hope it will focus the Board's attention, that the
    13 concerns with cross recovery are not just idle
    14 concerns for us. If you look back in the early 1980s
    15 when there was a Build Illinois Fund available and
    16 there was a Clean Illinois Fund available, cost
    17 recovery really did not play a real significant aspect
    18 as far as the money that was used to do cleanups. It
    19 does now.
    20 I just kind of put as an example what happened in
    21 1997 as far as the amount of money recovered compared
    22 to where we received from other areas. Cost recovery
    23 dollars tend to be variable from year-to-year. The
    24 Solid Waste Transfer money, fortunately, that is a
    25 consistent amount and we should be seeing that 2
    28
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 million dollars a year on a consistent basis.
    2 The hazardous waste disposal fees, they have been
    3 dropping and have dropped significantly since the
    4 early 1990s. And then the payments by voluntary
    5 sites, obviously, we can't really use those to do
    6 these types of cleanups.
    7 What makes these dollars important on the cross
    8 recovery aspect, from our perspective, is two things.
    9 One, it helps the leverage. It obviously helps the
    10 leverage of private dollars to be spent on cleanups.
    11 That is a very important factor. And, secondly, there
    12 is a -- we can use these dollars multiple times. As
    13 we recover dollars we then can spend those same
    14 dollars and hopefully recover them again. From our
    15 standpoint that tends to cut down on the needs to find
    16 other sources of revenue to do cleanups.
    17 With that discussion, I guess I would like to --
    18 that kind of concludes my general discussion of the
    19 background of things. I would like to turn it over to
    20 John Sherrill.
    21 MR. SHERRILL: Good morning. My name is John
    22 Sherrill. I have worked for the Illinois EPA since
    23 May of 1992. I have been involved in land
    24 environmental issues in the State of Illinois for the
    25 past 17 years. I have previously testified before the
    29
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Board in the Title 17 Rulemaking, the Tiered Approach
    2 to Corrective Action Objectives.
    3 Today I am testifying on behalf of the Agency in
    4 support of the proposed 741 rules. I am going to be
    5 providing background information and the framework of
    6 the existing Agency's 4(q) notice process. I am going
    7 to be -- I will briefly discuss cost recovery, and I
    8 am going to briefly discuss two case studies. And
    9 then lastly I will discuss allocation factors.
    10 I believe this background information is
    11 important, because it will show the type of Agency
    12 activities that proceed and follow the issuance of a
    13 4(q) notice, and it will note the very small number,
    14 as Gary King has said, of sites affected by the 4(q)
    15 notice and this subsequent 58.9(b) notice of the Act.
    16 And it will also explain that the Agency always tries
    17 to obtain cooperation from parties before expending
    18 State funds for a site or before referring a site to
    19 the Illinois Attorney General's office.
    20 If you are following in my written testimony, I am
    21 going to jump around a little bit here. I am going to
    22 go to page nine and just jump to these two case
    23 studies, two site examples. The first site example, I
    24 am going to be discussing the Steagall Landfill.
    25 These examples will demonstrate the difficulty of
    30
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 identifying PRPs prior to taking a State action.
    2 It will demonstrate the cost to the State if no
    3 viable PRPs are identified, and the frequent
    4 unwillingness of PRPs to respond until State resources
    5 are committed to a project. Even though there is very
    6 few sites that have historically been in this process,
    7 this 4(q) notice process, the magnitude of the
    8 environmental problem at these sites is traditionally
    9 very great.
    10 The Steagall site is an 80 acre waste disposal
    11 site located near Galesburg, Illinois, in Knox
    12 County. It accepted waste from the early 1960s to
    13 1975. It was not an Illinois EPA permitted landfill.
    14 This site accepted hazardous and nonhazardous waste.
    15 A State funded remedial action was performed in 1986,
    16 and the investigation determined contamination from
    17 the site affected groundwater and surface water.
    18 Leachate flowed freely from this landfill onto
    19 adjacent properties, and that was the -- attached to
    20 my written testimony I had some exhibits. And it is
    21 kind of hard to see within these pictures, but this is
    22 just leachate flowing from this particular site, in
    23 this Exhibit 1 that I have. This Exhibit 2, you know,
    24 it is, like, what are hogs doing here in this hearing
    25 before the Board again.
    31
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 It wasn't uncommon to see these hogs be completely
    2 orange-stained at this particular site. As you can
    3 see here, this hog here is drinking leachate from this
    4 site. We had two different hogs slaughtered and
    5 studied by the U of I for contaminate levels. And it
    6 was determined that these hogs, if they were to be fed
    7 to the -- as a sole source of food, it would have been
    8 an unhealthy situation. As it was, at this farrowing
    9 operation that was adjacent to the site, since the hog
    10 was being slaughtered and then distributed, per se, to
    11 the mass public, there was a lower level of a health
    12 risk.
    13 So in Gary's office several months ago when we
    14 were talking about which sites do we want to show
    15 pictures of, it was, like, do we want to show sites
    16 with drums or sites with -- you know, because they see
    17 as many pictures of these kinds of sites. And the
    18 point of bringing these pictures is that we are
    19 dealing with sites that do have significant
    20 environmental impact, such as this, hogs drinking
    21 leachate contaminated water.
    22 Also at this site, this -- the leachate was going
    23 downstream into what was called Brush Creek and Lake
    24 Bracken. This Lake Bracken was a privately owned lake
    25 by 140 permanent homes. There was sediment
    32
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 contamination consisting primarily of PNAs and PCBs.
    2 PNAs mean polynuclear aromatic hydrocarbons, and PCBs
    3 being polychlorinated biphenyls.
    4 The Illinois Department of Public Health and the
    5 Illinois Department of Conservation had issued
    6 warnings about eating catfish from Lake Bracken and
    7 coming into contact. And when I say coming into
    8 contact, just wading into this creek. So there was
    9 health advisories out that you were not even supposed
    10 to get into the creek that this leachate eventually
    11 flowed into.
    12 At Steagall, as is typical of most 4(q) sites,
    13 numerous inspections by Agency field inspectors had
    14 documented violations for several years prior to the
    15 issuance of the initial 4(q) notice. The first 4(q)
    16 notice was issued to four PRPs in November of 1985.
    17 If was only issued to four because the Agency could
    18 only identify four PRPs. The four PRPs were the
    19 lessee, the sub-lessee, the site owner, and the City
    20 of Galesburg.
    21 The PRPs did not perform the investigation and the
    22 Agency initiated the State funded investigation. So
    23 the first PRP was asking for an investigation. After
    24 the issuance of the first 4(q) notice the site
    25 operator and a local waste hauler provided information
    33
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 as to the identification of other PRPs. The second
    2 4(q) was issued to the original four PRPs and to
    3 additional PRPs for what is called a feasibility study
    4 and preliminary design. So at this point we had
    5 performed an investigation and we were looking into
    6 what needed to be done to correct the problem here.
    7 A third 4(q) was issued April 7, 1989, for
    8 remedial work, and seven additional PRPs were
    9 identified. A fourth 4(q) was issued for additional
    10 work located at and downstream from this site. And
    11 ultimately in the summer of 1990, and still without
    12 PRP cooperation, the Agency initiated a State funded
    13 remedial activity that included an impermeable cap and
    14 it enclosed a creek that ran through this site in a
    15 culvert. That way the creek would not be in contact
    16 with the leachate anymore. This stopped the flow of
    17 additional contamination into Brush Creek and to Lake
    18 Bracken. The remedial work was completed during 1991.
    19 So the point of this site was even after five
    20 years and the identification of 13 PRPs and these
    21 multiple 4(q) notices, the State still had to take the
    22 lead and conduct the cleanup.
    23 In December of 1990, 13 of these PRPs entered into
    24 12 separate consent decrees. The State investigation
    25 and remedial activities cost approximately 8.8 million
    34
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 at this site, and as Gary King was saying, this was
    2 funded primarily by what was known then as Clean
    3 Illinois and Build Illinois monies.
    4 As a footnote to this site, this was one of our
    5 largest sites, instead of -- as far as State funded
    6 remedial efforts. So every State funded site we get
    7 into is not of this magnitude.
    8 Of this approximately 8.8 million that the State
    9 had expended, approximately 5.4 million was recovered
    10 through these consent decrees during 1991. An
    11 additional $497,000.00 was recovered during 1997. And
    12 today long-term remedial efforts include operation of
    13 a leachate and collection and treatment system that is
    14 being funded by the Hazardous Waste Fund. And the
    15 Illinois Attorney General continues to pursue two PRPs
    16 who did not enter into consent decrees. Today the
    17 State spends about $90,000.00 a year on this
    18 particular site to run this leachate collection
    19 system.
    20 The most -- so that is one of our case examples.
    21 That was one of the, you could say, historical in the
    22 mid 1980s up through 1990. It shows that we are still
    23 dealing with this site today.
    24 Then my other case example is this Logan
    25 Landfill. It was the most recent State funded
    35
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 remedial action completed prior to these hearings.
    2 This was an inactive 22 acre landfill that had
    3 received waste from 1968 until 1992 at which time it
    4 was abandoned. The site conditions deteriorated
    5 rapidly until refuse was exposed on the land surface.
    6 Attached to my written testimony -- I had this
    7 picture blown up. It just shows exposed refuse at a
    8 landfill. What you don't see at this picture is there
    9 is 22 acres of this just open refuse. Landfills, when
    10 they are not capped properly, the integrity increases
    11 at an increasing rate. So if you don't correct it
    12 within the first few years you start getting all kinds
    13 of disease, flies, rats, just uncontrollable leachate
    14 and so forth.
    15 There is a creek that you don't see that is behind
    16 this landfill. So here we have exposed refuse at this
    17 particular site. These -- this site was permanently
    18 corrected during 1997 when we had properly capped the
    19 landfill. So this one -- I brought these two
    20 pictures. It is kind of like a before and after. So
    21 you don't have the exposed refuse. When you don't
    22 have the exposed refuse and you put on a proper cap,
    23 you don't have the uncontrollable leachate
    24 generation.
    25 Also, just as a point of reference, if you look in
    36
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 this, the closed landfill type cap, you see this house
    2 here in the background, and you can barely see the
    3 house. It kind of gets faded out. It is in the back
    4 middle here. So the picture was taken from the same
    5 reference point. Like I said, you know, I could come
    6 in here, and I don't think -- I could come in here and
    7 bring all kinds of pictures saying how bad some of
    8 these sites are, and these just happen to be the ones
    9 that we picked. This ends my two little site
    10 examples. But I just wanted to show kind of how bad
    11 these sites are.
    12 Now I am going to flip back to page two of my
    13 testimony, if you are following in my testimony. I am
    14 just trying to summarize. I am not going to read word
    15 for word, as Gary said. I am on page two now of my
    16 written testimony.
    17 The 4(q) notice is widely recognized as the, and I
    18 will use the term trigger mechanism, utilized by the
    19 Illinois EPA before initiating a State funded remedial
    20 response. Section 58.9(b) of the Act also contains a
    21 notice requirement that the Agency proposes in the
    22 Section 741 rules to combine with the 4(q) notice
    23 where appropriate.
    24 So I am going to be providing this background
    25 notice on the 4(q) notice, and the Agency believes
    37
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 that it will be used kind of at the same type of sites
    2 that we have traditionally used the 4(q) notice at.
    3 To put the numbers of all 4(q) notices in perspective
    4 with all releases and remedial actions in Illinois,
    5 from 1984 to 1998, from 1984 to 1998, more than 15,000
    6 releases from underground storage tanks were
    7 reported. That is what we know of as the LUST type
    8 rules and the LUST requirements there. During the
    9 last 12 years over 1,000 sites have entered the Site
    10 Remediation Program or its predecessor also known as
    11 the Voluntary Program. And there has been an average
    12 of 2,700 reportable releases per year during the last
    13 five years. I am talking about the big global picture
    14 of all type remedial releases and responses in
    15 Illinois.
    16 On the other hand, during the last 15 years only
    17 85 individual sites have been issued 4(q) notices.
    18 And then Attachment 1 of my testimony reflects the
    19 number of sites issued a 4(q) notice each year. I am
    20 going to reference -- this was kind of a helpful
    21 exercise that we had done and then we attached it to
    22 this testimony. I am looking now at Attachment 1 to
    23 my testimony. You will see it is a chart graph. I
    24 will kind of give everybody an opportunity to turn to
    25 it. I am going to reference it.
    38
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 So just looking at this, it is called Attachment
    2 1, Number of Sites with 4(q) Notices, it says a total
    3 of 85 sites. On the left-hand side, number of sites,
    4 and as you can see I started in 1984 when we first
    5 started issuing 4(q)s. We had two in 1984. We had
    6 nine in 1985. In 1986 we had 13. We had 13 in 1986
    7 and so forth. As can be seen, the most number of
    8 sites in any one year was 16 in 1989. And since 1991
    9 the number of sites with a 4(q) is just a handful, as
    10 you can see.
    11 So I just wanted to -- you know, I was throwing
    12 out these numbers of thousands of releases. Well, how
    13 many actually receive a 4(q) notice, well, this is how
    14 many sites have traditionally received a 4(q) notice
    15 up through 1997, just to give that in perspective.
    16 As a follow-up, and I think there was some
    17 questions that we will be following up on this later
    18 on. On these 4(q) notices several of these 4(q)
    19 notices in regard to cost recovery, there is also a
    20 differentiation between multiple PRPs and single
    21 PRPs. So we issue these 4(q) notices also at sites
    22 that only have clearly one PRP, and that graph that I
    23 have there is reflecting all the Agency 4(q) notices.
    24 But still keep in mind that although there is
    25 relatively few of these sites that are warranted 4(q),
    39
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 they are some of the worse in terms of health
    2 endangerment and environmental damage, because
    3 frequently these sites have free product in the
    4 groundwater, abandoned drums of waste, known hazardous
    5 waste, or open leachate seeps.
    6 I am going to talk now -- I am going to kind of
    7 change my -- I am on page three of my testimony, but I
    8 am going to change the focus now to, like, how do we
    9 hear about these sites or, you know, how do we decide
    10 which of these sites within Illinois get a 4(q)
    11 notice.
    12 The decision whether to issue a 4(q) notice is
    13 made only after consideration of many factors. These
    14 factors include site history, human health risks,
    15 ecological concerns, spreading environmental damage,
    16 expected benefits to human health and the
    17 environment. Secondary, yet important, concerns
    18 include expected project costs, competition for Agency
    19 resources among other problem sites, and carry-over
    20 expenses of other Illinois EPA projects from previous
    21 years, and public acceptance of the project.
    22 So during the 4(q) decision process several of
    23 these factors may be considered simultaneously and
    24 many are revisited and revised during the review
    25 process. In my written testimony the 4(q) process is
    40
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 presented almost like it is a start to finish. But
    2 actually the progression from the Agency evaluation of
    3 a site to the actual decision is site-specific and
    4 difficult to describe and impossible to flow chart.
    5 In other words, I couldn't -- we tried to do it
    6 internally and we couldn't. You can't describe how
    7 does a site warrant a 4(q) process. There are many
    8 factors that go into that decision making.
    9 It may be a good point here to say that it is
    10 actually the Director of the Illinois EPA that issues
    11 the 4(q) notice. It is initiated and there is many
    12 factors that are considered from various parties from
    13 within the Agency, but it is actually the decision of
    14 the Director of the Illinois EPA.
    15 This decision process whether to issue a 4(q) to a
    16 site may appear to happen in a matter of days. In
    17 other words, the Agency finds out about a bad site, do
    18 we issue a 4(q) notice. Well, in reality it is
    19 usually measured in times of months or years because
    20 traditionally we know about a bad site because of all
    21 these other factors and other sites. We don't just
    22 automatically overnight issue a 4(q) notice.
    23 You know, how do we hear about these sites to
    24 issue a 4(q). Potential 4(q) sites are initially
    25 referred to the Illinois EPA by various sources
    41
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 including local citizens, through reportable releases,
    2 other government entities and Agency field
    3 inspectors. Once the Agency becomes aware of a
    4 problem, the site's owners and operators, if there are
    5 any, are contacted to discuss the situation. This
    6 contact may clarify any misunderstandings or explain
    7 the environmental concern as a non-issue so that no
    8 future Agency investigation or response action is
    9 required.
    10 The Agency may conduct an on-site visual
    11 inspection to assess the site and evaluate whether
    12 there is an imminent hazard constituting an emergency
    13 situation, such as a truck or rail accident, serious
    14 spills, and the like. And it was my understanding
    15 that Title 17 of the Act nor these proposed 741 rules
    16 or TACO really was not designed to address what we
    17 would call in the media an emergency response. And,
    18 actually, TACO actually states that in 742.105(c).
    19 So, you know, when there is a truck accident, an
    20 emergency situation, we did not think this process,
    21 and when I say this process, the 4(q) where the State
    22 would be issuing an -- expending State funds to
    23 cleanup a site, we did not think it was really
    24 relevant to this type of rulemaking.
    25 Emergency situations are generally handled by what
    42
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 is called the Office of Chemical Safety, the Emergency
    2 Response Unit, and the ERU oversees the emergency
    3 response until the emergency is abated.
    4 Getting back to the context of all remedial
    5 responses in Illinois, most emergencies are remediated
    6 by a PRP in a timely manner and don't warrant a 4(q)
    7 notice. So if we read about every day, you know, a
    8 truck accident in Chicago, a pipeline type release,
    9 PRPs, it is our experience, that they, especially in
    10 the 1990s, they respond to those immediately and we
    11 don't have these -- the Agency is not even really
    12 involved. In other words, the ERU, or Emergency
    13 Response Unit, is involved, but as far as the State
    14 having to expend funds and go clean up, the
    15 responsible party does that.
    16 Sites that do not constitute what I would call an
    17 emergency still may be considered time critical or
    18 immediate. If a site appears to present an immediate
    19 risk to human health or the environment and the PRPs
    20 are not responding, the Illinois EPA typically refers
    21 the site to the U.S. Environmental Protection Agency,
    22 Region 5, Emergency Response Branch, for consideration
    23 as a time critical removal.
    24 The Illinois EPA typically refers 15 to 20 sites
    25 per year to the U.S. EPA. It is not unusual that the
    43
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 U.S. EPA will perform only the immediate removal
    2 action at a site and then the Illinois EPA is left to
    3 perform a planned long-term remedial response.
    4 By definition, time critical removals include, but
    5 are not limited to, excavating obviously contaminated
    6 surficial soils, staging and removing drums, and
    7 emptying above ground storage tanks; all with the goal
    8 of reducing immediate threats.
    9 During the federal fiscal year October 1996
    10 through September of 1997, the U.S. EPA spent more
    11 than 9.5 million at 11 sites doing these what I call
    12 immediate removals in Illinois. This is a substantial
    13 asset, I guess you could say, to Illinois' overall
    14 environmental health. Because we, and when I say
    15 "we," the Illinois EPA and the Hazardous Waste Fund,
    16 we don't have the resources to respond to many sites
    17 that the U.S. EPA responds to. I am not talking about
    18 the Superfund type sites. I am talking about sites
    19 that the U.S. EPA does an immediate removal. We call
    20 them up on the phone and say, we have discovered a
    21 site that has open drums and it is an abandoned site,
    22 can you respond to it. So, fortunately, the U.S. EPA
    23 has a lot of resources to be able to address many of
    24 those.
    25 However, I would like to say that that changes
    44
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 from year-to-year. On the bottom of page five of my
    2 testimony I have a little case example that the U.S.
    3 EPA has been responding to an unusually large incident
    4 that involves methyl parathion. Over 500 residences
    5 in the Chicago area were sprayed by a termite
    6 exterminator, and more than 150 of these homes
    7 required a substantial cleanup. The Illinois EPA
    8 contributed considerable State personnel resources to
    9 this. We didn't really have any funds to provide in
    10 this effort.
    11 But during this period, and actually, they are
    12 still doing some of this cleanup, we were in contact
    13 with the U.S. EPA and we have kind of known by them
    14 that some of these other sites that we have referred
    15 they have put on the back burner. They said we can't
    16 respond to it now because they have limited resources
    17 and personnel, too. So they have been addressing this
    18 one particular, you could call it a site, but it is
    19 multiple sites, but this one particular problem for
    20 over a year now, and it has kind of put on delay some
    21 of these immediate responses that they have
    22 traditionally been able to help us with.
    23 So if a site is not referred or if it is referred
    24 but not completely remediated by the U.S. EPA, the
    25 Illinois EPA's assessment, if we believe that it
    45
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 warrants an additional investigation, the site becomes
    2 a candidate for a 4(q) notice. The 4(q) is issued as
    3 an opportunity for the PRPs to respond and signals a
    4 commitment to expend State funds at a site for the
    5 purposes of environmental remediation. It also serves
    6 as notice to PRPs that the State will seek cost
    7 recovery for the expenses of the cleanup.
    8 The Agency does not issue 4(q) notices unless it
    9 intends to commit State monies to address a site. So
    10 that was kind of tying in what I said earlier about
    11 when we issue the 4(q), the PRPs know that we are
    12 committed to using State funds to address the
    13 cleanup. The regulated community and the general
    14 public often presume the State has readily available
    15 resources to just clean up a site or go sue somebody.
    16 That is a typical response we get on the phone. You
    17 know, I see contamination, so go sue somebody or go
    18 clean it up. I kind of went through this little
    19 litany here because to show that it is a process that,
    20 you know, that we have limited resources and we will
    21 try to get the U.S. EPA to do it and if they can't do
    22 it, we try to go after the PRPs.
    23 State funded cleanups are administered by the
    24 Agency Remedial Project Management Section. These
    25 began June 1984 funded by these Clean Illinois monies
    46
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 and later there was additional Build Illinois monies.
    2 Both of these funding sources have dried up and State
    3 initiated cleanups are now funded through the
    4 Hazardous Waste Fund. That is what Gary mentioned
    5 earlier.
    6 There has to be someone to issue the 4(q) notices
    7 to, and identifying the PRPs is usually difficult
    8 despite the steps the Agency employs to locate the
    9 PRPs. The steps that the Agency employs to identify
    10 PRPs includes reviewing company records, manifests,
    11 courthouse records, tax records, property titles,
    12 Secretary of State records, interviewing former
    13 employees, interviewing local neighbors of the sites
    14 and reviewing business publications that may list
    15 corporate ownership.
    16 In other words, we do -- because of our limited
    17 resources, we try to -- it is in our best interest to
    18 have the PRPs work on the site before we would expend
    19 State funds on a site. Included in a 4(q) notice when
    20 we actually do issue a 4(q) notice is a section called
    21 the identified response. And often, not all the time,
    22 but often the 4(q) notice will identify an
    23 investigation as the initial response. And on our
    24 Steagall Landfill site that I went through earlier
    25 that had the open leachate and so forth, our initial
    47
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 response that we were wanting the PRPs to do was to
    2 perform an investigation.
    3 Even after a site investigation, the Agency must
    4 continue to compare the contaminated site competing
    5 for other Agency resources and determine if, how, and
    6 where to utilize our Hazardous Waste Fund monies and
    7 Agency resources. This scarcity of dollars combined
    8 with the problems of identifying PRPs creates a
    9 situation that limits the Agency's ability to respond
    10 but just to a few sites per year. That was depicted
    11 in the graph that I was going over earlier.
    12 Therefore, it is in the best interest to conserve
    13 resources and before issuing a 4(q) notice the Agency
    14 does identify, to the extent that it can, all the PRPs
    15 with the hope that one or more will respond. If the
    16 Agency must proceed, it uses a combination of in-house
    17 expertise and contractual technical assistance to
    18 develop and conduct the identified response action.
    19 And today all of our remediations at this type of
    20 sites are consistent with the TACO, so everything is
    21 reviewed in the light of TACO today.
    22 I am going to jump to page 11 and just briefly
    23 talk about the cost recovery. When the Agency
    24 utilizes resources, and when I say resources it could
    25 mean Hazardous Waste Fund monies or personnel time at
    48
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 a site, the State does seek to recover those
    2 resources. When PRPs are requested to reimburse the
    3 Hazardous Waste Fund they often ask, you know, what
    4 did this money go for. You know, you are coming after
    5 me for cost recovery, what did you spend this money
    6 for.
    7 By far the largest percentage of total site costs
    8 are directly attributable to the investigation and
    9 cleanup. These include costs incurred by the
    10 engineering and corrective action firms contracted by
    11 the Agency. In fact, from discussions -- this is
    12 anecdotal, but from discussions with several PRPs at
    13 some of these sites, the State cleanup efforts are
    14 actually very efficient in comparison to cleanups
    15 overseen with multiple PRPs.
    16 The reason, from what the PRPs tell me, is because
    17 we know exactly what we want done at the site and we
    18 don't have to have a PRP meeting and clients and
    19 consultants and attorneys from all over the United
    20 States. We already have a consultant and engineering
    21 firm ready to do exactly what the Agency wants. So we
    22 are -- it is a quick process there once we know what
    23 we want done at a site to do that.
    24 Cost recovery has traditionally occurred by one of
    25 three methods: Billing, and I mean by that invoices.
    49
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Litigation, which includes consent orders. And
    2 environmental reclamation liens. These three methods
    3 may be used in combination. And actually it would be
    4 stronger than may be. Traditionally they are used in
    5 combination at most sites.
    6 We see -- I had a site just the other day, to tell
    7 you the truth, that we asked them -- we said, we can
    8 either refer this to the Attorney General's office or
    9 do you wish us to send you a bill. They said, we
    10 prefer you to send us bill. We sent them a bill and
    11 they paid it in a couple days. But a lot of times it
    12 happens in combination.
    13 It is not unusual that the PRPs prefer to pay an
    14 Agency invoice. If, however, the PRPs fail to pay,
    15 the Agency's Division of Legal Counsel will prepare
    16 what is called a Cost Recovery Referral to the
    17 Attorney General's office.
    18 This ends the first part of my testimony, and I
    19 will discuss allocation factors later in these
    20 hearings. Thank you.
    21 MR. WIGHT: All right. Next we go back to Gary
    22 King for a more specific presentation on the proposal
    23 itself.
    24 MR. GARY KING: I am going to pick up my
    25 discussion on the bottom of page 11 going to the top
    50
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 of page 12, and as part of this we will start talking
    2 about some of the fundamental issues that really the
    3 Board is going to face. Much of the hearing so far, I
    4 think, is background for what these issues are all
    5 about.
    6 Again, the way we have divided 741, there are
    7 three subparts. First is Subpart A as the general
    8 subpart. Subpart B is the subpart that deals with
    9 State initiated complaints. And then Subpart C is the
    10 area that deals with proceedings started by a private
    11 party where there has not been a State initiated
    12 complaint. 741.105(a), that describes how Subpart B,
    13 the complaint process is triggered. That is pretty
    14 straightforward, I think. Subsection B describes how
    15 Subpart C provisions are triggered. The discussion
    16 there, I think, is fairly straightforward in the
    17 testimony. We won't spend very much time, I think, at
    18 all talking about Subpart C, just a few discussion
    19 points.
    20 Part of that is, I think, when we first started in
    21 talking about the whole PSL rule a year ago, SRAC, at
    22 least, thought that this was going to be a significant
    23 issue. And the more that we got into it I think they
    24 understood kind of the nature of our 4(q) process as
    25 we described it. They saw that that Subpart C process
    51
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 was really going to be -- involved far fewer sites
    2 than they initially thought it would involve.
    3 I think Subpart C is going to play a role in only
    4 a very tiny number of sites. Actually, we would not
    5 even have proposed this Subpart C if it were not for
    6 the fact that there is a specific obligation in
    7 Section 58.9(d) for the Board to come up with a
    8 procedure for private parties to come forward on a
    9 voluntary basis to do that.
    10 Okay. So subsection A talks about when the
    11 Subpart B is invoked. Subsection B talks about when
    12 Subsection C is invoked. And then Subsection C limits
    13 the applicability for both Subsections B and C. This
    14 is kind of the -- this is really the first point of
    15 real controversy related to our proposal.
    16 We proposed in our rule that the limitations that
    17 are set forth in Section 58.1(a)(2) that they applied
    18 to when Section 58.9 is applicable. Those four items
    19 are listed in my testimony. I will just go over those
    20 briefly. This is not a complete statement of what
    21 those cover. It is just a summary. One is the sites
    22 that are on the NPL list. The second item -- the
    23 second one is sites that are subject to RCRA Subtitle
    24 C or D. The third one is sites that are subject to
    25 RCRA Subtitle I. Then, finally, sites that are under
    52
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 some kind of specific federal court or administrative
    2 order from the U.S. EPA.
    3 Sites that -- the way we have it proposed is that
    4 sites falling within one of those four categories
    5 would fall outside of Part 741. We took this approach
    6 for a number of reasons. One, we certainly thought it
    7 was consistent with the structure of Title 17 of the
    8 Act in terms of what sites the -- what sites Title 17
    9 was applied to.
    10 We had a very strong policy concern relative to
    11 this, and in terms of how those RCRA Subtitle C, D,
    12 and I programs operate. They are all based on a
    13 strict joint and several liability concept. And if we
    14 were to impose a liability standard based upon cause
    15 or contribution and proportional share requirements,
    16 as we proposed here, we believe that that would cause
    17 us some difficulties with our authorization approvals
    18 from the U.S. EPA.
    19 One of the questions we will respond to later on
    20 talks about, you know, have you talked to the U.S. EPA
    21 about that issue, you know. And to be frank, no, we
    22 haven't. We didn't want to raise an issue before
    23 there was a final resolution on the matter. We have
    24 had some -- a couple of circuit court decisions, a
    25 lower court, that really we felt badly misconstrued
    53
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 how Title 17 works.
    2 If those, however, don't represent a generally
    3 applicable determination, we think the Board's
    4 decision here is what is generally applicable for the
    5 State. If the Board disagrees with the interpretation
    6 that we have annunciated here relative to the
    7 applicability limitations, how they interact with
    8 58.9, if the Board disagrees with that as part of the
    9 final rule we would certainly take that to the U.S.
    10 EPA and inform them of that, and then we would have to
    11 go through what will be a horrendous process relative
    12 to seeking to get that whole process corrected, at
    13 least from our views.
    14 Certainly, based on our history of how things have
    15 happened in the past, the Board may recall that in
    16 1993 there were certain amendments to the Underground
    17 Storage Tank Program which were inconsistent with
    18 federal law, and we went through a very complex and
    19 painful process of having approval withdrawn and then
    20 doing steps to get it back and then additional
    21 legislation. That all resulted in another rulemaking
    22 before the Board. So we have tried to structure
    23 things to avoid that problem here for that public
    24 policy reason, again, because it is supported by the
    25 legislation and its history.
    54
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Now, SRAC does not -- has not disagreed with that
    2 position. However, they have indicated that they
    3 think our position is too broadly stated. And we
    4 would agree that it would be possible to state the
    5 position a little more narrowly than what we have.
    6 However, we were concerned going into this proceeding
    7 as to where the Board would stand on this issue and we
    8 wanted to present what we think is the most direct
    9 positive argument relative to the interrelationship
    10 between 58.1(a)(2) and 58.9.
    11 If there is -- we also were not sure what other
    12 parties would be involved in this proceeding as well.
    13 If there is a general -- you know, if there is a
    14 general consensus that 58.9 is limited by 58.1(a)(2)
    15 then it seems to me that it could be appropriate to
    16 draw a little more narrow confinement to the way we
    17 have structured 741.105(c).
    18 The next major issue to be looked at is under
    19 741.115. That's the issue of information orders. My
    20 discussion on that begins at the bottom of page 16.
    21 What we have drafted there is an information order
    22 provision that is -- it has taken as its source, as
    23 far as the type of language that we have used, we have
    24 used the -- we have modeled it based on what is in
    25 Section 104(e) of the Federal Superfund Law. We
    55
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 thought it is important to do that, and we have -- we
    2 have modeled it on it, but we have not done it in
    3 quite the same way that 104(e) works.
    4 Under 104(e) the U.S. EPA simply has the authority
    5 to issue those orders. We did not conceive that as
    6 something that would be appropriate for us to do. We
    7 have cast it in terms of that would be an order that
    8 would be issued by the Board rather than issued by the
    9 Agency. We think that this order process, although
    10 there is no -- you can't look at 58.9 and see the
    11 words information order in there anywhere, but we
    12 think it is clearly consistent with the Board's broad
    13 rulemaking authority under Section 58.9, and it is
    14 important to assure that there is a workable
    15 implementation of that section.
    16 As John was saying, in the past we have had -- you
    17 know, there has always been difficulties in locating
    18 PRPs and creating the proper incentives for people
    19 with information to present that information. Even
    20 under a joint and several liability concept, it
    21 becomes, from our perspective, even more important
    22 under principles of Proportionate Share Liability for
    23 the State if we are going to assure that there is a
    24 complete remediation to identify as many PRPs as we
    25 can as soon as the problem site is involved.
    56
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 With the proportional share process, again, there
    2 is a reduction in the incentive for -- particularly
    3 for somewhat marginal PRPs to come forward. We think
    4 it is an important tool to make sure that as much
    5 information is generated early on to create the model
    6 of what site operations were. That is going to be the
    7 best way to make sure that allocations in the long run
    8 are fairly performed. It is not a magic answer to the
    9 problem of finding and addressing PRPs, but we think
    10 it is a modest tool and we think it is consistent with
    11 the Board's authority under Section 58.9.
    12 Turning to the discussion on Subpart B, my
    13 discussion here begins on page 19. As we see it,
    14 Subpart B is really the crux of Part 741. It sets
    15 forth the cause or contribution requirements that the
    16 State must establish to prove liability, and it sets
    17 forth the procedures for determining and allocating
    18 the proportionate shares of liability where the State
    19 has proven that liability exists.
    20 It does represent, in our view, a significant
    21 departure from the principles of strict joint and
    22 several liabilities as they are used under federal
    23 law, but we think it also proposes a procedure that is
    24 both workable and fair for both complainants and
    25 respondents.
    57
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 The first real significant departure from the
    2 CERCLA liability system relates to the cause or
    3 contribution requirement. One of the things under
    4 Federal Superfund Law that I think has really caused a
    5 lot of difficulties for a lot of people and has ended
    6 up being what I think is the most disruptive element,
    7 particularly as to how properties relate to the
    8 transaction process, the whole notion of cleaning up
    9 and redeveloping Brownfields, is the idea of liability
    10 simply based on owner status.
    11 Under Federal Superfund Law if you are an owner of
    12 a site where there has been a release, regardless of
    13 when your ownership occurred relative to that release,
    14 you are liable. And that, in my mind, has caused more
    15 problems relative to the whole Brownfields
    16 redevelopment process than anything else in Superfund
    17 Law. I think that is one of the things that the
    18 legislature -- in the legislative history they really
    19 were -- the legislature was really focused on. You
    20 know, we need to make sure that our liability system
    21 is not getting in the way of Brownfields
    22 redevelopment. I think this is the most important
    23 provision relative to that.
    24 We have gone away from that CERCLA system.
    25 22.2(f)(1) incorporates the same CERCLA liability
    58
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 provision, but in our -- as we have laid out, in 741,
    2 Subpart B, we don't have a status based provision for
    3 owners and operators. There has to be proof of
    4 liability based on actions or inactions or omissions,
    5 not just status.
    6 The other significant difference under Subpart B
    7 is that we do not incorporate joint and several
    8 liability. Although some people may think that we
    9 have, we don't. The way things work under -- just in
    10 a short sort of way, under Superfund Law, in general,
    11 if the government establishes liability then the
    12 respondent, unless it proves that the harm is
    13 divisible is responsible as to the government to
    14 perform or pay for the entire remediation.
    15 That is not the way we have it structured under
    16 our proposal. Under Subpart B, once liability is
    17 established, the burden of establishing proportionate
    18 share is properly placed on those who have been
    19 demonstrated to be liable and there are consequences
    20 related to that. But there is not this requirement of
    21 proving divisibility. That's a key difference. Under
    22 Federal Superfund Law there is a requirement to prove
    23 divisibility. Under our proposal there is not.
    24 There is another, I think, extreme difference, and
    25 that is the notion of -- under our system, and John
    59
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 will talk a little bit more about this later on, is
    2 that we have -- we allow the whole process of
    3 allocation to be developed using risk based
    4 remediation objectives under TACO. I am not aware of
    5 anything that remotely resembles that under the
    6 Federal CERCLA liability system, perhaps because they
    7 don't have anything that even remotely resembles the
    8 kind of flexible cleanup objectives process that we
    9 have under TACO.
    10 Looking at the specifics, I guess focusing on
    11 Section 741.210, that sets forth the burden and
    12 standard of proof for a State filed complaint under
    13 Section 741.105, one of the things that I would point
    14 out, because the Board is going to be receiving
    15 testimony from Browning & Ferris relative to the
    16 liability standard for transporters that we have
    17 included in Section 741.210(b)(5).
    18 They commented that the version that we have is
    19 different from the Federal Superfund Law. We agree
    20 that it is different from the Federal Superfund Law.
    21 And that is because the version that we put into
    22 741.210 is modeled on the language that appears in the
    23 Environmental Protection Act which, again, is
    24 different from the Superfund Law as to the transporter
    25 liability. You know, I think it is really kind of up
    60
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 to the Board as to which one they now include in this
    2 proceeding. We simply included the transporter
    3 liability provision as it was already set forth in the
    4 Environmental Protection Act.
    5 As I was saying, under 741.210(b) the burden of
    6 proof for the threshold issue of liability is placed
    7 on the State. There is a requirement that the State
    8 prove their liability by the preponderance of the
    9 evidence, and liability is based on the degree to
    10 which the PRP caused or contributed to the release or
    11 the substantial threat of a release. Again, we have
    12 set forth five ways that a person can be held liable.
    13 I commented (b)(5), and I am sure as we have questions
    14 come up during the hearing process we can comment on
    15 some of the other issues as to the cause or
    16 contribution elements.
    17 Subsection C, what we have done there is we have
    18 shifted the burden. We said that you can raise
    19 defenses and we have included within those defenses
    20 those stated in 58.9, and we have included those
    21 stated in 22.2(j). Those are not -- 58.9 does not
    22 require Section 22.2(j) defenses to be included within
    23 this provision, but we thought that made sense. That
    24 made sense to do that.
    25 Also, that is a -- as I was saying, that is a
    61
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 shifting of the burden. We consider the provisions in
    2 58.9 in Subsection B, there is the -- SRAC has
    3 contended that those are limitations as opposed to
    4 defenses. We really don't see how -- if those are
    5 limitations, in our view those become conditions
    6 precedent to our ability to establish liability. That
    7 would be certainly inconsistent with the way
    8 everything has worked up to this time. And we think
    9 if you look at what all those provisions entail, it
    10 would require the Agency to introduce proof on a whole
    11 series of items that could be very extraneous to what
    12 the case is really about. We think that those -- what
    13 they contend are limitations really should be viewed
    14 as defenses similar to the way that the defenses in
    15 22.2(j) are laid out.
    16 Subsection D -- and, again, we are still in
    17 741.210(b) -- has said that the liability is on the
    18 State as far as proving -- the responsibility is on
    19 the State to prove liability by a preponderance of the
    20 evidence, and Subsection C says here is the defenses
    21 to those liability provisions. Now Subsection D deals
    22 with what happens once a party's liability has been
    23 demonstrated, who has the burden of demonstrating
    24 proportionate share. In our proposal we have shifted
    25 that burden to the liable party. SRAC does not agree
    62
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 with that.
    2 We did that, and I think there is key reasons for
    3 doing that. And I think we have cited the Restatement
    4 of Torts as providing some of the jurisprudence
    5 underpinnings as to why and when you shift the burden
    6 of proof as to the allocation issues. We think that
    7 discussion makes sense in the context of these cases.
    8 It also makes sense in terms of who should have -- who
    9 has the information to be brought forward as to what
    10 allocation percentages should be involved.
    11 That provision carries through, that concept
    12 carries through down into Subsection (d)(3) which
    13 perhaps is the most controversial point of what we
    14 had, and it talks about what happens when there is
    15 inadequate information, what is the Board to do in
    16 those situations. Under joint liability provisions,
    17 where there was liability established and somebody
    18 couldn't make any kind of proof as to the allocation,
    19 they simply would be assigned 100 percent
    20 responsibility. That is not the way we have organized
    21 this rule. We will talk a little bit more about how
    22 we have organized that later on.
    23 But we think it is important that it be organized
    24 in that kind of way, first of all, to make sure that
    25 we are motivating the production of complete and
    63
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 accurate information. And, secondly, to prevent
    2 clearly liable parties from entirely escaping
    3 responsibility in cases where there is insufficient
    4 information to apportion harm.
    5 One of the issues that has been discussed is what
    6 happens to the orphan share, you know, who is going to
    7 absorb that. Well, we think it is one thing for the
    8 State to absorb an orphan share where a party is
    9 bankrupt or cannot be found, and we think that is
    10 appropriate under this provision for the Agency to
    11 absorb that orphan share.
    12 It is another thing for the State to be absorbing
    13 a share of a party that has been found to be liable,
    14 has been found to be viable, and just because the
    15 evidence is not conclusive in the State's favor as to
    16 what that share should be, we think that goes beyond
    17 proportionate share. I am not sure what it is, but it
    18 is something beyond it. I think that's the position
    19 that SRAC favors and we don't.
    20 One of the things that I think the Board will hear
    21 argued in the context of this proceeding is that we
    22 have had -- what we have is a return to joint and
    23 several liability. And we don't think that is true
    24 and, actually, I think as we have looked at this issue
    25 we think there is more -- perhaps it is our not
    64
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 following through and explaining our proposal enough
    2 to persons involved.
    3 So really through seeing the testimony and the
    4 questions come in over the last week or so we thought
    5 it would be appropriate to develop some scenarios that
    6 kind of illustrate the approach that we are taking to
    7 apportionment and also illustrate how it is different
    8 from Federal Superfund Law and illustrate how it is
    9 different from what SRAC is proposing.
    10 HEARING OFFICER ERVIN: Could I interrupt? Why
    11 don't we take a short five or ten minute break to let
    12 people stretch their legs, if this is an appropriate
    13 time to take a break.
    14 MR. WIGHT: Yes, sure.
    15 (Whereupon a short recess was taken.)
    16 HEARING OFFICER ERVIN: Back on the record.
    17 Whenever you are ready. I thank you for the
    18 indulgence for the break.
    19 MR. WIGHT: Just to pick up where Mr. King left
    20 off, he was talking about pre-filed testimony that we
    21 received over the last week or ten days, and it
    22 becoming apparent to us that part of what we proposed
    23 in 741.210 is greatly misunderstood. So we were
    24 trying to think of ways that we could illustrate that
    25 better than what we have been able to do in narrative
    65
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 testimony.
    2 As a result of that, we have put together what we
    3 are calling some allocation scenarios. Really, it is
    4 just three pages of tables which contain no
    5 explanation. But Mr. King will be providing the
    6 explanation and then we will be passing out the copies
    7 so that everyone will have these once this is admitted
    8 as an exhibit, and you can all follow along with the
    9 explanation. To start that process I will have Mr.
    10 King identify the exhibit.
    11 Mr. King, I am handing you a document that has
    12 been marked Exhibit 7 for identification. Would you
    13 please take a look at it?
    14 (Witness complied.)
    15 MR. WIGHT: Do you recognize the document?
    16 MR. GARY KING: Yes, I do.
    17 MR. WIGHT: Would you please explain what it is?
    18 MR. GARY KING: It is a document entitled,
    19 Allocation Scenarios Illustrating Approaches to
    20 Apportionment for Liable Parties.
    21 MR. WIGHT: That document consists of three
    22 pages?
    23 MR. GARY KING: That's correct.
    24 MR. WIGHT: Okay. Is that a correct copy of the
    25 examples worked up by the work group for presentation
    66
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 at the hearing today?
    2 MR. GARY KING: Yes, it is.
    3 MR. WIGHT: Okay. This exhibit was not
    4 pre-filed. As I said, it was prepared just within the
    5 last few days. However, I would request permission to
    6 have the exhibit entered into the record.
    7 HEARING OFFICER ERVIN: Are there any objections
    8 to the admittance of this document?
    9 All right. Seeing none, then we will enter this
    10 into evidence as Exhibit Number 7 entitled, Allocation
    11 Scenarios Illustrating Approaches to Apportionment for
    12 Liable Parties.
    13 (Whereupon said document was entered into evidence
    14 as Hearing Exhibit 7 as of this date.)
    15 MR. WIGHT: We will distribute copies to
    16 everyone. We will be coming around so everybody will
    17 have a copy and may follow along.
    18 MR. GARY KING: As we are passing those out, let
    19 me explain why we decided to do this. As I was saying
    20 before and Mark was saying before, one of the things
    21 that we saw as the testimony was coming in was to us
    22 there seemed like there was some confusion as to what
    23 we were proposing as to 710.210(d) and in particular
    24 (d)(3). So we developed these scenarios, and we have
    25 done this for three purposes.
    67
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 One, we wanted to show how 210(d)(3) of our
    2 proposal works. Second, we wanted to compare it to
    3 the way joint and several liability works under
    4 Federal Superfund. And then, third, we wanted to
    5 compare it to the way we see the SRAC proposal
    6 working.
    7 I am just going to -- I would like to just go
    8 through these on a scenario-by-scenario basis and kind
    9 of explain these. You have to look at these with a
    10 couple assumptions, though. The first assumption is
    11 that we are talking about liable parties. Okay. In
    12 the scenario that we had lined out, there is the --
    13 the State has a burden of proof to establish that a
    14 party is liable for purposes of this example. We are
    15 assuming that the parties named are liable parties.
    16 Okay. The second thing, the second assumption is
    17 that for each example we have -- for purposes of that
    18 example, all the PRPs have been identified. There are
    19 no other PRPs for purposes of the example. And with
    20 that I would kind of like to walk through it.
    21 If you look at Scenario 1, Example 1, this assumes
    22 that there is three parties that have been found to be
    23 liable, Parties A, B, and C, and there are no other
    24 parties involved. And that each of them is contending
    25 that the share is 25 percent. And then the case goes
    68
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 to hearing and the proof shows that for party A he
    2 does have a 25 percent share, as he contended. For
    3 party B, party B has a 35 percent share based on the
    4 proof, not 25 percent as he contended. And then party
    5 C has a 40 percent share.
    6 Well, under the way 210(d) would work, party A
    7 would -- his proportionate share would be 25 percent.
    8 Party B would be 35 percent. And party C would be 40
    9 percent. That is true because that is what the proof
    10 showed. What the proof showed is what the party
    11 gets.
    12 Okay. Going down to Example 2, in this example,
    13 we have got four responsible parties, again, all four
    14 have been found to be liable under one of the
    15 standards of liability, and these are the four and
    16 there are no others. And in this hypothetical A
    17 contends he is 20 percent responsible. B contends he
    18 is 20 percent responsible. And C contends he is 20
    19 percent responsible. And then D is a bankrupt
    20 person. He doesn't participate.
    21 Okay. At the hearing -- the case goes to hearing
    22 and the proof shows under that column that party A is
    23 20 percent liable and so is party B, who thought
    24 that -- he contended he was 20 percent liable. It
    25 shows that he is 25 percent liable. The same is true
    69
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 for party C. And then the bankrupt, the orphan share,
    2 that is determined -- the proof shows that that person
    3 has a 30 percent allocation.
    4 Well, then under 210(d), party A gets a 20 percent
    5 responsibility, because that is what the proof shows.
    6 Party B gets 25 percent, because that is what the
    7 proof showed. Party C also 25. And then party D gets
    8 30 percent, because that is what the proof shows.
    9 Now, in that scenario for a cleanup to proceed,
    10 that would mean that the State would have to be coming
    11 up with 30 percent of the funding in order for the
    12 remediation to be complete.
    13 Okay. Flip to the next scenario, Scenario 2 and
    14 Example 1. Again, we are assuming that the parties
    15 are -- have been determined to be liable, and that
    16 there are no other parties involved. We have added
    17 another column to show how this would work vis-a-vis
    18 the Superfund liability and how this compares to what
    19 we proposed.
    20 Again, each of the responsible parties in Example
    21 1, A, B and C, contend they have a 25 percent share.
    22 Well, looking at -- the case goes to hearing and party
    23 A, the proof shows that he has got 25 percent
    24 responsibility. But for B and C, the evidence didn't
    25 complete as to what the allocation should be. Well,
    70
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 under proportionate share, as we have proposed it,
    2 party A would get a 25 percent share because that's
    3 what the proof showed. And then for parties B and C
    4 there would be an allocation of the total of 75
    5 percent between those two.
    6 Now, if you compare that to Superfund, where,
    7 again, our example here, you know, there is no proof
    8 of divisibility, each of those parties, because they
    9 were liable, would be joint and several up to 100
    10 percent. Okay. Again, I think that shows one of the
    11 key differences between what we proposed in 210(d) and
    12 how CERCLA liability works.
    13 Again, this is a -- another point I probably
    14 should have bought up before about how (d)(3) works,
    15 it is -- the way we phrase it, it is not the Board
    16 shall allocate between all these, it is a
    17 discretionary point. So this total is a total of 75
    18 percent to be allocated by the Board as it is making
    19 the decision. It is not mandated that the Board
    20 allocate that 75 percent in any specific way or in
    21 total.
    22 The Example 2, this assumes four parties. There
    23 are only four parties identified. They are all,
    24 again, liable. Parties A, B, and C contend that they
    25 have a 20 percent share each. The fourth party, party
    71
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 D, he is bankrupt. He doesn't participate.
    2 The proof shows at hearing that party A has a 25
    3 percent share. For B and C it is incomplete. And for
    4 party D it is an orphan share. It is 30 percent
    5 there. Under 210(d), the way that would work is party
    6 A would get a 20 percent share. Dropping down to D, D
    7 gets a 30 percent share which because it is orphan it
    8 would, in essence, become the State's responsibility
    9 to pay for the remediation to be complete. And then
    10 between B and C the Board would, as a matter of
    11 discretion, allocate a total of 50 percent.
    12 Again, comparing that to CERCLA or joint and
    13 several liability, under CERCLA you are liable unless
    14 you prove indivisibility, which is not a requirement
    15 under 741, you get 100 percent under joint and
    16 several.
    17 Now, turning to Scenario 3, it is basically the
    18 same as Scenario 2 except here we have added a column
    19 which we believe represents what SRAC is proposing.
    20 We tried to do this in a way that I think that it
    21 should demonstrate to the Board the kind of middle
    22 ground that the Agency has taken with its proposal
    23 between the extreme of joint and several liability
    24 under CERCLA, and also we think is an extreme position
    25 going the other way.
    72
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Under the SRAC allocation, again, looking at
    2 Example 1, you have got three parties, A, B and C.
    3 They are each contending they are 25 percent, their
    4 allocation share is 25 percent. For A the proof shows
    5 he is 25 percent responsible. Under either our system
    6 or the SRAC system that guy would get 25 percent.
    7 Now, where the information is incomplete, however,
    8 there becomes then a major difference between what the
    9 Agency is suggesting happen and what SRAC is proposing
    10 to happen. In our proposal we are suggesting that the
    11 Board, because these are the only three parties there,
    12 that it falls within the Board's discretion to
    13 allocate that 75 percent between B and C.
    14 SRAC would propose, as we understand the proposal,
    15 that they would escape responsibility because it was
    16 an incomplete, the evidence was incomplete. So
    17 although they were reliable, they would pay no share.
    18 Again, you can see the contrasting difference with the
    19 CERCLA process.
    20 Under that, as you see there is a Footnote 1 there
    21 that talks about, you know, under that allocation
    22 system because those two parties escape liability,
    23 then for the -- escape paying a share, then the State
    24 would have to pay 75 percent of the remedial costs for
    25 the project to be completed.
    73
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Moving down to Example 2, it is the same as
    2 Scenario 2, Example 2, now under Scenario 3, just
    3 going back over that, we have got four parties, A B,
    4 C, and D. Those are the only four liable parties. A,
    5 B, and C contend they are 20 percent liable. Party D
    6 does not participate.
    7 Now, the information on all of these is -- on A it
    8 shows 20 percent. But on B, C, and D, the information
    9 is incomplete. So under our -- the way we have viewed
    10 proportionate share, that 20 percent would go to party
    11 A, and then amongst B, C, and D there would be
    12 allocated 80 percent. And under our proceeding then
    13 whatever the State determines the orphan share to be,
    14 then, you know, the State would have to be providing
    15 funding for that for the remediation to be complete.
    16 Contrast that with the CERCLA, again 100 percent
    17 down the line, and then under SRAC's proposal, party A
    18 would get a 20 percent share. And then the rest of
    19 the parties, because the evidence was incomplete, they
    20 would escape allocation, even though they were liable
    21 parties. Under that scenario now the State, instead
    22 of providing an orphan share, would have to be paying
    23 80 percent of the remedial costs.
    24 So that's the way we tried to -- at least that's
    25 our analysis of dealing with these kind of short
    74
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 hypotheticals to show how our proposal works
    2 contrasting that with showing the differences from
    3 CERCLA, joint and several liability, and then
    4 contrasting it with what we believe that SRAC is
    5 proposing.
    6 MR. RIESER: Excuse me, Mr. King, Mrs. Hearing
    7 Officer, I was out of the room when the hearing
    8 started and Mr. Wight presented this evidence and I
    9 didn't hear how it was described when he introduced
    10 it. We should have reserved our objections to this
    11 until we had a chance to actually see it and hear the
    12 description of it.
    13 I would like to, if I may, interpose at least a
    14 reservation of objection until we can ask Mr. King
    15 some questions about this. A, it is something that we
    16 have not seen. But I think more to the point, B, is
    17 that it is a -- it reminds me of sort of the old
    18 laundry ads where they hold a dirty towel up and that
    19 was brand X and then Tide, of course, got the towel
    20 incredibly clean. We have no idea what the
    21 definitions of the terms that are used are and how the
    22 conclusions were drawn that support any of the numbers
    23 that are used. Just off the top of my head, I think
    24 it totally misrepresents what our position would be.
    25 I would like to reserve an objection to the
    75
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 introduction of his exhibit until at least after we
    2 have had a chance to question Mr. King regarding some
    3 of the definitions and the assumptions that went into
    4 this exhibit.
    5 HEARING OFFICER ERVIN: Mr. Wight, would you like
    6 to respond?
    7 MR. WIGHT: Well, I think the exhibit was
    8 presented -- I think the exhibit was presented. It
    9 has been admitted. I am not sure -- again, the
    10 numbers are more or less arbitrary, but they are
    11 picked for purposes of the example. They are not
    12 picked to represent any particular site.
    13 The interpretation of the SRAC allocations are
    14 from provisions in the testimony of Mr. Rieser and Mr.
    15 Marder. Although they have not been formally given to
    16 the Board at this point, they have been pre-filed and
    17 we were able to glean this interpretation from those.
    18 They will certainly have their opportunity to correct
    19 it if this is a misinterpretation, and I think the
    20 exhibit should remain in the record.
    21 HEARING OFFICER ERVIN: I have already admitted
    22 this into the record, so I am going to have to allow
    23 it to remain in. However, we will give you ample time
    24 this afternoon to question the Agency on this
    25 exhibit.
    76
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: Thank you.
    2 HEARING OFFICER ERVIN: Mr. Wight, would you like
    3 to continue?
    4 MR. WIGHT: Yes, just back to Mr. King's
    5 presentation.
    6 MR. GARY KING: Okay. With that, that concludes
    7 the discussion on 741.210. I would like to briefly
    8 talk about 741.215. That provides a short list of
    9 allocation factors. We did not intend that to be --
    10 those to be totally exclusive factors. But, you know,
    11 we have tried to develop factors that we thought were
    12 as objective as possible. We were familiar with
    13 the -- what are termed the Gore factors under the
    14 Federal Superfund Law, and we didn't want to track
    15 those directly because we thought those had more
    16 subjectivity to them, and we thought it was
    17 appropriate for purposes of this proceeding. And so
    18 you see a much more limited list.
    19 One of the things that we did include, and this is
    20 something that SRAC strongly argued for, and we
    21 thought was appropriate, and that was that you allow
    22 the risk based remediation objectives. How you derive
    23 that and how that affects the actual cleanup to --
    24 that's a factor in how you look at the allocation.
    25 They put an example, a brief hypothetical, in the
    77
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 testimony, if you could have an exposure route which
    2 is driving the cost of a response action and how you
    3 respond to that exposure route may vary with the
    4 remediation objectives methodology used and different
    5 PRPs could be more or less responsible depending on
    6 the remediation response that was taken.
    7 That pretty much concludes my discussion. As I
    8 was saying earlier, there is another subpart, Subpart
    9 C. We think that is fairly straightforward. There
    10 was no real controversies relevant to that. As I said
    11 early on in testimony, I don't think it is going to be
    12 used very frequently at all. I think that the rule in
    13 the testimony kind of speaks for itself.
    14 So with that I will let John finish up his
    15 presentation.
    16 MR. WIGHT: Mr. Sherrill has just a few remarks on
    17 the allocation factors themselves.
    18 MR. SHERRILL: This picks up on page 13 of my
    19 pre-filed testimony regarding allocation factors. And
    20 to reiterate what Mr. King said, these were not all of
    21 the factors, but they were objective factors that we
    22 identified. And I am just going to summarize, and
    23 this will probably just take less than ten minutes or
    24 so.
    25 Proposed Section 741.215 includes three factors
    78
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 for allocating cost among PRPs:
    2 The volume of regulated substance for which each
    3 liable party is responsible;
    4 Risk and hazard potential of contaminants;
    5 And then the third factor would be the degree of
    6 involvement of a party in the generation,
    7 transportation, treatment, storage, or disposal of
    8 this contaminant -- excuse me -- of this regulated
    9 substance or pesticide.
    10 Parties that can show that their contribution to
    11 environmental damage is relatively small stand in a
    12 better position to be allocated a smaller portion of
    13 responsibility.
    14 To go into a little bit more on the volume of
    15 regulated substance or pesticide for which each party
    16 is responsible, indicates the waste volume as a
    17 portion of the contamination at a site. All other
    18 factors being equal, the greater the waste volume for
    19 which a party is responsible, the greater the
    20 proportion of responsibility allocated.
    21 In certain circumstances, where records depict
    22 that the amount of waste contributed by an individual
    23 party is not available, the length of time an owner or
    24 operator owned or operated the site may be considered
    25 as a surrogate measure for volume. For example, in an
    79
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 allocation proceeding where the precise amount of
    2 waste contributed by each owner or operator is
    3 unknown, the volume estimate could equal the number of
    4 years each party owned or operated the site divided by
    5 the total years the site was in operation. And I
    6 provide a little example of that on page 14.
    7 And in this part of my testimony when I use the
    8 term waste, I am just doing that as a -- it could also
    9 mean regulated substance or pesticide.
    10 Time, we believe, as a surrogate value is
    11 reasonable and should provide consistency among all
    12 other allocation factors. Therefore, if there is
    13 little or no accurate knowledge of the waste volumes
    14 released, the number of years each party owned or
    15 operated the contributing site as a percentage of the
    16 total years the site has been in operation should be
    17 considered for that party's degree of responsibility.
    18 The second allocation factor, risk and hazard
    19 potential, should be based upon a waste's toxicity and
    20 persistence in the environment. All other factors
    21 being equal, the more toxic and persistent the waste,
    22 the greater the percentage of responsibility
    23 allocated.
    24 Together with the toxicity and persistence
    25 potential of the waste, site-specific remediation
    80
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 objectives are to be developed consistent with TACO to
    2 derive the risk and hazard potential.
    3 The third allocation factor, the degree of a
    4 party's involvement in generating, transporting,
    5 treating, storing, disposing, or otherwise improperly
    6 managing waste is meaningful to determine
    7 apportionment when volume and toxicity are less
    8 relevant. For example, this allocation factor is
    9 applicable to a site owner who may not have originated
    10 the wastes, but instead received them from off-site
    11 generators. If the site owner improperly manages the
    12 wastes, resulting in the release, then some share of
    13 the responsibility must be allocated based on those
    14 improper actions, or inactions or omissions.
    15 That ends my testimony. I will turn it back over
    16 to Mark.
    17 MR. WIGHT: That concludes our presentation for
    18 this morning. So whenever the Board is ready, we will
    19 be prepared to begin to answer questions.
    20 HEARING OFFICER ERVIN: Thank you. As I said at
    21 the beginning of this proceedings, following the
    22 Agency's testimony we will begin with the pre-filed
    23 questions. Given the time that it is around lunch, I
    24 think we will wait for the pre-filed questions until
    25 after lunch.
    81
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 I will give Mr. Rieser the opportunity if you
    2 would like to question the Agency regarding the
    3 scenarios now or if you would like to wait and work
    4 them into the pre-filed questions after lunch.
    5 MR. RIESER: Why don't we work it into the whole
    6 discussion.
    7 HEARING OFFICER ERVIN: All right. Then we will
    8 adjourn for lunch for an hour. We will reconvene at
    9 1:15.
    10 (Whereupon a lunch recess was taken from
    11 12:15 p.m. to 1:15 p.m.)
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    82
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 AFTERNOON SESSION
    2 (May 4, 1998; 1:15 p.m.)
    3 (Board Member G. Tanner Girard was not present for
    4 the afternoon session.)
    5 HEARING OFFICER ERVIN: We will now proceed with
    6 the pre-filed questions for the Agency. We had two
    7 sets of pre-filed questions. One set was by the
    8 Illinois Environmental Regulatory Group and the second
    9 set from the Illinois Steel Group and the Chemical
    10 Industry Council of Illinois.
    11 To have a more orderly record, I have asked that
    12 the questions be asked by sections. So if you are
    13 following along with the pre-filed questions, it will
    14 be out of order. All right. We will begin.
    15 I think, Mr. Rieser, you had a question, a general
    16 question regarding Mr. King's testimony? Or would you
    17 like to start with the --
    18 MR. RIESER: It all applies to the cost recovery
    19 issues, and let's just take that all at one shot.
    20 HEARING OFFICER ERVIN: All right.
    21 MR. RIESER: I am sorry. The question number
    22 one?
    23 HEARING OFFICER ERVIN: Do you want to start with
    24 the scenarios or do you --
    25 MR. RIESER: I am sorry. I misunderstood. I
    83
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 thought you were asking whether I wanted to ask
    2 questions about the scenarios. If you are asking that
    3 I ask number one, I will be happy to do that. Excuse
    4 me.
    5 HEARING OFFICER ERVIN: Yes, it was my
    6 understanding that you wanted to ask about the
    7 scenarios within the section.
    8 MR. RIESER: That is fine. Fine. I am sorry. I
    9 misunderstood.
    10 This is a question directed to Mr. King. With
    11 respect to the cost recovery litigation described on
    12 page 11 of Gary King's testimony, what types of sites
    13 were these? Were these consent orders or litigated
    14 actions? How many separate actions were involved?
    15 How do these figures compare with prior years?
    16 MR. GARY KING: We appreciate the appropriateness
    17 of the question. However, we just -- it does request
    18 a lot of specific information, and in the short time
    19 between us receiving the question and this hearing
    20 today, we were not able to get all of the facts that
    21 this question really would require us to have in order
    22 to answer it. So we would like to defer that further
    23 response to this question to a subsequent hearing and
    24 answer it at that point.
    25 MR. RIESER: And that's fine as long as I have a
    84
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 chance to follow-up. And as long as you are going to
    2 get information, I guess another question filled in on
    3 something Mr. Sherrill testified to today, is how much
    4 of this cost recovery litigation amounts to, of the
    5 5.4 million, how much of that represents voluntary
    6 payments where the Agency sent an invoice out and they
    7 said fine, and paid it.
    8 HEARING OFFICER ERVIN: If you would like to bring
    9 that information to the next hearing.
    10 MS. ROSEN: Could I ask one additional question
    11 then?
    12 HEARING OFFICER ERVIN: Certainly.
    13 MS. ROSEN: The penalties category that you have
    14 on the chart, are those penalties that in all cases
    15 were received as part of a filed consent order or does
    16 that encompass like an administrative citation process
    17 that the Agency might have used?
    18 MR. GARY KING: I can answer that. Those are all
    19 consent orders.
    20 MS. ROSEN: Okay.
    21 HEARING OFFICER ERVIN: Now we can move to the
    22 questions regarding the specific sections. I believe
    23 there were questions on Section 741.105.
    24 MS. ROSEN: Question number two. Question number
    25 two of the Board's compiled questions.
    85
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Page five of the Agency's Statement of Reasons
    2 states that the applicability of Part 741 is limited
    3 in the case of treatment, storage, disposal sites for
    4 which a current permit has been issued or that are
    5 subject to closure requirements under Federal or State
    6 solid or hazardous waste laws, end quote, emphasis
    7 added.
    8 Does this exemption encompass sites where, due to
    9 the applicability of regulatory exemptions or based on
    10 the Agency's discretion, closure under applicable
    11 Federal and State laws will not be required?
    12 MR. GARY KING: We were -- we have two responses
    13 on that. First we were a little confused about the
    14 nature of the question. And then, secondly, and this
    15 will apply to -- there is, I think, probably two or
    16 three other questions that deal with the applicability
    17 of RCRA Subtitle C and D requirements. And we did not
    18 have the opportunity to consult with our RCRA people
    19 before today. And I would like to make sure that we
    20 are consulting with them before we provide any answer
    21 on this question and the other ones that kind of imply
    22 some kind of RCRA hypothetical, so we have to make
    23 sure that we have a consistent answer there.
    24 As far as maybe if you could give us a little more
    25 explanation as to what you are asking for when you
    86
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 say, does this exemption encompass sites? Or due to
    2 the applicability of regulatory exemptions. I guess
    3 we are getting a little confused as to what the thrust
    4 of the question was.
    5 MS. ROSEN: Okay. Let me see if I can better
    6 clarify, if you want to stop for a second.
    7 MR. RIESER: I think what they are talking about
    8 is given that there are sites that could
    9 conceivably -- it is a question that kind of comes up
    10 in different categories. Sites where there were
    11 releases of material that could be characterized --
    12 and I am using that term in a broad sense --
    13 characterized as a hazardous waste, so that
    14 theoretically at least the RCRA Subtitle C regulations
    15 would apply the remediation, but typically for a
    16 variety of reasons it is not the Agency's practice to
    17 handle those sites the Agency will allow those types
    18 of sites to be handled under the Site Remediation
    19 Program or just some sort of quick and effective means
    20 of remediating those sites. The question is whether
    21 those types of sites would be excluded from coverage
    22 under the Proportionate Share Liability regulations?
    23 MR. GARY KING: Okay. I think that helps out.
    24 That will allow us to formulate a better answer then.
    25 HEARING OFFICER ERVIN: Okay. So they are
    87
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 bringing back information to the next hearing. Do you
    2 have a follow-up question?
    3 MR. RIESER: Go ahead.
    4 MS. ROSEN: Question number three, what concerns,
    5 if any, has the U.S. EPA expressed to the Agency
    6 regarding any perceived deficiencies and/or
    7 inconsistencies in the State's administration of
    8 programs under the Solid Waste Disposal Act due to the
    9 enactment of the Proportionate Share Liability
    10 provisions?
    11 MR. GARY KING: As I was saying this morning, they
    12 have not expressed any concerns to us because we
    13 really have not brought to their attention that there
    14 may be a deficiency. And the reason why we have not
    15 done that is because we felt that it is really the --
    16 that this rulemaking will define whether there is an
    17 inconsistency or not. So we don't know of any that
    18 they have raised because of the fact that we have not
    19 presented the issue to them yet.
    20 MS. ROSEN: At the time of the passage of the
    21 legislation, were these concerns expressed by the U.S.
    22 EPA?
    23 MR. GARY KING: There were concerns expressed when
    24 the -- I am going to check my -- let me make sure I
    25 have the right bill number here. When Public Act
    88
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 89-431 was being debated, there was a concern raised
    2 by the U.S. EPA as to whether -- if that were enacted
    3 as it was originally proposed whether that would be --
    4 whether it would be an inconsistency with the
    5 Memorandum of Agreement that the State of Illinois has
    6 with the U.S. EPA relative to our Volunteer Cleanup
    7 Program. The legislation changed and so that resolved
    8 that concern. Then 89-433 which added 58.9, I am not
    9 aware of any U.S. EPA comments being raised during the
    10 legislative debate, as to the RCRA applicability
    11 rules.
    12 MR. RIESER: And since the passage of this
    13 legislation in December of 1995, did you have further
    14 discussions with the EPA to update the Memorandum of
    15 Agreement regarding the Superfund liability?
    16 MR. GARY KING: We have, but it -- the Superfund
    17 one has not changed. There has been a long
    18 outstanding discussion involving the U.S. EPA and
    19 various states, regional offices, as to whether more
    20 of these are going to be signed, you know, what are
    21 they going to look like, how complicated are they
    22 going to -- what are they going to cover. So rather
    23 than raise a series of issues relative to our own
    24 agreement with them, which would then -- could then
    25 end up toppling the whole agreement, we have not done
    89
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 so.
    2 MR. RIESER: And they have not affirmatively come
    3 back to you and said that the issue of apportionment
    4 shares is an issue with them in terms of that
    5 Memorandum of Agreement?
    6 MR. GARY KING: No, and they would not be expected
    7 to.
    8 MR. RIESER: The Memorandum of Understanding with
    9 respect to RCRA liability was also arrived at after
    10 the passage of this legislation in December of 1995?
    11 MR. GARY KING: Right.
    12 MR. RIESER: Okay. Was this issue of
    13 Proportionate Share Liability an issue that was
    14 discussed in the RCRA MOU?
    15 MR. GARY KING: No, it was not.
    16 MS. ROSEN: Number four, can the Agency provide a
    17 general description of the type of site which would be
    18 subject to Proportionate Share Liability?
    19 MR. GARY KING: I will give you -- I am not sure
    20 this is necessarily helpful as to what you want, but
    21 here is the way that I would describe it. I would
    22 describe it as a site where there has been a release
    23 of a hazardous substance or a pesticide or even a
    24 threatened release of a hazardous substance or
    25 pesticide, and the State has filed a complaint before
    90
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 the Board seeking either cleanup of the site or cost
    2 recovery and the complaint involves more than one
    3 party.
    4 MS. ROSEN: Could you maybe further define the
    5 number of parties you would envision? More than one
    6 but less than how many?
    7 MR. GARY KING: Well, it would be more than one
    8 and -- well, I am trying to think of the most number
    9 of parties that we have dealt with at a site. It runs
    10 into the thousands. So you certainly could have
    11 thousands of responsible parties at any one site.
    12 MS. ROSEN: But in terms of where the Agency views
    13 that this procedure might be used, how many parties
    14 might be expected to be the normal?
    15 MR. SHERRILL: I am going to follow-up on this
    16 question. Kind of the nature of the type of sites --
    17 and this will kind of go back to historical
    18 perspective of the 4(q). This touches on page eight
    19 of my testimony, but I will be providing a little bit
    20 maybe more detail than that.
    21 From 1984 to 1997, 85 sites have received a 4(q).
    22 Of these 85, I believe 50 are of a single entity
    23 responsible party. So of the 85 that we have issued
    24 over the last 15 years, 50 of these are what we would
    25 think of as a single entity PRP. That would leave us
    91
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 with 35 of these sites that have received a 4(q) over
    2 the last 15 years that have what we would call
    3 multiple party PRPs, multiple party such as, you know,
    4 would have Proportionate Share Liability.
    5 Of these 35, 14 are landfills. Six of these
    6 landfills received what we would call industrial waste
    7 only. In other words, they were landfills operated by
    8 a few local industries that did not receive municipal
    9 refuse. And so you would not think of them as the
    10 traditional municipal solid waste landfill.
    11 During the last 15 years, we identified 21
    12 manufacturing type concerns that have received a
    13 4(q). And of those only four were of the multiple
    14 party type PRP scenario. So, there again, only four
    15 sites of a manufacturing type. You could say that --
    16 as multiple PRP type manufacturing sites, you could
    17 say they received a 4(q) notice approximately every
    18 four years.
    19 That kind of gets back to what Gary and I were
    20 saying, you know, the nature of these types of sites
    21 there may not be that many of them. There were 12
    22 multiple PRP type sites of what I would characterize
    23 as a drum and/or waste oil recycler. And so just to
    24 kind of follow-up on your question, that is kind of
    25 the nature of -- that we would envision that this
    92
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 future process, the 58 -- the proportionate share of
    2 Section 58 of the Act, we would think to see these
    3 same types of sites.
    4 MR. RIESER: Just to follow-up, you got 35 sites
    5 with multiple party sites. Then 14 of those are
    6 landfills, and 21 you characterized as manufacturing
    7 facilities; is that correct?
    8 MR. SHERRILL: Let me rephrase that. 14 of the
    9 multiple part PRP scenarios are landfills.
    10 MR. RIESER: Okay.
    11 MR. SHERRILL: Of the manufacturing type there are
    12 only four. There were 21 4(q)s issued to
    13 manufacturing types, but approximately 17 of those
    14 were at a single entity manufacturer. The owner --
    15 all the waste was at the site, they manufactured some
    16 product at the site, the waste was at the site. There
    17 was not the multiple PRP scenario.
    18 MR. RIESER: Okay. So it is that 21 plus that 14
    19 that gives us our 35 sites?
    20 MR. SHERRILL: No, the landfills were the 14.
    21 Then 12 multiple PRP type sites were drum and/or waste
    22 oil recyclers. We had two refineries that were
    23 multiple PRPs. There was one transformer facility.
    24 There was one tractor-trailer. There was one lead or
    25 coal mine type facility. And that gets us up to our
    93
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 35.
    2 MR. RIESER: If we could get a table rather than
    3 me trying to reconstruct all of this in my head. If
    4 we can get just a table listing all of these I think
    5 that would be useful.
    6 MR. WIGHT: I think we could prepare that for the
    7 next hearing.
    8 HEARING OFFICER ERVIN: Okay.
    9 MR. RIESER: Thank you very much.
    10 HEARING OFFICER ERVIN: Okay. Continue with
    11 question five.
    12 MS. ROSEN: Would Proportionate Share Liability
    13 apply at the following sites?
    14 MR. GARY KING: Before you get all the way through
    15 that question -- it is a long question, and I thought
    16 maybe we are going to -- because of the details of the
    17 hypotheticals there we needed to have more time to
    18 review that than we have had up to now.
    19 MS. ROSEN: Okay. Thank you.
    20 MR. GARY KING: And the same thing would apply
    21 with question six.
    22 MS. ROSEN: Okay.
    23 MR. RIESER: All right. So we are up to question
    24 seven?
    25 HEARING OFFICER ERVIN: Yes, question seven.
    94
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: Does the language proposed by SRAC
    2 regarding Section 741.105 precluding application of
    3 the PSL regulations to certain owners and operators
    4 rather than certain sites satisfy the Agency's concern
    5 regarding continued enforcement of their federally
    6 authorized programs? If not, why not?
    7 MR. GARY KING: As I said this morning, we would
    8 agree that, you know, all things being equal, that it
    9 would be possible to state the principles as to the
    10 applicability more narrowly than we have done so and
    11 not jeopardize federally authorized programs.
    12 We have been reviewing the language that Mr.
    13 Rieser included as an attachment to his testimony and,
    14 you know, we think -- we are still taking a look at
    15 that, and I think we will have a response to that at
    16 one of the later hearings.
    17 MR. RIESER: When you testified this morning that
    18 going to the U.S. EPA after the Board did not agree
    19 with what you proposed on this issue would be a
    20 horrendous experience, I think is generally how you
    21 said it, but that is not your exact words, was that
    22 assuming that the Board did not limit this at all? Is
    23 that what you were thinking of?
    24 MR. GARY KING: That's correct.
    25 MR. RIESER: Okay. But if there was some -- there
    95
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 might be a livable limitation that they would find
    2 acceptable so long as it preserved the State's
    3 authority to administer their programs?
    4 MR. GARY KING: That's correct.
    5 MS. ROSEN: Number eight, why does Section
    6 741.105(c)(2) delete the requirement that a permit
    7 must have been issued under Federal or State solid or
    8 hazardous waste laws for a site to fall within the
    9 applicability exclusion from Part 741? What is the
    10 Agency's support for deleting this requirement?
    11 And to clarify, I would just say that we are
    12 referencing the language that is in the statute
    13 Section 58.1(a)(2). It talks about for which a permit
    14 has been issued.
    15 MR. GARY KING: Again, that is one of those RCRA
    16 corresponding ones that we would like to defer until
    17 the next hearing.
    18 MS. ROSEN: Okay. Question nine I will read into
    19 the record, but I believe you may have addressed it
    20 probably as much as you are going to.
    21 On page 16 of Mr. King's testimony, he proposes
    22 modifying the statutory language to fine-tune the
    23 exclusions even further without jeopardizing the
    24 Federal authorizations/delegations. Can you please
    25 explain this statement and provide examples of such
    96
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 modifications? I don't know if you have anything
    2 further to add.
    3 MR. GARY KING: I responded to a similar question
    4 with question number seven, and I think that stands,
    5 that response stands for both of these questions.
    6 MS. ROSEN: Okay.
    7 HEARING OFFICER ERVIN: Do you have a follow-up
    8 question?
    9 MS. ROSEN: No.
    10 BOARD MEMBER HENNESSEY: I have a general question
    11 that the Agency may not be ale to answer today that I
    12 would like to get into the record because it deals
    13 with applicability.
    14 HEARING OFFICER ERVIN: Sure.
    15 BOARD MEMBER HENNESSEY: My question is whether
    16 you believe Section 58.9 would apply to a private cost
    17 recovery action brought, for example, under Section
    18 21(e) of the Act. That section covers disposal
    19 treatment or storage of any waste at a site that does
    20 not apply with the Act or regulations. Occasionally
    21 we have had cases in which such suits have been
    22 brought and the cost of cleanup has been sought as
    23 part of the remedy.
    24 MR. GARY KING: Our proposal applies strictly to
    25 cases brought by the State and for us that was what we
    97
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 interpreted the thrust of Section 58.9 being. The
    2 concern that we had is that if you allow -- if you are
    3 allowing some type of private action other than what
    4 we have in Subpart C, our attempt to deal with that
    5 private action is in Subpart C, but we are very
    6 careful there to put it in a way that somehow the
    7 State was not being dragged into some kind of private
    8 actions and being required to make remedial action
    9 decisions before it was ready to do so or being put in
    10 a position where we were being -- if not legally
    11 obligated perhaps obligated in some other way to spend
    12 money at a site that was not fitting with the
    13 priorities of things as we saw them. So we attempted
    14 to create, to deal with the private cost recovery
    15 action in terms of what is in Subpart C.
    16 BOARD MEMBER HENNESSEY: Subpart C would not
    17 address, then, a citizen's enforcement suit that was
    18 brought under Section 31 of the Act that alleged that
    19 the defendant had violated Section 21 of the Act by
    20 open dumpings of hazardous substances? Am I
    21 understanding you correctly?
    22 MR. GARY KING: Right, that's correct.
    23 BOARD MEMBER HENNESSEY: Okay.
    24 MR. GARY KING: Because if you track that all the
    25 way through, we are talking about proportional share
    98
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 allocation, and we are talking about, in essence,
    2 where there is an orphan share the State is going to
    3 have to pick that up for remediation to be complete.
    4 If a party has -- in a private cost recovery action
    5 has sued these other private people, but some of them
    6 are orphan shares, well, how -- is now the State
    7 supposed to come in and put up that amount of money to
    8 make sure that the cleanup goes forward? We saw that
    9 type of action as really involving us -- requiring us
    10 to be involved in litigation, which would end up
    11 allocating state dollars, before we had gone through
    12 the process of really deciding if that's the best use
    13 of State money. So that was at least our logic
    14 process with that.
    15 BOARD MEMBER HENNESSEY: Okay. Thank you.
    16 HEARING OFFICER ERVIN: All right. Moving on to
    17 Section 741.115, information orders. Ms. Rosen, you
    18 have several questions on that section.
    19 MS. ROSEN: Yes. Number ten, can the Agency
    20 provide any statutory authority or legislative history
    21 which supports the information order concept and
    22 authorizes the Agency to seek such information in such
    23 a manner?
    24 MR. GARY KING: Well, first of all, I should -- I
    25 need to point out that the proposal, as we have
    99
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 drafted, is not authorizing the Agency to seek such
    2 information. It is authorizing the Board to issue an
    3 order to seek such information. And although there is
    4 not -- as I said this morning, there is not -- in 58.9
    5 you will not find the specific words, "information
    6 order." You will find, in Section 58.9(d), the Board
    7 being authorized to come up with a proposal that is
    8 comprehensive and workable relative to Proportionate
    9 Share Liability.
    10 MR. RIESER: Let me ask a real basic question
    11 about that, just following up. How exactly do you
    12 envision this process working?
    13 MR. GARY KING: May I have just a couple minutes?
    14 I will find my notes on that. I apologize. Just a
    15 lot of papers in front of us with several sets of
    16 questions. I am trying to wade through and find the
    17 right set of responses.
    18 What we think the way the process would work is
    19 that there would be a petition for an information
    20 order, which would be filed with the Board. And as we
    21 see it there wouldn't be -- it wouldn't be a hearing
    22 process in the terms of a formal hearing with
    23 witnesses and that kind of thing. It would be more of
    24 a petition being granted based on the papers filed and
    25 there would be -- the papers would include affidavits
    100
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 or other documents which would constitute the evidence
    2 that would be required to meet the requirements for
    3 the order. It would not be an ex parte proceeding.
    4 There would need to be notice and service of the
    5 petition to the party that is ordered to provide
    6 information in a reasonable but short time to
    7 respond.
    8 Then, as we see it, this is a pre-enforcement
    9 activity, so it -- there wouldn't be an appellate
    10 review of it. The review would occur in terms of
    11 refusing to comply and then raising any defenses
    12 during a proceeding to enforce the order.
    13 MR. RIESER: Were you intending to supplement the
    14 regulations, the proposed regulations with some of the
    15 detail on the procedures?
    16 MR. GARY KING: Yes, we can certainly do that if
    17 that is -- if we -- we had not gotten that far,
    18 obviously, when we filed the proposal in February.
    19 This was an issue that we had not reached agreement on
    20 with the private party, but -- the private sector with
    21 SRAC, and so we had not laid out all the specific
    22 procedures. But that certainly would be something
    23 that we would be willing to do if this is going to be
    24 incorporated as part of the rule.
    25 MR. RIESER: If a person who received notice of
    101
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 this disagreed with your affidavits, would they be
    2 entitled to submit counter affidavits?
    3 MR. GARY KING: Yes.
    4 MR. RIESER: The Board would be entitled to not
    5 issue the order with respect to that person?
    6 MR. GARY KING: Yes.
    7 MR. RIESER: What would the factual issue be on
    8 which this would be based?
    9 MR. GARY KING: If you look at 741.115(a), what it
    10 ties back to, the demonstration is how it is related
    11 to whether there is a reasonable basis for belief that
    12 there is a release or a substantial threat of a
    13 release. That's what the criteria ties back to.
    14 MR. RIESER: Isn't it two parts? There has to be
    15 a reasonable basis for the belief that there is
    16 release or substantial release, and the person has to
    17 have information relevant to that release?
    18 MR. GARY KING: Yes, that's true. Correct.
    19 HEARING OFFICER ERVIN: Do you have a follow-up
    20 question?
    21 MR. RIESER: If a person disputed either of those
    22 two points and the Board ruled against them, they
    23 would have no right to appeal? They would have to
    24 take enforcement action and be subject to potential
    25 penalties if they are wrong?
    102
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. GARY KING: I am not sure what you mean by
    2 "enforcement action," related to that.
    3 MR. RIESER: I thought you said earlier that there
    4 would be no appeal, but that if a person basically
    5 disagreed, their avenue was to not provide the
    6 information that was being ordered and then bring up
    7 whatever their defenses were in the subsequent
    8 enforcement action for not providing the information
    9 that was ordered?
    10 MR. GARY KING: Okay. That's correct. That's
    11 true. That is the way it will work.
    12 MR. RIESER: So they would be taking the bet that
    13 they wouldn't have penalties issued against them in
    14 that situation?
    15 MR. GARY KING: Right.
    16 MR. RIESER: Thank you.
    17 MS. ROSEN: Number 11, are the criteria listed at
    18 Section 741.115(a)-(c) intended to be limitations on
    19 the scope of information which can be sought by the
    20 Agency pursuant to an information order?
    21 MR. GARY KING: Yes, that's correct.
    22 MS. ROSEN: Number 12, in light of the inspection
    23 authority granted to the Agency pursuant to Section
    24 4(d) of the Act, why is Section 741.115(b)(1)
    25 necessary? To the extent that the inspection
    103
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 authority granted in Section 741.115(b)(1) exceeds the
    2 authorization in Section 4(d) of the Act, what
    3 statutory provisions support the extension of the
    4 Agency's inspection authority?
    5 MR. GARY KING: The question assumes kind of a
    6 mixing of things, of concepts that I guess we wouldn't
    7 quite agree with. Section (4)(d) of the Act is
    8 related to an Agency inspection authority. This
    9 section 741.115 is not related to Agency inspections
    10 but is related to the Board's authority to obtain the
    11 necessary information relative to -- relative to
    12 allocation and liability issues. So I guess I am not
    13 quite understanding the question.
    14 MS. ROSEN: Well, just on that point alone,
    15 Section (4)(d) gives you the ability to inspect and
    16 enter and review the premises to seek information
    17 about what is going on.
    18 MR. GARY KING: I would agree with that. That is
    19 true.
    20 MS. ROSEN: Okay. Subsection B provides for the
    21 same opportunity, just dependent upon the Board
    22 issuing this order?
    23 MR. GARY KING: Well, the Board's authority here
    24 is different than the inspection authority.
    25 Obviously, the Agency's inspection authority is
    104
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 focused on the site where the release occurs. There
    2 could be information relative to those -- relative to
    3 that release at the sites which are not where the
    4 release occurred. That's why it is important that the
    5 Board have that authority relative to those pieces of
    6 information.
    7 MS. ROSEN: I think the provisions that -- in
    8 Section 741, though, are seeking the Board to order
    9 the Agency or to perhaps provide the authorization to
    10 the Agency. Doesn't the Agency have to have some sort
    11 of independent authorization to take those actions on
    12 their own under the Environmental Protection Act?
    13 MR. GARY KING: Well, we were trying to spell out
    14 an alternative under (b)(1), or (b)(2) rather, than
    15 just mandating that the copies of documents be
    16 furnished to the Agency which we could have just done
    17 that. We allowed for the option of us to go on to --
    18 go to the location of the records and have those
    19 records produced and then we could copy them at that
    20 point.
    21 It certainly would be, I think, okay with us if
    22 the person was just required to furnish those
    23 documents rather than have that option for Agency
    24 access. We put it as an option because, again, as I
    25 said this morning, we modeled this off of the
    105
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Superfund Law under Section 104(e), and I believe they
    2 allow either option. I would expect that in virtually
    3 every case that a person who was issued one of these
    4 orders would prefer just to provide the copies to the
    5 Agency rather than having the Agency, you know, coming
    6 to the site and review the records there.
    7 MS. ROSEN: Okay. My -- the issue doesn't
    8 necessarily go to whether the Agency goes to the
    9 person's site or the person provides the information,
    10 but it goes to the requirement that a person either
    11 provide the information or allow the Agency in to
    12 look. And that's where I am seeking some sort of, I
    13 guess, authorization.
    14 MR. GARY KING: Well, I guess I wouldn't even see
    15 that the issue would come up if it is a situation
    16 where the Board is just directing somebody to provide
    17 copies to the Agency.
    18 (Mr. Wight and Mr. King confer briefly.)
    19 HEARING OFFICER ERVIN: Did you have something
    20 more to add, Mr. Wight?
    21 MR. WIGHT: No, we were just conferring.
    22 HEARING OFFICER ERVIN: Ms. Rosen, if you want to
    23 go on.
    24 MR. RIESER: I have just one follow-up.
    25 HEARING OFFICER ERVIN: Okay.
    106
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: So the ability for the Board to issue
    2 an order for the Agency to go on to premises was
    3 solely for the purpose of obtaining documents and that
    4 alone?
    5 MR. GARY KING: That's correct. I mean, if we
    6 were going to go on and do an inspection at a facility
    7 relative to, for instance, compliance issues at that
    8 facility, and that person didn't want to grant us
    9 access, then we would use Section (4)(d) and we would
    10 go in with the representation of the Attorney
    11 General's office and go in and get a search warrant,
    12 which we have done many times.
    13 MS. ROSEN: Okay. Thank you. Question 13?
    14 HEARING OFFICER ERVIN: Yes, number 13.
    15 MS. ROSEN: Describe the information gathering
    16 processes which the Agency has traditionally used in
    17 State Superfund/CERCLA actions.
    18 MR. GARY KING: I think this morning John Sherrill
    19 was talking about how we obtained information on
    20 sites, and I think one of the things you probably can
    21 pick up from his discussion is that our ability to
    22 gather information at the State sites under State
    23 authority is -- has been pretty weak. I mean, there
    24 is nothing -- there is no consistent way of doing it.
    25 We have to rely on our field tools. We have to
    107
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 rely on complaints that we get. We have to rely on
    2 our own records. At times we will go ahead and try to
    3 perform the field work that chases some contamination
    4 source backwards. It is a pretty cumbersome and
    5 difficult process.
    6 Now, we have sometimes used CERCLA Section 104(e)
    7 for purposes of State Superfund actions, but that has
    8 not been the universal thing. We prefer to try to
    9 rely on State authorities when we are dealing with
    10 State cases as opposed to, you know, notifying and
    11 going through the Federal government on these types of
    12 cases.
    13 MR. RIESER: At the manufacturing sites that you
    14 talked about, don't you typically have all of the
    15 records that there are? I mean, you have the site
    16 itself and you have whatever operations went on at
    17 that site. Wouldn't that constitute all of the
    18 records that exist with respect to that particular
    19 site?
    20 MR. GARY KING: I would firmly disagree with that.
    21 At many of the sites they have historical
    22 contamination issues that go back long before the
    23 Agency was even in existence. You could have prior
    24 owners who may have left records at a site. You know,
    25 there would be all sorts of cases where we would not
    108
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 have information in our files in our offices that
    2 could be very pertinent to identifying who was
    3 responsible for a release at a site.
    4 MR. RIESER: But if you have the site itself and
    5 the existing ability to inspect at that site for the
    6 documents at that site, wouldn't that get you to
    7 almost all of the documents in existence with respect
    8 to that site?
    9 MR. GARY KING: No. I would see many occasions
    10 where records could be held at a location not at the
    11 site where the release is at.
    12 HEARING OFFICER ERVIN: Do you have a follow-up
    13 question?
    14 MS. ROSEN: No. Thank you. Number 14, explain
    15 why the proportionate share allocation process
    16 requires the extension of the Agency's information
    17 gathering authority?
    18 You have commented on this a great deal. I don't
    19 know if you want to elaborate more.
    20 MR. GARY KING: I did comment on that earlier.
    21 Again, if you are aware of how the CERCLA process
    22 works, there is a strong incentive based on the way
    23 the liability system is structured for people to
    24 provide information. Under that system, all the
    25 parties have the incentive to identify other PRPs and
    109
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 to identify as much information relative to other PRPs
    2 as they can. It is just a natural incentive. If you
    3 have information relative to somebody else's
    4 liability, you want to present that. If you have
    5 information that may identify somebody else, you want
    6 to present that.
    7 Under the Proportionate Share Liability context,
    8 as we have proposed it here, you don't have that
    9 incentive. There is not an incentive for a party that
    10 is liable to try to get information relative to other
    11 liable parties, it seems to me anyway.
    12 MS. ROSEN: Would you agree that if I -- if a site
    13 owner at a facility at a site that was contaminated
    14 had knowledge of contamination that had been caused by
    15 others that was dissimilar from any contamination that
    16 he would have caused, wouldn't he have an incentive to
    17 provide that information to you in hopes that his
    18 property might, in fact, be cleaned up by the dollars
    19 from the person who actually caused the harm? Isn't
    20 that an incentive?
    21 MR. GARY KING: I am not sure I understood the
    22 hypothetical.
    23 MS. ROSEN: The hypothetical is there is a
    24 situation where there is a site, and the current owner
    25 may have caused some of the contamination. There is
    110
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 also a lot of contamination at the site that was not
    2 caused by that owner or operator, and he has knowledge
    3 of that, information about that. Wouldn't he have an
    4 incentive to provide that information to the Agency in
    5 hopes that it might be used to be able to secure
    6 funding or whatnot to get the site clean? Wouldn't
    7 that be an incentive?
    8 MR. GARY KING: I think that would be an incentive
    9 that would operate from an economic standpoint
    10 relative to the value of the property. It was -- it
    11 is an incentive to get the property cleaned up. It is
    12 not an incentive to bring other people forward for
    13 liability purposes. I mean, his liability is kind of
    14 fixed by what he did. If the fact that he wants his
    15 property totally cleaned up to me it is kind of a
    16 different sort of incentive. If I am confusing the
    17 hypothetical I --
    18 MS. ROSEN: Well, you are not --
    19 MR. RIESER: Let's take a step back. If in a
    20 joint and several liability system -- is information
    21 regarding an individual's proportionate share relevant
    22 to costs that they have to pay under joint and several
    23 liability?
    24 MR. GARY KING: Could you restate that again?
    25 MR. RIESER: Why don't you read the question back,
    111
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 please.
    2 (Whereupon the requested portion of the record was
    3 read back by the Reporter.)
    4 MR. GARY KING: Are you waiting for me?
    5 MR. RIESER: Yes.
    6 MR. GARY KING: I am sorry. Could I have the
    7 question again?
    8 HEARING OFFICER ERVIN: Could the court reporter
    9 read the question back again.
    10 (Whereupon the requested portion of the record was
    11 read back by the Reporter.)
    12 MR. WIGHT: I guess we are having a hard time
    13 discerning what the question is. Let's take a step
    14 back, and then joint and several liability.
    15 MR. RIESER: Okay. In a joint and several
    16 liability system, are the -- is the information that
    17 an individual brings forward regarding how much stuff
    18 they sent to the site, is that relevant to how much
    19 they have to pay under that system?
    20 MR. GARY KING: It is not -- I think it would
    21 be -- I think I am going to need to defer on this. I
    22 think we are going to need to confer and take some
    23 time to make sure we have the proper answer on this.
    24 I don't want to jump ahead.
    25 MR. RIESER: Well, in follow-up, in a
    112
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 proportionate share system, where liability is based
    2 on exactly the issue of how much they sent to the site
    3 or how much they contributed, wouldn't there be a
    4 larger incentive for that person to bring that
    5 information forward under that system as opposed to
    6 the joint and several liability system?
    7 MR. GARY KING: Okay. I think I understand the
    8 question. I think I would like to take some time to
    9 think about that and respond.
    10 MR. RIESER: Okay. Then I want to -- there is a
    11 third part to that. It is that when you talk about
    12 that, you talk about the incentive for the person to
    13 demonstrate someone else's shares. And my question is
    14 whether there is an issue, a separate issue, regarding
    15 the incentive for individuals to try and bring other
    16 people into the liability mix, if you will, into the
    17 number of persons potentially responsible. That's a
    18 different issue than demonstrating their own
    19 individual shares, and whether the incentive concerned
    20 has to do with bringing other people in as opposed to
    21 bringing one's own information forward.
    22 MR. GARY KING: I think those are all fair
    23 follow-up questions, and we will address those.
    24 HEARING OFFICER ERVIN: We will move on to the
    25 questions regarding Subpart B. Ms. Rosen, I think you
    113
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 have a general question, question number 15.
    2 MS. ROSEN: On page 20 of Mr. King's testimony he
    3 explains that, quote, for owners and operators as well
    4 as other categories of PRPs, liability is established
    5 based on actions, or inactions, not status, end
    6 quote. Please describe the sort of inaction which
    7 would result in liability.
    8 MR. GARY KING: What was being described there was
    9 the concept that you can have liability based on an
    10 act or an omission to act. That's what I meant by the
    11 term inaction there.
    12 MS. ROSEN: I am going to ask you some
    13 hypotheticals that would better define it. Just a
    14 second.
    15 MR. RIESER: Well, just to follow-up on that, if
    16 an owner, a new owner of a property who had no
    17 responsibility for causing a release on that property,
    18 and no knowledge of that release when he bought the
    19 property, whether that owner would then subsequently
    20 gain knowledge of that ongoing release, and I am going
    21 to make it even more defined, which is not having an
    22 impact outside of the boundaries of the property,
    23 whether that owner would be liable for failing to take
    24 action with respect to that release?
    25 MR. GARY KING: That can be a real fact-specific
    114
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 type issue. There is, of course, always all sorts of
    2 examples where somebody has purchased a piece of
    3 property -- done due diligence, purchased a piece of
    4 property, and then found that there was contamination
    5 there. It was discovered and nobody knew about it.
    6 That is not causing any direct impact, any off-site
    7 users. In that case it would seem to me that, you
    8 know, that is probably not a responsible person. I
    9 mean, it is probably a person that is not going to be
    10 liable.
    11 There is also other examples where people have
    12 bought pieces of property where, you know, it is at
    13 the point of failure. I mean, tanks are about to have
    14 releases and things like that and in that situation it
    15 seems to me that is a similar but a different kind of
    16 fact situation and it -- you really have to evaluate
    17 that kind of issue on a case-by-case basis.
    18 MR. RIESER: Okay. Looking ahead at
    19 741.210(b)(3).
    20 MR. GARY KING: Are we dropping down to question
    21 16?
    22 MR. RIESER: Well, it was not intended although it
    23 may cover that, and Whitney may want to follow-up.
    24 But I just wanted to follow-up on what you said real
    25 quickly. You used the terms at the end of the section
    115
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 disposal, transport, storage or treatment. And I
    2 notice that you didn't use the term which is commonly
    3 used in that litany of release. Was that
    4 intentional?
    5 MR. GARY KING: We did it intentionally the way we
    6 have it set up here.
    7 MR. RIESER: And what was the purpose of that?
    8 MR. GARY KING: It focuses on the actions. I
    9 mean, obviously, you can have a release going on over
    10 a period of time, but these are more concrete -- what
    11 we have there are more concrete actions that are
    12 more -- I think are a little more easy to judge, more
    13 objective to judge.
    14 MR. RIESER: Okay. Thank you.
    15 HEARING OFFICER ERVIN: Do you have an additional
    16 follow-up question?
    17 MS. ROSEN: No.
    18 HEARING OFFICER ERVIN: Okay. Please proceed.
    19 MS. ROSEN: Okay. Question 17, explain why
    20 common-law principles, as set forth in the Restatement
    21 (Second) of Torts, apply as a guide to interpreting
    22 the proportionate share allocation provisions.
    23 MR. GARY KING: Well, as I was saying this
    24 morning, we saw 58.9, the language of it being -- you
    25 know, there is a lot of ambiguities and
    116
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 inconsistency. So we thought it was appropriate to
    2 look at other accepted judicial -- other accepted
    3 principles of jurisprudence to figure out what is the
    4 best approach to handling some of the ambiguities and
    5 inconsistencies within the statutory language. And in
    6 looking at the Restatement of Torts, and, I mean,
    7 that's a, you know, commonly accepted treatise dealing
    8 with issues of jurisprudence, and we thought it was a
    9 good source to look at principles that should apply to
    10 these types of actions.
    11 MS. ROSEN: But you did not -- there is a
    12 distinction to be made between torts and causes of
    13 action under the Environmental Protection Act?
    14 MR. GARY KING: Well, yes, there is a difference.
    15 One is if you are under common-law strictly then you
    16 are not under a statutory terminology. Whereas if you
    17 are under statutory terminology, you look to that.
    18 However, it certainly has been true of all sorts of
    19 cases where there is statutory principles involved
    20 that you also go to the common-law to figure out how
    21 to interpret provisions of statutory law.
    22 HEARING OFFICER ERVIN: Ms. Rosen, do you have a
    23 follow-up question?
    24 MS. ROSEN: We are just going to go down to 18.
    25 HEARING OFFICER ERVIN: You skipped over 16.
    117
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MS. ROSEN: Can we just go to 18?
    2 HEARING OFFICER ERVIN: Sure.
    3 MS. ROSEN: Is there any language in Section 58.9
    4 of the Act which specifically authorizes shifting the
    5 burden of proof to the defendant in an action to
    6 require remediation or recover response costs?
    7 MR. GARY KING: Just a second. I have to find my
    8 notes on that. This is sort of the same kind of issue
    9 related to the term information order. If you look at
    10 Section 58.9 you won't find the words burden shifting
    11 in there. However, that is a principle that is well
    12 recognized under the Environmental Protection Act and
    13 is one of the foundational principles that the Act is
    14 based on.
    15 MR. RIESER: Is there an instance in the
    16 Environmental Protection Act where the burden shifts
    17 where there is not a specific statutory mandate that
    18 it shifts?
    19 MR. GARY KING: I guess I would have to defer on
    20 that. I am not sure on that. We would have to do a
    21 little legal research relative to that.
    22 HEARING OFFICER ERVIN: Question 19 is similar to
    23 question 18. Is that answered to your satisfaction?
    24 MR. RIESER: Yes.
    25 HEARING OFFICER ERVIN: Okay. We will go on to
    118
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 question 20.
    2 MR. RIESER: Is there any language in Section 58.9
    3 of the Act which supports the statement on page 23 of
    4 Gary King's testimony that, quote, the hardship from
    5 the inability or failure to produce the evidence
    6 necessary to apportion harm, end quote, should fall
    7 upon the defendant in an action to require remediation
    8 or recover response costs?
    9 MR. GARY KING: I think that is -- there was -- I
    10 think that is a misstatement of the testimony in terms
    11 of the not being a complete statement of the principle
    12 involved. What the full sentence says is where a
    13 party has been demonstrated to have caused or
    14 contributed to a release, any hardship arising from
    15 the inability or failure to produce the evidence
    16 necessary to apportion harm shall fall upon the liable
    17 party.
    18 And the key is that we have got a party who has
    19 been demonstrated to have caused or contributed to a
    20 release and, as I was saying, I mean, that is one of
    21 the founding principles within the Environmental
    22 Protection Act. If you look at Section (2)(b), it
    23 talks about the purpose of the Act being to assure
    24 that adverse effects upon the environment are fully
    25 considered and borne by those who cause them.
    119
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: So a person who arranged for disposal
    2 of materials at a given site, under your proposal,
    3 would, assuming that that was shown to be accurate,
    4 would be liable -- would be a liable party, correct?
    5 MR. GARY KING: No. I don't think that is a
    6 correct statement of the legal requirements that need
    7 to go into a demonstration of proof for a generator
    8 liability.
    9 MR. RIESER: Okay. What else would need to be
    10 shown?
    11 MR. GARY KING: Our provision on generator
    12 liability tracks what appears in 22.2(f) which
    13 similarly then tracks what is in the Federal Superfund
    14 Law. And there are a number of cases where we kind of
    15 list all of the elements of proof that have to be
    16 provided to prove generator liability.
    17 One of the good cases that I am familiar with is
    18 The United States of America versus South Carolina
    19 Recycling & Disposal, Inc. It is a case that dates
    20 back to 1984, and it goes through the liability
    21 requirements for proving generator liability. I can
    22 read through that, if you would like.
    23 MR. RIESER: Sure.
    24 MR. GARY KING: Okay.
    25 HEARING OFFICER ERVIN: Excuse me. Could you read
    120
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 the cite into the record as well?
    2 MR. GARY KING: Yes. It is 653, Federal
    3 Supplement 984.
    4 HEARING OFFICER ERVIN: Thank you.
    5 MR. GARY KING: I will just read a little bit from
    6 the case. It says, stripping away the excess language
    7 of the statute, a generator may be held liable under
    8 Section 107(a)(3) of CERCLA if the government can
    9 prove that:
    10 A, the generator's hazardous substances were at
    11 some point in the past shipped to a facility;
    12 B, the generator's hazardous substances or
    13 hazardous substances like those of the generator were
    14 present at the site;
    15 C, there was a release or threatened release of a
    16 or any hazardous substance at the site;
    17 D, the release or a threatened release causes the
    18 occurrence or response cause.
    19 MR. RIESER: So a generator who sends solder rods
    20 containing lead to a site at which there is a release
    21 of TCE, which is the significant problem at the site,
    22 the release of TCE into groundwater, would still be a
    23 liable party with respect to that site, correct?
    24 MR. GARY KING: I wouldn't think so. I mean, that
    25 is not -- you are not describing the release of lead
    121
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 in which you just described.
    2 MR. RIESER: So there has to be a release of the
    3 substance which the generator shipped?
    4 MR. GARY KING: Or something like it. I mean,
    5 what you are talking about is something totally
    6 different.
    7 MR. RIESER: Assume there is lead in the soil, but
    8 the site -- the remediation of the site is focused
    9 entirely on the TCE.
    10 MR. GARY KING: Are you describing in terms of an
    11 allocation factor issue or a liability issue?
    12 MR. RIESER: A liability issue.
    13 MR. GARY KING: So you are saying that there is
    14 lead in the soil. Let's get the hypothetical straight
    15 before we go too far with trying to reach a
    16 conclusion. You are saying there is lead in the
    17 soil?
    18 MR. RIESER: Yes.
    19 MR. GARY KING: And there has been lead sent
    20 there, so there has been a release of lead?
    21 MR. RIESER: Yes. And a person who is -- has sent
    22 lead to the site and that lead has been released?
    23 MR. RIESER: Right.
    24 MR. GARY KING: Well, if he has sent lead to the
    25 site and lead has been released, then he would be the
    122
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 liable party.
    2 MR. RIESER: Okay. The remediation to be done at
    3 the site is to remediate the TCE in the groundwater.
    4 That person is still liable for the costs of that
    5 remediation?
    6 MR. GARY KING: Well, that -- again, I think
    7 that's one of the things that really makes our
    8 proposal quite unique with regards to this, and that
    9 is it allows somebody to look at what is causing or
    10 what is driving the costs of the cleanup in terms of
    11 the cleanup objectives process. So we could use TACO
    12 in that context to make arguments as to what is really
    13 driving the cleanup and what the problem really is,
    14 and reduce their allocation accordingly.
    15 MR. RIESER: Could that allocation for that party
    16 be reduced to zero?
    17 MR. GARY KING: It depends. To some extent -- I
    18 guess I am not quite clear what you are assuming as
    19 far as the lead. I mean, are you assuming that there
    20 is no risk whatsoever from the lead at the site?
    21 MR. RIESER: Yes.
    22 MR. GARY KING: And that as a result of
    23 remediating the organic materials there is no
    24 additional costs related to that lead being at the
    25 site?
    123
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: Yes.
    2 MR. GARY KING: Then I think the cost could go to
    3 zero for the person contributing lead.
    4 MR. RIESER: Okay. If this same generator did not
    5 know how many drums that they sent to the site, so it
    6 can't prove how much material it sent to the site, is
    7 that -- does that generator now have to share in the
    8 cost of the allocation because he can't prove what was
    9 sent? He has to absorb all of the additional unproven
    10 shares?
    11 MR. GARY KING: Well, you would have to prove what
    12 he sent in terms of the types of contaminants. I
    13 mean, he certainly couldn't get off the hook, so to
    14 speak, by just proving nothing and escaping liability
    15 in that context. If he is proving that I don't know
    16 how much lead I sent there; and I am never going to be
    17 able to figure out how much lead I sent there; but all
    18 I ever sent was lead there; and I can prove that all I
    19 ever sent was lead there; and lead has nothing to do
    20 with the cleanup that is going on; lead has nothing to
    21 do with any of the costs related to any of the cleanup
    22 that is going on; I think his allocation becomes zero
    23 under our system.
    24 HEARING OFFICER ERVIN: Is there a follow-up
    25 question?
    124
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: Excuse us just one moment, please.
    2 (Mr. Rieser and Ms. Rosen confer briefly.)
    3 MR. RIESER: No, no thank you.
    4 HEARING OFFICER ERVIN: Okay. Moving on to
    5 question number 21.
    6 MS. ROSEN: Do we need to revisit -- didn't we
    7 skip one earlier?
    8 HEARING OFFICER ERVIN: Yes, you skipped question
    9 number 16.
    10 MR. RIESER: Is it accurate that Section
    11 741.210(b)(3) is intended to impose liability on
    12 owners by virtue of their status as owners of the
    13 property and without respect to any actions in causing
    14 the release or disposal of contaminants?
    15 MR. GARY KING: No.
    16 MR. RIESER: What is it in the language that
    17 states that?
    18 MR. GARY KING: I think this goes back to the --
    19 we were just talking about the question before as to
    20 what this says. There is -- it talks about if the
    21 respondent owned or operated the site or facility at
    22 the time of any such disposal, transfer, storage, or
    23 treatment. So it is fixed on when those activities
    24 occurred.
    25 MR. RIESER: And it is fixed on disposal or
    125
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 treatment and not on release, correct? Disposal,
    2 transport, storage, or treatment -- excuse me -- and
    3 not on --
    4 MR. GARY KING: Yes, that is correct.
    5 MS. ROSEN: Question 21, with respect to Section
    6 741.210(d)(3), does the Agency intend that any party
    7 unable to demonstrate its proportionate share should
    8 be required to assume any orphan shares, even if such
    9 party has made a good faith effort to produce all
    10 available information?
    11 MR. GARY KING: The way our process defines orphan
    12 shares, and I think kind of the scenarios that we
    13 talked about earlier show this, if there is an orphan
    14 share then other parties are not responsible for that.
    15 MS. ROSEN: On Scenario 3, Example 2, Exhibit 7,
    16 under that scenario you characterize responsible party
    17 named letter D, contended share, bankrupt, does not
    18 participate. The proof shows incomplete. Under the
    19 proportionate share, per your proposal, the Agency's
    20 proposal, it would appear that that share is being
    21 allocated among responsible parties B and C; is that
    22 correct?
    23 MR. GARY KING: Well, no, I guess I would not -- I
    24 would not look at that quite that way. In fact, I
    25 think the better hypothetical as to this question is
    126
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 if you look at Scenario 2, Example 2, down at the D
    2 person, bankrupt, does not participate, the proof
    3 shows that it is a 30 percent orphan share. The
    4 proportionate share is there of 30 percent. And as we
    5 say in the footnote, for the cleanup to proceed the
    6 State must pay D's demonstrated orphan share.
    7 MS. ROSEN: Who is demonstrating the orphan
    8 share?
    9 MR. GARY KING: I think that's an issue of what
    10 the evidence shows at hearing.
    11 MS. ROSEN: And under your scenario, you are
    12 placing the burden on the responsible parties to
    13 present the evidence as to the shares, so is it
    14 correct to say that the burden would be on the other
    15 named parties?
    16 MR. GARY KING: Well, in the example that we have
    17 provided there, what the -- again, this is Scenario 2,
    18 Example 2. A, B, and C are contending that they each
    19 have a 20 percent share. Their burden is going to be
    20 to show that they have got a 20 percent share. If
    21 they are able to demonstrate that they have got a 20
    22 percent share, then, you know, that's what they get.
    23 MR. RIESER: But who proves the bankrupt share?
    24 MR. GARY KING: I mean, that is going to be a cost
    25 that is -- in essence, there is -- it is kind of a
    127
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 different kind of scenario with a bankrupt, because
    2 you have a PRP that is choosing not to participate.
    3 So it is not really -- anybody has a burden as to his
    4 share. Of course, from the State's perspective, we
    5 are going to want to see that orphan share as low as
    6 possible.
    7 MR. RIESER: But if B and C, under this scenario,
    8 can't demonstrate their share, then aren't they also
    9 in danger of picking up the orphan share as well,
    10 because that orphan share has not been isolated?
    11 There is no one there to step up and say this is who
    12 this is, and no one, no one, has the information to
    13 make the demonstration of a differentiation between B,
    14 C and D?
    15 MR. GARY KING: So what's the question?
    16 MR. RIESER: Well, don't B and C end up with the
    17 30 percent share of D?
    18 MR. GARY KING: Well, now you are jumping back to
    19 Scenario 3.
    20 MR. RIESER: No, under Scenario 2.
    21 MR. GARY KING: Well --
    22 MR. RIESER: Who proves the 30 percent share of D?
    23 MR. GARY KING: I am struggling with that, because
    24 the column contended share is what -- here is what
    25 each of these parties is contending his share is. Now
    128
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 you have gone to hearing and this is what the proof
    2 has shown. So, I mean, this is what it has shown. It
    3 has shown 30 percent responsibility. It is assuming
    4 that that has been shown.
    5 BOARD MEMBER McFAWN: I think what they are asking
    6 is who, at hearing, would make that proof about the 30
    7 percent? Do you just deduce that from the evidence
    8 presented on A, B, and C, or is the State going to
    9 assume a role of putting forth proof about the
    10 bankrupt share, based upon perhaps what evidence they
    11 can glean from the bankrupt PRP?
    12 Is that correct, Mr. Rieser, that that is the
    13 question that you --
    14 MR. RIESER: Yes.
    15 MR. GARY KING: I think it could be both. I mean,
    16 there were certainly -- in this kind of context, the
    17 context of this example, I think that the dynamics of
    18 it would be such that it serves B's and C's interest
    19 to increase that orphan share, and it would serve the
    20 State's interest by trying to decrease that orphan
    21 share. So you could have information from both
    22 sides.
    23 CHAIRMAN MANNING: I have sort of a follow-up to
    24 that point, too, Mr. King. The Board would appreciate
    25 any information that the State has in terms of how you
    129
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 treat bankrupt potentially responsible parties; not
    2 necessarily today. But we have sort of discussed
    3 internally how it is that -- what it is that you might
    4 do, as the State, to protect your interests.
    5 Where you know that someone is about to go
    6 bankrupt or, you know, we have had several cases
    7 before the Board where someone is pending bankruptcy
    8 and that sort of thing. I guess the question that we
    9 have often asked each other is what is the State doing
    10 out there to protect, and to go into bankruptcy court,
    11 if you will, to protect whatever interests there may
    12 be, environmental liability, that there may be in
    13 terms of a bankruptcy.
    14 MR. GARY KING: Well, we can talk about that now.
    15 We have, you know, been very actively involved in
    16 bankruptcy courts all over this country, as a matter
    17 of fact. Bankruptcies can be filed virtually
    18 anywhere, depending on where the person is
    19 headquartered, or so to speak. And we have actively
    20 pursued bankrupt parties to try to collect as much
    21 money as we possibly could from them.
    22 You know, we have a process for doing that and we
    23 get involved and maybe we intervene in those cases
    24 where we get notice. We have a process set up to get
    25 those cases before the Attorney General's office very
    130
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 quickly because they, obviously, have to get involved
    2 in a very quick basis on those, and we do so.
    3 And, you know, obviously, when you get into a
    4 bankrupt situation you are not collecting 100 percent
    5 on the dollar, and we try to get as much as we can.
    6 We try to assert higher levels of priority relative to
    7 environmental issues, and do the -- the State does the
    8 best that it can as far as getting funds from a
    9 bankrupt party.
    10 HEARING OFFICER ERVIN: Do you have some more
    11 questions on the scenarios, or do you want to go back
    12 to the pre-filed questions?
    13 MR. RIESER: Just to sort of step back on these
    14 scenarios, when you say contended share, what do you
    15 mean?
    16 MR. GARY KING: Well, I think that during the
    17 hearing process there is, at least for the purposes of
    18 these hypotheticals, you have a person who is
    19 proposing that he is 20 percent responsible but, you
    20 know, certainly no more than 20 percent responsible.
    21 MR. RIESER: So this is the share that the
    22 individuals are putting forward and saying this is how
    23 much we are responsible for?
    24 MR. GARY KING: Yes.
    25 MR. RIESER: When you say the proof shows, what do
    131
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 you mean?
    2 MR. GARY KING: After hearing -- you know, there
    3 would be an evidentiary hearing, and then the proof
    4 shows what we have delineated in that column.
    5 MR. RIESER: So the proof shows is the decision
    6 that the Pollution Control Board makes?
    7 MR. GARY KING: Well, the proof shows is the
    8 evidence at hearing. The decision that the Board
    9 would make would be the next column.
    10 MR. RIESER: Okay. So when you say incomplete
    11 under proof shows, what do you mean?
    12 MR. GARY KING: The evidence is such that you
    13 really -- you couldn't make a decision as to -- again,
    14 contrasting it with the first scenario where there is
    15 contended shares and the proof is showing specific
    16 amounts, that is how you make a decision. What
    17 happens then is you really don't have any information
    18 that clearly shows what responsibility is.
    19 MR. RIESER: Okay. So in situations that -- these
    20 are in situations where people are contending that
    21 they have a certain amount. Don't they, in order to
    22 contend that amount, aren't they making factual
    23 allegations that support that they are -- that that is
    24 the amount that should be applied to them?
    25 MR. GARY KING: Well, they could be. We are just
    132
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 trying to show as an example here. Again, you have to
    2 understand -- again, the premise here is that there
    3 has been causation established on all these, and that
    4 they are, in fact -- they are liable parties. And now
    5 it is a question of what the allocation should be for
    6 them as a liable party.
    7 MR. RIESER: But the liable parties that are
    8 presenting allegations, evidence of a sort that
    9 establishes a certain -- in their minds, at least,
    10 establishes a certain amount, because that is what
    11 they are contending, and the Board has to make a
    12 decision based on that evidence, and under what you
    13 are proposing, the fact that they can establish that
    14 it is 20 percent means that they have to take a 75
    15 percent, half of a 75 percent share, looking at
    16 Example 1, Scenario 2.
    17 MR. GARY KING: Just so it is clear here, by
    18 incomplete we are not saying there is no information.
    19 It is just that the information may be incomplete as
    20 to, you know, establishing this firmly as what party A
    21 does. And you are right, where that is incomplete,
    22 when you just can't -- when the information is not
    23 enough to really make a clear demonstration, then you
    24 would have an allocation of a 75 percent.
    25 MR. RIESER: Is there a language proposed under
    133
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 this regulation where the Board makes a decision that
    2 the evidence is incomplete?
    3 MR. GARY KING: Well, we don't use the term
    4 incomplete, but I think (d)(3) is as close to it as we
    5 get.
    6 MR. RIESER: Doesn't the Board have to make a
    7 decision on whatever evidence is presented to it;
    8 either decides, A, the evidence is incomplete or, B,
    9 we have to make a decision here, so we are going to
    10 decide it is X?
    11 MR. GARY KING: Well, yes, the Board will have to
    12 make a decision.
    13 MR. RIESER: Are you saying the Board should make
    14 a separate decision other than X? It should make a
    15 decision that the information is not complete and
    16 that, therefore, the person should bear a larger share
    17 than what they are contending?
    18 MR. GARY KING: I don't -- we were not trying to
    19 suggest that the Board had to make a separate decision
    20 of incompleteness. The Board would have to make a
    21 determination of liability, and then after making the
    22 determination of liability they would look at what the
    23 evidence shows as to allocation, and then make a
    24 decision based on that.
    25 MR. RIESER: Is that --
    134
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. GARY KING: Recognizing that the Board -- you
    2 know, there is various factors that the Board is
    3 supposed to look at.
    4 MR. RIESER: Is that decision anything other than
    5 assigning a specific percentage to that party?
    6 MR. GARY KING: Well, it could be.
    7 MR. RIESER: What could it be?
    8 MR. GARY KING: It could be a flat dollar amount,
    9 particularly if you are in a cost recovery situation.
    10 You know, there wouldn't be any real reason to do a
    11 percentage. I mean, it would just be a -- dollar
    12 amounts that were spent should be there, and so it
    13 should just be a flat dollar amount.
    14 MR. RIESER: The flat dollar amount would be a
    15 percentage of the whole, as you presented in your
    16 scenarios, correct?
    17 MR. GARY KING: Well, yeah. You can translate a
    18 flat dollar amount to a percentage, yes.
    19 MR. RIESER: In situations where parties were
    20 contending they had, as you have in Example 1, 25
    21 percent shares, Scenario 2, Example 1, in Exhibit 7,
    22 they have percentage shares.
    23 MR. GARY KING: Which scenario are you on?
    24 MR. RIESER: I am sorry. Scenario 2, Example 1.
    25 MR. GARY KING: Okay.
    135
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: That they had certain percentage
    2 shares. Would the Agency take the position that their
    3 information was not complete and, therefore, they had
    4 to bear the cost of everything that was left, the
    5 entire orphan share, rather than contending on what
    6 the specific percentage should be?
    7 MR. GARY KING: Well, these -- in this example
    8 there is not an orphan share.
    9 MR. RIESER: The share remaining after the
    10 allocated -- the one allocated share is established?
    11 MR. GARY KING: Well, I don't consider those
    12 orphan shares.
    13 MR. RIESER: Then call it the share remaining
    14 after the one share is established.
    15 MR. GARY KING: So the remaining share. What
    16 about the remaining share now?
    17 MR. RIESER: Would the Agency take the position
    18 that in responding to a party contending that their
    19 percentage was X, that the Agency would not say, no,
    20 the percentage is Y but, no, you have not established
    21 X, therefore, you have got whatever is left here?
    22 MR. GARY KING: I think you are presuming a level
    23 of knowledge as to my being able to predict how we
    24 would do -- I don't know how we would predict how we
    25 would handle a specific case.
    136
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 BOARD MEMBER HENNESSEY: Can I just ask a
    2 question. The standard that the respondent has to use
    3 to prove how much they caused or contributed to the
    4 release is a preponderance of the evidence. So in
    5 Scenario 1, Example -- Scenario 2, Example 1, B and C
    6 have not shown by a preponderance of the evidence that
    7 their share was 25 percent?
    8 MR. GARY KING: Right.
    9 HEARING OFFICER ERVIN: Can I interject here? Is
    10 it that they didn't show that their contended share
    11 was 25 percent, or they couldn't show any share?
    12 MR. GARY KING: It could be either one.
    13 HEARING OFFICER ERVIN: Okay.
    14 BOARD MEMBER HENNESSEY: But the Board is free to
    15 find some other, that they did show by a preponderance
    16 of the evidence 30 percent?
    17 HEARING OFFICER ERVIN: Or 10 percent?
    18 MR. GARY KING: Right.
    19 CHAIRMAN MANNING: Or 90 for one of them? I mean,
    20 it seems to me that we might be making this more
    21 complicated, by virtue of the word incomplete on the
    22 scenario, than what it may be. Is what you are trying
    23 to say is that A, B, and C each come in and they each
    24 contend they are 25 percent liable, but you have
    25 already told us they are all the liable parties you
    137
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 have got, and they are all liable. So, therefore, we
    2 have 100 percent to divvy out between the three of
    3 them.
    4 It seems to me it is up to the parties to come
    5 forward to say, you know, I am 30, I am 25, I am 40, I
    6 am 60, and ultimately the Board is going to have to
    7 make a determination based on all of the evidence that
    8 is presented at the hearing. But the Board's role in
    9 that second column, it seems to me, is to come up with
    10 100 percent liability among the three of them. Is
    11 that correct? Is that what you are saying?
    12 I am getting confused when we say incomplete for B
    13 and incomplete for C, and that sort of thing. It
    14 seems to me our job is maybe not all that
    15 complicated.
    16 MR. GARY KING: I would agree with what you said.
    17 We kind of struggled with how to show this in the time
    18 we had it. And maybe we could have chosen a little
    19 different way to describe this, but I think
    20 essentially that is correct, what you said.
    21 BOARD MEMBER McFAWN: Can I ask a question? In
    22 this Scenario 2, Example 1, does anyone have to prove
    23 that there is not an orphan?
    24 MR. SHERRILL: Which one is that again?
    25 BOARD MEMBER McFAWN: Scenario 2, Example 1. It
    138
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 looks like it presumes that there is some proof here
    2 that there is no orphan share.
    3 MR. GARY KING: Yes, that is true. In this
    4 example, just for purposes of the example there is
    5 just three parties, and the three parties only.
    6 BOARD MEMBER McFAWN: Do those parties bear the
    7 responsibility of proving that there is no orphan?
    8 Because if you don't have voluntary information, then
    9 what adds up to 100 percent. Oftentimes in these
    10 allocation discussions the unproven volumetric share
    11 is often called the orphan share. So is it up to A,
    12 B, and C to prove there were no other generators,
    13 there were no other responsible parties? Is that part
    14 of their proof?
    15 MR. GARY KING: No.
    16 BOARD MEMBER HENNESSEY: You know, I think part of
    17 the confusion stems from we have been using three
    18 different terms here, and you have not really defined
    19 them. We have been using the term orphan share. We
    20 have been using the term unallocated share. And then
    21 in (d)(3) you have used the term unapportioned costs.
    22 It might be useful either now or at the next
    23 hearing to define for the record, to make sure we are
    24 all talking about the same thing, what each of those
    25 three terms mean, and do we need to be using three
    139
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 different terms.
    2 MR. GARY KING: I think that's a good point. I
    3 think you are right. I think there is some
    4 confusion. I think that both the SRAC and us have
    5 used orphan share at times for different things. And
    6 I think you are right, I think it would be helpful to
    7 clarify what we mean by the term orphan shares.
    8 HEARING OFFICER ERVIN: Do you have additional
    9 questions on the scenarios?
    10 MR. RIESER: Let me go back to something on
    11 Scenario 3, Example 2. This has to do with the -- you
    12 clearly know that there is a bankrupt share, but you
    13 have B and C absorbing that bankrupt's share. Were
    14 you saying that that was not accurate, that that was
    15 drawn incorrectly?
    16 MR. GARY KING: No. If you look at the footnote,
    17 footnote two, it says for cleanup to proceed, the
    18 State must pay D's presumptive orphan share that is
    19 under that column.
    20 MR. RIESER: Okay. So when you say a total of 80
    21 percent is allocated by the Board for B, C and D, the
    22 State is still picking up whatever the bankrupt share
    23 is, and B and C are sharing whatever is left?
    24 MR. GARY KING: That's correct.
    25 MR. RIESER: Okay.
    140
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MS. ROSEN: Could we just reserve the right to ask
    2 further questions on the scenarios after we have had
    3 more of an opportunity to look at it?
    4 HEARING OFFICER ERVIN: Certainly.
    5 BOARD MEMBER McFAWN: Excuse me. I have a
    6 question. I don't know if you answered this today or
    7 not. The way you set these up, there is still a
    8 question remaining, which is, for example, the last
    9 example, Scenario 3, Example 2; it is not clear how
    10 that 80 percent is divided between B, C, and D. Is
    11 that something you are presuming the Board will
    12 further articulate in its decision?
    13 MR. GARY KING: On a case-by-case decision, yes.
    14 That would be something that the Board would have to
    15 make a decision on as to how that 80 percent would be
    16 allocated.
    17 BOARD MEMBER McFAWN: You wouldn't turn it back to
    18 them and say you have an 80 percent share, and now you
    19 have to allocate among yourselves, right?
    20 MR. GARY KING: No, I wouldn't, no.
    21 BOARD MEMBER HENNESSEY: In making that decision
    22 the Board is to consider the factors in 741.215 and
    23 any other relevant factors?
    24 MR. GARY KING: Yes, that's correct.
    25 HEARING OFFICER ERVIN: All right. I think we are
    141
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 now on Question 21.
    2 MS. ROSEN: With respect to Section 741.210(d)(3),
    3 does the Agency intend that any party unable to
    4 demonstrate its proportionate share should be required
    5 to assume any orphan shares, even if such party has
    6 made a good faith effort to produce all available
    7 information?
    8 MR. GARY KING: Actually, I think I answered that
    9 one already before we went around on the scenarios.
    10 But as we have defined orphan share, and I think Board
    11 Member Hennessey made the point that we don't -- we
    12 are not quite clear how orphan share is being defined.
    13 As we have been defining orphan share, no, another
    14 party would not be required to assume that orphan
    15 share.
    16 MR. RIESER: You are using the term -- but if the
    17 question was are you required to assume any
    18 unallocated share, even if such person had made a good
    19 faith effort to produce all available information,
    20 what would your answer be?
    21 MR. GARY KING: The issue of whether it is an
    22 unallocated share, that is going to be an issue for
    23 the Board, in its discretion, relative to the facts of
    24 the case.
    25 MR. RIESER: But doesn't that regulation, the
    142
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 proposed regulation, require the Board to assign those
    2 unallocated shares to any party who can't demonstrate
    3 what its share is?
    4 MR. GARY KING: No, it does not.
    5 MR. RIESER: And that's based upon the statement
    6 that it may be liable for all unapportioned costs or
    7 response actions?
    8 MR. GARY KING: Correct.
    9 MR. RIESER: What are the factors that the Board
    10 is to use to decide whether they may or may not be
    11 liable?
    12 MR. GARY KING: Well, again, you used liable
    13 there, and --
    14 MR. RIESER: I am sorry. That may --
    15 MR. GARY KING: Be allocated?
    16 MR. RIESER: Well, you used may be liable for all
    17 unapportioned costs, so I am --
    18 MR. GARY KING: Okay. You are using --
    19 MR. RIESER: I am tracking the language that you
    20 proposed.
    21 MR. GARY KING: Well, I think we were -- well, we
    22 were talking about that earlier. Board Member
    23 Hennessey was pointing out some of those factors. I
    24 mean, if you look at -- we have listed a series of
    25 allocation factors to be included for consideration
    143
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 under A. And then under B it talks about, you know,
    2 the Board is not required to determine precisely all
    3 relevant factors. I mean, there could be various
    4 relevant factors as to that.
    5 MR. RIESER: Isn't that CERCLA because you are
    6 talking about a party that cannot demonstrate any of
    7 that information that goes to any of those factors?
    8 MR. GARY KING: Well, now, remember, you are
    9 talking about a person who has been determined to be
    10 liable for purposes of 210(d), you know. So to the
    11 extent that there is a difficulty of proof, it has
    12 already been shown that they are a person who is
    13 liable under the criteria of 210(d). And so now if
    14 there is a failure on the part of the evidence where
    15 does that responsibility run to.
    16 MR. RIESER: That can be a generator that
    17 generated a hazardous substance that has been
    18 discovered to be released at the site, but they don't
    19 know how much they sent and how much anybody else
    20 sent?
    21 MR. GARY KING: You mean -- I am not sure. And
    22 what? I mean --
    23 MR. RIESER: And that could be a person who --
    24 what does that person do? That person has no
    25 information with respect to any of the other factors.
    144
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 All they know is they generated something that was at
    2 that site. They don't know how much they sent. They
    3 don't how much anybody else sent.
    4 MR. SHERRILL: I can give a couple -- you know,
    5 regarding this lack of information, just to kind of
    6 give some anecdotal information, it is not uncommon
    7 that we will investigate a site where a PRP that
    8 manufactures and then a by-product, a waste product
    9 will be at a site that we 4(q). So, in other words,
    10 that is the material in question and they happen to be
    11 located right next door to that site.
    12 And then there may be another party, let's say
    13 outside the state, that was a generator for this site
    14 in question, too. And the evidence would appear to be
    15 that the out-of-state waste generator contributed very
    16 little to the site, because of the transportation
    17 costs. But the site next door contributed quite a bit
    18 of material to the site. We may not know exactly how
    19 much the generator next door did, contributed, but it
    20 was evidence from the review of the site history. But
    21 due to transportation costs the next door generator
    22 was the main contributor to that site.
    23 And so each little site kind of rests on its --
    24 there is various little facts that go with each site
    25 that add to the evidence of -- when we review these
    145
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 sites.
    2 MR. RIESER: But if that out-of-state generator
    3 has no documentation anymore about what the
    4 transportation costs were at the time and they can't
    5 demonstrate -- they didn't send very much, but they
    6 can't demonstrate how much they sent, and they don't
    7 know who else demonstrated that same by-product. Are
    8 they responsible for all unallocated shares based upon
    9 that lack of demonstration?
    10 MR. GARY KING: I thought we kind of answered
    11 that. I mean, that is an issue -- under (d)(3) it is
    12 an issue for the Board to decide. I mean --
    13 MR. RIESER: But what if there is no information
    14 to support any of the factors?
    15 MR. GARY KING: I mean, I guess I am trying to
    16 figure out -- you keep asking the same question and we
    17 keep giving the same answer. I mean, it is a party
    18 that has been determined to be liable. Now they don't
    19 have any evidence as to what they did beyond that they
    20 have been proven to be liable. So they come in saying
    21 I don't know nothing except it has been proven that I
    22 am liable. So I don't know how I am supposed to prove
    23 what my allocated share is.
    24 MR. RIESER: Under your proposal, that person is
    25 jointly and severally liable for the entire costs, all
    146
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 unallocated costs at that site?
    2 MR. GARY KING: Well, you can say that, but that
    3 is not true. That is not correct at all. I think
    4 that's a gross misstatement of what we said. That is
    5 what compelled us to do these scenarios to begin with
    6 because you were grossly misstating what our proposal
    7 was.
    8 MR. RIESER: But isn't that exactly -- well, how
    9 would the Board make the decision that it does not
    10 make -- it does not have those costs?
    11 MR. GARY KING: I just -- I can't -- it is very
    12 difficult for me to come to grips with a hypothetical
    13 that is based on there being no information. It is --
    14 I don't know what I am being asked to respond to.
    15 HEARING OFFICER ERVIN: Why don't we -- think
    16 about that and maybe have a response maybe for the
    17 next hearing.
    18 In the meantime, let's take a ten minute break and
    19 we will reconvene at 3:20.
    20 (Whereupon a short recess was taken.)
    21 HEARING OFFICER ERVIN: All right. Back on the
    22 record, please.
    23 I think we are now on question number 22. Mr.
    24 Rieser?
    25 MR. RIESER: On page 24 of Gary King's testimony,
    147
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 why is it a reasonable assumption that an allocated
    2 share belongs to a party which is unable to prove its
    3 share of the harm at a site?
    4 MR. GARY KING: The comment referenced to is part
    5 of a larger sentence which begins with the phrase, if
    6 a demonstrably liable party is unable to prove its
    7 share of the harm. And the key there is that you have
    8 got a demonstrated liable party in terms of
    9 741.210(b). If that liable party does not have some
    10 allocation, then the liable party escapes payment for
    11 any allocation which just does not seem to be the
    12 appropriate result if the person is liable to escape
    13 payment for any of the damages.
    14 MR. RIESER: Didn't you say earlier that there
    15 could be liable parties for whom an allocation is
    16 zero, because they are not responsible for any of the
    17 causing of any of the costs at a site?
    18 MR. GARY KING: Right. But that would be -- that
    19 would be a situation where they are able to prove a
    20 share of the harm which in that case was zero, in the
    21 hypothetical that we discussed.
    22 MR. RIESER: Or they were able to show -- maybe
    23 not prove its share, but show that what they sent to
    24 the site was not what caused the costs to be
    25 incurred?
    148
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. GARY KING: Well, I would say that is proving
    2 its share of the harm, which it is proving that it
    3 didn't have any share to the harm.
    4 HEARING OFFICER ERVIN: Do you have a follow-up
    5 question, Mr. Rieser?
    6 MR. RIESER: What do you envision is the situation
    7 where you have a liable party who does not -- who
    8 can't prove its share?
    9 MR. GARY KING: Is there more to that?
    10 MR. RIESER: No, that is it.
    11 MR. GARY KING: Well, it depends on what the
    12 evidence is in a proceeding.
    13 MR. RIESER: What did you have in mind when you
    14 wrote that?
    15 MR. GARY KING: What we had in mind was that the
    16 Board would have discretionary authority to make this
    17 determination based on what the evidence said.
    18 MR. RIESER: So the Board would decide a share
    19 based on the evidence before it, correct?
    20 MR. GARY KING: Right.
    21 MR. RIESER: Okay. So why do you need to say what
    22 is said in (d)(3) that all of an unallocated share
    23 goes to someone who can't prove their share?
    24 MR. GARY KING: Well, are you suggesting a
    25 revision of that language?
    149
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: I am not -- well, yes, we have
    2 suggested deleting it at numerous times. If what you
    3 are really saying is that the Board makes a decision
    4 based on the evidence before it, why is it necessary
    5 to affirmatively state that the unallocated share goes
    6 to somebody who can't prove their share, or may go to
    7 someone who can't prove their share?
    8 MR. GARY KING: Again, we have to follow through
    9 in looking at (d)(2) and (d)(3). I mean, (d)(2) talks
    10 about the burden of the respondent to prove by a
    11 preponderance of the evidence. And then (3) is really
    12 focusing on what is the situation, what happens when
    13 the evidence just isn't very clear, and what is the
    14 Board to do at that point and who bears the burden of
    15 those informational deficiencies.
    16 MR. RIESER: Is it your testimony that if there
    17 are informational deficiencies that the Board doesn't
    18 make an allocation, it just assigns whatever share is
    19 left to whoever can't produce evidence?
    20 MR. GARY KING: No. As you perhaps can tell, I am
    21 getting a little bit confused by the questions,
    22 because they seem to be kind of going over the same
    23 ground that we have talked about before. What I would
    24 like to do is defer the response on this question
    25 until the next hearing.
    150
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: That's fine.
    2 MS. ROSEN: Could we skip down to 25?
    3 HEARING OFFICER ERVIN: Yes.
    4 MS. ROSEN: Thank you. Question 25, explain the
    5 Agency's conclusions that unallocated shares must be
    6 paid by the public, on page 11 of the Statement of
    7 Reasons.
    8 MR. GARY KING: What we were talking about in that
    9 context was unallocated. And, again, I apologize. We
    10 are using the terms unallocated and orphan, and we
    11 have kind of mixed those. And it is something we are
    12 committed to clarify.
    13 But when we used that phrase in the Statement of
    14 Reasons we did so in the sense that if there is a
    15 remediation to go forward and you have got a share,
    16 whether you call it an orphan or an unallocated share,
    17 and somebody is not going to -- somebody is not going
    18 to be paying for that, then the State's -- by public
    19 we mean the State's public resources will be used to
    20 complete the cleanup activity.
    21 MS. ROSEN: Would the -- the public resources
    22 would be used, but there wouldn't be -- are you saying
    23 that there is some sort of legal obligation on the
    24 part of the State to fund that portion?
    25 MR. GARY KING: No, we are not saying there is a
    151
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 legal obligation.
    2 MS. ROSEN: Okay. So a developer or someone else
    3 who had interest in the property could agree to fund
    4 it, and it is not automatic that the State would have
    5 is to expend those monies?
    6 MR. GARY KING: That's correct.
    7 MS. ROSEN: Okay. Question 26, the pre-filed
    8 testimony of Sidney Marder, Executive Director of the
    9 Illinois Environmental Regulatory Group, sets forth
    10 the procedural history of the enactment of Section
    11 58.9, and specifically describes the agreed-to funding
    12 package which established new funding for the
    13 Hazardous Waste Fund to be used by the Agency to
    14 address orphan shares. The pre-filed testimony of
    15 Sidney M. Marder, pages 7 through 10.
    16 Explain where the Agency intends to allocate this
    17 extra funding, and what portion of the funding will be
    18 applied to orphan shares.
    19 MR. GARY KING: What we do with the funding that
    20 goes into the Hazardous Waste Fund is it is not kept
    21 in a segregated account. It is kept in the entire
    22 fund. And what we do is make an evaluation on a
    23 site-by-site basis using the type of analysis that
    24 John Sherrill talked about this morning. And, again,
    25 focusing -- our primary focus being on sites that
    152
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 showed the most -- the greatest threat to public
    2 health and the environment.
    3 So we use those funds then to proceed to do
    4 cleanup activities, and we can do mixed funding in
    5 different sorts of ways. We have always done --
    6 provided for doing mixed funding where we will fund
    7 part of a project and a PRP will fund another part of
    8 the project. And we have a major project that we are
    9 going to be starting -- we are starting on this year
    10 which is a combination of funding from the Agency and
    11 from a non PRP, a local government, that is going to
    12 be providing a substantial amount of money.
    13 So, again, as I was saying, we focus -- it is a
    14 site-by-site evaluation. We focus on the sites that
    15 pose the greatest risk to human health and the public,
    16 and we try to make conclusions based on where can we
    17 extend the dollars the furthest. If you have -- if
    18 you have PRPs or non PRPs that are willing to put
    19 forward money, and the addition of State dollars can
    20 get the project over the hump, in essence, to get it
    21 completed, then that's one the factors that we would
    22 strongly consider as part of doing a project.
    23 MR. RIESER: Just a follow-up a little bit on the
    24 Hazardous Waste Fund. It is accurate, is it not, that
    25 it can be used for things in addition to actual
    153
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 investigation and cleanup activities at hazardous
    2 substance sites?
    3 MR. GARY KING: I am not sure what you are
    4 thinking of there.
    5 MR. RIESER: Well, the statute allows it to be
    6 used for a variety of activities under 22.2.
    7 MR. GARY KING: Well, that's true. Yes, there is
    8 a broad variety of activities.
    9 MR. RIESER: Do you know what -- given that your
    10 1997, which is what you reported on in your testimony,
    11 what percentage of the fund in that year was used for
    12 actual investigation and cleanup activities, and what
    13 percentage was not?
    14 MR. GARY KING: We will get that at the next
    15 hearing. We don't have that right here, but we can
    16 tell you what we spent on projects versus non
    17 projects.
    18 MR. RIESER: Okay. Thanks very much.
    19 MS. ROSEN: Question 27, is Mr. King's statement
    20 that there is a, quote, reasonable presumption,
    21 unquote, that unallocated shares belong to parties
    22 which are unable to -- excuse me. Why don't we just
    23 put this question on hold.
    24 HEARING OFFICER ERVIN: That's fine.
    25 MS. ROSEN: Okay.
    154
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 HEARING OFFICER ERVIN: Before we go on to the
    2 next section, I think Board Member Hennessey had a
    3 question.
    4 BOARD MEMBER HENNESSEY: Yes, I had a question
    5 about the introductory language in 741.210(b) which
    6 reads, quote, to establish liability, the State shall
    7 prove, by a preponderance of the evidence, that the
    8 respondent caused or contributed to the release or
    9 substantial threat of a release in one or more of the
    10 following ways, end quote.
    11 The statute uses the term proximate when it talks
    12 about cause or contribution. Section 58.9(a)(1)
    13 refers to a proximate cause or contribution for a
    14 release. Is there a reason why you did not use the
    15 same language in the introductory language in
    16 741.210(b)?
    17 MR. GARY KING: This is one of the things that
    18 made the statute very difficult to read and try to put
    19 something together because, you are right, in (a)(1)
    20 it says proximately caused. But then you drop down
    21 into (2)(a) and then it says neither caused nor
    22 contributed in any material respect. It doesn't have
    23 the proximate language there. Then if you drop down
    24 into -- that was in (2)(a) of 58.9. When you drop
    25 down into 58.9(d) now the phrase is directly caused or
    155
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 contributed.
    2 So there is -- we kind of struggled with how to do
    3 that. So what we were trying to state here is here
    4 are the five ways that we see that a person is causing
    5 or contributing to a release such that they should be
    6 liable for that release given everything that is in
    7 the statute. So, I mean, that's why we chose not to
    8 bring that proximate word through every single
    9 section.
    10 BOARD MEMBER HENNESSEY: Thank you.
    11 HEARING OFFICER ERVIN: All right. Moving on,
    12 then, to Section 741.215, allocation factors.
    13 Ms. Rosen, you have a question?
    14 MS. ROSEN: Yes. Just a second, please.
    15 HEARING OFFICER ERVIN: Actually, I think you may
    16 have already covered most of this.
    17 MS. ROSEN: Yes.
    18 HEARING OFFICER ERVIN: Mr. Rieser, then you have
    19 several questions regarding 4(q) notice questions and
    20 Mr. Sherrill's testimony.
    21 MR. RIESER: Okay. Question 29, from 1991 to the
    22 present, how many sites per year have been referred to
    23 the U.S. EPA?
    24 MR. SHERRILL: This was covered in my testimony,
    25 and typically approximately 15 to 20 sites per year
    156
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 are referred to the U.S. EPA Emergency Response
    2 Branch. As a point of information, we are usually in
    3 touch with the U.S. EPA, and as I -- on page five,
    4 footnote five, they are dealing with or they have been
    5 dealing with, the U.S. EPA, this methyl parathion
    6 release. And we have known that we really couldn't
    7 refer many sites up during this time period.
    8 The exact numbers, if you -- so there is different
    9 factors that are considered when we refer a site. If
    10 they tell us over the phone that we are not really --
    11 we don't have the availability to work on sites right
    12 now then we don't refer. And by the context of your
    13 question, when you say "refer," I took it to mean in
    14 the context of my testimony, because there is
    15 referrals that we may do for NPL listing, and I didn't
    16 think you meant that.
    17 MR. RIESER: That is correct. I was hoping,
    18 however, that I could get a quantification on a
    19 year-to-year basis because you use ranges for all of
    20 the years, looking at your exact quantification for
    21 4(q) sites. That obviously changed -- numbers that
    22 were submitted in issue changed over time although you
    23 could say we issued X per year on an average and, in
    24 fact, in some years you didn't do any and some years
    25 you issued a lot. I was hoping we could get an exact
    157
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 count coming forward from 1991.
    2 MR. SHERRILL: I can look into that for next time.
    3 MR. RIESER: Thanks very much.
    4 MR. EASTEP: Can we just clarify? I am not sure
    5 exactly what the purpose is that you are looking for
    6 those. Because some of the sites that we refer up,
    7 that John mentioned, are not necessarily sites that we
    8 would be looking at on the State side anyway. There
    9 are different types of sites.
    10 Some of them are true emergency -- well, I don't
    11 want to say emergencies like train wrecks, but sites
    12 where we discover a warehouse with some drums and it
    13 is right next door to a school, and the EPA has the
    14 ability to move in there literally within days
    15 probably secure the site and start taking action to
    16 remove stuff. That might be a little bit different
    17 than the way we handle it.
    18 So are these the types of things -- the 15 or 20
    19 typically are what we call removal actions. They are
    20 things that the EPA is going to move in fairly
    21 quickly.
    22 MR. RIESER: Okay. Obviously, John Sherrill found
    23 it important to describe a certain number of sites
    24 that -- the IEPA asks the U.S. EPA to handle a certain
    25 number of sites for year for a variety of reasons
    158
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 which he identified. I just want to make sure the
    2 quantification is accurate on those numbers, the
    3 sites, just so the Board knows.
    4 MR. EASTEP: You are principally talking about
    5 removal actions.
    6 MR. RIESER: Talking about removal actions?
    7 MR. EASTEP: Is that correct?
    8 MR. RIESER: If that is what John was talking
    9 about.
    10 MR. SHERRILL: Yes.
    11 MR. EASTEP: All right.
    12 MR. RIESER: Okay. I just want to get that 15 to
    13 20 nailed down.
    14 MR. SHERRILL: The context of these removals is
    15 that the Agency has limited resources to respond to
    16 all remedial actions in Illinois, and occasionally
    17 these -- if we had to respond to every immediate
    18 removal, we probably wouldn't have 4(q)'d anybody
    19 hardly. I mean, we would have 4(q)'d after the fact.
    20 But these immediate removals would just take away more
    21 funds than we currently have available.
    22 MR. EASTEP: I have to follow-up a little bit.
    23 This figure is going to be extremely difficult to come
    24 up with. Because John mentioned something in his
    25 response a few minutes ago that a lot of times we talk
    159
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 to them over the phone. And sometimes they will tell
    2 us we are real busy and we can't do anything for the
    3 next six weeks, or it is the end of the year, and we
    4 have spent all of our money somewhere else, and you
    5 will have to wait until next year, and so --
    6 MR. RIESER: They spent it on caterers.
    7 (Laughter.)
    8 MR. EASTEP: So some of that is literally verbal.
    9 Other things we kind of come upon at the same time,
    10 more or less. Some citizen files a complaint and so
    11 we start talking to them and, well, is that something
    12 that we referred or they discovered it and we are
    13 working with them.
    14 To go back to 1991, I don't think we are going to
    15 find extremely accurate information, because there is
    16 no formal process for all of them to go up there.
    17 MR. RIESER: So what does the 15 to 20 represent?
    18 What does that figure represent, just sort of a gut
    19 feeling?
    20 MR. EASTEP: That represents our best professional
    21 judgment as to what we have been doing for the last
    22 several years.
    23 MR. RIESER: That is consistent with the other
    24 values you have given in terms of how many 4(q) --
    25 MR. EASTEP: No, no. The 4(q) stuff is
    160
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 information that we have that is accurate.
    2 MR. SHERRILL: Yes. The chart that shows the
    3 number of 4(q)s issued per year, we did double-check
    4 that and we believe that is accurate.
    5 MR. RIESER: Whatever you can. If the information
    6 is not there, it is not there. But if there is a way
    7 to put a year-by-year figure on it, that would be
    8 useful for the Board.
    9 MR. SHERRILL: Okay.
    10 MR. RIESER: Let me follow-up with something about
    11 the emergency actions, which is something that came up
    12 in the testimony this morning. You were -- one of you
    13 discussed the -- oh, John Sherrill in his testimony
    14 talked about how this works. In general the Site
    15 Remediation Act, TACO, and the Site Remediation
    16 Program don't apply to emergency actions. Do you
    17 recall that testimony?
    18 MR. SHERRILL: Yes.
    19 MR. RIESER: Okay. It is not your position that
    20 because costs were expended in an emergency action
    21 that Proportionate Share Liability would not apply?
    22 MR. SHERRILL; Correct. The reference that I made
    23 to that was let's say there is a train wreck in Mt.
    24 Vernon and we don't want someone to go to the Board
    25 trying to determine liability before they respond, the
    161
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 on scene response to that train wreck with chemicals
    2 spewing out. We don't want them to sit there and
    3 figure TACO formulas either. We want them to go and
    4 immediately respond to that.
    5 MR. RIESER: So you want -- the train operator is,
    6 obviously, and the person who owned the material that
    7 they are transporting, obviously, have a role. But
    8 let me ask it this way. If the landowner adjacent to
    9 the railroad is subject to this spill that came on to
    10 their property, they had nothing do with it, anything
    11 like that, would the Agency bring an action to get the
    12 landowner to clean up their property, and take the
    13 position that the proportionate share wouldn't apply?
    14 MR. SHERRILL: I will let others speak on that.
    15 But from our -- I will say this part. On most of the
    16 emergencies such as that, as far as the Agency having
    17 to get involved in a post remedial, long-term remedial
    18 effort, in today's environment, the last 10 or 15
    19 years, I mean, I applaud the regulated community.
    20 They go out and respond in a very prompt manner and
    21 address those type of -- in most circumstances address
    22 those type of releases.
    23 Gary, did you want to --
    24 MR. GARY KING: Yes. The only problem that I
    25 think the owner would run into in that situation is if
    162
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 took a stance that he was not going to allow people on
    2 to do the remediation work, in which case we would
    3 have to try to do something legally with regards to
    4 that owner to try to make sure that that remedial work
    5 got done properly.
    6 MR. RIESER: But that owner would still have the
    7 protection of Proportionate Share Liability?
    8 MR. GARY KING: Well, yes. I wouldn't see him
    9 being liable unless somehow -- I don't know -- unless
    10 he got himself into some kind of situation where he
    11 was causing the problem to get worse because of his
    12 failure to allow people to come on and do the
    13 remediation.
    14 MR. RIESER: Okay. Thank you. Question 30, with
    15 respect to footnote 7 of John Sherrill's testimony, is
    16 it accurate to state that the 2 million dollars per
    17 year added to the Hazardous Waste Fund was as a result
    18 of the passage of the House Bill 901 adopting Section
    19 58.9?
    20 MR. SHERRILL: Yes.
    21 MR. RIESER: In his testimony, John Sherrill uses
    22 two landfills as examples of the Section 4(q)
    23 process. Is it accurate to state that the vast
    24 majority of the sites which receive Section 4(q)
    25 notices are not landfills or sites with many
    163
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 generators? Is it accurate that the vast majority of
    2 these sites or -- it should be are industrial or
    3 manufacturing facilities where the PRPs are past and
    4 current owners and operators?
    5 MR. SHERRILL: We kind of discussed this a little
    6 bit earlier. I will bring a chart to kind of explain
    7 which type of sites have gotten 4(q)s and which ones
    8 we believe are multiple PRP scenarios.
    9 MR. RIESER: Thank you. At the Steagall site why
    10 did not the owner and the lessees fund the cost of the
    11 remediation?
    12 MR. SHERRILL: When I read that question I was
    13 thinking why did not the owner, you mean funded at the
    14 time of -- well, let me just back up. I really just
    15 can't speculate as to the motives of the PRPs or the
    16 responsible parties.
    17 MR. RIESER: Why was the Agency or the State not
    18 able to require the owners or the lessees to fund,
    19 completely fund the cleanup of that site based on
    20 principles of joint and several liability?
    21 MR. SHERRILL: I mean, I can describe what
    22 happened at the site.
    23 MR. GARY KING: They fought and they delayed, and
    24 as they fought and delayed the problem got worse and
    25 worse. We considered it to be prudent to protect, you
    164
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 know, people's health to do something about it so that
    2 the contamination situation didn't get worse.
    3 Remember, this is the site where you have a
    4 contaminated creek flowing into a lake where people
    5 are using it for --
    6 MR. SHERRILL: Recreation.
    7 MR. GARY KING: -- recreation and uses, and we
    8 felt the need to move before all the litigation was
    9 resolved itself. Because the litigation still has not
    10 resolved. We are now in 1988 and we still have
    11 litigation.
    12 MR. RIESER: When was the original case filed.
    13 MR. GARY KING: Jim Morgan left. He has been
    14 handling that case for probably a decade now. It has
    15 been a long time. I mean, it was -- the original case
    16 was the mid 1980s, I would say.
    17 MR. RIESER: Question 33, why is there no
    18 expectations of cost recovery at the Logan Landfill?
    19 MR. SHERRILL: At the Logan -- actually, my
    20 testimony stated I anticipate a little cost recovery,
    21 not no cost recovery. And the investigation to date
    22 has uncovered no viable PRPs. The landfill
    23 corporation went bankrupt and the sole landfill
    24 stockholder died penniless in a motel along old Route
    25 66. This is the kind of information you run into when
    165
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 we talk about incomplete information.
    2 Well, there is approximately $100,000.00 left in a
    3 landfill trust account, and that we do plan on
    4 utilizing that money at this site. We still have some
    5 more work to do there, but most of it has been done.
    6 There is some adjacent property that we can sell that
    7 we will recover some of the costs. Transportation and
    8 manifest records were not recovered at this particular
    9 site.
    10 MR. RIESER: Were any generators known at that
    11 site?
    12 MR. SHERRILL: Not that I know of.
    13 MR. RIESER: Regarding the three methods for cost
    14 recovery described by John Sherrill on page 12 of his
    15 testimony, how often has each method been used and how
    16 much has been recovered using each method?
    17 MR. GARY KING: As you recall, when John was
    18 talking about this this morning he really talked about
    19 the fact that they are used in combination more often
    20 than not. It will be extremely difficult to try to
    21 segregate out how often each thing has been used. I
    22 mean, billing, we do billing for different sorts of
    23 sites. We have got cost recovery litigation. Some of
    24 that is pending already. We file liens.
    25 Maybe if you would be a little more specific as to
    166
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 what you are -- what is going to be hard is to connect
    2 up how much has been recovered using each method,
    3 because you can't really segregate -- with some of
    4 these you can't really segregate the method.
    5 MR. RIESER: I was trying to identify or find out
    6 whether cost recovery litigation was the way of
    7 recovering all of the money or whether the invoices
    8 was a way of recovering.
    9 MR. SHERRILL: Just kind of as a rough
    10 professional judgment, the environmental liens which
    11 is where we would tack on a lien to a property, as a
    12 percentage of money we do not recover much money that
    13 way, because most of these -- as I said, there are
    14 very few of these sites that we do initiate these type
    15 of cleanups. I mean, like, this one site was 8.8
    16 million. Well, the property, the whole landfill, is
    17 not worth 8.8 million dollars. So for the
    18 environmental liens we get a very small percentage of
    19 money.
    20 MR. RIESER: By the liens you get a small
    21 percentage, and that means by attaching a lien to the
    22 property and then foreclosing on that lien?
    23 MR. GARY KING: We have never foreclosed on a
    24 property.
    25 MR. RIESER: Okay.
    167
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. GARY KING: The way we have attained money
    2 through the lien mechanism is there has been -- in
    3 some cases there has been a purchaser come along on
    4 that property, the lien has been sitting on it, and so
    5 in order to kind of clear the title on the property
    6 they pay off the lien.
    7 MR. RIESER: Okay. Thank you. Please proceed.
    8 MR. SHERRILL: Then the other method, billing, to
    9 me, or invoicing seems to be more of a recent
    10 phenomenon because PRPs do not want to get into
    11 litigation, let's say with the Attorney General, and
    12 occasionally -- I can think of one site we settled
    13 just recently, where we -- the PRPs performed a
    14 cleanup, but they did not want to investigate the
    15 groundwater. We investigated the groundwater and we
    16 sustained about an $80,000.00 or $90,000.00 Agency
    17 expenses.
    18 Then the PRP said, well, if that's all you spent
    19 we will just cut a check for you and, they sent it to
    20 us in the mail. So that settled that particular
    21 matter. And then I would say that the bulk of the
    22 money, which I guess we are going to follow-up on, is
    23 through cost recovery through the Attorney General's
    24 office.
    25 MR. GARY KING: I will just add to that that
    168
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 historically by far the predominant source for us to
    2 recover costs we have expended is for us to refer cost
    3 recovery actions to the Attorney General's office and
    4 then they proceed with litigation relative to those
    5 cases.
    6 MR. RIESER: Thank you. Then question 35,
    7 Attachment 1 appears to reflect 80 sites rather than
    8 85 sites. I was just looking at that, looking at the
    9 numbers that appear to be reflected on the graph.
    10 MR. SHERRILL: I recounted and I counted 85. It
    11 could be the interpolation on the particular graph
    12 just interpolating in between two numbers. And just
    13 to follow-up, that is sites through -- through 1997,
    14 so we are not including 1998.
    15 MR. RIESER: Are there 4(q)s the Agency has issued
    16 at the request of the owner?
    17 MR. SHERRILL: I know there has been a couple of
    18 them. Their reasons were apparently for -- I mean,
    19 for insurance cost recovery. But I would say I would
    20 know of only, I think, maybe two of them. I don't
    21 know if Gary --
    22 MR. GARY KING: Yes, it is usually not a very good
    23 practice for people to ask for those things, because
    24 you end up -- from their perspective they end up with
    25 something that is not under their control any
    169
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 further. And I don't usually advise people to ask for
    2 those things, because they might get what they ask
    3 for.
    4 MR. RIESER: Would you agree with John Sherrill's
    5 number, though?
    6 MR. GARY KING: A couple? Yes. Maybe a couple.
    7 We have gotten a request recently.
    8 MR. RIESER: When did the Build Illinois, Clean
    9 Illinois funds stop?
    10 MR. GARY KING: They stopped in June of 1991.
    11 MR. RIESER: Is there federal money available for
    12 funding site remediations in Illinois?
    13 MR. GARY KING: Well, I mean, we talked about
    14 these sites that we refer to the federal government.
    15 There are those. Is that what you mean, those sites?
    16 Or stuff that we administered otherwise?
    17 MR. RIESER: Yes.
    18 MR. GARY KING: Well, sort of there is. I mean,
    19 the relationship between the State and the federal
    20 government is extremely complicated as to these kinds
    21 of funding issues and the whole concept of scoring
    22 sites, and then once they are proposed for NPL -- you
    23 know, if they are proposed for NPL then we can get
    24 some money.
    25 Then if it qualifies as a Superfund Accelerated
    170
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Cleanup Model Site, then there is another process for
    2 money to be made available to the State so that we can
    3 kind of direct things along. It is a very complex
    4 thing.
    5 MR. SHERRILL: And kind of to follow-up on that,
    6 too, I know of at least, I believe, two 4(q)s that the
    7 sites eventually went NPL. So, I mean, to
    8 reemphasize, these are some of are worse sites or we
    9 wouldn't be issuing a 4(q) notice.
    10 MR. RIESER: If I may, I just have a couple more
    11 questions.
    12 HEARING OFFICER ERVIN: Sure.
    13 MR. RIESER: With respect to 741.120, which
    14 describes the 58.9(b) notice, would the Agency
    15 consider including a statement with respect to how
    16 liability is based -- liability allocation is based on
    17 Proportionate Share Liability that would be similar to
    18 the appeal language that you see in your denial
    19 letters under 740 or 732, sort of an informational
    20 statement?
    21 MR. GARY KING: I guess I am not sure what you are
    22 referring to.
    23 MR. RIESER: Well --
    24 MR. GARY KING: You are talking about some blanket
    25 language that we have in our NFR letters?
    171
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. RIESER: Well, I am saying it would be an
    2 informational statement with respect to how liability
    3 is allocated under Section 741, so that people getting
    4 these notices understand the Proportionate Share
    5 Liability. You don't have language like that
    6 currently, but I am just saying in terms of there
    7 being an informational letter language in that notice
    8 that that be included.
    9 MR. GARY KING: You know, I hesitate to say that
    10 we would do that, but I think if we -- you know, if
    11 there was perhaps a more formal kind of way it would
    12 give us a chance to respond to it more directly but,
    13 you know, we are not adverse to providing more
    14 information in these 58.9(b) notices.
    15 MR. RIESER: With respect to 741.220(a), you have
    16 a specific limitation on -- the last sentence of (a)
    17 says to the extent the underlying complaint was for
    18 cost recovery the adjustment procedure is not
    19 applicable. And the question is why not.
    20 MR. GARY KING: The adjustment provision was
    21 really -- we thought it was important where you had a
    22 case, for instance, where we were seeking for PRPs to
    23 perform a cleanup and during the course of that case
    24 there would be an allocation assigned. Well, by the
    25 time you got through with the case you might find out
    172
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 that you had more information come in, and you could
    2 conclude at that point that maybe the allocation that
    3 was initially arrived at was not the -- as fair as it
    4 should be so, therefore, you should readjust that.
    5 Well, with the cost recovery case the money has
    6 already been spent before the litigation is started as
    7 to -- certainly, as to that phase, so there is no
    8 point in adjusting the cost recovery as to that
    9 because you already know what has been spent and what
    10 the allocation should be at the time the case is
    11 decided.
    12 MR. RIESER: So when you use cost recovery in this
    13 context what you are talking about is sites where the
    14 removal action or the remediation for which these
    15 monies had been spent has already occurred?
    16 MR. GARY KING: Yes, that's correct.
    17 MR. RIESER: So you have your model and site
    18 conditions, for example?
    19 MR. GARY KING: Right, that's correct. The key
    20 factor there -- I think one of the real key factors is
    21 what type of remediation needs to occur at the site,
    22 and with some of these you may not know what the final
    23 remediation -- the remedial action is at very early in
    24 the process, at the removal stage.
    25 MR. RIESER: Okay. Thank you.
    173
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 HEARING OFFICER ERVIN: Do you have anything
    2 additional?
    3 MR. RIESER: I have no further questions at this
    4 time. Obviously, we reserve the right to follow-up on
    5 the various questions that the Agency is going to
    6 follow-up on.
    7 HEARING OFFICER ERVIN: Okay. Thank you.
    8 Is there anyone in the audience that has any
    9 questions for the Agency?
    10 MR. ROSEMARIN: Yes.
    11 HEARING OFFICER ERVIN: Could you please stand up
    12 and identify yourself for the court reporter?
    13 MR. ROSEMARIN: Yes. My name is Carey S.
    14 Rosemarin. I am an attorney with Jenner & Block. I
    15 represent Commonwealth Edison.
    16 I have a question for the Agency on something that
    17 I believe that we can all agree on, based on the
    18 testimony. I would like to know whether the Agency
    19 agrees, just conceptually, given all the back and
    20 forth we have heard concerning the language of 58.9,
    21 just conceptually, focusing on the concept of
    22 Proportionate Share Liability, I would like to know
    23 whether the Agency agrees that Proportionate Share
    24 Liability requires that a party pay no more than the
    25 cleanup costs attributable to that party's wastes?
    174
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. GARY KING: There is certainly a number of
    2 issues hidden within kind of the foundations of that
    3 question, but really it seems to me as to what you are
    4 referring to is Scenario 1, Example 1 and, you know,
    5 in that context your statement is correct.
    6 MR. ROSEMARIN: I have a follow-up, please. I am
    7 not referring to any particular example. Again, I
    8 emphasized that my question goes to generic, and
    9 whatever 58.9 says, and we can debate that, I think we
    10 are all in agreement that it requires Proportionate
    11 Share Liability.
    12 And I am really asking the question generically
    13 whether, and I believe that the Agency would have to
    14 agree with this, that Proportionate Share Liability
    15 requires, by definition, that a party pay no more than
    16 the cleanup costs attributable to that party's waste?
    17 MR. GARY KING: Well, you are just -- you are
    18 assuming certain things with that. You are assuming
    19 certain elements of proof, and we are -- that's why I
    20 referred to Scenario 1, Example 1. If you are
    21 assuming that he has proved, you know, that that is
    22 what his waste was and that is what his share of
    23 things is, I would agree with it.
    24 But, again, if he has not proven what his share
    25 is, then it becomes an issue, under the way we
    175
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 structured it, for the Board to make a determination
    2 relative to all evidentiary factors.
    3 MR. SHERRILL: One other thing, too, to touch on
    4 what Gary is saying, I don't want to get bogged down
    5 on -- the term waste has a legal definition to us, and
    6 we have used it -- I used it in my testimony kind of
    7 generically because, I mean, PRPs will contend it was
    8 not a waste when I last had it. Then I gave it to
    9 party B and party B did something to it and now it is
    10 a waste. So we are kind of meaning that generic term
    11 that something -- that some hazardous substance or
    12 pesticide has caused some kind of threat to human
    13 health and the environment.
    14 HEARING OFFICER ERVIN: Do have you a follow-up
    15 question?
    16 MR. ROSEMARIN: No, I don't. Thank you.
    17 HEARING OFFICER ERVIN: Are there any additional
    18 questions for the Agency?
    19 Seeing none, the Board has several questions, but
    20 given the lateness of the day, we are not going to get
    21 into a lot of them. A lot of them have already been
    22 asked, and you are bringing some additional
    23 information on those.
    24 There are a couple of questions, though, that we
    25 haven't addressed that I would like to ask. I promise
    176
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 I will get you out of here by 4:30 if you bear with
    2 me.
    3 The first one is regarding Section 741.105. It
    4 says that Subpart C is only applicable when no
    5 complaint has been filed by the State. Does that
    6 preclude the State from filing an action under Subpart
    7 B?
    8 MR. GARY KING: No.
    9 HEARING OFFICER ERVIN: So that the State could
    10 then file -- while the Subpart C action is pending,
    11 the State could come in and file a Subpart B action?
    12 MR. GARY KING: Right. That's correct. The way
    13 we have it structured is that a Subpart C proceeding
    14 could begin before a Subpart B proceeding is
    15 initiated. But that wouldn't mean that you could not
    16 initiate a Subpart B proceeding.
    17 MR. RIESER: Excuse me. If I may, if that State
    18 action was filed that would mean that the Subpart C
    19 proceeding would stop or disappear or what would
    20 happen to it?
    21 MR. GARY KING: I don't know that we have answered
    22 that question in the context of the rule.
    23 HEARING OFFICER ERVIN: Is it something you can
    24 think about and get back to us?
    25 MR. GARY KING: Yes.
    177
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 HEARING OFFICER ERVIN: Okay. Thank you. Section
    2 741.115, information orders. The way I read this is
    3 that this is only a tool for the Agency. Wouldn't
    4 such information orders be a useful tool for the PRPs
    5 to use as well to discover other PRPs prior to a
    6 Subpart C proceeding?
    7 Would you like to get back to us?
    8 MR. GARY KING: That's a good question. It is one
    9 of those questions that we never contemplated in terms
    10 of the proposal. We will have to get back to you.
    11 HEARING OFFICER ERVIN: Sure. Section 741.120,
    12 resolution of issues, Section 58.9(b) notice. Section
    13 741.120(c) indicates that the Agency may offer the
    14 person whom a Section 58.9(b) notice has been sent the
    15 opportunity to meet with the Agency. Is this meeting
    16 discretionary or is it mandatory?
    17 MR. GARY KING: We considered that not to be
    18 mandatory, and we were really using as our reference
    19 for that Section 58.9(c).
    20 HEARING OFFICER ERVIN: If it is discretionary,
    21 what factors will the Agency take into consideration
    22 in deciding whether to give an opportunity for a
    23 meeting?
    24 MR. GARY KING: Well, what we normally do with
    25 these notices is we put a time frame in for somebody
    178
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 to request to meet with us, and if they timely respond
    2 and are willing to meet in a timely fashion, you know,
    3 we would, 99 times out of 100, meet with them. I
    4 don't know why we wouldn't meet with them if they were
    5 proceeding in a timely way.
    6 The issue would become one of where somebody is
    7 asking the -- for a meeting, you know, way down the
    8 road for something that happened many months or years
    9 earlier, and now they are claiming a right to do
    10 that. We might reject it at that point.
    11 MR. SHERRILL: We totally -- I mean, I stated this
    12 more than once in my testimony. We prefer the PRPs
    13 initiate the remedial action and perform the cleanup.
    14 I mean, it is less that we would have to do, and we
    15 can get on to other sites.
    16 HEARING OFFICER ERVIN: Thank you. I have a
    17 question on Section 741.315, and to some extent it
    18 carries over to some of the other sections.
    19 If you have four PRPs that file a petition under
    20 Subpart C and after discovery the parties submit a
    21 joint proposal under Section 741.315 seeking to
    22 dismiss one PRP where everybody has agreed them liable
    23 for ten percent of the costs, under Section
    24 741.320(b)(3) allows for those three other parties to
    25 reach an agreement as long as the agreement results in
    179
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 100 percent allocation of a response cost.
    2 Is that really 100 percent of the response cost or
    3 100 percent of the response cost minus the agreed
    4 percentage for the dismissed party?
    5 MR. GARY KING: Well, it would be the 100 percent
    6 of the 90 percent is what we were looking at.
    7 HEARING OFFICER ERVIN: I am not sure that that is
    8 actually how this reads.
    9 MR. GARY KING: Okay.
    10 MR. WIGHT: What section is that again?
    11 HEARING OFFICER ERVIN: It is 741.320(b)(3), 100
    12 percent allocation of costs.
    13 MR. WIGHT: Okay. Thank you.
    14 HEARING OFFICER ERVIN: Another scenario I have a
    15 question on is if you do have an agreed allocation and
    16 a motion to dismiss one of the parties, does that
    17 agreed allocation go immediately to the Board for the
    18 Board to review?
    19 MR. GARY KING: Yes, that was our contemplation,
    20 because one of the issues with this type of hearing
    21 would be to make sure that those -- that that type of
    22 person was allowed out of process as early as possible
    23 to reduce their transactional costs.
    24 HEARING OFFICER ERVIN: Okay. If it turns out to
    25 be a bifurcated proceeding where we have the one and
    180
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 there has been an agreed allocation, that agreement
    2 goes directly to the Board for approval and the other
    3 three PRPs go to hearing?
    4 MR. GARY KING: Right. That is the way we were
    5 envisioning it, yes.
    6 HEARING OFFICER ERVIN: Can the hearing occur
    7 before we have proof that that allocation for that one
    8 PRP is going to be dismissed?
    9 MR. GARY KING: I am trying to think of a
    10 circumstance where there wouldn't be the case. I
    11 would think that would make sense to do that. I mean,
    12 because it is an agreed allocation. So I don't know
    13 why the Board would reject it.
    14 HEARING OFFICER ERVIN: Can the Board reject it?
    15 MR. GARY KING: Yes, I suppose -- it would
    16 certainly be within the Board's authority to do so.
    17 HEARING OFFICER ERVIN: If it is rejected would we
    18 have to wait to have the hearing on the other three
    19 until we approve the agreed allocation?
    20 MR. GARY KING: I think those are very good
    21 questions that I don't have a very good answer for. I
    22 wonder if we could just --
    23 HEARING OFFICER ERVIN: Sure. The next hearing. I
    24 also have a question along the lines under Section
    25 741.325(b). You talk about allocating 100 percent,
    181
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 the Board has to allocate 100 percent. Again, is it
    2 100 percent of what is left to be allocated if you
    3 have a dismissed party, or do you -- or are you
    4 contemplating one Board order where we allocate all
    5 100 percent of the response costs?
    6 MR. GARY KING: We were envisioning 100 percent of
    7 the example you gave of the 90 percent of what was
    8 left. But I can see it is the same issue here on
    9 whether that is clear.
    10 HEARING OFFICER ERVIN: Thank you. Under Section
    11 741.325, if someone defaults on a payment or
    12 performance, Section 741.324 provides the remaining
    13 parties to allocation proceedings shall be responsible
    14 for the amount in the default. How is this any
    15 different than joint and several liability when you
    16 are still being held responsible for more than your
    17 apportioned share?
    18 BOARD MEMBER HENNESSEY: I think you said 324. I
    19 think you meant 325.
    20 HEARING OFFICER ERVIN: Oh, I am sorry. It is
    21 325.
    22 MR. GARY KING: Well, the context we have here is
    23 it -- it does have some kinship to a joint and several
    24 concept, the way that a voluntary cleanup does for a
    25 project that comes into the Site Remediation Program.
    182
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 If a project comes into the Site Remediation Program,
    2 and there is -- you know, there is three parties to do
    3 the -- that are agreeing to do the cleanup, if one of
    4 them drops out, well, the other two have to pick up
    5 that remaining portion for that cleanup to proceed all
    6 the way through.
    7 It is a similar sort of context here where you
    8 have a group of PRPs who want an allocation so that
    9 they can perform a remediation, but then one of them
    10 drops out. Well, unless the other parties pick up the
    11 default amounts, then the cleanup will not proceed,
    12 you know. And then what does that mean vis-a-vis the
    13 Agency, you know.
    14 Do we now have a situation where you have three
    15 parties and two of them -- I am not saying this would
    16 happen, but it could happen -- that you could have two
    17 of the parties bring in somebody who is a bankrupt
    18 party and, you know, give him the lion's share of
    19 responsibility and then allow him to default on it,
    20 and now the other two parties have a Board order that
    21 shows that they have a much lower share of
    22 responsibility.
    23 So we were trying to avoid a straw man situation
    24 where we would not be involved in the case. We don't
    25 want to be involved in the cases but by the same
    183
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 token we don't want to end up with a Board order that
    2 puts us in a poor position relative to trying to get a
    3 site cleaned up.
    4 HEARING OFFICER ERVIN: Is this consistent with
    5 58.9, though, where you say you can only be held for
    6 your apportionment share?
    7 MR. GARY KING: We would do this type of
    8 proceeding different because, again, it is a voluntary
    9 type of proceeding where the parties are agreeing up
    10 front that they are going to allocate all of the costs
    11 amongst themselves. You could have -- you could have
    12 three parties coming in and agreeing to allocate all
    13 of the costs amongst themselves, when there might be,
    14 you know, 20 possible responsible parties.
    15 And for them to pick up those shares, well, they
    16 are picking up other people's shares, but they
    17 voluntarily have chosen to initiate this proceeding.
    18 So it is not the same context as 58 -- as far as the
    19 Subpart B of 741. It is just a different context, the
    20 way we see it.
    21 HEARING OFFICER ERVIN: Thank you. Are there any
    22 other questions for the Agency?
    23 Okay. Seeing that there are no further questions,
    24 then I would -- oh, I am sorry. Mr. King?
    25 MR. CHARLES KING: Under 741.315 -- well, under
    184
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Subpart C, generally, do we want to let agreed people
    2 out of the proceeding? Will that affect whether they
    3 are going to be bound by an order that comes out of
    4 it?
    5 It looks like it comprehends that where someone
    6 has agreed and everyone agrees that this party is
    7 responsible for, say, ten percent but then they get
    8 let out of the proceeding, but if you do that are they
    9 still going to be bound by whatever order gets entered
    10 then?
    11 MR. GARY KING: As we were seeing this, and maybe
    12 this is an issue that needs to be clarified into the
    13 rule itself, but we were seeing that there would still
    14 be a Board order at some point. That they would not
    15 just be dismissed out without some kind of Board order
    16 that would set up the allocation.
    17 MR. CHARLES KING: Okay.
    18 MR. GARY KING: We were thinking that 325(a) would
    19 govern that.
    20 MR. CHARLES KING: Okay. I guess I was kind of
    21 thrown by the word "dismissal" in there then. Maybe
    22 you want to use a different word for that, because I
    23 don't think that you are actually going to dismiss
    24 those parties out then. It would be more in the
    25 nature of a summary judgment for them at the outset or
    185
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 an agreed order that would take care of their
    2 liability. But I don't think that is a dismissal.
    3 They are not being dismissed as parties if you are
    4 still going to include them in final allocation of
    5 everything.
    6 MR. WIGHT: That's 315(a)(2)?
    7 MR. CHARLES KING: Yes.
    8 HEARING OFFICER ERVIN: Yes, Mr. Rieser?
    9 MR. RIESER: Mr. King, in situations like this
    10 might the parties come to some financial undertaking
    11 where the party that is being let go puts money up
    12 before that happens or some other means of financial
    13 assurance so that the other parties know the money is
    14 there to do whatever they are going to do?
    15 MR. GARY KING: Yes, there is all sorts of
    16 arrangements that could be made in that context.
    17 HEARING OFFICER ERVIN: All right. Are there any
    18 other questions?
    19 CHAIRMAN MANNING: No, I don't have anymore
    20 questions. I just wanted to indicate that the Board
    21 will have more questions. I think the Hearing Officer
    22 said that. We just don't want to ask them yet today.
    23 HEARING OFFICER ERVIN: Your panel will be
    24 available for questions in the next two dates won't
    25 they, Mr. Wight?
    186
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 MR. WIGHT: Yes.
    2 HEARING OFFICER ERVIN: Seeing that there are no
    3 further questions, I would note that the second
    4 hearing in this proceeding has been scheduled for
    5 Tuesday, May 12, in Chicago at 10:00, at the State of
    6 Illinois Building -- not the James R. Thompson
    7 Building -- but the State of Illinois Building, across
    8 the street. It will be in Room C-500, 160 North La
    9 Salle Street. I think the Hearing Officer order
    10 actually set this at South La Salle, but it is on
    11 North La Salle.
    12 I want to remind the Agency that any issues which
    13 the Agency had agreed to address in this hearing shall
    14 be answered in the beginning of the second hearing.
    15 We will then move into the rest of the pre-filed
    16 questions beginning with the -- I am sorry -- the
    17 pre-filed testimony of Matthew Dunn, followed by
    18 Sidney Marder, David Rieser, David Howe and, finally,
    19 Browning Ferris Industries.
    20 The Board has requested an expedited transcript of
    21 this hearing. The transcript should be available in
    22 our Board's Springfield office on Thursday. If anyone
    23 would like to have a copy of the transcript from
    24 today's hearing, please speak to the court reporter
    25 directly.
    187
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 Also, in the past I think some of you have
    2 downloaded our transcripts from the Web. Kevin St.
    3 Angel (spelled phonetically) who did all of our web
    4 posting has left the Board, and we have not found a
    5 replacement. So our web site will not updated with
    6 this transcript.
    7 If you would like a copy, however, you can contact
    8 me or the Board's Chicago office and you can get one
    9 transcript free of charge.
    10 All right. Are there any other matters?
    11 MS. ROSEN: If you could please repeat the room
    12 number again for the hearing.
    13 HEARING OFFICER ERVIN: Yes. It is Room C-500.
    14 MS. ROSEN: Okay. Thank you.
    15 HEARING OFFICER ERVIN: Okay. Are there any other
    16 matters that need to be addressed at this time?
    17 MR. WIGHT: I have a question with regard to the
    18 series of questions that you posed here at the end of
    19 proceeding. Would it be possible to get a copy of
    20 those questions in writing, so that we can make sure
    21 we have those for follow-up?
    22 HEARING OFFICER ERVIN: No problem. I will have
    23 those to you by noon tomorrow.
    24 MR. WIGHT: Okay. Thank you.
    25 HEARING OFFICER ERVIN: Seeing that there are no
    188
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 further matters to be addressed, this matter is
    2 adjourned. I thank you for your participation here
    3 today.
    4 (Hearing Exhibits 1 through 7
    5 retained by Hearing Officer Ervin.)
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    189
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    1 STATE OF ILLINOIS )
    ) SS
    2 COUNTY OF MONTGOMERY)
    3
    4 C E R T I F I C A T E
    5
    6 I, DARLENE M. NIEMEYER, a Notary Public in and for
    7 the County of Montgomery, State of Illinois, DO HEREBY
    8 CERTIFY that the foregoing 189 pages comprise a true,
    9 complete and correct transcript of the proceedings
    10 held on the 4th of May A.D., 1998, at 200 South Ninth
    11 Street, the 2nd Floor, Springfield, Illinois, In the
    12 Matter of: Proportionate Share Liability, in
    13 proceedings held before the Honorable Cynthia Ervin,
    14 Hearing Officer, and recorded in machine shorthand by
    15 me.
    16 IN WITNESS WHEREOF I have hereunto set my hand and
    17 affixed my Notarial Seal this 6th day of May A.D.,
    18 1998.
    19
    20
    Notary Public and
    21 Certified Shorthand Reporter and
    Registered Professional Reporter
    22
    CSR License No. 084-003677
    23 My Commission Expires: 03-02-99
    24
    25
    190
    KEEFE REPORTING COMPANY
    Belleville, Illinois

    Back to top